APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project...

164
APPENDIX 5.3A Air Quality Emissions Calculations

Transcript of APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project...

Page 1: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

APPENDIX 5.3A

Air Quality Emissions Calculations

Page 2: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project
Page 3: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project information.

Land Use - See Section 5.10, Land Use and Planning for more details. Based on information provided by ARB.

Construction Phase - Based on information provided by ARB.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

1.1 Land Usage

Land Uses Size Metric Lot Acreage Floor Surface Area Population

General Office Building 122.46 1000sqft 2.81 122,459.00 0

Research & Development 41.63 1000sqft 0.96 41,631.00 0

General Light Industry 213.12 1000sqft 4.89 213,120.02 0

Other Asphalt Surfaces 12.00 1000sqft 0.28 12,000.00 0

Parking Lot 422.50 1000sqft 9.70 422,500.00 0

1.2 Other Project Characteristics

Urbanization

Climate Zone

Urban

10

Wind Speed (m/s) Precipitation Freq (Days)2.2 31

1.3 User Entered Comments & Non-Default Data

1.0 Project Characteristics

Utility Company Riverside Public Utilities

2021Operational Year

CO2 Intensity (lb/MWhr)

1325.65 0.029CH4 Intensity (lb/MWhr)

0.006N2O Intensity (lb/MWhr)

ARB Southern California Relocation Project Air District, Annual

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 1 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 4: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Trips and VMT - CalEEMod defaults for worker trips. See Section 3.0, Project Description, of the DEIR for estimated hauling trips.

On-road Fugitive Dust - CalEEMod defaults.

Demolition - See Section 3.0 for construction details.

Grading - See Section 3.0 for construction details.

Architectural Coating - ARB will use no-VOC coatings for interior and low-VOC coatings for exterior. A conservative estimate was assumed, 5 g/l for interior and

50 g/l for exterior.

Vehicle Trips - CalEEMod inputs were based on Dudek calculated net vehicle miles travelled for the proposed project.

Vehicle Emission Factors - Default CalEEMod factors.

Vehicle Emission Factors - Default CalEEMod factors.

Vehicle Emission Factors - Default CalEEMod factors.

Road Dust - CalEEMod Defaults.

Woodstoves - No hearths.

Consumer Products - CalEEMod defaults.

Area Coating - ARB will use no-VOC coatings for interior and low-VOC coatings for exterior. A conservative estimate was assumed, 5 g/l for interior and 50 g/l for exterior.

Landscape Equipment - CalEEMod defaults.

Energy Use - Based on information provided from ARB.

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 2 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 5: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Water And Wastewater - See Section 3.0, Project Description, of the DEIR for details on water use. Default CalEEMod factors.Solid Waste - CalEEMod defaults.

Land Use Change - Land use change calculated outside of CalEEMod.

Sequestration - Land use change calculated outside of CalEEMod.

Construction Off-road Equipment Mitigation - SCAQMD Rule 403 for Fugitive Dust suppression.

Mobile Land Use Mitigation - No traffic mitigation.

Mobile Commute Mitigation - No cummute mitigation.

Area Mitigation - ARB will use no-VOC coatings for interior and low-VOC coatings for exterior. A conservative estimate was assumed, 5 g/l for interior and 50 g/l for exterior.

Energy Mitigation - Proposed project includes a 3.5 MW solar PV system. Any additional grid electricity needed will be renewably sourced.

Water Mitigation - No water mitigation.

Waste Mitigation - Department of General Services Management Memo 15-06 requires at least a 50% diversion from state buildings.

Stationary Sources - Emergency Generators and Fire Pumps - Stationary sources calculated outside of CalEEMod.

Stationary Sources - Process Boilers - Stationary sources calculated outside of CalEEMod.

Stationary Sources - User Defined - Stationary sources calculated outside of CalEEMod.

Stationary Sources - Emergency Generators and Fire Pumps EF - Stationary sources calculated outside of CalEEMod.

Stationary Sources - Process Boilers EF - Stationary sources calculated outside of CalEEMod.

Table Name Column Name Default Value New Value

tblArchitecturalCoating EF_Nonresidential_Exterior 100.00 50.00

tblArchitecturalCoating EF_Nonresidential_Interior 100.00 5.00

tblAreaCoating Area_EF_Nonresidential_Exterior 100 50

tblAreaCoating Area_EF_Nonresidential_Interior 100 5

tblLandUse BuildingSpaceSquareFeet 122,460.00 122,459.00

tblLandUse BuildingSpaceSquareFeet 41,630.00 41,631.00

tblLandUse BuildingSpaceSquareFeet 213,120.00 213,120.02

tblLandUse LandUseSquareFeet 122,460.00 122,459.00

tblLandUse LandUseSquareFeet 41,630.00 41,631.00

tblLandUse LandUseSquareFeet 213,120.00 213,120.02

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 3 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 6: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.0 Emissions Summary

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 4 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 7: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.1 Overall Construction

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Year tons/yr MT/yr

2018 0.2351 2.1549 1.7712 4.0000e-003

0.2295 0.0968 0.3262 0.0432 0.0905 0.1337 0.0000 364.5570 364.5570 0.0659 0.0000 366.2048

2019 1.1891 7.8134 9.7380 0.0243 1.2620 0.3457 1.6077 0.3377 0.3328 0.6705 0.0000 2,203.3452

2,203.3452

0.1875 0.0000 2,208.0319

2020 0.7020 2.3487 2.9306 7.5200e-003

0.3803 0.0991 0.4794 0.1017 0.0952 0.1970 0.0000 678.6319 678.6319 0.0607 0.0000 680.1504

Maximum 1.1891 7.8134 9.7380 0.0243 1.2620 0.3457 1.6077 0.3377 0.3328 0.6705 0.0000 2,203.3452

2,203.3452

0.1875 0.0000 2,208.0319

Unmitigated Construction

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Year tons/yr MT/yr

2018 0.0991 1.0936 1.9777 4.0000e-003

0.1598 7.4700e-003

0.1673 0.0357 7.3400e-003

0.0430 0.0000 364.5568 364.5568 0.0659 0.0000 366.2046

2019 0.7399 5.5407 10.1159 0.0243 1.2620 0.0515 1.3135 0.3377 0.0502 0.3879 0.0000 2,203.3444

2,203.3444

0.1875 0.0000 2,208.0311

2020 0.5657 1.7032 3.0748 7.5200e-003

0.3801 0.0138 0.3939 0.1017 0.0135 0.1152 0.0000 678.6316 678.6316 0.0607 0.0000 680.1501

Maximum 0.7399 5.5407 10.1159 0.0243 1.2620 0.0515 1.3135 0.3377 0.0502 0.3879 0.0000 2,203.3444

2,203.3444

0.1875 0.0000 2,208.0311

Mitigated Construction

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 5 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 8: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e

Percent Reduction

33.93 32.31 -5.05 0.00 3.73 86.56 22.32 1.56 86.31 45.46 0.00 0.00 0.00 0.00 0.00 0.00

Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter)

1 6-4-2018 9-3-2018 0.4888 0.2139

2 9-4-2018 12-3-2018 1.1089 0.4664

3 12-4-2018 3-3-2019 2.1334 1.4734

4 3-4-2019 6-3-2019 2.1043 1.4731

5 6-4-2019 9-3-2019 2.0979 1.4667

6 9-4-2019 12-3-2019 2.5136 1.7357

7 12-4-2019 3-3-2020 2.1570 1.5455

8 3-4-2020 6-3-2020 1.1729 0.9329

9 6-4-2020 9-3-2020 0.1805 0.1240

Highest 2.5136 1.7357

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 6 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 9: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.2 Overall Operational

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Area 1.4266 1.0000e-004

0.0104 0.0000 4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 0.0201 0.0201 5.0000e-005

0.0000 0.0215

Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2,390.1384

2,390.1384

0.0523 0.0108 2,394.6694

Mobile 0.5975 3.0281 6.0870 0.0198 1.5212 0.0166 1.5378 0.4076 0.0155 0.4231 0.0000 1,831.1295

1,831.1295

0.1028 0.0000 1,833.6984

Waste 0.0000 0.0000 0.0000 0.0000 77.4045 0.0000 77.4045 4.5745 0.0000 191.7664

Water 0.0000 0.0000 0.0000 0.0000 2.8949 71.4450 74.3399 0.2989 7.3400e-003

84.0010

Total 2.0241 3.0282 6.0974 0.0198 1.5212 0.0166 1.5378 0.4076 0.0155 0.4232 80.2995 4,292.7331

4,373.0325

5.0285 0.0182 4,504.1566

Unmitigated Operational

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 7 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 10: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.2 Overall Operational

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Area 1.4266 1.0000e-004

0.0104 0.0000 4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 0.0201 0.0201 5.0000e-005

0.0000 0.0215

Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 -1,306.081

7

-1,306.081

7

-0.0286 -0.0059 -1,308.557

6

Mobile 0.5975 3.0281 6.0870 0.0198 1.5212 0.0166 1.5378 0.4076 0.0155 0.4231 0.0000 1,831.1295

1,831.1295

0.1028 0.0000 1,833.6984

Waste 0.0000 0.0000 0.0000 0.0000 38.7023 0.0000 38.7023 2.2872 0.0000 95.8832

Water 0.0000 0.0000 0.0000 0.0000 2.8949 71.4450 74.3399 0.2989 7.3400e-003

84.0010

Total 2.0241 3.0282 6.0974 0.0198 1.5212 0.0166 1.5378 0.4076 0.0155 0.4232 41.5972 596.5129 638.1101 2.6604 1.4300e-003

705.0464

Mitigated Operational

3.0 Construction Detail

Construction Phase

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e

Percent Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.20 86.10 85.41 47.09 92.13 84.35

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 8 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 11: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Phase Number

Phase Name Phase Type Start Date End Date Num Days Week

Num Days Phase Description

1 Site Preparation Site Preparation 6/4/2018 6/22/2018 5 15

2 Demolition Demolition 6/25/2018 6/29/2018 5 5

3 Grading 4 - Underground Utilities Grading 7/2/2018 8/24/2018 5 40

4 Grading 3 - Building Pad and Foundation

Grading 8/27/2018 11/2/2018 5 50

5 Grading 2 - Basement Excavations

Grading 9/17/2018 11/16/2018 5 45

6 Grading 1 - Deep Excavation Grading 11/12/2018 11/30/2018 5 15

7 Building Construction Building Construction 12/3/2018 4/3/2020 5 350

8 Paving-ARB Facility Paving 9/27/2019 1/2/2020 5 70

9 Architectural Coating Architectural Coating 3/23/2020 5/15/2020 5 40

10 Excavation and Installation-Iowa Site Preparation 4/13/2020 5/22/2020 5 30

11 Fiber-Optic Improvements Trenching 5/18/2020 5/29/2020 5 10

12 Paving-Iowa Paving 6/1/2020 7/17/2020 5 35

13 Improvements-Cranford Avenue Trenching 7/20/2020 7/31/2020 5 10

OffRoad Equipment

Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor

Site Preparation Concrete/Industrial Saws 2 8.00 16 0.73

Site Preparation Crawler Tractors 1 8.00 212 0.43

Site Preparation Excavators 1 8.00 158 0.38

Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 565,815; Non-Residential Outdoor: 188,605; Striped Parking Area: 26,070 (Architectural Coating – sqft)

Acres of Grading (Site Preparation Phase): 0

Acres of Grading (Grading Phase): 0

Acres of Paving: 9.98

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 9 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 12: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Site Preparation Other Construction Equipment 1 8.00 172 0.42

Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37

Demolition Air Compressors 1 8.00 78 0.48

Demolition Tractors/Loaders/Backhoes 1 8.00 97 0.37

Grading 4 - Underground Utilities Excavators 0 8.00 158 0.38

Grading 4 - Underground Utilities Graders 0 8.00 187 0.41

Grading 4 - Underground Utilities Plate Compactors 1 8.00 8 0.43

Grading 4 - Underground Utilities Rubber Tired Dozers 0 8.00 247 0.40

Grading 4 - Underground Utilities Rubber Tired Loaders 1 8.00 203 0.36

Grading 4 - Underground Utilities Scrapers 0 8.00 367 0.48

Grading 4 - Underground Utilities Tractors/Loaders/Backhoes 1 8.00 97 0.37

Grading 3 - Building Pad and Foundation

Excavators 1 8.00 158 0.38

Grading 3 - Building Pad and Foundation

Graders 0 8.00 187 0.41

Grading 3 - Building Pad and Foundation

Rubber Tired Dozers 0 8.00 247 0.40

Grading 3 - Building Pad and Foundation

Rubber Tired Loaders 1 8.00 203 0.36

Grading 3 - Building Pad and Foundation

Scrapers 1 8.00 367 0.48

Grading 3 - Building Pad and Foundation

Tractors/Loaders/Backhoes 2 8.00 97 0.37

Grading 2 - Basement Excavations Bore/Drill Rigs 0 8.00 221 0.50

Grading 2 - Basement Excavations Excavators 1 8.00 158 0.38

Grading 2 - Basement Excavations Graders 0 8.00 187 0.41

Grading 2 - Basement Excavations Rubber Tired Dozers 0 8.00 247 0.40

Grading 2 - Basement Excavations Rubber Tired Loaders 1 8.00 203 0.36

Grading 2 - Basement Excavations Scrapers 0 8.00 367 0.48

Grading 2 - Basement Excavations Tractors/Loaders/Backhoes 2 8.00 97 0.37

Grading 1 - Deep Excavation Bore/Drill Rigs 2 8.00 221 0.50

Grading 1 - Deep Excavation Rubber Tired Loaders 1 8.00 203 0.36

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 10 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 13: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Building Construction Air Compressors 4 8.00 78 0.48

Building Construction Cranes 1 8.00 231 0.29

Building Construction Forklifts 3 8.00 89 0.20

Building Construction Generator Sets 3 8.00 84 0.74

Building Construction Skid Steer Loaders 3 8.00 65 0.37

Building Construction Tractors/Loaders/Backhoes 1 8.00 97 0.37

Building Construction Welders 0 8.00 46 0.45

Paving-ARB Facility Pavers 2 8.00 130 0.42

Paving-ARB Facility Paving Equipment 2 8.00 132 0.36

Paving-ARB Facility Rollers 2 8.00 80 0.38

Architectural Coating Air Compressors 3 8.00 78 0.48

Excavation and Installation-Iowa Excavators 1 8.00 158 0.38

Excavation and Installation-Iowa Graders 1 8.00 187 0.41

Excavation and Installation-Iowa Paving Equipment 1 8.00 132 0.36

Excavation and Installation-Iowa Plate Compactors 1 8.00 8 0.43

Excavation and Installation-Iowa Tractors/Loaders/Backhoes 1 8.00 97 0.37

Fiber-Optic Improvements Plate Compactors 1 8.00 8 0.43

Fiber-Optic Improvements Tractors/Loaders/Backhoes 1 8.00 97 0.37

Paving-Iowa Cement and Mortar Mixers 1 8.00 21 0.56

Paving-Iowa Pavers 1 8.00 130 0.42

Paving-Iowa Paving Equipment 1 8.00 132 0.36

Paving-Iowa Rollers 1 8.00 80 0.38

Improvements-Cranford Avenue Plate Compactors 1 8.00 8 0.43

Improvements-Cranford Avenue Tractors/Loaders/Backhoes 1 8.00 97 0.37

Trips and VMT

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 11 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 14: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.1 Mitigation Measures Construction

Use Cleaner Engines for Construction Equipment

Water Exposed Area

Clean Paved Roads

Phase Name Offroad Equipment Count

Worker Trip Number

Vendor Trip Number

Hauling Trip Number

Worker Trip Length

Vendor Trip Length

Hauling Trip Length

Worker Vehicle Class

Vendor Vehicle Class

Hauling Vehicle Class

Site Preparation 0 26.00 0.00 140.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Demolition 0 8.00 0.00 4.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 4 - Underground Utilities

0 8.00 0.00 150.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 3 - Building Pad and Foundation

0 14.00 0.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 2 - Basement Excavations

0 8.00 0.00 12.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 1 - Deep Excavation

0 10.00 0.00 12.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Building Construction 0 800.00 134.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Paving-ARB Facility 0 16.00 2.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Architectural Coating 0 160.00 2.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Excavation and Installation-Iowa

0 30.00 12.00 120.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Fiber-Optic Improvements

0 12.00 0.00 80.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Paving-Iowa 0 30.00 16.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Improvements-Cranford Avenue

0 12.00 0.00 10.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 12 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 15: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.2 Site Preparation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 5.0000e-005

0.0000 5.0000e-005

1.0000e-005

0.0000 1.0000e-005

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.0153 0.1656 0.1004 1.9000e-004

7.8200e-003

7.8200e-003

7.2400e-003

7.2400e-003

0.0000 16.8644 16.8644 4.9300e-003

0.0000 16.9875

Total 0.0153 0.1656 0.1004 1.9000e-004

5.0000e-005

7.8200e-003

7.8700e-003

1.0000e-005

7.2400e-003

7.2500e-003

0.0000 16.8644 16.8644 4.9300e-003

0.0000 16.9875

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 7.5000e-004

0.0268 5.0600e-003

7.0000e-005

1.5600e-003

1.1000e-004

1.6700e-003

4.3000e-004

1.0000e-004

5.3000e-004

0.0000 6.8020 6.8020 4.5000e-004

0.0000 6.8133

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 1.0400e-003

8.5000e-004

9.1000e-003

2.0000e-005

2.1400e-003

2.0000e-005

2.1600e-003

5.7000e-004

2.0000e-005

5.8000e-004

0.0000 2.0524 2.0524 7.0000e-005

0.0000 2.0541

Total 1.7900e-003

0.0276 0.0142 9.0000e-005

3.7000e-003

1.3000e-004

3.8300e-003

1.0000e-003

1.2000e-004

1.1100e-003

0.0000 8.8544 8.8544 5.2000e-004

0.0000 8.8674

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 13 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 16: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.2 Site Preparation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 2.0000e-005

0.0000 2.0000e-005

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 2.5400e-003

0.0633 0.1137 1.9000e-004

2.7000e-004

2.7000e-004

2.7000e-004

2.7000e-004

0.0000 16.8644 16.8644 4.9300e-003

0.0000 16.9875

Total 2.5400e-003

0.0633 0.1137 1.9000e-004

2.0000e-005

2.7000e-004

2.9000e-004

0.0000 2.7000e-004

2.7000e-004

0.0000 16.8644 16.8644 4.9300e-003

0.0000 16.9875

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 7.5000e-004

0.0268 5.0600e-003

7.0000e-005

1.5600e-003

1.1000e-004

1.6700e-003

4.3000e-004

1.0000e-004

5.3000e-004

0.0000 6.8020 6.8020 4.5000e-004

0.0000 6.8133

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 1.0400e-003

8.5000e-004

9.1000e-003

2.0000e-005

2.1400e-003

2.0000e-005

2.1600e-003

5.7000e-004

2.0000e-005

5.8000e-004

0.0000 2.0524 2.0524 7.0000e-005

0.0000 2.0541

Total 1.7900e-003

0.0276 0.0142 9.0000e-005

3.7000e-003

1.3000e-004

3.8300e-003

1.0000e-003

1.2000e-004

1.1100e-003

0.0000 8.8544 8.8544 5.2000e-004

0.0000 8.8674

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 14 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 17: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.3 Demolition - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 1.0000e-005

0.0000 1.0000e-005

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 1.6600e-003

0.0133 0.0120 2.0000e-005

9.7000e-004

9.7000e-004

9.3000e-004

9.3000e-004

0.0000 1.5605 1.5605 3.0000e-004

0.0000 1.5680

Total 1.6600e-003

0.0133 0.0120 2.0000e-005

1.0000e-005

9.7000e-004

9.8000e-004

0.0000 9.3000e-004

9.3000e-004

0.0000 1.5605 1.5605 3.0000e-004

0.0000 1.5680

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 2.0000e-005

7.6000e-004

1.4000e-004

0.0000 4.0000e-005

0.0000 5.0000e-005

1.0000e-005

0.0000 2.0000e-005

0.0000 0.1943 0.1943 1.0000e-005

0.0000 0.1947

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 1.1000e-004

9.0000e-005

9.3000e-004

0.0000 2.2000e-004

0.0000 2.2000e-004

6.0000e-005

0.0000 6.0000e-005

0.0000 0.2105 0.2105 1.0000e-005

0.0000 0.2107

Total 1.3000e-004

8.5000e-004

1.0700e-003

0.0000 2.6000e-004

0.0000 2.7000e-004

7.0000e-005

0.0000 8.0000e-005

0.0000 0.4048 0.4048 2.0000e-005

0.0000 0.4053

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 15 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 18: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.3 Demolition - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 3.6000e-004

6.9200e-003

0.0120 2.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

0.0000 1.5605 1.5605 3.0000e-004

0.0000 1.5680

Total 3.6000e-004

6.9200e-003

0.0120 2.0000e-005

0.0000 3.0000e-005

3.0000e-005

0.0000 3.0000e-005

3.0000e-005

0.0000 1.5605 1.5605 3.0000e-004

0.0000 1.5680

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 2.0000e-005

7.6000e-004

1.4000e-004

0.0000 4.0000e-005

0.0000 5.0000e-005

1.0000e-005

0.0000 2.0000e-005

0.0000 0.1943 0.1943 1.0000e-005

0.0000 0.1947

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 1.1000e-004

9.0000e-005

9.3000e-004

0.0000 2.2000e-004

0.0000 2.2000e-004

6.0000e-005

0.0000 6.0000e-005

0.0000 0.2105 0.2105 1.0000e-005

0.0000 0.2107

Total 1.3000e-004

8.5000e-004

1.0700e-003

0.0000 2.6000e-004

0.0000 2.7000e-004

7.0000e-005

0.0000 8.0000e-005

0.0000 0.4048 0.4048 2.0000e-005

0.0000 0.4053

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 16 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 19: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.4 Grading 4 - Underground Utilities - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 0.0319 0.0000 0.0319 3.4400e-003

0.0000 3.4400e-003

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.0147 0.1641 0.0857 2.0000e-004

7.5300e-003

7.5300e-003

6.9500e-003

6.9500e-003

0.0000 17.7104 17.7104 5.3800e-003

0.0000 17.8450

Total 0.0147 0.1641 0.0857 2.0000e-004

0.0319 7.5300e-003

0.0394 3.4400e-003

6.9500e-003

0.0104 0.0000 17.7104 17.7104 5.3800e-003

0.0000 17.8450

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 8.1000e-004

0.0287 5.4300e-003

7.0000e-005

1.6800e-003

1.1000e-004

1.7900e-003

4.6000e-004

1.1000e-004

5.7000e-004

0.0000 7.2878 7.2878 4.8000e-004

0.0000 7.2999

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 8.5000e-004

7.0000e-004

7.4700e-003

2.0000e-005

1.7600e-003

1.0000e-005

1.7700e-003

4.7000e-004

1.0000e-005

4.8000e-004

0.0000 1.6840 1.6840 6.0000e-005

0.0000 1.6854

Total 1.6600e-003

0.0294 0.0129 9.0000e-005

3.4400e-003

1.2000e-004

3.5600e-003

9.3000e-004

1.2000e-004

1.0500e-003

0.0000 8.9718 8.9718 5.4000e-004

0.0000 8.9854

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 17 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 20: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.4 Grading 4 - Underground Utilities - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 0.0124 0.0000 0.0124 1.3400e-003

0.0000 1.3400e-003

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 3.4500e-003

0.0604 0.1139 2.0000e-004

3.1000e-004

3.1000e-004

3.1000e-004

3.1000e-004

0.0000 17.7104 17.7104 5.3800e-003

0.0000 17.8450

Total 3.4500e-003

0.0604 0.1139 2.0000e-004

0.0124 3.1000e-004

0.0127 1.3400e-003

3.1000e-004

1.6500e-003

0.0000 17.7104 17.7104 5.3800e-003

0.0000 17.8450

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 8.1000e-004

0.0287 5.4300e-003

7.0000e-005

1.6800e-003

1.1000e-004

1.7900e-003

4.6000e-004

1.1000e-004

5.7000e-004

0.0000 7.2878 7.2878 4.8000e-004

0.0000 7.2999

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 8.5000e-004

7.0000e-004

7.4700e-003

2.0000e-005

1.7600e-003

1.0000e-005

1.7700e-003

4.7000e-004

1.0000e-005

4.8000e-004

0.0000 1.6840 1.6840 6.0000e-005

0.0000 1.6854

Total 1.6600e-003

0.0294 0.0129 9.0000e-005

3.4400e-003

1.2000e-004

3.5600e-003

9.3000e-004

1.2000e-004

1.0500e-003

0.0000 8.9718 8.9718 5.4000e-004

0.0000 8.9854

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 18 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 21: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.5 Grading 3 - Building Pad and Foundation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 0.0663 0.0000 0.0663 7.1600e-003

0.0000 7.1600e-003

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.0600 0.6968 0.4618 8.2000e-004

0.0316 0.0316 0.0290 0.0290 0.0000 74.8155 74.8155 0.0233 0.0000 75.3978

Total 0.0600 0.6968 0.4618 8.2000e-004

0.0663 0.0316 0.0979 7.1600e-003

0.0290 0.0362 0.0000 74.8155 74.8155 0.0233 0.0000 75.3978

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 1.8600e-003

1.5200e-003

0.0163 4.0000e-005

3.8400e-003

3.0000e-005

3.8700e-003

1.0200e-003

3.0000e-005

1.0500e-003

0.0000 3.6838 3.6838 1.3000e-004

0.0000 3.6869

Total 1.8600e-003

1.5200e-003

0.0163 4.0000e-005

3.8400e-003

3.0000e-005

3.8700e-003

1.0200e-003

3.0000e-005

1.0500e-003

0.0000 3.6838 3.6838 1.3000e-004

0.0000 3.6869

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 19 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 22: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.5 Grading 3 - Building Pad and Foundation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 0.0259 0.0000 0.0259 2.7900e-003

