APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An...

19
APPENDICES

Transcript of APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An...

Page 1: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

103

Kiltiernan/ Glenamuck Local Area Plan 2007

APPENDICES

Page 2: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

104

Appendix A: Guidelines and Strategies to be considered by the Planning Authority when preparing a Local Area PlanNational• The National Spatial Strategy 2002-2020 People, Places and

Potential, DOELG, November 2002.

• Childcare Facilities - Guidelines for Planning Authorities, DOELG, June 2001.

• Architectural Heritage Protection. Guidelines for Planning Authorities, DOELG, 23 February 2005.

• Action on Architecture 2002-2005, Department of Arts, Heritage, Gaeltacht and the Islands, 2001.

• Landscape and Landscape Assessment – Consultation Draft of Guidelines for Planning Authorities, DOELG, 2000.

• Retail Planning - Guidelines for Planning Authorities, DOELG, February 2005.

• Housing Supply - Guidelines for Planning Authorities, DOELG, 2000.

• Part V of the Planning and Development Act, 2000 and Part 2 of the Planning and Development (Amendment Act), 2002, GOI.

• Action on Housing, DOELG, June 2000.

• The National Climate Change Strategy, DOELG, 2000.

• Residential Density - Guidelines for Planning Authorities, DOELG, September 1999. (Under Review)

• Sustainable Rural Housing - Guidelines for Planning Authorities, DOELG, April 2005.

• Social Housing Design Guidelines, DOELG, 1999.

• Ireland - National Development Plan 2000-2006, GOI, 1999.

• Framework and Principles for the Protection of the Archaeological Heritage, Department of Arts, Heritage, Gaeltacht and the Islands, 1999.

• Sustainable Development – A Strategy for Ireland, DOE, 1997.

• Windfarm Developments, Guidelines for Planning Authorities, DOE, September 1996.

• Telecommunications Antennae and Support Structures, Guidelines for Planning Authorities, DOE, July 1996. (Under Review)

• Tree Preservation - Guidelines for Planning Authorities, DOE, 1994.

• Ready, Steady, Play! A National Play Policy, National Children’s Office.

• Waste Management – Changing Our Ways, DOELG.

Regional• Regional Planning Guidelines Greater Dublin Area 2004-

2016, Dublin Regional Authority and Mid East Regional Authority, July 2004.

• Retail Planning Strategy for the Greater Dublin Area, November 2001.

• A Platform for Change, Strategy 2000-2016 – Final Report, Dublin Transportation Office, November 2001.

• The Greater Dublin Water Supply Strategic Study (2021).

• Dublin Drainage – A Strategic Study for Greater Dublin.

• Waste Management Plan for the Dublin Region, 1999-2003.

• Air Quality Management Plan for the Dublin Region, 1999

• Implementation of SEA Directive (2001/42/EC): Assessment of the Effects of Certain Plans and Programmes on the Environment. Guidelines for Regional Authorities and Planning Authorities, DOEHLG, November 2004.

County• Dun Laoghaire-Rathdown County Development Plan 2004-

2010, Dun Laoghaire-Rathdown County Council, 2004.

• Housing Strategy 2004-2010, Dun Laoghaire-Rathdown County Council, 2004.

• Dun Laoghaire-Rathdown County Council Heritage Plan 2004-2008, Dun Laoghaire-Rathdown County Council, 2004.

• An Integrated Strategy for the Social, Economic and Cultural Development of Dun Laoghaire-Rathdown County, 2002-2012, Dun Laoghaire-Rathdown County Development Board, June 2002.

• Traveller Accommodation Programme 2005-2008, Dun Laoghaire-Rathdown County Council, April 2005.

• Landscape Assessment Study, Dun Laoghaire-Rathdown Economic Development & Planning Department, May 2002.

• Guidelines for Sustainable Development, Dun Laoghaire-Rathdown County Council, May 1999.

Note: This list is not exhaustive and additional documents will be considered as appropriate.

Page 3: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

105

Kiltiernan/ Glenamuck Local Area Plan 2007

Appendix B

Zoning Objective ‘A’ “To protect and/or improve residential amenity” Use classes related to zoning objectivePermitted in principle *Open Space, Public Services, Residential, Residential Institution, Retirement Home, Travellers Accommodation.

Open for considerationBed & Breakfast, Betting Office, Carpark, Caravan Park-Holiday, Caravan Park-Residential, Cemetery, Church, Community Facility, Crèche/Nursery School, Cultural Use, Doctor/Dentist etc. Education, Enterprise Centre, Funeral Home, Garden Centre, Guest House, Health Centre, Home Based Economic Activities, Hospital, Hotel/Motel, Household Fuel Depot, Industry-Light, Office Based Industryh, Offices less than 200sq.mj, Petrol Station, Public House, Recreational Buildings (Commercial), Recreational Facility/Sports Club, Restaurant, Refuse Transfer Station, Service Garage, Shop-Local, Shop-Neighbourhood, Veterinary Surgery.

h: less than 200sq.m.

j: Where the office use will not have adverse effects on the “A” zoning objective, “to protect and/or improve residential amenity”.

* Note to ‘Permitted in Principle’

Local ObjectivesSubject to compliance with the relevant policies, local objectives, standards and requirements set out in this Plan, office development is ‘permitted in principle’ under Zoning Objective ‘A’ within those areas covered by the designation ‘Specific Local Objectives’ as shown on Development Plan Map 3 (Specific Local Objectives 3, 7 and 9 respectively) and set out in Chapter 14 of the Written Statement under the heading ‘Specific Local Objectives’ (Map 3, numbers 3, 7 and 9 respectively). Group medical practices are also ‘permitted in principle’ under the terms of Local Objective 9, Map 3.

Zoning Objective ‘B’ “To protect and improve rural amenity and to provide for the development of agriculture” Use classes related to zoning objectivePermitted in principleAgricultural Buildings, Boarding Kennels, Caravan Park-Holiday, Cemetery, Church, Community Facility, Concrete/Asphalt (etc.) Plant in or adjacent to a Quarry, Home Based Economic Activities, Industry-Extractive, Open Space, Public Services, Rural Industry-Cottage, Rural Industry-Food, Travellers Accommodation.

