Geothermal as an Alternative Source of Geothermal as an Alternative Source of Energy for Tanzania Energy for Tanzania a new Project a new Project 3 3 Ministry of Energy and Ministry of Energy and Minerals (MEM), Dar Minerals (MEM), Dar es es Salaam Salaam (TANESCO (Tanzania Electric (TANESCO (Tanzania Electric Supply Company Ltd.)) Supply Company Ltd.)) 1 1 Geological Survey of Geological Survey of Tanzania (GST), Tanzania (GST), Dodoma Dodoma 2 2 Bundesanstalt f Bundesanstalt f ü ü r r Geowissenschaften und Geowissenschaften und Rohstoffe (BGR), Hannover Rohstoffe (BGR), Hannover Addis Addis Ababa Ababa , ARGeoC1, 29.11.2006 , ARGeoC1, 29.11.2006 P. Ndonde P. Ndonde 1 1 , C. Stadtler , C. Stadtler 2 2 , N. Mwihava , N. Mwihava 3 3 , K. Kessels , K. Kessels 2 2 , M. Kraml , M. Kraml 2 2 & D. Delvaux & D. Delvaux 4 4 4 4 Royal Museum for Central Africa Royal Museum for Central Africa

Transcript of “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative...

Page 1: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

““Geothermal as an Alternative Source of Geothermal as an Alternative Source of Energy for TanzaniaEnergy for Tanzania””

–– a new Projecta new Project

33Ministry of Energy and Ministry of Energy and Minerals (MEM), Dar Minerals (MEM), Dar eses Salaam Salaam

(TANESCO (Tanzania Electric (TANESCO (Tanzania Electric Supply Company Ltd.))Supply Company Ltd.))

11Geological Survey of Geological Survey of Tanzania (GST), Tanzania (GST), DodomaDodoma

22Bundesanstalt fBundesanstalt füür r Geowissenschaften und Geowissenschaften und

Rohstoffe (BGR), HannoverRohstoffe (BGR), Hannover

Addis Addis AbabaAbaba, ARGeoC1, 29.11.2006, ARGeoC1, 29.11.2006

P. NdondeP. Ndonde11, C. Stadtler, C. Stadtler22, N. Mwihava, N. Mwihava33, K. Kessels, K. Kessels22, M. Kraml, M. Kraml22 & D. Delvaux& D. Delvaux44

44Royal Museum for Central AfricaRoyal Museum for Central Africa

Page 2: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Tanzania country backgroundTanzania country background

Population: 34.6M (2002)Population: 34.6M (2002)Pop. growth rate: 2.9%/yearPop. growth rate: 2.9%/yearLife expectancy: 50yrs, Life expectancy: 50yrs, GDP per capita $286GDP per capita $28675% of population 75% of population -- ruralrural80% of rural population live under 80% of rural population live under

poverty linepoverty linePercapitaPercapita energy consumption: energy consumption:

0.7 0.7 ToEToE ((tonnetonne of oil equivalent)of oil equivalent)Rice market in Rice market in KyelaKyela

Page 3: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

ElectricityElectricityGenerating capacity (2005): Generating capacity (2005): 1018 MW1018 MW72.3% owned & operated by TANESCO 72.3% owned & operated by TANESCO Hydro Hydro 561 MW 561 MW Natural gas Natural gas 182 MW 182 MW Diesel IPP Diesel IPP 100 MW100 MWIsolated 10 towns (decentralized) Isolated 10 towns (decentralized) 55.5 MW55.5 MWOther Other IPPsIPPs 41.5 MW41.5 MWImported (Zambia & Uganda) Imported (Zambia & Uganda) 13 MW13 MW

Consumption: Consumption: 84 kWh/capita84 kWh/capitaAccess to electricity: Access to electricity: 11.511.5 %% of populationof populationRural population access to electricity: Rural population access to electricity: 2 %2 %

Cement factory in Cement factory in SongweSongwe basinbasin

Page 4: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Challenges in electricity supplyChallenges in electricity supplyNational power system is mostly relying on hydropower.National power system is mostly relying on hydropower.A long period of drought between 2003 and 2006 and A long period of drought between 2003 and 2006 and cchanging rainfall pattern are adversely affecting hanging rainfall pattern are adversely affecting hydropower plants, they are no longer reliable as basehydropower plants, they are no longer reliable as base--load.load.

