Annual Report - Mass.Gov · 8/30/2017 · The Massachusetts Clean Water Trust (the Trust), in...
Transcript of Annual Report - Mass.Gov · 8/30/2017 · The Massachusetts Clean Water Trust (the Trust), in...
Office of the State TreasurerExecutive Office of Administration and Finance
Massachusetts Department of Environmental Protection
2016 Annual Repor t
Table of ConTenTs
Message from the Chair.........………………………………….....................i
Introduction…………………………………………………………..................1
Clean Water SRF Annual Summary…………………………......................2
Drinking Water SRF Annual Summary…………………….........................8
SRF Financial Summary……………………………………….......................16
Appendices………………………………………………………….................20
September 30, 2016
The Massachusetts Clean Water Trust (the Trust) is pleased to submit its Clean Water and Drinking Water State Revolving Fund (SRF) Annual Report for State Fiscal Year (SFY) 2016.
The Trust is a collaborative effort between the Office of the State Treasurer, the Executive Office for Administration and Finance, and the Massachusetts Department of Environmental Protection (MassDEP). The Trust’s leveraged financing program maximizes the impact of available funds throughout the Commonwealth. To date, the Trust has used approximately $2.3 billion in federal grants and state matching funds to finance nearly $6.7 billion in clean water and drinking water planning and construction projects.
As our water infrastructure continues to age, there is no better time for municipalities to invest in protecting the health of their citizens and the environment, while simultaneously creating economic development within their communities. In order to achieve these goals, easy access to financing is essential. The Trust continues to do its part by providing subsidized loans backed by its AAA credit.
In SFY 2016, the Trust provided approximately $241 million in commitments for low interest rate loans to cities and towns in the Commonwealth. This commitment amount will support an estimated 1,440 construction and engineering jobs. The financing improves the quality of the state’s waterways and protects public health through such projects as combined sewer overflow removal, wastewater treatment plant upgrades, sewer system construction and rehabilitation, septic system repairs, drinking water treatment facilities, treated water storage and water main replacement and rehabilitation.
This year, in addition to issuing its second Green Bond series, the Trust has taken an active role assisting public schools in eliminating lead in drinking water. The Board of Trustees has authorized $2 million be set aside for testing and technical training for school districts to identify any lead contamination that might exist. Allocating these funds is the first step in ensuring that the drinking water in public schools in Massachusetts is safe for our children. Once results are received the Trust anticipates being part of the solution going forward.
I would like to take this opportunity to thank the staff of the Environmental Protection Agency Region 1 for all of their efforts during SFY 2016. I would also like to thank the staff of the Trust and at MassDEP for a job well done. Without the combined efforts of these organizations, these important projects we are doing in the Commonwealth would not be possible.
Finally, I would like to thank our borrowers, the cities and towns. Without their dedication to protecting the environment and public health of their citizens, the program would not be a success.
Thank you and I look forward to continuing this essential work.
Sincerely,
Deborah B. GoldbergChairMassachusetts Clean Water Trustwww.mass.gov/treasury
M E S S A G EfRoM THe CHaIR
2016 SRF ANNUAL REPORT | 1
InTRoduCTIonThe Massachusetts Clean Water Trust (the Trust), in partnership with the Massachusetts Department of Environmental Protection (MassDEP) provides cities and towns of the Commonwealth with low interest rate loans for water infrastructure projects. MassDEP manages project development and approval while the Trust manages the flow of money to the communities. Each year, MassDEP prepares the Intended Use Plan (IUP) of projects as required by the Environmental Protection Agency (EPA). This IUP establishes the Commonwealth’s project priorities for the upcoming year. This is accomplished through two programs – the Clean Water State Revolving Fund (SRF) and the Drinking Water State Revolving Fund. The EPA requires reporting on both of the programs through the Clean Water SRF Annual Report and the Drinking Water SRF Biennial Report. These reports have been combined into this report, which covers the State Fiscal Year (SFY) ending June 30, 2016. An estimated 97% of Massachusetts citizens have benefited from these essential projects. In SFY 2016, the Trust provided binding commitments for 36 clean water projects, including the Community Septic Management Program (CSMP), totaling $191 million and 14 drinking water projects totaling $49 million.
The SRF loan program receives funding from the EPA in the form of an annual grant, supplemented by state matching funds and the repayment of loans from borrowers. In addition, the Trust issues bonds guaranteed by pledged assets that are funded by federal and state grants. The Trust’s
lending and bond issuance programs are structured in such a way as to ensure adequate cash flows to fund its loans and to repay its bonds to maturity. The Trust’s bonds are secured by a combination of pledged sources which include loan repayments, contract assistance from the Commonwealth and interest
earnings on debt service reserve funds. The “SRF Financial Summary” section provides additional details on the financial management activities and most recent bond issue of the SRF program.
Since its inception in 1989, the SRF loan program has provided over $6 billion in loans to nearly 300 borrowers to improve and maintain the quality of water in the Commonwealth.
This report covers the State Fiscal Year ending June 30, 2016
2016 SRF ANNUAL REPORT | 2
2016 Clean Water Program ResultsIn 2016, the Trust continued to expand its program by providing new commitments of $191 million in financing for 36 loans to communities across the Commonwealth. Of the 36 loans, 5 were provided to the Community Septic Management Program (CSMP). The CSMP provides low interest financing to Massachusetts’ cities and towns to assist homeowners in the repair of failed septic systems.
Interim Loans The Trust makes funds available to eligible projects on the IUP through its Interim Loan Program year round. Borrowers can enter into a short term loan that enables projects to proceed prior to a Trust bond sale. The Trust is capable of funding a project prior to a bond sale by extending the use of program equity funds as a source of capital. The interest is accrued monthly on the basis of the balance drawn on the construction account. The interest rate is set at one-half of the one year Massachusetts Municipal Depository Trust (MMDT) rate. The average interest rate charged in SFY 2016, accruing only on drawn funds, was 0.13%. During SFY 2016, the Board of Trustees voted to eliminate the interest rate as of April 1, 2016. All interim loans approved from that date on will not accrue interest, making borrowing from the Trust even less expensive. In the SFY, 93 projects had drawn $144.0 million of interim loan funds.
Extended Term Financing As in previous years, the Trust continues to offer extended term financing up to 30 years to its participants. Extended term financing is available for Clean Water projects that can demonstrate the project’s useful life is at least as long as the term of the loan. The term can be extended to a maximum of thirty years.
DisbursementsDuring 2016, the Trust disbursed $215.7 million for clean water projects to various local governmental entities through the program project funds and interim loans. Of this amount, $3.3 million was disbursed in the form of additional subsidy with repayment not required, to either “Renewable Energy” projects or “Environmental Justice” communities.
Administrative Expenses For SFY 2016, $3.4 million of annual Clean Water SRF grant administration funds were spent by MassDEP. This consisted of $3.2 million in federal funds and $0.2 million in state matching funds. These costs were associated with construction management of the Clean Water SRF program. An additional amount of $3.5 million was spent from the
Clean WaTeR sRf annual suMMaRy
SFY 2016 Clean Water Disbursements
Amount# of
Loans
Interim Loans $144,028,419 93
Program Project Funds 71,683,411 44
Total $215,711,829 137
Clean Water Grant Awards
SFY 2016 Grant Awards
Program to date Grant Awards
Federal $47,360,000 $1,420,610,761
State 9,472,000 257,510,692
Total $56,832,000 $1,678,121,453
Massachusetts continues to finance projects that focus on rehabilitation of wastewater infrastructure, which promotes sustainability and smart growth principles. The SRF program provides additional subsidies to designated low-income environmental justice communities, and continues to perform outreach activities to help borrowers realize opportunities to implement energy efficiencies and alternative energy projects.
2016 SRF ANNUAL REPORT | 3
Trust’s Administrative Fund to supplement MassDEP administrative costs for both the Clean and Drinking Water programs as well as fund the administrative costs of the Trust. Clean Water Trust Chair Treasurer Goldberg, along with Trustees Secretary of Administration and Finance Lepore and MassDEP Commissioner Suuberg, voted to fund a MassDEP-led effort to test for lead and copper contamination in the drinking water of public schools across the Commonwealth. The Board approved $2.0 million to provide technical assistance to train school personnel to identify drinking water sources in their facilities, to collect samples under a specified protocol, and to transport the samples to approved laboratories for analysis. The intent of the survey is to identify at-risk buildings and student populations, and work toward mitigation measures to eliminate the contamination sources.
American Iron and Steel MassDEP has incorporated the American Iron and Steel (AIS) requirements into its Loan Application and Plans and Specifications Package. The necessary language has also been added into the Project Regulatory Agreement and the Financing Agreement. All projects during the reporting period were subject to the AIS requirements because all projects had Plans and Specifications submitted or contracts finalized after the AIS effective date of January 17, 2014.
Federal Funding Accountability and Transparency Act In compliance with the Federal Funding Accountability and Transparency Act (FFATA), the Trust reports recipient or sub-recipient awards for any amount equaling $25,000 or greater in the FFATA Sub-award Reporting System (FSRS) at www.fsrs.gov. The loans used by the Trust for FFATA Reporting can be found in the Appendices to this report.
Green Project Reserve For 2014, Congress required that at least 10 % of the federal grant be dedicated to Green Infrastructure (GI) projects or components as defined by USEPA. For Massachusetts, this required that an estimated $4.8 million be allocated towards GI projects. Twelve projects had ‘green’ components that would potentially count toward that goal. Eight of those projects are under construction, with $1.5 million in Green Infrastructure realized thus far.
In 2015, the 10% Green Infrastructure target is $4.6 million. Three projects have proposed GI components with a total value of $52 million. One of those projects, an ‘organics to energy’ facility, is entirely Green, with an estimated project value of $25 million. The 2015 projects are not yet under construction.
Under the Fiscal Year 2016 Omnibus Appropriations Bill, Congress again requires that at least 10% of the federal grant be used to fund GI. For Massachusetts, this requires that an estimated $4.4 million be allocated towards GI projects. For 2016, MassDEP has identified and highlighted 16 new projects with a total value of over $200 million that meet EPA guidelines for Green Infrastructure. Most of these projects are not entirely green; therefore, determining the exact value of the green portions of the project is not yet possible. The total value of green components of those projects will be determined when detailed project applications are submitted. MassDEP expects to meet the minimum $4.4 million that EPA requires be allocated towards Green Infrastructure projects.
Until each construction cycle is completed, the true GI costs cannot be calculated for any one year. Acknowledging that these are Local and not State projects, we stipulate that not all IUP-listed projects go forward and not all projects that propose Green components at the outset end up incorporating GI into the final construction. The final decision on whether to proceed with a project, or whether to pursue green infrastructure elements, rests with the local Borrower. The State has no ability to compel the Local government to accept SRF financing.
2016 SRF ANNUAL REPORT | 4
2016 Federal Grant Projects Receiving Additional Subsidy
Borrower Project Loan # Project CostPrincipal
ForgivenessExpended
Amount
Brockton Sewer Rehab CWP-15-22 $ 1,401,693 $ 44,999 $ -
Chicopee Sewer Separation-Area 5 Ph A
CWP-15-23 12,405,179 398,251 -
Gardner WWTP Upgrade CWP-15-21 4,580,286 147,044 -
GLSD Organics to Energy CWP-15-15 24,888,064 798,997 28,830
GLSD(RE) Organics to Energy CWP-15-15 24,888,064 798,997 -
GLSD CSO Abatement Program CWP-15-16 9,029,369 289,875 -
Great Barrington
WWTF Upgrades&Sewer Improv.
CWP-15-24 4,731,194 151,888 -
Lynn Water and Sewer Commission
WWTP Incinerator Upgrade CWP-15-01 5,268,266 169,130 -
Norwood Underdrain Area Sewer Rehab
CWP-15-08 2,285,644 73,377 -
Quincy Pump Sta. Renovation CWP-15-06 3,754,561 120,535 120,535
Revere Sewer Rehab CWP-15-29 11,263,713 361,606 -
Saugus SSO Reduction Subsystem 4 CWP-15-07 1,855,109 59,556 59,556
Worcester Lake Ave. Sewer Rehab CWP-15-02 2,670,821 85, 743 -
Total $ 109,021,963 $ 3,500,000 $ 208,921
Additional Subsidy The Water Resources Reform and Development of 2014 (WRRDA) allowed States to use up to 30% of the 2015 CWSRF grant to enhance the subsidy of loans. Massachusetts chose to apply these funds to communities that meet the Environmental Justice (EJ) income threshold of below 65% of the state’s median household income and for renewable energy projects. This targets the subsidy to lower income communities across the Commonwealth as well as providing subsidy for renewable energy projects that would typically have lengthy payback periods without the subsidy. Massachusetts provides the subsidy to the communities in the form of principal forgiveness. During the
reporting period, Massachusetts provided the subsidy to thirteen clean water projects. Each project received an equivalent of 3.2% of the project cost as additional subsidy. Greater Lawrence received a bonus subsidy in consideration of the proposal being both an environmental justice and renewable energy project.
The funds used as additional subsidy are the first dollars drawn against the project. As of SFY 2016, $0.2 million of the additional subsidy from the 2015 grant has been disbursed. The remaining funds should be disbursed within the next few months. As a follow up to the 2015 Annual Report, all of the additional subsidy funds from the 2014 grant have been fully expended.
2016 SRF ANNUAL REPORT | 5
2016 Clean Water Leveraged Program The Trust program is leveraged by issuing bonds to increase capacity to be able to issue more loans. Federal and state grants are pledged to secure the bonds by either funding reserve funds or pledged direct loans or a combination of both. Since 2002, the Trust has provided loans to communities at a 2% interest rate. As the effective market interest rate on the bonds is higher than the 2% loan rate, borrowers receive a subsidy equal to the difference between the rates. Debt service on the Trust’s SRF bonds is paid from a combination of three sources: borrower loan principal and interest repayments, interest earnings on the debt service reserve funds, and subsidy payments provided by the Commonwealth, known as contract assistance. Further discussion of the Trust’s leveraged financing program can be found in the “The Financial Summary” sections.
Borrower Repayments Each borrower is obligated to repay the principal amount of its loan at a subsidized interest rate of 2% or less. Although those with extended term financing, greater than 20 years, may have a subsidized interest rate somewhat higher than 2%. In SYF 2016, borrower principal and interest loan repayments accounted for approximately 71.5% of debt service, totaling $206.7 million. Since 2012, the Trust has pledged certain direct loans that it makes from its program equity funds as additional security for its series of revenue bonds, rather than utilizing a traditional reserve fund. The interest the Trust receives from the pledged direct loans is used to pay a portion of debt service, while the principal payments received are available as additional security and recycled back to SRF program funds
after debt service obligations have been met. As of June 30, 2016, the Trust has $277.4 million of pledged direct loans outstanding.
Reserve Fund Interest Earnings Reserve funds, or pledged direct loans, are held as security for all Trust bonds at an amount between 33% and 50% of the outstanding principal. As of June 2016, the Trust held $703.8 million in clean water reserve funds invested in guaranteed investment contracts (GIC), and US Treasury and Agency obligations. Earnings on these investments are applied to pay a portion of the debt service on the related series of SRF bonds. In SFY 2016, reserve fund earnings applied to current debt service payments accounted for 12.8% of debt service, totaling $36.9 million. As bonds are repaid, reserve funds are released and returned to the Clean Water Equity Fund. In SFY 2016, $69.7 million was released to the Clean Water Equity Fund, and made available for new loans.
Commonwealth Contract Assistance The Commonwealth has entered into an agreement with the Trust for contract assistance payments to subsidize debt service on the SRF bonds. Contract assistance is appropriated annually in the Commonwealth’s operating budget. To date, the Trust has received $957.6 million in Clean Water contract assistance with a future commitment of $252.5 million, for a total commitment by the Commonwealth of $1.2 billion. In SFY 2016, Commonwealth contract assistance accounted for approximately 15.7% of debt service, totaling $45.2 million in assistance applied.
Total Sources of Revenue for CWSRF SFY 2016
2016 SRF ANNUAL REPORT | 6
Clean WaTeR PRojeCTs
Greater Lawrence Sanitary District (GLSD)Organics to energy. $24.88 mm
Massachusetts DEP recently passed a ban on disposing of commercial organic waste material in landfills or at waste incineration facilities. In June 2013, GLSD and consultant CDM Smith developed the Organics to Energy Feasibility Study, outlining a three- phase program of Wastewater Treatment Facility upgrades recommended to achieve co-digestion of organic food waste with the facility’s wastewater sludge.
In October 2014, the GLSD began Phase 1 improvements intended to control digester foaming incidents, thereby allowing the anaerobic sludge digestion operation to be expanded to co-digestion in Phase 2. Phase 2 will include:• Biogas metering system upgrade;• Addition of a waste blending tank and mixing system to facilitate
acceptance of organic material;• Addition of high pressure digester feed pumps to handle organic
material; and• Four to five month pilot testing program for operating co-digestion
system.
Phase 3 will include the installation of additional digester gas storage and combined heat and power (CHP) processes. If successful, GLSD will have the potential to produce enough electricity to virtually remove its reliance on the electrical grid, and the additional gas storage included in Phase 3 will further reduce GLSD’s reliance on natural gas.
The Massachusetts SRF program continues to meet the goals established in the annual IUP. As outlined in the IUP, all SRF projects are subject to the rigorous environmental review procedures of the Massachusetts Environmental Policy Act.The Clean Water SRF provides loans for a wide variety of projects. The primary recipients of Clean Water loans have been combined sewer overflow, wastewater treatment, and wastewater collection projects. Other projects such as drainage improvement, landfill closure, brownfields remediation, renewable energy, and non-point source pollution projects are eligible for financing.
2016 SRF ANNUAL REPORT | 7
PlymouthEmergency Repairs. $48.2 mm
This project is for emergency sewer forcemain repair and replacement in the Town of Plymouth. In the winter of 2015/2016, catastrophic failure of sewer infrastructure in several locations created a public health emergency requiring immediate action to correct excessive deterioration of the 30 inch ductile iron forcemain. The Town of Plymouth was authorized for $48.2 million
in emergency funding from the Clean Water SRF. Funds are used for emergency response and creation of a bypass system, slipline and replacement of forcemain, and construction of a redundant 24” sewer forcemain.
FalmouthSewer Upgrades. $39.5 mm
The Maravista/Little Pond area of Falmouth has been recommended for sewering since the Town’s 1981 Wastewater Facilities Plan, which was updated in 2001. The 2006 Total Maximum Daily Load Analysis (TMDL) developed under the Massachusetts Estuaries Project recommends 100% sewering of this watershed to achieve the TMDL limits for nitrogen. The area is densely developed, primarily with very small lots, and high groundwater. The Town’s CWMP cites 20% of the properties have septic systems newer than 1995, and a large percentage of those are cesspools. On-site wastewater systems do not effectively remove nitrogen from effluent, and are thus considered to be significant contributors to coastal water degradation. Under this project, sewering will be done in 3 multi-year contracts, encompassing approximately 1500 parcels.Additionally, the project will address the current effluent discharge requirements of the NPDES permit, which the plant cannot currently meet. Facility upgrades and improvements are needed at the plant, primarily to meet the nitrogen limit, which requires an average annual total nitrogen effluent limit of 3.0 mg/L.
2016 SRF ANNUAL REPORT | 8
dRInkIng WaTeR sRf annual suMMaRy
2016 Drinking Water Program Results In 2016, the Trust continued to expand its program by providing new commitments of approximately $49.0 million in funding for 14 loans to communities across the Commonwealth.
Interim Loans The Trust makes funds available to eligible projects on the IUP through the Interim Loan Program year round. Borrowers can enter into a short term loan that enables projects to proceed during the time prior to a Trust bond sale. The Trust is capable of funding a project prior to a bond sale by extending the use of program equity funds as a source of capital. The interest is accrued monthly on the basis of the balance drawn on the construction account. The interest rate is set at one-half of the one year Massachusetts Municipal Depository Trust (MMDT) rate. The average interest rate charged in SFY 2016, accruing only on drawn funds, was 0.13%. During SFY 2016, the Board of Trustees voted to eliminate the interest rate as of April 1, 2016. All interim loans approved from that date on will not accrue interest, making borrowing from the Trust even less expensive . In the SFY, 32 projects had drawn $60.7 million of interim loan funds.
Massachusetts continues to support protection of public health by ensuring that all of its public water suppliers have the necessary technical, financial, and managerial capacity to meet the current and foreseeable Safe Drinking Water Act requirements. The program continues to promote the completion of cost-effective projects that maximize protection of public health.
Drinking Water Grant Awards
SFY 2016 Grant Awards
Program to date Grant Awards
Federal $16,333,000 $495,019,100
State 3,266,600 88,560,620
Total $19,599,600 $583,579,720
Extended Term Financing In SFY 2016, the Trust was able to offer extended term financing up to 30 years to its participants. The extended term financing is available to any project that can demonstrate a useful life to match the term of the loan. This is the first time in the Drinking Water program’s history that extended term financing has been available and has made financing larger infrastructure projects less burdensome on borrowers.
Disbursements During 2016, the Trust disbursed $107.7 million for drinking water projects to various local governmental entities through the program project funds and interim loans. Of this amount, $2.8 million was disbursed in the form of additional subsidy with repayment not required to either “Renewable Energy” projects or “Environmental Justice” communities.
American Iron and Steel As with the Clean Water Program, MassDEP has incorporated the American Iron and Steel (AIS) requirements into its Loan Application and Plans and Specifications Package. The necessary language has also been added into the Project Regulatory Agreement and the Financing Agreement. All projects during
SFY 2016 Drinking Water Disbursements
Amount# of
Loans
Interim Loans $60,650,990 32
Program Project Funds 47,037,012 35
Total $107,688,002 67
2016 SRF ANNUAL REPORT | 9
The total DWSRF funds expected to be available for 2016 is $124,221,000. Fifteen percent of that amount is $18,633,150. The Final IUP list contains 5 small system projects totaling $17,208,000, including one Eastham project for $17,114,000. There were an insufficient number of applications from small systems to achieve the 15% goal. MassDEP elevated all of the small systems to the IUP in order to come as close to the goal as possible.
Going forward, the Trust will continue to attempt to comply with the new interpretation of the small systems requirement. The MassDEP Drinking Water program does significant outreach to small systems throughout the Commonwealth through the 2% Small Systems Technical Assistance set aside, which stresses the availability and use of the SRF as a low cost source of financing. Even with these efforts to reach and recruit small systems, the Trust is concerned that in most years, there may not be sufficient applications to make up 15% of the total assistance provided.
Additional Subsidy Massachusetts was required to provide a minimum of $3.2 million in additional subsidy from the 2016 grant. This additional subsidy is provided to communities that would not otherwise be able to afford the project. Massachusetts chose to apply these funds to communities that meet the Environmental Justice (EJ) income threshold of below 65% of the state’s median household income and for renewable energy projects. This targets the subsidy to lower income communities across the Commonwealth as well as providing subsidy for renewable energy projects that would typically have lengthy payback periods without the subsidy. Massachusetts provides the subsidy to the communities in the form of principal forgiveness. During this reporting period, Massachusetts provided the required minimum amount of subsidy to ten drinking water projects. Each project received an equivalent of about 4.3% of the project cost as additional subsidy.