Open for considerationAbattoir, Bed & Breakfast, Betting Officeb, Carpark, Cash & Carry/Wholesale Outletb, Crèche/Nursery School, Cultural Use, Discotheque/Nightclubb, Doctor/Dentist etc., Education, Enterprise Centre, Funeral Homeb, Garden Centre, Guest House, Health Centreb, Heavy Vehicle Park, Hospital, Hotel/Motel, Household Fuel Depotb, Industry-Generalb, Industry-Lightb, Industry Special, Motor Sales Outletb, Office Based Industry

b, Offices less than 200sq.mb, Petrol Stationb, Public Houseb, Recreational Buildings (Commercial)b, Recreational Facility/Sports Club, Refuse Landfill/Tip, Refuse Transfer Station, Residentialc, Residential Institution, Restaurant, Retirement Homec, Service Garageb, Science and Technology Based Industry, Shop-Localb, Shop-Neighbourhoodb, Transport Depot, Veterinary Surgery.

b: In Villages to Serve Local Needs

c: In accordance with Council policy for residential development in rural areas.

Zoning Objective ‘NC’ “To protect, provide for and/or improve neighbourhood centre facilities” Use classes related to zoning objectivePermitted in principleAdvertisements & Advertising Structures, Bed & Breakfast, Betting Office, Carpark, Community Facility, Crèche/Nursery School, Cultural Use, Doctor/Dentist etc., Education, Enterprise Centre, Funeral Home, Garden Centre, Guest House, Health Centre, Offices less than 100sq.m, Open Space, Petrol Station, Public House, Public Services, Recreational Buildings (Commercial), Recreational Facility/Sports Club, Residential, Residential Institution, Restaurant, Retirement Home, Service Garage, Shop-Local, Shop-Neighbourhood, Veterinary Surgery.

Page 4: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

106

Open for considerationBoarding Kennels, Cash & Carry/Wholesale Outlet, Church, Discotheque/Nightclub, Discount Food Store, Home Based Economic Activities, Hotel/Motel, Household Fuel Depot, Motor Sales Outlet, Office Based Industry, Offices 100sq.m - 250sq.m, Rural Industry-Cottage, Shop-Specialist, Travellers Accommodation.

Zoning Objective ‘E’ “To provide for economic development and employment” Use classes related to zoning objectivePermitted in principleAbattoir, Advertisements and Advertising Structures, Carpark, Cash & Carry/Wholesale Outlet, Crèche/Nursery School, Enterprise Centre, Heavy Vehicle Park, Hospital, Household Fuel Depot, Industry-General, Industry-Light, Industry-Special, Motor Sales Outlet, Office Based Industry, Office less than 200sq.m, Offices 200sq.m - 1,000sq.m, Offices over 1,000sq.m, Open Space, Petrol Station, Public Services, Refuse Transfer Station, Retail Warehouse, Rural Industry-Food, Science and Technology Based Industry, Scrap Yard, Service Garage, Transport Depot, Travellers Accommodation, Warehousing.

Open for considerationAgricultural Buildings, Bed & Breakfast, Boarding Kennels, Church, Community Facility, Concrete/Asphalt (etc.) Plant in or adjacent to a Quarry, Cultural Use, Discotheque/Nightclub, Discount Food Storek, Doctor/Dentist etc., Education, Funeral Home, Garden Centre, Health Centre, Home Based Economic Activities, Hotel/Motel, Industry-Extractive, Public House, Recreational Buildings (Commercial), Recreational Facility/Sports Club, Refuse Landfill/Tip, Residentiall, Restaurant, Rural Industry-Cottage, Shop-Local, Shop-Neighbourhood, Veterinary Surgery.

k: On Brownfield sites where the industrial use has become redundant.

l: In certain circumstances residential use may be acceptable where the primary use of the zone for employment creation is not jeopardised and which complies with Section 8.1.8, Policy E8: Enhanced Working Environment.

Zoning Objective ‘F’ “To preserve and provide for open space and recreational amenities” Use classes related to zoning objectivePermitted in principleCommunity Facility, Cultural Use, Open Space, Recreational Facilities/Sports Club, Travellers Accommodation.

Open for considerationAgricultural Buildings, Bed & Breakfasta, Boarding Kennels, Carpark, Caravan Park-Holiday, Cemetery, Church, Creche/Nursery School, Education, Garden Centre, Guest Housea, Home Based Economic Activities, Hospital, Hotel/Motel, Industry-Extractive, Public Services, Recreational Buildings (Commercial), Refuse Landfill/Tip, Residential, Restaurant, Shop-Local.

a: In existing premises

Zoning Objective ‘G’ “To protect and improve high amenity areas” Use classes related to zoning objectivePermitted in principleOpen Space, Travellers Accommodation.

Open for considerationAgricultural Buildings, Bed & Breakfasta, Boarding Kennels, Carpark, Caravan Park-Holiday, Cemetery, Church, Community Facility, Concrete/Asphalt (etc.) Plant in or adjacent to a Quarry, Cultural Use, Doctor/Dentista, Education, Garden Centre, Guest Housea, Home Based Economic Activities, Hospital, Hotel/Motel, Industry-Extractive, Public Services, Recreational Facility/Sports Club, Refuse Landfill/Tip, Residentialc, Residential Institutiona, Restaurant, Rural Industry-Cottage, Rural Industry-Food, Shop-Local, Veterinary Surgerya.

a: In existing premises.

c: In accordance with Council Policy for Development in Rural Areas.

Page 5: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

107

Kiltiernan/ Glenamuck Local Area Plan 2007

Appendix C: Vegetation Landscape Types within the LAP Area• Woodland

There is limited woodland cover in the Kiltiernan/Glenamuck area. In some instances the mature hedgerows give way to linear wooded areas. If comparison is made with the 1st edition OS map for the area it is evident that the present day woodland habitat corresponds with that mapped in the early 19th century. The species found in these wooded areas are not greatly different from those of the hedgerows.

A wooded strip, located along the south-eastern perimeter of the LAP area and zoned ‘Objective G’, is of interest because it contains a small stand of pure blackthorn. This blackthorn forms a dense stand of ten metre tall bushes that diminish to bushes of about one metre in the adjacent field. Grazing pressure may be keeping the spread of the blackthorn in check.

On the slopes (external to the LAP area) overlooking Palmers Restaurant at the Golden Ball there is a small stand of recently planted ash and older mature broadleaved (ash, sycamore, oak, holly) woodlands. The old woodland appears on the 1st edition ordnance survey map so possibly dates back to mid 19th century. This is valuable habitat for birds and mammals of the area and a link with the network of hedgerows to the upland woods in the hinterland.

