Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000...

10
001-REP | Issue Rev 3 | 9 January 2014 \\GLOBAL\LONDON\ILG\JOBS\226000\226259-00 WILTS AND BERKS CANAL\04_ILG-GROUP-PROJECT-DATA\20140107 FINAL REPORT ISSUE REV3.DOCX Page C4 Appendix C Proposed Outline Design of Canal

Transcript of Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000...

Page 1: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

001-REP | Issue Rev 3 | 9 January 2014

\\GLOBAL\LONDON\ILG\JOBS\226000\226259-00 WILTS AND BERKS CANAL\04_ILG-GROUP-PROJECT-DATA\20140107 FINAL REPORT ISSUE REV3.DOCX

Page C4

Appendix C

Proposed Outline Design of Canal

Page 2: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

D

E

N

C

H

W

O

R

T

H

R

O

A

D

D

E

N

C

H

W

O

R

T

H

R

O

A

D

M

A

B

L

Y

W

A

Y

DOWNSVIEW ROAD

L

E

T

C

O

O

M

B

E

B

R

O

O

K

M

O

O

R

I

N

G

B

A

S

I

N

A338

-0+

200.000

-0+

100.000

0+

000.000

0+

100.000

0+

200.000

0+

300.000

0

+

4

0

0

.0

0

0

0

+

5

0

0

.0

0

0

0

+

6

0

0

.

0

0

0

0

+

7

0

0

.

0

0

0

0

+

8

0

0

.

0

0

0

0

+

9

0

0

.

0

0

0

1

+

0

0

0

.

0

0

0

1

+

1

0

0

.

0

0

0

1

+

2

0

0

.

0

0

0

1

+

3

0

0

.

0

0

0

1

+

4

0

0

.

0

0

0

1

+

5

0

0

.

0

0

0

1

+

6

0

0

.

0

0

0

1

+

7

0

0

.

0

0

0

1

+

8

0

0

.

0

0

0

1

+

9

0

0

.0

0

0

2+

000.000

2

+

1

0

0

.0

0

0

2

+

2

0

0

.

0

0

0

2

+

3

0

0

.

0

0

0

2

+

4

0

0

.

0

0

0

2

+

5

0

0

.

0

0

0

2

+

6

0

0

.0

0

0

2

+

7

0

0

.

0

0

0

2

+

8

0

0

.

0

0

0

2

+

9

0

0

.

0

0

0

3

+

0

0

0

.

0

0

0

3

+

1

0

0

.

0

0

0

3

+

2

0

0

.

0

0

0

3

+

3

0

0

.

0

0

0

3

+

4

0

0

.

0

0

0

3

+

5

0

0

.

0

0

0

3

+

6

0

0

.0

0

0

3

+

7

0

0

.0

0

0

Start of A

rup S

cope

(C

h. -100.000)

E

n

d

o

f

A

r

u

p

S

c

o

p

e

(

C

h

.

+

3

1

0

0

.

0

0

0

)

Job No

Drawing Status

Plot ID

Scale at A1

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

A1

1

2

3

4

5

6

7

8

9

10

11

© Arup

A B C D E F G H I J K L M N

13 Fitzroy Street

London W1T 4BQ

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924

www.arup.com

001 05226259

1:5000 @ A1 / 1:10,000 @ A3

Outline Proposal

Proposed Canal Alignment

Key Plan

Wilts and Berks Canal

Grove and Wantage Section

Wilts and Berks Canal Trust

1BFB6FF3-02BF-43D6-B9D8-716AC3E5DAEA

J:\226000\226259-00 W

ilts and B

erks C

anal\11_ILG

_D

raw

ings\02_D

raw

ings\001.dw

g 9 Jan 2014 12:07:39 david.sapin

Notes:

Survey is based on National Grid. Using OSTN02

transformation of GPS derived co-ordinates.

All levels are related to Newlyn datum.

Approximate Alignment of Historical Canal Towpath

Surveyed By Glanville Consultants, Cornerstone

house, 62 Foxhall Road, Didcot. OX11 7AD. AL

814229.

