API 570 Pipeline Inspection CourseAPI 570 (Inspection, Repair, Alteration, and Rerating of...

3
API 570 Pipeline Inspection Course 28th September - 2nd October 2020 Online Training Course This 5 day Pipeline Inspection course is based on API 570/574, API RP 577/ 578, ASME B16.5/ B31.3 and ASME BPVC Section V/ Section IX. API 570’s extensive involvements in the facilities inspection, as well as his practical coaching and mentoring approaches, this course not only prepare the from the following Mechanical Engineering Inspection Maintenance & Operations Technical & Engineering QAQC and technical personnel inspection and maintenance activities of piping system at upstream oil & Overview Who Should Attend Objective This programs focus on your immediate working issues toensure that you are able to apply and deliver immediate results in real work situations Application and implementation of industry knowledge and experience are the drivers for our course design, not theoretical academic lectures. This training focuses on practical interactive learning tools and techniques including case studies, group discussions, scenarios, simulations, practical exercises and knowledge assessments during the course. Invest a small amount of your time to prepare before attending this course to ensure maximum learning.

Transcript of API 570 Pipeline Inspection CourseAPI 570 (Inspection, Repair, Alteration, and Rerating of...

Page 1: API 570 Pipeline Inspection CourseAPI 570 (Inspection, Repair, Alteration, and Rerating of In-Service Piping Systems) Scope & Definition Owner/user inspection organization API authorized

API 570 Pipeline Inspection Course28th September - 2nd October 2020 Online Training Course

This 5 day Pipeline Inspection course is based on API 570/574, API RP 577/ 578, ASME B16.5/ B31.3 and ASME BPVC Section V/ Section IX. API 570’s

extensive involvements in the facilities inspection, as well as his practical coaching and mentoring approaches, this course not only prepare the

from the following

• Mechanical Engineering• Inspection• Maintenance & Operations• Technical & Engineering• QAQC and technical personnel

inspection and maintenance activities of piping system at upstream oil &

Overview

Who Should Attend ObjectiveThis programs focus on your immediate working issues toensure that you are able to apply and deliver immediate results in real work situations Application and implementation of industry knowledge and experience are the drivers for our course design, not theoretical academic lectures. This training focuses on practical interactive learning tools and techniques including case studies, group discussions, scenarios, simulations, practical exercises and knowledge assessments during the course. Invest a small amount of your time to prepare before attending this course to ensure maximum learning.

Page 2: API 570 Pipeline Inspection CourseAPI 570 (Inspection, Repair, Alteration, and Rerating of In-Service Piping Systems) Scope & Definition Owner/user inspection organization API authorized

BENCH-MARK QUIZINTRODUCTION TO API 570 CERTIFICATION

Day 1ASME B 31.3 (Process Piping)Scope and applicabilityService/Fluid ClassificatioJoint Quality FactorsAllowable stressesDesign for Internal PressureDesign of permanent blanksImpact testing for Low temperature serviceAcceptance of Impact test resultsWelding requirements-Preheat TemperaturesPost Weld Heat TreatmentHardness Testing after PWHTInspection and testingNon Destructive Examination RequirementsAcceptance CriteriaLeak testing-HydrostaticLeak testing-PneumaticPrecautions during Pneumatic testService leak testThermal Expansion of Piping

Day 2ASME B16.5 (Pipe Flanges and Flanged Fittings)Overview of pipe flanges and flanged fittScopeMaterialsDimensionsSystem pressure TestPressure Temperature RatingsAPI 570 (Inspection, Repair, Alteration, and Rerating of In-Service PipingSystems)Scope & DefinitionOwner/user inspection organizationAPI authorized piping inspector qualification and certificatiInspection and testing practicesRisk-based inspectionPreparation for inspectionInspection for specific types of corrosion and crackinTypes of inspection and surveillanceThickness measurement locationsFrequency and extent of inspectionPiping service classesInspection intervalsExtent of visual external and cui inspectionsInspection data evaluation, analysis, and recordingCorrosion rate determinationMaximum allowable working pressure determinationRepairs, alterations, and rerating of piping systemsWelding and hot tappingInspection of buried pipingTypes and methods of inspectionFrequency and extent of inspectionRepairs to buried systemsThickness measurement methodsInspection of welds in-serviceInspection of flanged joints

Day 3API 570 (Inspection, Repair,Alteration, and Rerating ofIn-Service Piping Systems)equency and extent of inspectionPiping service classesInspection intervalsExtent of visual external and cui inspectionsInspection data evaluation, analysis, and recordingCorrosion rate determinationMaximum allowable working pressure determinationRepairs, alterations, and rerating of piping systemsWelding and hot tappingInspection of buried pipingTypes and methods of inspectionFrequency and extent of inspectionRepairs to buried systems

