Appendix B SRAIP Subdivision Planseisdocs.dsdip.qld.gov.au/Scenic Rim Agricultural Industrial...

4
REPORT PR142489 | Draft Impact Assessment Report | 6 | 14 April 2020 rpsgroup.com Appendix B SRAIP Subdivision Plans

Transcript of Appendix B SRAIP Subdivision Planseisdocs.dsdip.qld.gov.au/Scenic Rim Agricultural Industrial...

Page 1: Appendix B SRAIP Subdivision Planseisdocs.dsdip.qld.gov.au/Scenic Rim Agricultural Industrial Precinct... · KALBAR Legend Site Boundary Proposed Flow Path Q100 STAGE 3 22m Wide New

REPORT

PR142489 | Draft Impact Assessment Report | 6 | 14 April 2020

rpsgroup.com

Appendix B

SRAIP Subdivision Plans

Page 2: Appendix B SRAIP Subdivision Planseisdocs.dsdip.qld.gov.au/Scenic Rim Agricultural Industrial Precinct... · KALBAR Legend Site Boundary Proposed Flow Path Q100 STAGE 3 22m Wide New

478

SP256449

14

SP229448

15

SP229448

17

RP20993

18

RP20993

9

RP209733

2

SP121240

1

SP121240

5

CC1915

6

M3151

7

M3151

8

SP105804

CHECKED BY:

DRAWN BY:

DATE:

CLIENT:

142489- 11H

PLAN REF:

MD/PHE

LZ

16 MARCH 2020

KALFRESH

Note:

All Lot Numbers, Dimensions and Areas are

approximate only, and are subject to survey

and Council approval.

Dimensions have been rounded to the

nearest 0.1 metres.

Areas have been rounded down to the

nearest 5m².

The boundaries shown on this plan should

not be used for final detailed engineers

design.

Source Information:

Site boundaries: DCDB

Adjoining information: DCDB.

Contours: RPS Survey

Overland Flow Path: Aurecon

SUBDIVISION PLAN

SCENIC RIM AGRICULTURAL

© COPYRIGHT PROTECTS THIS PLAN

Unauthorised reproduction or amendment not permitted.

Please contact the author.

0 1 : 5,000 @ A125 50 75 100 150

+61 7 3539 9500

Fortitude Valley QLD 4006

Level 4 HQ South

520 Wickham Street

rpsgroup.com

URBAN DESIGN

PO Box 1559

W

T

INDUSTRIAL PRECINCT

6200 CUNNINGHAM HWY

KALBAR

C

U

N

N

I

N

G

H

A

M

H

I

G

H

W

A

Y

Legend

Site Boundary

Proposed Flow Path (Q100)

STAGE 1

112.981 HA

72.566 HA

1

3

2

39.265 HA

2

SP192221

1

RP216694

Yield BreakdownAllotments OverallManagement Allotments 5Total Allotments 5

Land BudgetLand Use Area %Site Area 248.526 ha 100.0%Existing Parcels 3.526 ha 1.4%Management Allotments 245.000 ha 98.6%

Access Easement

for Wagners Road Alignment

4

6.924 HA

5

13.262 HA

Page 3: Appendix B SRAIP Subdivision Planseisdocs.dsdip.qld.gov.au/Scenic Rim Agricultural Industrial Precinct... · KALBAR Legend Site Boundary Proposed Flow Path Q100 STAGE 3 22m Wide New

478

SP256449

14

SP229448

15

SP229448

17

RP20993

18

RP20993

9

RP209733

2

SP121240

1

SP121240

5

CC1915

6

M3151

7

M3151

8

SP105804

CHECKED BY:

DRAWN BY:

DATE:

CLIENT:

142489- 11H

PLAN REF:

MD/PHE

LZ

16 MARCH 2020

KALFRESH

Note:

All Lot Numbers, Dimensions and Areas are

approximate only, and are subject to survey

and Council approval.

Dimensions have been rounded to the

nearest 0.1 metres.

Areas have been rounded down to the

nearest 5m².

The boundaries shown on this plan should

not be used for final detailed engineers

design.

Source Information:

Site boundaries: DCDB

Adjoining information: DCDB.

Contours: RPS Survey

Overland Flow Path: Aurecon

SUBDIVISION PLAN

SCENIC RIM AGRICULTURAL

© COPYRIGHT PROTECTS THIS PLAN

Unauthorised reproduction or amendment not permitted.

Please contact the author.

0 1 : 5,000 @ A125 50 75 100 150

+61 7 3539 9500

Fortitude Valley QLD 4006

Level 4 HQ South

520 Wickham Street

rpsgroup.com

URBAN DESIGN

PO Box 1559

W

T

INDUSTRIAL PRECINCT

C

U

N

N

I

N

G

H

A

M

H

I

G

H

W

A

Y

6200 CUNNINGHAM HWY

KALBAR

Legend

Site Boundary

Proposed Flow Path Q100

STAGE 2

50.699 HA

72.566 HA

2

5

4

39.265 HA

19.765 HA

3

42.510 HA

1

Future Access Easement

FUTURE ACCESS

EASEMENT

TO BE CONSIDERED

FOR LOTS 4-6

Access Easement

for Wagners Road Alignment

Yield BreakdownAllotments OverallManagement Allotments 7Total Allotments 7

Land BudgetLand Use Area %

Site Area 248.526 ha 100.0%Existing Site 3.526 ha 1.4%Management Alloments 245.000 ha 98.6%

