Appendix A

Comparison Summary and Process Flow and Logic Diagrams

Idaho Completion Project Bechtel BWXT Idaho, LLC A- 1

Idaho Completion Project A-2 Bechtel BWXT Idaho, LLC

Excavation I I I

Pass 1: Forklift/loader digs and hauls Layer A to outside pile.

Comparison Summary of Retrieval Alternatives

Pass 1: Backhoe digs and loads Layer A into soil hopper. Overhead crane (Alt. 1) or forklift/loader

Closure

El 5009 - Topaof Overburden

(3' Overburden)

I Pass 2: Backhoe digs and loads Layer B into soil hopper. Overhead crane (Alt. 1) or forklift/loader (Alt.3) carry and dump soil hopper on inside pile.

Pass 2: Backhoe excavates and forklift/loader hauls Layer B to inside pile.

I Layer B

(2' Overburden)

I

V Pass 3, Part 1: Backhoe excavates and forklift/loader hauls Layer C to sorting deck.

Layer Overburden) Pass 3, Part 1: Backhoe excavates and loads Layer C into a box.

El 5003 - T o p of Waste I

Pass 3, Part 2: Forklifuloader excavates and hauls Layers D and E to sorting deck. As the underburden is cleaned off, gravel is spread by the forklift/loader to harden the surface for wheel traffic.

Layer D (6'

Pass 3, Part 2: Backhoe excavates and loads Layers D and E into separate boxes. The overhead crane (Alt.1) or forklift (Alt.3) carry the boxes from Parts 1, 2 and 3 to the AGV, which delivers them to the sorting deck.

El 5010 - T o p of Backfill

Pass 8: Front-end-loader backfills with outside borrow to form Layer L.

Pass 9: Front-end-loader backfills with outside borrow to form Layer L.

.p I

Layer L (2' Soil Backfill)

Pass 7: Overhead crane (At. 1) or forklift/loader (Alt.3) carries soil hopper from AGV to spread soil from Layer A to form Layer K. Compactor with blade (Alt.1) or forkWloader (Alt.3) spreads and

Pass 8: Forklift/loader hauls, places, and compacts clean fill soil from Layer A to form Layer IC

Layer K (3 ' soil Backfill) compacts soil.

I

Pass 6: Overhead crane (At. 1) or forklift/loader (Alt.3) carries soil hopper from AGV to spread bulk soil from characterization to form Layer J over waste boxes. Compactor with blade (Alt.1) or forkWloader (Alt.3) spreads and compacts soil.

Pass 7: Forklift/loader hauls, places, and compacts soil returned from characterization to form Layer J over waste boxes. Layer J

(2'

I El 5003 - T o p b f Waste Boxes

Pass 6: Six foot high boxes of treated waste placed on top of finished floor by forkWloader

Pass 5: Six foot high boxes of treated waste placed on top of finished floor by overhead crane (Alt.1) or forkWloader (Alt.3) and AGV

\

Layer I te) (6 ' Wa!

El 4991 - Tc, .. Underburden Laver E (6" Underburden) Excavated in Pass 3, Part 2, above. Excavated in Pass 3. Part 2. above.

El 4991 - T O P Backfilled in Pass 5. below. Lave1

Boxes)

. -..... . - . . . . . (6" Gravel) Backfilled in Pass 4. below - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

t Pass 4: Overhead crane (At. 1) or forklift/loader (Alt.3) carries soil hopper from AGV to begin backfill with soil from Layer B to form Layer G. Compactor with blade (Alt. 1) or forklift/loader (Alt.3) spreads and compacts. Layer His added and compacted in same manner.

Pass 3, Part 3: Backhoe excavates and loads Pass 5: ForkWloader backfills and compacts Layer F into a box. soil from Layer B to form Layer G. Forklift/

loader also places and compacts 6" of gravel (Layer H) for finished floor.

Layer G (2'

Pass 4: Backhoe excavates and forklift/loader hauls Layer F to the sorting deck. Layer F

(2' Underburden)

E l 4994 5 Bottom of Excavation

T o p of Basalt Top of Basalt

-9

9-10-03

Figure A- 1. Retrieval methods comparison summary.

A-3

A-4

Q f

I

Id I

b

f

Alternative 1 Passes 5 ,6 ,7 and 8

Waste Box Return with Backhoe and Overhead Crane

Rzgm Pas.; h in parallel with Pass 5 Move

waste boxes and start

returned to s t a t backfill over boxes Ycs > Crimpactor up to lop of > and is Compactor

Usc .4GV and overhead crane fo place boxes of

treated waste on finished flooi

A donc w~ floor backii icess

AG\ ~ Automate Glided Velacle Compactor ~ CP-321 nith blade OD = Overburden

i s m g AGV and overhead crane, transfer dirt rchirned froin charactcriration onto

waste boxes, addmg 2' of fill sod (Layer J) to bring lcvcl up to el. 5005 Ompactor

levels and compacts f i U dirt

krom 4lternathe 1, Pa5s 4 Enough floor space ha? becn proparcd

to slut rehirnmg sas t e bovza

start 0 Pacs 5

Yes I Fnd Pass 5 Continue Pass 6

( End > /1 I Ekein and coinolete Pass R Rackfdl with outside soil to form Layer L. Add 2' of cumpacted

dirt, hrniging level up to cl 5010

Move equipment from pit

, I u I across whole Dit.

A Room and completc Pass 7. Btckfill soil from Layer A to form Layer K with dirt hopper and overhead crane. Add 3' of

compacted dirt, bringing level up to el 5008

in concert wilh dzcontaminnhon cycles

Has backfill over boxe5

across whole pit Perform this ni I ' layen completed?