The funds used as additional subsidy are the first dollars drawn against the project. As of SFY 2016, $0.9 million of the additional subsidy from the 2015 grant has been disbursed. The remaining funds should be disbursed within the next few months. As a follow up to 2015 Annual Report, all of the additional subsidy funds from the 2014 grant have been fully expended.
the reporting period were subject to the AIS requirements because all projects had Plans and Specifications submitted or contracts finalized on or after the January 17, 2014 AIS effective date.
Federal Funding Accountability and Transparency ActIn compliance with the Federal Funding Accountability and Transparency Act (FFATA), the Trust reports recipient or sub-recipient awards for any amount equaling $25,000 or greater in the FFATA Sub-award Reporting System (FSRS) at www.fsrs.gov. The loans used by the Trust for FFATA Reporting can be found in the Appendices to this report.
Small SystemsFor a number of years, the Trust has been providing financing to small systems in the amount of at least 15% of the federal grant, with the concurrence of EPA Region 1. In 2016, EPA changed its interpretation of the small systems requirement from 15% of the federal grant to 15% of the total amount of assistance provided. This change in interpretation has a large effect on the Massachusetts program.
The 2014 IUP was released before the change in interpretation of the small systems requirement. The 2014 IUP listed four projects totaling $3.58 million, which was in excess of 15% of the federal grant. Taking into account the projects on the extended PPL, the total value of all small systems applications was $5.14 million. With a total IUP cost of $126.4 million, the 15% small systems requirement is $18.96 million. Even if every project on the PPL proceeded to construction, the 15% requirement could not be met.
In 2015, MassDEP received small system applications from 7 communities totaling $20.0 million. One large project (Eastham) made up $16.0 million of the request, thus meeting the 15% requirement of $16.0 million by itself. Eastham is establishing a water distribution system for the first time with an overall expected cost of $125 million. The first phase of this project is $45.0 million, to be phased over three years. The Eastham project should provide small system expenditures to help meet the requirement for the next several years.
2016 SRF ANNUAL REPORT | 10
2016 Federal Grant Projects Receiving Additional SubsidyBorrower Project Loan # Cost
Principal Forgiveness
Expended Amount
Brockton Water Main Improvements
DWP-15-06 $ 3,513,471 $ 149,175 $ -
Eastham Water System Phase I DWP-15-01 24,985,403 1,060,829 -
Eastham Water System Phase I DWP-15-01A 3,514,597 149,223 - Eastham Water System Phase I DWP-16-02 10,863,982 461,262 - Fall River Water Main
Improvements DWP-15-10
3,365,071 142,874 -
Fall River WTP Improvements DWP-15-11 1,015,919
43,134 -
Falmouth Long Pond WTF DWP-15-02 16,000,000 679,327 679,327 Falmouth Long Pond WTF DWP-16-01 8,658,900 367,639 - New Bedford
Transmission Main Improv. DWP-15-03 4,323,792
183,579 183,579
Plainville Tank Rehab DWP-15-09 696,150 29,557 - Total $76,937,285 $ 3,266,600 $ 862,906
2016 SRF ANNUAL REPORT | 11
2016 Drinking Water Leveraged Program The Trust program is leveraged by issuing bonds to increase capacity to be able to issue more loans. Federal and state grants are pledged to secure the bonds by either funding reserve funds or pledged direct loans or a combination of both. Since 2002, the Trust has provided loans to communities at a 2% interest rate. As the interest rate on the bonds is higher than the 2% loan rate, borrowers receive a subsidy equal to the difference between the rates. Debt service on the Trust’s SRF bonds is paid from a combination of three sources: borrower loan principal and interest repayments, interest earnings on the debt service reserve funds, and subsidy payments provided by the Commonwealth, known as contract assistance.
Borrower Repayments Each borrower is obligated to repay the principal amount of its loan at a subsidized interest rate of 2% or less. The newly implemented extended term borrowing has a subsidized interest rate above 2% based upon market rates at the time of financing. In SFY 2016, borrower principal and interest loan repayments accounted for approximately 79.0% of debt service, totaling $70.1 million. Since 2012, the Trust has pledged certain direct loans that it makes from its program equity funds as additional security for its series of revenue bonds, rather than utilizing a traditional reserve fund. The interest the Trust receives from the pledged direct loans is used to pay a portion of debt service, while the principal payments received are available as additional security and recycled back to SRF program funds after debt service obligations have been met. As of June 30, 2016, the Trust has $117.4 million of pledged direct loans outstanding.
Reserve Fund Interest Earnings Reserve funds, or pledged direct loans, are held as security for all Trust bonds at an amount between 33% and 50% of the outstanding principal. As of June 2016, the Trust held $160.8 million in drinking water reserve funds invested in guaranteed investment contracts and US Treasury and Agency obligations. Earnings on these investments are applied to pay a portion of the debt service on the related series of SRF bonds. In SFY 2016 reserve fund earnings applied to current debt service payments accounted for 9.9% of debt service, totaling $8.7 million. As bonds are repaid, reserve funds are released and returned to the Drinking Water Equity Fund. In SFY 2016, $22.5 million was released to the Drinking Water Equity Fund, and made available to be applied to new loans.
Commonwealth Contract AssistanceThe Commonwealth has entered into an agreement with the Trust for contract assistance payment to subsidize debt service on the SRF bonds. Contract assistance is appropriated annually in the Commonwealth’s budget. To date, the Trust has received $136.8 million in drinking water contract assistance with a future commitment of $70.7 million, for a total commitment by the Commonwealth of $207.5 million. In SFY 2016, Commonwealth contract assistance accounted for approximately 11.1% of debt service, totaling $9.8 million in assistance applied.
Total Sources of Revenue for DWSRF SFY 2016
2016 SRF ANNUAL REPORT | 12
supervision and other drinking water program activities. Some highlights of the programs in SFY 2016 include: Sanitary Survey Program – MassDEP Drinking Water staff is responsible for evaluating the technical, financial and managerial capability of Community, Non-Transient Non-Community and Transient Non-Community PWS. During the last year the drinking water staff has completed 370 evaluations on existing systems. See Figure 1 below for breakdown of system types.
Operator Certification - MassDEP has a very active operator certification program. The program activities have been integrated into daily staff activities. Program activities range from chairing the Board of Certification of Drinking Water Operators to providing general and specialized training of, and guidance for, drinking water operators at all levels.
Wellhead Protection Program – Technical assistance was provided to water supply systems for wellhead protection compliance, the development of protection plans, and for determining monitoring waiver eligibility.
Capacity Development - During the course of conducting sanitary surveys on public water systems, DEP staff identified 1,165 technical, financial, or managerial deficiencies and provided corrective action assistance to ensure compliance. MassDEP’s Capacity Development strategy focuses on improving the technical, financial, and managerial operations of both new and existing public water systems in the Commonwealth.
Drinking Water Set-Asides MassDEP continues to use set-aside funds as outlined in the annual IUP. The following sections describe the basic programs and accomplishments.
4% Set-Aside: Administration MassDEP uses eight (8) full time equivalent (FTE) staff members to administer the Drinking Water SRF program. These FTEs utilize 4% set-aside funding to accomplish the following tasks: developing program selection criteria, application ranking and rating, project development, construction inspections, invoice payment, data management and administrative support functions.
2% Set-Aside: Small System Technical Assistance Municipal Services Support - MassDEP uses two (2) FTEs to support Municipal Services. These FTEs provide training and technical assistance (compliance and operational issues) to small systems throughout Massachusetts. During the past year, MassDEP also worked with outside training and technical assistance providers. The Massachusetts Rural Water Association, United States Department of Agriculture (Rural Development), and US EPA Environmental Finance Center also provided training to public water suppliers.
Contract Services - MassDEP signed an Inter-Agency Service Agreement (ISA) with the University of Massachusetts – Amherst. The ISA required UMass to provide Technical Assistance and Training and Outreach on a variety of topics including (but not limited to): Very Small System Operator Training, Opening and Closing a Seasonal System, Total Coliform Rule (RTCR), Manganese, Annual Statistical Reporting and Regulatory Updates, pump and motor maintenance, rate setting, board training, public relations, disinfection, sampling and exam review. The ISA also included funding from the 15% set-aside.
10% Set-Aside: State Program Management Mass DEP used approximately twelve (12) FTEs to administer the state drinking water program. These FTEs utilize 10% set-aside funding for Public Water System support, including the following programs: Sanitary Survey, Source & Wellhead Protection, Emergency Response, Capacity Development, Operator Certification, Consumer Confidence Report assistance, adoption and implementation of new regulations, evaluation and maintenance of existing federal rules, planning, outreach, eDEP and data management, engineering and construction supervision, compliance
MassDEP Sanitary Surveys Completed SFY 2016Type of Public Water System Total # of
Surveys Completed
Community Systems 167Non-Transient Non Community Systems 29Transient Non Community System 174
Totals 370
Figure 1:
2016 SRF ANNUAL REPORT | 13
15% Set-Aside: Local AssistanceMassDEP used sixteen (16) FTEs from the 15% local assistance set-aside to support the Public Water System Supervision programs, including sanitary surveys, adoption and implementation of new regulations, registration of new systems, evaluation and maintenance of existing federal rules, planning, outreach, data management, engineering and construction supervision. Some highlights of the programs in 2016 include:
Source Protection Support - Work includes the registration of new public water systems (see Figure 2), continuing the implementation and monitoring of the chemical monitoring waiver program which provides incentive to do source protection as well as promoting preparedness and sustainability. Source protection technical assistance was provided during the 370 sanitary surveys that were completed throughout the year.
Contract Services - MassDEP has contracted fund Information Technology (IT) staff to assist with data management support for public water systems and implementation of the Safe Drinking Water Act programs. Key activities include reporting, program evaluation and database maintenance and improvement.
MassDEP Registration of New Small Public Water Systems SFY 2016
Type of Public Water System Total # of Systems
Community Systems 2Non-Transient Non Community Systems 1Transient Non Community System 6Totals 9
Figure 2:
2016 SRF ANNUAL REPORT | 14
dRInkIng WaTeR PRojeCTs
The Massachusetts Drinking Water SRF program continues to meet the goals established in the annual IUP. As outlined in the IUP, all SRF projects are subject to the rigorous environmental review procedures of the Massachusetts Environmental Policy Act. Drinking Water projects typically involve construction and/or rehabilitation of drinking water treatment plants, replacement of aging water mains, and construction of drinking water storage facilities.
Bellingham Water Treatment FacilitiesWater Treatment Facility. $14.2mm
This $14.0 million project includes the construction of a new water treatment plant at Wrentham Road, improvements to the existing Harford Ave Water Treatment Plant, and new transmission mains for connecting wells to the treatment facilities. The project will increase the overall quality of the town’s water supply by providing required disinfection, compliance with the Groundwater Rule and removal of manganese and iron that is present in existing source water.
Auburn Water DistrictWater Treatment Facility Upgrades. $2.7mm
This $2.7 million project addresses elevated levels of iron, manganese and arsenic in the source water. Arsenic levels in 2 wells exceed the MCL of 0.010 mg/L, and iron and manganese levels are above SCMLs. In 2012, samples from the West Street Wells (combined water) were 0.021 mg/L. These wells were taken off line in May 2013 until arsenic removal upgrades can be completed. The District is using pressure filtration and polyphosphate addition to sequester the metals, treating approximately 1.5 mgd.
2016 SRF ANNUAL REPORT | 15
Falmouth Long Pond WTPEnhanced Water Treatment. $42.2mm
The construction of the new treatment facility for Long Pond is a $42.2 million undertaking. The Town of Falmouth currently relies on Long Pond for 50 to 60% of its water supply needs. The Long Pond Water Treatment Facility (WTF) operates under a filtration waiver and only provides chlorination and pH adjustment. Increasing algae blooms in Long Pond and organic loading from the surrounding forest are resulting in degraded water quality. The Town also has an extension to install a second disinfection method to comply with Long Term 2 (LT2) of the EPA’s Enhanced Surface Water Treatment Rule. The Town has also exceeded a trihalomethane (THM) limit under the Disinfection By-Products Rule. The Town must invest significant money to comply with LT2, which will still not solve its THM problems. A proper surface water treatment facility is required to provide a long term solution to the Town’s water quality problems.
2016 SRF ANNUAL REPORT | 16
sRf fInanCIal suMMaRy
Leveraged Financing ModelThe Trust’s SRF loan program receives funding from the EPA in the form of an annual grant, supplemented by state matching grants and the repayment of funds from previous borrowers (“SRF Program Funds”). The Trust’s SRF Program utilizes a “leveraged” financing model, under which federal grants and state matching grants are used as a source of security for revenue bonds (“SRF Bonds”) issued by the Trust. The proceeds from the SRF bonds are used to fund loans to local governmental units for eligible project costs.
The leveraged structure of the Trust’s program permits the Commonwealth to substantially increase the amounts available to fund eligible project costs. Each federal grant and associated state matching grant dollar contributed to the program results in at least two to three dollars of project cost financing while assuring the perpetual nature of the revolving fund.
The Trust’s lending and bond issuance programs are structured in such a way as to ensure adequate cash flows to fund its loans and to repay its bonds to maturity. Depending on the type of projects being financed, the terms of the loans to borrowers, and the subsidy levels to which the borrowers are entitled, the Trust applies its SRF Program Funds to fund either direct loans to local governmental units or, invest in reserve funds, or a combination of both, which are then pledged as a source of payment and security for the SRF Bonds.
Pledged Direct LoansUnder the pledged direct loan approach, the Trust pledges as additional security for a series of its SRF Bonds, direct loans (“Pledged Direct Loans”) that it has made or is making concurrently with the issuance of such SRF Bonds from its SRF Program Funds to eligible borrowers for water pollution abatement and drinking water projects. The Trust applies the interest payments on such Pledged Direct Loans to pay a portion of the debt service on the related series of SRF Bonds, thereby supplementing the loan repayment obligations of the borrowers of the Leveraged Loans funded by such SRF Bonds. Principal payments on the Pledged Direct Loans are pledged as further security for the related series of SRF Bonds. The Trust used the Pledged Direct Loan approach for its Series 19 SRF Bonds. The bonds are the fourth series of Trust SRF Bonds issued under the Pledged Direct Loan approach. As of June 30, 2016, the Trust has $394.8 million in Pledged Direct Loans.
The following discussion provides additional details on the financing management activities of the SRF loan program.
2016 SRF ANNUAL REPORT | 17
Reserve FundsIn the past, the Trust has applied a portion of its Program Equity Funds to establish reserve funds to secure a series of its SRF Bonds. Those investment earnings are then applied to pay a portion of the debt service on the related SRF Bonds, thereby supplementing the loan repayment obligation of the borrowers of the Leveraged Loans funded by such SRF Bonds. As of June 30, 2016, the Trust has $864.6 million in DSRF reserve funds invested in guaranteed investment contracts (GIC) and US Treasury and Agency Obligations.
SRF Bonds Sources of RepaymentPrincipal and interest payments on the Trust’s SRF Bonds are made from the following sources: (1) loan repayments from borrowers; (2) earnings on the federal grants and state matching grants pledged as security to the SRF Bonds, including, as applicable, interest earning on reserve funds and interest payments on direct loans pledged to secure such bonds; and (3) subsidy payments provided by the Commonwealth, known as contract assistance.
Commonwealth Contract Assistance PaymentsThe Commonwealth makes assistance payments on behalf of certain Loans to borrowers to be used to pay a portion of debt service on the related series of the Trust’s SRF Bonds, and thereby reduced the borrower’s loan repayment obligation. The obligation of the Commonwealth to make such payments to the Trust is a general obligation of the Commonwealth, for which its full faith and credit are pledged.
The Commonwealth has pledged over $329.3 million in current and future assistance payments on behalf of
program borrowers. The Commonwealth is currently rated “AA+/Aa1/AA+”.
* based on highest rating
Total Sources of Revenue for FY 2016
2016 SRF ANNUAL REPORT | 18
Deallocation of FundsFor all bond series issued prior to Series 18, on each date that the Trust pays down the principal amount of a series of SRF Bonds, or borrowers pay down the principal amount of the related pledged loans, the amount held in the related reserve fund is reduced proportionately, and the amounts released from each reserve fund are transferred either to the Pool Program Reserve Fund and then to the Deficiency Fund or directly to the Deficiency Fund and are available to cure shortfalls in any bond series. If not needed to cure a shortfall, the released funds are transferred to the Program Equity Funds which assures the perpetual nature of the revolving fund.
Beginning with Series 18, bonds are governed by the new Master Trust Agreement (MTA). The MTA simplifies the flow and deallocation of funds. As depicted on the chart above, the MTA deallocates funds in the same method as prior bond series but when the funds release they flow directly to the Program Equity Fund. The Program Equity Fund is then available to cure shortfalls in all bond series governed by the MTA and prior bond series. Once it has been determined there no shortfalls, the funds are then available to be disbursed to new loans, thus assuring the perpetual nature of the revolving fund.
Series 19 Green BondsOn February 11, 2016, the Trust issued $207.8 million in Green Bonds to fund 62 loans to 42 unique borrowers which was secured by 8 pledged direct loans totaling $94.8 million to an additional 8 borrowers. The Trust was able to borrow these funds at the true interest cost of 2.67% due to its AAA rating by all three rating agencies and the credit strength of its borrowers. The bond offering was the Trust’s second Green Bond series. In the Appendix to the Annual Report the Trust is providing an update to the Green Bond Disclosures for both the Series 18 and19 Official Statements as to the use of Green Bond proceeds. The Trust will continue to report on the use of proceeds until the full amount has been expended.
Single Obligor Programs*# of Recipients: 2
# of Loans: 21Loan Principal Outstanding: $299MBond Principal Outstanding: $63M
Reserve Balance: $110MFinal Maturity: 8/1/2032
Master Trust Agreement (MTA) # of Recipients: 90
# of Loans: 186Loan Principal Outstanding: $705MBond Principal Outstanding: $429M
Reserve Balance: $0Final Maturity: 2/1/2046
Pool SRF Program# of Recipients: 290
# of Loans: 1,594Loan Principal Outstanding: $2.9BBond Principal Outstanding: $2.5B
Reserve Balance: $738MFinal Maturity: 2/1/2043
Single Obligor SRF Bonds
Commonwealth Contract Assistance Payments
Individual DSRFs
Loan Repayments
Pool Program Reserve Fund
Pool SRF Bonds
Commonwealth Contract Assistance Payments
Loan Repayments
Individual DSRFs
*Includes MWRA and SESD.
DEFICIENCY FUND
MTA Debt ServiceReserve Fund***
(If needed)
MTA Bonds
Commonwealth Contract Assistance Payments
Loan Repayments
EQUITY FUND
Excess coverage
Reserve De-allocation and Excess Coverage
Planned Cash Flows
As needed Cash Flows
Appendices
2016 SRF ANNUAL REPORT | 20
Clean Water SRF 2016 2015
Annual Grant Awards
Federal Clean Water SRF Grant $ 47,360,000 $ 47,603,000
State Matching Funds 9,472,000 9,520,600
Total Federal & State Grant Awards
$ 56,832,000 $ 57,123,600
Annual Binding Commitments
$ Committed # of Loans $ Committed # of Loans
Binding Loan Commitments Issued $ 191,656,089 36 $ 246,200,432 40
Interest Earnings not for bond repayments
$ 3,001,633 $ 1,116,496
Annual Disbursements
$ Disbursed # of Loans $ Disbursed # of Loans
Clean Water Interim Loans $ 144,028,419 93 $ 119,450,441 97
Pool Program Project Loans 71,683,411 44 87,772,403 57
Direct Loan Projects - - - -
Total Disbursements $ 215,711,829 137 $ 207,222,844 154
Financial Results From Program Inception
Federal Clean Water SRF Grant $ 1,420,610,761 $1,373,250,761
State Matching Funds 257,510,692 248,038,692
Total Federal & State Grant Awards $ 1,678,121,453 $1,621,289,453
TOTAL Clean Water Assets $4,434,947,000 $4,396,020,000
TOTAL Loans Financed $5,185,541,235 $4,984,826,956
2016 SRF ANNUAL REPORT | 21
Drinking Water SRF 2016 2015
Annual Grant Awards
Federal Drinking Water SRF Grant $ 16,333,000 $ 16,441,000
State Matching Funds 3,266,600 3,288,200
Total Federal & State Grant Awards $ 19,599,600 $ 19,729,200
Annual Binding Commitments
$ Committed # of Loans $ Committed # of Loans
Binding Loan Commitments Issued $ 49,817,519 14 $ 81,034,279 25
Interest Earnings not for bond repayments
$ 533,369 $ 187,348
Annual Disbursements
$ Disbursed # of Loans $ Disbursed # of Loans
Drinking Water Interim Loans $ 60,650,990 32 $ 58,547,738 33
Pool Program Project Loans 47,037,012 35 24,227,038
47
Direct Loan Projects - - - -
Total Disbursements $ 107,688,002 67 $ 82,774,776 80
Financial Results From Program Inception
Federal Drinking Water SRF Grant $495,019,100 $ 478,686,100
State Matching Funds 88,560,620 85,294,020
Total Federal & State Grant Awards $583,579,720 $ 563,980,120
TOTAL Drinking Water Assets $ 1,328,819,000 $1,256,935,000
TOTAL Loans Financed $ 1,476,467,070 $1,337,244,100
2016 SRF ANNUAL REPORT | 22
SFY 2016 Clean Water CommitmentsPRA# Government Entity Agreement
DateProject Description Commitment Amount
CWT-15-12 Avon 07/30/2015 Community Septic Management Program $ 400,000.00
CWT-16-02 Bellingham 04/01/2016 Community Septic Management Program 300,000.00
CW-14-21 Billerica 11/01/2015 Contract 35 Sewers 9,724,962.00
CW-14-17 Bridgewater 08/01/2015 Sewer Inspection, Cleaning and Lining 2,454,650.00
CWP-15-22 Brockton 05/01/2016 Sewer Rehab 1,401,693.00
CW-15-17 BWSC 06/01/2016 Sewer Separation 7,049,114.00
CWP-15-23* Chicopee 06/01/2016 Sewer Separation - Area 5 Phase A 12,405,179.00
CW-13-24-A Dracut 06/01/2016 Contract No. 32 Sewer Extensions 181,873.00
CWT-15-09 Easton 07/30/2015 Community Septic Management Program 500,000.00
CW-13-02A Fall River 03/01/2016 CSO Abatement Program 487,150.00
CWP-12-01A
Fitchburg 09/01/2015 Combined Sewer Separation 721,648.00
CWP-15-21 Gardner 05/01/2016 WWTP Upgrade 4,580,286.00
CWP-15-15 GLSD 05/01/2016 Organics to Energy 24,888,064.00
CWP-15-16 GLSD 06/01/2016 CSO Abatement Program 9,029,369.00
CW-15-14 Grafton 01/01/2016 WWTP Improvements 14,613,300.00
CW-15-14A Grafton 01/01/2016 WWTP Improvements 22,555,800.00
CWP-15-24 Great Barrington 06/01/2016 WWTF Upgrades & Sewer Improvements 4,731,194.00
CW-14-16* Lawrence 12/01/2015 Sewer System Rehabilitation 3,346,107.00
CW-14-34* MWRA 11/01/2015 CSO Phase 15 29,600,000.00
CW-14-37* MWRA 11/01/2015 DITP Digester and Cryogenics Upgrade 6,255,873.00
CW-14-38* MWRA 11/01/2015 DITP Electrical and Plant Upgrades 813,700.00
CWP-14-19A
New Bedford 06/01/2016 CSO Abatement 2,681,930.00
CW-14-33 Norton 12/01/2015 Sewer Extensions 2,924,728.00
CWP-15-08 Norwood 10/01/2015 Underdrain Area Sewer Rehab 2,285,644.00
CWT-16-04 Plymouth 06/01/2016 Community Septic Management Program 200,000.00
CWP-15-06 Quincy 12/01/2015 PS Renovation 3,754,561.00
CW-15-11 Revere 08/01/2015 FOG Study 250,000.00
CW-15-19 Revere 01/01/2016 Illicit Connection Detection 800,000.00
CW-13-16A Revere 01/01/2016 Collection System Improvements 1,161,117.00
CW-15-18 Revere 04/01/2016 SSES 1,700,000.00
CWP-15-29 Revere 05/01/2016 Sewer Rehab 11,263,713.00
CWP-15-07 Saugus 10/01/2015 SSO Reduction Subsystem 4 1,855,109.00
CW-14-26A Taunton 05/01/2016 SSES Phases 10-12 3,037,504.00
CW-15-13 UBWPAD 11/01/2015 Wet Weather Management and FP Nutrient Upgrade
831,000.00
CWT-16-01 Wareham 02/01/2016 Community Septic Management Program 200,000.00
CWP-15-02 Worcester 01/01/2016 Lake Ave Sewer Rehab 2,670,821.00
Total $ 191,656,089.00
*Loans used for FFATA Reporting
2016 SRF ANNUAL REPORT | 23
SFY 2016 Drinking Water CommitmentsPRA# Government Entity Agreement
DateProject Description Commitment
AmountDWP-15-06 Brockton 5/1/2016 Water Main Improvements $ 3,513,471.00
DWP-15-01A Eastham 5/1/2016 Water System Phase I 3,514,597.00
DWP-16-02 Eastham 5/1/2016 Water System Phase I 10,863,982.00 DWP-15-10 Fall River 5/1/2016 Water Main Improvements 3,365,071.00 DWP-15-11 Fall River 5/1/2016 WTP Improvements 1,015,919.00DWP-16-01 Falmouth 5/1/2016 Long Pond WTF 8,658,900.00
DW-16-03 Hadley 6/1/2016 Water Infrastructure Improvement 249,971.00 DW-11-21A Lowell 8/1/2015 WTF and Pump Station Improvement & PV
Installation 3,593,407.00
DW-14-03 Manchester-By-The-Sea
9/1/2015 Water System Improvements 1,440,000.00
DW-14-11* MWRA 11/1/2015 Weston Aqueduct Supply Mains and Sec 36/101 6,876,818.00 DW-14-13* MWRA 11/1/2015 Lower Hultman Aqueduct Rehabilitation 3,000,000.00 DW-14-14* MWRA 11/1/2015 Low Service Storage 3,000,000.00
DWP-15-09 Plainville 5/1/2016 Tank Rehab 696,150.00 DW-12-19A Water Supply District
of Acton10/1/2015 New Water Treatment Plant 29,233.00
Total $ 49,817,519.00
*Loans used for FFATA Reporting
2016 SRF ANNUAL REPORT | 24
Seri
es 1
8 G
reen
Bon
d Pr
ojec
t Des
crip
tions
Pr
ojec
ts F
inan
ced
with
Gre
en B
ond
Proc
eeds
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
Bar
re
DW
$6
3,80
0 W
ell #
3 Ev
alua
tion-
The
pro
ject
is a
pla
nnin
g stu
dy to
pro
vide
the
Tow
n of
Bar
re w
ith m
ore
flexi
bilit
y in
ope
ratin
g th
eir w
ater
supp
ly sy
stem
. W
hile
the
tow
n is
not
look
ing
to in
crea
se th
eir W
ater
M
anag
emen
t Act
(WM
A) a
ppro
ved
rate
, the
y ar
e lo
okin
g to
incr
ease
thei
r with
draw
al ra
te fr
om W
ell
#3.