• Hedgerows

The most significant habitat type in the LAP area is hedgerow. Many of the hedgerows have a high biodiversity and preliminary inspection undertaken during the HCLA study, identified those classified as being mature as being over one hundred years old. Mature hedgerows in the area are characterised by a range of mature native tree species, most notably ash, have three to four layers of vegetation and are generally four to six metres wide at ground level. These hedgerows may be described as linear woodlands. Unlike recently planted or maintained and stock-proof hedges the mature hedgerows in the Kiltiernan / Glenamuck area have, in many cases, an interior environment. This adds to their value as habitats for birds, mammals and invertebrates.

In general the condition of the hedgerows ranges from very good to excellent. The mature and well structured hedgerows require limited management intervention. Under-planting may be necessary where mature trees and heavy shade lead to a dearth of ground vegetation.

The HCLA Study recommends undertaking a detailed ranking survey of the hedgerows, which could qualify the sustainability of these important resources. This is particularly important considering that land, which has been zoned for future development, contains mature hedgerows.

The main tree/shrub species of the hedgerows are: Ash, hawthorn, blackthorn, sycamore, oak, willow, holly, blackberry, elderberry and elm.

• Grassland

A significant proportion of the land is currently grazed or in a few instances cut for silage. In some cases the grasslands have not been actively managed in recent years and thistle, ragwort and gorse are prevalent. The grasslands to the west of the R117 are generally on shallower mineral soils than those to the east. The land on the west rises to scrub vegetation and then into coniferous woodland. The shallow mineral soils in this area are also prone to have more exposed boulder material. Where grazing pressure is absent gorse has come to dominate on what might be described as rough grassland. The fields immediately behind the Golden Ball have drainage problems and rushes and horsetail plants are evidence that this has been a problem for a number of years. More intensive management of grassland is evident to the east of the R117. Here silage is cut and grass / clover mix is prevalent in some fields.

Reduced grazing pressure may result, in the long term, in increased biodiversity. Plants abundant along the margins of fields begin to colonise the abandoned grasslands. In the field opposite the Church of Ireland church willow and gorse are spreading into the field, which is currently dominated by a variety of grasses and thistle.

Sports grounds are another grassland management regime. The grass is fertilised and cut and limited to a few grass species.

On the western side of Glenamuck Road, there is an area given over to cereal production. Cereal production is an intensive form of agriculture requiring high inputs of fertilizer, pest/weed management and the production of one species over relatively large areas. In spite of that the cereal fields are generally bordered by mature and wide hedgerows.

• Roadside Vegetation

Along the roads of the area the main habitats are hedgerows and stone walls. The margins of the R117 are of limited biodiversity value. Mature beech dominates on the approach from the south along the R117 while leaving the area to the north the mature hedgerows of the area are seen to the east. Along the Glenamuck Road and the R116 where gardens give way to agricultural lands the hedgerows are mature and rich in species, and for the main mature and well structured.

Page 6: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

108

• Gardens

The houses in the Kiltiernan / Glenamuck area have for the most part mature gardens with a variety of native and exotic species. Mature poplar, eucalyptus and cypresses are found in gardens with beech, oak, ash, willow and birch. These are often mature trees and give a sense of continuity or linkage to the surrounding countryside and in particular to the hedgerows and wooded patches.

Page 7: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

109

Kiltiernan/ Glenamuck Local Area Plan 2007

Appendix D: Relevant Landscape Character AreasDescription Sensitivity/Strategy

5. Kilternan Plain

This is a large enclosure, which comprises the hillocky plain lying between Three Rock to the west, Newtown, Barnaslingan (The Scalp) and Carrickgollogan to the south, the disused lead mines and chimney to the east. The enclosure is curtailed to the north by the coniferous plantation on Three Rock. The edge of Stepaside Area Action Plan and Ticknick also forms a boundary to the north east.

This enclosure is characterised by a series of smaller hillocks within a plain. Roads run between the undulations most notably the main Enniskerry Road running north-south from Stepaside and disappearing into the Scalp.

This large hillocky plain that is part of the foothills of the Dublin Mountains accommodates much of the rural development in the County (Kiltiernan and Stepaside). Given its terrain and the number of routeways traversing this plain, it is likely to be subject to the most pressure for long term development, which would significantly alter the existing landscape.

• The area has accommodated much change generated by the pressures of being adjacent to a large urban area. The village of Stepaside will accommodate further change as detailed in the Area Action Plan. There is a risk that continued linear development along the road between Kiltiernan and Stepaside will simply merge the two villages into a continuous built up strip. Settlement strategy shall ensure the consolidation of these villages along with the provision of an open space buffer zone between the two.

6. Ballycorus

This enclosure encompasses the valley along which runs the Ballycorus Road and is bounded by the disused lead mines to the south and Ticknick and the Glenamuck Road to the north, Barnaslingan to the west with Three Rock in the background. This enclosure displays past and also present industrial/extractive works. The past is in the form of the old leadworks especially the lead mine’s chimney. Quarrying/extraction has continued into the present with the activities of Cement Roadstone in the valley.

• Recognition of the important role of Ballycorus leadmines in the past.

• Dingle Glen is a sensitive landscape and shall be afforded protection due to its rarity.

• Maintenance and restoration of field patterns and boundaries.

• Consideration of designation of Carrickgollogan Hill as an area for a Special Amenity Area Order.

13. Carrickmines

This enclosure encompasses the area east of the Stepaside Action Area and is bounded by the motorway to the north, the Glenamuck Road to the South and the Enniskerry Road to the west. The most dominant visual feature of this enclosure is the Ballyogan landfill. The landforms of the area have been stripped. This enclosure is dominated by the fact that it is located at the edge of the built up area of Dun Laoghaire Rathdown. It functions as a buffer between the more densely built-up area of Leopardstown/Stepaside and the lower density suburban generated housing area of Kiltiernan.

This enclosure is best viewed from a height adjacent to Dingle Glen NHA. From this viewpoint one gets a clear view of the enclosure. The impact of the multitude of urban uses – the tiphead, pylons and houses on the landscape are evident.