1.

2.

3.

Alignment of Glanville survey

Proposed towpath centreline

Existing water filled sections of canal

Proposed canal in water

/ /01 23 05 05 DW BT CU

Grove Bridge

Pinch Point 3

Proposed Route

Mably Way

Pinch Point 2

Approximate Alignment

Of Historic Canal Route

East Challow Bridge

Pinch Point 1

S

E

E

D

R

A

W

I

N

G

0

0

3

S

E

E

D

R

A

W

I

N

G

0

0

2

S

E

E

D

R

A

W

I

N

G

0

0

4

DRAWING 005

DRAWING 006

DRAWING 007

Foul Water Sewer

Trunk Main

Letcombe Brook

/ /02 01 11 05 CB BT CU

/ /03 02 05 13 DS BT CU

/ /04 02 08 13 DS BT CU

/ /05 09 01 14 BA BT CU

Page 3: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

Notes:

1. Survey is based on National Grid. Using OSTN02

transformation of GPS derived co-ordinates.

2. Historic water levels taken from existing invert

level at King's Lift bridge, and calculated using lock

falls from Scott Wilson Report.

3. Existing ground levels & chainages are from

Glanville survey. Dwgs. 100 - 107 Dated. Nov 2004.

4. Dimensions are in mm and heights in metres

relative to Ordnance Datum.

5. Typical section dimensons are generally taken

from Scott Wilson feasibility study Jan 1998.

6. Chainages are measured along the proposed

canal route. Glanville survey changes have been

modified to suit.

Job No

Drawing Status

Plot ID

Scale at A0

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

A0 A

1

© Arup

B C D E F G H I J K L M N O P Q R S T U

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

13 Fitzroy Street

London W1T 4BQ

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924

www.arup.com

002 05226259

As Shown

Outline Proposal

Proposed Canal Plan Long Section

and Sections

Sheet 1 of 3

Wilts and Berks Canal

Grove and Wantage Section

Wilts and Berks Canal Trust

46D36EAF-7CE8-47F3-850C-D01A0526658B

J:\226000\226259-00 W

ilts and B

erks C

anal\11_ILG

_D

raw

ings\02_D

raw

ings\002.dw

g 9 Jan 2014 12:17:07 david.sapin

SECTION A-A

NATURAL BANK PROTECTION

COMPOSITE SECTION

SECTION B-B

SECTION C-C

VERTICAL WALL

EAST CHALLOW BRIDGE

APPROACH & BRIDGE HOLE SECTION

SECTION D-D

A

A

B

B

C

C

D

D

G

G

SECTION G-G

SE

E S

HE

ET

2 O

F 3

FO

R C

ON

TIN

UA

TIO

N

Key:

Glanville Survey

Proposed towpath centreline

Existing canal water filled sections

Proposed canal in water

TOW PATH ON NORTH

SIDE OF CANAL

A

4

1

7

A

4

1

7

SE

E S

HE

ET

2

O

F 3

FO

R C

ON

TIN

UA

TIO

N

/ /01 26 05 05 DW BT CU

CANAL PLAN

EAST CHALLOW BRIDGE

CANAL LONG SECTION

SCALE 1:100 @ A0

SCALE 1:100 @ A0

SCALE 1:100 @ A0

SCALE 1:100 @ A0

SCALE 1:2000 @ A0

SCALE - H = 1:2000, V = 1:400 @ A0

SCALE - H = 1:4000, V = 1:800 @ A2

/ /02 01 11 05 CB BT CU

T

O

K

I

N

G

S

L

I

F

T

B

R

I

D

G

E

FOR DETAILS OF EAST CHALLOW

BRIDGE PINCH POINT.