In S
prin
g 20
10, W
ell #
1 te
sted
pos
itive
for c
olifo
rm b
acte
ria a
nd th
e to
wn
was
issu
ed a
NO
N b
y D
EP to
beg
in p
erm
anen
t dis
infe
ctio
n at
Wel
l #1.
Bec
ause
the
wat
er fr
om W
ell #
1 ha
s a h
igh
iron
conc
entra
tion,
inst
allin
g di
sinf
ectio
n at
the
site
will
like
ly re
sult
in o
ther
wat
er q
ualit
y pr
oble
ms.
Wel
l #3
doe
s not
hav
e a
high
iron
con
cent
ratio
n.
100%
Tow
n of
Bel
mon
t C
W
$2,3
00,0
00
Illic
it C
onne
ctio
n El
imin
atio
n- T
his p
roje
ct w
ill e
limin
ate
sani
tary
sew
er il
licit
conn
ectio
ns e
nter
ing
the
stor
m d
rain
syst
em’s
trib
utar
y to
Ale
wife
Bro
ok, L
ittle
Pon
d an
d B
lair
Pond
. The
obj
ectiv
e of
this
pr
ojec
t is t
o pr
otec
t pub
lic h
ealth
and
impr
ove
wat
er q
ualit
y in
are
a br
ooks
and
pon
ds in
the
Mys
tic
Riv
er W
ater
shed
.
100%
Tow
n of
Bill
eric
a C
W
$1,5
15,1
86
Phas
e I P
ump
Stat
ion
Upg
rade
- Thi
s pro
ject
will
resu
lt in
sew
er p
ump
stat
ion
impr
ovem
ents
/upg
rade
s to
all
of th
e pu
mp
stat
ions
in th
e to
wn
that
are
in im
med
iate
nee
d of
repa
ir or
repl
acem
ent d
ue to
im
min
ent f
ailu
re o
r saf
ety
haza
rd.
The
pum
p st
atio
n im
prov
emen
ts a
re th
e re
sult
repa
irs n
eces
sary
for
oper
ator
safe
ty, p
rope
r ala
rms a
nd b
ack-
up p
ower
be
impl
emen
ted.
The
elim
inat
ion
of th
e B
erth
a C
ircle
and
Poe
Roa
d Pu
mp
Stat
ions
and
byp
ass w
ith g
ravi
ty se
wer
will
be
done
as p
art o
f Pha
se I.
In
addi
tion
to th
e C
ateg
ory
3 re
pairs
, Pha
se I
incl
udes
inst
itutin
g a
SCA
DA
syst
em, c
ompl
etio
n of
the
rem
aini
ng u
pgra
des t
o th
e R
oger
and
Bro
wn
Pum
p St
atio
ns a
nd c
ompe
te u
pgra
de to
the
Mid
dles
ex
Turn
pike
Pum
p St
atio
n.
98.8
5%
Tow
n of
Bill
eric
a C
W
$9,0
00,0
00
Sew
er E
xten
sion
and
Pum
p St
atio
n Im
prov
emen
ts- T
his p
roje
ct in
clud
es a
sew
er e
xten
sion
in E
ast
Bill
eric
a an
d im
prov
emen
ts, u
pgra
des,
and/
or e
limin
atio
n of
seve
ral s
ewer
pum
p st
atio
ns in
the
tow
n.
The
proj
ect i
nclu
des i
nsta
llatio
n of
app
roxi
mat
ely
5 m
iles o
f sew
er in
the
high
est p
riorit
y ar
ea
iden
tifie
d in
the
Com
preh
ensi
ve W
aste
wat
er M
anag
emen
t Pla
n. T
he p
ump
stat
ion
impr
ovem
ent
proj
ect i
nclu
des e
limin
atio
n of
the
Ber
tha
Circ
le, P
oe R
oad
and
Mar
shal
l Stre
et P
ump
Stat
ions
and
im
prov
emen
ts to
the
Nas
hua
Roa
d, Il
ford
Roa
d an
d M
onso
n Pu
mp
Stat
ion.
97.3
7%
Tow
n of
Bill
eric
a C
W
$4,4
68,5
35
Was
te W
ater
Tre
atm
ent F
acili
ties (
WW
TF) I
mpr
ovem
ents
- Thi
s pro
ject
will
incr
ease
the
phys
ical
and
bi
olog
ical
cap
acity
of t
he L
etch
wor
th A
venu
e W
WTF
, whi
ch is
ver
y cl
ose
to re
liabl
y tre
atin
g w
aste
wat
er.
The
proj
ect w
ill a
chie
ve th
is th
roug
h th
e im
plem
enta
tion
of th
e po
rtion
s of t
he C
apita
l Im
prov
emen
ts P
lan
(CIP
) whi
ch a
ddre
sses
cap
acity
con
cern
s. Im
prov
emen
ts to
the
WW
TF w
ill h
elp
rem
edia
te w
ell d
ocum
ente
d en
viro
nmen
tal i
mpa
cts t
o th
e C
onco
rd R
iver
.
100%
2016 SRF ANNUAL REPORT | 25
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
Bill
eric
a C
W
$6,8
92,8
29
Was
te W
ater
Tre
atm
ent F
acili
ties (
WW
TF) I
mpr
ovem
ents
- Thi
s pro
ject
will
incr
ease
the
phys
ical
and
bi
olog
ical
cap
acity
of t
he L
etch
wor
th A
venu
e W
WTF
, whi
ch is
ver
y cl
ose
to re
liabl
y tre
atin
g w
aste
wat
er.
The
proj
ect w
ill a
chie
ve th
is th
roug
h th
e im
plem
enta
tion
of th
e po
rtion
s of t
he C
apita
l Im
prov
emen
ts P
lan
(CIP
) whi
ch a
ddre
sses
cap
acity
con
cern
s. Im
prov
emen
ts to
the
WW
TF w
ill h
elp
rem
edia
te w
ell d
ocum
ente
d en
viro
nmen
tal i
mpa
cts t
o th
e C
onco
rd R
iver
.
100.
00%
City
of B
rock
ton
DW
$1
,912
,312
W
ater
Sys
tem
Impr
ovem
ent P
rogr
am- T
his p
roje
ct in
clud
es m
ultip
le c
ontra
cts.
The
pro
ject
incl
udes
a
cont
ract
whi
ch w
ill re
plac
e re
side
ntia
l wat
er m
eter
s and
impl
emen
t city
-wid
e A
utom
atic
Met
er
Rea
ding
(AM
R).
An
addi
tiona
l con
tract
will
elim
inat
e le
ad se
rvic
e co
nnec
tions
on
Wes
t Elm
Stre
et
whi
le a
noth
er c
ontra
ct w
ill u
pdat
e G
IS p
rogr
am fo
r im
plem
enta
tion
of A
MR
; rep
lace
air
relie
f val
ves
on 2
4" tr
ansm
issi
on m
ains
from
Silv
er L
ake;
Wes
t Elm
Stre
et se
rvic
e co
nnec
tions
upg
rade
; ins
tall
sola
r pho
tovo
ltaic
cel
ls a
t Silv
er L
ake
wat
er tr
eatm
ent f
acili
ty a
nd u
pgra
de o
rigin
al 1
950'
s boo
ster
st
atio
n. A
maj
or re
ason
for t
he m
eter
wor
k is
an
effo
rt to
com
ply
with
an
Inte
rbas
in T
rans
fer A
ct
requ
irem
ent t
o re
duce
una
ccou
nted
-for
-wat
er to
10%
or l
ess.
100%
Tow
n of
C
hath
am
CW
$3
,847
,853
C
olle
ctio
n Sy
stem
Ext
ensi
on a
nd Im
prov
emen
ts- T
his s
ewer
Col
lect
ion
Syst
em E
xten
sion
and
Im
prov
emen
t Pro
ject
will
add
ress
nitr
ogen
load
ing
conc
erns
by
furth
er e
xten
ding
the
was
tew
ater
co
llect
ion
syste
m.
The
proj
ect i
s the
third
pha
se o
f im
plem
entin
g ni
troge
n m
itiga
tion
effo
rts th
at
bega
n in
201
0. T
he p
roje
ct w
ill in
clud
e se
wer
ing
addi
tiona
l sec
tions
of C
hath
am a
nd c
onst
ruct
ing
two
pum
p st
atio
ns c
apab
le o
f han
dlin
g a
tota
l of 6
8,00
0 ga
llons
per
day
of s
ewag
e. T
he m
itiga
tion
of
nitro
gen
will
hel
p pr
otec
t the
hea
lth o
f sal
t and
fres
h w
ater
bod
ies i
n th
e to
wn.
100.
00%
Che
rry
Val
ley
&
Roc
hdal
e
Wat
er D
istr
ict
DW
$5
56,0
38
Mod
ifica
tions
to W
ater
Tre
atm
ent P
lant
- Thi
s pro
ject
will
be
done
in tw
o ph
ases
. Th
e w
ork
in P
hase
I co
nsis
ts o
f rep
laci
ng v
alve
s and
sand
med
ia a
t the
Grin
dsto
ne W
TF.
Phas
e I a
lso
incl
udes
a p
ilot
stud
y fo
r the
pro
pose
d up
grad
es to
the
WTF
, an
upda
te to
the
exis
ting
feas
ibili
ty st
udy
and
a C
apac
ity
Ass
essm
ent R
epor
t. P
hase
2 c
onsi
sts o
f the
con
stru
ctio
n of
mod
ifica
tions
to th
e ex
istin
g W
TF.
Mod
ifica
tions
will
incl
ude
inst
allin
g a
Mie
x sy
stem
for T
OC
rem
oval
, a c
ontin
uous
mon
itorin
g sy
stem
fo
r the
Gro
undw
ater
rule
, re-
pipi
ng o
f the
bac
kwas
h sy
stem
, spi
llway
mod
ifica
tions
and
repl
acem
ent
of h
igh
lift p
umps
in th
e ex
istin
g cl
earw
ell.
The
com
plet
ion
of th
is p
roje
ct w
ill si
gnifi
cant
ly im
prov
e th
e qu
ality
of w
ater
supp
lied
to th
e C
herr
y V
alle
y an
d R
ochd
ale
Wat
er D
istri
ct in
clud
ing
the
chie
f go
al o
f rem
oval
of T
OC
's.
94.4
4%
City
of C
hico
pee
CW
$1
4,84
5,99
1 C
ombi
ned
Sew
er O
verf
low
(CSO
)- T
his p
roje
ct in
clud
es C
SO se
para
tion
of C
all S
treet
are
a an
d M
ontg
omer
y St
reet
/She
ridan
Stre
et.
Thes
e ar
eas r
epre
sent
Pha
se 2
of t
he e
ight
pha
se p
lan
pres
ente
d in
Chi
cope
e’s F
inal
Lon
g Te
rm C
ontro
l Pla
n an
d Fi
nal E
nviro
nmen
tal I
mpa
ct R
epor
t (FL
TCP/
FEIR
). Th
e pr
ojec
t will
sepa
rate
ove
r 400
acr
es a
nd e
limin
ate
the
CSO
’s in
thes
e ar
eas.
In m
ost c
ases
sew
er
sepa
ratio
n fo
r the
se se
wer
sepa
ratio
n pr
ojec
ts w
ill b
e ac
hiev
ed b
y pr
ovid
ing
a ne
w sa
nita
ry se
wer
pip
e
100%
2016 SRF ANNUAL REPORT | 26
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
and
utili
zing
the
exis
ting
com
bine
d se
wer
pip
e fo
r the
con
veya
nce
of st
orm
wat
er.
The
elim
inat
ion
of
CSO
dis
char
ge to
the
Chi
cope
e R
iver
and
the
crea
tion
of a
dditi
onal
inte
rcep
tor c
apac
ity d
owns
tream
to
acc
omm
odat
e co
mbi
ned
sew
er fl
ows f
rom
oth
er a
reas
with
in th
e ci
ty w
ill c
ontri
bute
to im
prov
e w
ater
qua
lity.
City
of C
hico
pee
CW
$3
,008
,860
W
aste
wat
er, W
aste
Wat
er T
reat
men
t Fac
ility
(WW
TF)
and
Stor
mw
ater
Impr
ovem
ents
- The
In
tegr
ated
Mun
icip
al S
torm
wat
er a
nd W
aste
wat
er R
esou
rce
Man
agem
ent P
lan
will
serv
e as
a p
lann
ing
basi
s for
futu
re p
hase
s of C
SO a
bate
men
t and
infr
astru
ctur
al re
new
al w
ork.
Sig
nific
ant p
ortio
ns o
f the
In
tegr
ated
Pla
n w
ill b
e de
vote
d to
col
lect
ing
data
and
mod
elin
g to
doc
umen
t the
act
ual C
SO re
duct
ion
prog
ress
that
has
bee
n m
ade
by th
e al
read
y co
mpl
eted
sew
er se
para
tion
proj
ects
, eva
luat
ing
the
effe
ctiv
enes
s of t
hose
pro
ject
s and
re-a
sses
sing
whe
ther
or n
ot to
con
tinue
full
impl
emen
tatio
n of
the
curr
ently
pro
pose
d C
SO L
ong
Term
Con
trol P
lan
reco
mm
enda
tions
.
92.4
7%
Tow
n of
Clin
ton
CW
$1
20,0
00
Stor
mw
ater
Man
agem
ent P
lan-
The
pro
ject
is a
pla
nnin
g st
udy
to d
evel
op sp
ecifi
c re
com
men
datio
ns
and
impr
ovem
ents
for t
he st
orm
dra
in sy
stem
infr
astru
ctur
e an
d as
soci
ated
surf
ace
wat
ers u
nder
the
Phas
e II
NPD
ES re
quire
men
ts fo
r the
Tow
n of
Clin
ton.
The
pro
ject
will
subs
tant
ially
miti
gate
pr
oble
ms a
ssoc
iate
d w
ith st
orm
wat
er c
onta
min
atio
n.
100.
00%
Tow
n of
D
artm
outh
C
W
$288
,057
In
flow
and
Infil
tratio
n (I
/I) a
nd S
ewer
Sys
tem
Eva
luat
ion
Surv
ey (S
SES)
- Thi
s pro
ject
will
con
sist
of
I/I a
nd S
SES
for a
reas
of t
own
that
are
trib
utar
y to
the
Sout
h D
artm
outh
and
Cla
renc
e pu
mpi
ng
stat
ions
. Th
ese
area
s of t
he to
wn
have
bee
n ex
perie
ncin
g ex
cess
ive
infil
tratio
n an
d in
flow
lead
ing
to
sew
er b
ack-
ups a
nd sa
nita
ry se
wer
ove
rflo
w. T
he p
roje
ct w
ill b
e co
nduc
ted
in a
ccor
danc
e w
ith D
EPs
1993
Gui
delin
es fo
r per
form
ing
(I/I)
and
SSE
S. T
he p
roje
ct w
ill id
entif
y th
e so
urce
s of t
he e
xces
sive
I/I
and
reco
mm
end
mea
sure
s to
addr
ess t
he d
efic
ienc
ies.
100.
00%
Tow
n of
D
artm
outh
C
W
$9,8
47,4
78
Was
te W
ater
Tre
atm
ent F
acili
ties (
WW
TF) U
pgra
des-
Thi
s pro
ject
incl
udes
upg
rade
s and
im
prov
emen
ts to
the
(WW
TF) a
nd fo
ur p
ump
stat
ions
. M
ost o
f the
faci
litie
s/pr
oces
ses a
re 2
0 ye
ars
old
and
upgr
ades
war
rant
ed to
con
tinue
to m
eet t
he c
urre
nt a
nd fu
ture
NPD
ES p
erm
it. U
pgra
des w
ill
incl
ude
odor
con
trol u
pgra
des,
addi
tion
of te
rtiar
y fil
tratio
n sy
stem
and
repl
acem
ent o
f pum
ping
sy
stem
s. T
he c
ompl
eted
pro
ject
will
elim
inat
e se
wer
syst
em o
verf
low
s at s
outh
mai
n pu
mpi
ng st
atio
n,
elim
inat
e od
or re
late
d co
mpl
aint
s fro
m re
side
nts,
decr
ease
feca
l col
iform
and
ent
eroc
occi
co
ncen
tratio
ns a
nd T
SS in
the
efflu
ent.
The
pro
ject
will
impr
ove
wat
er q
ualit
y di
scha
rged
to th
e w
ater
shed
are
a an
d to
the
Buz
zard
s Bay
are
a.
98.9
4%
Tow
n of
Dra
cut
CW
$9
,559
,545
C
olle
ctio
n Se
wer
s- T
he o
bjec
tive
of th
e pr
ojec
t is t
o im
prov
e w
ater
qua
lity
in th
e ar
ea b
y re
duci
ng th
e am
ount
of u
ntre
ated
was
tew
ater
ent
erin
g th
e en
viro
nmen
t fro
m fa
iled
sept
ic sy
stem
s and
dire
ct
sew
erag
e co
nnec
tions
to th
e lo
cal s
torm
wat
er sy
stem
. Thi
s pro
ject
will
pro
vide
sew
er se
rvic
e to
the
96.3
9%
2016 SRF ANNUAL REPORT | 27
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Met
huen
Stre
et a
nd W
heel
er R
oad
Are
as w
hich
are
loca
ted
in th
e ea
ster
n an
d so
uthe
aste
rn se
ctio
ns o
f D
racu
t. T
he p
roje
ct in
clud
es th
e co
nstru
ctio
n of
app
roxi
mat
ely
40,0
00 lf
of s
anita
ry g
ravi
ty se
wer
, fo
rce
mai
n an
d pr
essu
re se
wer
and
one
pum
ping
stat
ion.
City
of E
vere
tt C
W
$661
,967
St
orm
wat
er/W
aste
wat
er C
apita
l Im
prov
emen
t- Th
e ob
ject
ive
of th
e Ev
eret
t and
Che
lsea
St
orm
wat
er/W
aste
wat
er C
apita
l Im
prov
emen
ts P
roje
ct is
to a
ddre
ss th
e cr
itica
l nee
d fo
r rep
lace
men
t of
the
faili
ng M
arke
t Stre
et c
ulve
rt an
d th
e re
gula
tory
requ
irem
ents
for r
ehab
ilita
tion/
repl
acem
ent o
f th
e B
ehan
Stre
et a
rea
was
tew
ater
and
stor
mw
ater
infr
astru
ctur
e. U
ltim
atel
y th
ese
proj
ects
will
serv
e to
pro
tect
the
wat
er b
odie
s in
the
Mys
tic R
iver
and
Bos
ton
Har
bor b
asin
s. T
he M
arke
t Stre
et c
ulve
rt ha
s exp
erie
nced
seve
ral f
ailu
res s
ince
198
4 w
ith v
ario
us se
ctio
ns o
f the
cul
vert
bein
g re
paire
d an
d/or
re
plac
ed o
ver t
he la
st 2
5 ye
ars.