Idaho Completion Project Bechtel BWXT Idaho, LLC A-7

Moco front end loader

Alternative 2 Passes 1 and 2

Overburden Removal with Front End Loader

Record position of uncovered item.

Cover visible nmte items with soil and

leave iii place.

No Continue Pass I

A-8 Idaho Completion Project

Bechtel BWXT Idaho, LLC

I 8

r-

t

V

k -l I

h m Alternative 2, Pdsr 3 Enough wa(tv has been removed to

aUoa floor preparation to begin

Go to Alternative

Alternative 2 Passes 4 and 5

Floor Preparation with Front End Loader

Yes Go to ALrzriiative 2,

LB ~ Underburden FEL = Front End Loader OB ~ Ovuhurdcn

2, Pass 6

No Ciintmue Pass 4 I I

Pass b and work Pass 6 I

\ /

U'

" I

Yes I Pass 4 complete. Continuz Pass 5 z

m parallel with Pass 5 .

Csing FEL, backfill with Layer B soil from OR stagrng aoa, adduig 2 feet of fiU dirt and 6'' of grawl (1.qers G & to bring finlshed iloor up to cl 4997. FEL levels

and compacts the fill dirt and gravel.

Idaho Completion Project A-10 Bechtel BWXT Idaho, LLC

3

I

P F-r -

k*om AItemati\e 3, Pass 2 Approxlrnately 5 of OH h a

been removed from pit

Alternative 3 Pass 3

Wavte Retriewl and Underburden Excaiation with Backhoe and Forklift

AGV = Automatic Guided Vehicle OB = Overbuden LJB = Llndei burden

A Has a high rad

rource been detected OL is

(el 5004) UB (Laycrs D B item too lage for treatment')

Raluate d s face radration and excmatc wasto item that arc withm reach, includii 5" of

Bogin Pass 3. P a t I Move hackhoe mto thc p t at thc south end on top of remaining OR

whhln reach of ExKarnts raman6llg

OB between

seam (Layer C)

Place OB ni the backhoe and ate Ictrlcvalbor '

t

Go to Altel.l,atlVo 3, Pass 4 and work Pass 4 m parallel with Pass

Y Yes

and charactenstas of

Place high rad item m dosignaled container. grout large obicct m place or move d to designated pzt locatim before

YrouhnE.

retrieval hox full?

Move rehievai box to sorting deck via AGV and ibrkhft

Return an empty box lo backhoe

Idaho Completion Project Bechtel BWXT Idaho, LLC A-13

Alternative 3 Pass 4

Floor Preparation with Backhoe and Forklift

M o ~ c forkliftlhader into pit and work in parallel with Pass 3.

,4GV = Automatic Guided Vehicle OR -= Ovsrburden LB = Underburden

Rackfdl Layer B soil from OB staging area into pit with soil hopper on .kGV

and forklift, adding 2’ of soil and 6 inches of gravel to bring fmished floor up to el. 4997. Furktiftiloader Ievvols

and compacts f i U dirt and gravel.

From Alternative 3, Pass 3 Enough UDhas been removed down tu el 4994 5 to begm flooi preparation

Start Pass 4

backfill been completed?

hiove forklifu loader out of’ pit. Pass 4

1 r--

Has enough floor been prepouod to

start returning waste boxes?

--N

Go to Alternative 3. Pass 5 and work Pass 5 < in parallel Nith Pass I

I

Idaho Completion Project A-14 Bechtel BWXT Idaho, LLC

Eroin Alternative 3, Pass 4 Enough floor spa'e hhi been prepared

to start returning waste boxes

boxes been returned to at& backfill over with Pass 5. Move

forklift~loador done of waste boxes and start bacl process

Regin Pass 6 in pa~allel

boxes mid i3 Yes+ forkMt)loader up to top >

Alternative 3 Passes 5,6,7 and 8

Waste Box Return with Backhoe and AGV

lising AGVand forklift, transfer soil returned fmm characterisation onto waste boxes, addmg 2' of soil (Layer J ) to bring lewl up to el. 5005. Forkliftloader levels

md compacts soil

AGV- Automatic Guided Vchicle OB = Overbrirdeii

No I

I

Yes I Coiitlnue Pnss 6

A Move equipment

from pit

Rcgui and complete Pass 7. HackiiU soil from Layer A to fonn Iayer K with soil

hopper and forklff. Add 3' of competed soil brlngrng level up to el. 5008 across whole pit. Perform this in I ' layers m concert with decontamlnalion cycles.

&gin and completc Pass 8. Llackfil with outride soil to form Layer I>. Add 2' ofcompacted

dirt brlnging lex el up to el 501 0 , across whole pit. completed?

I

Idaho Completion Project Bechtel BWXT Idaho, LLC A-15

A-16 Idaho Completion Prolsct

Bechtel BWXT Idaho, LLC

Appendix B

Detailed Drawings of Alternate Retrieval Facilities

Idaho Completion Project Bechtel BWXT Idaho, LLC B- I

Idaho Completion Project B-2 Bechtel BWXT Idaho, LLC

~. . . 8 I I 6 I 5 1 4 I I 2 I 1 ri

DRAWING INDEX '$El DWG NO. I ,,&y:o I REV1 DRAWING TITLE

REV DESCRlPnON EFFECllVE DATE

FOE D R A I N G INDEX SEE DRAMNG NO 6 2 4 9 7 9

10 ISALM?\ !10 BUTT;

lNFK1 -*da*ro-rnn-lrvalvrr

OU 7- 10, PIT 9 REMEDIATION PROJECT

ZbBCONmYl NO S i C * T E / B W X T Y A X O L L G

N/A REQUESTER SL AUSTAO

Q

300

WMF 601

RWMC NORTH

DESCN DN NISHIOKA DRAWN CA BEHM

/--.