SEE DRAWING 005

SCALE 1:100 @ A0

E

E

SECTION E-E

(NOTE: NO CHANGE TO ROAD LEVELS)

SCALE 1:100 @ A0

/ /03 02 05 13 BA DS BT

Assumed historic water level

Glanville Survey

Proposed canal water level

Long Section Key:

WINDING HOLE

SECTION F-F

BASCULE BRIDGE

SCALE 1:100 @ A0

F

F

Existing Ground from Glanville Cross

Section Survey dated 10/05/13

/ /04 02 08 13 BA DS BT

NEW EAST CHALLOW

SUMP LOCK

/ /05 09 01 14 BA DS BT

WINDING HOLE

Page 4: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

82.16mOD

81.25mOD

86.30mOD

2200

2000 1500 52504570

171002000

42600

1

VARIES

81.86mOD

MIXED USE CYCLEPATH & FOOTPATH

TO/FROM DOWNSVIEW ROAD

DDA COMPLIANT RAMP / CYCLEPATH

ALONGSIDE LOCK STAIRCASE

LOCK STAIRCASE

R.C. RETAINING WALL

2200

81.86mOD

85.25mOD

REINFORCED CONCRETE

BOX UNDERPASS

ROOM FOR UTILITY DIVERSIONS TO

BE ACCESSIBLE UNDER TOWPATH

R.C. FOOTING

79.72mOD

78.62mOD

80.12mOD

DRAINAGE TO BE PROVIDED AT

ENTRANCES TO CULVERT TO INTERCEPT

RAINWATER AND AVOID POOLING.

78.12mOD

82.42mOD

EXISTING

ROAD LEVEL

76

0

2000

Towpath

6700

PILES

DEPTH TBC

23

00

15

00

27

00

T.B.C

REINFORCED CONCRETE

BOX UNDERPASS

PILES

ROOM FOR UTILITY

DIVERSIONS TO BE

ACCESSIBLE UNDER

TOWPATH

R.C. FOOTING

80.42mOD

78.62mOD

80.12mOD

PAVING

DEPTH

78.12mOD

83.12mOD

13

70

84.49OD

6700

2000

30

00

27

00

1000

EXTRA METRE WIDTH

TO PROVIDE SIGHT

LINES FOR CYCLISTS

B.L 82.30mOD

3000 6700

TOWPATH LEVEL BED

3000

C OF GLANVILLE

SURVEY

L

EXISTING GROUND LEVEL

WIDTH OF CANAL BELT SET ASIDE IN STOCKHAM FARM PLANNING APPLICATION

EXISTING HEDGEROW

1

3

1

3

SLOPE DEPENDANT ON

GROUND CONDITIONS

SLOPE DEPENDANT ON

GROUND CONDITIONS

86.34mOD

87.50mOD

POSSIBLE OUTLINE

STOCKHAM BRIDGE STRUCTURE

W.L 83.80mOD

84.10mOD

ED

GE

O

F C

AN

AL B

ELT

ED

GE

O

F C

AN

AL

B

ELT

1001.924

83.650

1051.924

83.660

1101.924

83.750

1151.924

83.690

1201.924

83.640

1251.924

83.630

1300.000

83.680

2180.486

81.250

2230.486

81.290

2279.753

81.180

2316.295

81.050

83.80

SE

CT

IO

N H

-H

CH

AIN

AG

E 1

+4

10

.0

00

MA

BLY

W

AY

(N

EW

L

OC

K)

