Anton completion focuses on integrated service
A leading completion service provider locally in China
Also an excellent partner with other IOSC globally
Completion services and productions business in 17 countries
9 international service bases and 300 members supporting field services
1. Completion Product Line
-
4
1. Completion Product Line
Business Scope
IntegratedServices
Stimulation
Production Completion
Cementing Completion
SandControl
Water Control
Water Injection
-
5
Services Capacity
Integrated completion design
Full-set down-hole tools
Surface equipment
Professional service group
Reservoir evaluation, engineering design, effectevaluation, simulation experimental.
HTHP and Anti-corrosive completion tools, with 4manufacture base in China.
11set Coiled tubing units and 100,000 HHPpumping capacity.
7 Seiner experts and 60 engineers support globalfield operation, with 9 services bases globally.
1. Completion Production Line
-
6
Contents
01
02
03
Completion Production Line
Completion Technology
Services Tools and Equipment
04 Global Clients
-
7
2. Completion Technology
Anton provide characteristic completion technology
(1) Integrated completion solution
Full-range wellbore completion design
Complete surface and down-hole equipment
Professional on-site technical services
• Wellhead
• Completion fluid
• Production completion services
• Stimulation/Cementing/Sand control completion services
Integrated
-
8
2. Completion Technology
(1) Integrated completion solutions
Multi-lateral completion well
Reduce well construction cost and operation time
Key technologies of assess, isolation and re-entry.
Multi-lateral
-
9
2. Completion Technology
(2) Production completion technology
HT/HP well or CO2/H2S gas well.
Reliable safety valve systems, flow
control systems, and packer
systems secure a stable production.
Complicated well
C asing13 3/8"
C ontrol line
Flow coupling
Tubing retrievable S S S V
X P lug
A R Landing nipple
Flow coupling
P erm anent P acker
M illout E xtension
X O
P erforate P ipe
Tubing H anger
A F Landing nipple
A nchor S eal N ipple
S S D
150℃
Max. 15000psi
Nickel
base alloy
-
10
2. Completion Technology
Using a permanent packer and PBRre-connection.
Larger ID for higher pumping andproduction rates.
One trip of completion system.
Mono boreSSSVFlow Coupling Flow Coupling
SISO anchor seal assembly
Open Hole
PBRLiner hanger with top packer
Tieback seal assembly
PBR
Top isolation packer
Tubing Hanger
Landing Collar
Float Collar
Double Valve Float Shoe
(2) Production completion technology
-
11
2. Completion Technology
CO2 gas well or HTHP wells. Liner hanger & top packer system
ensure cementing quality. High-pressure tie-back system
provides reliable wellbore integration.
Complicated well
(3) Liner hanger technology
150℃
10000psi
Tie back
-
12
2. Completion Technology
Single trip multi-layers system for fracturing orcircle gravel packing.
Unique dual seal system ensures independentoperation.
Unique self-alignment Weight Down designcan easily locate the indication coupling.
The large 3.88’’ inner production bore.
Single trip Multi-layers
(4) Multi-layers gravel pack technology
-
13
2. Completion Technology
Automatic identification of oil and water production in isolation layers
Control high water-cut Adjust the oil production contribution in
multiple-layer reservoirs Integrate the sand control, water control
with stimulation
(5) Multi-layers AICD technology
Multi-layersWater cut
-
14
2. Completion Technology
Real-time monitoring of injection parameters
Manage injection parameters according to monitoring data lively
Reduce time and cost of work-over
(6) Intelligent water injection technology
Smart distributor
Transmitter
-
15
Contents
01
02
03
Completion Production Line
Completion Technology
Services Tools and Equipment
04 Global Clients
-
16
Liner hanger system Liner Hanger Series
Casing Accessories• Cementing Stage Tool• Dart/Plug/Landing Collar• Float Collar/Shoe• Centralizer(rigid/bow)
Expand Casing Packers• ECP/ACP Packer • Swell Packer
• Conventional liner hanger• HongAT rotatable liner hanger • Retrievable liner hanger
3. Services Tools and Equipment
ApplicationsMain market: China, Iraq, Ethiopia, Central Asia, South America
-
17
HongAT rotatable liner hanger system
3. Services Tools and Equipment
Liner hanger system
• Ideal for gas storage wells, severe corrosion
gas wells, 3D wells and other hostile wells.
• Can rotate liner while RIH or cementing job.
• Work load up to 200tons.
• 10000psi working pressure.
• 180 Deg.C working temperature.
• High performance raw material selected.
-
18
Applications
• Hydraulic set and release.
• Retrieving by pulling directly.
• Easily operating in directional and horizontal wells.
