“Transmission or Distribution”
Phil Collins
March 18, 2005
CUSC Principles of Ownership
• Power Station• Busbar clamp on busbar side of busbar isolators on generators circuit
• Distribution System• Busbar clamp on busbar side of busbar selector isolator on distribution
circuit• If no busbar exists, an equivalent isolator• If no isolator exists, an agreed bolted connection at or adjacent to the tee
point
• Non-Embedded Customer• Clamp on circuit breaker side of cable disconnections at User’s substation
Overview
• Transmission Connection Boundary Definition:• Shareable or potentially shareable assets classed as Infrastructure• Substations and associated site infrastructure and land classed as
Transmission Infrastructure• Generation only Spurs are Transmission Infrastructure• Shared substations where National Grid or TOs own the busbars and
transformer circuits connecting shared LV substations are Infrastructure
• Grid Supply Points• DNO has no right of export
• Embedded Connections• Non Contiguous Connections
Transmission Connection Examples
Distributor Owned Substation
TO Owned Substation132kV, 275kV or 400kV
TOSubstation
TOSubstation
ConnectionBoundary
Demand
Infrastructure Assets
Single DNO T Connection
LVTO Owned Substation
TO Owned Substation132kV, 275kV or 400kV
TOSubstation
User Owned AssetsInfrastructure
Assets
TOSubstation
~
Single T Connection
Shared LVTO Owned Substation
TO Owned Substation132kV, 275kV or 400kV
TOSubstation
User Owned Assets
Demand
Infrastructure Assets
TOSubstation
~
Shared T Connection
Distributor OwnedSubstation
TO Owned Substation132kV, 275kV or 400kV
TOSubstation
ConnectionBoundary
Demand
~Infrastructure
Assets
TOSubstation
Generation and Demand Connection
User Owned Assets
TO Owned Substation132kV, 275kV or 400kV
Generation Only - Non Spur Connection
TOSubstation
Infrastructure Assets
GeneratorAssets
~
Infrastructure AssetsTO
Substation
~
TO Owned Substation132kV, 275kV or 400kV
Generation Only Spur (Turn in)
InfrastructureAssetsGenerator
Assets
~
TO Owned Substation132kV, 275kV or 400kV
Generation Only Spur (Remote sub)
GeneratorAssets
~
TOSubstation
InfrastructureAssets
TO Owned Substation132kV, 275kV or 400kV
Generation Only Spur (Tee)
GeneratorAssets
~Infrastructure
Assets
Distribution Connection Examples
Distributor Owned Substation
National Grid Substation132kV, 275kV or 400kV
TOSubstation
TOSubstation
DNO ConnectionBoundary
Demand
Infrastructure Assets
DNO Connection with embedded generationand demand
~
Distributor Owned Substation
Demand
DNO Connection with embedded generationand demand
~
National Grid Substation132kV, 275kV or 400kV
Distributor Owned Substation
DNO ConnectionBoundary
Distributor Owned Substation
Demand
DNO Connection with embedded generationand demand
~
National Grid Substation132kV, 275kV or 400kV
Distributor Owned Substation
DNO ConnectionBoundary
Connection Example
Distributor Owned Substation
TO Owned Substation132kV, 275kV or 400kV
TOSubstation
TOSubstation
ConnectionBoundary
Infrastructure Assets
What am I?What am I?
~
No Demand
Generator
Application Process - Transmission
Transmission Application ProcessApplications
Customer NGC (GBSO) Host TO
Affected TO
Transmission Application ProcessOffers
Host TO
Affected TO
CustomerGBSO
Transmission Application ProcessOffer Acceptance
Customer
Host TO
GBSO
Affected TOs
Transmission Application ProcessSummary
• User makes application
• GBSO makes an NGC Construction Application if required
• TO make TO Construction Offer (TOCO) if works are required
• GBSO makes Offer to Customer
• Customer signs and returns Offer
• GBSO signs Offer and TOCO
• GBSO returns TO Construction Agreement
Application Process - Embedded
Embedded Application ProcessSummary
Embedded Generator NGC (GBSO) Host TO
Affected TODNO
Embedded Application ProcessKey Attributes
• BEGA• User Applies• NGC Construction Application• TO Construction Offer (null)• BEGA Gets Construction Agreement and Bilateral Agreement• NGC makes Mod Notice to DNO (possible CONSAG)
• BELLA• User and DNO Applies• NGC Construction Application• TO Construction Offer (null)• BELLA gets Bilateral Agreement and DNO gets Construction Agreement