- scE. 1'' = 300 o'

DES~GN PHASE PRE CON SAFETV CATEGORY N/A

CONSTRUCTION AREA

PROJECT NO 1 023203 SPEC CODE SITE MAP, AREA MAP AND DRAWING INDEX + sii OAR NO. m a 8 0 FfECiIM D A k . 9-30-2003

- TO REXBURG

TO ARC0

IDAHO FALLS

TO BLACKFOOl CONSTRUCTION AREA-J

INEEL SITE MAP SCALE. NONE

L a I

1 6 2 4 9 7 9 1-T-1 SITE MAP, AREA MAP AND DRAWING INDEX

2 6 2 4 9 8 0 1-C-I EXISTING SITE PLAN 3 624981 1-C-2 IMPROVED SITE PLAN

4 6 2 4 9 8 2 1-A-1 GENERAL BUILDING FLOOR PLAN 5 6 2 4 9 8 3 ~ - A - z UPPER RETRIEVAL PLAN 6 6 2 4 9 8 4 1- A- 3 ELEVATIONS 7 6 2 4 9 8 5 I - A- 4 ENLARGED PLANS

8 6 2 4 9 8 6 1- A- 5 SECTION AND DETAIL 9 6 2 4 9 8 7 1- A- 6 SECTION

1 0 6 2 4 9 8 8 1-HV-1 HVAC FLOW DIAGRAM

11 9 2 4 9 8 9 I- E- 1 ONELINE DIAGRAM

RETRIEVAL OPTION 1

a I 7 I 6 I 5 t 4 I 3 I 4 I

B-3

Q

t Ip I-

l l i

01 R I Y I . 4 8

TREATMENT AREA BY OTHERS

7 6 5 4 3 2 1

!--- c

B-5

Q

m I

(0 N

\,

\ \

\ \ \

/ /

.01-.011

C

U

n

t

W 0" I Y [I( x

0

r!T

0 CL

V

0

0 N - P)

in (D m

7

I ,

2 W 0

4 W

5 -

0

N N -

...... W E HSVM X 3 0 l t i l V 11x3

I______ OS1 H13N31

\

S i- (I 0 /

W W '

\. I i

/

,.*-.so 1 l-

+ & R C Y 31 8

490'-0" 155'"''

7 6 5 4 3 2 1

l i 3VERBURDEN STAGING

AREA, BELOW

MAINTENANCE AND

HVAC BUILDING

INLET

6

UPPER RETREIVAL PLAN SCALE 1 ' = 30'-0"

I

INLET AIR DUCT

\IN,, AIR DUCT

(r

h c I

-

NOTE ACCESS AND EQUIPMENT CORRIDORS NOT SHOWN FOR CLARITY

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

B-7

+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS

REV DESCRlPnON EFFECllVE DATE

LOOKING NORTH

SOUTH ELEVATION SCALE 1"=2O'

\NEW PILING, BELOW GRADE

EXISTING PILING BELOW GRADE

LOOKING WEST

EAST ELEVATION SCALE 1"=30' RELEASED

FOR RECORD ONLY

DO NOT FABRICATE

B-8

+ & R C Y 31 8

193'-3" - 105'- 4"

7 6 5 4 3 2 1

NORTH

ENLARGED PLAN OVERBURDEN STAGING AREA

SCALE: 1 ' = 2O'-O"

FOE D R A I N G INDEX SEE DRAMNG NO 624979

1O""

r NEW PILES AND SHEET PILES, W P

EXISTING CONCRETE

lNFK1 -*da*ro-rnn-lrvalvrr ZbBCONmACl NO S i C * T E / B W X T Y A X O L L G

N/A

REQUESTER SL AUSTAO OU 7- 1 0 PIT 9 REMEDIATION PROJECT

CONCRETE

a 7

\

6 5 t- 4 3 4 I

\ -rs- \

N

m t u l NEW CONCRETE

2-

SOUTH

ENLARGED PLAN SCALE 1' = 20'-0"

R ETRl EVAL OPTION 1

B-9

Ol-RCY 31 8

---

OVERBURDEN

7 6 5 4 3 2 1

Ft

10'-0"

AIR INTAKE DUCTING ROOF JOISTS VERHEAD CRANE RAIL

I /I111 I \

OVERHEAD CRANE MAINTENANCE AREA VERTICAL SEPARATOR

DETAIL 1 SCALE: 1"=10' -

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

lNFK1 -*da*ro-rnn-lrvalvrr

OU 7-10, PIT 9 REMEDIATION PROJECT

FOE D R A I N G INDEX SEE DRAMNG NO ZbBCONIRYl NO S i C * T E / B W X T Y A X O L L G

624979

B-10

Q

3 3

a

,"Z/l 9-.9'r

0

m n z

N

4 -

0 t- o w vt .*

I P ii

0 I 0 w

8 7 6 5 4 4 3 2 1 p?