• Sealing capacity:• Special polymer materials: Temperature 400 ℉, Pressure 5,000Psi
• Metal polymer materials: Temperature 550℉, Pressure 3,000Psi
• Special material: More than Temperature 662 ℉, Pressure 2,000Psi
The successful applications are more than 60 wells in Venezuela and Ecuador.
3. Services Tools and Equipment
Thermal Retrievable Packer Liner hanger system
-
19
Packer system
Flowing system• Sliding sleeve
Safe valve system
• Permanent/Retrievable• Cable production packer
• Sub-surface safety valve• Flow sub• Hydraulic control pipe
Integrate global resources for Customer.
Production Completion Tools
ApplicationsMain market: China, Iraq, Ethiopia, Central Asia, South America
3. Services Tools and Equipment
-
20
AT-PP Premium Retrievable Packer
• For HTHP gas wells.• Retrievable and hydraulic-set .• With performance of a permanent packer as a retrievable packer.• Retrieval by mechanical cut or shear release.• 10000psi WP.• 300 Deg.F WT.• 9Cr, 13Cr, 718 material selected.
Production Completion Tools
3. Services Tools and Equipment
-
21
Packer• Open Hole Packer• Bridge Plug Packer• Dissolve Bridge Plug
Stimulation Completion Tools
Frac-Sleeve• Open Hole Frac-sleeve • Cement Frac-sleeve• Full bore Frac-sleeve Other Fracturing Tools• Polymer ball/Dissolve ball• Isolation valve
ApplicationsThe first China local company apply segment hydraulic fracturing technology.Over 800 wells have been applied in open-hole and casing bore.
3. Services Tools and Equipment
-
22
AT-DFP Dissoluble Bridge Plug
High-performance plug is rated to 10,000 psi for zonal
isolation during wellbore stimulation with the most
advanced dissolvable metal and rubber materials.
3. Services Tools and Equipment
• Materials dissolve time based on temperature and salinity.
• Provides an entire wellbore ID for future operations upon
complete dissolution.
• Helps eliminate the risk and costs of conventional plug removal.
• Special slim design for deformed casing in shale development
Stimulation Completion Tools
-
23
Chemical Agent
3. Services Tools and Equipment
• Fracture liquid system
• Acid liquid system
• Nano stimulation liquid system
Stimulation Completion Tools
Block off material• Temporary plug material
• Chemical plug material
Proppant• Low/Middle/High density ceramsite
• High strength ceramsite
-
2424
AICD (Autonomous Inflow Control
Device)• Automatic identification of oil and water
• Achieve a balanced production
• Prevent early water breakthrough
• Limit water area production
ApplicationsTotally we have applied 36 wells in CNPC, Sinopec, and offshore CNOOC.
Flow Control Product
3. Services Tools and Equipment
-
2525
FCD (Flow Control Device)
Steam Injection Valve
We can provide a comprehensive solution to steam injection and production.• Uniform steam inject in segmented horizontal wells
• Single directional inject channel
• Automatic inflow control during production
• Single string with steam injection and oil production in CSS or SGAD.
Flow Control Product
3. Services Tools and Equipment
-
26
Service Scope
• Conventional gravel pack system
• Single Trip Multi-layers gravel pack system
Over 2,000 wells have been installed inglobal, widely used in China, Iraq andColombia.
Applications
• Gravel Packer
• Pack off Housing
• Closing Sleeve Assembly
• Sand screen
• Sump Packer
STML GP system
Gravel Pack
3. Services Tools and Equipment
-
2727
Precise Punched Slots Screen (PPS)
Precise Micropore Composite Screen (PMC)
Water and sand control screen (AICD)
Pre-Packed Screen (PPK)
Sand Screen Product:
More than 1,280,000 meters of global installed, main
markets: Most oilfield in China, Canada, South America,
Central Asia, Middle East and Africa regions.
Applications
Sand Screens
3. Services Tools and Equipment
-
2828
PPS screensSpecial Lateral Slots
• P u n c h e d s l o t s p a t e n t e dtechnology, three-dimensionalstructure design.
• Embedded bridge slots, the rapidformation of sand bridge.
• Lateral slots flow structure, avoidformation fluid directly erosion.
Sand ScreensPPS
Jacket
End Ring
Base pipe
3. Services Tools and Equipment
-
2929
Services Capacity:
100,000 HHP.
47 Pump trucks.
3 Liquid nitrogen pump trucks.
9 Blander trucks.
8 Instrument trucks.
5 Pipe line integration trucks.
More than 100 other trucks.
3660 m³ liquid tanks.
Single well Max. 40,000 m³ liquid and 1,600 m³ proppant pumping record.