• Following on from decommissioning of the existing tiphead it is probable that the landscape of this enclosure will alter. The decommissioning of the tiphead offers an opportunity to enhance and restore a portion of the landscape for an amenity type purpose. The enclosure sits between the urban and the rural landscapes and is capable of accommodating development.

Page 8: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

110

Appendix E: Historical Heritage of Kiltiernan/GlenamuckPrehistoric periodThe first evidence of habitation appears in the Kiltiernan/Glenamuck area in the Neolithic period. Excavations at the portal tomb in Kiltiernan produced artifactural evidence from said Period in the form of coarse ware pottery, flint arrowheads and scrapers. There is evidence of extensive tomb building along the flanks of the Dublin mountains, with portal-type tombs located to the east of the county on the lower slopes of the Dublin mountains e.g. Brennanstown and Kiltiernan. The simple agriculture practiced during this period was suited to the thinner upland soils.

Evidence for habitation in the Dublin area during the Bronze Age is sparse. While the overall settlement pattern in the area comprising the south-east portion of DLRCC is mixed, a number of the lowlands sites date to the Bronze age, while a number of the upland sites date to the Neolithic period, thus suggesting a gradual trend from upland to lowland. Kiltiernan / Glenamuck is located between these two settlement zones.

Pre-Christian PeriodNear Kiltiernan - at Rathmichael, there is evidence of a later Bronze Age hillfort, which encloses a ringfort with a souterrain (or artificial subterranean structure constructed for storage or refuge).The scale of structures such as this and the impressive coastal promontory forts, constructed during the late Bronze age and early Iron Age suggests the presence of sizable populations. The upland focus of settlement is still evident during this time.

Early Christian PeriodThere are sixty-seven pre-Norman ecclesiastical sites in county Dublin, with the main concentration of such sites to the south east of the county (Geraldine Stout). These sites would have functioned as service and population centres. The church at Kiltiernan appears to date from this period.

The move of settlement from upland to lowland is clearly evident during this period. The concentration of important church sites on the lower fringes of the Dublin Mountains demonstrates that Kiltiernan is located in an important transition zone during this period.

Medieval PeriodBy the medieval period the focus of settlement was on the lowland sites where soil was heavier, and forest covering had been cleared throughout the early Christian period. The medieval fabric includes elements such as castles and fortifications. While there is documentary evidence of a castle in Kiltiernan, the site of its location is unknown.

One of the earliest recorded mentions of the name Kiltiernan (i.e. The Church of Tiernan) appears to be in the Papal Taxation Rolls of 1306. In a charter dated 1406 the parish is recorded as being the property of St Mary’s Abbey, Dublin and this connection probably goes back to at least 1185. The foundation of the church at this site has been attributed to a saint called Tiernan, whose festival is April 8, but nothing is known about him.

The only visible fabric that may actually date to this period are the ruins of a small church on Bishop’s Lane located to the west of the south-western boundary of the LAP area. There is no record of the church being used after the dissolution of the local Abbey (Irish monasteries were dissolved in 1540) and the church became a ruin.

16th to 18th CenturiesThroughout the sixteenth and seventeenth centuries, Kiltiernan lay beyond the pale. The economy was tillage based with a relatively high proportion of Gaelic as opposed to Anglo surnames in evidence.

In Roque’s 1750 map the early roots of the settlement at Kiltiernan or ‘Kill Ternan’ appears as a cluster of houses around a central open area - perhaps a green or ‘square’. While this could not be considered as a substantial settlement, it does exhibit evidence of planning and formal layout.

After the Dissolution of the Monasteries, the lands and rectory of Kiltiernan passed into the hands of the Dean of St Patrick’s who granted them to the FitzWilliam family.

The Fitzwilliams kept the property until the closing years of the seventeenth century when they passed to the Johnson family (After the 1641 rebellion Kiltiernan may have became part of the Loughlinstown estates of Sir William Domville.). The Johnsons are credited with building a manor house and a mill and this may be the mill, which is annotated in Roque’s 1750 map.

The early focus of settlement was to the west of the present day village of Kiltiernan, in the vicinity of the old church. This is clearly evident in Roque’s 1750 map and also in Taylor’s 1816 map. By the time of Taylor’s map a second mill had been constructed to the east, but the focus of settlement is still on the old church site and the early mill, in conjunction with Kiltiernan Demesne.

Page 9: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

111

Kiltiernan/ Glenamuck Local Area Plan 2007

19th Century30 years later – in the first edition Ordnance Survey map, this focal point may correlate with a cluster of houses which are evident in trees to the west of Kiltiernan Lodge.

Survival of fabric between the various maps is quite strong, with the existence of the mill being illustrated throughout. As the church was abandoned at such an early date, and therefore has not been altered, its survival at this point acts as an anchor point for reference between various maps.

The ‘landscaping’ in Roque’s 1750 map in the sites later occupied by Kiltiernan House and Kiltiernan Lodge, suggest continuity of settlement at these two sites.

While many of these elements display some survival to the present day, the main focus of settlement at Kiltiernan / Glenamuck has drifted eastwards, to occupy a location on the main communication route (R117) in the region.

In Roque’s 1790 map of Ireland, ‘Killternan’ is sufficiently important to merit inclusion. While this map does not give us very detailed information about the site the cartographic style of this map, does illustrate the relationship between the settlement and the surrounding mountain landscape to the west and south.

By 1837 there is evidence of a number of house clusters scattered around the area that later became known as Kiltiernan. To the east of the cotton mill and north of ‘Boddies Bridge’ (now known as Kiltiernan Bridge) stood one cluster of houses.

In the vicinity of the Post Office there is evidence of settlement and again a small number of habitations are evident at the Golden Ball cross roads. These sites appear to form the core around which later settlement evolves.

The Church of Ireland parishes of Kilgobbin and ‘Kilternan’ were combined by Act of Parliament in 1824. Kilgobbin church had been rebuilt on the old pre-Norman site in 1703 and it is reputed to have been the first church erected in Ireland after the Reformation. By 1818, this Church was in poor repair and too small for its congregation. The present day Church of Ireland church at Kiltiernan was designed by John Semple (also the architect for Whitechurch, Donnybrook, Tallaght, Rathmines and the Black Church in Dorset Street, Dublin). It was built on a new site by John Richardson and consecrated on 10 December 1826. In 1837 the Parochial Hall was built, in 1870 a house near the Church was purchased for use as a rectory and in 1908 the stained glass east window was installed.