Harbour of Dar Harbour of Dar eses SalaamSalaam

Page 5: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Stages of geothermal developmentStages of geothermal development

Geothermal Geothermal not included in not included in ““National Power National Power SectorSector Master Master PlanPlan““ as there is still no planning data; inadequate explorationas there is still no planning data; inadequate exploration

Project definition and reconnaissance studyProject definition and reconnaissance study•• Detailed explorationDetailed exploration•• Exploratory drilling & delineationExploratory drilling & delineation•• Resource data analysis & assessment of development Resource data analysis & assessment of development

potentialpotential•• Field developmentField development•• Steam production & resource managementSteam production & resource management•• Power plant constructionPower plant construction

Page 6: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

ObjectiveObjective: Tanzanian Institutions move further on evaluating : Tanzanian Institutions move further on evaluating the countries geothermal potential the countries geothermal potential

Period: June 2006 Period: June 2006 –– end of 2007end of 2007

Project in TanzaniaProject in Tanzania

MbeyaMbeya with with NgoziNgozi volcano in backgroundvolcano in background

Page 7: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Main project components:Main project components:–– Training of Tanzanian experts in acquiring, Training of Tanzanian experts in acquiring,

analysing and interpreting exploration dataanalysing and interpreting exploration data–– Recommend potential locations for a geothermal Recommend potential locations for a geothermal

exploration borehole in exploration borehole in SongweSongwe area on the basis area on the basis of modern geothermal exploration methodsof modern geothermal exploration methods

–– Enabling MEM and GST to continue with Enabling MEM and GST to continue with geothermal exploration worksgeothermal exploration works

–– Dissemination of information about possibilities Dissemination of information about possibilities of geothermal energy use in Tanzania among of geothermal energy use in Tanzania among decision makersdecision makers

–– Search for funding for shallow drilling in Search for funding for shallow drilling in SongweSongwe

Travertine deposits in Travertine deposits in SongweSongwe areaarea

Page 8: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Main project activities in 2006:Main project activities in 2006:–– Training of Jacob Mayalla from MEM Training of Jacob Mayalla from MEM

at UNUat UNU--GTP (geological exploration) GTP (geological exploration) in Iceland in 2006in Iceland in 2006

–– Appraisal mission, sampling of Appraisal mission, sampling of possible project sites and selection of possible project sites and selection of one site as project area (June 2006)one site as project area (June 2006)

–– Test and upgrade of geophysical Test and upgrade of geophysical equipment of GST (August 2006)equipment of GST (August 2006)

–– First short field survey (November First short field survey (November 2006)2006)

Fault with fluid flow in Fault with fluid flow in SongweSongwe areaarea

Page 9: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Source: Mwihava, 2005

Geothermal sites in Geothermal sites in Tanzania and the Tanzania and the selected selected GEOTHERM GEOTHERM project regionproject region

Project region Project region MbeyaMbeya((RungweRungwe volcanic volcanic complex)complex)

Page 10: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Rungwevolcaniccomplex

Rukwa + Songwe basin

Usangu basin

Malaw

i basin

Appraised and sampled hotAppraised and sampled hotsprings in June 2006:springs in June 2006:SongweSongweKilambo/MakweheKilambo/MakweheMampuloMampulo

Selection of project siteSelection of project site

Project team in front of Lake Project team in front of Lake NyasaNyasa

Page 11: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

0

50

100

150

200

250

Songwe

Res

ervo

irte

mpe

ratu

re

SiO2Na/KK/MgNaKCagas

Kilambo Mampulo

Res

ervo

ir te

mpe

ratu

re[°

C]

*

* improved Na/K (Can 2000)