Cur
rent
ly, t
here
is a
larg
e se
ctio
n of
the
culv
ert t
hat h
as p
artia
lly
colla
psed
and
ther
e is
a si
gnifi
cant
con
cern
that
the
culv
ert m
ay c
ompl
etel
y fa
il. T
his p
roje
ct w
ill
impl
emen
t an
inve
stig
atio
n an
d pl
anni
ng e
ffor
t foc
used
on
iden
tifyi
ng th
e fin
anci
al a
nd te
chni
cal
requ
irem
ents
for r
ehab
ilita
tion
and/
or re
plac
emen
t of t
he c
ulve
rt. T
he B
ehan
Stre
et a
rea
is th
e su
bjec
t of
an
Adm
inis
trativ
e C
onse
nt O
rder
issu
ed to
the
City
of E
vere
tt by
Mas
sDEP
to a
ddre
ss se
vera
l sa
nita
ry se
wer
ove
rflo
ws i
n th
ese
area
s. T
he C
ity o
f Eve
rett
is c
urre
ntly
und
erta
king
an
inve
stig
atio
n of
this
are
a to
det
erm
ine
the
natu
re a
nd e
xten
t of t
he re
quire
d co
rrec
tive
actio
ns.
Due
to th
e di
ffic
ultie
s enc
ount
ered
dur
ing
the
clea
ning
and
CC
TV in
spec
tions
, the
eng
inee
r is e
valu
atin
g th
e fo
llow
ing
four
opt
ions
for p
ipel
ine
reha
bilit
atio
n/re
plac
emen
t: cu
red-
in-p
lace
pip
e lin
ing,
in-in
re
plac
emen
t (pi
pe b
urst
ing)
, slip
linin
g an
d ex
cava
tion
and
repl
acem
ent.
100.
00%
Tow
n of
Fa
irha
ven
DW
$7
89,8
46
Bos
ton
Hill
Tan
k R
ehab
and
Mai
n R
epla
cem
ent-
The
proj
ect i
s for
the
pain
ting,
cle
anin
g an
d re
habi
litat
ion
of th
e B
osto
n H
ill W
ater
Sto
rage
Tan
k. I
nsta
llatio
n of
a n
ew m
ixin
g sy
stem
in th
e ta
nk
will
enh
ance
wat
er q
ualit
y an
d m
inim
ize
the
form
atio
n se
dim
ent a
t the
bot
tom
of t
he ta
nk.
The
addi
tion
of se
curit
y m
easu
res w
ill re
duce
una
utho
rized
acc
ess t
o th
e ta
nk a
nd p
oten
tial c
onta
min
atio
n.
93.8
3%
City
of F
all R
iver
C
W
$12,
668,
331
Com
bine
d Se
wer
Ove
rflo
ws (
CSO
) Aba
tem
ent P
rogr
am- T
he o
bjec
tive
of th
is p
roje
ct is
to
abat
eCSO
’s in
Fal
l Riv
er in
ord
er to
ach
ieve
com
plia
nce
with
stat
e an
d fe
dera
l CSO
regu
latio
ns a
nd to
co
mpl
y w
ith a
Fed
eral
Cou
rt O
rder
. Th
e w
ork
invo
lves
the
cons
truct
ion
of C
SO c
ontro
ls fo
r the
Pr
esid
ent A
venu
e C
SO o
utfa
ll an
d ot
her C
SO o
utfa
lls to
the
Taun
ton
Riv
er a
nd M
t. H
ope
Bay
. Th
is
proj
ect i
s par
t of a
mul
ti-ye
ar u
nder
taki
ng.
Plan
ned
CSO
con
trol p
roje
cts i
nclu
de se
vera
l add
ition
al
CSO
scre
enin
g an
d di
sinf
ectio
n fa
cilit
ies a
nd/o
r sew
er se
para
tion
proj
ects
The
City
of F
all R
iver
has
a
com
bine
d sy
stem
with
19
CSO
out
falls
that
dis
char
ge to
the
Mt.
Hop
e B
ay, T
aunt
on R
iver
or
Que
quec
han
Riv
er. T
hese
CSO
out
falls
dis
char
ge u
ntre
ated
stor
mw
ater
runo
ff a
nd se
wag
e w
ith
asso
ciat
ed fe
cal c
olifo
rm, f
loat
able
s, su
spen
ded
solid
s, nu
trien
ts, a
nd o
ther
con
tam
inan
ts d
urin
g w
et
wea
ther
to th
eir r
espe
ctiv
e re
ceiv
ing
wat
ers.
100%
2016 SRF ANNUAL REPORT | 28
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
City
of F
all R
iver
D
W
$112
,499
W
ater
Sys
tem
Mas
ter P
lan
Upd
ate-
Thi
s pro
ject
will
upd
ate
the
2002
Wat
er S
yste
m M
aste
r Pla
n. T
he
plan
will
add
ress
syst
em im
prov
emen
ts c
ompl
eted
sinc
e 20
02.
The
Hyd
raul
ic M
odel
will
be
upda
ted
and
reco
mm
enda
tions
will
be
mad
e fo
r con
tinue
d sy
stem
impr
ovem
ents
. U
pdat
ing
the
plan
will
in
clud
e an
alyz
ing
the
over
all s
yste
m in
clud
ing
wat
er m
ains
, tan
ks a
nd w
ater
trea
tmen
t pla
nts t
he
Wat
er S
yste
m M
aste
r Pla
n w
ill h
elp
assi
st th
e ci
ty in
pla
nnin
g, fu
ture
fund
ing
and
prio
ritiz
atio
n of
pr
ojec
ts a
s wel
l as i
dent
ifyin
g an
y ex
istin
g e
nviro
nmen
tal o
r pub
lic h
ealth
issu
es in
the
wat
er sy
stem
.
100.
00%
City
of F
all R
iver
D
W
$2,4
03,9
40
Wat
er M
ain
Impr
ovem
ents
, Pha
se 1
2- T
his p
roje
ct is
for t
he re
plac
emen
t of w
ater
mai
ns a
nd le
ad
serv
ices
on
vario
us st
reet
s in
Fall
Riv
er a
nd fo
r wat
er m
ain
impr
ovem
ents
at W
attu
ppa
Pond
. The
pr
ojec
t inc
lude
s the
eva
luat
ion
and
refu
rbis
hmen
t of t
he tr
ansm
issi
on m
ains
bet
wee
n th
e w
ater
tre
atm
ent p
lant
and
the
Bed
ford
Stre
et T
anks
. The
wor
k w
ill a
lso
incl
ude
new
dra
inag
e in
fras
truct
ure
alon
g B
edfo
rd S
treet
in th
e vi
cini
ty o
f the
Wat
er D
epar
tmen
t fac
ilitie
s to
bette
r pro
tect
Nor
th
Wat
tupp
a Po
nd fr
om w
asho
uts o
f sur
roun
ding
road
way
s. Th
e ci
ty is
cur
rent
ly u
nder
Adm
inis
tratio
n O
rder
due
to v
iola
tions
of t
he le
ad a
nd c
oppe
r rul
e. T
he w
ater
mai
n im
prov
emen
ts a
t Wat
tupp
a Po
nd
will
hel
p co
ntin
ue p
rote
ctio
n of
the
wat
er su
pply
and
con
tinue
to p
rovi
de sa
fe a
nd re
liabl
e w
ater
su
pply
to th
e ci
ty.
99.1
7%
City
of F
itchb
urg
CW
$5
,575
,799
C
ombi
ned
Sew
er S
epar
atio
n (C
SS)-
Thi
s pro
ject
is th
e co
ntin
uatio
n of
the
city
’s p
rogr
am to
sepa
rate
co
mbi
ned
sew
ers t
o el
imin
ate
raw
sew
age
disc
harg
es d
urin
g st
orm
eve
nts.
The
pro
ject
elim
inat
es
com
bine
d se
wer
s by
cons
truct
ing
new
dra
inag
e pi
pes a
djac
ent t
o se
wer
pip
es to
con
vey
stor
mw
ater
, w
hich
will
allo
w th
e ci
ty to
clo
se se
vera
l Com
bine
d Se
wer
Ove
rflo
ws (
CSO
s).
The
proj
ect w
ill
real
ize
heal
th a
nd sa
fety
ben
efits
from
redu
ced
odor
s, im
prov
ed a
esth
etic
s and
bet
ter w
ater
qua
lity
in
the
Nas
hua
Riv
er a
nd a
ffec
ted
tribu
tarie
s, an
d al
low
the
city
to c
ompl
y w
ith th
e A
dmin
istra
tive
Con
sent
Ord
er is
sued
by
the
EPA
.
100%
City
of F
itchb
urg
CW
$7
,143
,406
C
hem
ical
ly E
nhan
ced
Prim
ary
Trea
tmen
t Upg
rade
- Thi
s pro
ject
is th
e up
grad
e of
the
East
erly
W
aste
wat
er T
reat
men
t Fac
ility
(WW
TF) t
o ad
d ch
emic
ally
enh
ance
d pr
imar
y tre
atm
ent.
The
faci
lity
rece
ives
all
the
was
tew
ater
flow
s fro
m th
e ci
ty a
s wel
l as c
ontri
butio
ns fr
om W
estm
inst
er a
nd
Lune
nbur
g. T
he fa
cilit
y di
scha
rges
its t
reat
ed e
fflu
ent t
o th
e N
orth
Bra
nch
of th
e N
ashu
a R
iver
. Th
e fa
cilit
y ha
s exc
eede
d its
allo
wab
le d
isch
arge
lim
its u
nder
its N
PDES
per
mit,
par
ticul
arly
in th
e am
ount
of
pho
spho
rous
and
am
mon
ia d
isch
arge
d. T
he E
PA h
as is
sued
an
Adm
inis
trativ
e O
rder
for
Com
plia
nce
to th
e ci
ty fo
r the
vio
latio
n of
the
efflu
ent l
imits
in th
e pe
rmit.
Thi
s pro
pose
d w
ork
will
si
gnifi
cant
ly im
prov
e di
scha
rge
perm
it co
mpl
ianc
e an
d w
ill im
prov
e th
e w
ater
qua
lity
of th
e N
ashu
a R
iver
.
100.
00%
Tow
n of
Fr
amin
gham
C
W
$3,5
15,9
98
East
Fra
min
gham
Sew
er Im
prov
emen
ts- P
hase
1 o
f thi
s pro
ject
incl
udes
the
elim
inat
ion
of th
ree
exis
ting
pum
ping
stat
ions
and
app
roxi
mat
ely
22,0
00 fe
et o
f exi
stin
g fo
rce
mai
n by
com
bini
ng tw
o 10
0.00
%
2016 SRF ANNUAL REPORT | 29
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
sepa
rate
maj
or p
umpi
ng st
atio
ns in
to o
ne a
nd b
y re
dire
ctin
g flo
w b
y gr
avity
from
the
tribu
tary
are
as o
f tw
o ot
her p
umpi
ng st
atio
ns to
a n
ew in
terc
epto
r sew
er in
stal
led
at a
low
er d
epth
. Thi
s pro
ject
re
pres
ents
the
cent
ral p
roje
ct in
a se
ries o
f pro
pose
d pr
ojec
ts th
at a
re re
com
men
ded
in th
e re
cent
ly
com
plet
ed C
WM
P.
City
of
Glo
uces
ter
DW
$4
,482
,909
W
ater
Tre
atm
ent P
lant
(WTP
) Upg
rade
-The
pur
pose
of t
he W
TP U
pgra
des i
s to
impr
ove
relia
bilit
y,
redu
ndan
cy a
nd e
nerg
y ef
ficie
ncy
at th
e ci
ty's
Wes
t Glo
uces
ter f
acili
ty.
Prop
osed
impr
ovem
ents
in
clud
e re
plac
emen
t of m
uch
of th
e m
echa
nica
l and
ele
ctric
al e
quip
men
t whi
ch h
as re
ache
d th
e en
d of
its
use
ful l
ife a
nd is
als
o in
effic
ient
. Th
e up
grad
e w
ill in
clud
e a
back
was
h w
ater
recy
cle
syst
em w
hich
w
ill si
gnifi
cant
ly re
duce
was
tew
ater
dis
char
ged
to th
e G
louc
este
r sew
er sy
stem
(spe
cific
ally
the
Esse
x A
ve S
ewer
and
Ban
jo P
ump
Stat
ion)
pot
entia
lly re
duci
ng th
e fr
eque
ncy
and
seve
rity
of p
oten
tial
futu
re S
SO's.
In
addi
tion,
safe
ty e
quip
men
t will
be
upda
ted
and/
or in
stal
led
at b
oth
the
Wes
t G
louc
este
r and
Bab
son
WTP
's. A
ll th
e im
prov
emen
ts a
t the
Wes
t Glo
uces
ter W
TP w
ill im
prov
e re
liabi
lity
of th
e W
TP's
abili
ty to
pro
vide
a c
onst
ant s
uppl
y of
drin
king
wat
er e
spec
ially
if th
ere
is ra
w
wat
er c
onta
min
atio
n an
d/or
mec
hani
cal f
ailu
re a
t the
Bab
son
WTP
.
100.
00%
City
of
Glo
uces
ter
DW
$
9,86
6,52
4
Wat
er S
yste
m Im
prov
emen
ts- T
he p
roje
ct is
split
into
thre
e co
ntra
cts.
Con
tract
1 is
for t
he c
lean
ing
and
pain
ting
of th
e 0.
6 M
G B
lack
burn
Wat
er S
tora
ge T
ower
and
the
1.0
MG
Plu
m C
ove
Wat
er
Stor
age
Tank
. Th
ere
will
als
o be
the
inst
illat
ion
of h
ydra
ulic
mix
ing
syst
ems f
or th
ese
tank
s and
the
6.0
MG
Bon
d H
ill R
eser
voir.
Thi
s con
tract
will
als
o in
clud
e op
erat
iona
l upd
ates
to th
e Fu
ller B
oost
er
Pum
p St
atio
n. C
ontra
ct 2
will
incl
ude
repl
acin
g ap
prox
imat
ely
2-1/
2 m
iles o
f cas
t iro
n w
ater
mai
n al
ong
Wes
tern
Ave
nue.
Con
tract
3 in
clud
es re
plac
ing
appr
oxim
atel
y 4
mile
s of w
ater
mai
n in
the
Com
mon
wea
lth A
venu
e ne
ighb
orho
od.
100.
00%
City
of
Glo
uces
ter
DW
$2
,522
,368
W
ater
Tra
nsm
issi
on Im
prov
emen
ts- T
his p
roje
ct c
onsi
sts o
f rel
ocat
ing
appr
oxim
atel
y 2,
100
feet
of 2
0-in
ch w
ater
mai
n fr
om th
e B
ond
Hill
Tan
k to
Wes
tern
Ave
nue
to m
ake
it ac
cess
ible
for r
outin
e an
d em
erge
ncy
mai
nten
ance
. A
seco
nd a
spec
t of t
he p
roje
ct is
to re
loca
te th
e tw
o 20
-inch
wat
er m
ains
un
der t
he B
lym
an C
anal
from
the
Wes
tern
Ave
nue
utili
ty tu
nnel
to th
e ar
ea d
irect
ly u
nder
Ann
esqu
am
Riv
er.
100%
Gre
ater
Law
renc
eSa
nita
ry D
istr
ict
CW
$2
,296
,515
W
aste
Wat
er T
reat
men
t Pla
nt Im
prov
emen
ts- T
he p
roje
ct is
Pha
se 1
of t
he D
istri
ct’s
“Fi
nal L
ong
Term
Com
bine
d Se
wer
Ove
rflo
w (C
SO) C
ontro
l Pla
n an
d En
viro
nmen
tal I
mpa
ct R
epor
t” a
nd
incl
udes
: prim
ary
clar
ifier
enh
ance
men
ts to
impr
ove
rem
oval
eff
icie
ncy
unde
r hig
h flo
w c
ondi
tions
, ad
ditio
n of
a fi
fth a
erat
ion
blow
er a
nd a
dditi
onal
aer
atio
n ta
nk d
iffus
ers,
mod
ifica
tions
and
im
prov
emen
ts to
the
seco
ndar
y tre
atm
ent s
yste
m in
fluen
t flo
w g
ates
and
aer
atio
n sy
stem
, rel
ocat
ion
of
the
exis
ting
ferr
ic c
hlor
ide
syst
em to
allo
w e
xpan
sion
of t
he p
lant
sodi
um h
ypoc
hlor
ite sy
stem
and
fu
rther
stud
y of
pro
pose
d im
prov
emen
ts to
the
Riv
ersi
de P
ump
Stat
ion
and
forc
e m
ain.
The
dis
trict
86.2
5%
2016 SRF ANNUAL REPORT | 30
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
antic
ipat
es th
e pr
ojec
t will
furth
er re
duce
the
num
ber o
f CSO
ove
rflo
ws a
nd in
crea
se c
aptu
re o
f wet
w
eath
er fl
ows.
Gre
ater
Law
renc
eSa
nita
ry D
istr
ict
CW
$7
21,4
15
New
For
ce M
ain
for R
iver
side
Pum
p St
atio
n- T
he p
roje
ct is
Pha
se 3
of t
he D
istri
ct's
"Fin
al L
ong
Term
C
ombi
ned
Sew
er O
verf
low
(CSO
) Con
trol P
lan
and
Envi
ronm
enta
l Im
pact
Rep
ort"
and
incl
udes
co
nstru
ctio
n of
app
roxi
mat
ely
1/2
mile
s of n
ew fo
rce
mai
n fr
om th
e R
iver
side
Pum
p (th
e D
istri
ct's
mai
n pu
mpi
ng st
atio
n) to
the
Dis
trict
's w
aste
wat
er tr
eatm
ent f
acili
ty (W
WTF
) and
mod
ifica
tions
to th
e fo
rce
mai
n he
ader
. Th
e ex
istin
g fo
rce
mai
n ha
s bee
n id
entif
ied
as su
bjec
t to
prem
atur
e fa
ilure
due
to
brea
kage
of t
he p
re-s
tress
ing
wire
. A
cous
tic m
onito
ring
of th
e pi
pe c
onfir
ms t
hat t
he w
ire b
reak
s are
oc
curr
ing
on th
is p
ipe.
Rep
lace
men
t will
elim
inat
e th
e th
reat
of a
cat
astro
phic
pip
e fa
ilure
whi
ch
pose
s a d
irect
thre
at to
the
Mer
rimac
k R
iver
, nea
rby
resi
dent
s, an
d th
e ad
jace
nt M
BTA
railr
oad
line.
Th
e D
istri
ct a
ntic
ipat
es th
at th
is p
roje
ct w
ill p
rovi
de th
e co
nvey
ance
cap
acity
nec
essa
ry to
fully
im
plem
ent t
he d
istri
ct's
CSO
Con
trol P
lan.
Ful
l im
plem
enta
tion
of th
e pl
an w
ill re
duce
the
num
ber o
f C
SO o
verf
low
s and
will
incr
ease
cap
ture
of w
et w
eath
er fl
ows.
76.0
9%
City
of H
aver
hill
CW
$5
,176
,671
C
ombi
ned
Sew
er O
verf
low
/Flo
od C
ontro
l Im
prov
emen
ts- T
he p
roje
ct in
clud
es th
e pu
rcha
sing
of t
hree
m
obile
10.
5 M
GD
trai
ler m
ount
ed p
umps
and
impr
ovem
ents
to th
e se
wer
col
lect
ion
syst
em, o
n th
e M
errim
ack
Riv
er F
lood
wal
l and
the
Littl
e R
iver
Con
duit.
The
trai
ler m
ount
ed p
umps
will
be
used
as a
ba
ckup
to th
e M
argi
nal P
ump
Stat
ion
durin
g hi
gh fl
ow e
vent
s. C
olle
ctio
n sy
stem
impr
ovem
ents
in
clud
e up
grad
es to
seve
n di
vers
ion
gate
s to
allo
w fl
ow to
be
dive
rted
away
from
the
mid
dle
sew
er
inte
rcep
tor a
nd M
argi
nal P
ump
Stat
ion.
Im
prov
emen
ts to
the
Mer
rimac
k Fl
oodw
all c
onsi
st o
f rep
airs
to
the
exis
ting
flood
wal
l; im
prov
emen
ts to
the
Littl
e R
iver
Con
duit
incl
ude
conc
rete
repa
irs, r
epai
ring
expa
nsio
n jo
ints
, re-
poin
ting
pier
s, an
d re
late
d w
ork
to m
itiga
te st
orm
wat
er im
pact
s on
the
cond
uit.
74.4
0%
Tow
n of
H
ollis
ton
DW
$2
,500
,000
W
ell N
o. 4
Rep
lace
men
t and
Tre
atm
ent P
lant
Upg
rade
- The
Tow
n of
Hol
listo
n W
ell N
o. 4
cur
rent
ly
expe
rienc
es e
valu
ated
con
cent
ratio
ns o
f iro
n, m
anga
nese
and
org
anic
mat
eria
l. T
his p
roje
ct w
ill
redu
ce th
e am
ount
of o
rgan
ic m
ater
ial i
n th
e ra
w w
ater
thro
ugh
the
inst
alla
tion
of a
repl
acem
ent w
ell.
Th
e ex
istin
g W
ell 4
Wat
er T
reat
men
t Fac
ility
will
be
upgr
aded
to a
ddre
ss th
e ne
w w
ater
qua
lity
from
th
e re
plac
emen
t wel
l. T
he u
pgra
de to
the
Wat
er T
reat
men
t fac
ility
will
rem
ove
one
of th
e pr
ecur
sors
of
dis
infe
ctio
n by
pro
duct
s (D
BPs
). D
BPs
are
the
resu
lt of
the
com
bina
tion
of th
e or
gani
c m
ater
ial
and
disin
fect
ant.
The
wel
l use
s sod
ium
hyp
ochl
orite
for d
isin
fect
ion
in th
e fin
ishe
d w
ater
of t
he
treat
men
t pla
nt a
nd w
ith th
e el
evat
ed c
once
ntra
tions
of o
rgan
ic m
ater
ial D
BPs
exc
eedi
ng th
e re
gula
tory
lim
its m
ay fo
rm in
the
dist
ribut
ion
syst
em.
The
elev
ated
leve
ls o
f iro
n in
the
dist
ribut
ion
syst
em m
ay a
lso
lead
to ir
on b
acte
ria c
reat
ing
a pu
blic
hea
lth th
eat.
The
pro
ject
upg
rade
s will
redu
ce
the
amou
nt o
f iro
n in
the
finis
hed
wat
er p
reve
ntin
g th
e fo
rmat
ion
of ir
on b
acte
ria.
100.