0.0000 2.7900e-003

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.0139 0.2664 0.5008 8.2000e-004

1.3400e-003

1.3400e-003

1.3400e-003

1.3400e-003

0.0000 74.8154 74.8154 0.0233 0.0000 75.3977

Total 0.0139 0.2664 0.5008 8.2000e-004

0.0259 1.3400e-003

0.0272 2.7900e-003

1.3400e-003

4.1300e-003

0.0000 74.8154 74.8154 0.0233 0.0000 75.3977

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 1.8600e-003

1.5200e-003

0.0163 4.0000e-005

3.8400e-003

3.0000e-005

3.8700e-003

1.0200e-003

3.0000e-005

1.0500e-003

0.0000 3.6838 3.6838 1.3000e-004

0.0000 3.6869

Total 1.8600e-003

1.5200e-003

0.0163 4.0000e-005

3.8400e-003

3.0000e-005

3.8700e-003

1.0200e-003

3.0000e-005

1.0500e-003

0.0000 3.6838 3.6838 1.3000e-004

0.0000 3.6869

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 20 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 23: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.6 Grading 2 - Basement Excavations - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 0.0159 0.0000 0.0159 1.7200e-003

0.0000 1.7200e-003

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.0282 0.3078 0.2179 4.0000e-004

0.0158 0.0158 0.0146 0.0146 0.0000 36.2103 36.2103 0.0113 0.0000 36.4921

Total 0.0282 0.3078 0.2179 4.0000e-004

0.0159 0.0158 0.0317 1.7200e-003

0.0146 0.0163 0.0000 36.2103 36.2103 0.0113 0.0000 36.4921

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 6.0000e-005

2.2900e-003

4.3000e-004

1.0000e-005

1.3000e-004

1.0000e-005

1.4000e-004

4.0000e-005

1.0000e-005

5.0000e-005

0.0000 0.5830 0.5830 4.0000e-005

0.0000 0.5840

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 9.6000e-004

7.8000e-004

8.4000e-003

2.0000e-005

1.9700e-003

2.0000e-005

1.9900e-003

5.2000e-004

1.0000e-005

5.4000e-004

0.0000 1.8945 1.8945 6.0000e-005

0.0000 1.8961

Total 1.0200e-003

3.0700e-003

8.8300e-003

3.0000e-005

2.1000e-003

3.0000e-005

2.1300e-003

5.6000e-004

2.0000e-005

5.9000e-004

0.0000 2.4775 2.4775 1.0000e-004

0.0000 2.4801

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 21 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 24: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.6 Grading 2 - Basement Excavations - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 6.2100e-003

0.0000 6.2100e-003

6.7000e-004

0.0000 6.7000e-004

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 6.8800e-003

0.1496 0.2690 4.0000e-004

6.5000e-004

6.5000e-004

6.5000e-004

6.5000e-004

0.0000 36.2102 36.2102 0.0113 0.0000 36.4920

Total 6.8800e-003

0.1496 0.2690 4.0000e-004

6.2100e-003

6.5000e-004

6.8600e-003

6.7000e-004

6.5000e-004

1.3200e-003

0.0000 36.2102 36.2102 0.0113 0.0000 36.4920

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 6.0000e-005

2.2900e-003

4.3000e-004

1.0000e-005

1.3000e-004

1.0000e-005

1.4000e-004

4.0000e-005

1.0000e-005

5.0000e-005

0.0000 0.5830 0.5830 4.0000e-005

0.0000 0.5840

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 9.6000e-004

7.8000e-004

8.4000e-003

2.0000e-005

1.9700e-003

2.0000e-005

1.9900e-003

5.2000e-004

1.0000e-005

5.4000e-004

0.0000 1.8945 1.8945 6.0000e-005

0.0000 1.8961

Total 1.0200e-003

3.0700e-003

8.8300e-003

3.0000e-005

2.1000e-003

3.0000e-005

2.1300e-003

5.6000e-004

2.0000e-005

5.9000e-004

0.0000 2.4775 2.4775 1.0000e-004

0.0000 2.4801

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 22 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 25: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.7 Grading 1 - Deep Excavation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 7.7400e-003

0.1029 0.0444 1.9000e-004

3.1300e-003

3.1300e-003

2.8800e-003

2.8800e-003

0.0000 17.1293 17.1293 5.3300e-003

0.0000 17.2626

Total 7.7400e-003

0.1029 0.0444 1.9000e-004

0.0000 3.1300e-003

3.1300e-003

0.0000 2.8800e-003

2.8800e-003

0.0000 17.1293 17.1293 5.3300e-003

0.0000 17.2626

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 6.0000e-005

2.2900e-003

4.3000e-004

1.0000e-005

1.3000e-004

1.0000e-005

1.4000e-004

4.0000e-005

1.0000e-005

5.0000e-005

0.0000 0.5830 0.5830 4.0000e-005

0.0000 0.5840

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 4.0000e-004

3.3000e-004

3.5000e-003

1.0000e-005

8.2000e-004

1.0000e-005

8.3000e-004

2.2000e-004

1.0000e-005

2.2000e-004

0.0000 0.7894 0.7894 3.0000e-005

0.0000 0.7901

Total 4.6000e-004

2.6200e-003

3.9300e-003

2.0000e-005

9.5000e-004

2.0000e-005

9.7000e-004

2.6000e-004

2.0000e-005

2.7000e-004

0.0000 1.3724 1.3724 7.0000e-005

0.0000 1.3740

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 23 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 26: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.7 Grading 1 - Deep Excavation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 3.1100e-003

0.0502 0.1011 1.9000e-004

3.1000e-004

3.1000e-004

3.1000e-004

3.1000e-004

0.0000 17.1292 17.1292 5.3300e-003

0.0000 17.2626

Total 3.1100e-003

0.0502 0.1011 1.9000e-004

0.0000 3.1000e-004

3.1000e-004

0.0000 3.1000e-004

3.1000e-004

0.0000 17.1292 17.1292 5.3300e-003

0.0000 17.2626

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 6.0000e-005

2.2900e-003

4.3000e-004

1.0000e-005

1.3000e-004

1.0000e-005

1.4000e-004

4.0000e-005

1.0000e-005

5.0000e-005

0.0000 0.5830 0.5830 4.0000e-005

0.0000 0.5840

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 4.0000e-004

3.3000e-004

3.5000e-003

1.0000e-005

8.2000e-004

1.0000e-005

8.3000e-004

2.2000e-004

1.0000e-005

2.2000e-004

0.0000 0.7894 0.7894 3.0000e-005

0.0000 0.7901

Total 4.6000e-004

2.6200e-003

3.9300e-003

2.0000e-005

9.5000e-004

2.0000e-005

9.7000e-004

2.6000e-004

2.0000e-005

2.7000e-004

0.0000 1.3724 1.3724 7.0000e-005

0.0000 1.3740

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 24 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 27: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 0.0499 0.4289 0.3549 5.8000e-004

0.0276 0.0276 0.0267 0.0267 0.0000 50.9473 50.9473 8.5100e-003

0.0000 51.1600

Total 0.0499 0.4289 0.3549 5.8000e-004

0.0276 0.0276 0.0267 0.0267 0.0000 50.9473 50.9473 8.5100e-003

0.0000 51.1600

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.1000e-003

0.1740 0.0448 3.6000e-004

8.8700e-003

1.2500e-003

0.0101 2.5600e-003

1.2000e-003

3.7600e-003

0.0000 35.1446 35.1446 2.5000e-003

0.0000 35.2071

Worker 0.0447 0.0365 0.3920 9.8000e-004

0.0922 7.5000e-004

0.0929 0.0245 6.9000e-004

0.0252 0.0000 88.4103 88.4103 3.0200e-003

0.0000 88.4857

Total 0.0508 0.2105 0.4369 1.3400e-003

0.1010 2.0000e-003

0.1030 0.0270 1.8900e-003

0.0289 0.0000 123.5548 123.5548 5.5200e-003

0.0000 123.6928

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 25 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 28: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 0.0113 0.2213 0.3733 5.8000e-004

2.2300e-003

2.2300e-003

2.2300e-003

2.2300e-003

0.0000 50.9472 50.9472 8.5100e-003

0.0000 51.1600

Total 0.0113 0.2213 0.3733 5.8000e-004

2.2300e-003

2.2300e-003

2.2300e-003

2.2300e-003

0.0000 50.9472 50.9472 8.5100e-003

0.0000 51.1600

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.1000e-003

0.1740 0.0448 3.6000e-004

8.8700e-003

1.2500e-003

0.0101 2.5600e-003

1.2000e-003

3.7600e-003

0.0000 35.1446 35.1446 2.5000e-003

0.0000 35.2071

Worker 0.0447 0.0365 0.3920 9.8000e-004

0.0922 7.5000e-004

0.0929 0.0245 6.9000e-004

0.0252 0.0000 88.4103 88.4103 3.0200e-003

0.0000 88.4857

Total 0.0508 0.2105 0.4369 1.3400e-003

0.1010 2.0000e-003

0.1030 0.0270 1.8900e-003

0.0289 0.0000 123.5548 123.5548 5.5200e-003

0.0000 123.6928

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 26 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 29: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 0.5512 4.8456 4.3507 7.2100e-003

0.2952 0.2952 0.2858 0.2858 0.0000 629.4328 629.4328 0.1019 0.0000 631.9812

Total 0.5512 4.8456 4.3507 7.2100e-003

0.2952 0.2952 0.2858 0.2858 0.0000 629.4328 629.4328 0.1019 0.0000 631.9812

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0687 2.0390 0.5113 4.4800e-003

0.1102 0.0133 0.1236 0.0318 0.0128 0.0446 0.0000 432.9274 432.9274 0.0300 0.0000 433.6764

Worker 0.5042 0.4005 4.3527 0.0118 1.1454 9.0800e-003

1.1545 0.3042 8.3700e-003

0.3126 0.0000 1,064.1410

1,064.1410

0.0333 0.0000 1,064.9724

Total 0.5729 2.4395 4.8641 0.0163 1.2556 0.0224 1.2781 0.3360 0.0211 0.3571 0.0000 1,497.0684

1,497.0684

0.0632 0.0000 1,498.6488

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 27 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 30: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 0.1400 2.7499 4.6391 7.2100e-003

0.0277 0.0277 0.0277 0.0277 0.0000 629.4320 629.4320 0.1019 0.0000 631.9805

Total 0.1400 2.7499 4.6391 7.2100e-003

0.0277 0.0277 0.0277 0.0277 0.0000 629.4320 629.4320 0.1019 0.0000 631.9805

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0687 2.0390 0.5113 4.4800e-003

0.1102 0.0133 0.1236 0.0318 0.0128 0.0446 0.0000 432.9274 432.9274 0.0300 0.0000 433.6764

Worker 0.5042 0.4005 4.3527 0.0118 1.1454 9.0800e-003

1.1545 0.3042 8.3700e-003

0.3126 0.0000 1,064.1410

1,064.1410

0.0333 0.0000 1,064.9724

Total 0.5729 2.4395 4.8641 0.0163 1.2556 0.0224 1.2781 0.3360 0.0211 0.3571 0.0000 1,497.0684

1,497.0684

0.0632 0.0000 1,498.6488

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 28 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 31: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 0.1300 1.1558 1.1217 1.8800e-003

0.0668 0.0668 0.0646 0.0646 0.0000 162.6825 162.6825 0.0258 0.0000 163.3282

Total 0.1300 1.1558 1.1217 1.8800e-003

0.0668 0.0668 0.0646 0.0646 0.0000 162.6825 162.6825 0.0258 0.0000 163.3282

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0153 0.4862 0.1204 1.1600e-003

0.0287 2.3800e-003

0.0311 8.2900e-003

2.2800e-003

0.0106 0.0000 112.0557 112.0557 7.3600e-003

0.0000 112.2396

Worker 0.1214 0.0931 1.0302 2.9700e-003

0.2984 2.3100e-003

0.3007 0.0793 2.1200e-003

0.0814 0.0000 268.6452 268.6452 7.7100e-003

0.0000 268.8379

Total 0.1367 0.5793 1.1506 4.1300e-003

0.3271 4.6900e-003

0.3318 0.0875 4.4000e-003

0.0920 0.0000 380.7008 380.7008 0.0151 0.0000 381.0775

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 29 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 32: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 0.0365 0.7164 1.2087 1.8800e-003

7.2100e-003

7.2100e-003

7.2100e-003

7.2100e-003

0.0000 162.6823 162.6823 0.0258 0.0000 163.3280

Total 0.0365 0.7164 1.2087 1.8800e-003

7.2100e-003

7.2100e-003

7.2100e-003

7.2100e-003

0.0000 162.6823 162.6823 0.0258 0.0000 163.3280

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0153 0.4862 0.1204 1.1600e-003

0.0287 2.3800e-003

0.0311 8.2900e-003

2.2800e-003

0.0106 0.0000 112.0557 112.0557 7.3600e-003

0.0000 112.2396

Worker 0.1214 0.0931 1.0302 2.9700e-003

0.2984 2.3100e-003

0.3007 0.0793 2.1200e-003

0.0814 0.0000 268.6452 268.6452 7.7100e-003

0.0000 268.8379

Total 0.1367 0.5793 1.1506 4.1300e-003

0.3271 4.6900e-003

0.3318 0.0875 4.4000e-003

0.0920 0.0000 380.7008 380.7008 0.0151 0.0000 381.0775

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 30 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 33: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 0.0495 0.5183 0.4986 7.8000e-004

0.0280 0.0280 0.0258 0.0258 0.0000 69.6156 69.6156 0.0220 0.0000 70.1663

Paving 0.0127 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0622 0.5183 0.4986 7.8000e-004

0.0280 0.0280 0.0258 0.0258 0.0000 69.6156 69.6156 0.0220 0.0000 70.1663

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 2.7000e-004

7.9300e-003

1.9900e-003

2.0000e-005

4.3000e-004

5.0000e-005

4.8000e-004

1.2000e-004

5.0000e-005

1.7000e-004

0.0000 1.6835 1.6835 1.2000e-004

0.0000 1.6864

Worker 2.6300e-003

2.0900e-003

0.0227 6.0000e-005

5.9700e-003

5.0000e-005

6.0200e-003

1.5900e-003

4.0000e-005

1.6300e-003

0.0000 5.5450 5.5450 1.7000e-004

0.0000 5.5493

Total 2.9000e-003

0.0100 0.0247 8.0000e-005

6.4000e-003

1.0000e-004

6.5000e-003

1.7100e-003

9.0000e-005

1.8000e-003

0.0000 7.2284 7.2284 2.9000e-004

0.0000 7.2357

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 31 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 34: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 0.0114 0.3413 0.5881 7.8000e-004

1.2700e-003

1.2700e-003

1.2700e-003

1.2700e-003

0.0000 69.6155 69.6155 0.0220 0.0000 70.1662

Paving 0.0127 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0241 0.3413 0.5881 7.8000e-004

1.2700e-003

1.2700e-003

1.2700e-003

1.2700e-003

0.0000 69.6155 69.6155 0.0220 0.0000 70.1662

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 2.7000e-004

7.9300e-003

1.9900e-003

2.0000e-005

4.3000e-004

5.0000e-005

4.8000e-004

1.2000e-004

5.0000e-005

1.7000e-004

0.0000 1.6835 1.6835 1.2000e-004

0.0000 1.6864

Worker 2.6300e-003

2.0900e-003

0.0227 6.0000e-005

5.9700e-003

5.0000e-005

6.0200e-003

1.5900e-003

4.0000e-005

1.6300e-003

0.0000 5.5450 5.5450 1.7000e-004

0.0000 5.5493

Total 2.9000e-003

0.0100 0.0247 8.0000e-005

6.4000e-003

1.0000e-004

6.5000e-003

1.7100e-003

9.0000e-005

1.8000e-003

0.0000 7.2284 7.2284 2.9000e-004

0.0000 7.2357

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 32 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 35: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 1.3600e-003

0.0141 0.0147 2.0000e-005

7.5000e-004

7.5000e-004

6.9000e-004

6.9000e-004

0.0000 2.0028 2.0028 6.5000e-004

0.0000 2.0190

Paving 3.7000e-004

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 1.7300e-003

0.0141 0.0147 2.0000e-005

7.5000e-004

7.5000e-004

6.9000e-004

6.9000e-004

0.0000 2.0028 2.0028 6.5000e-004

0.0000 2.0190

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 1.0000e-005

2.1000e-004

5.0000e-005

0.0000 1.0000e-005

0.0000 1.0000e-005

0.0000 0.0000 0.0000 0.0000 0.0492 0.0492 0.0000 0.0000 0.0493

Worker 7.0000e-005

5.0000e-005

6.1000e-004

0.0000 1.8000e-004

0.0000 1.8000e-004

5.0000e-005

0.0000 5.0000e-005

0.0000 0.1580 0.1580 0.0000 0.0000 0.1581

Total 8.0000e-005

2.6000e-004

6.6000e-004

0.0000 1.9000e-004

0.0000 1.9000e-004

5.0000e-005

0.0000 5.0000e-005

0.0000 0.2072 0.2072 0.0000 0.0000 0.2074

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 33 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 36: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 3.3000e-004

0.0100 0.0173 2.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 2.0028 2.0028 6.5000e-004

0.0000 2.0190

Paving 3.7000e-004

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 7.0000e-004

0.0100 0.0173 2.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 2.0028 2.0028 6.5000e-004

0.0000 2.0190

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 1.0000e-005

2.1000e-004

5.0000e-005

0.0000 1.0000e-005

0.0000 1.0000e-005

0.0000 0.0000 0.0000 0.0000 0.0492 0.0492 0.0000 0.0000 0.0493

Worker 7.0000e-005

5.0000e-005

6.1000e-004

0.0000 1.8000e-004

0.0000 1.8000e-004

5.0000e-005

0.0000 5.0000e-005

0.0000 0.1580 0.1580 0.0000 0.0000 0.1581

Total 8.0000e-005

2.6000e-004

6.6000e-004

0.0000 1.9000e-004

0.0000 1.9000e-004

5.0000e-005

0.0000 5.0000e-005

0.0000 0.2072 0.2072 0.0000 0.0000 0.2074

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 34 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 37: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.10 Architectural Coating - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Archit. Coating 0.3445 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.0194 0.1347 0.1465 2.4000e-004

8.8700e-003

8.8700e-003

8.8700e-003

8.8700e-003

0.0000 20.4260 20.4260 1.5800e-003

0.0000 20.4656

Total 0.3639 0.1347 0.1465 2.4000e-004

8.8700e-003

8.8700e-003

8.8700e-003

8.8700e-003

0.0000 20.4260 20.4260 1.5800e-003

0.0000 20.4656

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 1.3000e-004

4.2700e-003

1.0600e-003

1.0000e-005

2.5000e-004

2.0000e-005

2.7000e-004

7.0000e-005

2.0000e-005

9.0000e-005

0.0000 0.9838 0.9838 6.0000e-005

0.0000 0.9854

Worker 0.0143 0.0110 0.1212 3.5000e-004

0.0351 2.7000e-004

0.0354 9.3200e-003

2.5000e-004

9.5700e-003

0.0000 31.6053 31.6053 9.1000e-004

0.0000 31.6280

Total 0.0144 0.0152 0.1223 3.6000e-004

0.0354 2.9000e-004

0.0357 9.3900e-003

2.7000e-004

9.6600e-003

0.0000 32.5891 32.5891 9.7000e-004

0.0000 32.6134

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 35 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 38: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.10 Architectural Coating - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Archit. Coating 0.3445 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 4.3600e-003

0.0848 0.1466 2.4000e-004

3.2000e-004

3.2000e-004

3.2000e-004

3.2000e-004

0.0000 20.4260 20.4260 1.5800e-003

0.0000 20.4655

Total 0.3489 0.0848 0.1466 2.4000e-004

3.2000e-004

3.2000e-004

3.2000e-004

3.2000e-004

0.0000 20.4260 20.4260 1.5800e-003

0.0000 20.4655

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 1.3000e-004

4.2700e-003

1.0600e-003

1.0000e-005

2.5000e-004

2.0000e-005

2.7000e-004

7.0000e-005

2.0000e-005

9.0000e-005

0.0000 0.9838 0.9838 6.0000e-005

0.0000 0.9854

Worker 0.0143 0.0110 0.1212 3.5000e-004

0.0351 2.7000e-004

0.0354 9.3200e-003

2.5000e-004

9.5700e-003

0.0000 31.6053 31.6053 9.1000e-004

0.0000 31.6280

Total 0.0144 0.0152 0.1223 3.6000e-004

0.0354 2.9000e-004

0.0357 9.3900e-003

2.7000e-004

9.6600e-003

0.0000 32.5891 32.5891 9.7000e-004

0.0000 32.6134

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 36 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 39: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.11 Excavation and Installation-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 3.5000e-004

0.0000 3.5000e-004

5.0000e-005

0.0000 5.0000e-005

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.0177 0.1985 0.1516 2.9000e-004

8.5400e-003

8.5400e-003

7.8700e-003

7.8700e-003

0.0000 25.4821 25.4821 8.1400e-003

0.0000 25.6856

Total 0.0177 0.1985 0.1516 2.9000e-004

3.5000e-004

8.5400e-003

8.8900e-003

5.0000e-005

7.8700e-003

7.9200e-003

0.0000 25.4821 25.4821 8.1400e-003

0.0000 25.6856

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 5.7000e-004

0.0202 4.1300e-003

6.0000e-005

1.3400e-003

7.0000e-005

1.4100e-003

3.7000e-004

7.0000e-005

4.3000e-004

0.0000 5.7001 5.7001 3.7000e-004

0.0000 5.7094

Vendor 6.0000e-004

0.0192 4.7600e-003

5.0000e-005

1.1300e-003

9.0000e-005

1.2300e-003

3.3000e-004

9.0000e-005

4.2000e-004

0.0000 4.4271 4.4271 2.9000e-004

0.0000 4.4344

Worker 2.0100e-003

1.5400e-003

0.0170 5.0000e-005

4.9400e-003

4.0000e-005

4.9800e-003

1.3100e-003

4.0000e-005

1.3500e-003

0.0000 4.4445 4.4445 1.3000e-004

0.0000 4.4477

Total 3.1800e-003

0.0409 0.0259 1.6000e-004

7.4100e-003

2.0000e-004

7.6200e-003

2.0100e-003

2.0000e-004

2.2000e-003

0.0000 14.5717 14.5717 7.9000e-004

0.0000 14.5915

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 37 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 40: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.11 Excavation and Installation-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Fugitive Dust 1.4000e-004

0.0000 1.4000e-004

2.0000e-005

0.0000 2.0000e-005

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 4.3700e-003

0.1077 0.1932 2.9000e-004

4.7000e-004

4.7000e-004

4.7000e-004

4.7000e-004

0.0000 25.4821 25.4821 8.1400e-003

0.0000 25.6855

Total 4.3700e-003

0.1077 0.1932 2.9000e-004

1.4000e-004

4.7000e-004

6.1000e-004

2.0000e-005

4.7000e-004

4.9000e-004

0.0000 25.4821 25.4821 8.1400e-003

0.0000 25.6855

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 5.7000e-004

0.0202 4.1300e-003

6.0000e-005

1.3400e-003

7.0000e-005

1.4100e-003

3.7000e-004

7.0000e-005

4.3000e-004

0.0000 5.7001 5.7001 3.7000e-004

0.0000 5.7094

Vendor 6.0000e-004

0.0192 4.7600e-003

5.0000e-005

1.1300e-003

9.0000e-005

1.2300e-003

3.3000e-004

9.0000e-005

4.2000e-004

0.0000 4.4271 4.4271 2.9000e-004

0.0000 4.4344

Worker 2.0100e-003

1.5400e-003

0.0170 5.0000e-005

4.9400e-003

4.0000e-005

4.9800e-003

1.3100e-003

4.0000e-005

1.3500e-003

0.0000 4.4445 4.4445 1.3000e-004

0.0000 4.4477

Total 3.1800e-003

0.0409 0.0259 1.6000e-004

7.4100e-003

2.0000e-004

7.6200e-003

2.0100e-003

2.0000e-004

2.2000e-003

0.0000 14.5717 14.5717 7.9000e-004

0.0000 14.5915

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 38 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 41: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.12 Fiber-Optic Improvements - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 1.2500e-003

0.0118 0.0125 2.0000e-005

7.1000e-004

7.1000e-004

6.6000e-004

6.6000e-004

0.0000 1.5207 1.5207 4.6000e-004

0.0000 1.5321

Total 1.2500e-003

0.0118 0.0125 2.0000e-005

7.1000e-004

7.1000e-004

6.6000e-004

6.6000e-004

0.0000 1.5207 1.5207 4.6000e-004

0.0000 1.5321

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 3.8000e-004

0.0134 2.7500e-003

4.0000e-005

8.9000e-004

5.0000e-005

9.4000e-004

2.5000e-004

4.0000e-005

2.9000e-004

0.0000 3.8001 3.8001 2.5000e-004

0.0000 3.8063

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 2.7000e-004

2.1000e-004

2.2700e-003

1.0000e-005

6.6000e-004

1.0000e-005

6.6000e-004

1.7000e-004

0.0000 1.8000e-004

0.0000 0.5926 0.5926 2.0000e-005

0.0000 0.5930

Total 6.5000e-004

0.0137 5.0200e-003

5.0000e-005

1.5500e-003

6.0000e-005

1.6000e-003

4.2000e-004

4.0000e-005

4.7000e-004

0.0000 4.3927 4.3927 2.7000e-004

0.0000 4.3993

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 39 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 42: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.12 Fiber-Optic Improvements - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 3.5000e-004