CH

AIN

AG

E 1+

64

0.00

0

SE

CT

IO

N I-I

CH

AIN

AG

E 1+

69

0.00

0

SE

CT

IO

N J-J D

OW

NS

VIE

W R

OA

D

CH

AIN

AG

E 1+

76

0.00

0

SE

CT

IO

N L

-L

D

EN

CH

WO

RT

H R

OA

D

CH

AIN

AG

E 1+

86

0.00

0

79.92

83.80

80.94

1100.000

1400.000

83.800

1500.000

83.800

1600.000

87.850

1630.000

87.500

1700.000

86.000

1750.000

84.490

1880.000

1900.000

2000.000

2100.000

81.630

2130.000

81.320

CANAL DEVIATION FROM HISTORICAL ROUTE

LEVELS TAKEN FROM DANDARA SURVEY

CANAL DEVIATION FROM HISTORICAL ROUTE

LEVELS TAKEN FROM GLANVILLE SURVEY 2013

2090.000

2080.000

2060.000

2020.000

81.570

81.830

81.650

81.760

81.920

1920.000

1940.000

1960.000

82.080

82.350

82.670

72.740

83.300

83.550

84.060

84.500

1760.000

1800.000

1860.000

83.820

1820.000

GLANVILLE CROSS SECTION

SURVEY LEVELS

SE

CT

IO

N K

-K

CH

AIN

AG

E 1

+8

10

.0

00

LEVELS TAKEN FROM DANDARA SURVEY

81.86

100067003000

W.L 80.12mOD

B.L 78.62mOD

PUDDLING CLAY

500mm THICK

RC BEAM

CANTILEVER SHEET

PILE WALL

LEVEL BED

1

3

1

3

8400 APPROX3500 APPROX

LAND TAKE REQUIRED

(VARIES)

(TBC)

(TBC)

(VARIES)

(VARIES)

TOWPATH

80.72mOD

EXISTING GROUND LEVEL

83.82mOD

RC BEAM

CANTILEVER SHEET

PILE WALL

ED

GE

O

F G

RO

VE

P

AR

K

PR

OP

ER

TIE

S L

TD

L

AN

D

SUBJECT TO NEGOTIATIONS

WITH WILLIAM WASBROUGH,

VETICAL RETAINING WALL

MAY BE REQUIRED.

RETAINING WALL

81.02mOD

Job No

Drawing Status

Plot ID

Scale at A0

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

A0 A

1

© Arup

B C D E F G H I J K L M N O P Q R S T U

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

13 Fitzroy Street

London W1T 4BQ

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924

www.arup.com

003 05226259

As Shown

Outline Proposal

Proposed Canal Plan Long Section

and Sections

Sheet 2 of 3

Wilts and Berks Canal

Grove and Wantage Section

Wilts and Berks Canal Trust

F2F6B133-A820-465B-847B-F600B5B921F2

J:\226000\226259-00 W

ilts and B

erks C

anal\11_ILG

_D

raw

ings\02_D

raw

ings\003.dw

g 6 Jan 2014 10:14:22 brian.anderson

H

H

I

I

J

J

L

L

TO BE REPLACED WITH A BRIDGE

POSSIBLE FOOTBRIDGE

NEW MABLY WAY

LOCK STAIRCASE

DENCHWORTH ROAD

CROSSING

MABLY WAY ROUNDABOUT

SECTION H-H

SCALE 1:100 @ A0

SECTION I-I

MABLY WAY LOCK STAIRCASE

SCALE 1:100 @ A0

SECTION J-J

DOWNSVIEW ROAD

SCALE 1:100 @ A0

SECTION K-K

SCALE 1:100 @ A0

SE

E S

HE

ET

1 O

F 3

FO

R C

ON

TIN

UA

TIO

N

SE

E S

HE

ET

1 O

F 3

FO

R C

ON

TIN

UA

TIO

N

SE

E S

HE

ET

3 O

F 3

FO

R C

ON

TIN

UA

TIO

N

SE

E S

HE

ET

3

O

F 3

FO

R C

ON

TIN

UA

TIO

N

DOWNSVIEW ROAD CROSSING

/ /01 26 05 05 DW BT CU

GROUND LEVEL

CHAINAGE

69.00 A.O.D.

CANAL PLAN

MABLY WAY ROUNDABOUT

CANAL LONG SECTION

SCALE 1:2000 @ A0

SCALE - H = 1:2000, V = 1:400 @ A0

SCALE - H = 1:4000, V = 1:800 @ A2

/ /02 01 11 05 WM BT CU

FOR DETAILS OF MABLY WAY ROUNDABOUT

PINCH POINT SEE DRAWING 006.

Notes:

1. Survey is based on National Grid. Using OSTN02

transformation of GPS derived co-ordinates.

2. Historic water levels taken from existing invert

level at King's Lift bridge, and calculated using lock

falls from Scott Wilson Report.