HVAC FLOW DIAGRAM lNFK1 -*da*ro-rnn-lrvalvrr

REQUESTER SL AUSTAO OU 7- 10, PIT 9 REMEDIATION PROJECT DESCN BK GROVER R ETRl EVAL DRAWN CA BEHM OPTION 1 PROJECT NO 1 0203203 SPCL CODE HVAC FLOW DiAGRAM

FOE D R A I N G INDEX SEE DRAMNG NO SbBCDNIRACl NO S i C * T E / B W X T Y A X O L L G

6 2 4 9 7 9

NO SCALE + DESGN PHASE PRE CON SEf DPR NO 105080 SAFtTV CATEGORY N /A EFfEClIM D A k 9-30-2003

,*" Jlmii

DESGN PHASE PRE CON SAFtTV CATEGORY N /A

PROJECT NO 1 0203203 SPCL CODE HVAC FLOW DiAGRAM

SEf DPR NO 105080 EFfEClIM D A k 9-30-2003

+

REV DESCRlPnON EFFECllVE DATE

iEVERSE RETURN WATER SKTEM *

.............

.............

TO PLC MAiNTENANCE ROOM c

7 - - , 7 r--- 450 GPM, 5 HP PUMP 1

37,000 CFM 1

BACK-UP ........................

5 HP PUMP

I I 111 I I I

46"0 ' 36"@

46"0 L! TO w PLC

RETRIEVAL AREA

r 72"@

PRIMARY - 1.5" WG I i I 1 1

, I

I I 73,000 CFM I

I I

-d) I1 I

c

I1 j r 7 2 " 0 3 AC/HR 110,000 CFM 1 AC/HR OSA I 37.000 CFM 11

N ~

PLC TO MASTER

LEGEND PLC

FIT

PROGRAMMABLE LOGIC CONTROLLER

FLOW iNDlCATlNG TRANSMITTER

TEMPERATURE iNDlCATOR

PRESSURE INDICATING DEVICE

VERIAELE FREQUENCY DRIVE

BACK DRAFT DAMPER

RELEASED FOR RECORD ONLY

DO NOT FABRICATE PiD

VFD

BOD HVAC FLOW DIAGRAM

HVAC DUCTING

PIPING

ELECTRONIC SIGNAL

PUNT AIR

B-12

8

FROM SUB-9 P

T

7 6 5 4 3 2 1

CBL-0018 AMPACITY 185 A

CBL-0022 AMPACIN 510 A AMFACIN 510 A

HVF- 1 ti Ds-l

s-PP-2 DEMAND 1 2 KVA

1 S-XFR-1 KVA 1000 .0 KVA PRI 4 1 6 0 V T SEC 480 V

'1 PD-0033

CBL-0006 AMPACIN 1530 A

FOE D R A I N G INDEX SEE DRAMNG NO 6 2 4 9 7 9 ONELINE DIAGRAM

NO SCALE

DESGN PHASE FRE-CON SAFtTV CATEGORY N /A

f SM-1 S-MCC-1

lNFK1 -*da*ro-rnn-lrvalvrr

REQUESTER SL AUSTAO OU 7- 10, FIT 9 REMEDIATION PROJECT DESCN BL COWLN R ETRl EVAL DRAWN EL COWLEY OPTION 1 PROJECT NO 1 023203 SPCL CODE ELECTRICAL ONELINE DIAGRAM

ZbBCONIRACI NO S i C * T E / B W X T Y A X O L L G

N/A

+ DPR NO ia5a8a

FfECiIM D A k 9-30-2003

DEMAND 8 5 1 KVA PF 91.83%

BLO-1 BLO-2 RATED HP 150.0 HP RATED HP 150.0 HF

$-PP--1

OFFICE Eo-1 DEMAND30.00 KVA

8 0 %

LIGHTS-1 DEMAND133.00 KVA

80%

LIGHTS-2 DEMAND133 00 KVA

80%

h3PP-4

GEN L( E - 1 DEMAND50.00 KVA

80%

PUMP-4 RATED HP 2 5 0 HP

HEAT-1 DEMAND332 55 KVA

PF 100

FROM sua-9 B

T CBL-0025 AMPACITY 480 A

PD-0057 4 PD-0056 I

N-XFR-1 KVA 2 0 0 0 . 0 KVA FRI 4 1 6 0 V

CBL-0024 AMPACITY 3120 A

PUMP-3 RATED HP 5.0 HP

BLO-3 1 RATED HP 300.0 HP I BLO-4 CMP-I

caL-ooi 4 AMPACITY 20 A

RATED HP 300.0 HP RATED HP 50.0 HP

N-PP-1 DEMAND 3 7 1 KVA P F 80%

I BL-0013 MPACITY 510 A

C B L - O O Z ~ AMPACIN 680 A

CHILLER- 1 HEAT-2 HEAT-3 DEMAND1 65.15 KVA DEMAND332.55 KVA DEMAND332.55 KVA

P F 80% PF 1.00 P F 1.00

FD-0031

- N-LP-1 "PD-0053 DEMAND 3 9 9 KVA PF 80% t t t $PDF0046 $PD-0047 $?D-0048 '1 PD-0037

r s 1 LIGHTS-4 LIGHTS-5

caL-0017 AMPACIN 5 5 A

LIGHTS-3 PD-0036

DEMAND133 00 KVA DEMAND133 00 KVA DEMAND133 00 KVA 80% 80% 80% OFFICE EQ-2 GEN LOADS-2

cBL-ools DEMAND42 00 DEMAND300 00 KVA AMPACITY 55 A KVA 8 0 %

RELEASED FOR RECORD ONLY

BREATH 1 AIR

RATED HP 2 5 0 HF

DO NOT FABRICATE

B-13

~. . . 8 I I 6 I 5 1 4 I I 2 I 1 ri

DRAWING INDEX '$El DWG NO. I ,,&y:o I REV1 DRAWING TITLE

REV DESCRlPnON EFFECllVE DATE

- scE. 1'' = 300 o'