The 1837 map of Kiltiernan illustrates a thriving location with a Cotton Factory and a Paper Mill in the area. This map also illustrates the area as a Landlord dominated landscape. While industrial features such as mills existed, they were most likely

owned and run by the landed classes. Also illustrating the landed classes is the presence of many large houses, of which Kiltiernan House, Kiltiernan Lodge, Rockville and Glenamuck Houses are important. The impact of parklands and Demesne land on the landscape is also evident at this time.

Both Kiltiernan House and Kiltiernan Lodge were sufficiently substantial to merit mention in the Ordnance survey name books, and both are recorded as being two storey slated houses. The cluster of houses to the west of Kiltiernan Lodge identified in earlier maps would appear to have become disused by the 1830s. While these appear as a distinct group of structures in the 1750 map they appear to have been over-taken by Kiltiernan Lodge at this time, as there is substantial planting in the vicinity of these structures.

Industry and institutionsThe nineteenth century drawing of Kiltiernan paper mill by Wakeman shows a substantial two-storey building with slate roof. This supports the entry in the Ordnance Survey Name books, which provide the following detail: “Paper Mill - North part of the td. of Kiltiernan. About 25 to 30 persons employed & a greater number of boys & girls. Has a good supply of water.”

In addition to the paper mill there was also a cotton Mill located in the townland of Kiltiernan – this was slightly larger than the paper mill:

“Cotton Mill - North part of the Td of Kiltiernan & south of road leading from Dundrum to Enniskerry. About 35 persons employed; has a constant supply of water”.

While there is a long tradition of lead mining at nearby Ballycorus, no direct evidence has been found of a linkage between the two areas. This is possibly because maintenance of the local ‘big houses’ and the mills between them provided sufficient employment for the working class population.

As with previous maps (particularly the 1790 map by Roque), the 1860 map clearly illustrates Kiltiernan as an important point on the route from Dublin, Dundrum and ‘Killgobbin’ to the South of Ireland. The importance of this routeway explains why the earlier settlement - originating at the church site and later evolving in to a mill site - moved eastwards. The beginnings of this move can be seen here, however, at this time, Golden Ball is a more important site on the routeway than Kiltiernan, which has not been named.

Page 10: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

112

Appendix F: Recommendations of the Historical Landscape Character Assessment

Recommendations 1 - How the HLCA could inform the LAPIssue Recommendation

Future Development Future development in the study area should take cognisance of the context. Therefore to minimise impact, future development should consider the unique mix of scale / massing in the current fabric.

Protection of Built Fabric It is imperative to protect historically important local buildings.Protection of Hedgerows Protection of local hedgerows is a high priority for ensuring habitat survival and

maintaining local biodiversity.

Adoption of Local Placenames Usage of local placenames should be encouraged wherever possible in future developments.

Use of Local Building Materials An important element of the local character is employment of granite in construction. The use of local granite should be encouraged in future development, to continue the tradition of utilising local materials and to maximise the visual and economic linkages with the local landscape.

Retention of Views Preservation of both internal and external views is important considerations as they are essential elements of the local character.

Recommendations 2 – Future WorkIssue Recommendation

Loughlinstown River Study It is important to undertake a detailed study of the Loughlinstown River system including: the historical industrial systems, the portal tomb, the Early Christian/Medieval church precinct, Mill House precinct, Moss Cottage precinct and the surviving mill ruins.

Kiltiernan Castle The possible location of Kiltiernan Castle is unknown, and should be investigated further.

Flora and Fauna A full inventory of flora and fauna is required, encompassing, mammals, invertebrates, fish, birds, birds and plant life.

Estate Houses It would be worthwhile to undertake a detailed study of the local large estate houses (their demesnes and contexts). This would include Shaldon Grange, Rockville, Kiltiernan Lodge, the old Mill House, and the site of Kiltiernan Abbey. (The latter three buildings/sites are not within the LAP area.)

Victorian Fabric Consideration should be given to investigate and protect the wide range of Victorian buildings and elements in the village.

Design Guide It would be worthwhile considering a style/design guide, which could be adopted to encourage sympathetic further development in the study area.

Page 11: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

113

Kiltiernan/ Glenamuck Local Area Plan 2007

Appendix G: Guideline Electrical RequirementsResidential developments of 5000 houses in one or more development phases by one or more developers in an area of 2km2

0.41 ha for a new high voltage (HV) substation (Occasionally an outdoor 110kV option will be pursued. Site size: 1.01ha)

Residential developments of 2500 apartments in one or more development phases by one or more developers

0.41 ha for a new high voltage (HV) substation

Residential developments of 4000 units (house/apartment mix) in one or more development phases by one or more developers in an area of 2km2

0.41 ha for a new high voltage (HV) substation(Occasionally an outdoor 110kV option will be pursued. Site size: 1.01ha)

Commercial developments of 50 000m2 in one or more development phases by one or more developers in an area of 2km2

0.41 ha for a new high voltage (HV) substation (Occasionally an outdoor 110kV option will be pursued. Site size: 1.01ha)

To allow for access 20m wide easementRoadways providing cable access shall be indicated.

Appendix H: Kiltiernan/Glenamuck Bus Services1

• Route 63 - City Centre to Kiltiernan

This service operates from Kiltiernan via Glenamuck Road to Foxrock - Stillorgan QBC - Ballsbridge - Mountjoy Square in the Dublin City Centre. There are two (2) buses on this route providing one bus approximately per hour all day.

• Route 44 - City Centre to Enniskerry

This service operates from Enniskerry via Enniskerry Road to Stepaside – Sandyford – Dundrum – Milltown – Ranelagh – Earlsfort Terrace to Townsend Street in the City Centre. There are eight (8) buses on this route providing a 20 – 25 minute frequency in both directions at peak times and a 25 – 30 minute frequency in both directions off-peak.

• Route 118

This service operates from Kiltiernan via Stepaside - Kilgobbin Road - Murphystown Road - Leopardstown Road - Brewery Road - Stillorgan Rd Q.B.C. to D’Olier Street in the City Centre. There is currently one (1) bus on this route providing one (1) morning and one (1) evening departure inbound and two (2) outbound evening departures.