3. Existing ground levels & chainages are from

Glanville survey. Dwgs. 100 - 107 Dated. Nov 2004.

4. Dimensions are in mm and heights in metres

relative to Ordnance Datum.

5. Typical section dimensions as taken from Scott

Wilson feasibility study Jan 1998.

6. Chainages are measured along the proposed

canal route. Glanville survey changes have been

modified to suit.

/ /01 26 05 05 DW BT CU

Key:

Key:

Glanville Survey

Proposed towpath centreline

Existing canal water filled sections

Proposed canal in water

Assumed historic water level

Glanville Survey

Proposed canal water level

Long Section Key:

/ /03 02 05 13 BA DS BT

BASCULE BRIDGE ACROSS

CANAL

SECTION L-L

SCALE 1:100 @ A0

DENCHWORTH ROAD

K

K

/ /04 02 08 13 BA DS BT

AIRPLANE SCULPTURE

POSSIBLY RELOCATED

POSSIBLE NEW FOOTBRIDGE

POSSIBLE MOORING AREA

THICK LINES INDICATE

VERTICAL RETAINING WALLS

THIN LINES INDICATE EXTENT

OF 1:3 SLOPE, WHERE NO

RETAINING WALL REQUIRED

/ /05 ?? 01 14 BA DS BT

TEMPORARY WANTAGE

VISITOR MOORINGS

CYCLE PATH RAMPS UP TO

STOCKHAM BRIDGE

OVERFLOW WEIR

WINDING HOLE

Page 5: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

E

nd of A

rup S

cope

(C

h. +

3100.000)

Job No

Drawing Status

Plot ID

Scale at A0

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

A0 A

1

© Arup

B C D E F G H I J K L M N O P Q R S T U

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

13 Fitzroy Street

London W1T 4BQ

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924

www.arup.com

004 05226259

As Shown

Outline Proposal

Proposed Canal Plan Long Section

and Sections

Sheet 3 of 3

Wilts and Berks Canal

Grove and Wantage Section

Wilts and Berks Canal Trust

2E613126-436C-4D7C-9AF8-B1963DB6127B

J:\226000\226259-00 W

ilts and B

erks C

anal\11_ILG

_D

raw

ings\02_D

raw

ings\004.dw

g 9 Jan 2014 13:32:22 david.sapin

SCALE 1:100 @ A0

SECTION P-P

SECTION Q-Q

SCALE 1:100 @ A0

P

P

Q

Q

A

3

3

9

MOORING AREA

A

3

3

9

S

S

MOORING AREA

ACCESS BRIDGE (NOT

DETAILED HERE)

T

T

T

In

d

ic

a

tiv

e

T

In

d

ic

a

tiv

e

CRABHILL LIFT BRIDGE

(NOT DETAILED HERE)

T

O

S

P

IR

IT

L

O

C

K

SCALE 1:100 @ A0

SECTION S-S

SECTION T-T

SCALE 1:100 @ A0

SE

E S

HE

ET

2 O

F 3

FO

R C

ON

TIN

UA

TIO

N

SE

E S

HE

ET

2 O

F 3

FO

R C

ON

TIN

UA

TIO

N

GROUND LEVEL

CHAINAGE

69.00 A.O.D.

/ /01 26 05 05 DW BT CU

CANAL PLAN

GROVE BRIDGE

CANAL LONG SECTION

SCALE 1:2000 @ A0

SCALE - H = 1:2000, V = 1:400 @ A0

SCALE - H = 1:4000, V = 1:800 @ A2

SECTION M-M

SCALE 1:100 @ A0

/ /02 01 11 05 CB BT CU

TOWPATH

M

M

FOR DETAILS OF GROVE BRIDGE

PINCH POINT SEE DRAWING 007.

SECTION O-O

Notes:

1. Survey is based on National Grid. Using OSTN02

transformation of GPS derived co-ordinates.

2. Historic water levels taken from existing invert

level at King's Lift bridge, and calculated using lock

falls from Scott Wilson Report.