DES~GN PHASE PRE CON SAFETV CATEGORY N/A

10 ISALM?\ !10 BUTT;

PROJECT NO 1 023203 SPEC CODE SITE MAP, AREA MAP AND DRAWING INDEX + sii OAR NO. m a 8 0 FfECiIM D A k . 9-30-2003

Q WMF 601

RWMC NORTH /--. CONSTRUCTION AREA - TO REXBURG

TO ARC0

IDAHO FALLS

TO BLACKFOOl CONSTRUCTION AREA-J

INEEL SITE MAP SCALE. NONE

L a I

1 6 2 4 9 9 0 2-T-1 SITE MAP, AREA MAP AND DRAWING INDEX

2 624991 2-C-1 EXISTING SITE PLAN 3 6 2 4 9 9 2 2- C- 2 IMPROVE0 SITE PLAN

4 6 2 4 9 9 3 2-A- 1 GENERAL BUILDING FLOOR PLAN

5 6 2 4 9 9 4 2- A- 2 UPPER RETRIEVAL PLAN 6 6 2 4 9 9 5 2- A- 3 ELEVATIONS 7 6 2 4 9 9 6 2- A- 4 ENLARGED PLANS

8 6 2 4 9 9 7 2- A- 5 SECTION AND DETAIL 9 6 2 4 9 9 8 2- A- 6 SECTION

10 6 2 4 9 9 9 2-HV-1 HVAC FLOW DIAGRAM

11 6 2 5 0 0 0 2-E-1 ONELINE DIAGRAM

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

DESCN DN NISHIOKA 300 DRAWN CA BEHM

RETREIVAL OPTION 2

a I 7 I 6 I 5 t 4 I 3 I 4 I

B-14

Q

Q

I Ip IC

Q

,

w w w w "" \I'

\ -S'

\

I j j

,/'

/'

..0L- ,OlL

c t

..t-.s01

+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS

REV DESCRlPnON EFFECllVE DATE

INLET AIR DUCT--'

1 12'-4"

I ___

4 9 0 '- 0 '

1 \ /

\

NEW CONCRETE- TRACK, BELOW

MAINTENANCE AND

HVAC BUILDING

I

6

UPPER RETREIVAL PLAN SCALE 1 ' = 30 ' -0"

NOTE ACCESS AND EQUIPMENT CORRIDORS NOT SHOWN FOR CLARITY

W I

N -

&INLET AIR DUCT 1

RE LEAS ED FOR RECORD ONLY

DO NOT FABRICATE

a t A 4

B-18

+ & R C Y 31 8

t r

7 6 5 4 3 2 1

FINISH GRADE

a

LOOKING NORTH

SOUTH ELEVATION SCALE 1"=2O'

I 7 6 5 4 3 4 I I

\--NEW PILING, BELOW GRADE

a

655'-3" -

7 6 5 4 3 4 I

I I I ' I I H H

. . .. . . . . .. . . . . .. . .

\

LOOKING WEST

EAST ELEVATION SCALE: 1"=30 RELEASED

FOR RECORD ONLY

DO NOT FABRICATE

,mp r ,8Ec"TELmT,xT Y l x o - r i r

N/A 6 2 4 9 9 0 z0 REQUESTER SL AUSTAO OU 7- 10, PIT 9 REMEDIATION PROJECT

RETRIEVAL SCALE 1. 20 0 DRAWN ?A KFI I FY OPTION 2

B-19

Q

I

'1

..Z/l i-.sz

..O-.Ol -n-

..Z/L 2-.OZ . Z / l 6-.EZ

+ & R C Y 31 8

y- - - - - -- - - - - / -\

NDERBURDEN

OVERBURDEN

7 6 5 4 3 2 1

r A I R INTAKE DUCTING r ROOF JOISTS

PERSONNEL ACCESS AND EMERGENCY EGRESS CORRIDOR

b t I ll~ n I fi'

?BURDEN STAGING AREA .-

NEW CONCRETE

DETAIL 1 SCALE: 1"=10' -

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

B-2 I

+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS

REV DESCRlPnON EFFECllVE DATE

150'-0'

L 20"" I 1 IO'"''

SECONDARY CONFINEMENT DIVIDING WALL SECONDARY CONFINEMENT ZONE TO ZONE ACCESS DOOR

AIR-INLET DUCTING

/-PERSONNEL ACCESS ZONE/ SECONDARY CONFINEMENT

/ 24'-3 1/2" I --- I 1

AIR INLET / ~~,~ ^ : w - I

- - A .I :

:o 0

N N

I f t

SECONDARY CONFINEMENT

SECONDARY CONFINEMENT

/ /

0 I i?

OPERATING CORRIDOR MEZZANINE

CONFINEMENT /// HVAC ROOM

AIR RETURN DUCT, 6'-0"@

EXISTING CONCRETE, N P

EXISTING PILES, TYP

7'-4' - BACKHOE

EXISTING PILES AND--- SHEET PILING j E X I S T I N G PILES AND

SHEET PILING

142'-6" 10'"'' tj

20'""

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

I I I t 4 I I 4 I

B-22

8 7 6 5 4 4 3 2 1 p?