Day 4ASME Boiler and Pressure Vessel Code Section IX(Welding and brazing QualificationsReview of a WPS and PQRDetermine if WPS and PQR are in compliance with ASME Sec. IXEssential and Nonessential VariablesDetermine that the number and type of mechanical tests are correct testsDetermine whether the results are acceptableASME Boiler and Pressure Vessel Code Section V(Non-Destructive Examination)Article 1, general requirements:Article 2, radiographic examinationArticle 6, liquid penetrant examinationArticle 7, magnetic particle examination (yoke and prod techniques only)Article 9, visual examinationArticle 10, leak testingAPI Recommended Practice574•Inspection of piping, tubing, valves, and fitting

Day 5API RP 571 (Damage Mechanisms in the Refining IndustryBrittle FractureThermal FatigueErosion/Erosion CorrosionMechanical FatigueVibration Induced FatigueAtmospheric CorrosionCorrosion Under Insulation (CUI)Boiler Water Condensate CorrosionFlue Gas Dew Point CorrosionMicrobiological Induced Corrosion (MIC)Soil CorrosionSulfidatioChloride Stress Corrosion Cracking (ClSCC)Caustic Stress corrosion Cracking (Caustic Embrittlement)High Temperature Hydrogen Attack (HTTA)API Recommended Practice 577Welding inspection and metallurgyAPI Recommended Practice 578Material verification program for new and existing allopiping systems

Agenda

Page 3: API 570 Pipeline Inspection CourseAPI 570 (Inspection, Repair, Alteration, and Rerating of In-Service Piping Systems) Scope & Definition Owner/user inspection organization API authorized

API 570 Pipeline Inspection

Fill in the form and send to: Ryan

[email protected]

www.empiretraining.co.za372 Oak Avenue, Randburg 2160,Johannesburg, RSA

+27 11 886 0941

By signing and returning this registration form, the authorizing signatory on behalfof the stated company is subject to the following terms and conditions: Charge of 50% of the registration fees, plus R700 (+ VAT) Administrative

charge will be made for cancellations received in writing at least 14 workingdays prior to the event.

or any cancellations received in less than 7 working days before the te of the event, the full fee will be payable and no refunds or credit notes will be

. If a registered delegate does not cancel and fails to attend the summit, this will

be treated as cancellation and no refund or credit will be issued.

gistration fees above INCLUDES the followingements: Entrance to session, registration pack, d

lunch and refreshment breaks.

gistration fees above EXCLUDES the followingentitlements: Travel costs and accomodation

Authourising Person

RESERVE YOUR PLACE TODAY!First Name: ________________________________________ Surname: _________________________________________Company/ Organisation: _____________________________Designation: _______________________________________Phone: ____________________________________________Fax: _______________________________________________Email Address: ______________________________________Company VAT No: ____________________________________Postal Address: ______________________________________Postal Code: ________________________________________Person dealing with accounts: __________________________Country: ___________________________________________Email Address: ______________________________________

Date: ______________________________________________Signature:___________________________________________________

By Completing and signing this form, the signatory accepts the terms and conditions as stated on the registration form

Re

Re

SUBSTITUTIONS:Delegate substitutions. Substitutions is welcome at any time and do not occur any additionl charges.Please notify EMPIRE in writing of any such changes at least 3 days before the date of the event.

Please note that the speakers and topics were confirmed at the time of publishing howevercircumstances beyond the control of the organizers may necessitate substitutions, alterations orcancellations of the speakers and/or topics. As such, EMPIRE reserves the right to alter or modify the advertised speakers and /or topics if necessary. Any substitutions or alterations will be updated and sent to you as soon as possible Delegate substitutions must be made in writing 7 days before the event.

Please state your full names clearly on the money transfer.

Please note, bank charges are of your OWN account and this should bestipulated to your bank. Please advise your bank that the charges should beincluded in your deposit

A copy of the bank deposit receipt should accompany your registration formand must be posted or faxed

PAYMENT BY MEANS OF BANK TRANSFER

PLEASE NOTE - EMPIRE HAS A STRICT NO CASH REFUND POLICY

.

Name of Bank

Branch name

Account name

First National Bank

250-655

62626629979

FIRNZAJJ

MYBRANCH

Empire Conferencing & Training

Branch Code

Account number

Swift Code

Please state your full names clearly on the money transfer. Please note, bank charges are of your OWN account and this should be

stipulated to your bank. Please advise your bank that the charges should beincluded in your deposit

A copy of the bank deposit receipt should accompany your registration formand must be posted or faxed

PAYMENT BY MEANS OF BANK TRANSFER

DELEGATE ATTENDANCE FORM

Title Delegate Name & Surname Email PhonePosition

FEE/ DELEGATEYes. [I / We] will attend the event

28th Sept - 2nd October 2020 Online Course

Normal Rate:

Per Delegate

REGISTER 5 DELEGATES AND QUALIFY FOR 1 FREE

R7000.00@ $402.00

International Rate: