3
PLANT DESIGN (H82PLD) SPRING SEMESTER 2006-2007 Q2: (a) Hot utility = 40kW Hot stream pinch temperature = 480 ºC Cold utility = 106 kW Cold stream pinch temperature = 460 ºC Q3: N m = 4.31 R min = 0.425 R=1.3R min = 0.552508767 N = 2 N m = 8.618016408 Q4: (a) Hot utility = 90kW Hot stream pinch temperature = 260 ºC Cold utility = 50 kW Cold stream pinch temperature = 240 ºC Q5: (a) v C3 = f C3 ξ C3 = 15.22 y C3 = 0.48 v C5 = f C5 ξ C5 = 9.00 y C5 = 0.29 v C6 = f C6 ξ C6 = 7.33 y C6 = 0.23 V = Σv k = 31.55 (b) T = 122.9ºC

description

jkb

Transcript of Answer for PLD Final Exams

  • PLANT DESIGN (H82PLD)

    SPRING SEMESTER 2006-2007

    Q2:

    (a) Hot utility = 40kW Hot stream pinch temperature = 480 C

    Cold utility = 106 kW Cold stream pinch temperature = 460 C

    Q3:

    Nm = 4.31

    Rmin = 0.425

    R=1.3Rmin = 0.552508767

    N = 2 Nm = 8.618016408

    Q4:

    (a) Hot utility = 90kW Hot stream pinch temperature = 260 C

    Cold utility = 50 kW Cold stream pinch temperature = 240 C

    Q5:

    (a)

    vC3 = fC3C3 = 15.22 yC3 = 0.48vC5 = fC5C5 = 9.00 yC5 = 0.29vC6 = fC6C6 = 7.33 yC6 = 0.23V = vk = 31.55

    (b) T = 122.9C

  • SPRING SEMESTER 2007-2008

    Q1: (a)

    vC2 = fC2C2 = 9.73 yC2 = 0.14vC3 = fC3C3 = 18.39 yC3 = 0.26vC4 = fC4C4 = 16.00 yC4 = 0.23vC5 = fC5C5 = 18.32 yC5 = 0.26vC6 = fC6C6 = 7.63 yC6 = 0.11V = k vk = 70.07 k yk = 1.00

    (b) P = 6017.326 mmHg

    Q2:

    (b) Minimum units = 4 process streams + 2 utilities - 1 = 5

    Q3:

    (a) Total head loss = 100 when Q =100 m3/h

    (c) Q = 64 m3/h; H = 230 m; Power = 44.1232 kW

    Q4:

    (a) Hot utility = 760 kW Hot stream pinch temperature = 145 C

    Cold utility = 960 kW Cold stream pinch temperature = 125 C

  • SPRING SEMESTER 2008-2009

    Q1:

    (a) Nmin = 9

    (d) Flow rate of hot oil = 0.03 kg/s

    Flow rate of Cooling water = 13.55 kg/s

    Q2:

    (a) ROI =0.28 PBP = 2.71 yr

    (b) ny = 5 yr

    Q3:

    (b)

    (i)

    Tmin 55. CHot Pinch 159. CCold Pinch 104. CQ hot(min) 21.799 MWQ cold(min) 16.037 MW

    (ii) Annualised capital cost = $279876

    Cost of Hot Utility= $ 65397

    Cost of Cool Utility= $ 16037

    (iii) T optimum = 55 oC

    Q5:

    (a) 5 shells

    (b) Ft = 0.7841

    (c) 1713 m2