1 See www.dublinbus.ie for current timetable.

Page 12: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

114

Appendix I: Sports, Leisure and Recreational Facilities

Name of facility

AddressIn/Out of LAP area

Type of facility

Facilities included

Ownership Additional details

Carrickmines Croquet and Lawn Tennis Club

Tournament Offices, Carrickmines

Out Tennis and Croquet Club

8 outdoor & 2 indoor tennis courts; Croquet Lawn; Clubhouse with changing, bar/ restaurant facilities.

Private The Club is a members only facilities (c. 1000 members).

Carrickmines Equestrian Centre

Glenamuck Road

Out Equestrian Centre

Equestrian arena; Floodlit outdoor arena

Private This is a privately owned commercial venture. It is a pay and play facility catering specifically for local residents, but also for disadvantaged childrens’ groups from the inner city. There are approximately 100 horses at the facility. The centre has an outdoor ménage (100x50m), which is one of the largest all weather equestrian arenas in Ireland. This floodlit sand arena is used for a range of activities including show jumping, polo crosse and dressage. There is a second floodlit smaller outdoor arena (50x30m), and an indoor arena (40x20m). A variety of courses and competitions occur at the centre. A portion of land is also rented for polo crosse and trekking.

Carrickmines Golf Course

Carrickmines Out Golf Course 9-Hole golf course; Bar facilities

Private This nine-hole golf course has 18 different tees. It is a members only facility with c.450 members, the majority of whom are from the surrounding area.

Page 13: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

115

Kiltiernan/ Glenamuck Local Area Plan 2007

Name of facility

AddressIn/Out of LAP area

Type of facility

Facilities included

Ownership Additional details

De La Salle Palmerston RFC

Kiltiernan Out Rugby Grounds

3 Playing pitches; Floodlit training area; Clubhouse and bar; Tarmacadam (BB) in carpark

Club In 1985 De La Salle RFC and Palmerston RFC merged to become De La Salle Palmerston RFC. The Club is well established and facilities currently include three playing pitches with floodlit training area, changing rooms and clubhouse with bar.

There is also a Gaelscoil located on the site in temporary accommodation, which has a basketball court in the car park area.

(In 2003 the Club was approached by a private developer wishing to build a commercial 5-aside soccer facility on the site. This project was not pursued.)

Glenamuck Sports Ground – Bective Rangers

Carrickmines In Sports Ground

Playing pitch Club This comprises a rugby training ground in Carrickmines used by Bective Rangers Club. This Club is based in Donnybrook, Dublin 4.

Kilternan Parish Lawn Tennis Club

Kiltiernan In Tennis courts

3 floodlit courts with synthetic grass surface; small pavilion with changing rooms

Private This Club has been in existence for over 60 years. While it is a Members only Club, it is open to the local community and well as Members of the Parish to join. Membership: 75 families.

Stepaside Driving Range

Stepaside Out Driving range and Par 3 course

30 Covered bays; Coffee shop; Par 3 golf course

Private This privately operated pay and play facility is open daily 08h00 to 22h00

Stepaside Golf Course

Stepaside Out Golf Course 9 Hole golf course; Clubhouse

DLRCC This is a 9-hole pay and play golf course and is owned by DLRCC. The Clubhouse comprises a reception area and changing rooms. Visitor numbers to this facility were 30,227 in 2001.

Page 14: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

116

Name of facility

AddressIn/Out of LAP area

Type of facility

Facilities included

Ownership Additional details

Wayside Celtic Football Club

Kiltiernan In Playing pitches

3 Playing pitches; Floodlit training area

Private

This is a long established Club catering for 3 senior and 15 schoolboy/girl teams. The Club also provides football facilities for 60 (u7) boys and girls on Sunday mornings. The Club also provides for the South Dublin League semi-finals and finals each year. The local national Schools use the facilities together with Glencullen based G.A.A club ‘Stars of Eireann’. ‘Step Enterprises’, catering for moderately handicapped people use the Club facilities approx. 5 times/year.

The Club utilises three playing pitches and a floodlit training area. There is no fencing protecting the pitches.

The grounds on which the Club plays are the focus of Objective 13 on Map 9 of the CDP 2004-2010. In this regard, planning permission has been granted for the relocation of the Wayside Celtic playing pitches, which was a requirement of Objective 13, to a field (zoned ‘Objective F’) located on the eastern side of Glenamuck Road. Development will consist of the construction of four soccer pitches, two senior, one juvenile and one training pitch, a two storey clubhouse / community centre, a single storey equipment shed, clubhouse car parking and a distribution road with an access road to the clubhouse.

Future Sport, Leisure and Recreational Needs Analysis – Stepaside Action Plan Area, Consultants Holohan Leisure, 2002/2003. (With additional comment)

Additional Note:

Planning permission has recently been granted for the development of a new facility for Lansdowne Old Wesley at a site immediately to the east of the LAP area bounded generally by Ballycorus Road to the north; Loughlinstown River to the South; ‘Kingston Grove’ and agricultural lands to the east and ‘Glen Orma’ and agricultural lands to the west. This development constitutes the relocation of the existing L.O.W. facility from grounds at Kilgobbin Lane, Stepaside. Facilities to include: 3 no. rugby pitches (2 no. 114m x 65m, and 1 no. 120m x 69m), 2 no. of which will have 100 lux training lights (8 no. 14m high columns per pitch); and the provision of a part single, part two storey clubhouse (567m2). The proposed clubhouse incorporates changing facilities; reception areas; tea room; and general purpose room. The site will be accessed via a new entrance off the Ballycorus Road and will provide 100 no. car parking spaces, 3 no. coach parking spaces, and cycle parking, all at surface level.

Page 15: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

117

Kiltiernan/ Glenamuck Local Area Plan 2007

Appendix J: Development Contribution SchemesSection 48

Sub-section (1) of Section 48 of the Planning and Development Act, 2000, enables a planning authority, when granting a planning permission under Section 34 of the Act, to include conditions for requiring the payment of a contribution. This contribution is in respect of public infrastructure and facilities benefiting development in the area of the planning authority, and that is provided, or that it is intended will be provided, by or on behalf of a local authority (regardless of other sources of funding for the infrastructure and facilities).