3. Existing ground levels & chainages are from

Glanville survey. Dwgs. 100 - 107 Dated. Nov 2004.

4. Dimensions are in mm and heights are in metres

relative to Ordnance Datum.

5. Typical section dimensions as taken from Scott

Wilson feasibility study Jan 1998.

6. Chainages are measured along the proposed

canal route. Glanville survey changes have been

modified to suit.

LINE OF FWS

TRUNK

NEW LIME KILN LOCK

(FALL 1.52M)

SCALE 1:100 @ A0

/ /03 02 05 13 BA DS BT

Key:

Glanville Survey

Proposed towpath centreline

Existing canal water filled sections

Proposed canal in water

Assumed historic water level

Glanville Survey

Proposed canal water level

Long Section Key:

POSSIBILE BRANCH TO

NEW GROVE/WANTAGE WHARF

WINDING HOLE

PROPOSED LETCOMBE

BROOK AQUEDUCT

SECTION N-N

SCALE 1:100 @ A0

SECTION R-R

SCALE 1:100 @ A0

R

R

N

N

O

O

Existing Ground from Glanville Cross

Section Survey dated 10/05/13

/ /04 02 08 13 BA DS BT

/ /05 09 01 14 BA DS BT

WINDING HOLE

Page 6: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

1500

2500

1822

2200

2200

Key:

Proposed towpath

centreline

Existing canal water filled

sections

Proposed canal in water

Job No

Drawing Status

Plot ID

Scale at A3

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

A3 A

1

© Arup

B C D E F G

2

3

4

5

6

www.arup.com

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924

London W1T 4BQ

13 Fitzroy Street

005 04226259

1:2000 1:500

OUTLINE PROPOSAL

Detail of Pinch Point 1

East Challow Crossing

Wilts & Berks Canal

Grove & Wantage Section

Wilts & Berks Canal Trust

17088C07-1484-4FE4-812E-27CBD2A8CFE5

J:\226000\226259-00 W

ilts and B

erks C

anal\11_ILG

_D

raw

ings\02_D

raw

ings\005.dw

g 9 Jan 2014 13:34:19 david.sapin

/ /01 01 11 05 CB BT CU

Notes:

1. For sections see drawing 002.

Traffic lights

Waiting area

E

E

D

D

C

C

B

B

Access to Canal House

housing group via bascule

bridge and Canal Way.

/ /02 02 05 13 BA DS BT

1:16 ramp starting at this point

for towpath to go over canal.

2.0m long landings every 6m.

Dangerous crossing point for pedestrians

(poor sight lines). Suggest pedestrians

cross in front of bridge house.No land take on north side of canal

Traffic lights

Towpath 3.0m wide

1:15 ramp down from A417 to footpath.

1.5m landings every 5m.

Winding hole

F

F

Proposed new access

road to Canal House

housing group

Detail 1

Drop lock detail Scale 1:500

No land take on north side of canal

Lock keeper's walkway

Protective booms

Protective booms

See Detail 1

/ /03 02 08 13 BA DS BT

Nalder Estate

Proposed Development

Towpath continues out of Nalder Estate

Swing bridge incorporated in lock gates

Shared use 2.0m wide

Nalder Estate footpath/

cyclepath/ towpath

Small grass embankment

Canal edge follows Nalder Estate boundary.

Wall/fence to be removed to provide canal

access to Nalder Estate residents.

WBCT Depot Site

Winding hole

Office and pump house

/ /04 09 01 14 BA DS BT

Page 7: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

Denchworth Road crossing

Downsview Road crossing

+80.22mOD

+82.63mOD

+80.22mOD

1:15 slope with one landing 2.0m long

(not wheelchair accessible)

1:20 slope with 2.0m long

landings every 10m

1:20 slope with 2.0m long

landings every 10m

DDA compliant ramp

alongside lock staircase.