HVAC FLOW DIAGRAM lNFK1 -*da*ro-rnn-lrvalvrr

REQUESTER SL AUSlAO OU 7- 1 0 , PIT 9 REMEDIATION PROJECT DESCN BK GROVER R ETRl EVAL DRAWN CA BEHM OPTION 2 PROJECT NO 1 0203203 SPCL CODE HVAC FLOW DIAGRAM

FOE D R A I N G INDEX SEE DRAMNG NO SbBCDNIRACl NO S i C * T E / B W X T Y A X O L L G

624990

NO SCALE + DESGN PHASE PRE CON SEf DPR NO 105080 SAFtTV CATEGORY N /A EFfEClIM D A k 9-30-2003

,*" Jlmii

DESGN PHASE PRE CON SAFtTV CATEGORY N /A

PROJECT NO 1 0203203 SPCL CODE HVAC FLOW DIAGRAM

SEf DPR NO 105080 EFfEClIM D A k 9-30-2003

+

REV DESCRlPnON EFFECllVE DATE

iEVERSE RETURN WATER SKTEM *

.............

.............

450 GPM, 5 HP PUMP 1

37,000 CFM 1

BACK-UP ........................

5 HP PUMP

46"Q 46"Q

RETRIEVAL AREA

r 72"@

PRIMARY - 1.5" WG I i I 1 1

I I 73,000 CFM I

I I

d) I1 I

c

50" Q

I1 j r 7 2 " 0 3 AC/HR 110,000 CFM 1 AC/HR OSA 46"0 37.000 CFM

36"O I

N

TO MASTER PLC

LEGEND PLC

Fir PROGRAMMABLE LOGIC CONTROLLER

FLOW INDICATING TRANSMITTER

TEMPERATURE INDICATOR

PRESSURE INDICATING DEVICE

VERiABLE FREQUENCY DRIVE

BACK DRAFT DAMPER

RELEASED FOR RECORD ONLY DO NOT FABRICATE PID

VFD

BDD HVAC FLOW DIAGRAM

HVAC DUCTING

PIPING

ELECTRONIC SIGNAL

PUNT AIR

B-23

+ & R C Y 31 8

FROM SUB-9 P

T

7 6 5 4 3 2 1

CBL-0018 AMPACITY 185 A

SSP-3 SSP-4

HVF- 1 ti Ds-l 1 S-XFR-1 KVA 1000.0 KVA PRI 4 1 6 0 V T SEC 4 8 0 V

CBL-0006 AMPACIN 1530 A

f SM-1 S-MCC-1 DEMAND 8 5 1 KVA PF 91.83%

BL0-1 BLO-2 RATED HP 150.0 HP RATED HP 150.0 HP

$-PP--1

SB-3 ;) SB-5

EL-0015 MPACIN 510 A

$#0510 A p ~ ~ ~ 7 AMPACITY 55 A

RATED HP 2 5 0 HP HEAT-1

DEMAND332 55 KVA PF 100

PUMP-3 RATED HP 5.0 HP

BL0-3 RATED HP 300.0 HP

BL0-4 CMP-1 RATED HP 300.0 HP RATED HP 50.0 HP

EL-001 4 VlPACITY 20 A

! OFFICE Eo-1 DEMAND30 0 0 KVA

8 0 %

LIGHTS-1 DEMAND133 0 0 KVA

8 0 %

LIGHTS-2 DEMAND133 0 0 KVA

8 0 %

GEN LOADS-1 DEMAND50 0 0 KVA

8 0 %

FROM SUE-9 B

T CBL-0025 AMPACITY 480 A

PD-0057 4 PD-0056 I

N-XFR-1 KVA 2 0 0 0 . 0 KVA PRI 4 1 6 0 V

T S E C 4 8 0 v

CBL-0024 AMPACITY 3120 A

PUMP-2 RATED HP 5 0 HP

PUMP-1 RATED HP 5.0 HP

'0-0033

- N-PP-1 DEMAND 371 KVA PF 8 0 %

3-6

I BL-0013 MPACITY 510 A

PO-0031

-

OFFICE EQ-2 GEN LOADS-2 CBL-Ools DEMAND42.00 DEMAND300.00 KVA AMPACIN 55 A KVA 8 0 %

BREATH AIR RATED HP 25.0 HP

CBL-0021 CBL-0022 4MPACIN 510 A IAMPALIIY 510 A I

CEL-0023 AMPACIN 680 A

CHILLER- 1 HEAT-2 HEAT-3 DEMAND1 65.15 KVA DEMAND332.55 KVA DEMAND332.55 KVA

PF 80% PF 1.00 PF 1.00

N- LP- 1 "PD-0053 DEMAND 3 9 9 KVA PF 8 0 %

"?D-0048 1 J" r s

"PD-0047

LIGHTS-3 LIGHTS-4 LIGHTS-5 DEMAND133.00 KVA DEMAND133.00 KVA DEMAND1 33.00 KVA

80% 8 0 % 8 0 %

ONELINE DIAGRAM OU 7- 1 0 , PIT 9 REMEDIATION PROJECT

PROJECT NO 1 023203 SPCL CODE ELECTRICAL ONELINE DIAGRAM +

DES~GN PHASE PRE-CON sii DPR NO. 1~x080 SAFETV CATEGORY N /A FfECiIM D A k . 9-30-2003

a I 7 I 6 I 5 t- 4 I 3 I 4 I I

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

lNFK1 -*da*ro-rnn-lrvalvrr

OU 7- 1 0 , PIT 9 REMEDIATION PROJECT R ETRl EVAL OPTION 2

FOE D R A I N G INDEX SEE DRAMNG NO sbBCONmY1 NO S i C * T E / B W X T Y A X O L L G

6 2 4 9 9 0

a I 7 I 6 I 5 t- 4 I 3 I 4 I I

B-24

~. . . 8 I I 6 I 5 1 4 I I 2 I 1 ri

DRAWING INDEX '$El DWG NO. I ,,&y:O I REV1 DRAWING TITLE

REV DESCRlPnON EFFECllVE DATE

WMF 601

RWMC NORTH /--. CONSTRUCTION AREA - TO REXBURG

TO ARC0

IDAHO FALLS

TO BLACKFOOl CONSTRUCTION AREA-J

INEEL SITE MAP SCALE. NONE

L a I

