ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
This document is controlled when viewed on the ISO New England Internet web site. When downloaded and printed, this document becomes UNCONTROLLED, and users should check the Internet web site to ensure that they have the latest version. In addition, a Controlled Copy is available in the Master Control Room procedure binders at the ISO. Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 1 of 10
ISO-NE PUBLIC
Appendix D -
OP-18 Metering And Telemetering Diagrams
Table of Contents
Figure 1 - Telemetry MW/MVAR Polarity ............................................... 2
Terms & Definitions ................................................................................ 3
Figure 2 - Single Generator Asset & Basic Generation Metering Concepts ................................................................................. 4
Figure 3 - Multiple Generator Assets - Dynamic (Ratio) Allocation of shared station service ............................................................ 5
Figure 4 - Multiple Generator Assets - Dynamic (Condition) Fixed (Ratio) Allocation of shared station service ......................... 6
Figure 5 - Multiple Generator Assets - Static (Ratio) Allocation of shared station service ............................................................ 7
Figure 6 - Combined Cycle Generator Assets ...................................... 8
Figure 7 – DC coupled asset metering distribution concept ............... 9
OP-18 Appendix D Revision History ....................................................... 10
ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 2 of 10
ISO-NE PUBLIC
Figure 1 - Telemetry MW/MVAR Polarity
ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 3 of 10
ISO-NE PUBLIC
Terms & Definitions
ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 4 of 10
ISO-NE PUBLIC
Figure 2 - Single Generator Asset & Basic Generation Metering Concepts
ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 5 of 10
ISO-NE PUBLIC
Figure 3 - Multiple Generator Assets - Dynamic (Ratio) Allocation of shared station service
ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 6 of 10
ISO-NE PUBLIC
Figure 4 - Multiple Generator Assets - Dynamic (Condition) Fixed (Ratio) Allocation of shared station service
ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 7 of 10
ISO-NE PUBLIC
Figure 5 - Multiple Generator Assets - Static (Ratio) Allocation of shared station service
ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 8 of 10
ISO-NE PUBLIC
Figure 6 - Combined Cycle Generator Assets
ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 9 of 10
ISO-NE PUBLIC
Figure 7 – DC coupled asset metering distribution concept
ISO New England Operating Procedures OP-18 - Metering and Telemetering Criteria Appendix D
Hard Copy Is Uncontrolled Revision 6 Effective Date: August 7, 2020 Page 10 of 10
ISO-NE PUBLIC
OP-18 Appendix D Revision History
Document History (This Document History documents action taken on the equivalent NEPOOL Procedure prior
to the RTO Operations Date as well revisions made to the ISO New England Procedure subsequent to the RTO Operations Date.)
Rev. No. Date Reason
Rev 0 04/13/99
Rev 1 10/21/99
Rev 2 06/21/02
Rev 3 10/01/04
Rev 4 02/01/05 Updated to conform to RTO terminology
Rev 4.1 02/13/15 Periodic review performed requiring no changes;
Rev 4.2 01/27/17 Periodic review performed requiring no changes; Made administrative changes required to publish a Minor Revision;
Rev 5 04/10/17 Periodic review performed by procedure owner; Created a new reformatted document; Added required corporate document identity and replaced page numbering with Page XofY format in all page footers; Deleted original diagram; Added new Figures 1 through 6; Added Terms and Definitions page;
Rev 5.1 01/23/19 Periodic review performed requiring no changes; Made administrative changes required to publish a Minor Revision;
Rev 6 08/07/20 Periodic review performed by procedure owner; Added Figure 7 – DC metering distribution concept