1:20 slope with 2.0m

long landings every 10m

1:20 slope with 2m long

landings every 9m

+80.22mOD

+85.50mOD

+85.50mOD

+83.25mOD

+84.10mOD

+84.10mOD

+84.49mOD

Mably Way new lock

+83.18mOD

I

I

J

J

K

K

L

L

+82.16mOD

+80.42mOD

Vertical retaining wall or slope extended

subject to planning approval.

Vertical retaining wall

MABLY WAY ROUNDABOUT

Existing airplane structure, solid line, possibly

relocated to location shown by dashed lines

Barriers required at end of

ramp to slow down cyclists

Waiting area prior to lock

Waiting area prior to lock

Overflow weir

Sheet piling

Key:

Proposed towpath

centreline

Proposed canal in water

Job No

Drawing Status

Plot ID

Scale at A3

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

A3 A

1

© Arup

B C D E F G

2

3

4

5

6

www.arup.com

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924

London W1T 4BQ

13 Fitzroy Street

006 04226259

1:1000

OUTLINE PROPOSAL

Detail of Pinch Point 2

Mably Way Roundabout

Wilts & Berks Canal

Grove & Wantage Section

Wilts & Berks Canal Trust

83825F9D-1F04-46B4-B6B7-58917D59ABCF

J:\226000\226259-00 W

ilts and B

erks C

anal\11_ILG

_D

raw

ings\02_D

raw

ings\006.dw

g 9 Jan 2014 13:42:04 david.sapin

/ /01 01 11 05 CB BT CU

Notes:

1. For sections see drawing 003.

/ /02 02 05 13 BA DS BT

Access Ramps for Cycle

and Pedestrian Access

/ /03 02 08 13 BA DS BT

/ /04 09 01 14 BA DS BT

Page 8: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

FOUL WATER SEWER

(APPROXIMATE POSITION OFF PAGE)

Key:

Proposed towpath

centreline

Canal water filled

sections

Proposed canal in water

Job No

Drawing Status

Plot ID

Scale at A3

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

A3 A

1

© Arup

B C D E F G

2

3

4

5

6

www.arup.com

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924

London W1T 4BQ

13 Fitzroy Street

007 04226259

1:1000

OUTLINE PROPOSAL

Detail Pinch Point 3

Grove Road Crossing

Wilts & Berks Canal

Grove & Wantage Section

Wilts & Berks Canal Trust

1F132E0E-82A5-47E0-9C23-840F030784F3

J:\226000\226259-00 W

ilts and B

erks C

anal\11_ILG

_D

raw

ings\02_D

raw

ings\007.dw

g 9 Jan 2014 13:45:40 david.sapin

/ /01 31 10 05 CB BT CU

Notes:

1. For Sections, See Drawing 004

TOWPATH

GROVE BRIDGE

MOORING AREA

VERTICAL WALL

ALONG POND EDGE

TRAFFIC

LIGHTS

PEDESTRIAN

BRIDGE INCORPORATED

IN LOCK GATES

NEW LIME

KILN LOCK

SHALLOW RAMP DOWN TO LOCK

N

N

Q

Q

MOORING/WAITING AREA

/ /02 02 05 13 DS BT CU

AQUADUCT OVER LETCOMBE BROOK

1:20 slope with 2.0m long

landings every 10m

connecting to existing

2-way cyclepath

O

O

P

P

R

R

EXISTING CULVERT TO BE

REMOVED TO INCREASE FLOW

CAPACITY OF LETCOMBE BROOK

RAMP TO ACCESS ROAD

/ /03 02 08 13 BA DS CU

1:20 RAMP WITH 2.0M

LANDINGS EVERY 10m

/ /04 09 01 14 BA DS CU

EMERGENCY STOP PLANKS SLOTS IN

CASE OF BREACH OF EMBANKMENT

INTO LETCOOMBE BROOK

PEDESTRIAN

BASCULE BRIDGE

WINDING HOLE

Page 9: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

Typical Lock Detail

Scale 1:200

23000 2000 200020002000

22

00

50

05

00

1

3

0

0

3

5

0

0

Head GatesTail Gates

RC lock walls

Sheet pile wall with RC capping beam

Sheet pile wall with RC capping beam

Water bypass pipework

Sluicing and control

mechanisms not shown

23

00

0

12000 51000

(could be reduced)