6.7700e-003

0.0117 2.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

0.0000 1.5207 1.5207 4.6000e-004

0.0000 1.5321

Total 3.5000e-004

6.7700e-003

0.0117 2.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

0.0000 1.5207 1.5207 4.6000e-004

0.0000 1.5321

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 3.8000e-004

0.0134 2.7500e-003

4.0000e-005

8.9000e-004

5.0000e-005

9.4000e-004

2.5000e-004

4.0000e-005

2.9000e-004

0.0000 3.8001 3.8001 2.5000e-004

0.0000 3.8063

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 2.7000e-004

2.1000e-004

2.2700e-003

1.0000e-005

6.6000e-004

1.0000e-005

6.6000e-004

1.7000e-004

0.0000 1.8000e-004

0.0000 0.5926 0.5926 2.0000e-005

0.0000 0.5930

Total 6.5000e-004

0.0137 5.0200e-003

5.0000e-005

1.5500e-003

6.0000e-005

1.6000e-003

4.2000e-004

4.0000e-005

4.7000e-004

0.0000 4.3927 4.3927 2.7000e-004

0.0000 4.3993

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 40 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 43: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.13 Paving-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 0.0145 0.1392 0.1369 2.2000e-004

7.2700e-003

7.2700e-003

6.7400e-003

6.7400e-003

0.0000 19.3960 19.3960 5.8800e-003

0.0000 19.5430

Paving 0.0131 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0276 0.1392 0.1369 2.2000e-004

7.2700e-003

7.2700e-003

6.7400e-003

6.7400e-003

0.0000 19.3960 19.3960 5.8800e-003

0.0000 19.5430

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 9.4000e-004

0.0299 7.4000e-003

7.0000e-005

1.7600e-003

1.5000e-004

1.9100e-003

5.1000e-004

1.4000e-004

6.5000e-004

0.0000 6.8867 6.8867 4.5000e-004

0.0000 6.8980

Worker 2.3400e-003

1.8000e-003

0.0199 6.0000e-005

5.7600e-003

4.0000e-005

5.8000e-003

1.5300e-003

4.0000e-005

1.5700e-003

0.0000 5.1853 5.1853 1.5000e-004

0.0000 5.1890

Total 3.2800e-003

0.0317 0.0273 1.3000e-004

7.5200e-003

1.9000e-004

7.7100e-003

2.0400e-003

1.8000e-004

2.2200e-003

0.0000 12.0719 12.0719 6.0000e-004

0.0000 12.0869

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 41 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 44: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.13 Paving-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 2.9200e-003

0.0879 0.1513 2.2000e-004

3.3000e-004

3.3000e-004

3.3000e-004

3.3000e-004

0.0000 19.3960 19.3960 5.8800e-003

0.0000 19.5430

Paving 0.0131 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0160 0.0879 0.1513 2.2000e-004

3.3000e-004

3.3000e-004

3.3000e-004

3.3000e-004

0.0000 19.3960 19.3960 5.8800e-003

0.0000 19.5430

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 9.4000e-004

0.0299 7.4000e-003

7.0000e-005

1.7600e-003

1.5000e-004

1.9100e-003

5.1000e-004

1.4000e-004

6.5000e-004

0.0000 6.8867 6.8867 4.5000e-004

0.0000 6.8980

Worker 2.3400e-003

1.8000e-003

0.0199 6.0000e-005

5.7600e-003

4.0000e-005

5.8000e-003

1.5300e-003

4.0000e-005

1.5700e-003

0.0000 5.1853 5.1853 1.5000e-004

0.0000 5.1890

Total 3.2800e-003

0.0317 0.0273 1.3000e-004

7.5200e-003

1.9000e-004

7.7100e-003

2.0400e-003

1.8000e-004

2.2200e-003

0.0000 12.0719 12.0719 6.0000e-004

0.0000 12.0869

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 42 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 45: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.14 Improvements-Cranford Avenue - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 1.2500e-003

0.0118 0.0125 2.0000e-005

7.1000e-004

7.1000e-004

6.6000e-004

6.6000e-004

0.0000 1.5207 1.5207 4.6000e-004

0.0000 1.5321

Total 1.2500e-003

0.0118 0.0125 2.0000e-005

7.1000e-004

7.1000e-004

6.6000e-004

6.6000e-004

0.0000 1.5207 1.5207 4.6000e-004

0.0000 1.5321

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 5.0000e-005

1.6800e-003

3.4000e-004

0.0000 1.1000e-004

1.0000e-005

1.2000e-004

3.0000e-005

1.0000e-005

4.0000e-005

0.0000 0.4750 0.4750 3.0000e-005

0.0000 0.4758

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 2.7000e-004

2.1000e-004

2.2700e-003

1.0000e-005

6.6000e-004

1.0000e-005

6.6000e-004

1.7000e-004

0.0000 1.8000e-004

0.0000 0.5926 0.5926 2.0000e-005

0.0000 0.5930

Total 3.2000e-004

1.8900e-003

2.6100e-003

1.0000e-005

7.7000e-004

2.0000e-005

7.8000e-004

2.0000e-004

1.0000e-005

2.2000e-004

0.0000 1.0676 1.0676 5.0000e-005

0.0000 1.0688

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 43 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 46: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

4.0 Operational Detail - Mobile

3.14 Improvements-Cranford Avenue - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Off-Road 3.5000e-004

6.7700e-003

0.0117 2.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

0.0000 1.5207 1.5207 4.6000e-004

0.0000 1.5321

Total 3.5000e-004

6.7700e-003

0.0117 2.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

3.0000e-005

0.0000 1.5207 1.5207 4.6000e-004

0.0000 1.5321

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Hauling 5.0000e-005

1.6800e-003

3.4000e-004

0.0000 1.1000e-004

1.0000e-005

1.2000e-004

3.0000e-005

1.0000e-005

4.0000e-005

0.0000 0.4750 0.4750 3.0000e-005

0.0000 0.4758

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 2.7000e-004

2.1000e-004

2.2700e-003

1.0000e-005

6.6000e-004

1.0000e-005

6.6000e-004

1.7000e-004

0.0000 1.8000e-004

0.0000 0.5926 0.5926 2.0000e-005

0.0000 0.5930

Total 3.2000e-004

1.8900e-003

2.6100e-003

1.0000e-005

7.7000e-004

2.0000e-005

7.8000e-004

2.0000e-004

1.0000e-005

2.2000e-004

0.0000 1.0676 1.0676 5.0000e-005

0.0000 1.0688

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 44 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 47: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Mitigated 0.5975 3.0281 6.0870 0.0198 1.5212 0.0166 1.5378 0.4076 0.0155 0.4231 0.0000 1,831.1295

1,831.1295

0.1028 0.0000 1,833.6984

Unmitigated 0.5975 3.0281 6.0870 0.0198 1.5212 0.0166 1.5378 0.4076 0.0155 0.4231 0.0000 1,831.1295

1,831.1295

0.1028 0.0000 1,833.6984

4.1 Mitigation Measures Mobile

4.2 Trip Summary Information

4.3 Trip Type Information

Average Daily Trip Rate Unmitigated Mitigated

Land Use Weekday Saturday Sunday Annual VMT Annual VMT

General Light Industry 1,485.45 281.32 468.86 1,905,010 1,905,010

General Office Building 1,350.73 301.25 134.71 1,674,895 1,674,895

Other Asphalt Surfaces 0.00 0.00 0.00

Parking Lot 0.00 0.00 0.00

Research & Development 337.62 79.10 54.93 423,535 423,535

Total 3,173.80 661.67 658.50 4,003,440 4,003,440

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 45 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 48: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Miles Trip % Trip Purpose %

Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by

General Light Industry 0.00 0.00 4.48 0.00 0.00 100.00 100 0 0

General Office Building 0.00 0.00 4.48 0.00 0.00 100.00 100 0 0

Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0

Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0

Research & Development 0.00 0.00 4.47 0.00 0.00 100.00 100 0 0

5.0 Energy Detail

5.1 Mitigation Measures Energy

Kilowatt Hours of Renewable Electricity Generated

4.4 Fleet Mix

Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH

General Office Building 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Research & Development 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

General Light Industry 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Other Asphalt Surfaces 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Parking Lot 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Historical Energy Use: N

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 46 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 49: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Electricity Mitigated

0.0000 0.0000 0.0000 0.0000 0.0000 -1,306.081

7

-1,306.081

7

-0.0286 -0.0059 -1,308.557

6

Electricity Unmitigated

0.0000 0.0000 0.0000 0.0000 0.0000 2,390.1384

2,390.1384

0.0523 0.0108 2,394.6694

NaturalGas Mitigated

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

NaturalGas Unmitigated

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 47 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 50: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

5.2 Energy by Land Use - NaturalGas

NaturalGas Use

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Land Use kBTU/yr tons/yr MT/yr

General Light Industry

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

General Office Building

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Other Asphalt Surfaces

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Research & Development

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Unmitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 48 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 51: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

5.2 Energy by Land Use - NaturalGas

NaturalGas Use

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Land Use kBTU/yr tons/yr MT/yr

General Light Industry

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

General Office Building

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Other Asphalt Surfaces

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Research & Development

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Mitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 49 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 52: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

5.3 Energy by Land Use - Electricity

Electricity Use

Total CO2 CH4 N2O CO2e

Land Use kWh/yr MT/yr

General Light Industry

2.20792e+006

1,327.6348

0.0290 6.0100e-003

1,330.1515

General Office Building

482488 290.1226 6.3500e-003

1.3100e-003

290.6726

Other Asphalt Surfaces

4200 2.5255 6.0000e-005

1.0000e-005

2.5303

Parking Lot 891475 536.0481 0.0117 2.4300e-003

537.0643

Research & Development

388834 233.8074 5.1100e-003

1.0600e-003

234.2507

Total 2,390.1384

0.0523 0.0108 2,394.6694

Unmitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 50 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 53: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Use Low VOC Paint - Non-Residential Interior

Use Low VOC Paint - Non-Residential Exterior

No Hearths Installed

6.1 Mitigation Measures Area

6.0 Area Detail

5.3 Energy by Land Use - Electricity

Electricity Use

Total CO2 CH4 N2O CO2e

Land Use kWh/yr MT/yr

General Light Industry

978523 588.3908 0.0129 2.6600e-003

589.5062

General Office Building

-746912 -449.1214 -0.0098 -0.0020 -449.9728

Other Asphalt Surfaces

-1.2252e+006

-736.7186 -0.0161 -0.0033 -738.1151

Parking Lot -337925 -203.1959 -0.0045 -0.0009 -203.5811

Research & Development

-840566 -505.4366 -0.0111 -0.0023 -506.3947

Total -1,306.081

7

-0.0286 -0.0059 -1,308.557

6

Mitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 51 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 54: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category tons/yr MT/yr

Mitigated 1.4266 1.0000e-004

0.0104 0.0000 4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 0.0201 0.0201 5.0000e-005

0.0000 0.0215

Unmitigated 1.4266 1.0000e-004

0.0104 0.0000 4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 0.0201 0.0201 5.0000e-005

0.0000 0.0215

6.2 Area by SubCategory

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

SubCategory tons/yr MT/yr

Architectural Coating

0.0345 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Consumer Products

1.3911 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Landscaping 9.7000e-004

1.0000e-004

0.0104 0.0000 4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 0.0201 0.0201 5.0000e-005

0.0000 0.0215

Total 1.4266 1.0000e-004

0.0104 0.0000 4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 0.0201 0.0201 5.0000e-005

0.0000 0.0215

Unmitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 52 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 55: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

7.1 Mitigation Measures Water

7.0 Water Detail

6.2 Area by SubCategory

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

SubCategory tons/yr MT/yr

Architectural Coating

0.0345 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Consumer Products

1.3911 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Landscaping 9.7000e-004

1.0000e-004

0.0104 0.0000 4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 0.0201 0.0201 5.0000e-005

0.0000 0.0215

Total 1.4266 1.0000e-004

0.0104 0.0000 4.0000e-005

4.0000e-005

4.0000e-005

4.0000e-005

0.0000 0.0201 0.0201 5.0000e-005

0.0000 0.0215

Mitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 53 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 56: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Total CO2 CH4 N2O CO2e

Category MT/yr

Mitigated 74.3399 0.2989 7.3400e-003

84.0010

Unmitigated 74.3399 0.2989 7.3400e-003

84.0010

7.2 Water by Land Use

Indoor/Outdoor Use

Total CO2 CH4 N2O CO2e

Land Use Mgal MT/yr

General Light Industry

0 / 0 0.0000 0.0000 0.0000 0.0000

General Office Building

9.125 / 0 74.3399 0.2989 7.3400e-003

84.0010

Other Asphalt Surfaces

0 / 0 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000

Research & Development

0 / 0 0.0000 0.0000 0.0000 0.0000

Total 74.3399 0.2989 7.3400e-003

84.0010

Unmitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 54 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 57: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

8.1 Mitigation Measures Waste

Institute Recycling and Composting Services

7.2 Water by Land Use

Indoor/Outdoor Use

Total CO2 CH4 N2O CO2e

Land Use Mgal MT/yr

General Light Industry

0 / 0 0.0000 0.0000 0.0000 0.0000

General Office Building

9.125 / 0 74.3399 0.2989 7.3400e-003

84.0010

Other Asphalt Surfaces

0 / 0 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000

Research & Development

0 / 0 0.0000 0.0000 0.0000 0.0000

Total 74.3399 0.2989 7.3400e-003

84.0010

Mitigated

8.0 Waste Detail

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 55 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 58: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Total CO2 CH4 N2O CO2e

MT/yr

Mitigated 38.7023 2.2872 0.0000 95.8832

Unmitigated 77.4045 4.5745 0.0000 191.7664

Category/Year

8.2 Waste by Land Use

Waste Disposed

Total CO2 CH4 N2O CO2e

Land Use tons MT/yr

General Light Industry

264.27 53.6444 3.1703 0.0000 132.9018

General Office Building

113.89 23.1186 1.3663 0.0000 57.2755

Other Asphalt Surfaces

0 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 0.0000 0.0000 0.0000 0.0000

Research & Development

3.16 0.6415 0.0379 0.0000 1.5892

Total 77.4045 4.5745 0.0000 191.7664

Unmitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 56 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 59: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

8.2 Waste by Land Use

Waste Disposed

Total CO2 CH4 N2O CO2e

Land Use tons MT/yr

General Light Industry

132.135 26.8222 1.5852 0.0000 66.4509

General Office Building

56.945 11.5593 0.6831 0.0000 28.6377

Other Asphalt Surfaces

0 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 0.0000 0.0000 0.0000 0.0000

Research & Development

1.58 0.3207 0.0190 0.0000 0.7946

Total 38.7023 2.2872 0.0000 95.8832

Mitigated

9.0 Operational Offroad

Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type

10.0 Stationary Equipment

Fire Pumps and Emergency Generators

Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type

Boilers

Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 57 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 60: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

11.0 Vegetation

User Defined Equipment

Equipment Type Number

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:51 AMPage 58 of 58

ARB Southern California Relocation Project - Air District, Annual

Page 61: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project information.

Land Use - See Section 5.10, Land Use and Planning for more details. Based on information provided by ARB.

Construction Phase - Based on information provided by ARB.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

1.1 Land Usage

Land Uses Size Metric Lot Acreage Floor Surface Area Population

General Office Building 122.46 1000sqft 2.81 122,459.00 0

Research & Development 41.63 1000sqft 0.96 41,631.00 0

General Light Industry 213.12 1000sqft 4.89 213,120.02 0

Other Asphalt Surfaces 12.00 1000sqft 0.28 12,000.00 0

Parking Lot 422.50 1000sqft 9.70 422,500.00 0

1.2 Other Project Characteristics

Urbanization

Climate Zone

Urban

10

Wind Speed (m/s) Precipitation Freq (Days)2.2 31

1.3 User Entered Comments & Non-Default Data

1.0 Project Characteristics

Utility Company Riverside Public Utilities

2021Operational Year

CO2 Intensity (lb/MWhr)

1325.65 0.029CH4 Intensity (lb/MWhr)

0.006N2O Intensity (lb/MWhr)

ARB Southern California Relocation Project Air District, Summer

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 1 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 62: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Trips and VMT - CalEEMod defaults for worker trips. See Section 3.0, Project Description, of the DEIR for estimated hauling trips.

On-road Fugitive Dust - CalEEMod defaults.

Demolition - See Section 3.0 for construction details.

Grading - See Section 3.0 for construction details.

Architectural Coating - ARB will use no-VOC coatings for interior and low-VOC coatings for exterior. A conservative estimate was assumed, 5 g/l for interior and

50 g/l for exterior.

Vehicle Trips - CalEEMod inputs were based on Dudek calculated net vehicle miles travelled for the proposed project.

Vehicle Emission Factors - Default CalEEMod factors.

Vehicle Emission Factors - Default CalEEMod factors.

Vehicle Emission Factors - Default CalEEMod factors.

Road Dust - CalEEMod Defaults.

Woodstoves - No hearths.

Consumer Products - CalEEMod defaults.

Area Coating - ARB will use no-VOC coatings for interior and low-VOC coatings for exterior. A conservative estimate was assumed, 5 g/l for interior and 50 g/l for exterior.

Landscape Equipment - CalEEMod defaults.

Energy Use - Based on information provided from ARB.

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 2 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 63: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Water And Wastewater - See Section 3.0, Project Description, of the DEIR for details on water use. Default CalEEMod factors.Solid Waste - CalEEMod defaults.

Land Use Change - Land use change calculated outside of CalEEMod.

Sequestration - Land use change calculated outside of CalEEMod.

Construction Off-road Equipment Mitigation - SCAQMD Rule 403 for Fugitive Dust suppression.

Mobile Land Use Mitigation - No traffic mitigation.

Mobile Commute Mitigation - No cummute mitigation.

Area Mitigation - ARB will use no-VOC coatings for interior and low-VOC coatings for exterior. A conservative estimate was assumed, 5 g/l for interior and 50 g/l for exterior.

Energy Mitigation - Proposed project includes a 3.5 MW solar PV system. Any additional grid electricity needed will be renewably sourced.

Water Mitigation - No water mitigation.

Waste Mitigation - Department of General Services Management Memo 15-06 requires at least a 50% diversion from state buildings.

Stationary Sources - Emergency Generators and Fire Pumps - Stationary sources calculated outside of CalEEMod.

Stationary Sources - Process Boilers - Stationary sources calculated outside of CalEEMod.

Stationary Sources - User Defined - Stationary sources calculated outside of CalEEMod.

Stationary Sources - Emergency Generators and Fire Pumps EF - Stationary sources calculated outside of CalEEMod.

Stationary Sources - Process Boilers EF - Stationary sources calculated outside of CalEEMod.

Table Name Column Name Default Value New Value

tblArchitecturalCoating EF_Nonresidential_Exterior 100.00 50.00

tblArchitecturalCoating EF_Nonresidential_Interior 100.00 5.00

tblAreaCoating Area_EF_Nonresidential_Exterior 100 50

tblAreaCoating Area_EF_Nonresidential_Interior 100 5

tblLandUse BuildingSpaceSquareFeet 122,460.00 122,459.00

tblLandUse BuildingSpaceSquareFeet 41,630.00 41,631.00

tblLandUse BuildingSpaceSquareFeet 213,120.00 213,120.02

tblLandUse LandUseSquareFeet 122,460.00 122,459.00

tblLandUse LandUseSquareFeet 41,630.00 41,631.00

tblLandUse LandUseSquareFeet 213,120.00 213,120.02

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 3 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 64: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.0 Emissions Summary

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 4 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 65: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.1 Overall Construction (Maximum Daily Emission)

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Year lb/day lb/day

2018 9.6356 60.1800 77.9840 0.1883 9.7998 2.8153 12.6150 2.6184 2.7217 5.3401 0.0000 18,837.3781

18,837.3781

1.5902 0.0000 18,874.3813

2019 10.5721 70.7180 88.4310 0.2101 9.9914 3.2604 13.2518 2.6695 3.1126 5.7821 0.0000 20,967.1726

20,967.1726

2.1251 0.0000 21,020.3001

2020 26.8085 64.8110 84.4001 0.2124 11.6010 2.8564 14.1605 3.0964 2.7250 5.5838 0.0000 21,119.0155

21,119.0155

2.0542 0.0000 21,155.8826

Maximum 26.8085 70.7180 88.4310 0.2124 11.6010 3.2604 14.1605 3.0964 3.1126 5.7821 0.0000 21,119.0155

21,119.0155

2.1251 0.0000 21,155.8826

Unmitigated Construction

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Year lb/day lb/day

2018 5.9535 40.4009 79.7335 0.1883 9.7998 0.4019 10.2017 2.6184 0.3912 3.0096 0.0000 18,837.3781

18,837.3781

1.5902 0.0000 18,874.3813

2019 6.3010 49.4537 93.2723 0.2101 9.9914 0.4235 10.4149 2.6695 0.4134 3.0829 0.0000 20,967.1726

20,967.1726

2.1251 0.0000 21,020.3000

2020 23.3071 47.8640 89.6024 0.2124 11.6010 0.3893 11.9809 3.0964 0.3808 3.4668 0.0000 21,119.0155

21,119.0155

2.0542 0.0000 21,155.8826

Maximum 23.3071 49.4537 93.2723 0.2124 11.6010 0.4235 11.9809 3.0964 0.4134 3.4668 0.0000 21,119.0155

21,119.0155

2.1251 0.0000 21,155.8826

Mitigated Construction

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 5 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 66: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e

Percent Reduction

24.36 29.63 -4.70 0.00 0.00 86.40 18.56 0.00 86.15 42.78 0.00 0.00 0.00 0.00 0.00 0.00

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 6 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 67: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.2 Overall Operational

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Area 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Mobile 4.6190 20.9964 44.2065 0.1465 11.0022 0.1173 11.1195 2.9439 0.1094 3.0533 14,921.5304

14,921.5304

0.8005 14,941.5438

Total 12.4382 20.9971 44.2897 0.1465 11.0022 0.1176 11.1198 2.9439 0.1097 3.0536 14,921.7080

14,921.7080

0.8010 0.0000 14,941.7333

Unmitigated Operational

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Area 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Mobile 4.6190 20.9964 44.2065 0.1465 11.0022 0.1173 11.1195 2.9439 0.1094 3.0533 14,921.5304

14,921.5304

0.8005 14,941.5438

Total 12.4382 20.9971 44.2897 0.1465 11.0022 0.1176 11.1198 2.9439 0.1097 3.0536 14,921.7080

14,921.7080

0.8010 0.0000 14,941.7333

Mitigated Operational

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 7 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 68: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.0 Construction Detail

Construction Phase

Phase Number

Phase Name Phase Type Start Date End Date Num Days Week

Num Days Phase Description

1 Site Preparation Site Preparation 6/4/2018 6/22/2018 5 15

2 Demolition Demolition 6/25/2018 6/29/2018 5 5

3 Grading 4 - Underground Utilities Grading 7/2/2018 8/24/2018 5 40

4 Grading 3 - Building Pad and Foundation

Grading 8/27/2018 11/2/2018 5 50

5 Grading 2 - Basement Excavations

Grading 9/17/2018 11/16/2018 5 45

6 Grading 1 - Deep Excavation Grading 11/12/2018 11/30/2018 5 15

7 Building Construction Building Construction 12/3/2018 4/3/2020 5 350

8 Paving-ARB Facility Paving 9/27/2019 1/2/2020 5 70

9 Architectural Coating Architectural Coating 3/23/2020 5/15/2020 5 40

10 Excavation and Installation-Iowa Site Preparation 4/13/2020 5/22/2020 5 30

11 Fiber-Optic Improvements Trenching 5/18/2020 5/29/2020 5 10

12 Paving-Iowa Paving 6/1/2020 7/17/2020 5 35

13 Improvements-Cranford Avenue Trenching 7/20/2020 7/31/2020 5 10

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e

Percent Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Acres of Grading (Site Preparation Phase): 0

Acres of Grading (Grading Phase): 0

Acres of Paving: 9.98

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 8 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 69: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

OffRoad Equipment

Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor

Site Preparation Concrete/Industrial Saws 2 8.00 16 0.73

Site Preparation Crawler Tractors 1 8.00 212 0.43

Site Preparation Excavators 1 8.00 158 0.38

Site Preparation Other Construction Equipment 1 8.00 172 0.42

Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37

Demolition Air Compressors 1 8.00 78 0.48

Demolition Tractors/Loaders/Backhoes 1 8.00 97 0.37

Grading 4 - Underground Utilities Excavators 0 8.00 158 0.38

Grading 4 - Underground Utilities Graders 0 8.00 187 0.41

Grading 4 - Underground Utilities Plate Compactors 1 8.00 8 0.43

Grading 4 - Underground Utilities Rubber Tired Dozers 0 8.00 247 0.40

Grading 4 - Underground Utilities Rubber Tired Loaders 1 8.00 203 0.36

Grading 4 - Underground Utilities Scrapers 0 8.00 367 0.48

Grading 4 - Underground Utilities Tractors/Loaders/Backhoes 1 8.00 97 0.37

Grading 3 - Building Pad and Foundation

Excavators 1 8.00 158 0.38

Grading 3 - Building Pad and Foundation

Graders 0 8.00 187 0.41

Grading 3 - Building Pad and Foundation

Rubber Tired Dozers 0 8.00 247 0.40

Grading 3 - Building Pad and Foundation

Rubber Tired Loaders 1 8.00 203 0.36

Grading 3 - Building Pad and Foundation

Scrapers 1 8.00 367 0.48

Grading 3 - Building Pad and Foundation

Tractors/Loaders/Backhoes 2 8.00 97 0.37

Grading 2 - Basement Excavations Bore/Drill Rigs 0 8.00 221 0.50

Grading 2 - Basement Excavations Excavators 1 8.00 158 0.38

Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 565,815; Non-Residential Outdoor: 188,605; Striped Parking Area: 26,070 (Architectural Coating – sqft)