00%
2016 SRF ANNUAL REPORT | 31
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
Ipsw
ich
CW
$2
,246
,791
W
aste
wat
er S
olid
s & U
V D
isin
fect
ion
Upg
rade
s- T
his p
roje
ct w
ill re
habi
litat
e an
d im
prov
e th
e ex
istin
g so
lids h
andl
ing
equi
pmen
t and
the
exis
ting
UV
dis
infe
ctio
n sy
stem
. The
solid
s han
dlin
g sy
stem
upg
rade
s are
inte
nded
to re
plac
e w
orn
out e
quip
men
t, im
prov
e so
lids h
andl
ing
syst
em
perf
orm
ance
and
cap
acity
and
impr
ove
effic
ienc
y. Im
prov
ed so
lids h
andl
ing
syst
ems w
ill a
lso
redu
ce
perf
orm
ance
impa
cts o
n th
e ul
travi
olet
ligh
t dis
infe
ctio
n sy
stem
. The
UV
Dis
infe
ctio
n Sy
stem
up
grad
es a
re in
tend
ed to
pro
mot
e co
mpl
ianc
e w
ith th
e ef
fluen
t cha
ract
eris
tics l
iste
d un
der t
he N
PDES
Pe
rmit,
exp
ress
ly re
late
d to
feca
l col
iform
exc
eeda
nces
. Bas
ed o
n th
e 20
09 W
aste
wat
er S
olid
s H
andl
ing
Stud
y, th
e pr
opos
ed so
lids h
andl
ing
upgr
ades
incl
ude
a ne
w 4
0 fo
ot d
iam
eter
thic
kene
r, re
furb
ishe
d sl
udge
stor
age
tank
, new
cen
trifu
ge, n
ew d
ewat
erin
g so
lids c
onve
yors
, new
truc
k lo
adin
g ho
pper
, and
new
sept
age
rece
ivin
g sy
stem
.
100.
00%
Tow
n of
K
ings
ton
DW
$4
,482
,474
Tr
ackl
e Po
nd W
ater
Tre
atm
ent F
acili
ty (W
TF)-
Thi
s pro
ject
incl
udes
the
cons
truct
ion
of a
new
WTF
to
redu
ce m
anga
nese
con
cent
ratio
ns a
t the
Tra
ckle
Pon
d W
ell.
The
new
WTF
will
incl
ude
Layn
eOx
Filtr
atio
n Sy
stem
, UV
dis
infe
ctio
n, P
LC a
nd S
CA
DA
syst
em, s
olar
pan
el in
stal
latio
n, a
nd re
plac
emen
t of
exi
stin
g w
ell p
umps
. T
he c
ompl
eted
pro
ject
will
redu
ce h
igh
man
gane
se c
once
ntra
tions
that
are
af
fect
ing
tast
e an
d co
lor o
f the
drin
king
wat
er.
The
proj
ect w
ill a
lso
elim
inat
e he
alth
con
cern
for
infa
nts a
nd y
oung
chi
ldre
n.
96.5
1%
City
of L
awre
nce
DW
$1
,589
,827
V
alve
Rep
lace
men
t- Th
is p
roje
ct w
ill re
pair
and
repl
ace
brok
en a
nd m
alfu
nctio
ning
val
ves i
n a
sign
ifica
nt n
umbe
r of l
ocat
ions
in th
e La
wre
nce
Wat
er D
istri
butio
n Sy
stem
. Ove
r 90
valv
es, r
angi
ng
in si
ze fr
om 6
" to
12"
, hav
e be
en id
entif
ied
need
ing
repa
ir or
repl
acem
ent i
n th
e di
strib
utio
n sy
stem
. A
s a re
sult
of th
is p
roje
ct, t
he c
ity w
ill b
e ab
le to
impl
emen
t a u
nidi
rect
iona
l flu
shin
g pr
ogra
m a
nd a
va
lve
exer
cise
pro
gram
whi
ch w
ill a
llow
the
city
to is
olat
e w
ater
mai
n se
ctio
ns d
urin
g re
pairs
or i
n th
e ca
se o
f em
erge
ncie
s.
99.3
2%
City
of L
awre
nce
DW
$3
,318
,458
W
ater
Met
er R
epla
cem
ent-
This
pro
ject
invo
lves
repl
acin
g ap
prox
imat
ely
10,7
00 e
xist
ing
met
ers i
n re
side
ntia
l, co
mm
erci
al a
nd m
unic
ipal
stru
ctur
es a
nd im
plem
entin
g a
met
er re
adin
g sy
stem
. The
pr
ojec
t will
ena
ble
the
city
to re
cove
r cos
ts o
f und
er-r
egis
terin
g m
eter
s and
redu
ce th
e am
ount
of
unac
coun
ted
for w
ater
.
95.3
4%
Lyn
n W
ater
and
Se
wer
Com
mis
sion
CW
$9
07,3
74
Win
d Tu
rbin
e Pr
ojec
t- Th
e pr
ojec
t will
con
stru
ct a
win
d tu
rbin
e w
ith a
min
imum
rate
d ca
paci
ty o
f 600
kW
at t
he R
egio
nal W
ater
Pol
lutio
n C
ontro
l Fac
ility
in L
ynn.
The
LW
SC W
WTF
con
sum
es
appr
oxim
atel
y 12
,000
,000
kW
h of
ele
ctric
ity p
er y
ear a
nd th
e es
timat
ed n
et e
nerg
y pr
oduc
tion
for t
he
turb
ine
is 9
93,4
00 k
Wh
annu
ally
.
100.
00%
City
of M
alde
n C
W
$3,8
44,0
78
Sew
er Im
prov
emen
ts- T
his s
ewer
line
impr
ovem
ent p
roje
ct w
as in
itiat
ed in
resp
onse
to a
n A
dmin
istra
tive
Con
sent
Ord
er n
egot
iate
d w
ith M
assD
EP a
nd th
e U
S EP
A.
The
cons
truct
ion
proj
ect
90.0
2%
2016 SRF ANNUAL REPORT | 32
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
will
redu
ce in
filtra
tion
and
inflo
w (I
/I) a
nd sa
nita
ry se
wer
ove
rflo
ws f
rom
occ
urrin
g w
ithin
the
City
of
Mal
den'
s was
tew
ater
col
lect
ion
syst
em w
hich
is b
eing
trea
ted
at th
e D
eer I
slan
d Se
wag
e Tr
eatm
ent
Plan
t unn
eces
saril
y. T
he p
roje
ct in
clud
es c
ured
-in-p
lace
pip
e lin
er (C
IPPL
) for
app
roxi
mat
ely
28,0
00
feet
of 8
-inch
to 1
0-in
ch p
ipe.
App
roxi
mat
ely
80 m
anho
les h
ave
also
bee
n id
entif
ied
as b
eing
in n
eed
of m
onol
ithic
cem
entit
ious
line
r. F
urth
er, a
ppro
xim
atel
y 1,
200
serv
ice
late
ral l
iner
s are
pro
pose
d to
m
itiga
te in
filtra
tion
from
ent
erin
g th
e se
wer
mai
ns a
t ser
vice
late
ral c
onne
ctio
ns.
City
of M
alde
n D
W
$270
,899
Th
e pr
ojec
t will
upd
ate
the
lead
serv
ice
line
repl
acem
ent p
rogr
am re
quire
d as
par
t of t
he
adm
inis
trativ
e co
nsen
t ord
er (A
CO
-BO
-06-
5D00
1) to
rem
ove
lead
serv
ices
thro
ugho
ut th
e sy
stem
. Th
is p
lann
ing
proj
ect c
onsi
sts o
f a n
ew w
ater
dis
tribu
tion
mod
el a
nd C
apita
l Im
prov
emen
ts P
lan
(CIP
) an
d w
ill a
llow
the
City
to d
evel
op a
com
pute
r mod
el th
at w
ill h
elp
stim
ulat
e ex
istin
g co
nditi
ons o
f the
sy
stem
and
eva
luat
e th
e co
nditi
ons o
f the
syst
em. T
he C
IP b
e ba
sed
on sy
stem
def
icie
ncie
s ide
ntifi
ed
in th
e hy
drau
lic m
odel
. The
pro
ject
will
pro
vide
the
city
with
tech
nica
l res
ourc
es to
com
plet
e de
velo
pmen
t of G
IS d
ata
and
base
for t
he e
xist
ing
Drin
king
Wat
er d
istri
butio
n sy
stem
.
100.
00%
City
of M
alde
n D
W
$6,0
65,1
16
Wat
er D
istri
butio
n Sy
stem
Pla
nnin
g- T
he p
roje
ct w
ill u
pdat
e th
e le
ad se
rvic
e lin
e re
plac
emen
t pr
ogra
m re
quire
d as
par
t of t
he a
dmin
istra
tive
cons
ent o
rder
to re
mov
e le
ad se
rvic
es th
roug
hout
the
syst
em. T
his p
lann
ing
proj
ect c
onsi
sts o
f a n
ew w
ater
dis
tribu
tion
mod
el a
nd C
apita
l Im
prov
emen
ts
Plan
(CIP
) and
will
allo
w th
e ci
ty to
dev
elop
a c
ompu
ter m
odel
that
will
hel
p st
imul
ate
exis
ting
cond
ition
s of t
he sy
stem
and
eva
luat
e th
e co
nditi
ons o
f the
syst
em. T
he C
IP b
e ba
sed
on sy
stem
de
ficie
ncie
s ide
ntifi
ed in
the
hydr
aulic
mod
el. T
he p
roje
ct w
ill p
rovi
de th
e ci
ty w
ith te
chni
cal
reso
urce
s to
com
plet
e de
velo
pmen
t of G
IS d
ata
and
base
for t
he e
xist
ing
Drin
king
Wat
er d
istri
butio
n sy
stem
.
97.6
8%
City
of M
alde
n D
W
$918
,658
Th
is p
roje
ct w
ill in
clud
e th
e re
plac
emen
t of o
ld u
nlin
ed c
ast i
ron
wat
er m
ains
with
larg
er c
emen
t lin
ed
duct
ile ir
on w
ater
mai
ns to
enh
ance
the
carr
ying
cap
acity
and
qua
lity
of w
ater
. The
pro
ject
will
als
o in
clud
e th
e re
mov
al o
f sev
eral
lead
serv
ice
lines
in c
ompl
ianc
e w
ith a
n A
CO
issu
ed b
y th
e st
ate
in
resp
onse
to d
rinki
ng w
ater
sam
ples
that
exc
eede
d th
e ac
tion
leve
l for
lead
.
39.8
4%
Tow
n of
Mar
ion
CW
$3
,147
,400
W
aste
wat
er a
nd S
torm
wat
er Im
prov
emen
t- Th
e ob
ject
ive
of th
is W
aste
wat
er C
olle
ctio
n Sy
stem
and
D
rain
age
Syst
em Im
prov
emen
ts p
roje
ct is
to im
prov
e w
ater
qua
lity
in c
oast
al re
ceiv
ing
wat
ers a
nd to
im
prov
e th
e op
erat
ions
of t
he T
own'
s was
tew
ater
col
lect
ion
syst
em a
nd tr
eatm
ent p
lant
by
redu
cing
th
e vo
lum
e of
infil
tratio
n an
d in
flow
(I/I)
ent
erin
g th
e co
llect
ion
syst
em, a
nd im
prov
ing
the
wat
er
qual
ity o
f sto
rm w
ater
dis
char
ges t
hrou
gh th
e re
mov
al o
f illi
cit c
onne
ctio
ns to
the
sew
er sy
stem
and
th
roug
h th
e co
nstru
ctio
n of
Bes
t Man
agem
ent P
ract
ices
. The
pro
ject
will
pro
vide
the
foun
datio
n fo
r th
e re
duct
ion
of p
atho
gen
disc
harg
es to
Sip
pica
n H
arbo
r and
Buz
zard
s Bay
as w
ell a
s sig
nific
antly
re
duce
the
volu
me
of p
ublic
and
priv
ate
I/I e
nter
ing
the
colle
ctio
n sy
stem
.
83.1
6%
2016 SRF ANNUAL REPORT | 33
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
City
of
Mar
lbor
ough
C
W
$20,
000,
000
Mar
lbor
ough
Eas
terly
Was
te W
ater
Tre
atm
ent P
lant
(WW
TP) U
pgra
des-
The
se p
roje
cts c
onsi
st o
f the
im
prov
emen
ts to
the
East
erly
WW
TP to
redu
ce e
fflu
ent p
hosp
horu
s, re
plac
e ag
ing
infr
astru
ctur
e an
d im
prov
e en
ergy
eff
icie
ncy
and
seco
ndly
to c
ondu
ct a
n in
filtra
tion/
inflo
w st
udy
of th
e w
aste
wat
er
colle
ctio
n sy
stem
to id
entif
y, c
hara
cter
ize
and
prio
ritiz
e de
ficie
ncie
s in
the
syst
em to
redu
ce p
eak
flow
s. T
he u
pgra
des a
re p
rimar
ily in
tend
ed to
redu
ce th
e ph
osph
orus
load
s dis
char
ged
from
the
faci
lity
to h
elp
rem
edia
te d
ocum
ente
d nu
trien
t enr
ichm
ent o
f the
rece
ivin
g w
ater
s and
the
dow
nstre
am
Sudb
ury
Riv
er.
The
proj
ect i
s con
sist
ent w
ith th
e C
ompr
ehen
sive
Was
tew
ater
Man
agem
ent P
lan
and
regi
onal
nut
rient
redu
ctio
n go
als.
The
pro
ject
will
als
o im
prov
e th
e en
ergy
eff
icie
ncy
of th
e fa
cilit
y an
d is
exp
ecte
d to
incl
ude
the
inst
alla
tion
of re
new
able
ene
rgy
syst
ems a
t the
site
.
100.
00%
Tow
n of
Med
way
D
W
$1,5
01,1
02
Wat
er M
ain
Rep
lace
men
t- Th
is p
roje
ct a
ddre
sses
the
repl
acem
ent o
f agi
ng w
ater
mai
ns a
nd
appu
rtena
nces
in v
ario
us st
reet
s in
the
com
mun
ity.
The
repl
acem
ent o
f the
se o
ld m
ains
will
hel
p im
prov
e w
ater
qua
lity
with
resp
ect t
o di
sinf
ectio
n, c
ircul
atio
n, v
olum
e an
d fir
e pr
otec
tion.
100%
Tow
n of
Mon
roe
CW
$2
00,0
00
Was
te W
ater
Tre
atm
ent F
acili
ty (W
WTF
) Rep
airs
- As a
resu
lt of
dam
age
sust
aine
d by
the
WW
TF
durin
g th
e w
inte
r of 2
010,
the
tow
n ha
s req
uest
ed a
nd re
ceiv
ed a
ppro
val f
or u
se o
f em
erge
ncy
fund
s to
mak
e te
mpo
rary
em
erge
ncy
repa
irs/m
odifi
catio
ns to
the
exis
ting
faci
lity
and
to st
art d
esig
n of
a
repl
acem
ent W
WTF
. The
des
ign
will
be
done
in a
ccor
danc
e w
ith th
e re
com
men
datio
ns o
utlin
ed in
an
appr
oved
eng
inee
ring
repo
rt da
ted
Dec
embe
r 201
0.
79.7
3%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
$2
,000
,000
N
ut Is
land
Hea
dwor
ks &
Con
very
or Im
prov
emen
ts- T
he p
roje
ct w
ill re
plac
e al
l em
bedd
ed e
lect
rical
co
mpo
nent
s bel
ow h
igh-
tide
leve
l and
will
repl
ace
key
com
pone
nts o
f the
scre
enin
g an
d gr
it co
nvey
or
syst
em a
t the
Nut
Isla
nd H
eadw
orks
(NIH
). T
idal
ly-in
fluen
ced
grou
ndw
ater
infil
tratio
n ha
s cau
sed
corr
osio
n of
the
elec
trica
l wiri
ng, c
ondu
its a
nd p
anel
s tha
t are
em
bedd
ed in
or m
ount
ed o
n th
e w
alls
an
d/or
slab
s and
this
pro
ject
will
cor
rect
the
prob
lem
with
cei
ling-
and
surf
ace-
mou
nted
com
pone
nts
and
have
con
cret
e su
rfac
es tr
eate
d to
pre
vent
infil
tratio
n. T
o im
prov
e th
e op
erat
ion
of th
e gi
rt an
d sc
reen
ings
con
veyo
r, th
e pr
ojec
t will
repl
ace
the
belt
scra
pers
, enc
lose
the
verti
cal b
elts
with
cov
ers,
add
a re
dund
ant s
cree
ning
s con
veyo
r, an
d in
stal
l wid
er d
rip p
ans.
The
pro
ject
will
sign
ifica
ntly
im
prov
e th
e op
erat
ions
, rel
iabi
lity,
and
eff
icie
ncy
of th
ese
syst
ems,
parti
cula
rly d
urin
g w
et w
eath
er
and
mai
ntai
n th
e pe
rfor
man
ce a
nd re
liabi
lity
of th
e N
IH a
s an
impo
rtant
com
pone
nt o
f MW
RS’
s lon
g-te
rm a
sset
pro
tect
ion
initi
ativ
es a
nd m
anag
emen
t pro
ject
s to
pres
erve
ope
ratin
g as
sets
.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
$1
,977
,802
El
ectri
cal U
pgra
des-
The
Dee
r Isl
and
Sew
er T
reat
men
t Pla
nt, w
hich
trea
ts se
wag
e fr
om 4
3 co
mm
uniti
es in
clud
ing
Bos
ton,
was
aff
ecte
d by
two
pow
er o
utag
es a
t NST
AR
subs
tatio
ns th
at p
rovi
de
pow
er to
trea
t sew
age.
The
out
ages
occ
urre
d on
Apr
il 3,
200
4 an
d A
pril
11, 2
004,
as a
resu
lt of
co
ntro
l pro
blem
s with
the
Dee
r Isla
nd e
lect
rical
bac
kup
syst
ems a
ppro
xim
atel
y 2
½ h
ours
and
2 h
ours
de
lay
befo
re p
ower
was
fully
rest
ored
. B
oth
thes
e ev
ents
resu
lted
in sa
nita
ry se
wer
ove
rflo
ws;
the
100.
00%
2016 SRF ANNUAL REPORT | 34
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
larg
est o
f the
syst
em o
verf
low
s las
ted
for s
ever
al h
ours
on
Apr
il 11
th.
MW
RA
als
o co
nduc
ted
ongo
ing
cond
ition
mon
itorin
g as
sess
men
t wor
k to
iden
tify
equi
pmen
t rep
lace
men
t nee
ds.
The
elec
trica
l sys
tem
relia
bilit
y pr
ojec
t will
incl
ude
the
repl
acem
ent o
f tra
nsfo
rmer
s, bu
s duc
t with
cab
le
duct
, and
var
iabl
e fr
eque
ncy
driv
e un
its.
The
elec
trica
l rel
iabi
lity
proj
ect i
s des
igne
d to
ove
rhau
l, up
grad
e, o
r rep
lace
equ
ipm
ent s
yste
ms a
nd is
not
rout
ine
CEP
pla
nt o
pera
tions
and
mai
nten
ance
ne
eds.
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
$2
,912
,188
W
aste
wat
er T
reat
men
t Pla
nt a
nd S
ewer
Impr
ovem
ents
- Thi
s pro
ject
incl
udes
upg
rade
s to
the
Dee
r Is
land
Tre
atm
ent P
lant
aut
omat
ion
and
cent
ral c
ontro
l sys
tem
s as w
ell a
s im
prov
emen
ts a
nd u
pgra
des
to se
vera
l exi
stin
g in
terc
epto
rs a
nd p
ump
stat
ions
that
are
in n
eed
of re
plac
emen
t and
/or
mod
erni
zatio
n. T
he p
roje
ct is
inte
nded
to e
xten
d cu
rren
t ass
et li
fe a
nd im
prov
e sy
stem
ope
rabi
lity.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
$5
,113
,812
D
eer I
slan
d Tr
eatm
ent P
lant
Impr
ovem
ents
- Thi
s pro
ject
is in
clud
ed in
the
Dee
r Isl
and
Trea
tmen
t Pl
ant A
sset
Pro
tect
ion
Prog
ram
, in
orde
r to
ensu
re th
at a
ll of
the
stru
ctur
es a
nd e
quip
men
t ins
talle
d at
D
eer I
slan
d re
mai
n in
goo
d w
orki
ng c
ondi
tion
and/
or a
re re
plac
ed w
ith n
eede
d.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
$8
40,9
82
Nut
Isla
nd H
eadw
orks
Ele
ctric
al &
Con
veyo
r Im
prov
emen
t- Th
e pr
ojec
t will
repl
ace
all e
mbe
dded
el
ectri
cal c
ompo
nent
s bel
ow h
igh-
tide
leve
l and
will
repl
ace
key
com
pone
nts o
f the
scre
enin
gs a
nd
grit
conv
eyor
syst
em a
t the
Nut
Isla
nd H
eadw
orks
(NIH
). T
idal
ly-in
fluen
ced
grou
ndw
ater
infil
tratio
n ha
s cau
sed
corr
osio
n of
the
elec
trica
l wiri
ng, c
ondu
its a
nd p
anel
s tha
t are
em
bedd
ed in
or m
ount
ed o
n th
e w
alls
and
/or s
labs
and
this
pro
ject
will
cor
rect
the
prob
lem
with
cei
ling-
and
surf
ace-
mou
nted
co
mpo
nent
s and
hav
e co
ncre
te su
rfac
es tr
eate
d to
pre
vent
infil
tratio
n. T
o im
prov
e th
e op
erat
ion
of th
e gr
it an
d sc
reen
ings
con
veyo
rs, t
he p
roje
ct w
ill re
plac
e th
e be
lt sc
rape
rs, e
nclo
se th
e ve
rtica
l bel
ts w
ith
cove
rs, a
dd a
redu
ndan
t scr
eeni
ngs c
onve
yor a
nd in
stal
l wid
er d
rip p
ans.
The
pro
ject
will
sign
ifica
ntly
im
prov
e th
e op
erat
ions
, rel
iabi
lity,
and
eff
icie
ncy
of th
ese
syst
ems,
parti
cula
rly d
urin
g w
et w
eath
er
and
mai
ntai
n th
e pe
rfor
man
ce a
nd re
liabi
lity
of th
e N
IH a
s an
impo
rtant
com
pone
nt o
f MW
RA
's lo
ng-
term
ass
et p
rote
ctio
n in
itiat
ives
and
man
agem
ent p
roje
cts t
o pr
eser
ve o
pera
ting
asse
ts.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
$1
5,00
0,00
0 C
ombi
ned
Sew
er O
verf
low
(CSO
) Pha
se 1
4- T
he p
rimar
y ob
ject
ive
of th
e C
SO c
ontro
l pla
n is
to
brin
g C
SO d
isch
arge
s in
Bos
ton
Har
bor a
nd it
s trib
utar
ies i
nto
com
plia
nce
with
stat
e an
d fe
dera
l re
quire
men
ts.
This
com
pone
nt o
f the
pla
n w
ill in
volv
e ni
ne se
wer
sepa
ratio
n pr
ojec
ts.
All
the
proj
ects
will
be
acco
mpl
ishe
d by
con
stru
ctin
g ne
w st
orm
dra
ins a
nd a
llow
ing
the
exis
ting
com
bine
se
wer
s to
func
tion
as se
para
te sa
nita
ry se
wer
s, or
by
cons
truct
ing
new
sani
tary
sew
ers a
nd a
llow
ing
the
exis
ting
com
bine
d se
wer
to se
rve
as st
orm
dra
ins.