Max. pump rate 22m³ /min, Max. pump pressure up to 98Mpa.
Pump services equipment
3. Services Tools and Equipment
-
3030
Services Capacity:
11 Coiled tubing service teams.
Size from 1 ¼” – 2 3/8”.
Max. operation depth record5712m.
Provides a coiled tubing drivepacker fracturing.
Coiled tubing equipment
3. Services Tools and Equipment
-
31
Tianjin base: Screen and Completion tools
Qingdao base:Gravel packing tools
Dongying base: Gravel packing and chemical material
Suining base:Proppant
Manufacturing Base
3. Services Tools and Equipment
-
32
• API SPEC 5CT
• API Q1
• API 11D1
• API 14A
• ISO 9001:2008 IDT
• ISO 14001:2004 IDT
• OHSAS 18001:2007 IDT
Qualification certificate
3. Services Tools and Equipment
-
33
Contents
01
02
03
Completion Production Line
Completion Technology
Services Tools and Equipment
04 Global Clients
-
34
4. Clients
http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=xCuMUS0Rkzj3UM&tbnid=9I3PXFr1B09naM:&ved=0CAUQjRw&url=http://www.cmi.com.co/i/p/imp.asp?n=77536&ei=VdNBUvfINoi1iwL9qoGABA&psig=AFQjCNEE0IPfHxzW4Ir136AEFroi7mqPbg&ust=1380132045328109http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Bprd-mXT7TJSgM&tbnid=i-Eg949_2KX9zM:&ved=0CAUQjRw&url=http://3blmedia.com/News/CSR/CITGO-Honored-2013-ILTA-Safety-Excellence-Award&ei=ldNBUr31LuHqiQKRk4HoDw&psig=AFQjCNGvgvf26Cnuf8YcBsd3x0ilDcYcfg&ust=1380132113563965http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Ry9NaZ1HUxjFGM&tbnid=mdOjjQ-_gLS0VM:&ved=0CAUQjRw&url=http://www.bjchp.gov.cn/publish/portal0/tab6000/info116566.htm&ei=xNRBUqyEPaatiQL41oDQBA&psig=AFQjCNH2YsWI-TW50iRcUTaK7qxEqEQh9Q&ust=1380132417279842http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=vt52NVrYq3M4QM&tbnid=7WqUdBPsK_JAAM:&ved=0CAUQjRw&url=http://www.chinafrontier.cn/cn/clients-cn.html&ei=NtVBUtTDO4TFiwKewYDAAg&psig=AFQjCNHcIO6MXDb7JbOF_OyrXrfHQ3LwTg&ust=1380132528536418http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=112iSENQ0VzmGM&tbnid=zQ0nlozVrHPLPM:&ved=0CAUQjRw&url=http://big5.ce.cn/gate/big5/intl.ce.cn/zhuanti/data/sinopec/index.shtml&ei=g9VBUqTAAYTcigKGz4GYDQ&psig=AFQjCNHrd739JplNOKSbJNYZ6ddfXfj75A&ust=1380132604317073http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=VKCPDizJiCN-RM&tbnid=VXEBHDAMQhQndM:&ved=0CAUQjRw&url=http://de.wikipedia.org/wiki/Datei:CITIC_Group_logo.svg&ei=Q9dBUtywFsnniAKEwoGQDg&psig=AFQjCNHkxqX7kDi1Mfj1uYGgW2Z_wnp9bg&ust=1380133041550176http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=hNm2DvyY1DIbfM&tbnid=hNlECHvXyxdxEM:&ved=0CAUQjRw&url=http://www.codimet.com/INICIO/Nuestros-clientes.php&ei=JtNBUobAL-H0iwK35IHwCw&psig=AFQjCNEidaHMgwV6oLz256poamPouOd-SA&ust=1380132000597489
-
www.antonoil.com
Helping others succeed…
THANKS!
幻灯片编号 1幻灯片编号 2幻灯片编号 3幻灯片编号 4幻灯片编号 5幻灯片编号 6幻灯片编号 7幻灯片编号 8幻灯片编号 9幻灯片编号 10幻灯片编号 11幻灯片编号 12幻灯片编号 13幻灯片编号 14幻灯片编号 15幻灯片编号 16幻灯片编号 17幻灯片编号 18幻灯片编号 19幻灯片编号 20幻灯片编号 21幻灯片编号 22幻灯片编号 23幻灯片编号 24幻灯片编号 25幻灯片编号 26幻灯片编号 27幻灯片编号 28幻灯片编号 29幻灯片编号 30幻灯片编号 31幻灯片编号 32幻灯片编号 33幻灯片编号 34幻灯片编号 35