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 9 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 70: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Grading 2 - Basement Excavations Graders 0 8.00 187 0.41

Grading 2 - Basement Excavations Rubber Tired Dozers 0 8.00 247 0.40

Grading 2 - Basement Excavations Rubber Tired Loaders 1 8.00 203 0.36

Grading 2 - Basement Excavations Scrapers 0 8.00 367 0.48

Grading 2 - Basement Excavations Tractors/Loaders/Backhoes 2 8.00 97 0.37

Grading 1 - Deep Excavation Bore/Drill Rigs 2 8.00 221 0.50

Grading 1 - Deep Excavation Rubber Tired Loaders 1 8.00 203 0.36

Building Construction Air Compressors 4 8.00 78 0.48

Building Construction Cranes 1 8.00 231 0.29

Building Construction Forklifts 3 8.00 89 0.20

Building Construction Generator Sets 3 8.00 84 0.74

Building Construction Skid Steer Loaders 3 8.00 65 0.37

Building Construction Tractors/Loaders/Backhoes 1 8.00 97 0.37

Building Construction Welders 0 8.00 46 0.45

Paving-ARB Facility Pavers 2 8.00 130 0.42

Paving-ARB Facility Paving Equipment 2 8.00 132 0.36

Paving-ARB Facility Rollers 2 8.00 80 0.38

Architectural Coating Air Compressors 3 8.00 78 0.48

Excavation and Installation-Iowa Excavators 1 8.00 158 0.38

Excavation and Installation-Iowa Graders 1 8.00 187 0.41

Excavation and Installation-Iowa Paving Equipment 1 8.00 132 0.36

Excavation and Installation-Iowa Plate Compactors 1 8.00 8 0.43

Excavation and Installation-Iowa Tractors/Loaders/Backhoes 1 8.00 97 0.37

Fiber-Optic Improvements Plate Compactors 1 8.00 8 0.43

Fiber-Optic Improvements Tractors/Loaders/Backhoes 1 8.00 97 0.37

Paving-Iowa Cement and Mortar Mixers 1 8.00 21 0.56

Paving-Iowa Pavers 1 8.00 130 0.42

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 10 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 71: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.1 Mitigation Measures Construction

Use Cleaner Engines for Construction Equipment

Water Exposed Area

Clean Paved Roads

Paving-Iowa Paving Equipment 1 8.00 132 0.36

Paving-Iowa Rollers 1 8.00 80 0.38

Improvements-Cranford Avenue Plate Compactors 1 8.00 8 0.43

Improvements-Cranford Avenue Tractors/Loaders/Backhoes 1 8.00 97 0.37

Trips and VMT

Phase Name Offroad Equipment Count

Worker Trip Number

Vendor Trip Number

Hauling Trip Number

Worker Trip Length

Vendor Trip Length

Hauling Trip Length

Worker Vehicle Class

Vendor Vehicle Class

Hauling Vehicle Class

Site Preparation 0 26.00 0.00 140.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Demolition 0 8.00 0.00 4.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 4 - Underground Utilities

0 8.00 0.00 150.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 3 - Building Pad and Foundation

0 14.00 0.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 2 - Basement Excavations

0 8.00 0.00 12.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 1 - Deep Excavation

0 10.00 0.00 12.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Building Construction 0 800.00 134.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Paving-ARB Facility 0 16.00 2.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Architectural Coating 0 160.00 2.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Excavation and Installation-Iowa

0 30.00 12.00 120.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Fiber-Optic Improvements

0 12.00 0.00 80.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Paving-Iowa 0 30.00 16.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Improvements-Cranford Avenue

0 12.00 0.00 10.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 11 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 72: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.2 Site Preparation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 6.3300e-003

0.0000 6.3300e-003

9.6000e-004

0.0000 9.6000e-004

0.0000 0.0000

Off-Road 2.0339 22.0732 13.3925 0.0252 1.0433 1.0433 0.9651 0.9651 2,478.6386

2,478.6386

0.7239 2,496.7355

Total 2.0339 22.0732 13.3925 0.0252 6.3300e-003

1.0433 1.0496 9.6000e-004

0.9651 0.9661 2,478.6386

2,478.6386

0.7239 2,496.7355

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0994 3.4432 0.6561 9.3300e-003

0.2120 0.0142 0.2261 0.0581 0.0136 0.0716 1,005.7442

1,005.7442

0.0652 1,007.3730

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.1401 0.1004 1.3046 3.1900e-003

0.2906 2.3200e-003

0.2929 0.0771 2.1400e-003

0.0792 317.0314 317.0314 0.0108 317.3017

Total 0.2395 3.5436 1.9606 0.0125 0.5026 0.0165 0.5191 0.1352 0.0157 0.1509 1,322.7757

1,322.7757

0.0760 1,324.6747

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 12 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 73: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.2 Site Preparation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 2.4700e-003

0.0000 2.4700e-003

3.7000e-004

0.0000 3.7000e-004

0.0000 0.0000

Off-Road 0.3382 8.4446 15.1545 0.0252 0.0366 0.0366 0.0366 0.0366 0.0000 2,478.6386

2,478.6386

0.7239 2,496.7355

Total 0.3382 8.4446 15.1545 0.0252 2.4700e-003

0.0366 0.0391 3.7000e-004

0.0366 0.0370 0.0000 2,478.6386

2,478.6386

0.7239 2,496.7355

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0994 3.4432 0.6561 9.3300e-003

0.2120 0.0142 0.2261 0.0581 0.0136 0.0716 1,005.7442

1,005.7442

0.0652 1,007.3730

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.1401 0.1004 1.3046 3.1900e-003

0.2906 2.3200e-003

0.2929 0.0771 2.1400e-003

0.0792 317.0314 317.0314 0.0108 317.3017

Total 0.2395 3.5436 1.9606 0.0125 0.5026 0.0165 0.5191 0.1352 0.0157 0.1509 1,322.7757

1,322.7757

0.0760 1,324.6747

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 13 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 74: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.3 Demolition - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 4.2800e-003

0.0000 4.2800e-003

6.5000e-004

0.0000 6.5000e-004

0.0000 0.0000

Off-Road 0.6643 5.3041 4.8090 7.0700e-003

0.3870 0.3870 0.3721 0.3721 688.0407 688.0407 0.1330 691.3664

Total 0.6643 5.3041 4.8090 7.0700e-003

4.2800e-003

0.3870 0.3913 6.5000e-004

0.3721 0.3728 688.0407 688.0407 0.1330 691.3664

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 8.5200e-003

0.2951 0.0562 8.0000e-004

0.0182 1.2100e-003

0.0194 4.9800e-003

1.1600e-003

6.1400e-003

86.2067 86.2067 5.5800e-003

86.3463

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0431 0.0309 0.4014 9.8000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 97.5481 97.5481 3.3300e-003

97.6313

Total 0.0516 0.3260 0.4576 1.7800e-003

0.1076 1.9200e-003

0.1095 0.0287 1.8200e-003

0.0305 183.7548 183.7548 8.9100e-003

183.9776

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 14 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 75: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.3 Demolition - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 1.6700e-003

0.0000 1.6700e-003

2.5000e-004

0.0000 2.5000e-004

0.0000 0.0000

Off-Road 0.1423 2.7677 4.7853 7.0700e-003

0.0104 0.0104 0.0104 0.0104 0.0000 688.0407 688.0407 0.1330 691.3664

Total 0.1423 2.7677 4.7853 7.0700e-003

1.6700e-003

0.0104 0.0120 2.5000e-004

0.0104 0.0106 0.0000 688.0407 688.0407 0.1330 691.3664

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 8.5200e-003

0.2951 0.0562 8.0000e-004

0.0182 1.2100e-003

0.0194 4.9800e-003

1.1600e-003

6.1400e-003

86.2067 86.2067 5.5800e-003

86.3463

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0431 0.0309 0.4014 9.8000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 97.5481 97.5481 3.3300e-003

97.6313

Total 0.0516 0.3260 0.4576 1.7800e-003

0.1076 1.9200e-003

0.1095 0.0287 1.8200e-003

0.0305 183.7548 183.7548 8.9100e-003

183.9776

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 15 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 76: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.4 Grading 4 - Underground Utilities - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 1.5933 0.0000 1.5933 0.1722 0.0000 0.1722 0.0000 0.0000

Off-Road 0.7360 8.2059 4.2827 9.8400e-003

0.3767 0.3767 0.3473 0.3473 976.1179 976.1179 0.2967 983.5360

Total 0.7360 8.2059 4.2827 9.8400e-003

1.5933 0.3767 1.9700 0.1722 0.3473 0.5195 976.1179 976.1179 0.2967 983.5360

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0400 1.3834 0.2636 3.7500e-003

0.0852 5.6900e-003

0.0909 0.0233 5.4400e-003

0.0288 404.0937 404.0937 0.0262 404.7481

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0431 0.0309 0.4014 9.8000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 97.5481 97.5481 3.3300e-003

97.6313

Total 0.0831 1.4143 0.6650 4.7300e-003

0.1746 6.4000e-003

0.1810 0.0471 6.1000e-003

0.0532 501.6418 501.6418 0.0295 502.3794

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 16 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 77: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.4 Grading 4 - Underground Utilities - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.6214 0.0000 0.6214 0.0671 0.0000 0.0671 0.0000 0.0000

Off-Road 0.1727 3.0173 5.6932 9.8400e-003

0.0154 0.0154 0.0154 0.0154 0.0000 976.1179 976.1179 0.2967 983.5360

Total 0.1727 3.0173 5.6932 9.8400e-003

0.6214 0.0154 0.6368 0.0671 0.0154 0.0825 0.0000 976.1179 976.1179 0.2967 983.5360

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0400 1.3834 0.2636 3.7500e-003

0.0852 5.6900e-003

0.0909 0.0233 5.4400e-003

0.0288 404.0937 404.0937 0.0262 404.7481

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0431 0.0309 0.4014 9.8000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 97.5481 97.5481 3.3300e-003

97.6313

Total 0.0831 1.4143 0.6650 4.7300e-003

0.1746 6.4000e-003

0.1810 0.0471 6.1000e-003

0.0532 501.6418 501.6418 0.0295 502.3794

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 17 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 78: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.5 Grading 3 - Building Pad and Foundation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 2.6513 0.0000 2.6513 0.2863 0.0000 0.2863 0.0000 0.0000

Off-Road 2.3981 27.8718 18.4713 0.0328 1.2626 1.2626 1.1616 1.1616 3,298.7983

3,298.7983

1.0270 3,324.4723

Total 2.3981 27.8718 18.4713 0.0328 2.6513 1.2626 3.9139 0.2863 1.1616 1.4479 3,298.7983

3,298.7983

1.0270 3,324.4723

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0754 0.0541 0.7025 1.7200e-003

0.1565 1.2500e-003

0.1577 0.0415 1.1500e-003

0.0427 170.7092 170.7092 5.8200e-003

170.8548

Total 0.0754 0.0541 0.7025 1.7200e-003

0.1565 1.2500e-003

0.1577 0.0415 1.1500e-003

0.0427 170.7092 170.7092 5.8200e-003

170.8548

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 18 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 79: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.5 Grading 3 - Building Pad and Foundation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 1.0340 0.0000 1.0340 0.1117 0.0000 0.1117 0.0000 0.0000

Off-Road 0.5545 10.6565 20.0313 0.0328 0.0538 0.0538 0.0538 0.0538 0.0000 3,298.7983

3,298.7983

1.0270 3,324.4723

Total 0.5545 10.6565 20.0313 0.0328 1.0340 0.0538 1.0878 0.1117 0.0538 0.1654 0.0000 3,298.7983

3,298.7983

1.0270 3,324.4723

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0754 0.0541 0.7025 1.7200e-003

0.1565 1.2500e-003

0.1577 0.0415 1.1500e-003

0.0427 170.7092 170.7092 5.8200e-003

170.8548

Total 0.0754 0.0541 0.7025 1.7200e-003

0.1565 1.2500e-003

0.1577 0.0415 1.1500e-003

0.0427 170.7092 170.7092 5.8200e-003

170.8548

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 19 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 80: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.6 Grading 2 - Basement Excavations - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.7072 0.0000 0.7072 0.0764 0.0000 0.0764 0.0000 0.0000

Off-Road 1.2512 13.6803 9.6845 0.0176 0.7033 0.7033 0.6471 0.6471 1,773.9994

1,773.9994

0.5523 1,787.8062

Total 1.2512 13.6803 9.6845 0.0176 0.7072 0.7033 1.4105 0.0764 0.6471 0.7235 1,773.9994

1,773.9994

0.5523 1,787.8062

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 2.8400e-003

0.0984 0.0187 2.7000e-004

6.0600e-003

4.0000e-004

6.4600e-003

1.6600e-003

3.9000e-004

2.0500e-003

28.7356 28.7356 1.8600e-003

28.7821

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0431 0.0309 0.4014 9.8000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 97.5481 97.5481 3.3300e-003

97.6313

Total 0.0460 0.1293 0.4202 1.2500e-003

0.0955 1.1100e-003

0.0966 0.0254 1.0500e-003

0.0264 126.2837 126.2837 5.1900e-003

126.4134

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 20 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 81: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.6 Grading 2 - Basement Excavations - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.2758 0.0000 0.2758 0.0298 0.0000 0.0298 0.0000 0.0000

Off-Road 0.3059 6.6486 11.9533 0.0176 0.0289 0.0289 0.0289 0.0289 0.0000 1,773.9994

1,773.9994

0.5523 1,787.8062

Total 0.3059 6.6486 11.9533 0.0176 0.2758 0.0289 0.3047 0.0298 0.0289 0.0587 0.0000 1,773.9994

1,773.9994

0.5523 1,787.8062

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 2.8400e-003

0.0984 0.0187 2.7000e-004

6.0600e-003

4.0000e-004

6.4600e-003

1.6600e-003

3.9000e-004

2.0500e-003

28.7356 28.7356 1.8600e-003

28.7821

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0431 0.0309 0.4014 9.8000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 97.5481 97.5481 3.3300e-003

97.6313

Total 0.0460 0.1293 0.4202 1.2500e-003

0.0955 1.1100e-003

0.0966 0.0254 1.0500e-003

0.0264 126.2837 126.2837 5.1900e-003

126.4134

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 21 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 82: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.7 Grading 1 - Deep Excavation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 1.0322 13.7172 5.9188 0.0250 0.4177 0.4177 0.3843 0.3843 2,517.5693

2,517.5693

0.7838 2,537.1631

Total 1.0322 13.7172 5.9188 0.0250 0.0000 0.4177 0.4177 0.0000 0.3843 0.3843 2,517.5693

2,517.5693

0.7838 2,537.1631

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 8.5200e-003

0.2951 0.0562 8.0000e-004

0.0182 1.2100e-003

0.0194 4.9800e-003

1.1600e-003

6.1400e-003

86.2067 86.2067 5.5800e-003

86.3463

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0539 0.0386 0.5018 1.2300e-003

0.1118 8.9000e-004

0.1127 0.0296 8.2000e-004

0.0305 121.9352 121.9352 4.1600e-003

122.0391

Total 0.0624 0.3338 0.5580 2.0300e-003

0.1300 2.1000e-003

0.1321 0.0346 1.9800e-003

0.0366 208.1418 208.1418 9.7400e-003

208.3854

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 22 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 83: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.7 Grading 1 - Deep Excavation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.4149 6.6908 13.4854 0.0250 0.0415 0.0415 0.0415 0.0415 0.0000 2,517.5693

2,517.5693

0.7838 2,537.1631

Total 0.4149 6.6908 13.4854 0.0250 0.0000 0.0415 0.0415 0.0000 0.0415 0.0415 0.0000 2,517.5693

2,517.5693

0.7838 2,537.1631

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 8.5200e-003

0.2951 0.0562 8.0000e-004

0.0182 1.2100e-003

0.0194 4.9800e-003

1.1600e-003

6.1400e-003

86.2067 86.2067 5.5800e-003

86.3463

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0539 0.0386 0.5018 1.2300e-003

0.1118 8.9000e-004

0.1127 0.0296 8.2000e-004

0.0305 121.9352 121.9352 4.1600e-003

122.0391

Total 0.0624 0.3338 0.5580 2.0300e-003

0.1300 2.1000e-003

0.1321 0.0346 1.9800e-003

0.0366 208.1418 208.1418 9.7400e-003

208.3854

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 23 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 84: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 4.7548 40.8508 33.7994 0.0552 2.6254 2.6254 2.5425 2.5425 5,348.5472

5,348.5472

0.8934 5,370.8816

Total 4.7548 40.8508 33.7994 0.0552 2.6254 2.6254 2.5425 2.5425 5,348.5472

5,348.5472

0.8934 5,370.8816

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.5702 16.2387 4.0440 0.0351 0.8576 0.1187 0.9763 0.2469 0.1135 0.3604 3,734.0177

3,734.0177

0.2541 3,740.3711

Worker 4.3106 3.0905 40.1406 0.0980 8.9421 0.0713 9.0134 2.3715 0.0657 2.4372 9,754.8133

9,754.8133

0.3326 9,763.1287

Total 4.8807 19.3292 44.1846 0.1331 9.7998 0.1899 9.9897 2.6184 0.1792 2.7976 13,488.8309

13,488.8309

0.5868 13,503.4998

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 24 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 85: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,348.5472

5,348.5472

0.8934 5,370.8816

Total 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,348.5472

5,348.5472

0.8934 5,370.8816

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.5702 16.2387 4.0440 0.0351 0.8576 0.1187 0.9763 0.2469 0.1135 0.3604 3,734.0177

3,734.0177

0.2541 3,740.3711

Worker 4.3106 3.0905 40.1406 0.0980 8.9421 0.0713 9.0134 2.3715 0.0657 2.4372 9,754.8133

9,754.8133

0.3326 9,763.1287

Total 4.8807 19.3292 44.1846 0.1331 9.7998 0.1899 9.9897 2.6184 0.1792 2.7976 13,488.8309

13,488.8309

0.5868 13,503.4998

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 25 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 86: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 4.2235 37.1313 33.3384 0.0552 2.2617 2.2617 2.1899 2.1899 5,316.7117 5,316.7117

0.8611 5,338.2380

Total 4.2235 37.1313 33.3384 0.0552 2.2617 2.2617 2.1899 2.1899 5,316.7117

5,316.7117

0.8611 5,338.2380

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.5166 15.3328 3.7066 0.0347 0.8576 0.1016 0.9592 0.2469 0.0972 0.3441 3,701.3440

3,701.3440

0.2449 3,707.4667

Worker 3.9180 2.7264 35.9469 0.0949 8.9421 0.0696 9.0117 2.3715 0.0641 2.4356 9,447.9123

9,447.9123

0.2955 9,455.2993

Total 4.4345 18.0592 39.6535 0.1296 9.7997 0.1712 9.9709 2.6184 0.1613 2.7797 13,149.2563

13,149.2563

0.5404 13,162.7660

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 26 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 87: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,316.7117 5,316.7117 0.8611 5,338.2380

Total 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,316.7117

5,316.7117

0.8611 5,338.2380

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.5166 15.3328 3.7066 0.0347 0.8576 0.1016 0.9592 0.2469 0.0972 0.3441 3,701.3440

3,701.3440

0.2449 3,707.4667

Worker 3.9180 2.7264 35.9469 0.0949 8.9421 0.0696 9.0117 2.3715 0.0641 2.4356 9,447.9123

9,447.9123

0.2955 9,455.2993

Total 4.4345 18.0592 39.6535 0.1296 9.7997 0.1712 9.9709 2.6184 0.1613 2.7797 13,149.2563

13,149.2563

0.5404 13,162.7660

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 27 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 88: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 3.8234 33.9926 32.9902 0.0552 1.9637 1.9637 1.9011 1.9011 5,274.3168

5,274.3168

0.8373 5,295.2495

Total 3.8234 33.9926 32.9902 0.0552 1.9637 1.9637 1.9011 1.9011 5,274.3168

5,274.3168

0.8373 5,295.2495

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.4401 14.0613 3.3483 0.0345 0.8576 0.0697 0.9273 0.2469 0.0666 0.3135 3,677.6093

3,677.6093

0.2309 3,683.3817

Worker 3.6195 2.4331 32.7054 0.0919 8.9421 0.0678 9.0099 2.3715 0.0625 2.4340 9,155.3396

9,155.3396

0.2632 9,161.9202

Total 4.0596 16.4944 36.0537 0.1264 9.7997 0.1375 9.9372 2.6184 0.1291 2.7475 12,832.9489

12,832.9489

0.4941 12,845.3020

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 28 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 89: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,274.3168

5,274.3168

0.8373 5,295.2495

Total 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,274.3168

5,274.3168

0.8373 5,295.2495

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.4401 14.0613 3.3483 0.0345 0.8576 0.0697 0.9273 0.2469 0.0666 0.3135 3,677.6093

3,677.6093

0.2309 3,683.3817

Worker 3.6195 2.4331 32.7054 0.0919 8.9421 0.0678 9.0099 2.3715 0.0625 2.4340 9,155.3396

9,155.3396

0.2632 9,161.9202

Total 4.0596 16.4944 36.0537 0.1264 9.7997 0.1375 9.9372 2.6184 0.1291 2.7475 12,832.9489

12,832.9489

0.4941 12,845.3020

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 29 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 90: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.4544 15.2441 14.6648 0.0228 0.8246 0.8246 0.7586 0.7586 2,257.0025

2,257.0025

0.7141 2,274.8548

Paving 0.3735 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 1.8280 15.2441 14.6648 0.0228 0.8246 0.8246 0.7586 0.7586 2,257.0025

2,257.0025

0.7141 2,274.8548

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 7.7100e-003

0.2289 0.0553 5.2000e-004

0.0128 1.5200e-003

0.0143 3.6900e-003

1.4500e-003

5.1400e-003

55.2439 55.2439 3.6600e-003

55.3353

Worker 0.0784 0.0545 0.7189 1.9000e-003

0.1788 1.3900e-003

0.1802 0.0474 1.2800e-003

0.0487 188.9583 188.9583 5.9100e-003

189.1060

Total 0.0861 0.2834 0.7743 2.4200e-003

0.1916 2.9100e-003

0.1946 0.0511 2.7300e-003

0.0539 244.2022 244.2022 9.5700e-003

244.4413

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 30 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 91: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.3341 10.0395 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,257.0025

2,257.0025

0.7141 2,274.8548

Paving 0.3735 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.7076 10.0395 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,257.0025

2,257.0025

0.7141 2,274.8548

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 7.7100e-003

0.2289 0.0553 5.2000e-004

0.0128 1.5200e-003

0.0143 3.6900e-003

1.4500e-003

5.1400e-003

55.2439 55.2439 3.6600e-003

55.3353

Worker 0.0784 0.0545 0.7189 1.9000e-003

0.1788 1.3900e-003

0.1802 0.0474 1.2800e-003

0.0487 188.9583 188.9583 5.9100e-003

189.1060

Total 0.0861 0.2834 0.7743 2.4200e-003

0.1916 2.9100e-003

0.1946 0.0511 2.7300e-003

0.0539 244.2022 244.2022 9.5700e-003

244.4413

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 31 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 92: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.3566 14.0656 14.6521 0.0228 0.7528 0.7528 0.6926 0.6926 2,207.7334

2,207.7334

0.7140 2,225.5841

Paving 0.3735 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 1.7301 14.0656 14.6521 0.0228 0.7528 0.7528 0.6926 0.6926 2,207.7334

2,207.7334

0.7140 2,225.5841

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.5700e-003

0.2099 0.0500 5.1000e-004

0.0128 1.0400e-003

0.0138 3.6900e-003

9.9000e-004

4.6800e-003

54.8897 54.8897 3.4500e-003

54.9759

Worker 0.0724 0.0487 0.6541 1.8400e-003

0.1788 1.3600e-003

0.1802 0.0474 1.2500e-003

0.0487 183.1068 183.1068 5.2600e-003

183.2384

Total 0.0790 0.2585 0.7041 2.3500e-003

0.1916 2.4000e-003

0.1940 0.0511 2.2400e-003

0.0534 237.9965 237.9965 8.7100e-003

238.2143

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 32 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 93: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.3341 10.0395 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,207.7334

2,207.7334

0.7140 2,225.5841

Paving 0.3735 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.7076 10.0395 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,207.7334

2,207.7334

0.7140 2,225.5841

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.5700e-003

0.2099 0.0500 5.1000e-004

0.0128 1.0400e-003

0.0138 3.6900e-003

9.9000e-004

4.6800e-003

54.8897 54.8897 3.4500e-003

54.9759

Worker 0.0724 0.0487 0.6541 1.8400e-003

0.1788 1.3600e-003

0.1802 0.0474 1.2500e-003

0.0487 183.1068 183.1068 5.2600e-003

183.2384

Total 0.0790 0.2585 0.7041 2.3500e-003

0.1916 2.4000e-003

0.1940 0.0511 2.2400e-003

0.0534 237.9965 237.9965 8.7100e-003

238.2143

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 33 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 94: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.10 Architectural Coating - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Archit. Coating 17.2264 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.9687 6.7354 7.3257 0.0119 0.4437 0.4437 0.4437 0.4437 1,125.7922