The
pro
ject
will
resu
lt in
the
elim
inat
ion
of
CSO
dis
char
ges a
t sev
eral
out
falls
.
100.
00%
2016 SRF ANNUAL REPORT | 35
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$5
,000
,000
Lo
w S
ervi
ce S
tora
ge- T
his p
roje
ct is
for t
he c
onst
ruct
ion
of a
20
mill
ion
gallo
n po
tabl
e w
ater
stor
age
tank
in th
e To
wn
of S
tone
ham
at i
ts te
rmin
al re
serv
oir a
t the
nor
thea
ster
n ex
trem
ity o
f the
MW
RA
w
ater
serv
ice
to m
etro
polit
an B
osto
n. T
he p
roje
ct w
ill p
rovi
de im
prov
ed st
orag
e (1
6-20
mill
ion
gallo
ns) b
ut w
ill a
lso
prov
ide
surg
e re
lief,
prot
ectin
g M
WR
A a
nd c
omm
unity
mai
ns; a
llow
mor
e ef
ficie
nt u
se o
f the
exi
stin
g M
WR
A d
istri
butio
n sy
stem
; and
, pro
vide
em
erge
ncy
back
up to
21
com
mun
ities
in th
e N
orth
ern
Inte
rmed
iate
Hig
h an
d N
orth
ern
Hig
h sy
stem
s.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$6
00,0
00
Nor
ther
n H
igh
Serv
ice(
NH
S)- R
ever
e &
Mal
den
Pipe
line-
The
pro
ject
wor
k in
clud
es th
e N
HS
impr
ovem
ents
in R
ever
e an
d M
alde
n.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$6
00,0
00
Nor
ther
n Lo
w S
ervi
ce (N
LS) A
rea
Reh
abili
tatio
n- T
his p
roje
ct in
volv
es th
e re
habi
litat
ion
of th
e N
LS
area
, whi
ch c
onsi
sts o
f the
repl
acem
ent o
f a p
ortio
n of
Sec
tion
8; re
habi
litat
ion
of S
ectio
ns 3
7 an
d 46
; an
d co
nstru
ctio
n of
Sec
tion
97A
. Se
ctio
n 8,
an
unlin
ed p
ipel
ine
was
inst
alle
d be
twee
n 18
97 a
nd 1
920
and
is c
urre
ntly
func
tioni
ng a
t app
roxi
mat
ely
45%
of i
ts o
rigin
al c
apac
ity d
ue to
the
build
-up
of ru
st
depo
sits
and
oth
er m
atte
r alo
ng th
e pi
pelin
e w
all a
nd h
as e
xper
ienc
ed le
aks a
t an
abov
e av
erag
e ra
te.
Exca
vatio
ns fo
r the
inst
alla
tion
of n
ew v
alve
s alo
ng p
ortio
ns o
f sec
tion
8 ha
ve in
dica
ted
poss
ible
se
vere
ext
erna
l cor
rosi
on o
n th
e pi
pe w
all,
whi
ch c
ould
aff
ect t
he st
ruct
ural
stab
ility
of t
he p
ipel
ine.
R
ehab
ilita
tions
of S
ectio
ns 3
7 an
d 46
will
impr
ove
the
serv
ice
to E
ast B
osto
n an
d w
ill a
llow
the
shut
dow
n of
Sec
tion
8 fo
r reh
abili
tatio
n.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$1
,000
,000
N
ew C
onne
ctin
g M
ains
- Thi
s pro
ject
invo
lves
the
cons
truct
ion
of n
ew c
onne
ctin
g m
ains
with
in th
e M
WR
A D
istri
butio
n Sy
stem
bet
wee
n W
esto
n A
qued
uct S
uppl
y M
ains
3 a
nd 4
and
the
City
Tun
nel.
Thes
e co
nnec
ting
mai
ns in
the
Inte
rmed
iate
Hig
h, N
orth
ern
Hig
h, N
orth
ern
Extra
Hig
h an
d So
uthe
rn
Hig
h se
rvic
e ar
eas p
rovi
de tr
ansp
ort o
f wat
er fr
om th
e C
ity T
unne
l and
the
City
Tun
nel E
xten
sion
to
mun
icip
al m
eter
s alo
ng a
n 11
-mile
pip
elin
e, w
hich
cur
rent
ly h
as n
o co
nnec
ting
mai
ns a
nd n
o ot
her
mea
ns a
vaila
ble
to a
dequ
atel
y su
pply
com
mun
ities
.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$1
,600
,000
Lo
wer
Hul
tman
Aqu
educ
t Reh
abili
tatio
n- T
he w
ork
incl
udes
the
cons
truct
ion
of in
terc
onne
ctio
ns
betw
een
the
Met
ro W
est T
unne
l and
the
Hul
tman
Aqu
educ
t; as
wel
l as r
ehab
ilita
tion
of th
e aq
uedu
ct
that
incl
udes
repl
acem
ent o
r rep
air o
f air
relie
f stru
ctur
es, b
low
-off
val
ves,
culv
erts
ben
eath
the
aque
duct
; and
repl
acem
ent o
f exi
stin
g va
lves
.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$2
40,3
42
Sout
hern
Spi
ne D
istri
butio
n M
ains
- Thi
s pro
ject
requ
ires c
lean
ing,
reha
bilit
atio
n an
d re
pair
of th
e 20
m
iles o
f old
wat
er m
ains
whi
ch a
re c
urre
ntly
func
tioni
ng a
t 50%
of t
heir
orig
inal
cap
acity
. In
ad
ditio
n, th
ere
is n
eed
to re
plac
e m
any
inop
erab
le v
alue
s in
the
syst
em.
The
mai
ns b
egin
in B
rook
line
100.
00%
2016 SRF ANNUAL REPORT | 36
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
and
end
at th
e B
lue
Hill
s Res
ervo
ir in
Qui
ncy.
The
mai
ns se
rve
the
Sout
hern
Hig
h an
d So
uthe
rn E
xtra
H
igh
Syst
em c
omm
uniti
es o
f Bos
ton,
Bro
oklin
e, M
ilton
, Qui
ncy,
Nor
woo
d an
d C
anto
n.
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$1
,800
,000
Lo
wer
Hul
tman
Aqu
educ
t Reh
abili
tatio
n- T
his w
ork
incl
udes
con
stru
ctio
n of
inte
rcon
nect
ions
be
twee
n th
e M
etro
Wes
t Tun
nel a
nd th
e H
ultm
an A
qued
uct,
as w
ell a
s reh
abili
tatio
n of
the
aque
duct
th
at in
clud
es re
plac
emen
t or r
epai
r of a
ir re
lief s
truct
ures
, blo
w-o
ff v
alve
s, cu
lver
ts b
enea
th th
e aq
uedu
ct; a
nd th
e re
plac
emen
t of e
xist
ing
valv
es.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$6
66,6
66
New
Con
nect
ing
Mai
ns- T
his p
roje
ct in
volv
es th
e co
nstru
ctio
n of
new
con
nect
ing
mai
ns w
ithin
the
MW
RA
Dis
tribu
tion
Syst
em b
etw
een
Wes
ton
Aqu
educ
t Sup
ply
Mai
ns 3
and
4 a
nd th
e C
ity T
unne
l. Th
ese
conn
ectin
g m
ains
in th
e In
term
edia
te H
igh,
Nor
ther
n H
igh,
Nor
ther
n Ex
tra H
igh
and
Sout
hern
H
igh
serv
ice
area
s pro
vide
tran
spor
t of w
ater
from
the
City
Tun
nel a
nd th
e C
ity T
unne
l Ext
ensi
on to
m
unic
ipal
met
ers a
long
an
11-m
ile p
ipel
ine,
whi
ch c
urre
ntly
has
no
conn
ectin
g m
ains
and
no
othe
r m
eans
ava
ilabl
e to
ade
quat
ely
supp
ly c
omm
uniti
es.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$2
,500
,000
Lo
w S
ervi
ce S
tora
ge- T
his p
roje
ct is
for t
he c
onst
ruct
ion
of a
20
mill
ion
gallo
n po
tabl
e w
ater
stor
age
tank
in th
e To
wn
of S
tone
ham
at i
ts te
rmin
al re
serv
oir a
t the
nor
thea
ster
n ex
trem
ity o
f the
MW
RA
w
ater
serv
ice
to m
etro
polit
an B
osto
n. T
he p
roje
ct w
ill p
rovi
de im
prov
ed st
orag
e (1
6-20
mill
ion
gallo
ns) b
ut w
ill a
lso
prov
ide
surg
e re
lief,
prot
ectin
g M
WR
A a
nd c
omm
unity
mai
ns, a
llow
mor
e ef
ficie
nt u
se o
f the
exi
stin
g M
WR
A d
istri
butio
n sy
stem
and
pro
vide
em
erge
ncy
back
up to
21
com
mun
ities
in th
e N
orth
ern
Inte
rmed
iate
Hig
h an
d N
orth
ern
Hig
h sy
stem
s.
100.
00%
Tow
n of
N
antu
cket
C
W
$4,9
99,2
00
Sew
er R
epla
cem
ent f
or In
flow
and
Infil
tratio
n (I
/I) R
emov
al- T
his p
roje
ct is
for t
he re
habi
litat
ion
of a
po
rtion
of N
antu
cket
’s se
wer
syst
em in
dow
ntow
n N
antu
cket
to re
mov
e ex
cess
ive
infil
tratio
n. T
his
porti
on o
f the
sew
age
colle
ctio
n sy
stem
is a
sign
ifica
nt c
ontri
buto
r of t
he st
orm
wat
er in
flow
and
gr
ound
wat
er in
filtra
tion
foun
d th
roug
hout
the
colle
ctio
n sy
stem
. Ill
icit
conn
ectio
ns to
the
sani
tary
se
wer
syst
em, b
acku
ps, a
nd o
verf
low
s are
all
prob
lem
s cau
sed
by I/
I. A
s a d
irect
resu
lt of
ove
rload
in
the
Surf
side
Was
tew
ater
Tre
atm
ent F
acili
ty, p
lant
eff
luen
t may
neg
ativ
ely
affe
ct a
rea
park
land
s, be
ache
s and
oth
er c
oast
al lo
catio
ns.
The
proj
ect i
nclu
des i
nstil
latio
n of
sew
ers,
inst
alla
tion
of d
ead
end
man
hole
s and
inst
alla
tion
of in
-line
man
hole
s. T
he re
habi
litat
ion
wor
k w
ill a
ssis
t in
mai
ntai
ning
co
mpl
ianc
e le
vels
at t
he W
WTF
and
fulfi
ll th
e co
mm
enda
tions
in th
e C
ompr
ehen
sive
Was
tew
ater
M
anag
emen
t Pla
n.
100%
City
of
New
bury
port
D
W
$300
,000
W
ater
Tre
atm
ent F
acili
ty (W
TF) U
pgra
de a
nd W
ater
Dis
tribu
tion
Syst
em- T
he p
roje
ct, w
hich
incl
udes
th
ree
cont
ract
s, w
ill u
pgra
de th
e N
ewbu
rypo
rt W
TP b
y co
nstru
ctin
g a
new
WTP
with
dis
solv
ed a
ir flo
atat
ion
clar
ifica
tion
and
will
inst
all n
ew w
ater
mai
ns to
add
ress
low
pre
ssur
e ar
eas a
nd d
ead
ends
w
ithin
the
wat
er d
istri
butio
n sy
stem
. The
new
WTP
will
allo
w th
e pl
ant t
o be
tter m
eet t
he p
eak
flow
98.8
4%
2016 SRF ANNUAL REPORT | 37
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
rate
for w
hich
the
plan
t is c
apab
le a
nd to
mee
t the
turb
idity
requ
irem
ents
. WTP
impr
ovem
ents
als
o in
clud
e up
grad
e of
the
exis
ting
WTP
bui
ldin
g, c
onst
ruct
ion
of a
new
cle
arw
ell a
nd p
ump
stat
ion
to
hous
e th
e fin
ishe
d w
ater
and
bac
kwas
h w
ater
pum
ps, a
nd u
pgra
de o
f the
resi
dual
s han
dlin
g sy
stem
to
prov
ide
recy
cle
of th
e fil
ter b
ackw
ash
wat
er a
nd d
isch
arge
of r
esid
uals
to th
e ex
istin
g la
goon
. The
W
ater
Dis
tribu
tion
Syst
em Im
prov
emen
ts p
roje
ct w
ould
add
ress
low
pre
ssur
e pr
oble
ms i
n tw
o lo
catio
ns: t
he st
reet
s sur
roun
ding
the
inte
rcon
nect
ion
betw
een
the
City
of N
ewbu
rypo
rt an
d th
e To
wn
of W
est N
ewbu
ry b
y re
plac
ing
the
exis
ting
forc
e m
ain
cros
sing
ove
r Rou
te 9
5 an
d th
e po
rtion
of t
he
syst
em th
at su
pplie
s wat
er to
the
Tow
n of
New
bury
by
repl
acin
g ap
prox
imat
ely
one-
mile
of f
orce
m
ain
with
an
incr
ease
d si
ze p
ipe.
The
Wat
er D
istri
butio
n pr
ojec
t will
als
o ad
dres
s the
elim
inat
ion
of
dead
-end
s by
inst
allin
g ne
w fo
rce
mai
ns o
n fiv
e st
reet
s inc
ludi
ng B
owle
n A
venu
e, F
inni
gan
Way
, G
olds
mith
Driv
e, H
ope
Ave
nue,
and
Tra
cey
Stre
et.
Tow
n of
Nor
th
Att
lebo
roug
h C
W
$11,
416,
000
Was
te W
ater
Tre
atm
ent F
acili
ty (W
WTF
) Upg
rade
and
Inflo
w a
nd In
filtra
tion
(I/I)
Rem
oval
- W
WTF
w
ill b
e up
grad
ed to
rem
ove
nitro
gen
and
phos
phor
us in
resp
onse
to a
new
NPD
ES p
erm
it an
d EP
A
Adm
inis
trativ
e O
rder
. Th
e w
ork
will
impr
ove
the
disc
harg
e to
the
Ten
Mile
Riv
er to
impr
ove
wat
er
qual
ity.
The
proj
ect a
lso
initi
ates
a fi
ve-y
ear (
I/I) r
emov
al p
rogr
am th
roug
hout
the
city
. Th
e I/I
pr
ojec
t inc
lude
s col
lect
ion
syst
em re
habi
litat
ion
and
repl
acem
ent a
nd d
isco
nnec
ting
stor
m sy
stem
co
nnec
tions
form
the
sew
er sy
stem
. R
educ
ing
I/I fr
om th
e tre
atm
ent p
lant
will
redu
ce th
e vo
lum
e of
w
ater
to b
e tre
ated
, res
ultin
g in
ope
ratio
nal a
nd e
nerg
y sa
ving
s.
95.5
7%
Tow
n of
Pe
mbr
oke
CW
$9
8,39
3 C
appi
ng o
f Hob
onoc
k St
reet
Lan
dfill
- The
pro
pose
d pr
ojec
t con
sist
s of p
rope
rly c
appi
ng th
e H
obom
ock
Stre
et L
andf
ill to
pre
vent
the
spre
ad o
f hea
vy m
etal
s and
oth
er p
ollu
tant
s int
o th
e gr
ound
wat
er a
nd n
eigh
borin
g w
ater
way
s. T
he c
ompl
eted
pro
ject
will
pro
vide
a lo
catio
n fo
r ren
ewab
le
ener
gy fa
cilit
y.
100.
00%
City
of P
ittsf
ield
C
W
$4,1
00,0
00
Ener
gy E
ffic
ienc
y, P
hoto
volta
ic &
Com
bine
d H
eat a
nd P
ower
(CH
P) In
stal
latio
n- T
he C
ity o
f Pi
ttsfie
ld o
pera
tes a
n ad
vanc
ed, n
utrie
nt-r
emov
al tr
eatm
ent f
acili
ty th
at p
roce
sses
app
roxi
mat
ely
10.8
m
illio
n ga
llons
of w
aste
wat
er p
er d
ay. T
he fa
cilit
y tre
ats m
unic
ipal
and
indu
stria
l was
tes f
rom
Pi
ttsfie
ld, D
alto
n, H
insd
ale,
Lan
esbo
roug
h an
d N
orth
Len
ox. T
he g
reen
ene
rgy
upgr
ades
to th
e pl
ant
will
incl
ude:
Upg
radi
ng th
e ex
istin
g si
ngle
-spe
ed m
echa
nica
l mix
ing
syst
em to
a fi
ne b
ubbl
e ae
ratio
n sy
stem
, pe
rfor
min
g he
atin
g an
d lig
htin
g up
grad
es;
Upg
radi
ng th
e ex
istin
g an
aero
bic
slud
ge d
iges
tion
syst
em b
y in
stal
ling
a 19
5 kW
bio
mas
s (sl
udge
) co
gene
ratio
n sy
stem
for o
n-si
te e
lect
ric p
ower
gen
erat
ion;
In
stal
ling
up to
a 1
,575
kW
sola
r pho
tovo
ltaic
syst
em (r
oof a
nd g
roun
d-m
ount
ed);
In to
tal,
over
$64
7,00
0 (8
9%) i
n an
nual
ene
rgy
savi
ngs,
1,77
0 kW
of g
reen
pow
er g
ener
atio
n (s
olar
ph
otov
olta
ic &
CH
P), a
nd a
ppro
xim
atel
y 3,
252
tons
of c
arbo
n di
oxid
e em
issi
on re
duct
ions
will
resu
lt
100.
00%
2016 SRF ANNUAL REPORT | 38
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
annu
ally
from
thes
e gr
een
inve
stm
ents
. C
onst
ruct
ion
of th
e C
HP
proj
ect r
evea
led
signi
fican
t ele
ctric
al o
verlo
ad c
ondi
tions
in th
e M
otor
C
ontro
l Cen
ter (
MC
C) a
nd a
ssoc
iate
d tra
nsfo
rmer
, and
non
-com
plia
nt e
lect
rical
and
bui
ldin
g co
de
cond
ition
s. T
he re
plac
emen
t of t
he e
xist
ing
MC
C, t
rans
form
er, s
tand
-by
pow
er sy
stem
s and
as
soci
ated
ele
ctric
al u
pgra
des a
re n
eces
sary
to e
nsur
e th
e sa
fe, u
nint
erru
pted
ope
ratio
n of
the
Was
te
Wat
er T
reat
men
t Pla
nt.
Tow
n of
R
ando
lph
DW
$2
,933
,623
W
ater
Sys
tem
Impr
ovem
ents
- Thi
s pro
ject
add
ress
es th
e re
quire
men
ts se
t for
th in
the
cons
ent o
rder
, by
iden
tifyi
ng a
nd re
pairi
ng w
ater
mai
ns in
nee
d of
reha
bilit
atio
n, to
pro
vide
impr
ovem
ents
to th
e w
ater
dis
tribu
tion
syst
em.
66.8
7%
City
of R
ever
e C
W
$1,2
73,7
74
SSES
Pha
se 3
and
Sto
rm W
ater
Sys
tem
Man
agem
ent P
lan
(SW
SMP)
- The
pro
ject
incl
udes
pla
nnin
g id
entif
ied
and
requ
ired
by a
con
sent
dec
ree.
The
pro
ject
scop
e w
ill in
clud
e th
e fo
llow
ing:
sew
er fl
ow
met
erin
g, fl
ow is
olat
ion,
tele
visi
on in
spec
tion,
dye
test
ing,
and
smok
e te
stin
g (a
s req
uire
d) to
com
plet
e th
e ev
alua
tion
of th
e w
aste
wat
er c
olle
ctio
n sy
stem
alo
ng w
ith su
ppor
t for
ong
oing
ass
essm
ent o
f the
st
orm
wat
er sy
stem
incl
udin
g ill
icit
disc
harg
e un
derw
ay in
the
city
.
100.
00%
City
of R
ever
e C
W
$5,8
56,3
07
Sew
er S
yste
m C
onst
ruct
ion-
The
pro
ject
con
sist
s of t
he im
prov
emen
ts to
the
mos
t def
icie
nt se
wer
pi
ping
in th
e Ph
ase
3 ar
ea, a
s wel
l as i
mpr
ovem
ents
iden
tifie
d du
ring
prev
ious
inve
stig
atio
ns.
The
proj
ect w
ill p
rimar
ily re
duce
infil
tratio
n an
d so
urce
s of e
xtra
neou
s inf
low
and
will
als
o re
duce
the
amou
nt o
f sto
rm w
ater
ent
erin
g th
e ci
ty’s
was
tew
ater
col
lect
ion
syst
em, c
ontri
butin
g to
sani
tary
sew
er
over
flow
s (SS
O’s
) tha
t are
unn
eces
saril
y be
ing
treat
ed a
t the
Dee
r Isl
and
Was
tew
ater
Tre
atm
ent P
lant
.
97.5
0%
City
of R
ever
e C
W
$1,8
91,4
06
Win
thro
p A
ve E
mer
genc
y Se
wer
Rep
lace
men
t- O
n A
ugus
t 28,
201
3 du
ring
the
proc
ess o
f per
form
ing
mai
nten
ance
on
the
Win
thro
p A
venu
e tru
nk se
wer
, an
appr
oxim
ate
20 fo
ot lo
ng se
ctio
n of
sew
er
colla
psed
. The
col
laps
e oc
curr
ed a
t the
app
roxi
mat
e m
id-p
oint
of a
160
foot
long
, 18
foot
dee
p,
vitri
fied
clay
(VC
) sew
er se
gmen
t, lo
cate
d be
low
two
MW
RA
wat
er m
ains
runn
ing
from
the
Elm
St
reet
inte
rsec
tion
east
erly
to th
e do
wns
tream
man
hole
. Se
vera
l alte
rnat
ives
to a
ddre
ss th
e co
llaps
ed
pipe
hav
e be
en c
onsi
dere
d. P
revi
ous p
erfo
rmed
hyd
raul
ic m
odel
ing
show
ed th
at th
e ex
istin
g 18
-inch
tru
nk se
wer
in W
inth
rop
Ave
nue
is u
nder
size
d an
d sh
ould
be
repl
aced
with
a 3
6-in
ch se
wer
to a
ddre
ss
surc
harg
ing/
flood
ing
issu
es in
this
are
a re
late
d to
cap
acity
of t
he tr
unk
sew
er.
Sinc
e th
e co
llaps
ed
trunk
sew
er is
sche
dule
d fo
r eve
ntua
l rep
lace
men
t/ups
izin
g in
the
next
few
yea
rs a
nd se
wer
segm
ents
up
stre
am a
nd d
owns
tream
of t
he c
olla
pse
are
in p
oor c
ondi
tion,
the
city
inte
nds t
o in
stal
l ap
prox
imat
ely
900
feet
of 3
6-in
ch re
plac
emen
t sew
er fr
om th
e in
terc
epto
r in
Rev
ere
Bea
ch P
arkw
ay
up to
Vic
toria
Ave
nue.