12000

11

00

0

36

00

38

00

36

00

50

0

2000

2

0

0

0

Fenders in corner Fenders in corner

Typical Winding Hole Detail

Scale 1:500

Natural side slope channel

Vertical sheet pile wall

with RC capping beam

Key:

Job No

Drawing Status

Plot ID

Scale at A3

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

A3 A

1

© Arup

B C D E F G

2

3

4

5

6

www.arup.com

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924

London W1T 4BQ

13 Fitzroy Street

008 02226259

As shown

OUTLINE PROPOSAL

Locks, Winding Holes

and Pedestrian Swing Bridge

Wilts & Berks Canal

Grove & Wantage Section

Wilts & Berks Canal Trust

574E0706-6B0B-4ACD-9398-A9AE69BF0744

J:\226000\226259-00 W

ilts and B

erks C

anal\11_ILG

_D

raw

ings\02_D

raw

ings\008.dw

g 1 A

ug 2013 18:56:19 D

avid.S

apin

/ /01 02 05 13 BA DS BT

/ /02 02 08 13 BA DS BT

Page 10: Appendix C - Wilts & Berks Canal Partnership - Swindon ... c.pdf83.80 SECTION H-H CHAINAGE 1+410.000 MABLY WAY (NEW LOCK) CHAINAGE 1+640.000 SECTION I-I CHAINAGE 1+690.000 SECTION

GROUND LEVEL

CHAINAGE

0.0

00

83

.3

30

23

5.0

00

85

.2

20

Pinch Point 1:

East Challow Bridge A417

17

50

.0

00

84

.4

90

24

20

.0

00

24

70

.0

00

18

80

.0

00

83

.1

80

26

20

.0

00

81

.2

70

Pinch Point 3:

Grove Road A338

Pinch Point 2:

Denchworth Road Crossing

Downsview Road Crossing

Existing Letcombe Brook Culvert

+77.31mOD Top of Pipe

Foul Water Trunk Sewer (700mmØ)

+77.31mOD Top of Pipe

Existing ground level up to +88mOD

Assumed historic water level

Ground Level from Glanville Survey

Proposed canal water level

Possible lock up after East Challow

Long Section Key:

+82.02 mOD

+80.12 mOD

+78.20 mOD

+75.30 mOD

+72.40 mOD

Mably Way Lock

(2 lock staircase)

3.88m total fall

New Lime Kiln Lock

1.85m fall

Grove Common Lock

2.77m fall

Smallmarsh Lock

2.90m fall

Possibility to keep canal in

deep cutting

New East Challow Lock

1.78m Fall

+80.94 mOD

Datum +69.00m OD

+78.07 mOD

+83.80 mOD

+85.22 mOD

+84.49 mOD

+83.18 mOD

+81.27 mOD

Variation to Vertical Alignment

Sumplock under A417

+83.80 mOD+83.80 mOD

Job No

Drawing Status

Plot ID

Scale at A3

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

A3 A

1

© Arup

B C D E F G

2

3

4

5

6

www.arup.com

Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924

London W1T 4BQ

13 Fitzroy Street

009 05226259

Hor 1:20 ; Ver 1:200

OUTLINE PROPOSAL

Summary Long Section

through Canal Water Levels

Wilts & Berks Canal

Grove & Wantage Section

Wilts & Berks Canal Trust

89478549-45A4-47EF-A019-E9EE5297CA69

J:\226000\226259-00 W

ilts and B

erks C

anal\11_ILG

_D

raw

ings\02_D

raw

ings\009.dw

g 3 Jan 2014 14:53:46 brian.anderson

/ /01 17 04 13 BA DS BT

/ /02 02 05 13 BA DS BT

+83.18

Vertical Level Control

Structures

KEY

/ /03 02 07 13 BA DS BT

/ /04 02 08 13 BA DS BT

/ /05 ?? 01 14 BA DS BT