1,125.7922

0.0872 1,127.9713

Total 18.1951 6.7354 7.3257 0.0119 0.4437 0.4437 0.4437 0.4437 1,125.7922

1,125.7922

0.0872 1,127.9713

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.5700e-003

0.2099 0.0500 5.1000e-004

0.0128 1.0400e-003

0.0138 3.6900e-003

9.9000e-004

4.6800e-003

54.8897 54.8897 3.4500e-003

54.9759

Worker 0.7239 0.4866 6.5411 0.0184 1.7884 0.0136 1.8020 0.4743 0.0125 0.4868 1,831.0679

1,831.0679

0.0526 1,832.3840

Total 0.7305 0.6965 6.5911 0.0189 1.8012 0.0146 1.8158 0.4780 0.0135 0.4915 1,885.9576

1,885.9576

0.0561 1,887.3599

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 34 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 95: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.10 Architectural Coating - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Archit. Coating 17.2264 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.2179 4.2393 7.3297 0.0119 0.0159 0.0159 0.0159 0.0159 0.0000 1,125.7922

1,125.7922

0.0872 1,127.9713

Total 17.4443 4.2393 7.3297 0.0119 0.0159 0.0159 0.0159 0.0159 0.0000 1,125.7922

1,125.7922

0.0872 1,127.9713

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.5700e-003

0.2099 0.0500 5.1000e-004

0.0128 1.0400e-003

0.0138 3.6900e-003

9.9000e-004

4.6800e-003

54.8897 54.8897 3.4500e-003

54.9759

Worker 0.7239 0.4866 6.5411 0.0184 1.7884 0.0136 1.8020 0.4743 0.0125 0.4868 1,831.0679

1,831.0679

0.0526 1,832.3840

Total 0.7305 0.6965 6.5911 0.0189 1.8012 0.0146 1.8158 0.4780 0.0135 0.4915 1,885.9576

1,885.9576

0.0561 1,887.3599

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 35 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 96: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.11 Excavation and Installation-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.0235 0.0000 0.0235 3.5600e-003

0.0000 3.5600e-003

0.0000 0.0000

Off-Road 1.1779 13.2360 10.1068 0.0195 0.5691 0.5691 0.5243 0.5243 1,872.6132

1,872.6132

0.5981 1,887.5649

Total 1.1779 13.2360 10.1068 0.0195 0.0235 0.5691 0.5926 3.5600e-003

0.5243 0.5279 1,872.6132

1,872.6132

0.5981 1,887.5649

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0374 1.2977 0.2683 3.9000e-003

0.0908 4.5100e-003

0.0954 0.0249 4.3200e-003

0.0292 421.4785 421.4785 0.0270 422.1536

Vendor 0.0394 1.2592 0.2999 3.0900e-003

0.0768 6.2400e-003

0.0830 0.0221 5.9700e-003

0.0281 329.3382 329.3382 0.0207 329.8551

Worker 0.1357 0.0912 1.2265 3.4500e-003

0.3353 2.5400e-003

0.3379 0.0889 2.3400e-003

0.0913 343.3252 343.3252 9.8700e-003

343.5720

Total 0.2126 2.6482 1.7946 0.0104 0.5030 0.0133 0.5163 0.1359 0.0126 0.1486 1,094.1419

1,094.1419

0.0576 1,095.5807

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 36 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 97: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.11 Excavation and Installation-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 9.1700e-003

0.0000 9.1700e-003

1.3900e-003

0.0000 1.3900e-003

0.0000 0.0000

Off-Road 0.2916 7.1776 12.8769 0.0195 0.0311 0.0311 0.0311 0.0311 0.0000 1,872.6132

1,872.6132

0.5981 1,887.5649

Total 0.2916 7.1776 12.8769 0.0195 9.1700e-003

0.0311 0.0402 1.3900e-003

0.0311 0.0325 0.0000 1,872.6132

1,872.6132

0.5981 1,887.5649

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0374 1.2977 0.2683 3.9000e-003

0.0908 4.5100e-003

0.0954 0.0249 4.3200e-003

0.0292 421.4785 421.4785 0.0270 422.1536

Vendor 0.0394 1.2592 0.2999 3.0900e-003

0.0768 6.2400e-003

0.0830 0.0221 5.9700e-003

0.0281 329.3382 329.3382 0.0207 329.8551

Worker 0.1357 0.0912 1.2265 3.4500e-003

0.3353 2.5400e-003

0.3379 0.0889 2.3400e-003

0.0913 343.3252 343.3252 9.8700e-003

343.5720

Total 0.2126 2.6482 1.7946 0.0104 0.5030 0.0133 0.5163 0.1359 0.0126 0.1486 1,094.1419

1,094.1419

0.0576 1,095.5807

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 37 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 98: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.12 Fiber-Optic Improvements - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.2496 2.3565 2.4902 3.5900e-003

0.1429 0.1429 0.1322 0.1322 335.2479 335.2479 0.1009 337.7693

Total 0.2496 2.3565 2.4902 3.5900e-003

0.1429 0.1429 0.1322 0.1322 335.2479 335.2479 0.1009 337.7693

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0749 2.5954 0.5366 7.8000e-003

0.1817 9.0300e-003

0.1907 0.0498 8.6300e-003

0.0584 842.9569 842.9569 0.0540 844.3072

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0543 0.0365 0.4906 1.3800e-003

0.1341 1.0200e-003

0.1352 0.0356 9.4000e-004

0.0365 137.3301 137.3301 3.9500e-003

137.4288

Total 0.1292 2.6319 1.0271 9.1800e-003

0.3158 0.0101 0.3259 0.0854 9.5700e-003

0.0949 980.2870 980.2870 0.0580 981.7360

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 38 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 99: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.12 Fiber-Optic Improvements - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.0696 1.3546 2.3421 3.5900e-003

5.0600e-003

5.0600e-003

5.0600e-003

5.0600e-003

0.0000 335.2479 335.2479 0.1009 337.7693

Total 0.0696 1.3546 2.3421 3.5900e-003

5.0600e-003

5.0600e-003

5.0600e-003

5.0600e-003

0.0000 335.2479 335.2479 0.1009 337.7693

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0749 2.5954 0.5366 7.8000e-003

0.1817 9.0300e-003

0.1907 0.0498 8.6300e-003

0.0584 842.9569 842.9569 0.0540 844.3072

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0543 0.0365 0.4906 1.3800e-003

0.1341 1.0200e-003

0.1352 0.0356 9.4000e-004

0.0365 137.3301 137.3301 3.9500e-003

137.4288

Total 0.1292 2.6319 1.0271 9.1800e-003

0.3158 0.0101 0.3259 0.0854 9.5700e-003

0.0949 980.2870 980.2870 0.0580 981.7360

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 39 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 100: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.13 Paving-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.8282 7.9541 7.8232 0.0129 0.4152 0.4152 0.3851 0.3851 1,221.7381

1,221.7381

0.3705 1,231.0005

Paving 0.7471 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 1.5753 7.9541 7.8232 0.0129 0.4152 0.4152 0.3851 0.3851 1,221.7381

1,221.7381

0.3705 1,231.0005

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0526 1.6790 0.3998 4.1200e-003

0.1024 8.3200e-003

0.1107 0.0295 7.9600e-003

0.0374 439.1175 439.1175 0.0276 439.8068

Worker 0.1357 0.0912 1.2265 3.4500e-003

0.3353 2.5400e-003

0.3379 0.0889 2.3400e-003

0.0913 343.3252 343.3252 9.8700e-003

343.5720

Total 0.1883 1.7702 1.6263 7.5700e-003

0.4377 0.0109 0.4486 0.1184 0.0103 0.1287 782.4428 782.4428 0.0374 783.3788

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 40 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 101: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.13 Paving-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.1670 5.0197 8.6478 0.0129 0.0187 0.0187 0.0187 0.0187 0.0000 1,221.7381

1,221.7381

0.3705 1,231.0005

Paving 0.7471 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.9141 5.0197 8.6478 0.0129 0.0187 0.0187 0.0187 0.0187 0.0000 1,221.7381

1,221.7381

0.3705 1,231.0005

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0526 1.6790 0.3998 4.1200e-003

0.1024 8.3200e-003

0.1107 0.0295 7.9600e-003

0.0374 439.1175 439.1175 0.0276 439.8068

Worker 0.1357 0.0912 1.2265 3.4500e-003

0.3353 2.5400e-003

0.3379 0.0889 2.3400e-003

0.0913 343.3252 343.3252 9.8700e-003

343.5720

Total 0.1883 1.7702 1.6263 7.5700e-003

0.4377 0.0109 0.4486 0.1184 0.0103 0.1287 782.4428 782.4428 0.0374 783.3788

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 41 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 102: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.14 Improvements-Cranford Avenue - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.2496 2.3565 2.4902 3.5900e-003

0.1429 0.1429 0.1322 0.1322 335.2479 335.2479 0.1009 337.7693

Total 0.2496 2.3565 2.4902 3.5900e-003

0.1429 0.1429 0.1322 0.1322 335.2479 335.2479 0.1009 337.7693

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 9.3600e-003

0.3244 0.0671 9.7000e-004

0.0227 1.1300e-003

0.0238 6.2200e-003

1.0800e-003

7.3000e-003

105.3696 105.3696 6.7500e-003

105.5384

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0543 0.0365 0.4906 1.3800e-003

0.1341 1.0200e-003

0.1352 0.0356 9.4000e-004

0.0365 137.3301 137.3301 3.9500e-003

137.4288

Total 0.0637 0.3609 0.5577 2.3500e-003

0.1568 2.1500e-003

0.1590 0.0418 2.0200e-003

0.0438 242.6997 242.6997 0.0107 242.9672

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 42 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 103: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

4.0 Operational Detail - Mobile

3.14 Improvements-Cranford Avenue - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.0696 1.3546 2.3421 3.5900e-003

5.0600e-003

5.0600e-003

5.0600e-003

5.0600e-003

0.0000 335.2479 335.2479 0.1009 337.7693

Total 0.0696 1.3546 2.3421 3.5900e-003

5.0600e-003

5.0600e-003

5.0600e-003

5.0600e-003

0.0000 335.2479 335.2479 0.1009 337.7693

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 9.3600e-003

0.3244 0.0671 9.7000e-004

0.0227 1.1300e-003

0.0238 6.2200e-003

1.0800e-003

7.3000e-003

105.3696 105.3696 6.7500e-003

105.5384

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0543 0.0365 0.4906 1.3800e-003

0.1341 1.0200e-003

0.1352 0.0356 9.4000e-004

0.0365 137.3301 137.3301 3.9500e-003

137.4288

Total 0.0637 0.3609 0.5577 2.3500e-003

0.1568 2.1500e-003

0.1590 0.0418 2.0200e-003

0.0438 242.6997 242.6997 0.0107 242.9672

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 43 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 104: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Mitigated 4.6190 20.9964 44.2065 0.1465 11.0022 0.1173 11.1195 2.9439 0.1094 3.0533 14,921.5304

14,921.5304

0.8005 14,941.5438

Unmitigated 4.6190 20.9964 44.2065 0.1465 11.0022 0.1173 11.1195 2.9439 0.1094 3.0533 14,921.5304

14,921.5304

0.8005 14,941.5438

4.1 Mitigation Measures Mobile

4.2 Trip Summary Information

4.3 Trip Type Information

Average Daily Trip Rate Unmitigated Mitigated

Land Use Weekday Saturday Sunday Annual VMT Annual VMT

General Light Industry 1,485.45 281.32 468.86 1,905,010 1,905,010

General Office Building 1,350.73 301.25 134.71 1,674,895 1,674,895

Other Asphalt Surfaces 0.00 0.00 0.00

Parking Lot 0.00 0.00 0.00

Research & Development 337.62 79.10 54.93 423,535 423,535

Total 3,173.80 661.67 658.50 4,003,440 4,003,440

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 44 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 105: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Miles Trip % Trip Purpose %

Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by

General Light Industry 0.00 0.00 4.48 0.00 0.00 100.00 100 0 0

General Office Building 0.00 0.00 4.48 0.00 0.00 100.00 100 0 0

Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0

Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0

Research & Development 0.00 0.00 4.47 0.00 0.00 100.00 100 0 0

5.0 Energy Detail

5.1 Mitigation Measures Energy

Kilowatt Hours of Renewable Electricity Generated

4.4 Fleet Mix

Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH

General Office Building 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Research & Development 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

General Light Industry 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Other Asphalt Surfaces 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Parking Lot 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Historical Energy Use: N

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 45 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 106: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

NaturalGas Mitigated

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

NaturalGas Unmitigated

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

5.2 Energy by Land Use - NaturalGas

NaturalGas Use

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Land Use kBTU/yr lb/day lb/day

General Light Industry

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

General Office Building

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Other Asphalt Surfaces

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Research & Development

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Unmitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 46 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 107: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Use Low VOC Paint - Non-Residential Interior

Use Low VOC Paint - Non-Residential Exterior

No Hearths Installed

6.1 Mitigation Measures Area

6.0 Area Detail

5.2 Energy by Land Use - NaturalGas

NaturalGas Use

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Land Use kBTU/yr lb/day lb/day

General Light Industry

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

General Office Building

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Other Asphalt Surfaces

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Research & Development

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Mitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 47 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 108: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Mitigated 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Unmitigated 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

6.2 Area by SubCategory

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

SubCategory lb/day lb/day

Architectural Coating

0.1888 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Consumer Products

7.6227 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Landscaping 7.7700e-003

7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Total 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Unmitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 48 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 109: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

8.1 Mitigation Measures Waste

Institute Recycling and Composting Services

7.1 Mitigation Measures Water

7.0 Water Detail

8.0 Waste Detail

6.2 Area by SubCategory

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

SubCategory lb/day lb/day

Architectural Coating

0.1888 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Consumer Products

7.6227 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Landscaping 7.7700e-003

7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Total 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Mitigated

9.0 Operational Offroad

Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type

10.0 Stationary Equipment

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 49 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 110: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

11.0 Vegetation

Fire Pumps and Emergency Generators

Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type

Boilers

Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type

User Defined Equipment

Equipment Type Number

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:53 AMPage 50 of 50

ARB Southern California Relocation Project - Air District, Summer

Page 111: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project information.

Land Use - See Section 5.10, Land Use and Planning for more details. Based on information provided by ARB.

Construction Phase - Based on information provided by ARB.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

1.1 Land Usage

Land Uses Size Metric Lot Acreage Floor Surface Area Population

General Office Building 122.46 1000sqft 2.81 122,459.00 0

Research & Development 41.63 1000sqft 0.96 41,631.00 0

General Light Industry 213.12 1000sqft 4.89 213,120.02 0

Other Asphalt Surfaces 12.00 1000sqft 0.28 12,000.00 0

Parking Lot 422.50 1000sqft 9.70 422,500.00 0

1.2 Other Project Characteristics

Urbanization

Climate Zone

Urban

10

Wind Speed (m/s) Precipitation Freq (Days)2.2 31

1.3 User Entered Comments & Non-Default Data

1.0 Project Characteristics

Utility Company Riverside Public Utilities

2021Operational Year

CO2 Intensity (lb/MWhr)

1325.65 0.029CH4 Intensity (lb/MWhr)

0.006N2O Intensity (lb/MWhr)

ARB Southern California Relocation Project Air District, Winter

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 1 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 112: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Off-road Equipment - See Section 3.0 for construction details.

Trips and VMT - CalEEMod defaults for worker trips. See Section 3.0, Project Description, of the DEIR for estimated hauling trips.

On-road Fugitive Dust - CalEEMod defaults.

Demolition - See Section 3.0 for construction details.

Grading - See Section 3.0 for construction details.

Architectural Coating - ARB will use no-VOC coatings for interior and low-VOC coatings for exterior. A conservative estimate was assumed, 5 g/l for interior and

50 g/l for exterior.

Vehicle Trips - CalEEMod inputs were based on Dudek calculated net vehicle miles travelled for the proposed project.

Vehicle Emission Factors - Default CalEEMod factors.

Vehicle Emission Factors - Default CalEEMod factors.

Vehicle Emission Factors - Default CalEEMod factors.

Road Dust - CalEEMod Defaults.

Woodstoves - No hearths.

Consumer Products - CalEEMod defaults.

Area Coating - ARB will use no-VOC coatings for interior and low-VOC coatings for exterior. A conservative estimate was assumed, 5 g/l for interior and 50 g/l for exterior.

Landscape Equipment - CalEEMod defaults.

Energy Use - Based on information provided from ARB.

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 2 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 113: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Water And Wastewater - See Section 3.0, Project Description, of the DEIR for details on water use. Default CalEEMod factors.Solid Waste - CalEEMod defaults.

Land Use Change - Land use change calculated outside of CalEEMod.

Sequestration - Land use change calculated outside of CalEEMod.

Construction Off-road Equipment Mitigation - SCAQMD Rule 403 for Fugitive Dust suppression.

Mobile Land Use Mitigation - No traffic mitigation.

Mobile Commute Mitigation - No cummute mitigation.

Area Mitigation - ARB will use no-VOC coatings for interior and low-VOC coatings for exterior. A conservative estimate was assumed, 5 g/l for interior and 50 g/l for exterior.

Energy Mitigation - Proposed project includes a 3.5 MW solar PV system. Any additional grid electricity needed will be renewably sourced.

Water Mitigation - No water mitigation.

Waste Mitigation - Department of General Services Management Memo 15-06 requires at least a 50% diversion from state buildings.

Stationary Sources - Emergency Generators and Fire Pumps - Stationary sources calculated outside of CalEEMod.

Stationary Sources - Process Boilers - Stationary sources calculated outside of CalEEMod.

Stationary Sources - User Defined - Stationary sources calculated outside of CalEEMod.

Stationary Sources - Emergency Generators and Fire Pumps EF - Stationary sources calculated outside of CalEEMod.

Stationary Sources - Process Boilers EF - Stationary sources calculated outside of CalEEMod.

Table Name Column Name Default Value New Value

tblArchitecturalCoating EF_Nonresidential_Exterior 100.00 50.00

tblArchitecturalCoating EF_Nonresidential_Interior 100.00 5.00

tblAreaCoating Area_EF_Nonresidential_Exterior 100 50

tblAreaCoating Area_EF_Nonresidential_Interior 100 5

tblLandUse BuildingSpaceSquareFeet 122,460.00 122,459.00

tblLandUse BuildingSpaceSquareFeet 41,630.00 41,631.00

tblLandUse BuildingSpaceSquareFeet 213,120.00 213,120.02

tblLandUse LandUseSquareFeet 122,460.00 122,459.00

tblLandUse LandUseSquareFeet 41,630.00 41,631.00

tblLandUse LandUseSquareFeet 213,120.00 213,120.02

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 3 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 114: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.0 Emissions Summary

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 4 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 115: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.1 Overall Construction (Maximum Daily Emission)

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Year lb/day lb/day

2018 10.0367 60.5023 74.6161 0.1810 9.7998 2.8171 12.6169 2.6184 2.7234 5.3418 0.0000 18,102.1171

18,102.1171

1.5897 0.0000 18,139.0618

2019 10.9503 70.9940 85.2722 0.2028 9.9914 3.2620 13.2534 2.6695 3.1141 5.7836 0.0000 20,236.8063

20,236.8063

2.1239 0.0000 20,289.9029

2020 27.2235 65.0319 81.4670 0.2043 11.6010 2.8575 14.1616 3.0964 2.7260 5.5848 0.0000 20,300.1867

20,300.1867

2.0535 0.0000 20,336.9578

Maximum 27.2235 70.9940 85.2722 0.2043 11.6010 3.2620 14.1616 3.0964 3.1141 5.7836 0.0000 20,300.1867

20,300.1867

2.1239 0.0000 20,336.9578

Unmitigated Construction

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Year lb/day lb/day

2018 6.3547 40.7232 76.3656 0.1810 9.7998 0.4038 10.2035 2.6184 0.3930 3.0114 0.0000 18,102.1171

18,102.1171

1.5897 0.0000 18,139.0618

2019 6.6793 49.7297 90.1136 0.2028 9.9914 0.4251 10.4165 2.6695 0.4150 3.0845 0.0000 20,236.8063

20,236.8063

2.1239 0.0000 20,289.9029

2020 23.7221 48.0849 86.6693 0.2043 11.6010 0.3904 11.9820 3.0964 0.3818 3.4679 0.0000 20,300.1867

20,300.1867

2.0535 0.0000 20,336.9578

Maximum 23.7221 49.7297 90.1136 0.2043 11.6010 0.4251 11.9820 3.0964 0.4150 3.4679 0.0000 20,300.1867

20,300.1867

2.1239 0.0000 20,336.9578

Mitigated Construction

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 5 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 116: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e

Percent Reduction

23.76 29.51 -4.89 0.00 0.00 86.36 18.56 0.00 86.11 42.77 0.00 0.00 0.00 0.00 0.00 0.00

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 6 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 117: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

2.2 Overall Operational

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Area 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Mobile 4.3705 21.1312 42.9504 0.1383 11.0022 0.1186 11.1208 2.9439 0.1107 3.0545 14,090.7305

14,090.7305

0.8168 14,111.1497

Total 12.1897 21.1320 43.0336 0.1383 11.0022 0.1189 11.1211 2.9439 0.1110 3.0548 14,090.9081

14,090.9081

0.8172 0.0000 14,111.3391

Unmitigated Operational

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Area 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Mobile 4.3705 21.1312 42.9504 0.1383 11.0022 0.1186 11.1208 2.9439 0.1107 3.0545 14,090.7305

14,090.7305

0.8168 14,111.1497

Total 12.1897 21.1320 43.0336 0.1383 11.0022 0.1189 11.1211 2.9439 0.1110 3.0548 14,090.9081

14,090.9081

0.8172 0.0000 14,111.3391

Mitigated Operational

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 7 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 118: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.0 Construction Detail

Construction Phase

Phase Number

Phase Name Phase Type Start Date End Date Num Days Week

Num Days Phase Description

1 Site Preparation Site Preparation 6/4/2018 6/22/2018 5 15

2 Demolition Demolition 6/25/2018 6/29/2018 5 5

3 Grading 4 - Underground Utilities Grading 7/2/2018 8/24/2018 5 40

4 Grading 3 - Building Pad and Foundation

Grading 8/27/2018 11/2/2018 5 50

5 Grading 2 - Basement Excavations

Grading 9/17/2018 11/16/2018 5 45

6 Grading 1 - Deep Excavation Grading 11/12/2018 11/30/2018 5 15

7 Building Construction Building Construction 12/3/2018 4/3/2020 5 350

8 Paving-ARB Facility Paving 9/27/2019 1/2/2020 5 70

9 Architectural Coating Architectural Coating 3/23/2020 5/15/2020 5 40

10 Excavation and Installation-Iowa Site Preparation 4/13/2020 5/22/2020 5 30

11 Fiber-Optic Improvements Trenching 5/18/2020 5/29/2020 5 10

12 Paving-Iowa Paving 6/1/2020 7/17/2020 5 35

13 Improvements-Cranford Avenue Trenching 7/20/2020 7/31/2020 5 10

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e

Percent Reduction

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Acres of Grading (Site Preparation Phase): 0

Acres of Grading (Grading Phase): 0

Acres of Paving: 9.98

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 8 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 119: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

OffRoad Equipment

Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor

Site Preparation Concrete/Industrial Saws 2 8.00 16 0.73

Site Preparation Crawler Tractors 1 8.00 212 0.43

Site Preparation Excavators 1 8.00 158 0.38

Site Preparation Other Construction Equipment 1 8.00 172 0.42

Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37

Demolition Air Compressors 1 8.00 78 0.48

Demolition Tractors/Loaders/Backhoes 1 8.00 97 0.37

Grading 4 - Underground Utilities Excavators 0 8.00 158 0.38

Grading 4 - Underground Utilities Graders 0 8.00 187 0.41

Grading 4 - Underground Utilities Plate Compactors 1 8.00 8 0.43

Grading 4 - Underground Utilities Rubber Tired Dozers 0 8.00 247 0.40

Grading 4 - Underground Utilities Rubber Tired Loaders 1 8.00 203 0.36

Grading 4 - Underground Utilities Scrapers 0 8.00 367 0.48

Grading 4 - Underground Utilities Tractors/Loaders/Backhoes 1 8.00 97 0.37

Grading 3 - Building Pad and Foundation

Excavators 1 8.00 158 0.38

Grading 3 - Building Pad and Foundation

Graders 0 8.00 187 0.41

Grading 3 - Building Pad and Foundation

Rubber Tired Dozers 0 8.00 247 0.40

Grading 3 - Building Pad and Foundation

Rubber Tired Loaders 1 8.00 203 0.36

Grading 3 - Building Pad and Foundation

Scrapers 1 8.00 367 0.48

Grading 3 - Building Pad and Foundation

Tractors/Loaders/Backhoes 2 8.00 97 0.37

Grading 2 - Basement Excavations Bore/Drill Rigs 0 8.00 221 0.50

Grading 2 - Basement Excavations Excavators 1 8.00 158 0.38

Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 565,815; Non-Residential Outdoor: 188,605; Striped Parking Area: 26,070 (Architectural Coating – sqft)

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 9 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 120: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Grading 2 - Basement Excavations Graders 0 8.00 187 0.41