92.4
7%
2016 SRF ANNUAL REPORT | 39
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
Sau
gus
CW
$4
39,3
69
Sew
er S
yste
m R
ehab
ilita
tion-
Thi
s pro
ject
incl
udes
sew
er sy
stem
reha
bilit
atio
n in
subs
yste
m 6
B,
whi
ch re
pres
ents
con
tinue
d w
ork
to re
duce
ext
rane
ous w
ater
in th
e w
aste
wat
er sy
stem
to d
ecre
ase
the
likel
ihoo
d of
syst
em su
rcha
rges
. R
ehab
ilita
tion
of su
bsys
tem
6B
incl
udes
app
roxi
mat
ely
3-1/
2 m
iles
of C
IPP
linin
g, in
stal
latio
n of
app
roxi
mat
ely
250
linin
g sy
stem
s to
impr
ove
serv
ice
to m
ainl
ine
conn
ectio
ns, r
ehab
ilita
tion
of a
ppro
xim
atel
y 15
0 m
anho
les,
and
rem
oval
and
/or r
e-di
rect
ing
priv
ate
inflo
w b
ase
on th
ose
prop
ertie
s con
firm
ed to
hav
e in
flow
sour
ces d
urin
g th
e to
wn-
wid
e ho
use-
to-
hous
e in
spec
tion
prog
ram
. Th
is p
roje
ct a
lso
incl
udes
upg
rade
s and
reha
bilit
atio
n to
the
Linc
oln
Ave
nue
Pum
p St
atio
n.
82.4
9%
Tow
n of
Sau
gus
CW
$1
,543
,200
Se
wer
Sys
tem
Ove
rflo
w (S
SO) R
educ
tion
Subs
yste
m 6
- Thi
s pro
ject
invo
lves
the
reha
bilit
atio
n of
pi
pelin
es, m
anho
les a
nd th
e re
mov
al o
f priv
ate
inflo
w so
urce
s in
Subs
yste
m 6
of t
he S
augu
s Sew
er
Syst
em a
s a m
eans
to e
limin
ate
infil
tratio
n an
d in
flow
(I/I)
from
the
syst
em a
nd si
gnifi
cant
ly re
duce
or
elim
inat
e se
wer
syst
em o
verf
low
s at t
he L
inco
ln A
venu
e Pu
mpi
ng S
tatio
n. T
he p
roje
ct a
lso
incl
udes
th
e in
stal
latio
n of
a w
et w
eath
er p
ump
stat
ion
(Sav
ille
Stre
et p
umpi
ng S
tatio
n) to
miti
gate
the
SSO
’s
in th
e In
nis a
nd E
lm S
treet
are
a. T
his p
roje
ct is
par
t of a
n on
goin
g pr
ogra
m to
elim
inat
e ex
cess
ive
I/I
in th
e Sa
ugus
Sew
er S
yste
m fr
om c
ausi
ng se
wer
ove
rflo
ws t
o R
umne
y M
arsh
and
the
Saug
us R
iver
an
d su
rcha
rgin
g to
the
Lynn
Sew
er S
yste
m.
92.9
8%
Tow
n of
Sh
rew
sbur
y C
W
$4,1
46,7
10
Sew
er In
terc
epto
r and
Pum
p St
atio
n- T
his p
roje
ct is
a th
ree-
phas
ed c
onst
ruct
ion
to re
plac
e or
line
Sh
rew
sbur
y se
wer
Inte
rcep
tor,
and
upgr
ade
exis
ting
six
pum
p st
atio
ns.
The
prop
osed
pro
ject
will
el
imin
ate
sew
er b
ack-
ups a
nd o
verf
low
s.
92.1
7%
City
of T
aunt
on
CW
$4
,688
,669
Ph
ases
8-9
Sew
er S
yste
m E
valu
atio
n Su
rvey
(SSE
S) a
nd P
ump
Stat
ion
Upg
rade
s - T
his p
roje
ct is
for
repa
ir an
d re
plac
emen
t of s
ewer
mai
ns a
nd se
rvic
e la
tera
ls, r
emov
al o
f sto
rmw
ater
con
nect
ions
to th
e sa
nita
ry se
wer
, rem
oval
of r
oof l
eade
rs a
nd su
mp
pum
p co
nnec
tions
from
the
sew
er sy
stem
, sep
arat
ion
of c
ombi
ned
man
hole
s, an
d up
grad
e of
vita
l pum
p st
atio
ns.
The
proj
ect w
ill e
limin
ate
pote
ntia
l pub
lic
heal
th th
reat
s and
nui
sanc
es re
sulti
ng fr
om se
wag
e di
scha
rge
to th
e re
ceiv
ing
wat
ers a
nd re
duce
the
risk
of se
wer
ove
rflo
ws.
100.
00%
City
of T
aunt
on
CW
$5
52,8
81
Win
thro
p St
. Sew
er E
xten
sion
s - T
he p
roje
ct w
ill e
xten
d se
wer
serv
ice
to n
eeds
are
as id
entif
ied
by th
e ci
ty's
Com
preh
ensi
ve W
aste
wat
er M
anag
emen
t Pla
n (C
WM
P).
The
proj
ect i
nclu
des c
onst
ruct
ing
a ne
w se
wag
e pu
mpi
ng st
atio
n. T
he w
ork
will
allo
w b
alan
cing
of f
low
s bet
wee
n pu
mp
stat
ions
to
prev
ent o
verta
the
War
ner B
oule
vard
pum
p st
atio
n.
90.9
9%
Tow
n of
Web
ster
D
W
$1,6
57,2
67
Wat
er M
ain
Con
stru
ctio
n- T
he p
roje
ct in
clud
es th
e co
nstru
ctio
n of
app
roxi
mat
ely
4,50
0 fe
et n
ew
wat
er m
ain
alon
g R
awso
n R
oad
Res
ervo
ir A
cces
s Roa
d, R
awso
n R
oad
to G
ore
Roa
d, a
nd se
ctio
n of
G
ore
Roa
d, in
stal
latio
n of
app
roxi
mat
ely
75 li
near
feet
cur
ed-in
-pip
e lin
er, a
nd in
stal
ling
a Ti
defle
x
100.
00%
2016 SRF ANNUAL REPORT | 40
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Mix
ing
Syst
em fo
r the
Raw
son
Roa
d W
ater
Tan
k. T
he p
roje
ct w
ill re
duce
the
prob
abili
ty o
f fut
ure
failu
res a
nd th
us re
duce
the
risk
of sy
stem
con
tam
inat
ion,
iron
and
man
gane
se w
ater
qua
lity
dist
urba
nces
and
the
loss
of w
ater
from
stor
age.
Tow
n of
W
ellfl
eet
CW
$2
00,0
00
Com
preh
ensi
ve W
aste
wat
er M
anag
emen
t Pla
n (C
WM
P)- T
he T
own
of W
ellfl
eet p
ropo
ses t
o cr
eate
a
CW
MP
to a
ddre
ss to
wn-
wid
e w
aste
wat
er m
anag
emen
t con
cern
s. M
uch
of th
e to
wn'
s Cen
tral D
istri
ct
has s
mal
l lot
s with
sept
ic sy
stem
s tha
t hav
e le
d to
doc
umen
ted
elev
ated
nitr
ate
leve
ls in
the
grou
ndw
ater
and
Wel
lflee
t Har
bor.
The
pla
n w
ill id
entif
y th
e op
tions
ava
ilabl
e to
redu
ce th
e po
llutio
n an
d im
prov
e w
ater
qua
lity
in th
e ar
ea.
100.
00%
Tow
n of
Wes
t Sp
ring
field
DW
$5
66,3
84
Wat
er T
rasm
issi
on M
ain
and
Wel
lfiel
d- T
he p
roje
ct in
volv
es th
e co
mpl
ete
repl
acem
ent (
abou
t 5
mile
s) o
f the
tran
smis
sion
mai
n fr
om W
ell #
4 at
the
Sout
hwic
k W
ellfi
eld
to a
n ex
istin
g m
ain
loca
ted
on D
ewey
Stre
et in
Wes
t Spr
ingf
ield
's di
strib
utio
n sy
stem
. The
exi
stin
g tra
nsm
issi
on m
ain
is
unre
liabl
e (in
stal
led
in 1
938)
, und
ersi
zed,
and
follo
ws a
mos
tly c
ross
-cou
ntry
rout
e th
at g
reat
ly li
mits
ac
cess
ibili
ty. D
ue to
this
, the
Tow
n is
not
abl
e to
util
ize
the
Sout
hwic
k W
ellfi
eld
to it
s per
mitt
ed
capa
city
. The
Sou
thw
ick
Wel
lfiel
d pr
ovid
es a
ppro
xim
atel
y 80
% o
f the
Tow
n's w
ater
supp
ly. D
ue to
th
e in
crea
sed
carr
ying
cap
acity
of t
he p
ropo
sed
trans
mis
sion
mai
n, th
e pr
ojec
t will
als
o ne
cess
itate
im
prov
emen
ts a
t the
Sou
thw
ick
Wel
lfiel
d, in
clud
ing
new
wel
l scr
eens
, ins
talla
tion
of V
FDs,
and
the
inst
alla
tion
of tw
o ad
ditio
nal c
arbo
n ab
sorb
ers a
t the
trea
tmen
t fac
ility
. Im
prov
ing
the
carr
ying
ca
paci
ty o
f the
tran
smis
sion
mai
n fr
om th
e So
uthw
ick
Wel
lfiel
d w
ill re
duce
the
Tow
n's r
elia
nce
on th
e B
ear H
ole
Res
ervo
ir, w
hich
is th
e To
wn'
s oth
er so
urce
of w
ater
. The
Tow
n ha
s had
pas
t epi
sode
s of
tast
e an
d od
or p
robl
ems r
esul
ting
from
alg
ae a
nd tu
rnov
er is
sues
in th
e re
serv
oir.
The
Bea
r Hol
e R
eser
voir
WTP
util
izes
ope
n sl
ow sa
nd fi
lters
that
hav
e no
bac
kwas
h ca
pabi
lity.
The
pro
ject
will
als
o in
stal
l var
iabl
e fr
eque
ncy
driv
es a
t eac
h of
the
wel
ls.
92.7
3%
Tow
n of
W
estb
orou
gh
CW
$9
8,28
0 A
n In
filtra
tion/
Inflo
w (I
/I) A
naly
sis a
nd S
ewer
Sys
tem
Eva
luat
ion
Surv
ey (S
SES)
will
atte
mpt
to
redu
ce th
e vo
lum
e of
I/I i
n th
e W
estb
orou
gh S
ewer
age
Syst
em, t
o th
e W
estb
orou
gh W
WTF
, and
fin
ally
to th
e A
ssab
et R
iver
; the
reby
atte
mpt
ing
to p
rote
ct th
e riv
er fr
om n
egat
ive
impa
cts.
The
Tow
n of
Wes
tbor
ough
pro
pose
s to
perf
orm
the
I/I A
naly
sis a
nd S
SES
in th
e do
wnt
own
area
, the
wes
t end
of
Tow
n, th
e ea
st e
nd o
f Tow
n, th
e fo
rmer
Lym
an S
choo
l for
Boy
s, an
d th
e St
ate
Hos
pita
l. Th
ese
area
s ar
e th
e m
ost d
ense
ly p
opul
ated
and
old
est a
reas
of t
he se
wer
syst
em.
100.
00%
City
of W
estf
ield
D
W
$2,3
52,2
48
Wat
er M
ain
Rep
lace
men
t- Th
is p
roje
ct re
plac
es a
n un
ders
ized
det
erio
rate
d 14
-inch
raw
wat
er
trans
mis
sion
mai
n in
stal
led
in 1
895.
The
pip
elin
e's h
ydra
ulic
cap
acity
has
dec
lined
to le
ss th
an 3
M
GD
, whi
ch p
reve
nts t
he C
ity o
f Wes
tfiel
d fr
om u
tiliz
ing
the
full
capa
city
of 4
MG
D fr
om th
e Sa
cket
t Wat
er T
reat
men
t Pla
nt.
The
new
tran
smis
sion
mai
n w
ill re
stor
e lo
ng-te
rm sy
stem
relia
bilit
y an
d fu
ll us
e of
the
treat
men
t pla
nt.
The
proj
ect a
lso
inco
rpor
ates
on-
site
ene
rgy
gene
ratio
n us
ing
an
99.4
6%
2016 SRF ANNUAL REPORT | 41
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
in-li
ne tu
rbin
e to
cap
ture
exc
ess h
ydra
ulic
hea
d to
gen
erat
e m
uch
of th
e en
ergy
nee
ded
to ru
n th
e pl
ant.
City
of
Wor
cest
er
CW
$5
61,5
00
Lake
Ave
Sew
er In
flow
and
Infil
tratio
n (I
/I)- T
his p
roje
ct w
ill im
plem
ent t
he re
com
men
datio
ns fr
om
the
Lake
Ave
nue
Are
a Se
wer
Sys
tem
Eva
luat
ion
Surv
ey (S
SES)
to re
mov
e co
st e
ffec
tive
I/I fr
om th
e La
ke A
venu
e A
rea
that
con
tribu
tes t
o su
rcha
rgin
g an
d ov
erflo
ws i
nto
Lake
Qui
nsig
amon
d.
100.
00%
2016 SRF ANNUAL REPORT | 42
Seri
es 1
9 G
reen
Bon
d Pr
ojec
t Des
crip
tions
Pr
ojec
ts F
inan
ced
with
Gre
en B
ond
Proc
eeds
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
And
over
C
W
$675
,000
Th
e Pr
ojec
t will
faci
litat
e la
ndfil
l clo
sure
, gro
undw
ater
sour
ce c
ontro
l and
wet
land
s rem
edia
tion
nece
ssar
y to
miti
gate
adv
erse
impa
cts t
o pu
blic
hea
lth a
nd th
e en
viro
nmen
t cau
sed
by th
e Le
dge
Roa
d La
ndfil
l. T
he p
roje
ct sc
ope
incl
udes
: 1.
Add
ition
al si
te in
vest
igat
ion
2.G
roun
dwat
er so
urce
con
trol s
yste
m p
ilot s
tudy
3.
Mas
sach
uset
ts E
nviro
nmen
tal P
olic
y A
ct C
ompl
ianc
e 4.
Land
fill e
nviro
nmen
tal m
onito
ring
5.Po
st c
losu
re u
se e
valu
atio
n 6.
Mas
sDEP
revi
ew fa
cilit
atio
n
7.Pu
blic
invo
lvem
ent
100%
Aub
urn
Wat
er
Dis
tric
tD
W
$2,6
88,9
52
This
pro
ject
will
add
ress
incr
ease
d le
vels
of a
rsen
ic in
wel
ls (1
1G a
nd 1
2G) a
bove
MC
L of
0.0
10
mill
igra
ms p
er li
ter.
Iron
and
man
gane
se le
vels
are
abo
ve se
cond
ary
max
imum
con
tam
inan
t lev
els.
Th
e 20
12 sa
mpl
es fr
om th
e W
est S
treet
Wel
ls (c
ombi
ned
wat
er) w
ere
0.02
1 m
illig
ram
s per
lite
r.
Thes
e w
ells
wer
e ta
ken
off l
ine
in M
ay 2
013
until
ars
enic
rem
oval
upg
rade
s can
be
com
plet
ed.
In
June
201
3, M
assD
EP m
et w
ith th
e di
stric
t reg
ardi
ng a
dra
ft A
dmin
istra
tive
Con
sent
Ord
er w
ith
Pena
lty to
hav
e th
em u
pgra
de th
eir w
ater
trea
tmen
t fac
ility
for a
rsen
ic re
mov
al.
87.5
3%
Tow
n of
B
arns
tabl
e D
W
$2,4
18,5
47
The
proj
ect i
nclu
des t
he re
plac
emen
t of a
ppro
xim
atel
y 4,
000
feet
of t
he 6
inch
cas
t iro
n an
d as
best
os-
cem
ent p
ipe
with
8 in
ch d
uctil
e iro
n w
ater
mai
n an
d 50
0 fe
et o
f 2 in
ch p
ipe
with
6 in
ch d
uctil
e iro
n w
ater
mai
n. A
thre
e ph
ase
clea
ning
and
lini
ng o
f 16
inch
wat
er m
ain
from
wat
er ta
nks d
own
to M
ain
Stre
et w
ill a
lso
be d
one.
62.0
6%
City
of B
rock
ton
CW
$1
,704
,244
Th
e fo
cus o
f the
pro
ject
is to
add
ress
and
rem
edia
te h
igh
bact
eria
con
cent
ratio
ns d
urin
g dr
y an
d w
et
wea
ther
, as i
dent
ified
in re
cent
wat
er q
ualit
y st
udie
s, to
redu
ce a
nd e
limin
ate
impa
cts t
o re
ceiv
ing
wat
ers.
The
city
has
com
plet
ed n
ine
sew
er sy
stem
reha
bilit
atio
n pr
ojec
ts a
nd fo
ur w
aste
wat
er
treat
men
t fac
ility
upg
rade
s to
addr
ess t
he is
sues
and
man
date
s with
in th
e A
dmin
istra
tive
Con
sent
O
rder
, whi
ch h
as re
cent
ly b
een
lifte
d. T
he p
roje
ct in
clud
es b
oth
trenc
hles
s reh
abili
tatio
n an
d op
en c
ut
repa
ir of
prio
ritiz
ed a
reas
to a
ddre
ss so
urce
s of e
xfilt
ratio
n, in
filtra
tion
and
inflo
w a
nd se
ctio
ns o
f un
ders
ized
pip
e to
impr
ove
wat
er q
ualit
y in
Sal
isbu
ry B
rook
, Tro
ut B
rook
, Sal
isbu
ry P
lain
Riv
er a
nd
Bea
ver B
rook
.
67.6
1%
City
of
Cam
brid
ge
CW
$1
4,00
0,00
0 C
ontra
cts 8
B H
uron
and
Con
tract
9 C
onco
rd w
ill c
ompl
ete
the
sew
er se
para
tion
of th
e C
AM
004
tri
buta
ry a
s req
uire
d by
USE
PA fe
dera
l cou
rt or
der.
Thes
e co
ntra
cts c
onsi
st o
f sew
er a
nd st
orm
wat
er
22.3
3%
2016 SRF ANNUAL REPORT | 43
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
sepa
ratio
n. T
he se
wer
sepa
ratio
n w
ork
may
incl
ude
rem
ovin
g ex
istin
g la
mp
hole
s, tra
nsfe
rrin
g ill
icit
sani
tary
serv
ices
to th
e sa
nita
ry se
wer
, pro
vidi
ng d
rain
late
rals
for p
rivat
e pr
oper
ties w
ith il
licit
stor
m
drai
n se
rvic
e an
d su
mp
pum
p co
nnec
tions
, tra
nsfe
rrin
g dr
ivew
ay d
rain
and
are
a dr
ain
late
rals
from
the
sani
tary
sew
er to
the
stor
m d
rain
and
tran
sfer
ring
catc
h ba
sin
late
rals
from
the
sani
tary
sew
er to
the
stor
m d
rain
.
Cha
rles
Riv
er
Pollu
tion
Con
trol
D
istr
ict
CW
$8
,741
,935
Th
is p
roje
ct in
volv
es u
pgra
des t
o an
adv
ance
s was
tew
ater
trea
tmen
t fac
ility
that
trea
ts w
aste
wat
er
from
the
com
mun
ities
of F
rank
lin, M
edw
ay, M
illis
and
Bel
lingh
am a
nd it
als
o ac
cept
s sep
tage
from
N
orfo
lk, S
herb
orn,
Dov
er, W
rent
ham
, Wes
ton,
Hol
listo
n an
d Sh
aron
. U
pgra
des i
n th
is p
hase
will
fo
cus o
n ac
hiev
ing
phos
phor
us c
ompl
ianc
e w
ith th
e di
stric
t’s d
raft
Nat
iona
l Pol
lutio
n D
isch
arge
El
imin
atio
n Sy
stem
per
mit
rene
wal
and
ach
ievi
ng o
vera
ll pr
oces
s and
supp
ort s
yste
m re
liabi
lity
thro
ugh
the
year
203
5.
94.4
1%
Tow
n of
C
hath
am
CW
$3
,336
,119
Th
is se
wer
col
lect
ion
syst
em e
xten
sion
and
impr
ovem
ent p
roje
ct w
ill a
ddre
ss n
itrog
en lo
adin
g co
ncer
ns b
y fu
rther
ext
endi
ng th
e w
aste
wat
er c
olle
ctio
n sy
stem
. Th
is p
roje
ct is
the
third
pha
se o
f im
plem
entin
g ni
troge
n m
itiga
tion
effo
rts th
at b
egan
in 2
010.
The
pro
ject
will
incl
ude
inst
allin
g se
wer
s to
addi
tiona
l sec
tions
of C
hath
am a
nd c
onst
ruct
ing
two
pum
p st
atio
ns c
apab
le o
f han
dlin
g a
tota
l of 6
8,00
0 ga
llons
per
day
of s
ewag
e.
81.0
8%
Tow
n of
Dra
cut
CW
$1
9,11
4
The
proj
ect w
ork
invo
lves
the
cons
truct
ion
of 2
5,20
0 lin
ear f
eet o
f san
itary
sew
ers,
2,80
0 lin
ear f
eet o
f fo
rce
mai
n an
d tw
o pu
mp
stat
ions
in P
eter
s Pon
d W
est A
rea.
10
0%
Tow
n of
Dra
cut
CW
$4
,693
,582
Th
is p
roje
ct in
volv
es th
e co
nstru
ctio
n of
new
sani
tary
sew
ers t
hat w
ill m
itiga
te th
e m
igra
tion
of
leac
hate
from
faili
ng se
ptic
syst
ems i
nto
tribu
tarie
s of t
he M
errim
ack
Riv
er.
In a
dditi
on, t
he p
roje
ct
will
elim
inat
e se
vera
l dire
ct se
wer
age
conn
ectio
ns to
the
loca
l sto
rm w
ater
syst
em in
add
ition
to
miti
gatin
g im
pact
s to
natu
ral r
esou
rces
, tow
n co
nser
vatio
n la
nd a
nd p
rivat
e dr
inki
ng w
ater
supp
lies.
96.9
7%
City
of F
all R
iver
D
W
$4,0
06,1
71
The
proj
ect w
ill c
reat
e a
high
serv
ice
area
at t
he A
irpor
t Roa
d In
dust
rial P
ar.
The
exis
ting
tank
will
be
repl
aced
with
a ta
ller t
ank
to im
prov
e pr
essu
res i
n th
e ne
w h
igh
serv
ice
area
. A
new
boo
ster
pum
p st
atio
n w
ill b
e co
nstru
cted
and
wat
er m
ains
will
be
repl
aced
and
upg
rade
d to
con
nect
the
new
pum
p st
atio
n an
d ta
nk to
the
exis
ting
syst
em.
100%
City
of F
all R
iver
D
W
$3,1
69,0
82
The
proj
ect i
nclu
des t
he re
plac
emen
t of u
p to
app
roxi
mat
ely
19,0
00 li
near
feet
of c
ast i
ron
wat
er
mai
ns a
nd 1
9 le
ad se
rvic
es.
