1 Introduction Huntsman “Give the OPERATOR the BEST tools and knowledge”

Transcript of “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and...

Page 1: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

1

Introduction Huntsman

“Give the OPERATOR the BEST tools and knowledge”

Page 2: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

POM

2

OPERATOR

TRAINING

HMI

ALARM MANAGEMENT

CONTROL

STRATEGY

Page 3: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

Topics

3

• Introduction

• Challenges Huntsman and project

• Vision / URS control strategy

• Project organisation

• Factors for success

• First results

Page 4: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

Introduction

4

Introduction

Challenges

Vision / URS

Organisation

Factors for success

First results

Jasper Rutten Sr. Process Engineer

Project rol: Sr. Process Engineer & Commissioning manager

Tom Verbruggen Project manager TA

Project rol: Lead Engineer Process Control

Page 5: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

5

Markets include:

Adhesives, Coatings

and Elastomers

Appliances

Automotive

Insulation

Composite Wood Products

Footwear

Furniture & Bedding

TPU

Page 6: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

6

Page 7: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links

375 graphics

DeltaV HMI

DeltaV DCS Chrystalisers 3&4, AWZI

PROVOX DCS

PROVOX HMI

HIMA SIS

MIMIC

FIELD EQUIPMENT

VOPAK YORK compres

sor

Fire & Gas

Truck loading

HCL compres

sor

RTO QC Analy-

sers

Fire water pumps

AWZI

Start engineering – Jan. 2014

MIMIC DeltaV HMI

DeltaV DCS

HIMA SIS

VOPAK YORK compres

sor

HCL compres

sor

Turn Around – April 2015

DeltaV HMI

DeltaV SIS

Turn Around – 2017

10 DCS controllers

45 SIS Logic Solver

4 I/O-shelters

300 multicores + system cabling

Page 8: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

Challenges Huntsman

8

Introduction

Challenges

Vision / URS

Organisation

Factors for success

First results

Qualified operators

• Aging experienced operators

• Increased mobility operators

• Certification (CCR-) Operators

Process Control System

• Current system is limiting the production goals

• Aged control strategy

• EndOfLive current DCS- and SIS-system

Page 9: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

Project Challenges

9

Introduction

Challenges

Vision / URS

Organisation

Factors for success

First results

• Parallel projects Major plant revamp

Development Operator Training System (dynamic model)

• Fast track project Start engineering Jan. 2014

Turn Around Apr. 2015

• TurnAround DCS-migration

Plant modifications

Regular maintenance works

Specific plant units will stay operational

Page 10: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

10

Introduction

Challenges

Vision / URS

Organisation

Factors for success

First results

Operator knowledge

System and control strategy

Safety

Future

Page 11: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

11

User Requirement Specifications

Control strategy Support operations • 2 CCR-operators in Q2-2015; 1,5 in Q2-2016 for normal operation

• Basic control functional copy of current DCS and SIS.

• Redesign of the automated sequences.

HMI Human Centric Design • HMI Designed according ISA 101.4

• Use of latest supplier standard library comply to ASM / HCD-guidelines

Page 12: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

12

User Requirement Specifications

Alarm/trip-management Alarmreduction, -suppression, LOPA’s

• Meet EEMUA-standard

• Re-evaluate SIL - Safety provisions.

• Re-evaluate production related tripfunctionality

Operator Training System incl. dynamic plantmodel OTS

• Train operators for TA2015

• Support DCS-FAT

Phase 2:

• Advanced training and certification with high fidelity plantmodel

• Testing future modifications

Page 13: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

13

Client / End user

EPC

Delivery and configuration DCS / SIS-system

Design HCD HMI

Design control strategy

Dynamic model and Training

Alarm evaluation

Page 14: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

Factors for success (1/2)

14

Introduction

Challenges

Vision / URS

Project Organisation

Factors for success

First results

• Clear vision and user requirements

• Priority awareness At ALL participants and organisation levels

• Make choices - decisively Quick decision process

Stick to the plan

Management of expectation (documented and communicated)

Page 15: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

Factors for success (2/2)

15

Introduction

Challenges

Vision / URS

Project Organisation

Factors for success

First results

• Resource management Assure competence and knowledge

Organisation – clear accountabilities

Team motivation – eye for the invidual

Best personel for the job

• Integrated team Focus on solutions

Always looking for most effective way of working

Using expertise of all members

Pro-actively call in expertise when needed

Page 16: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

First results

16

Introduction

Challenges

Vision / URS

Project Organisation

Factors for success

First results

• URS phase 1 implemented

• Intuitive HMI design

• Control Strategy fit for purpose

• Complex dynamic plant trainingsystem accurately built in short time

• Operator training in progress

• Fast track schedule on track

Page 17: “Give the OPERATOR the BEST tools and knowledge” · “Give the OPERATOR the BEST tools and knowledge” 4500 I/O: 3500 real I/O 1000 serial I/O in 7 serial links 375 graphics

“Give the OPERATOR the BEST tools and knowledge”

POM

fit for

TASKS

17

OPERATOR

CENTRIC

TRAINING

and

CERTIFICATION

HMI

fit for

TASKS

ALARM MANAGEMENT

Supply the right

information

at the right time

CONTROL

STRATEGY

Operator

always