1 625001 3-T-1 SITE MAP, AREA MAP AND DRAWING INDEX

2 6 2 5 0 0 2 3-C-1 EXISTING SITE PLAN 3 6 2 5 0 0 3 3- C- 2 IMPROVED SITE PLAN

4 6 2 5 0 0 4 3-A- 1 GENERAL BUILDING FLOOR PLAN

5 6 2 5 0 0 5 3- A- 2 UPPER RETRIEVAL PLAN 6 6 2 5 0 0 6 3- A- 3 ELEVATIONS 7 6 2 5 0 0 7 3- A- 4 ENLARGED PLANS

8 6 2 5 0 0 8 3- A- 5 9 6 2 5 0 0 9 3- A- 6 SECTION

1 0 6 2 5 0 1 0 3-HV-1 HVAC FLOW DIAGRAM

11 625011 3-E-1 ONELINE DIAGRAM

SECTION AND DETAIL

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

lNFK1 -*da*ro-rnn-lrvalvrr FOE D R A I N G INDEX SEE DRAMNG NO ZbBCONIRYl NO

REQUESTER SL AUSTAO OU 7- 10, PIT 9 REMEDIATION PROJECT DESCN WH LANDMAN RETREIVAL

OPTION 3

S i C * T E / B W X T Y A X O L L G

N/A 625001

a I 7 I 6 I 5 4 I 3 4 I I

B-25

Q

01 R I Y I . 4 8 7 6 5 4 3 2 1 REVISIONS

REV DESCRlPnON EFFECllVE DATE

TREATMENT AREA BY OTHERS

B-27

Q

I \

'\

,/ ,/

/' \

Z Q/

w 0 Y

4

L

I

tioaititio3 SNOIlVti3dO 13NNOSti3d I

\ -S' c t

..t-.s01

+ & R C Y 31 8

INLET AIR DUCT--'

7 6 5 4 3 2 1

1 12'-4"

I ___

4 9 0 '- 0 '

1 \ /

\

NEW CONCRETE- TRACK, BELOW

MAINTENANCE AND

HVAC BUILDING

I

6

UPPER RETREIVAL PLAN SCALE 1 ' = 30 '- 0"

W I

N -

&INLET AIR DUCT 1

NOTE ACCESS AND EQUIPMENT CORRIDORS NOT SHOWN FOR CLARITY

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

B-29

+ & R C Y 31 8

t r

7 6 5 4 3 2 1

FINISH GRADE

a

LOOKING NORTH

SOUTH ELEVATION SCALE 1"=2O'

I 7 6 5 4 3 4 I I

\--NEW PILING, BELOW GRADE

a

655'-3" -

7 6 5 4 3 4 I

I I I ' I I H H

. . .. . . . . .. . . . . .. . .

\

LOOKING WEST

EAST ELEVATION SCALE: 1"=30 RELEASED

FOR RECORD ONLY

DO NOT FABRICATE

B-30

+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS

REV DESCRlPnON EFFECllVE DATE

NORTH OVERBURDEN STAGING AREA

ENLARGED PLAN SCALE 1 ' = 20'-0"

lo'-"' -ir NEW PILES AND SHEET PILES, TYP r

ENLARGED PLAN SCALE: 1 ' = 20'-0"

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

lNFK1 -*da*ro-rnn-lrvalvrr

OU 7-10 PIT 9 REMEDIATION PROJECT

FOE D R A I N G INDEX SEE DRAMNG NO ZbBCONIRYl NO S i C * T E / B W X T Y A X O L L G

625001

DESCN Bc SPAULDING 'u DRAWN CA KELLN R ETRl EVAL OPTION 3

I I I t 4 I I 4 I

B-3 I

+ & R C Y 31 8

--\- - L- A

7 6 5 4 3 2 1

a I 7

OVERBURDEN STAGING SOIL

'-CLEAN OVERBURDEN

L ASTE SEAM

io'""

ROOF JOISTS AIR INTAKE DUCTING

PERSONNEL ACCESS AND EMERGENCY EGRESS CORRIDOR

.

t ~~ N N I %ll n i I lllll II I i b ,, 9

OVERBURDEN STAGING AREA 1 : GRADE EL 5009

NEW CONCRETE

DETAIL 1 SCALE: i " = l O ' -

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

I 5 t 4 I I 4 I

B-32

+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS

REV DESCRlPnON EFFECllVE DATE

150'-0'

L 20"" I 1 IO'"''

SECONDARY CONFINEMENT DIVIDING WALL SECONDARY CONFINEMENT ZONE TO ZONE ACCESS DOOR

AIR-INLET DUCTING

/-PERSONNEL ACCESS ZONE/ SECONDARY CONFINEMENT

/ 24'-3 1/2" I --- I 1

AIR INLET / ~~,~ ^ : w - I

- - A .I :

:o 0

N N

I f t

SECONDARY CONFINEMENT

SECONDARY CONFINEMENT

/ /

0 I i?

OPERATING CORRIDOR MEZZANINE

CONFINEMENT /// HVAC ROOM

AIR RETURN DUCT, 6'-0"@

EXISTING CONCRETE, NP

EXISTING PILES, TYP

7'-4' - BACKHOE

EXISTING PILES AND--- SHEET PILING j E X I S T I N G PILES AND

SHEET PILING

142'-6" 10'"'' tj

20'""

RELEASED FOR RECORD ONLY

DO NOT FABRICATE

R ETRl EVAL OPTION 3

DESCN Bc SPAULDING

I I I t 4 I I 4 I

B-33

+ & R C Y 31 8 7 6 5 4 4 3 2 1 p? I RF\4ClflhlC

REV DESCRlPnON EFFECllVE DATE

Y0 iEVERSE RETURN WATER SKTEM "

.............