The Dun Laoghaire Rathdown County Council Development Contribution Scheme 2004 was adopted by the County Council on 21 January 2004. Under the Scheme, the contributions to be paid (except where an Exemption applies) in respect of the different classes of public infrastructure and facilities are as follows from 1 January 2008:

The following categories of development will be exempted from the requirement to pay development contributions under the Scheme, or will be required to pay a reduced contribution:

• The first 40m2 of any residential extension, including granny flats, shall be exempt from the contribution scheme. All house extensions in excess of 40m2, including family or “granny” flats, shall be assessed at €125.90/m2 of residential development in respect of the portion exceeding 40m2.

• Primary schools, post primary schools, non-commercial community centres, youth centres, and similar non-commercial community related developments.

• Registered Charities.

• Social housing units, including those which are provided in accordance with an agreement made under Part V of the Act (as amended under the Planning & Development (Amendment) Act, 2002) or which are provided by a voluntary or co-operative housing body, which is recognised as such by the Council.

• Replacement dwellings or replacement commercial developments will be charged 50%.

• The non-built elements of recreational facilities (e.g. playing pitches, golf courses) will be exempt.

• Initial afforestation to be exempt from contributions.

Class of Public Infrastructural Development

E per unit of residential class of development

E per square metre of industrial/commercial class of development

E per square metre of development – Domestic extensions which are non exempted development

Class 1:

Community & Parks

4,797.97 40.78 41.72

Class 2:

Roads

5,649.27 49.09 49.13

Class 3:

Water & Drainage

4,030.65 36.03 35.05

Total of Contributions Payable:

E 14,477.89 per unit of residential class of development

E 125.90 per square metre of industrial/ commercial class of development

E 125.90 per square metre of development

NOTE 1.: These rates of contribution shall be updated effective from January 1st each year during the life of the Scheme in accordance with the Wholesale Price Index– Building and Construction (Capital Goods) as published by the Central Statistics Office (See Article 12 of the Scheme).

NOTE 2.: The floor area of proposed development shall be calculated as the gross floor area. This means the gross floor area determined from the inside of external walls of the proposed buildings, including the gross floor area of each floor including mezzanine floors.

Page 16: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

118

Section 49

Section 49 of the Planning and Development Act, 2000 enables a Planning Authority when granting planning permission pursuant to Section 34 of the Act to attach a condition to a planning permission requiring payment of a financial contribution in respect of any public infrastructure service or project hereafter referred to as a “Supplementary Development Contribution Scheme” (SDCS).

The supplementary development levies payable are as follows (2008):

Residential: A contribution rate of €319,070 per gross site hectare.

Commercial: A contribution rate of €727,480 per gross site hectare.

The following developments are exempt from the SDC levy: house extensions; a granny flat where it is a condition that it be used as a family unit; public utilities i.e. schools, community centres, youth centres etc; organisations which have been granted exemptions from Income tax/Corporation Tax under the provisions of section 20 of the Taxes Consolidation Act 1997 and are currently in receipt of an exemption certificate. Large-scale recreational developments (e.g. golf courses, sports pitches, tennis complexes, etc.), excluding buildings and ancillary facilities, shall also be exempt from the supplementary development contribution levy.

The contribution shall be updated each year on 13 January during the life at the scheme at a fixed compound interest rate at 5% per annum.

Page 17: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

119

Kiltiernan/ Glenamuck Local Area Plan 2007

Appendix K: GDDR Scheme - Optimal Route Layout Description (May 2006)The basic design philosophy adopted was the provision of roads that would allow traffic to/from the north and south of the Enniskerry Road to feed into one road (the GDDR) to facilitate access to/from the M50 and future development lands. The road hierarchy of this design would provide two single carriageway sections of road (the GDDR and the Link Road) feeding into a dual carriageway section of road (the mainline GDDR) closer to the Carrickmines Interchange.

The GDDR scheme requires two distinct cross section types along its length. They are that of a Two-Lane Single Carriageway and that of a Reduced Dual Carriageway. These cross sections include specific modifications to accommodate the provision of bus and traffic lanes in the future if required.

The junction strategy adopted in the design included four principal junctions between the GDDR scheme and the existing local road network with an additional key junction on the GDDR itself. The traffic impact and geometric requirements of each junction go together in the design process. The general traffic philosophy was the control of vehicles through the scheme. This was facilitated by the use of signal-controlled junctions throughout the scheme.

The proposed scheme option layout facilitates the development needs of the Glenamuck Road area allowing future development access to the distributer road at preferred access points. The Scheme provides restricted access to Kiltiernan

Village, thus removing the majority of unwanted through traffic and creating a naturally traffic calmed village. The scheme layout also requires a number of road closures (‘Cul de sacs’) on existing roads. These include:

• The existing Glenamuck Road is to be closed south of the existing roundabout junction to the south of the Carrickmines Interchange. The existing Glenamuck Road southern arm of the roundabout is to be removed from the junction as part of this Scheme.

• The existing Enniskerry Road will be closed south of Kiltiernan Village adjacent to the proposed tie-in with the GDDR Link Road.

• The existing Enniskerry Road at the northern tie-in to the GDDR single carriageway road.

• The existing Barnaslingan Lane will be closed south of Kiltiernan Village in close proximity to the proposed ‘cul-de-sac’ on the Enniskerry Road and adjacent to the proposed tie-in with the GDDR scheme.

The design has provided for public transport, pedestrian and cyclist infrastructure along the entire length of the GDDR scheme.

The scheme also considers future junction provision for development access and preferred points on the proposed road network are indicated. Careful consideration is also to be given to the tie-in between the GDDR scheme and the existing road network to ensure a safe transition between both road types and standards at detailed design stage.

(i) Cross Section Requirements

The GDDR requires two distinct cross sections along its length. They are that of a Reduced Dual Carriageway (Section A-A) and that of a Standard Two-Lane Carriageway (Section B-B). These cross sections will require specific modifications to

Road Road TypeLane Width (m)

Hard Strips (m)Min. Median Width (m)

Footpath Width (m)

Cycle path Width(m)

Verge Width (m)

Total Width (m)

GDDR Section A-A

Reduced Dual Carriage-way

4 x 3.75 2 x 1.0

(H. Strips)2.5 2 x 2.0 2 x 2.0 2 x 3.5 34.5

GDDR Section B-B

Standard Two-Lane

2 x 3.65 2 x 3.0

(H. Shoulder)- 2 x 2.0 2 x 2.0 - 21.3

Link Road Section C-C

Standard Two-Lane

2 x 3.65 2 x 3.0

(H. Shoulder)- 2 x 2.0 2 x 2.0 2 x 3.5 28.3

Link Road Section B-B

Standard Two-Lane

2 x 3.65 2 x 3.0

(H. Shoulder)- 2 x 2.0 2 x 2.0 - 21.3

Table 1: Required Urban Cross-Sections

Page 18: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

120

accommodate the provision of future bus lanes. The Link Road also requires two cross sections along its length namely that of two Standard Single Carriageways, Section B-B and Section C-C respectively. The required urban cross sections and total effective carriageway width are shown below in Table 1.

