Apc - 8dec2010
-
Upload
agora-group -
Category
Documents
-
view
608 -
download
2
description
Transcript of Apc - 8dec2010
All content in this presentation is protected – © 2010 American Power Conversion Corporation
APC by Schneider Electric InfraStruxure™ Management
Eduard BodorSenior System EngineerRomania
APC by Schneider Electric –InfraStruxure December 2010
Increasing pressure
Energy and servicecost control
Increasing availability expectations
Regulatory requirements Server
consolidation
Dynamic power variation
Uncertainlong-term plans for capacity or density
… on data center planning and operation
We created – and continue to improve – a new way to plan, design, install, manage, and maintain data centers
In response …
Cloud computing
Energy efficiency Virtualization
APC by Schneider Electric –InfraStruxure December 2010
Organic growth Tendency toward chaos
OverheatingOverheating
Clogged underfloorClogged underfloor
Cable spaghettiCable spaghetti
Overdue Overdue maintenancemaintenance
“Replace Battery” warning light
It’s a swamp!It’s a swamp!
Where can I Where can I plug it in?plug it in?
APC by Schneider Electric –InfraStruxure December 2010
The old way: Independent components
Pieces patched togetherPieces patched together
● Custom-designed solutions
● Components from many suppliers
● “Integration” = complex web of designers / vendors / builders
● Process is…
Slow Creates defects Complex Unpredictable Error-prone Hard to change
Unique designUnique design yields yields unique problemsunique problems that burn time and resources to solvethat burn time and resources to solve
APC by Schneider Electric –InfraStruxure December 2010
IT is getting boxed-in by power & cooling
● Rack density has doubled every 8 years since 1992
● Moore’s Law drives increased MIPs
● Power density increasing 15% per year
● By 2010, average kW per rack forecast to be 20+ kW (up from 1 kW in 2000)
● Dense power makes cooling unpredictable and expensive
Power density is explodingPower density is exploding
Source: IDC Report: Aligning IT with BusinessSource: IDC Report: Aligning IT with Business
Moore’s Law is now being limited Moore’s Law is now being limited by infrastructure!by infrastructure!
APC by Schneider Electric –InfraStruxure December 2010
ARCHITECTURE – Standardized, modular structure Addresses all the challenges – High density, efficiency, scalability, standardization with flexibility
MANAGEMENT – Real-time, rack-level, model-based The “brain” that enables reliable high density, lean capacity, and high efficiency
The new way: Pre-engineered, built-in structure
PROCESS Standardized, repeatable process for planning and building Predictable roadmap – Standardized, no surprises, less cost, faster deployment
SERVICES – Clearly defined by scopes-of-work (SOWs)
● Whole-system “smart” designWhole-system “smart” design
● SOLUTION that integrates all elementsSOLUTION that integrates all elements
APC by Schneider Electric –InfraStruxure December 2010
● One-time engineering● Unique training requirements● On-site assembly● On-site testing● Custom programming
To eliminate …To eliminate …● Modularize
● Pre-test systems in the factory
● Hot-swappable components
● Pluggable power-cooling-rack subsystems
● Out-of-the-box management & diagnostics
These example system-level improvements reduce These example system-level improvements reduce human error, reduce cycle time, and improve efficiencyhuman error, reduce cycle time, and improve efficiency
Standardization improves outcomes
116
White paper
APC by Schneider Electric –InfraStruxure December 2010
Uniqueness is for art …Uniqueness is for art … NOT for infrastructure NOT for infrastructure !!
StandardizedModularScalableIntegratedRepeatableUnderstandable
… a time-tested strategy
We all grew up with this conceptWe all grew up with this concept
Standardized, but CONFIGURABLEStandardized, but CONFIGURABLE
Modular architecture
APC by Schneider Electric –InfraStruxure December 2010
Free IT !
● AlignAlign capacity with demand At row, rack, and server level
● PredictPredict fan failure to IT impact Reduce wasteful excess capacity
● Monitor Monitor the physical infrastructure Instant status and alarms
● ReduceReduce non-IT power consumption
Increase DATA CENTER EFFICIENCY
Smart management can help you …
UNMANAGED infrastructure
… with lean, smart infrastructure
APC by Schneider Electric –InfraStruxure December 2010
● Know where your power goes
● Add IT equipment without breaker trips
● Add IT equipment without overheating
● Maximize the amount of IT equipment
in the room
● Manage IT asset inventory
Smart management can monitor, analyze, Smart management can monitor, analyze, model, and forecast, so you can …model, and forecast, so you can …
… for lean, efficient infrastructure
Know where you can add IT devices Know where you can add IT devices without surprises !without surprises !
“Smart” management
150
White paper
APC by Schneider Electric –InfraStruxure December 2010
●Network management●A graphical overview of the data center network paths and their interconnections.
●Blade servers●Mirror the exact data center setup, by modeling blades within their blade enclosures.
●Expiring license support●Expiring license support to enable current InfraStruxure Central customers to try out
InfraStruxure Operations for a limited time period
●Download available for customers with a valid software support contract.●SKU number: SFISXOPS61
InfraStruxure Operations 6.1Instant overview of data center operations through inventory management, PUE calculator, real-time device alarms, and location-based drill-down
Integrated inventory management for full overview of data center operations
APC by Schneider Electric –InfraStruxure December 2010
InfraStruxure Energy Efficiency 1.1
●PPower dependency editor●A hierarchical break-down of the power flow from the power enters the
building down to the main PDU, providing an overview of the power path through the building.
●CCarbon footprint
●Shows the CO2 footprint for each energy sub-system, for instant measurement of impact on the environment.
Intelligent PUE analytics at subsystem level
Full insight into current and historical energy efficiency for facilities, identifying efficiency losses and enabling improved PUE values at subsystem level.
APC by Schneider Electric –InfraStruxure December 2010
●Data Center Lab●For customers to try out future data center changes and view the impact,
without making any changes to their live InfraStruxure Operations application.
InfraStruxure Capacity 6.1Planning and optimizing utilization of actual power, cooling and rack capacities via shared data center model, enabling efficient equipment provisioning and right-sizing of your data center.
Balance IT demand with physical infrastructure supply
APC by Schneider Electric –InfraStruxure December 2010
InfraStruxure Management Software Configuration Services Suite
InfraStruxure Central Configuration Appliance Installation Application Configuration
Implementing the InfraStruxure Management Software Solution
InfraStruxure Capacity InfraStruxure Capacity Policy
Configuration InfraStruxure Advanced Power
Configuration
InfraStruxure Post Configuration Insight Post Configuration Knowledge
Transfer for InfraStruxure Central, InfraStruxure Operations & InfraStruxure Capacity
InfraStruxure Operations Catalog Creation Floor & Rack Layout Creation IT Device Assessment & Assignment Power Dependency Configuration Labeling Service
APC by Schneider Electric –InfraStruxure December 2010
Questions….?
Thank you!