API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

19
API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006

Transcript of API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Page 1: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

API 11V7 Task Group

Gas-Lift Task Group Meeting

Feb. 17, 2006

Page 2: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 2

API 11V7 Task Group

• Current task group:– Chair: Jim Hall, Shell International EP– Secretary: Cleon Dunham, OAC

• See separate task group roster

• What changes are needed?– Additions– Changes– Deletions

Page 3: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 3

Documents Not CurrentlyBeing Worked On

• API 11V1 – Gas-Lift Mandrels and Valves– Being replaced by ISO 17078-1 (side-pocket

mandrels) and ISO 17078-2 (flow control devices)

• API RP 11V2 – Gas-Lift Valve Testing and Modeling– Being replaced by 17078-2 (flow control devices)

Page 4: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 4

Documents Not CurrentlyBeing Worked On

• API RP 11V3 – Not used

• API RP 11V4 – Not used

• API RP 11V6 – Gas-Lift Design

Page 5: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 5

Documents Not CurrentlyBeing Worked On

• API RP 11V7 – Gas-Lift Valve Repair and Maintenance– Being replaced by 17078-2 (flow control devices)

• API RP 11V8 – Gas-Lift Systems

Page 6: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 6

Existing API 11V DocumentsThat Will Remain

• API RP 11V6 – Gas-Lift Design

• API RP 11V8 – Gas-Lift Systems– Periodically, we need to review these documents

and either:• Keep them as is• Update them• Delete them

Page 7: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 7

API RP 11V Documents ThatAre Currently Being Worked On

• API RP 11V5 – Gas-Lift Operation and Surveillance– This document has been substantially expanded– It has been reviewed by the API RP 11V Task

Group– It is in final stages of “clean up” editing– A “final push” is needed to get this document

finalized and re-submitted– Shall we agree on a target date / plan?

Page 8: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 8

API RP 11V Documents ThatAre Currently Being Worked On

• Members of API RP 11V5 Work Group– Jim Bennett– Joe Clegg– Ken Decker– Cleon Dunham – Chair– Jim Hall– Eric Laine– Tony Liau– John Martinez– Tom Ryan

Page 9: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 9

API RP 11V Documents ThatAre Currently Being Worked On

• API RP 11V9 – Dual Gas-Lift– This is a new document– It is largely (99%) drafted– A “final push” is needed to complete the first draft– Shall we agree on a target date / plan?– Once the first draft is done, the document needs

to be reviewed by the Task Group– Some clean up of the Work Group membership is

needed

Page 10: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 10

API RP 11V Documents ThatAre Currently Being Worked On

• Members of API RP 11V9 Work Group– Jim Bennett– Fortune Bikoro– Joe Clegg– Peter Dassey– Cleon Dunham – Chair– Jim Hall– Ali Hernandez− Ken Hilse– Sies Hussain

– Mariana Jamil – Eric Laine– David Lee− John Martinez− Tom Nations− Tom Ryan− Ron Schmidt− Gatut Widianoko

Page 11: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 11

API RP 11V Documents ThatAre Currently Being Worked On

• API RP 11V10 – Intermittent Gas-Lift– This is a new document– It is largely (95%) drafted– A “final push” is needed to complete the first draft– Ali Hernandez, the chair, can’t work on this now

due to his situation in Venezuela– Should we put this on hold, or finish the draft in

his absence?– Once the first draft is done, the document needs

to be reviewed by the Task Group– Some clean up of the Work Group membership is

needed

Page 12: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 12

API RP 11V Documents ThatAre Currently Being Worked On

• Members of API RP 11V10 Work Group– Jim Bennett– Jack Blann– Jesus Chacin– Joe Clegg– Cleon Dunham – Faustino Fuentes– Jim Hall– Ali Hernandez – Chair− Ken Hilse– Milka Hinojosa

– Eric Laine– Jim Lea– David Lee– Luisana Marcano– Mario Marmora− John Martinez− Santiago Rojas− Amitava Sarkar− Jim Watkins

Page 13: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 13

API Process for New Projects

• Task Group Chair Jim Hall will review the process and requirements for starting new API projects– Justification– Membership– Approval– Forms

Page 14: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 14

Potential New API Task Group Work

• API RP 11V6 Upgrade– Would there be interest in upgrading this

document, or in creating a new API RP 11V gas-lift design document, to include:

• Using gas-lift valve models in design• Using dynamic gas-lift design concepts• Other ideas

– If there is interest, would someone be willing to take the lead?

Page 15: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 15

Potential New API Task Group Work

• Possible new API 11V RP for surface-controlled downhole gas-lift equipment– With such equipment, there are significant

concerns for:• Selection• Design• Installation• Operation• Surveillance

– If there is interest, would someone be willing to take the lead?

Page 16: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 16

Potential New API Task Group Work

• Possible new API 11V RP for gas-lift automation, control, optimization– With such equipment, there are significant

concerns for:• Selection• Design• Installation• Operation• Surveillance

– If there is interest, would someone be willing to take the lead?

Page 17: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 17

Potential New API Task Group Work

• Possible new API 11V RP for design of production pressure operated gas-lift valves– This is essentially being covered in API RP 11V9– Is a separate RP needed?– If there is interest, would someone be willing to

take the lead?

Page 18: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 18

Potential New API Task Group Work

• Possible new API 11V RP for Dynamic Gas-Lift Design and Analysis– This is being proposed by Juan Carlos Mantecon– He has already lined up several people who are

willing to work on this

Page 19: API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Feb. 17, 2006 API Gas-Lift Task Group 19

Potential New API Task Group Work

• Brainstorm on other possible new API 11V RP’s– If there is interest, would someone be willing to

take the lead?