Grading 2 - Basement Excavations Rubber Tired Dozers 0 8.00 247 0.40

Grading 2 - Basement Excavations Rubber Tired Loaders 1 8.00 203 0.36

Grading 2 - Basement Excavations Scrapers 0 8.00 367 0.48

Grading 2 - Basement Excavations Tractors/Loaders/Backhoes 2 8.00 97 0.37

Grading 1 - Deep Excavation Bore/Drill Rigs 2 8.00 221 0.50

Grading 1 - Deep Excavation Rubber Tired Loaders 1 8.00 203 0.36

Building Construction Air Compressors 4 8.00 78 0.48

Building Construction Cranes 1 8.00 231 0.29

Building Construction Forklifts 3 8.00 89 0.20

Building Construction Generator Sets 3 8.00 84 0.74

Building Construction Skid Steer Loaders 3 8.00 65 0.37

Building Construction Tractors/Loaders/Backhoes 1 8.00 97 0.37

Building Construction Welders 0 8.00 46 0.45

Paving-ARB Facility Pavers 2 8.00 130 0.42

Paving-ARB Facility Paving Equipment 2 8.00 132 0.36

Paving-ARB Facility Rollers 2 8.00 80 0.38

Architectural Coating Air Compressors 3 8.00 78 0.48

Excavation and Installation-Iowa Excavators 1 8.00 158 0.38

Excavation and Installation-Iowa Graders 1 8.00 187 0.41

Excavation and Installation-Iowa Paving Equipment 1 8.00 132 0.36

Excavation and Installation-Iowa Plate Compactors 1 8.00 8 0.43

Excavation and Installation-Iowa Tractors/Loaders/Backhoes 1 8.00 97 0.37

Fiber-Optic Improvements Plate Compactors 1 8.00 8 0.43

Fiber-Optic Improvements Tractors/Loaders/Backhoes 1 8.00 97 0.37

Paving-Iowa Cement and Mortar Mixers 1 8.00 21 0.56

Paving-Iowa Pavers 1 8.00 130 0.42

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 10 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 121: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.1 Mitigation Measures Construction

Water Exposed Area

Clean Paved Roads

Use Cleaner Engines for Construction Equipment

Paving-Iowa Paving Equipment 1 8.00 132 0.36

Paving-Iowa Rollers 1 8.00 80 0.38

Improvements-Cranford Avenue Plate Compactors 1 8.00 8 0.43

Improvements-Cranford Avenue Tractors/Loaders/Backhoes 1 8.00 97 0.37

Trips and VMT

Phase Name Offroad Equipment Count

Worker Trip Number

Vendor Trip Number

Hauling Trip Number

Worker Trip Length

Vendor Trip Length

Hauling Trip Length

Worker Vehicle Class

Vendor Vehicle Class

Hauling Vehicle Class

Site Preparation 0 26.00 0.00 140.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Demolition 0 8.00 0.00 4.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 4 - Underground Utilities

0 8.00 0.00 150.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 3 - Building Pad and Foundation

0 14.00 0.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 2 - Basement Excavations

0 8.00 0.00 12.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Grading 1 - Deep Excavation

0 10.00 0.00 12.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Building Construction 0 800.00 134.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Paving-ARB Facility 0 16.00 2.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Architectural Coating 0 160.00 2.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Excavation and Installation-Iowa

0 30.00 12.00 120.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Fiber-Optic Improvements

0 12.00 0.00 80.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Paving-Iowa 0 30.00 16.00 0.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

Improvements-Cranford Avenue

0 12.00 0.00 10.00 14.70 6.90 26.00 LD_Mix HDT_Mix HHDT

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 11 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 122: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.2 Site Preparation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 6.3300e-003

0.0000 6.3300e-003

9.6000e-004

0.0000 9.6000e-004

0.0000 0.0000

Off-Road 2.0339 22.0732 13.3925 0.0252 1.0433 1.0433 0.9651 0.9651 2,478.6386

2,478.6386

0.7239 2,496.7355

Total 2.0339 22.0732 13.3925 0.0252 6.3300e-003

1.0433 1.0496 9.6000e-004

0.9651 0.9661 2,478.6386

2,478.6386

0.7239 2,496.7355

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.1018 3.5074 0.7003 9.1900e-003

0.2120 0.0144 0.2264 0.0581 0.0138 0.0718 991.3999 991.3999 0.0677 993.0917

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.1523 0.1100 1.1807 2.9800e-003

0.2906 2.3200e-003

0.2929 0.0771 2.1400e-003

0.0792 296.5766 296.5766 0.0101 296.8296

Total 0.2542 3.6174 1.8809 0.0122 0.5026 0.0167 0.5193 0.1352 0.0159 0.1511 1,287.9765

1,287.9765

0.0778 1,289.9213

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 12 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 123: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.2 Site Preparation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 2.4700e-003

0.0000 2.4700e-003

3.7000e-004

0.0000 3.7000e-004

0.0000 0.0000

Off-Road 0.3382 8.4446 15.1545 0.0252 0.0366 0.0366 0.0366 0.0366 0.0000 2,478.6386

2,478.6386

0.7239 2,496.7355

Total 0.3382 8.4446 15.1545 0.0252 2.4700e-003

0.0366 0.0391 3.7000e-004

0.0366 0.0370 0.0000 2,478.6386

2,478.6386

0.7239 2,496.7355

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.1018 3.5074 0.7003 9.1900e-003

0.2120 0.0144 0.2264 0.0581 0.0138 0.0718 991.3999 991.3999 0.0677 993.0917

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.1523 0.1100 1.1807 2.9800e-003

0.2906 2.3200e-003

0.2929 0.0771 2.1400e-003

0.0792 296.5766 296.5766 0.0101 296.8296

Total 0.2542 3.6174 1.8809 0.0122 0.5026 0.0167 0.5193 0.1352 0.0159 0.1511 1,287.9765

1,287.9765

0.0778 1,289.9213

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 13 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 124: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.3 Demolition - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 4.2800e-003

0.0000 4.2800e-003

6.5000e-004

0.0000 6.5000e-004

0.0000 0.0000

Off-Road 0.6643 5.3041 4.8090 7.0700e-003

0.3870 0.3870 0.3721 0.3721 688.0407 688.0407 0.1330 691.3664

Total 0.6643 5.3041 4.8090 7.0700e-003

4.2800e-003

0.3870 0.3913 6.5000e-004

0.3721 0.3728 688.0407 688.0407 0.1330 691.3664

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 8.7300e-003

0.3006 0.0600 7.9000e-004

0.0182 1.2300e-003

0.0194 4.9800e-003

1.1800e-003

6.1600e-003

84.9771 84.9771 5.8000e-003

85.1221

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0469 0.0339 0.3633 9.2000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 91.2543 91.2543 3.1100e-003

91.3322

Total 0.0556 0.3345 0.4233 1.7100e-003

0.1076 1.9400e-003

0.1095 0.0287 1.8400e-003

0.0305 176.2315 176.2315 8.9100e-003

176.4543

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 14 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 125: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.3 Demolition - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 1.6700e-003

0.0000 1.6700e-003

2.5000e-004

0.0000 2.5000e-004

0.0000 0.0000

Off-Road 0.1423 2.7677 4.7853 7.0700e-003

0.0104 0.0104 0.0104 0.0104 0.0000 688.0407 688.0407 0.1330 691.3664

Total 0.1423 2.7677 4.7853 7.0700e-003

1.6700e-003

0.0104 0.0120 2.5000e-004

0.0104 0.0106 0.0000 688.0407 688.0407 0.1330 691.3664

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 8.7300e-003

0.3006 0.0600 7.9000e-004

0.0182 1.2300e-003

0.0194 4.9800e-003

1.1800e-003

6.1600e-003

84.9771 84.9771 5.8000e-003

85.1221

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0469 0.0339 0.3633 9.2000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 91.2543 91.2543 3.1100e-003

91.3322

Total 0.0556 0.3345 0.4233 1.7100e-003

0.1076 1.9400e-003

0.1095 0.0287 1.8400e-003

0.0305 176.2315 176.2315 8.9100e-003

176.4543

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 15 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 126: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.4 Grading 4 - Underground Utilities - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 1.5933 0.0000 1.5933 0.1722 0.0000 0.1722 0.0000 0.0000

Off-Road 0.7360 8.2059 4.2827 9.8400e-003

0.3767 0.3767 0.3473 0.3473 976.1179 976.1179 0.2967 983.5360

Total 0.7360 8.2059 4.2827 9.8400e-003

1.5933 0.3767 1.9700 0.1722 0.3473 0.5195 976.1179 976.1179 0.2967 983.5360

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0409 1.4092 0.2814 3.6900e-003

0.0852 5.7800e-003

0.0909 0.0233 5.5300e-003

0.0289 398.3303 398.3303 0.0272 399.0101

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0469 0.0339 0.3633 9.2000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 91.2543 91.2543 3.1100e-003

91.3322

Total 0.0878 1.4431 0.6446 4.6100e-003

0.1746 6.4900e-003

0.1811 0.0471 6.1900e-003

0.0532 489.5847 489.5847 0.0303 490.3422

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 16 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 127: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.4 Grading 4 - Underground Utilities - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.6214 0.0000 0.6214 0.0671 0.0000 0.0671 0.0000 0.0000

Off-Road 0.1727 3.0173 5.6932 9.8400e-003

0.0154 0.0154 0.0154 0.0154 0.0000 976.1179 976.1179 0.2967 983.5360

Total 0.1727 3.0173 5.6932 9.8400e-003

0.6214 0.0154 0.6368 0.0671 0.0154 0.0825 0.0000 976.1179 976.1179 0.2967 983.5360

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0409 1.4092 0.2814 3.6900e-003

0.0852 5.7800e-003

0.0909 0.0233 5.5300e-003

0.0289 398.3303 398.3303 0.0272 399.0101

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0469 0.0339 0.3633 9.2000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 91.2543 91.2543 3.1100e-003

91.3322

Total 0.0878 1.4431 0.6446 4.6100e-003

0.1746 6.4900e-003

0.1811 0.0471 6.1900e-003

0.0532 489.5847 489.5847 0.0303 490.3422

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 17 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 128: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.5 Grading 3 - Building Pad and Foundation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 2.6513 0.0000 2.6513 0.2863 0.0000 0.2863 0.0000 0.0000

Off-Road 2.3981 27.8718 18.4713 0.0328 1.2626 1.2626 1.1616 1.1616 3,298.7983

3,298.7983

1.0270 3,324.4723

Total 2.3981 27.8718 18.4713 0.0328 2.6513 1.2626 3.9139 0.2863 1.1616 1.4479 3,298.7983

3,298.7983

1.0270 3,324.4723

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0820 0.0593 0.6357 1.6000e-003

0.1565 1.2500e-003

0.1577 0.0415 1.1500e-003

0.0427 159.6951 159.6951 5.4500e-003

159.8313

Total 0.0820 0.0593 0.6357 1.6000e-003

0.1565 1.2500e-003

0.1577 0.0415 1.1500e-003

0.0427 159.6951 159.6951 5.4500e-003

159.8313

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 18 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 129: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.5 Grading 3 - Building Pad and Foundation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 1.0340 0.0000 1.0340 0.1117 0.0000 0.1117 0.0000 0.0000

Off-Road 0.5545 10.6565 20.0313 0.0328 0.0538 0.0538 0.0538 0.0538 0.0000 3,298.7983

3,298.7983

1.0270 3,324.4723

Total 0.5545 10.6565 20.0313 0.0328 1.0340 0.0538 1.0878 0.1117 0.0538 0.1654 0.0000 3,298.7983

3,298.7983

1.0270 3,324.4723

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0820 0.0593 0.6357 1.6000e-003

0.1565 1.2500e-003

0.1577 0.0415 1.1500e-003

0.0427 159.6951 159.6951 5.4500e-003

159.8313

Total 0.0820 0.0593 0.6357 1.6000e-003

0.1565 1.2500e-003

0.1577 0.0415 1.1500e-003

0.0427 159.6951 159.6951 5.4500e-003

159.8313

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 19 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 130: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.6 Grading 2 - Basement Excavations - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.7072 0.0000 0.7072 0.0764 0.0000 0.0764 0.0000 0.0000

Off-Road 1.2512 13.6803 9.6845 0.0176 0.7033 0.7033 0.6471 0.6471 1,773.9994

1,773.9994

0.5523 1,787.8062

Total 1.2512 13.6803 9.6845 0.0176 0.7072 0.7033 1.4105 0.0764 0.6471 0.7235 1,773.9994

1,773.9994

0.5523 1,787.8062

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 2.9100e-003

0.1002 0.0200 2.6000e-004

6.0600e-003

4.1000e-004

6.4700e-003

1.6600e-003

3.9000e-004

2.0500e-003

28.3257 28.3257 1.9300e-003

28.3741

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0469 0.0339 0.3633 9.2000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 91.2543 91.2543 3.1100e-003

91.3322

Total 0.0498 0.1341 0.3833 1.1800e-003

0.0955 1.1200e-003

0.0966 0.0254 1.0500e-003

0.0264 119.5801 119.5801 5.0400e-003

119.7062

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 20 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 131: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.6 Grading 2 - Basement Excavations - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.2758 0.0000 0.2758 0.0298 0.0000 0.0298 0.0000 0.0000

Off-Road 0.3059 6.6486 11.9533 0.0176 0.0289 0.0289 0.0289 0.0289 0.0000 1,773.9994

1,773.9994

0.5523 1,787.8062

Total 0.3059 6.6486 11.9533 0.0176 0.2758 0.0289 0.3047 0.0298 0.0289 0.0587 0.0000 1,773.9994

1,773.9994

0.5523 1,787.8062

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 2.9100e-003

0.1002 0.0200 2.6000e-004

6.0600e-003

4.1000e-004

6.4700e-003

1.6600e-003

3.9000e-004

2.0500e-003

28.3257 28.3257 1.9300e-003

28.3741

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0469 0.0339 0.3633 9.2000e-004

0.0894 7.1000e-004

0.0901 0.0237 6.6000e-004

0.0244 91.2543 91.2543 3.1100e-003

91.3322

Total 0.0498 0.1341 0.3833 1.1800e-003

0.0955 1.1200e-003

0.0966 0.0254 1.0500e-003

0.0264 119.5801 119.5801 5.0400e-003

119.7062

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 21 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 132: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.7 Grading 1 - Deep Excavation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 1.0322 13.7172 5.9188 0.0250 0.4177 0.4177 0.3843 0.3843 2,517.5693

2,517.5693

0.7838 2,537.1631

Total 1.0322 13.7172 5.9188 0.0250 0.0000 0.4177 0.4177 0.0000 0.3843 0.3843 2,517.5693

2,517.5693

0.7838 2,537.1631

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 8.7300e-003

0.3006 0.0600 7.9000e-004

0.0182 1.2300e-003

0.0194 4.9800e-003

1.1800e-003

6.1600e-003

84.9771 84.9771 5.8000e-003

85.1221

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0586 0.0423 0.4541 1.1500e-003

0.1118 8.9000e-004

0.1127 0.0296 8.2000e-004

0.0305 114.0679 114.0679 3.8900e-003

114.1652

Total 0.0673 0.3430 0.5141 1.9400e-003

0.1300 2.1200e-003

0.1321 0.0346 2.0000e-003

0.0366 199.0451 199.0451 9.6900e-003

199.2874

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 22 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 133: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.7 Grading 1 - Deep Excavation - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.4149 6.6908 13.4854 0.0250 0.0415 0.0415 0.0415 0.0415 0.0000 2,517.5693

2,517.5693

0.7838 2,537.1631

Total 0.4149 6.6908 13.4854 0.0250 0.0000 0.0415 0.0415 0.0000 0.0415 0.0415 0.0000 2,517.5693

2,517.5693

0.7838 2,537.1631

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 8.7300e-003

0.3006 0.0600 7.9000e-004

0.0182 1.2300e-003

0.0194 4.9800e-003

1.1800e-003

6.1600e-003

84.9771 84.9771 5.8000e-003

85.1221

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0586 0.0423 0.4541 1.1500e-003

0.1118 8.9000e-004

0.1127 0.0296 8.2000e-004

0.0305 114.0679 114.0679 3.8900e-003

114.1652

Total 0.0673 0.3430 0.5141 1.9400e-003

0.1300 2.1200e-003

0.1321 0.0346 2.0000e-003

0.0366 199.0451 199.0451 9.6900e-003

199.2874

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 23 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 134: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 4.7548 40.8508 33.7994 0.0552 2.6254 2.6254 2.5425 2.5425 5,348.5472

5,348.5472

0.8934 5,370.8816

Total 4.7548 40.8508 33.7994 0.0552 2.6254 2.6254 2.5425 2.5425 5,348.5472

5,348.5472

0.8934 5,370.8816

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.5951 16.2658 4.4892 0.0341 0.8576 0.1205 0.9781 0.2469 0.1152 0.3622 3,628.1363

3,628.1363

0.2730 3,634.9618

Worker 4.6868 3.3857 36.3275 0.0917 8.9421 0.0713 9.0134 2.3715 0.0657 2.4372 9,125.4336

9,125.4336

0.3114 9,133.2185

Total 5.2819 19.6515 40.8167 0.1258 9.7998 0.1918 9.9915 2.6184 0.1809 2.7993 12,753.5699

12,753.5699

0.5844 12,768.1803

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 24 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 135: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2018

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,348.5472

5,348.5472

0.8934 5,370.8816

Total 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,348.5472

5,348.5472

0.8934 5,370.8816

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.5951 16.2658 4.4892 0.0341 0.8576 0.1205 0.9781 0.2469 0.1152 0.3622 3,628.1363

3,628.1363

0.2730 3,634.9618

Worker 4.6868 3.3857 36.3275 0.0917 8.9421 0.0713 9.0134 2.3715 0.0657 2.4372 9,125.4336

9,125.4336

0.3114 9,133.2185

Total 5.2819 19.6515 40.8167 0.1258 9.7998 0.1918 9.9915 2.6184 0.1809 2.7993 12,753.5699

12,753.5699

0.5844 12,768.1803

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 25 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 136: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 4.2235 37.1313 33.3384 0.0552 2.2617 2.2617 2.1899 2.1899 5,316.7117 5,316.7117 0.8611 5,338.2380

Total 4.2235 37.1313 33.3384 0.0552 2.2617 2.2617 2.1899 2.1899 5,316.7117

5,316.7117

0.8611 5,338.2380

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.5397 15.3436 4.1280 0.0338 0.8576 0.1032 0.9608 0.2469 0.0987 0.3456 3,595.4380

3,595.4380

0.2632 3,602.0173

Worker 4.2658 2.9863 32.4308 0.0887 8.9421 0.0696 9.0117 2.3715 0.0641 2.4356 8,837.2459

8,837.2459

0.2761 8,844.1485

Total 4.8055 18.3299 36.5587 0.1225 9.7997 0.1728 9.9725 2.6184 0.1628 2.7812 12,432.6840

12,432.6840

0.5393 12,446.1657

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 26 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 137: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,316.7117 5,316.7117 0.8611 5,338.2380

Total 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,316.7117

5,316.7117

0.8611 5,338.2380

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.5397 15.3436 4.1280 0.0338 0.8576 0.1032 0.9608 0.2469 0.0987 0.3456 3,595.4380

3,595.4380

0.2632 3,602.0173

Worker 4.2658 2.9863 32.4308 0.0887 8.9421 0.0696 9.0117 2.3715 0.0641 2.4356 8,837.2459

8,837.2459

0.2761 8,844.1485

Total 4.8055 18.3299 36.5587 0.1225 9.7997 0.1728 9.9725 2.6184 0.1628 2.7812 12,432.6840

12,432.6840

0.5393 12,446.1657

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 27 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 138: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 3.8234 33.9926 32.9902 0.0552 1.9637 1.9637 1.9011 1.9011 5,274.3168

5,274.3168

0.8373 5,295.2495

Total 3.8234 33.9926 32.9902 0.0552 1.9637 1.9637 1.9011 1.9011 5,274.3168

5,274.3168

0.8373 5,295.2495

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.4610 14.0467 3.7331 0.0335 0.8576 0.0707 0.9283 0.2469 0.0676 0.3145 3,571.2716

3,571.2716

0.2480 3,577.4711

Worker 3.9477 2.6641 29.4470 0.0860 8.9421 0.0678 9.0099 2.3715 0.0625 2.4340 8,562.9196

8,562.9196

0.2456 8,569.0590

Total 4.4087 16.7108 33.1800 0.1194 9.7997 0.1385 9.9383 2.6184 0.1301 2.7485 12,134.1912

12,134.1912

0.4936 12,146.5302

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 28 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 139: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.8 Building Construction - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,274.3168

5,274.3168

0.8373 5,295.2495

Total 1.0728 21.0717 35.5489 0.0552 0.2120 0.2120 0.2120 0.2120 0.0000 5,274.3168

5,274.3168

0.8373 5,295.2495

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.4610 14.0467 3.7331 0.0335 0.8576 0.0707 0.9283 0.2469 0.0676 0.3145 3,571.2716

3,571.2716

0.2480 3,577.4711

Worker 3.9477 2.6641 29.4470 0.0860 8.9421 0.0678 9.0099 2.3715 0.0625 2.4340 8,562.9196

8,562.9196

0.2456 8,569.0590

Total 4.4087 16.7108 33.1800 0.1194 9.7997 0.1385 9.9383 2.6184 0.1301 2.7485 12,134.1912

12,134.1912

0.4936 12,146.5302

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 29 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 140: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.4544 15.2441 14.6648 0.0228 0.8246 0.8246 0.7586 0.7586 2,257.0025

2,257.0025

0.7141 2,274.8548

Paving 0.3735 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 1.8280 15.2441 14.6648 0.0228 0.8246 0.8246 0.7586 0.7586 2,257.0025

2,257.0025

0.7141 2,274.8548

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 8.0500e-003

0.2290 0.0616 5.0000e-004

0.0128 1.5400e-003

0.0143 3.6900e-003

1.4700e-003

5.1600e-003

53.6633 53.6633 3.9300e-003

53.7615

Worker 0.0853 0.0597 0.6486 1.7700e-003

0.1788 1.3900e-003

0.1802 0.0474 1.2800e-003

0.0487 176.7449 176.7449 5.5200e-003

176.8830

Total 0.0934 0.2887 0.7102 2.2700e-003

0.1916 2.9300e-003

0.1946 0.0511 2.7500e-003

0.0539 230.4082 230.4082 9.4500e-003

230.6444

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 30 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 141: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2019

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.3341 10.0395 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,257.0025

2,257.0025

0.7141 2,274.8548

Paving 0.3735 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.7076 10.0395 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,257.0025

2,257.0025

0.7141 2,274.8548

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 8.0500e-003

0.2290 0.0616 5.0000e-004

0.0128 1.5400e-003

0.0143 3.6900e-003

1.4700e-003

5.1600e-003

53.6633 53.6633 3.9300e-003

53.7615

Worker 0.0853 0.0597 0.6486 1.7700e-003

0.1788 1.3900e-003

0.1802 0.0474 1.2800e-003

0.0487 176.7449 176.7449 5.5200e-003

176.8830

Total 0.0934 0.2887 0.7102 2.2700e-003

0.1916 2.9300e-003

0.1946 0.0511 2.7500e-003

0.0539 230.4082 230.4082 9.4500e-003

230.6444

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 31 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 142: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 1.3566 14.0656 14.6521 0.0228 0.7528 0.7528 0.6926 0.6926 2,207.7334

2,207.7334

0.7140 2,225.5841

Paving 0.3735 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 1.7301 14.0656 14.6521 0.0228 0.7528 0.7528 0.6926 0.6926 2,207.7334

2,207.7334

0.7140 2,225.5841

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.8800e-003

0.2097 0.0557 5.0000e-004

0.0128 1.0600e-003

0.0139 3.6900e-003

1.0100e-003

4.6900e-003

53.3026 53.3026 3.7000e-003

53.3951

Worker 0.0790 0.0533 0.5889 1.7200e-003

0.1788 1.3600e-003

0.1802 0.0474 1.2500e-003

0.0487 171.2584 171.2584 4.9100e-003

171.3812

Total 0.0858 0.2629 0.6447 2.2200e-003

0.1916 2.4200e-003

0.1941 0.0511 2.2600e-003

0.0534 224.5610 224.5610 8.6100e-003

224.7763

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 32 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 143: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.9 Paving-ARB Facility - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.3341 10.0395 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,207.7334

2,207.7334

0.7140 2,225.5841

Paving 0.3735 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.7076 10.0395 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,207.7334

2,207.7334

0.7140 2,225.5841

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.8800e-003

0.2097 0.0557 5.0000e-004

0.0128 1.0600e-003

0.0139 3.6900e-003

1.0100e-003

4.6900e-003

53.3026 53.3026 3.7000e-003

53.3951

Worker 0.0790 0.0533 0.5889 1.7200e-003

0.1788 1.3600e-003

0.1802 0.0474 1.2500e-003

0.0487 171.2584 171.2584 4.9100e-003

171.3812

Total 0.0858 0.2629 0.6447 2.2200e-003

0.1916 2.4200e-003

0.1941 0.0511 2.2600e-003

0.0534 224.5610 224.5610 8.6100e-003

224.7763

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 33 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 144: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.10 Architectural Coating - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Archit. Coating 17.2264 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.9687 6.7354 7.3257 0.0119 0.4437 0.4437 0.4437 0.4437 1,125.7922

1,125.7922

0.0872 1,127.9713

Total 18.1951 6.7354 7.3257 0.0119 0.4437 0.4437 0.4437 0.4437 1,125.7922

1,125.7922

0.0872 1,127.9713

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.8800e-003

0.2097 0.0557 5.0000e-004

0.0128 1.0600e-003

0.0139 3.6900e-003

1.0100e-003

4.6900e-003

53.3026 53.3026 3.7000e-003

53.3951

Worker 0.7895 0.5328 5.8894 0.0172 1.7884 0.0136 1.8020 0.4743 0.0125 0.4868 1,712.5839

1,712.5839

0.0491 1,713.8118

Total 0.7964 0.7425 5.9451 0.0177 1.8012 0.0146 1.8159 0.4780 0.0135 0.4915 1,765.8865

1,765.8865

0.0528 1,767.2069

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 34 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 145: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.10 Architectural Coating - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Archit. Coating 17.2264 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Off-Road 0.2179 4.2393 7.3297 0.0119 0.0159 0.0159 0.0159 0.0159 0.0000 1,125.7922

1,125.7922

0.0872 1,127.9713

Total 17.4443 4.2393 7.3297 0.0119 0.0159 0.0159 0.0159 0.0159 0.0000 1,125.7922

1,125.7922

0.0872 1,127.9713

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 6.8800e-003

0.2097 0.0557 5.0000e-004

0.0128 1.0600e-003

0.0139 3.6900e-003

1.0100e-003

4.6900e-003

53.3026 53.3026 3.7000e-003

53.3951

Worker 0.7895 0.5328 5.8894 0.0172 1.7884 0.0136 1.8020 0.4743 0.0125 0.4868 1,712.5839

1,712.5839

0.0491 1,713.8118

Total 0.7964 0.7425 5.9451 0.0177 1.8012 0.0146 1.8159 0.4780 0.0135 0.4915 1,765.8865

1,765.8865

0.0528 1,767.2069

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 35 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 146: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.11 Excavation and Installation-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 0.0235 0.0000 0.0235 3.5600e-003

0.0000 3.5600e-003

0.0000 0.0000

Off-Road 1.1779 13.2360 10.1068 0.0195 0.5691 0.5691 0.5243 0.5243 1,872.6132

1,872.6132

0.5981 1,887.5649

Total 1.1779 13.2360 10.1068 0.0195 0.0235 0.5691 0.5926 3.5600e-003

0.5243 0.5279 1,872.6132

1,872.6132

0.5981 1,887.5649

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0383 1.3205 0.2845 3.8400e-003

0.0908 4.5700e-003

0.0954 0.0249 4.3700e-003

0.0293 415.3060 415.3060 0.0280 416.0055

Vendor 0.0413 1.2579 0.3343 3.0000e-003

0.0768 6.3300e-003

0.0831 0.0221 6.0600e-003

0.0282 319.8154 319.8154 0.0222 320.3706

Worker 0.1480 0.0999 1.1043 3.2200e-003

0.3353 2.5400e-003

0.3379 0.0889 2.3400e-003

0.0913 321.1095 321.1095 9.2100e-003

321.3397

Total 0.2276 2.6783 1.7231 0.0101 0.5030 0.0134 0.5164 0.1359 0.0128 0.1487 1,056.2309

1,056.2309

0.0594 1,057.7158

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 36 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 147: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.11 Excavation and Installation-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Fugitive Dust 9.1700e-003

0.0000 9.1700e-003

1.3900e-003

0.0000 1.3900e-003

0.0000 0.0000

Off-Road 0.2916 7.1776 12.8769 0.0195 0.0311 0.0311 0.0311 0.0311 0.0000 1,872.6132

1,872.6132

0.5981 1,887.5649

Total 0.2916 7.1776 12.8769 0.0195 9.1700e-003

0.0311 0.0402 1.3900e-003

0.0311 0.0325 0.0000 1,872.6132

1,872.6132

0.5981 1,887.5649

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0383 1.3205 0.2845 3.8400e-003

0.0908 4.5700e-003

0.0954 0.0249 4.3700e-003

0.0293 415.3060 415.3060 0.0280 416.0055

Vendor 0.0413 1.2579 0.3343 3.0000e-003

0.0768 6.3300e-003

0.0831 0.0221 6.0600e-003

0.0282 319.8154 319.8154 0.0222 320.3706

Worker 0.1480 0.0999 1.1043 3.2200e-003

0.3353 2.5400e-003

0.3379 0.0889 2.3400e-003

0.0913 321.1095 321.1095 9.2100e-003

321.3397

Total 0.2276 2.6783 1.7231 0.0101 0.5030 0.0134 0.5164 0.1359 0.0128 0.1487 1,056.2309

1,056.2309

0.0594 1,057.7158

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 37 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 148: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.12 Fiber-Optic Improvements - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.2496 2.3565 2.4902 3.5900e-003

0.1429 0.1429 0.1322 0.1322 335.2479 335.2479 0.1009 337.7693

Total 0.2496 2.3565 2.4902 3.5900e-003

0.1429 0.1429 0.1322 0.1322 335.2479 335.2479 0.1009 337.7693

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0766 2.6410 0.5690 7.6800e-003

0.1817 9.1300e-003

0.1908 0.0498 8.7400e-003

0.0585 830.6120 830.6120 0.0560 832.0110

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0592 0.0400 0.4417 1.2900e-003

0.1341 1.0200e-003

0.1352 0.0356 9.4000e-004

0.0365 128.4438 128.4438 3.6800e-003

128.5359

Total 0.1358 2.6809 1.0107 8.9700e-003

0.3158 0.0102 0.3260 0.0854 9.6800e-003

0.0950 959.0558 959.0558 0.0596 960.5469

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 38 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 149: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.12 Fiber-Optic Improvements - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.0696 1.3546 2.3421 3.5900e-003

5.0600e-003

5.0600e-003

5.0600e-003

5.0600e-003

0.0000 335.2479 335.2479 0.1009 337.7693

Total 0.0696 1.3546 2.3421 3.5900e-003

5.0600e-003

5.0600e-003

5.0600e-003

5.0600e-003

0.0000 335.2479 335.2479 0.1009 337.7693

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0766 2.6410 0.5690 7.6800e-003

0.1817 9.1300e-003

0.1908 0.0498 8.7400e-003

0.0585 830.6120 830.6120 0.0560 832.0110

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0592 0.0400 0.4417 1.2900e-003

0.1341 1.0200e-003

0.1352 0.0356 9.4000e-004

0.0365 128.4438 128.4438 3.6800e-003

128.5359

Total 0.1358 2.6809 1.0107 8.9700e-003

0.3158 0.0102 0.3260 0.0854 9.6800e-003

0.0950 959.0558 959.0558 0.0596 960.5469

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 39 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 150: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.13 Paving-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.8282 7.9541 7.8232 0.0129 0.4152 0.4152 0.3851 0.3851 1,221.7381

1,221.7381

0.3705 1,231.0005

Paving 0.7471 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 1.5753 7.9541 7.8232 0.0129 0.4152 0.4152 0.3851 0.3851 1,221.7381

1,221.7381

0.3705 1,231.0005

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0550 1.6772 0.4457 4.0000e-003

0.1024 8.4400e-003

0.1109 0.0295 8.0800e-003

0.0376 426.4205 426.4205 0.0296 427.1607

Worker 0.1480 0.0999 1.1043 3.2200e-003

0.3353 2.5400e-003

0.3379 0.0889 2.3400e-003

0.0913 321.1095 321.1095 9.2100e-003

321.3397

Total 0.2031 1.7771 1.5500 7.2200e-003

0.4377 0.0110 0.4487 0.1184 0.0104 0.1288 747.5300 747.5300 0.0388 748.5004

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 40 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 151: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.13 Paving-Iowa - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.1670 5.0197 8.6478 0.0129 0.0187 0.0187 0.0187 0.0187 0.0000 1,221.7381

1,221.7381

0.3705 1,231.0005

Paving 0.7471 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.9141 5.0197 8.6478 0.0129 0.0187 0.0187 0.0187 0.0187 0.0000 1,221.7381

1,221.7381

0.3705 1,231.0005

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Vendor 0.0550 1.6772 0.4457 4.0000e-003

0.1024 8.4400e-003

0.1109 0.0295 8.0800e-003

0.0376 426.4205 426.4205 0.0296 427.1607

Worker 0.1480 0.0999 1.1043 3.2200e-003

0.3353 2.5400e-003

0.3379 0.0889 2.3400e-003

0.0913 321.1095 321.1095 9.2100e-003

321.3397

Total 0.2031 1.7771 1.5500 7.2200e-003

0.4377 0.0110 0.4487 0.1184 0.0104 0.1288 747.5300 747.5300 0.0388 748.5004

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 41 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 152: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

3.14 Improvements-Cranford Avenue - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.2496 2.3565 2.4902 3.5900e-003

0.1429 0.1429 0.1322 0.1322 335.2479 335.2479 0.1009 337.7693

Total 0.2496 2.3565 2.4902 3.5900e-003

0.1429 0.1429 0.1322 0.1322 335.2479 335.2479 0.1009 337.7693

Unmitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 9.5800e-003

0.3301 0.0711 9.6000e-004

0.0227 1.1400e-003

0.0239 6.2200e-003

1.0900e-003

7.3200e-003

103.8265 103.8265 7.0000e-003

104.0014

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0592 0.0400 0.4417 1.2900e-003

0.1341 1.0200e-003

0.1352 0.0356 9.4000e-004

0.0365 128.4438 128.4438 3.6800e-003

128.5359

Total 0.0688 0.3701 0.5128 2.2500e-003

0.1568 2.1600e-003

0.1590 0.0418 2.0300e-003

0.0438 232.2703 232.2703 0.0107 232.5373

Unmitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 42 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 153: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

4.0 Operational Detail - Mobile

3.14 Improvements-Cranford Avenue - 2020

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Off-Road 0.0696 1.3546 2.3421 3.5900e-003

5.0600e-003

5.0600e-003

5.0600e-003

5.0600e-003

0.0000 335.2479 335.2479 0.1009 337.7693

Total 0.0696 1.3546 2.3421 3.5900e-003

5.0600e-003

5.0600e-003

5.0600e-003

5.0600e-003

0.0000 335.2479 335.2479 0.1009 337.7693

Mitigated Construction On-Site

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Hauling 9.5800e-003

0.3301 0.0711 9.6000e-004

0.0227 1.1400e-003

0.0239 6.2200e-003

1.0900e-003

7.3200e-003

103.8265 103.8265 7.0000e-003

104.0014

Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Worker 0.0592 0.0400 0.4417 1.2900e-003

0.1341 1.0200e-003

0.1352 0.0356 9.4000e-004

0.0365 128.4438 128.4438 3.6800e-003

128.5359

Total 0.0688 0.3701 0.5128 2.2500e-003

0.1568 2.1600e-003

0.1590 0.0418 2.0300e-003

0.0438 232.2703 232.2703 0.0107 232.5373

Mitigated Construction Off-Site

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 43 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 154: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Mitigated 4.3705 21.1312 42.9504 0.1383 11.0022 0.1186 11.1208 2.9439 0.1107 3.0545 14,090.7305

14,090.7305

0.8168 14,111.1497

Unmitigated 4.3705 21.1312 42.9504 0.1383 11.0022 0.1186 11.1208 2.9439 0.1107 3.0545 14,090.7305

14,090.7305

0.8168 14,111.1497

4.1 Mitigation Measures Mobile

4.2 Trip Summary Information

4.3 Trip Type Information

Average Daily Trip Rate Unmitigated Mitigated

Land Use Weekday Saturday Sunday Annual VMT Annual VMT

General Light Industry 1,485.45 281.32 468.86 1,905,010 1,905,010

General Office Building 1,350.73 301.25 134.71 1,674,895 1,674,895

Other Asphalt Surfaces 0.00 0.00 0.00

Parking Lot 0.00 0.00 0.00

Research & Development 337.62 79.10 54.93 423,535 423,535

Total 3,173.80 661.67 658.50 4,003,440 4,003,440

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 44 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 155: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Miles Trip % Trip Purpose %

Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by

General Light Industry 0.00 0.00 4.48 0.00 0.00 100.00 100 0 0

General Office Building 0.00 0.00 4.48 0.00 0.00 100.00 100 0 0

Other Asphalt Surfaces 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0

Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0

Research & Development 0.00 0.00 4.47 0.00 0.00 100.00 100 0 0

5.0 Energy Detail

5.1 Mitigation Measures Energy

Kilowatt Hours of Renewable Electricity Generated

4.4 Fleet Mix

Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH

General Office Building 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Research & Development 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

General Light Industry 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Other Asphalt Surfaces 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Parking Lot 0.548858 0.043235 0.200706 0.120309 0.016131 0.005851 0.021034 0.033479 0.002070 0.001877 0.004817 0.000707 0.000925

Historical Energy Use: N

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 45 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 156: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

NaturalGas Mitigated

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

NaturalGas Unmitigated

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

5.2 Energy by Land Use - NaturalGas

NaturalGas Use

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Land Use kBTU/yr lb/day lb/day

General Light Industry

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

General Office Building

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Other Asphalt Surfaces

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Research & Development

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Unmitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 46 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 157: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

Use Low VOC Paint - Non-Residential Interior

Use Low VOC Paint - Non-Residential Exterior

No Hearths Installed

6.1 Mitigation Measures Area

6.0 Area Detail

5.2 Energy by Land Use - NaturalGas

NaturalGas Use

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Land Use kBTU/yr lb/day lb/day

General Light Industry

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

General Office Building

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Other Asphalt Surfaces

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Research & Development

0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Mitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 47 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 158: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

Category lb/day lb/day

Mitigated 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Unmitigated 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

6.2 Area by SubCategory

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

SubCategory lb/day lb/day

Architectural Coating

0.1888 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Consumer Products

7.6227 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Landscaping 7.7700e-003

7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Total 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Unmitigated

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 48 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 159: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

8.1 Mitigation Measures Waste

Institute Recycling and Composting Services

7.1 Mitigation Measures Water

7.0 Water Detail

8.0 Waste Detail

6.2 Area by SubCategory

ROG NOx CO SO2 Fugitive PM10

Exhaust PM10

PM10 Total

Fugitive PM2.5

Exhaust PM2.5

PM2.5 Total

Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e

SubCategory lb/day lb/day

Architectural Coating

0.1888 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Consumer Products

7.6227 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

Landscaping 7.7700e-003

7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Total 7.8192 7.6000e-004

0.0832 1.0000e-005

3.0000e-004

3.0000e-004

3.0000e-004

3.0000e-004

0.1776 0.1776 4.7000e-004

0.1894

Mitigated

9.0 Operational Offroad

Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type

10.0 Stationary Equipment

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 49 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 160: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

11.0 Vegetation

Fire Pumps and Emergency Generators

Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type

Boilers

Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type

User Defined Equipment

Equipment Type Number

CalEEMod Version: CalEEMod.2016.3.1 Date: 3/3/2017 10:56 AMPage 50 of 50

ARB Southern California Relocation Project - Air District, Winter

Page 161: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

HD (miles)1

LD/MD (miles)1

Diesel Gasoline Natural Gas

Gasoline - 227,912 MMSCF

Diesel 347,184 192,948 63,220 7,729 0.12

Natural Gas 5,916 -

Notes: 1 Total miles includes on-road vehicle testing as provided by ARB.

2 Based on ARB provided fuel estimates for project.

VOC NOx CO SOx PM10 PM2.5 CO2 CH4 N2O CO2e

HD 1.43 14.29 4.80 0.05 0.52 0.25 5,151.74 0.05 0.03 5,163.35

LD/MD 0.23 2.81 2.97 0.02 2.47 0.14 2,399.04 0.06 0.05 2,415.00

Total 1.66 17.10 7.77 0.07 2.99 0.40 7,550.78 0.11 0.08 7,578.35

HD 0.17 1.71 0.58 0.01 0.06 0.03 560.83 0.01 0.00 562.09

LD/MD 0.03 0.34 0.36 0.00 0.30 0.02 261.17 0.01 0.01 262.90

Total 0.20 2.05 0.93 0.01 0.36 0.05 822.00 0.01 0.01 825.00

lb/day

Vehicle Testing Emissions

ton/year MT/year

Vehicle Testing Data

Gallons

Fuel Consumption2

Page 162: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

EMFAC2014 (v1.0.7) Emission Rates

Region Type: Air District

Region: South Coast AQMD

Calendar Year: 2021

Season: Annual

Vehicle Classification: EMFAC2011 Categories

Units: miles/day for VMT, g/mile for RUNEX, PMBW and PMTW ROG_ RUNEX

ROG_

IDLEX

ROG_

STREX

ROG_

HOTSOAK

ROG_

RUNLOSS

ROG_

RESTLOSS

ROG_

DIURN

CO_

RUNEX CO_ IDLEX CO_ STREX

NOx_

RUNEX

NOx_

IDLEX

NOx_

STREX

CO2_

RUNEX

CO2_

IDLEX

CO2_

STREX

PM10_

RUNEX

PM10_

IDLEX

PM10_

STREX

PM10_

PMTW

PM10_

PMBW

PM2_ 5_

RUNEX

PM2_ 5_

IDLEX

PM2_ 5_

STREX

PM2_ 5_

PMTW

PM2_ 5_

PMBW

SOx_

RUNEX

SOx_

IDLEX

SOx_

STREX

CH4_

RUNEX

N2O

RUNEX

Fuel

Consumpti

on (mpg)

g/mile g/veh/day g/trip g/trip g/trip g/veh/day g/veh/day g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/mile g/mile g/veh/day g/trip g/mile g/mile g/mile g/veh/day g/trip g/mile g/mile

Region CalYr VehClass MdlYr Speed Fuel Population VMT Trips ROG_RUNEX ROG_IDLEXROG_STREXROG_HOTSOAKROG_RUNLOSSROG_RESTLOSSROG_DIURNCO_RUNEXCO_IDLEX CO_STREX NOx_RUNEXNOx_IDLEXNOx_STREXCO2_RUNEXCO2_IDLEXCO2_STREXPM10_RUNEXPM10_IDLEXPM10_STREXPM10_PMTWPM10_PMBWPM2_5_RUNEXPM2_5_IDLEXPM2_5_STREXPM2_5_PMTWPM2_5_PMBWSOx_RUNEXSOx_IDLEX SOx_STREX

South Coast AQMD 2021 LDA Aggregated Aggregated GAS 6317233 216223383.6 39880137.81 0.017828429 0 0.082027 0.109239 0.226637 0.249552 0.280753 0.828679 0 1.264873 0.061572 0 0.079596 333.6145 0 61.37942 0.002608 0 0.002385 0.008 0.03675 0.002398 0 0.002193 0.002 0.01575 0.002872 0 0.000635 0.023 0.021 21.4

South Coast AQMD 2021 LDA Aggregated Aggregated DSL 62692.86 2281927.742 391497.1151 0.031149372 0 0 0 0 0 0 0.335585 0 0 0.097303 0 0 303.6684 0 0 0.017263 0 0 0.008 0.03675 0.016517 0 0 0.002 0.01575 0.002523 0 0 0.001 0.001 21.4

South Coast AQMD 2021 LDA Aggregated Aggregated ELEC 191261.1 8736603.92 1246334.633 0 0 0 0.004884 0 0.008442 0.024437 0 0 0 0 0 0 0 0 0 0 0 0 0.008 0.03675 0 0 0 0.002 0.01575 0 0 0 0.000 0.000 80

South Coast AQMD 2021 LDT1 Aggregated Aggregated GAS 532419.1 17871995.66 3237316.701 0.04823331 0 0.215281 0.289803 0.995189 0.698728 0.882997 1.983186 0 3.086108 0.168341 0 0.181243 394.5513 0 71.7367 0.004165 0 0.003567 0.008 0.03675 0.00383 0 0.003281 0.002 0.01575 0.003422 0 0.000772 0.023 0.021 17.5

South Coast AQMD 2021 LDT1 Aggregated Aggregated DSL 629.2325 16738.35936 3254.810414 0.181443357 0 0 0 0 0 0 0.934183 0 0 0.783042 0 0 427.8702 0 0 0.134195 0 0 0.008 0.03675 0.12839 0 0 0.002 0.01575 0.003555 0 0 0.001 0.001 17.5

South Coast AQMD 2021 LDT1 Aggregated Aggregated ELEC 378.254 11745.41472 2282.538779 0 0 0 0.004884 0 0.007962 0.023426 0 0 0 0 0 0 0 0 0 0 0 0 0.008 0.03675 0 0 0 0.002 0.01575 0 0 0 0.000 0.000 50

South Coast AQMD 2021 LDT2 Aggregated Aggregated GAS 2246896 82938079.96 14229903.6 0.022830857 0 0.097114 0.110354 0.36454 0.309415 0.323386 1.017788 0 1.492273 0.092465 0 0.12315 444.6806 0 81.17023 0.002575 0 0.002324 0.008 0.03675 0.002368 0 0.002137 0.002 0.01575 0.003834 0 0.000837 0.023 0.021 17.5

South Coast AQMD 2021 LDT2 Aggregated Aggregated DSL 4026.382 159814.6683 25926.74051 0.023690507 0 0 0 0 0 0 0.207963 0 0 0.053628 0 0 400.9397 0 0 0.00659 0 0 0.008 0.03675 0.006305 0 0 0.002 0.01575 0.00332 0 0 0.001 0.001 17.5

South Coast AQMD 2021 LHDT1 Aggregated Aggregated GAS 116651.7 3313778.02 1737937.032 0.070876235 0.35512 0.476845 0.17575 1.18972 0.048514 0.083599 1.514151 3.101198 4.748391 0.354326 0.029787 1.777152 751.2044 115.2261 56.61496 0.001953 0 0.001706 0.008 0.07644 0.001796 0 0.001569 0.002 0.03276 0.007382 0.001214 0.000655 0.029 0.038 17.5

South Coast AQMD 2021 LHDT1 Aggregated Aggregated DSL 95358.85 3364969.161 1199494.409 0.113461007 0.10976 0 0 0 0 0 0.513525 0.909745 0 1.690769 2.279077 0 509.4018 136.3363 0 0.023988 0.026272 0 0.012 0.07644 0.02295 0.025135 0 0.003 0.03276 0.004644 0.001302 0 0.001 0.002 17.5

South Coast AQMD 2021 LHDT2 Aggregated Aggregated GAS 24680.4 848738.0102 367701.1708 0.02754109 0.352291 0.30993 0.100195 0.617104 0.028614 0.046259 0.601307 3.174118 3.410554 0.199673 0.029579 1.428439 839.0374 132.4552 67.01202 0.001458 0 0.001141 0.008 0.08918 0.00134 0 0.001049 0.002 0.03822 0.007957 0.001387 0.000733 0.029 0.038 17.5

South Coast AQMD 2021 LHDT2 Aggregated Aggregated DSL 40538.56 1573544.872 509924.0356 0.090367179 0.10976 0 0 0 0 0 0.391455 0.909745 0 1.030732 2.1655 0 574.9545 216.3576 0 0.018923 0.025993 0 0.012 0.08918 0.018104 0.024868 0 0.003 0.03822 0.005043 0.002065 0 0.001 0.002 17.5

South Coast AQMD 2021 MDV Aggregated Aggregated GAS 1480778 48862748.54 9212782.648 0.050873601 0 0.224168 0.172305 0.516578 0.481259 0.487214 1.767579 0 2.891466 0.176954 0 0.266119 599.0089 0 109.4397 0.002738 0 0.002549 0.008 0.03675 0.00252 0 0.002346 0.002 0.01575 0.005183 0 0.001145 0.033 0.015 7.3

South Coast AQMD 2021 MDV Aggregated Aggregated DSL 24741.9 948351.5843 158725.5759 0.02014085 0 0 0 0 0 0 0.31394 0 0 0.052161 0 0 517.0865 0 0 0.008028 0 0 0.008 0.03675 0.00768 0 0 0.002 0.01575 0.004297 0 0 0.005 0.005 7.3

South Coast AQMD 2021 MHDT Aggregated Aggregated GAS 19823.92 978719.6762 396636.9162 0.096153403 0.7889 0.726211 0.086817 0.451672 0.028373 0.046431 2.294369 12.14286 11.83883 0.534087 0.06781 1.709316 1377.06 524.161 112.9357 0.001415 0 0.001543 0.012 0.13034 0.001301 0 0.001419 0.003 0.05586 0.011402 0.005456 0.001337 0.033 0.015 7.3

South Coast AQMD 2021 MHDT Aggregated Aggregated DSL 136163.8 7730096.888 0 0.093418332 0.027397 0 0 0 0 0 0.409279 0.206125 0 2.079671 2.941058 0 1326.764 668.2562 0 0.007662 0.001944 0 0.012 0.13034 0.00733 0.00186 0 0.003 0.05586 0.010877 0.006375 0 0.005 0.005 7.3

LD&MD Composite 0.027261566 0.007473 0.119092 0.121697 0.339949 0.29793 0.328332 1.009947 0.073711 1.687463 0.146981 0.062964 0.168829 414.3257 12.38373 69.02454 0.003069 0.000339 0.002303 0.008138 0.039799 0.002843 0.000324 0.002118 0.002034 0.017057 0.003571 0.00012 0.000719 0.022762 0.019447 19.52517

Diesel

Gas

lb/mile 6.01005E-05 1.65E-05 0.000263 0.000268 0.000749 0.000657 0.000724 0.002227 0.000163 0.00372 0.000324 0.000139 0.000372 0.913416 0.027301 0.15217 6.76E-06 7.46E-07 5.08E-06 1.79E-05 8.77E-05 6.27E-06 7.14E-07 4.67E-06 4.49E-06 3.76E-05 7.87E-06 2.65E-07 1.59E-06 5.02E-05 4.29E-05

EMFAC2014 (v1.0.7) Emission Rates

Region Type: Air District

Region: South Coast AQMD

Calendar Year: 2021

Season: Annual

Vehicle Classification: EMFAC2011 Categories

Units: miles/day for VMT, trips/day for Trips, g/mile for RUNEX, PMBW and PMTW, g/trip for STREX, HTSK and RUNLS, g/vehicle/day for IDLEX, RESTL and DIURN