.............

450 GPM, 5 HP PUMP 1 1

37,000 CFM

1 i 1

BACK-UP ........................

5 HP PUMP

37,000 CFM, 15" SP

50" Q

/ / ~ L .................. i 1 ........................

LEGEND PLC

FIT

PROGRAMMABLE LOGIC CONTROLLER

FLOW INDICATING TRANSMITTER

TEMPERATURE INDICATOR

PRESSURE INDICATING DEVICE

VERIAELE FREQUENCY DRIVE

BACK DRAFT DAMPER

HVAC DUCTING

PIPING

ELECTRONIC SIGNAL

PUNT AIR

RELEASED FOR RECORD ONLY

DO NOT FABRICATE PID

VFD

BOD

- --- I

lNFK1 -*da*ro-rnn-lrvalvrr

OU 7-10, PIT 9 REMEDIATION PROJECT R ETRl EVAL

FOE D R A I N G INDEX SEE DRAMNG NO ZbBCONIRYl NO S i C * T E / B W X T Y A X O L L G HVAC FLOW DIAGRAM 625001 N/A

DESCN BK GROVER IDRAWN CA BEHM I OPTION 3

I I I t 4 I I 4 I

B-34

8 7 6 5 t 4 3 2 1 REVlSIONS

REV DESCXIPIION EFfECllVE DATE

FROM SUB-9 A

T CBL-0018 AMPACITY 185 A

DS-1

HVF-1

S-XFR-1 KVA 1000.0 KVA PRI 4 1 6 0 V SEC 480 v

S-MCC-1 DEMAND 8 5 1 KVA PF 91.83%

BLO-1 BLO-2 RATED HP 150.0 HP RATED HP 150.0 HP

$-PP-I

SB-3 ;) 3 - 4 ;) SB-5

CBL-0020

EL-0015 MPACIW 510 A I

PUMP-4 RATED HP 2 5 0 HP

t HEAT-1

DEMAND332 55 KVA PF 1 0 0

LIGHTS - 2 DEMAND1 3 3 00 KVA

8 0 %

GEN LOADS-1 DEMAND50 00 KVA

8 0 %

FROM SUB-9 8

T CBL-0025 AMPACITY 480 A

~ P ~ - 0 0 5 ,

PD-0056 I

N-XFR-1 KVA 2000.0 KVA PRI 4 1 6 0 V

T S E c 4 8 0 v

CBL-0024 AMPACITY 3120 A

PUMP-3 RATED HP 5.0 HP f&

BLO-3 RATED HP 300.0 HP

BLO-4 CMP-1 RATED HP 300.0 HP RATED HP 50.0 HP

EL-001 4 VIPACITY 20 A

s -PP-2 DEMAND 12 KVA >D-0033

- PF 80% ')SBP-3 $1 SBP-4

9 S S P - 3 9 S S P - 4

CBL-0003 CBL-0004 AMPACITY 20 A AMPACITY 20 A

PUMP-2 RATE0 HP 5.0 HP

PUMP-1 RATED HP 5.0 HP

3-6

EL-0013 MPACITY 510 A

PO-0031

- N-PP-1 DEMAND 371 KVA PF 80%

'1 PD-0037

CBL-0017 AMPACIN

fPD-00 j2

55 A ~'PD-0051 I t PO-0036

OFFICE EQ-2 GEN LOADS-2

BREATH AIR RATED HP 25.0 HP

CBL-0021 CBL-0022 4MPACIW 510 A IAMF'ACIW 510 A I

CBL-0023 AMPACIN 680 A

CHILLER- 1 HEAT-2 HEAT-3 DEMAND1 65.15 KVA DEMAND332.55 KVA DEMAND332.55 KVA

PF 80% PF 1.00 PF 1.00

N- LP- 1 DEMAND 3 9 9 KVA

I t)PD-0053

PF 80% I ~ P D - 0 0 4 7 1;:...8

LIGHTS-3 LIGHTS-4 LIGHTS-5 DEMANDl 33.00 KVA DEMANDl 33.00 KVA DEMAND1 3 3 . 0 0 KVA

80% 8 0 % 80%

RELEASED FOR RECORD ONLY

ONELINE DIAGRAM OU 7- 10, PIT 9 REMEDIATION PROJECT

R ETRl EVAL DESlGN BL COWLN

DO NOT FABRICATE , N F E, --*4rrr4*in*-aullrrr S l O X T E L B W X T i O l X D L L C

FOR ORAMNG 6 2 5 0 0 1 INDEX SEE DRAWING NO S~SCONIRACI NO

OU 7- 10, PIT 9 REMEDIATION PROJECT R ETRl EVAL

NO SCALE DRlW BL CGWLEY OPTION 3

REQUESTER SL AUSTAD DESlGN BL COWLN

PhOJECl NO 1 023203 SPCL CODE ELECTRICAL ONELINE DIAGRAM ~

- FOR hEVIEW//PPROVAL SIGNAIURES ~ I ~ ~ ~ ~ ~ r n D W G - 6 2 5 0 1 "" IN NU 11 REV DESGN PHASE PRE-CON sEt DAR NO 105080 098 9999 10 090 SAFETY CATEGORY N /A EIECW DIE 9-30-2003 S c k E NONE /SHEET 3-E- 1