Sampling results of June 2006: Sampling results of June 2006: geothermometrygeothermometry

Page 12: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Sampling results of June 2006: Carbon isotopic Sampling results of June 2006: Carbon isotopic composition of COcomposition of CO22

Mampulo, Makwehe, Songwe

δ13C (PDB) CO2

Mantle source

Different sources of CO2

The geothermal The geothermal systems of all sampled systems of all sampled hot springs are driven by hot springs are driven by a magmatic heat sourcea magmatic heat source

SongweSongwe hot springhot spring

Page 13: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Why Why SongweSongwe??logistical advantages logistical advantages good general conditions for good general conditions for trainingtrainingpartly good terrain partly good terrain accessibility to apply a broad accessibility to apply a broad spectrum of geoscientific spectrum of geoscientific methodsmethodscomparably high natural comparably high natural release of thermal energy release of thermal energy leads to the conclusion that a leads to the conclusion that a significant resource exists significant resource exists recommended in the recommended in the ““Tanzanian Rural Tanzanian Rural Electrification StudyElectrification Study”” (2005)(2005)

SongweSongwe hot springshot springs

2 km

Basement

Karoo

Red sandstone

Sinter

Volcanics

Lake beds

Page 14: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

SongweSongwe geothermal sitegeothermal site

MbeyaMbeya range

range

Songwe hot springs are the most impressive and active area in TanzaniaTmax = 80°C; total discharge: 50-75 l/s; 150 million Tonnes of travertine

deposit; natural heat loss: 10 MWth

Indications that the Songwe hot springs mark the terminus of a concealed outflow of hot water, channeled by a confined system.

Where is the heat source and the related high-enthalpy geothermal system?

SongweSongwe hot springshot springs

N Songwe basin

Page 15: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

View over triple junction & View over triple junction & RungweRungwe volcanic complexvolcanic complex

N

Livingstone escarpment

KiejoKiejo volcanovolcano

RungweRungwe volcanovolcano

NgoziNgozi volcanovolcano

SongweSongwe hot springshot springs

MbeyaMbeya RangeRangeUsangu basin

Malawi basin

Songwe basin? Heat source for Songwe ?

Page 16: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

First short field survey in November 2006First short field survey in November 2006Duration: 31.10. Duration: 31.10. –– 14.11.2006 14.11.2006 Applied methods: Applied methods:

––Geological investigationsGeological investigations––Sampling of rocks, fluids and gases Sampling of rocks, fluids and gases ––Transient electromagnetic soundings (TEM)Transient electromagnetic soundings (TEM)––Schlumberger soundings (VES)Schlumberger soundings (VES)

Lake Lake NgoziNgozi (caldera)(caldera)

Page 17: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

Topography of the Mbeya region with hot springs, TEM & VES

○ sampled hot spring□ TEM sounding+ VES sounding

Ngozi volcano

Rungwe volcano

Songwe hot springs

Page 18: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals

OutlookOutlookPlanned project activities:Planned project activities:

–– Training in data processing and interpretation of 1 or Training in data processing and interpretation of 1 or 2 scientists of GST at BGR in 2 scientists of GST at BGR in HannoverHannover, Germany , Germany

–– Planning of further field activities based on the Planning of further field activities based on the resultsresults

Field survey in middle of 2007 (May?) Field survey in middle of 2007 (May?) –– Presentation and distribution of project results and Presentation and distribution of project results and

possibilities of geothermal energy use (conference, possibilities of geothermal energy use (conference, workshop, exhibition, paper)workshop, exhibition, paper)

–– Training additionally of one scientist of GST at UNUTraining additionally of one scientist of GST at UNU--GTP in Iceland in 2007 or 2008GTP in Iceland in 2007 or 2008

Skyline of Dar Skyline of Dar eses SalaamSalaam

School children School children in in MbeyaMbeya

Page 19: “Geothermal as an Alternative Source of Energy for … P. Ndonde...“Geothermal as an Alternative Source of Energy for Tanzania” – a new Project 3Ministry of Energy and Minerals