ROG_ RUNEX

ROG_

IDLEX

ROG_

STREX

ROG_

HOTSOAK

ROG_

RUNLOSS

ROG_

RESTLOSS

ROG_

DIURN

CO_

RUNEX CO_ IDLEX CO_ STREX

NOx_

RUNEX

NOx_

IDLEX

NOx_

STREX

CO2_

RUNEX

CO2_

IDLEX

CO2_

STREX

PM10_

RUNEX

PM10_

IDLEX

PM10_

STREX

PM10_

PMTW

PM10_

PMBW

PM2_ 5_

RUNEX

PM2_ 5_

IDLEX

PM2_ 5_

STREX

PM2_ 5_

PMTW

PM2_ 5_

PMBW

SOx_

RUNEX

SOx_

IDLEX

SOx_

STREX

CH4_

RUNEX

N2O

RUNEX

g/mile g/veh/day g/trip g/trip g/trip g/veh/day g/veh/day g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/mile g/mile g/veh/day g/trip g/mile g/mile g/mile g/veh/day g/trip g/mile g/mile

Region CalYr VehClass MdlYr Speed Fuel Population VMT Trips ROG_RUNEX ROG_IDLEXROG_STREXROG_HOTSOAKROG_RUNLOSSROG_RESTLOSSROG_DIURNCO_RUNEXCO_IDLEX CO_STREX NOx_RUNEXNOx_IDLEXNOx_STREXCO2_RUNEXCO2_IDLEXCO2_STREXPM10_RUNEXPM10_IDLEXPM10_STREXPM10_PMTWPM10_PMBWPM2_5_RUNEXPM2_5_IDLEXPM2_5_STREXPM2_5_PMTWPM2_5_PMBWSOx_RUNEXSOx_IDLEX SOx_STREX

South Coast AQMD 2021 HHDT Aggregated Aggregated GAS 823.2087 107176.6194 16470.76024 0.395889375 0 1.192462 0.065715 0.30456 0.022818 0.032194 29.56605 0 44.31853 3.004037 0 3.611933 1710.817 0 139.2372 0.000857 0 0.001181 0.02 0.06174 0.000788 0 0.001086 0.005 0.02646 0.017558 0 0.002125 0.215171 0.094657

South Coast AQMD 2021 HHDT Aggregated Aggregated DSL 96532.34 13754182.38 0 0.125622439 1.760528 0 0 0 0 0 0.746497 7.024396 0 3.800931 57.92572 0 1609.944 12923.4 0 0.017119 0.042589 0 0.035389 0.060693 0.016379 0.040746 0 0.008847 0.026011 0.01485 0.119774 0 0.0051 0.0048

South Coast AQMD 2021 All Other Buses Aggregated Aggregated DSL 4466.117 298976.3999 0 0.062974802 0.033482 0 0 0 0 0 0.229837 0.271621 0 2.228358 4.129333 0 1166.743 694.151 0 0.011714 0.001033 0 0.012 0.13034 0.011208 0.000988 0 0.003 0.05586 0.011131 0.006623 0 0.0051 0.0048

South Coast AQMD 2021 Motor Coach Aggregated Aggregated DSL 1122.831 159764.8663 0 0.12710389 1.89529 0 0 0 0 0 0.516322 7.684231 0 3.837575 69.49151 0 1660.896 11305.66 0 0.019753 0.025996 0 0.012 0.13034 0.018898 0.024871 0 0.003 0.05586 0.015846 0.107861 0 0.0051 0.0048

South Coast AQMD 2021 OBUS Aggregated Aggregated GAS 8678.564 398409.1994 173640.7112 0.035348193 0.599138 0.392419 0.018726 0.200013 0.017313 0.033934 0.896199 4.952584 6.260635 0.262131 0.050569 1.01664 1130.287 364.4561 74.28196 0.000907 0 0.000873 0.012 0.13034 0.000834 0 0.000803 0.003 0.05586 0.011298 0.003741 0.000853 0.215171 0.094657

South Coast AQMD 2021 PTO Aggregated Aggregated DSL 0 233286.4293 0 0.301631941 0 0 0 0 0 0 1.25357 0 0 6.41801 0 0 2052.619 0 0 0.023263 0 0 0 0 0.022257 0 0 0 0 0.019583 0 0 0.0051 0.0048

South Coast AQMD 2021 SBUS Aggregated Aggregated GAS 2380.067 90130.13325 9520.267715 0.077268268 8.451434 0.946754 0.071633 0.454353 0.017187 0.034506 1.780986 69.98066 17.84889 0.474825 0.712586 1.362377 659.2545 2452.417 124.3053 0.001182 0 0.001709 0.008 0.7448 0.001086 0 0.001571 0.002 0.3192 0.006612 0.025938 0.001552 0.215171 0.094657

South Coast AQMD 2021 SBUS Aggregated Aggregated DSL 5323.894 202441.3082 0 0.129959934 0.216487 0 0 0 0 0 0.380427 1.93253 0 6.49701 42.19844 0 1294.275 3751.721 0 0.036854 0.045935 0 0.012 0.7448 0.03526 0.043948 0 0.003 0.3192 0.012348 0.035793 0 0.0051 0.0048

South Coast AQMD 2021 T7 Ag Aggregated Aggregated DSL 410.6914 6532.913802 0 0.737048032 4.134534 0 0 0 0 0 3.082172 11.565 0 9.159145 20.80458 0 1652.179 2794.933 0 0.467375 0.741105 0 0.036 0.06174 0.447156 0.709045 0 0.009 0.02646 0.015763 0.026665 0 0.0051 0.0048

South Coast AQMD 2021 T7 CAIRP Aggregated Aggregated DSL 10513.61 2241128.51 0 0.098803931 3.674114 0 0 0 0 0 0.480539 14.16502 0 3.035529 113.2726 0 1505.359 27758.11 0 0.013539 0.034626 0 0.036 0.06174 0.012954 0.033129 0 0.009 0.02646 0.014362 0.264825 0 0.0051 0.0048

South Coast AQMD 2021 T7 CAIRP constructionAggregated Aggregated DSL 707.8303 168945.6328 0 0.10626504 3.576052 0 0 0 0 0 0.487341 13.58173 0 3.188503 110.8737 0 1542.044 26167.99 0 0.017136 0.053308 0 0.036 0.06174 0.016394 0.051002 0 0.009 0.02646 0.014712 0.249655 0 0.0051 0.0048

South Coast AQMD 2021 T7 NNOOS Aggregated Aggregated DSL 10799.3 2779002.141 0 0.06266571 3.19873 0 0 0 0 0 0.349441 11.90941 0 1.322099 95.86987 0 1413.771 31671.35 0 0.006452 0.022335 0 0.036 0.06174 0.006173 0.021369 0 0.009 0.02646 0.013488 0.30216 0 0.0051 0.0048

South Coast AQMD 2021 T7 NOOS Aggregated Aggregated DSL 4235.931 885245.1007 0 0.098408925 4.477246 0 0 0 0 0 0.481354 17.16499 0 3.05307 137.4418 0 1506.921 34256.24 0 0.013774 0.048162 0 0.036 0.06174 0.013178 0.046078 0 0.009 0.02646 0.014377 0.326821 0 0.0051 0.0048

South Coast AQMD 2021 T7 POLA Aggregated Aggregated DSL 14948.89 2325697.35 0 0.231664346 1.675558 0 0 0 0 0 0.852947 6.627538 0 6.285481 44.58476 0 1729.737 9195.434 0 0.026424 0.006779 0 0.036 0.06174 0.025281 0.006486 0 0.009 0.02646 0.016502 0.087729 0 0.0051 0.0048

South Coast AQMD 2021 T7 Public Aggregated Aggregated DSL 7448.664 170730.5517 0 0.087923854 1.656119 0 0 0 0 0 0.381233 6.124192 0 8.425034 73.40149 0 1660.614 7757.812 0 0.046831 0.196543 0 0.036 0.06174 0.044805 0.188041 0 0.009 0.02646 0.015843 0.074013 0 0.0051 0.0048

South Coast AQMD 2021 T7 Single Aggregated Aggregated DSL 11122.32 1174877.088 0 0.090809907 0.717776 0 0 0 0 0 0.38054 2.84547 0 3.531629 25.69029 0 1584.897 4702.693 0 0.018 0.013076 0 0.036 0.06174 0.017221 0.01251 0 0.009 0.02646 0.015121 0.044866 0 0.0051 0.0048

South Coast AQMD 2021 T7 single constructionAggregated Aggregated DSL 4574.527 437040.1234 0 0.087803185 0.687897 0 0 0 0 0 0.377384 2.721714 0 3.422074 24.27377 0 1576.186 4686.523 0 0.016893 0.011848 0 0.036 0.06174 0.016162 0.011335 0 0.009 0.02646 0.015038 0.044712 0 0.0051 0.0048

South Coast AQMD 2021 T7 SWCV Aggregated Aggregated DSL 6993.052 322075.1374 0 0.196748689 0.715702 0 0 0 0 0 9.58829 6.437645 0 7.491449 59.418 0 3740.321 7590.243 0 0.009043 0.14105 0 0.036 0.06174 0.008652 0.134949 0 0.009 0.02646 0.0139 0.023808 0 0.0051 0.0048

South Coast AQMD 2021 T7 tractor Aggregated Aggregated DSL 20498.62 2669306.396 0 0.130432849 0.831214 0 0 0 0 0 0.552461 3.304895 0 4.280083 27.59956 0 1556.553 5117.16 0 0.020407 0.008086 0 0.036 0.06174 0.019524 0.007736 0 0.009 0.02646 0.01485 0.04882 0 0.0051 0.0048

South Coast AQMD 2021 T7 tractor constructionAggregated Aggregated DSL 3646.209 325845.7136 0 0.125733846 0.723371 0 0 0 0 0 0.52463 2.876312 0 4.455092 25.56122 0 1586.577 4729.449 0 0.025212 0.011411 0 0.036 0.06174 0.024121 0.010917 0 0.009 0.02646 0.015137 0.045121 0 0.0051 0.0048

South Coast AQMD 2021 T7 utility Aggregated Aggregated DSL 632.7013 14469.28857 0 0.044464968 0.610214 0 0 0 0 0 0.262555 2.255838 0 0.857613 18.61183 0 1582.231 7386.357 0 0.002914 0.001797 0 0.036 0.06174 0.002788 0.001719 0 0.009 0.02646 0.015095 0.070469 0 0.0051 0.0048

South Coast AQMD 2021 T7IS Aggregated Aggregated GAS 823.2087 107176.6194 16470.76024 0.395889375 0 1.192462 0.065715 0.30456 0.022818 0.032194 29.56605 0 44.31853 3.004037 0 3.611933 1710.817 0 139.2372 0.000857 0 0.001181 0.02 0.06174 0.000788 0 0.001086 0.005 0.02646 0.017558 0 0.002125 0.215171 0.094657

South Coast AQMD 2021 UBUS Aggregated Aggregated GAS 2393.684 272429.2967 9574.737184 0.649122023 0 2.262866 0.231406 1.987657 0.032886 0.05911 6.442686 0 29.8244 1.436861 0 3.924038 1668.876 0 304.5032 0.002576 0 0.003183 0.012 0.13034 0.002369 0 0.002926 0.003 0.05586 0.016787 0 0.003582 0.215171 0.094657

South Coast AQMD 2021 UBUS Aggregated Aggregated DSL 4433.195 504866.8458 17732.78021 0.878835507 0 0 0 0 0 0 13.47094 0 0 13.21491 0 0 2087.582 0 0 0.173293 0 0 0.012 0.84182 0.165796 0 0 0.003 0.36078 0.00586 0 0 0.0051 0.0048

0.428342856 1.575002 0.521991 0.031866 0.278064 0.002288 0.004317 1.440189 7.195585 10.0139 3.952635 46.88693 1.262731 1597.464 10243.79 85.00368 0.021429 0.034795 0.00096 0.032407 0.103338 0.020499 0.03329 0.000882 0.008102 0.044288 0.014385 0.095102 0.001023 0.016651 0.009741

lb/mile 0.000944318 0.003472 0.001151 7.03E-05 0.000613 5.04E-06 9.52E-06 0.003175 0.015863 0.022077 0.008714 0.103366 0.002784 3.521745 22.58331 0.187398 4.72E-05 7.67E-05 2.12E-06 7.14E-05 0.000228 4.52E-05 7.34E-05 1.95E-06 1.79E-05 9.76E-05 3.17E-05 0.00021 2.26E-06 3.67E-05 2.15E-05

ROG_RUNEX TOG_RUNEX CO_RUNEX NOx_RUNEXSOx CO2_RUNEXPM10_RUNEXPM2_5_RUNEX

South Coast AQMD 2021 HHDT Aggregated 15 GAS 1971.234 1.06538541 1.55460789 45.27149444 4.119723 2481.382 0.002309 0.002123

South Coast AQMD 2021 HHDT Aggregated 15 DSL 219842.9 0.613853911 1.202079329 3.793959957 11.47518 2553.273 0.030443 0.029126

South Coast AQMD 2021 HHDT Aggregated 20 GAS 4853.037 0.738274591 1.07728855 41.1334469 3.678995 2001.887 0.001631 0.001499

South Coast AQMD 2021 HHDT Aggregated 20 DSL 594479.7 0.355097029 0.522967051 1.842050193 7.193404 2090.693 0.023571 0.022551

HHDT Composite 0.428342856 0.710536124 2.701099579 8.311602 0 2214.951 0.02523 0.024138

Units: miles/day for VMT, g/mile for RUNEX, PMBW and PMTW ROG_ RUNEX

ROG_

IDLEX

ROG_

STREX

ROG_

HOTSOAK

ROG_

RUNLOSS

ROG_

RESTLOSS

ROG_

DIURN

CO_

RUNEX CO_ IDLEX CO_ STREX

NOx_

RUNEX

NOx_

IDLEX

NOx_

STREX

CO2_

RUNEX

CO2_

IDLEX

CO2_

STREX

PM10_

RUNEX

PM10_

IDLEX

PM10_

STREX

PM10_

PMTW

PM10_

PMBW

PM2_ 5_

RUNEX

PM2_ 5_

IDLEX

PM2_ 5_

STREX

PM2_ 5_

PMTW

PM2_ 5_

PMBW

SOx_

RUNEX

SOx_

IDLEX

SOx_

STREX

CH4_

RUNEX

N2O

RUNEX

Fuel

Consumpti

on (mpg)

g/mile g/veh/day g/trip g/trip g/trip g/veh/day g/veh/day g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/mile g/mile g/veh/day g/trip g/mile g/mile g/mile g/veh/day g/trip g/mile g/mile

Region CalYr VehClass MdlYr Speed Fuel Population VMT Trips ROG_RUNEX ROG_IDLEXROG_STREXROG_HOTSOAKROG_RUNLOSSROG_RESTLOSSROG_DIURNCO_RUNEXCO_IDLEX CO_STREX NOx_RUNEXNOx_IDLEXNOx_STREXCO2_RUNEXCO2_IDLEXCO2_STREXPM10_RUNEXPM10_IDLEXPM10_STREXPM10_PMTWPM10_PMBWPM2_5_RUNEXPM2_5_IDLEXPM2_5_STREXPM2_5_PMTWPM2_5_PMBWSOx_RUNEXSOx_IDLEX SOx_STREX

South Coast AQMD 2021 LDA Aggregated Aggregated DSL 62692.86 2281927.742 391497.1151 0.031149372 0 0 0 0 0 0 0.335585 0 0 0.097303 0 0 303.6684 0 0 0.017263 0 0 0.008 0.03675 0.016517 0 0 0.002 0.01575 0.002523 0 0 0.001 0.001 21.4

South Coast AQMD 2021 LDT1 Aggregated Aggregated DSL 629.2325 16738.35936 3254.810414 0.181443357 0 0 0 0 0 0 0.934183 0 0 0.783042 0 0 427.8702 0 0 0.134195 0 0 0.008 0.03675 0.12839 0 0 0.002 0.01575 0.003555 0 0 0.001 0.001 17.5

South Coast AQMD 2021 LDT2 Aggregated Aggregated DSL 4026.382 159814.6683 25926.74051 0.023690507 0 0 0 0 0 0 0.207963 0 0 0.053628 0 0 400.9397 0 0 0.00659 0 0 0.008 0.03675 0.006305 0 0 0.002 0.01575 0.00332 0 0 0.001 0.001 17.5

South Coast AQMD 2021 LHDT1 Aggregated Aggregated DSL 95358.85 3364969.161 1199494.409 0.113461007 0.10976 0 0 0 0 0 0.513525 0.909745 0 1.690769 2.279077 0 509.4018 136.3363 0 0.023988 0.026272 0 0.012 0.07644 0.02295 0.025135 0 0.003 0.03276 0.004644 0.001302 0 0.001 0.002 17.5

Page 163: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project

South Coast AQMD 2021 LHDT2 Aggregated Aggregated DSL 40538.56 1573544.872 509924.0356 0.090367179 0.10976 0 0 0 0 0 0.391455 0.909745 0 1.030732 2.1655 0 574.9545 216.3576 0 0.018923 0.025993 0 0.012 0.08918 0.018104 0.024868 0 0.003 0.03822 0.005043 0.002065 0 0.001 0.002 17.5

South Coast AQMD 2021 MDV Aggregated Aggregated DSL 24741.9 948351.5843 158725.5759 0.02014085 0 0 0 0 0 0 0.31394 0 0 0.052161 0 0 517.0865 0 0 0.008028 0 0 0.008 0.03675 0.00768 0 0 0.002 0.01575 0.004297 0 0 0.005 0.005 7.3

South Coast AQMD 2021 MHDT Aggregated Aggregated DSL 136163.8 7730096.888 0 0.093418332 0.027397 0 0 0 0 0 0.409279 0.206125 0 2.079671 2.941058 0 1326.764 668.2562 0 0.007662 0.001944 0 0.012 0.13034 0.00733 0.00186 0 0.003 0.05586 0.010877 0.006375 0 0.005 0.005 7.3

composite 0.083551459 0.051206 0 0 0 0 0 0.411815 0.416581 0 1.473087 1.937605 0 878.9442 309.6622 0 0.013687 0.0105 0 0.011152 0.095194 0.013095 0.010046 0 0.002788 0.040798 0.007344 0.002955 0 0.00308 0.003339

lb 0.000184196 0.000113 0 0 0 0 0 0.000908 0.000918 0 0.003248 0.004272 0 1.937708 0.682677 0 3.02E-05 2.31E-05 0 2.46E-05 0.00021 2.89E-05 2.21E-05 0 6.15E-06 8.99E-05 1.62E-05 6.51E-06 0 6.79E-06 7.36E-06

Units: miles/day for VMT, g/mile for RUNEX, PMBW and PMTW ROG_ RUNEX

ROG_

IDLEX

ROG_

STREX

ROG_

HOTSOAK

ROG_

RUNLOSS

ROG_

RESTLOSS

ROG_

DIURN

CO_

RUNEX CO_ IDLEX CO_ STREX

NOx_

RUNEX

NOx_

IDLEX

NOx_

STREX

CO2_

RUNEX

CO2_

IDLEX

CO2_

STREX

PM10_

RUNEX

PM10_

IDLEX

PM10_

STREX

PM10_

PMTW

PM10_

PMBW

PM2_ 5_

RUNEX

PM2_ 5_

IDLEX

PM2_ 5_

STREX

PM2_ 5_

PMTW

PM2_ 5_

PMBW

SOx_

RUNEX

SOx_

IDLEX

SOx_

STREX

CH4_

RUNEX

N2O

RUNEX

Fuel

Consumpti

on (mpg)

g/mile g/veh/day g/trip g/trip g/trip g/veh/day g/veh/day g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/veh/day g/trip g/mile g/mile g/mile g/veh/day g/trip g/mile g/mile g/mile g/veh/day g/trip g/mile g/mile

Region CalYr VehClass MdlYr Speed Fuel Population VMT Trips ROG_RUNEX ROG_IDLEXROG_STREXROG_HOTSOAKROG_RUNLOSSROG_RESTLOSSROG_DIURNCO_RUNEXCO_IDLEX CO_STREX NOx_RUNEXNOx_IDLEXNOx_STREXCO2_RUNEXCO2_IDLEXCO2_STREXPM10_RUNEXPM10_IDLEXPM10_STREXPM10_PMTWPM10_PMBWPM2_5_RUNEXPM2_5_IDLEXPM2_5_STREXPM2_5_PMTWPM2_5_PMBWSOx_RUNEXSOx_IDLEX SOx_STREX

South Coast AQMD 2021 LDA Aggregated Aggregated GAS 6317233 216223383.6 39880137.81 0.017828429 0 0.082027 0.109239 0.226637 0.249552 0.280753 0.828679 0 1.264873 0.061572 0 0.079596 333.6145 0 61.37942 0.002608 0 0.002385 0.008 0.03675 0.002398 0 0.002193 0.002 0.01575 0.002872 0 0.000635 0.023 0.021 21.4

South Coast AQMD 2021 MCY Aggregated Aggregated GAS 299529 1994547.45 598998.0205 2.486347501 0 2.061947 0.689935 2.081474 1.408826 2.361236 3.083213 0 2.244161 0.689935 2.081474 1.408826 2.361236 19.08436 0 9.626754 1.128292 0 0.309368 182.3575 0 45.22727 0.002225 0 0.003841 0.004 0.01176 0.002081 0 0.00362 0.001

South Coast AQMD 2021 LDT1 Aggregated Aggregated GAS 532419.1 17871995.66 3237316.701 0.04823331 0 0.215281 0.289803 0.995189 0.698728 0.882997 1.983186 0 3.086108 0.168341 0 0.181243 394.5513 0 71.7367 0.004165 0 0.003567 0.008 0.03675 0.00383 0 0.003281 0.002 0.01575 0.003422 0 0.000772 0.023 0.021 17.5

South Coast AQMD 2021 LDT2 Aggregated Aggregated GAS 2246896 82938079.96 14229903.6 0.022830857 0 0.097114 0.110354 0.36454 0.309415 0.323386 1.017788 0 1.492273 0.092465 0 0.12315 444.6806 0 81.17023 0.002575 0 0.002324 0.008 0.03675 0.002368 0 0.002137 0.002 0.01575 0.003834 0 0.000837 0.023 0.021 17.5

South Coast AQMD 2021 LHDT1 Aggregated Aggregated GAS 116651.7 3313778.02 1737937.032 0.070876235 0.35512 0.476845 0.17575 1.18972 0.048514 0.083599 1.514151 3.101198 4.748391 0.354326 0.029787 1.777152 751.2044 115.2261 56.61496 0.001953 0 0.001706 0.008 0.07644 0.001796 0 0.001569 0.002 0.03276 0.007382 0.001214 0.000655 0.029 0.038 17.5

South Coast AQMD 2021 LHDT2 Aggregated Aggregated GAS 24680.4 848738.0102 367701.1708 0.02754109 0.352291 0.30993 0.100195 0.617104 0.028614 0.046259 0.601307 3.174118 3.410554 0.199673 0.029579 1.428439 839.0374 132.4552 67.01202 0.001458 0 0.001141 0.008 0.08918 0.00134 0 0.001049 0.002 0.03822 0.007957 0.001387 0.000733 0.029 0.038 17.5

South Coast AQMD 2021 MDV Aggregated Aggregated GAS 1480778 48862748.54 9212782.648 0.050873601 0 0.224168 0.172305 0.516578 0.481259 0.487214 1.767579 0 2.891466 0.176954 0 0.266119 599.0089 0 109.4397 0.002738 0 0.002549 0.008 0.03675 0.00252 0 0.002346 0.002 0.01575 0.005183 0 0.001145 0.033 0.015 7.3

South Coast AQMD 2021 MHDT Aggregated Aggregated GAS 19823.92 978719.6762 396636.9162 0.096153403 0.7889 0.726211 0.086817 0.451672 0.028373 0.046431 2.294369 12.14286 11.83883 0.534087 0.06781 1.709316 1377.06 524.161 112.9357 0.001415 0 0.001543 0.012 0.13034 0.001301 0 0.001419 0.003 0.05586 0.011402 0.005456 0.001337 0.033 0.015 7.3

composite 0.03862352 0.005958 0.141845 0.132675 0.372187 0.34293 0.399606 1.070494 0.061679 1.77794 0.096184 0.056986 0.188064 401.8174 2.973145 71.93611 0.054139 0.030617 0.0024 0.009622 1.01231 0.002452 1.227293 0.002226 0.001992 0.015994 0.003495 0.000345 0.000768 0.024022 0.020512

lb 8.51489E-05 1.31E-05 0.000313 0.000292 0.000821 0.000756 0.000881 0.00236 0.000136 0.00392 0.000212 0.000126 0.000415 0.885841 0.006555 0.158589 0.000119 6.75E-05 5.29E-06 2.12E-05 0.002232 5.41E-06 0.002706 4.91E-06 4.39E-06 3.53E-05 7.7E-06 7.6E-07 1.69E-06 5.3E-05 4.52E-05

Natural Gas Emission FactorsROG,

lb/MMBTU

NOX,

lb/MMBTU

CO,

lb/MMBTU

SO2,

lb/MMBTU

PM10,

lb/MMBTU

PM2_5,

lb/MMBTU

CO2_NBIO,

lb/MMBTU

CH4,

lb/MMBTU

N2O,

lb/MMBTUNatural Gas

kg/scf2

g/mmbtu2

g/mmbtu2

mmbtu/scf2

122 3233 394 0.6 39 39 0.05 0.95 2.85 0.001026

110,000 2.15 6.45

lb/MMscf1

lb/MMscf

Notes: 1 Emission factors from SCAQMD AER reporting tool for natural gas internal combustion.2 Emission factors from 2016 Climate Registry Default Emission Factors for natural gas combustion.

Page 164: APPENDIX 5 - Dudek · 2017-12-16 · APPENDIX 5.3A Air Quality Emissions Calculations . Project Characteristics - See Section 3.0, Project Description, of the DEIR for detailed project