Four principal junctions between the GDDR scheme and the existing local road network are to be provided with an additional key junction on the GDDR itself. The following key junctions in the GDDR scheme have been designed, assessed and analysed:

• Junction 1 – Roundabout junction with the GDDR, Ballyogan Link Road and Glenamuck Road,

• Junction 3/9 – Signalised junction between the GDDR and the Link Roads,

• Junction 5 – Signalised junction between the Link Road and the existing Glenamuck Road,

• Junction 11 – Priority junction between the Link Road and the realigned Enniskerry Road, and

• Junction 12 – Signalised junction between the Link Road and Ballycorus Road.

Other junctions in the scheme which are likely to be development driven (i.e. will be designed and constructed subject to future development and planning applications on zoned lands) include the following:

• Junction 2 - Signalised junction north of Kilternan Village,

• Junction 6 - Signalised junction on the Link Road between Junction 5 and 12,

• Junction 3/9 - Signalised junction between the GDDR and the Link Road (additional junction arm),

• Junction 7 - Signalised junction on the Enniskerry Road between Junction 8 and 12,

• Junction 10 - Signalised junction on the GDDR between Junction 3/9 and 1,

• Junction 13 - Signalised junction on the existing Glenamuck Road between Junction 4 and 1, and

• Junction 14 - Junction on the existing Glenamuck Road between Junction 5 and 8.

The proposed junction strategy will meet the local objective of free flowing traffic with safe and strategically placed junctions to connect the GDDR and Link Road with the existing local road network and consequently minimising the provision of junctions on the network. Table 2 summarises the key junction types.

Recommended target design speeds are as follows:

Table 3: Road Name and Target Minimum Design Speed.

Road Name Target Design Speed

GDDR (Dual Carriageway Section) 85 kph

GDDR (Single Carriageway Section)

60 kph

Link Road (Single Carriageway) 60 kph

Kilternan Village (Enniskerry Road) 50 kph

(ii) Drainage and Receiving Waters

Three attenuation ponds are proposed as part of the GDDR Scheme and these are specifically designed and provided as a requirement for the GDDR Scheme. The road drainage provisions for attenuation (currently totalling approximately 7,000m3) may be combined with development attenuation provisions.

(iii) Road Signage and Public Lighting

Proper signage and adequate lighting are important aspects of major road schemes particularly on approach to junctions where driver confusion may occur. In urban areas, it is considered necessary to provide lighting over the full extent of new road links.The required road signage is recommended to be examined in more detail during the detailed design. Strategic direction signing is very important to ensure the most efficient route for the road user and to discourage alternative routes, which could lead to congestion within Kiltiernan Village. The signs will be designed in accordance with the ‘Traffic Signs Manual’ (1996) published by the Department of the Environment, Heritage and

Table 2: Summary of Key Junction Types on the GDDR Scheme

Junction 1 Junction 3/9 Junction 5 Junction 11 Junction 12GDDR Roundabout Signal Priority

Link Road Signal Signal Signal

Page 19: APPENDICES - Dublin€¦ · Waste Management Plan for the Dublin Region, 1999-2003. • ... • An Integrated Strategy for the Social, Economic and Cultural . Development of Dun Laoghaire-Rathdown

121

Kiltiernan/ Glenamuck Local Area Plan 2007

Local Government. It is envisaged all of the proposed signs will be accommodated within the land take for the Scheme.

Public Lighting is recommended to be provided in this Scheme at all key junctions, on the mainline GDDR and the Link Road. This is a safety requirement for users of the roadways and where provided, is done so to mandatory road safety and design standards.

(iv) Service Relocations

The disruption of utilities along the route has implications for the design and construction stages of road schemes as follows:

• It will be necessary to re-route sections of existing services, with connections back to the existing apparatus at the terminal points of these diversions,

• Provision must be made for any proposed additional services and/or extensions to existing networks where these works can be anticipated, and

• For existing services, it will be necessary to maintain existing services as far as possible during construction. This may entail temporary diversions of services and/or staging of the works in the construction phase.

(v) Boundary Treatments

The form of boundary treatment to be implemented should be appropriate to the adjacent landuse. Where agriculture is predominant, timber post and rail fencing is recommended, though the detail and exact form of fence may depend on the particular animals. Where gardens or property associated with dwellings is impacted upon, particular provisions may be as agreed between residents and DLRCC.

As development in the area proceeds, it is likely that boundary treatments will need to be amended to suit the particular developments taking place. Such amendments to the boundary treatments should be carefully considered as part of the planning process.

Particular boundary treatments may also be necessary to mitigate visual, noise and vibration impacts of the scheme. The recommendations of the Environmental Study should be followed in such situations.

(vi) Safety Audit

A Stage 1 Safety Audit will be carried out on the Scheme upon completion of the preliminary design. The Safety Audit will be carried out in accordance with the relevant sections of the NRA DMRB standard HD 19/01 and the draft National Road Safety Audit Guidelines published by the NRA.

(vii) Mobility Management Plans

The GDDR Study recommends that Mobility Management Plans (MMPs) be required for proposed developments in the

LAP area. (This is also in line with DLRCC policy.) Developments would include centres of employment, or existing centres where expansion/development is proposed, mixed use, leisure and other developments, and which DLRCC considers will have significant trip generation and attraction rates at peak hours or throughout the day, and where the utilisation of existing or proposed public transport may be employed to good effect.

In addition to requirement for MMPs at the planning stage, it is also recommended that the MMP’s be monitored following the development opening to ensure that the proposed targets and objectives are being met. Either the developer or DLRCC should complete this monitoring process on a yearly or semi-yearly basis. The monitoring process should be agreed prior to grant of planning permission. Consideration should also be given to the implementation of suitable penalties if targets are not met within an agreed timeframe.