2

SP192221

1

RP216694

6.924 HA

6

13.262 HA

7

Page 4: Appendix B SRAIP Subdivision Planseisdocs.dsdip.qld.gov.au/Scenic Rim Agricultural Industrial Precinct... · KALBAR Legend Site Boundary Proposed Flow Path Q100 STAGE 3 22m Wide New

14

SP229448

1

SP121240

5

CC1915

6

M3151

7

M3151

8

SP105804

1

11

7

8

2

13

15

14

6

5

4

3

9

10

12

16

Stage 3B

Stage 3C

Stage 3A

4

8

R

2

0

7000m²

1.628HA

5585m²

5.000HA

5055m²

2.140HA

1.751HA

2.000HA

3.000HA

2.000HA

2.000HA

1.987HA

2.006HA

4.972HA

3.992HA

3.017HA

4350m²

19.137HA

PROPOSED

OVERLAND

FLOW PATH

19.7

56.4

5

2

.1

2

5

.

6

1

0

8

.

8

1

5

6

.

1

2

6

3

.

2

1

5

6

.

2

2

6

7

2

2

6

.

8

1

4

7

.

7

7

4

.

5

8

2

.

2

6

8

6

8

8

2

.

2

7

4

.

5

6

8

5

1

.

3

25.3

3

3

.

2

2

4

.

8

1

5

.

1

3

3

.

6

3

2

.

7

1

6

5

8

8

.

6

8

67

4

.

2

7

1

.

5

2

4

.

4

1

8

5

1

3

9

.

9

2

0

7

.

2

1

5

1

.

3

9

6

.

1

1

9

1

.

5

1

9

3

.

2

4

6

.4

50.7

3

1

.

6

1

0

5

1

5

2

.

2

1

4

0

.

7

1

0

8

.

6

1

1

3

.

1

7

9

.

1

9

2

.

7

9

3

.

9

7

9

.

7

1

9

2

.

8

8

3

.

5

1

7

2

.

8

9

2

.

5

2

1

9

.

4

7

9

1

1

0

.

3

1

0

3

.

5

1

0

7

.

7

9

5

.

5

1

4

6

.

2

1

0

9

.

2

45.8

1

4

8

.

4

1

2

4

.

9

43.1

1

0

4

.

2

3

8

3

1

.4

31.4

1

2

3

.

9

CHECKED BY:

DRAWN BY:

DATE:

CLIENT:

142489- 11H

PLAN REF:

MD/PHE

LZ

16 MARCH 2020

KALFRESH

Note:

All Lot Numbers, Dimensions and Areas are

approximate only, and are subject to survey

and Council approval.

Dimensions have been rounded to the

nearest 0.1 metres.

Areas have been rounded down to the

nearest 5m².

The boundaries shown on this plan should

not be used for final detailed engineers

design.

Source Information:

Site boundaries: DCDB

Adjoining information: DCDB.

Contours: RPS Survey

Overland Flow Path: Aurecon

SUBDIVISION PLAN

SCENIC RIM AGRICULTURAL

© COPYRIGHT PROTECTS THIS PLAN

Unauthorised reproduction or amendment not permitted.

Please contact the author.

0 1 : 5,000 @ A125 50 75 100 150

+61 7 3539 9500

Fortitude Valley QLD 4006

Level 4 HQ South

520 Wickham Street

rpsgroup.com

URBAN DESIGN

PO Box 1559

W

T

INDUSTRIAL PRECINCT

C

U

N

N

I

N

G

H

A

M

H

I

G

H

W

A

Y

6200 CUNNINGHAM HWY

KALBAR

Legend

Site Boundary

Proposed Flow Path Q100

STAGE 3

2

2

m

W

i

d

e

N

e

w

R

o

a

d

2

2

m

W

i

d

e

N

e

w

R

o

a

d

Access Easement

for Wagners Road

Alignment

Stage Boundary

Access Easement

Yield Breakdown - Stage 3

Industry Allotments Stage 3A Stage 3B Stage 3C Overall

4000m² -1HA 2 — — 2

1HA- 2.99HA 6 — 2 8

3HA + 2 1 1 4

Total Industry Allotments 10 1 3 14

Infrastructure

Digester and Energy Site — — 1 1

Sewer Treatment Plant 1 — — 1

Total Infrastructure Allotments 1 — 1 2

Land Budget - Stage 3

Stage 3A Stage 3B Stage 3C OverallArea %

Area of Stage 40.280 ha 8.992 ha 10.020 ha 59.292 ha 100.0%

Saleable Area

Industry Allotments 17.555 ha 3.992 ha 10.021 ha 31.567 ha 53.2%

Road

Private Road 2.453 ha — — 2.453 ha 4.1%

Stormwater

Drainage 19.137 ha — — 19.137 ha 32.3%

Detention Basin 0.700 ha — — 0.700 ha 1.2%

Infrastucture

Digester and Energy Site — 5.000 ha — 5.000 ha 8.4%

Sewer Treatment Plant 0.435 ha — — 0.435 ha 0.7%