Answer for PLD Final Exams
-
Upload
zakariya-mohamed -
Category
Documents
-
view
214 -
download
0
description
Transcript of Answer for PLD Final Exams
-
PLANT DESIGN (H82PLD)
SPRING SEMESTER 2006-2007
Q2:
(a) Hot utility = 40kW Hot stream pinch temperature = 480 C
Cold utility = 106 kW Cold stream pinch temperature = 460 C
Q3:
Nm = 4.31
Rmin = 0.425
R=1.3Rmin = 0.552508767
N = 2 Nm = 8.618016408
Q4:
(a) Hot utility = 90kW Hot stream pinch temperature = 260 C
Cold utility = 50 kW Cold stream pinch temperature = 240 C
Q5:
(a)
vC3 = fC3C3 = 15.22 yC3 = 0.48vC5 = fC5C5 = 9.00 yC5 = 0.29vC6 = fC6C6 = 7.33 yC6 = 0.23V = vk = 31.55
(b) T = 122.9C
-
SPRING SEMESTER 2007-2008
Q1: (a)
vC2 = fC2C2 = 9.73 yC2 = 0.14vC3 = fC3C3 = 18.39 yC3 = 0.26vC4 = fC4C4 = 16.00 yC4 = 0.23vC5 = fC5C5 = 18.32 yC5 = 0.26vC6 = fC6C6 = 7.63 yC6 = 0.11V = k vk = 70.07 k yk = 1.00
(b) P = 6017.326 mmHg
Q2:
(b) Minimum units = 4 process streams + 2 utilities - 1 = 5
Q3:
(a) Total head loss = 100 when Q =100 m3/h
(c) Q = 64 m3/h; H = 230 m; Power = 44.1232 kW
Q4:
(a) Hot utility = 760 kW Hot stream pinch temperature = 145 C
Cold utility = 960 kW Cold stream pinch temperature = 125 C
-
SPRING SEMESTER 2008-2009
Q1:
(a) Nmin = 9
(d) Flow rate of hot oil = 0.03 kg/s
Flow rate of Cooling water = 13.55 kg/s
Q2:
(a) ROI =0.28 PBP = 2.71 yr
(b) ny = 5 yr
Q3:
(b)
(i)
Tmin 55. CHot Pinch 159. CCold Pinch 104. CQ hot(min) 21.799 MWQ cold(min) 16.037 MW
(ii) Annualised capital cost = $279876
Cost of Hot Utility= $ 65397
Cost of Cool Utility= $ 16037
(iii) T optimum = 55 oC
Q5:
(a) 5 shells
(b) Ft = 0.7841
(c) 1713 m2