The
proj
ect a
lso
incl
udes
inst
alla
tion
of a
new
sani
tary
grin
der p
ump
stat
ion
for d
isch
arge
of d
omes
tic se
wag
e fr
om th
e ci
ty's
wat
er tr
eatm
ent p
lant
and
the
repl
acem
ent o
f th
e re
sidu
als p
ump
stat
ion
and
asso
ciat
ed e
lect
rical
and
con
trol s
yste
ms.
93.5
8%
2016 SRF ANNUAL REPORT | 44
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
Fa
lmou
th
CW
$4
,284
,956
Th
e pr
ojec
t is t
o ad
dres
s the
cur
rent
eff
luen
t dis
char
ge re
quire
men
ts o
f the
Nat
iona
l Pol
lutio
n D
isch
arge
Elim
inat
ion
Syst
em p
erm
it, w
hich
the
plan
t can
not c
urre
ntly
mee
t and
the
need
ed fa
cilit
y up
grad
es a
nd im
prov
emen
ts a
t the
pla
nt, p
rimar
ily to
mee
t the
nitr
ogen
lim
it, w
hich
requ
ires a
n av
erag
e an
nual
tota
l nitr
ogen
eff
luen
t lim
it of
3.0
mill
igra
ms p
er li
ter.
The
des
ign
capa
city
of t
he
plan
t is 1
.2 m
illio
n ga
llons
per
day
, but
flow
is c
urre
ntly
rest
ricte
d to
800
,000
gal
lons
per
day
.
69.5
0%
Tow
n of
Fa
lmou
th
CW
$1
1,14
0,58
3
The
Mar
avis
ta/L
ittle
Pon
d ar
ea o
f Fal
mou
th h
as b
een
reco
mm
ende
d to
hav
e se
wer
s ins
talle
d si
nce
the
Tow
n's 1
981
Was
tew
ater
Fac
ilitie
s Pla
n (u
pdat
ed in
200
1).
The
Mas
sach
uset
ts E
stua
ries P
rogr
am
tota
l max
imum
dai
ly lo
ad (T
MD
L), c
ompl
eted
in Ja
nuar
y, 2
006
reco
mm
ends
100
% se
wer
ing
of th
is
wat
ersh
ed to
ach
ieve
the
TMD
L. T
he a
rea
is d
ense
ly d
evel
oped
, prim
arily
with
ver
y sm
all l
ots a
nd
high
gro
undw
ater
. Th
e to
wn'
s Com
preh
ensi
ve W
ater
Man
agem
ent P
lan
cite
s 20%
of t
he p
rope
rties
ha
ve se
ptic
syst
ems n
ewer
than
199
5 an
d a
larg
e pe
rcen
tage
of t
hose
are
ces
spoo
ls.
Sew
erin
g w
ill b
e do
ne in
3 m
ulti-
year
con
tract
s, en
com
pass
ing
appr
oxim
atel
y 1,
500
parc
els.
Add
ition
ally
, a n
ew tr
eate
d w
ater
rech
arge
site
is p
ropo
sed
at S
ite 7
(nor
th o
f the
Was
te W
ater
Tr
eatm
ent F
acili
ty a
nd o
utsi
de o
f the
Wes
t Fal
mou
th w
ater
shed
), sp
ecifi
cally
to a
ccom
mod
ate
the
0.26
mill
ion
gallo
ns p
er d
ay fl
ow fr
om th
e Li
ttle
Pond
wat
ersh
ed, a
s req
uire
d by
the
new
flow
lim
itatio
ns to
the
was
te w
ater
trea
tmen
t fac
ility
from
out
side
the
Wes
t Fal
mou
th H
arbo
r wat
ersh
ed
(800
,000
gal
lon
per d
ay fl
ow li
mit,
with
no
mor
e th
an 5
70,0
00 g
allo
ns p
er d
ay fr
om o
utsi
de th
e W
est
Falm
outh
Har
bor w
ater
shed
and
230
,000
gal
lons
per
day
from
insi
de th
e W
est F
alm
outh
Har
bor
wat
ersh
ed).
100%
Tow
n of
Fa
lmou
th
DW
$1
6,12
6,20
7 Th
e To
wn
of F
alm
outh
cur
rent
ly re
lies o
n Lo
ng P
ond
for 5
0 to
60%
of i
ts w
ater
supp
ly n
eeds
. Th
e Lo
ng P
ond
Trea
tmen
t Fac
ility
ope
rate
s und
er a
filtr
atio
n w
aive
r and
onl
y pr
ovid
es c
hlor
inat
ion
and
pH a
djus
tmen
t. In
crea
sing
alg
ae b
loom
s in
Long
Pon
d an
d or
gani
c lo
adin
g fr
om th
e su
rrou
ndin
g fo
rest
are
resu
lting
in d
egra
ded
wat
er q
ualit
y. T
he to
wn
also
has
an
exte
nsio
n to
inst
all a
seco
nd
disi
nfec
tion
met
hod
to c
ompl
y w
ith th
e EP
A’s
Lon
g Te
rm 2
of t
he E
nhan
ced
Surf
ace
Wat
er
Trea
tmen
t Rul
e (L
T2).
As o
f Sep
tem
ber,
the
tow
n ha
s exc
eede
d a
triha
lom
etha
ne L
ocat
iona
l Run
ning
A
nnua
l Ave
rage
und
er S
tage
2 o
f the
Dis
infe
ctio
n B
y-Pr
oduc
ts R
ule.
The
tow
n ne
eds t
o in
vest
si
gnifi
cant
mon
ey to
com
ply
with
the
LT2
rule
whi
ch w
ill n
ot so
lve
its tr
ihal
omet
hane
pro
blem
s. A
pr
oper
surf
ace
wat
er tr
eatm
ent f
acili
ty is
requ
ired
to p
rovi
de a
long
term
solu
tion
to th
e To
wn'
s wat
er
qual
ity p
robl
ems.
100%
City
of F
itchb
urg
CW
$7
21,4
26
This
pro
ject
is th
e co
ntin
uatio
n of
the
city
’s p
rogr
am to
sepa
rate
com
bine
d se
wer
s to
elim
inat
e ra
w
sew
age
disc
harg
es d
urin
g st
orm
eve
nts.
The
pro
ject
elim
inat
es c
ombi
ned
sew
ers b
y co
nstru
ctin
g ne
w
drai
nage
pip
es a
djac
ent t
o se
wer
pip
es to
con
vey
stor
m w
ater
, whi
ch w
ill a
llow
the
city
to c
lose
co
mbi
ned
sew
er o
verf
low
s. T
he p
roje
ct w
ill re
aliz
e he
alth
and
safe
ty b
enef
its fr
om re
duce
d od
ors,
100%
2016 SRF ANNUAL REPORT | 45
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
impr
oved
aes
thet
ic a
nd b
ette
r wat
er q
ualit
y in
the
Nas
hua
Riv
er a
nd a
ffec
ted
tribu
tarie
s. T
he p
roje
ct
will
als
o al
low
the
city
to c
ompl
y w
ith th
e A
dmin
istra
tive
Con
sent
Ord
er is
sued
by
the
EPA
.
Tow
n of
Fr
amin
gham
C
W
$2,1
14,5
87
This
pro
ject
is a
com
pone
nt o
f the
Cap
ital I
mpr
ovem
ent P
rogr
am fo
r the
tow
n's c
olle
ctio
n sy
stem
that
in
clud
es e
limin
atio
n of
the
two
sipho
ns u
nder
the
Sudb
ury
Riv
er a
nd re
habi
litat
ion
of th
e Su
dbur
y R
iver
inte
rcep
tor f
rom
Cen
tral S
treet
con
tinui
ng so
uth
alon
g th
e Su
dbur
y R
iver
to W
orce
ster
Roa
d.
100%
Tow
n of
Fr
amin
gham
C
W
$84,
190
Th
e pl
anni
ng p
roje
ct p
ropo
ses t
o co
ntin
ue in
vest
igat
ions
into
the
stat
us o
f the
was
tew
ater
col
lect
ion
syst
em e
mpl
oyin
g cl
osed
circ
uit T
V in
spec
tions
, man
hole
insp
ectio
ns, s
ite sp
ecifi
c flo
w m
onito
ring,
ho
use-
to-h
ouse
insp
ectio
ns a
nd sm
oke
test
ing
and
ease
men
ts in
vest
igat
ions
.
100%
City
of
Glo
uces
ter
DW
$4
74,1
27
This
pro
ject
will
impr
ove
relia
bilit
y, re
dund
ancy
and
ene
rgy
effic
ienc
y at
the
Wes
t Glo
uces
ter a
nd
Bab
son
Wat
er T
reat
men
t Pla
nts (
WG
WTP
). Im
prov
emen
ts a
t the
WG
WTP
incl
ude
repl
acem
ent o
f th
e hi
gh li
ft pu
mps
and
var
iabl
e fr
eque
ncy
driv
es, f
locc
ulat
ion
equi
pmen
t, se
dim
enta
tion
basi
n ch
ains
an
d fli
ghts
, ele
ctric
al se
rvic
e an
d eq
uipm
ent l
oad
cent
er a
nd a
bac
kwas
h w
ater
recy
clin
g sy
stem
to
redu
ce th
e am
ount
of w
ater
dra
wn
from
the
rese
rvoi
r sys
tem
.
100%
Tow
n of
Gre
at
Bar
ring
ton
CW
$4
,210
,000
Th
is p
roje
ct in
clud
es u
pgra
des t
o th
e w
aste
wat
er tr
eatm
ent f
acili
ty (W
WTF
) and
impr
ovem
ents
to th
e co
llect
ion
syst
em to
redu
ce in
flow
and
infil
tratio
n. T
he tr
eatm
ent p
lant
upg
rade
s will
repl
ace
or re
pair
agin
g eq
uipm
ent,
impr
ove
syst
em re
liabi
lity,
ach
ieve
hig
her l
evel
s of p
hosp
horu
s rem
oval
, and
pr
epar
e fo
r nitr
ogen
rem
oval
upg
rade
s. T
he W
WTF
upg
rade
will
incl
ude
inst
alla
tion
of a
relia
ble
syst
em to
redu
ce to
tal p
hosp
horu
s loa
ds to
the
Hou
sato
nic
Riv
er, r
esul
ting
in a
redu
ctio
n of
eu
troph
icat
ion
pote
ntia
l in
the
river
and
its r
ecei
ving
bod
y, L
ong
Isla
nd S
ound
.
99.7
3%
Tow
n of
Har
wic
h D
W
$1,8
78,2
32
The
proj
ect i
nclu
des t
he c
onst
ruct
ion
of a
1 m
illio
n ga
llon
per d
ay ir
on a
nd m
anga
nese
rem
oval
fa
cilit
y at
the
Wat
er D
epar
tmen
t's W
ell N
o.10
Site
, loc
ated
off
Nor
th W
estg
ate
Roa
d in
Har
wic
h.
All
chem
ical
trea
tmen
t will
rem
ain
in th
e ex
istin
g pu
mp
hous
e an
d th
e pr
opos
ed fa
cilit
y w
ill b
e fo
r wat
er
polis
hing
onl
y.
99.8
6%
Tow
n of
Hol
den
DW
$5
25,0
00
This
pro
ject
incl
udes
the
repl
acem
ent o
f app
roxi
mat
ely
4,50
0 lin
ear f
eet o
f exi
stin
g w
ater
mai
n to
im
prov
e w
ater
qua
lity,
syst
em p
ress
ure,
and
relia
bilit
y. A
lso
incl
uded
in th
e pr
ojec
t are
wat
er
supe
rvis
ory
cont
rol a
nd d
ata
acqu
isiti
on sy
stem
impr
ovem
ents
(har
dwar
e, so
ftwar
e an
d a
prog
ram
mab
le lo
gic
cont
rolle
r for
syst
em m
onito
ring)
.
100%
2016 SRF ANNUAL REPORT | 46
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
City
of L
awre
nce
DW
$9
,186
,062
Th
is p
roje
ct in
volv
es th
e re
plac
emen
t of a
ppro
xim
atel
y 45
,000
line
ar fe
et o
f wat
er m
ains
, als
o re
plac
ing
brok
en a
nd m
alfu
nctio
ning
hyd
rant
s and
val
ves.
83.9
3%
City
of
Leo
min
ster
C
W
$10,
500,
000
Th
is p
roje
ct is
for t
he u
pgra
de o
f the
aer
atio
n sy
stem
at t
he w
aste
wat
er tr
eatm
ent p
lant
. The
City
of
Leom
inst
er’s
seco
ndar
y w
aste
wat
er tr
eatm
ent f
acili
ty h
as b
een
oper
atio
nal s
ince
198
3 w
ith c
apac
ity to
ha
ndle
9.3
mill
ion
gallo
ns p
er d
ay.
The
faci
lity
has y
et to
rece
ive
any
sign
ifica
nt u
pgra
des.
The
faci
lity
disc
harg
es to
Nor
th N
ashu
a R
iver
with
ulti
mat
e di
scha
rge
to th
e A
tlant
ic O
cean
via
the
Mer
rimac
k R
iver
und
er E
PA N
atio
nal P
ollu
tion
Dis
char
ge E
limin
atio
n Sy
stem
(NPD
ES) P
erm
it (M
A-
0100
617)
issu
ed o
n Se
p. 2
8. 2
006.
The
faci
lity
is c
urre
ntly
not
in c
ompl
ianc
e w
ith it
s cur
rent
di
scha
rge
perm
it, a
nd a
s a re
sult
has e
nter
ed in
to a
n A
dmin
istra
tive
Con
sent
Dec
ree
with
EPA
whi
ch
requ
ires t
he fa
cilit
y to
com
ply
with
its t
otal
Pho
spho
rous
dis
char
ge li
mits
no
late
r tha
n N
ov. 3
0, 2
011.
Th
is p
roje
ct w
ill im
plem
ent a
ll tre
atm
ent f
acili
ty u
pgra
des a
nd p
roce
ss m
odifi
catio
ns re
quire
d to
ac
hiev
e co
mpl
ianc
e w
ith to
tal p
hosp
horo
us d
ischa
rges
lim
its m
anda
ted
in th
e 20
06 E
PA N
PDES
Pe
rmit.
88.5
1%
City
of L
owel
l D
W
$4,5
41,5
10
This
pro
ject
incl
udes
con
stru
ctin
g a
new
36
inch
dia
met
er re
dund
ant t
reat
ed w
ater
tran
smis
sion
mai
n.
The
proj
ect w
ill a
llow
the
Low
ell R
egio
nal W
ater
Util
ity to
con
tinue
to su
pply
wat
er a
nd fi
re
prot
ectio
n to
the
entir
e di
strib
utio
n sy
stem
in th
e ev
ent o
f a b
reak
in th
e ex
istin
g 36
inch
mai
n tra
nsm
issi
on p
ipe
exis
ting
in th
e w
ater
trea
tmen
t pla
nt.
77.5
1%
Tow
n of
Lud
low
C
W
$50
3,67
6
The
mai
n ob
ject
ive
of th
is p
roje
ct is
the
sepa
ratio
n of
a c
ombi
ned
sew
er sy
stem
exi
stin
g in
the
Hub
bard
Stre
et a
rea
of th
e To
wn
of L
udlo
w.
The
Hub
bard
Stre
et se
wer
sepa
ratio
n w
ill re
duce
en
viro
nmen
tal s
tress
es p
lace
d on
the
Chi
cope
e R
iver
due
to d
isch
arge
d, u
ntre
ated
sani
tary
was
te. T
he
new
sew
er sy
stem
will
als
o ad
dres
s dan
gers
to p
ublic
hea
lth b
y de
crea
sing
bac
kups
of t
he c
ombi
ned
stor
m w
ater
and
sani
tary
was
te.
The
recr
eatio
nal u
ses o
f the
Chi
cope
e R
iver
, whi
ch in
clud
e bo
atin
g sw
imm
ing
and
fishi
ng, w
ill a
lso
be p
rote
cted
100%
Tow
n of
L
unen
burg
C
W
$1,5
21,6
53
In o
rder
to d
eter
min
e ex
istin
g co
nditi
ons a
nd p
riorit
ize
need
s for
long
-term
was
tew
ater
man
agem
ent
for t
he to
wn,
Mas
sDEP
and
the
Mas
sach
uset
ts E
stuar
ies P
rogr
am a
ppro
ved
the
Com
preh
ensi
ve
Was
tew
ater
Man
agem
ent P
lan
(CW
MP)
, com
plet
ed b
y th
e to
wn
and
Wrig
ht-P
ierc
e in
four
pha
ses.
Th
e C
WM
P be
gan
in 2
006
and
the
final
pha
se w
as c
ompl
eted
in M
ay 2
010.
The
four
th a
nd fi
nal
phas
e of
the
CW
MP
delin
eate
d an
d pr
iorit
ized
the
area
s of h
ighe
st c
once
rn.
Am
ong
them
wer
e sp
ecifi
c “A
reas
of C
once
rn,”
refe
rred
to a
s “ar
eas.”
Are
as 6
and
9 (S
ewer
Ser
vice
Zon
es 6
) are
are
as
whe
re m
unic
ipal
sew
er e
xten
sion
s are
hig
hly
reco
mm
ende
d du
e to
the
fact
that
on-
site
was
tew
ater
tre
atm
ent w
as c
onsi
dere
d in
adeq
uate
in th
ese
loca
tions
due
to si
te c
ondi
tions
. Ph
ase
4 of
the
CW
MP
incl
udes
the
need
for o
ff-s
ite w
aste
wat
er m
anag
emen
t sol
utio
ns fo
r Sew
er S
ervi
ce Z
ones
6 a
nd 9
. A
rea
6 in
clud
es P
ratt
Stre
et a
nd R
enni
e St
reet
, whi
ch h
as th
e m
ost p
ress
ing
need
for a
sew
er
77.9
7%
2016 SRF ANNUAL REPORT | 47
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
exte
nsio
n. A
rea
9 in
clud
es P
ine
Gro
ve R
oad,
Sun
set A
venu
e, H
arris
Ave
nue,
Lak
evie
w A
venu
e an
d C
ross
Roa
d. T
he to
wn
may
pur
sue
the
othe
r por
tions
of S
ewer
Ser
vice
Zon
e 9
at a
late
r dat
e, b
ut th
e lis
ted
stre
ets a
re im
med
iate
ly a
djac
ent t
o W
halo
m L
ake
and
have
the
mos
t pre
ssin
g ne
ed fo
r a
mun
icip
al se
wer
ext
ensi
on a
t thi
s tim
e.
City
of M
alde
n D
W
$2,7
90,0
63
This
pro
ject
con
sist
s of t
wo
cont
acts
, 201
4-H
/W-1
and
201
4 H
/W-2
, whi
ch w
ill b
e re
plac
ing
over
15
,00
feet
of o
ld u
nlin
ed c
ast i
ron
wat
er m
ains
whi
ch a
re se
vere
ly tu
berc
ulat
ed, w
ith n
ew c
emen
t lin
ed
duct
ile ir
on p
ipe
alon
g w
ith th
e re
plac
emen
t of h
ydra
nts a
nd in
oper
able
val
ves.
The
resu
lt w
ill b
e be
tter q
ualit
y an
d flo
w o
f wat
er in
the
syst
em.
64.9
3%
City
of
Mar
lbor
ough
C
W
$14,
960,
073
Th
is p
roje
ct c
onsi
sts o
f the
impr
ovem
ents
to th
e Ea
ster
ly w
aste
wat
er tr
eatm
ent f
acili
ty to
redu
ce
efflu
ent p
hosp
horu
s, re
plac
e ag
ing
infr
astru
ctur
e an
d im
prov
e en
ergy
eff
icie
ncy
and
seco
ndly
to
cond
uct a
n in
filtra
tion/
inflo
w st
udy
of th
e w
aste
wat
er c
olle
ctio
n sy
stem
to id
entif
y, c
hara
cter
ize
and
prio
ritiz
e de
ficie
ncie
s in
the
syst
em to
redu
ce p
eak
flow
s. T
he u
pgra
des a
re p
rimar
ily in
tend
ed to
re
duce
the
phos
phor
us lo
ads d
isch
arge
d to
from
the
faci
lity
to h
elp
rem
edia
te d
ocum
ente
d nu
trien
t en
richm
ent o
f the
rece
ivin
g w
ater
s and
the
dow
nstre
am S
udbu
ry R
iver
. Th
e pr
ojec
t is c
onsi
sten
t with
th
e co
mpr
ehen
sive
was
tew
ater
man
agem
ent p
lan
and
regi
onal
nut
rient
redu
ctio
n go
als.
The
pro
ject
w
ill a
lso
impr
ove
the
ener
gy e
ffic
ienc
y of
the
faci
lity
and
is e
xpec
ted
to in
clud
e th
e in
stal
latio
n of
re
new
able
ene
rgy
syst
ems a
t the
site
.
97.2
4%
City
of
Mar
lbor
ough
D
W
$4,8
09,1
84
As p
er th
e Lo
ng T
erm
2 E
nhan
ced
Surf
ace
Wat
er T
reat
men
t Rul
e (L
T2) r
equi
rem
ents
, the
Mill
ham
W
ater
Tre
atm
ent P
lant
was
requ
ired
to sa
mpl
e th
e w
ater
for c
rypt
ospo
ridiu
m b
etw
een
Apr
il 20
08 a
nd
Mar
ch 2
010
to d
eter
min
e bi
n cl
assi
ficat
ion.
The
bin
cla
ssifi
catio
n pr
ovid
es c
rypt
ospo
ridiu
m re
mov
al
requ
irem
ents
that
syst
ems h
ave
to m
eet b
y de
adlin
es b
ased
on
thei
r ser
vice
pop
ulat
ion.
The
pur
pose
of
the
LT2
rule
is to
redu
ce d
isea
se in
cide
nce
asso
ciat
ed w
ith C
rypt
ospo
ridiu
m a
nd o
ther
pat
hoge
nic
mic
roor
gani
sms i
n dr
inki
ng w
ater
. Th
ere
wer
e th
ree
posi
tive
resu
lts fo
r cry
ptos
porid
ium
dur
ing
the
24 m
onth
sam
plin
g pe
riod.
On
Nov
embe
r 30,
201
0, M
assD
EP n
otifi
ed th
e M
arlb
orou
gh D
epar
tmen
t of
Pub
lic W
orks
that
the
Mill
ham
Wat
er T
reat
men
t Pla
nt h
as a
2-lo
g or
99-
perc
ent
rem
oval
/inac
tivat
ion
of c
rypt
ospo
ridiu
m.
Und
er th
e ne
w L
T2 re
quire
men
ts, a
n ad
ditio
nal 1
-log
rem
oval
/inac
tivat
ion
is re
quire
d fo
r a to
tal o
f 3-lo
g or
99.
9% re
mov
al/in
activ
atio
n re
mov
al o
f cr
ypto
spor
idiu
m.
95.5
5%
Tow
n of
Med
way
D
W
$1,3
83,0
00
This
pro
ject
add
ress
es th
e re
plac
emen
t of a
ging
wat
er m
ains
and
app
urte
nanc
es in
var
ious
stre
ets i
n th
e co
mm
unity
. Th
e re
plac
emen
t of t
hese
old
mai
ns w
ill h
elp
impr
ove
wat
er q
ualit
y w
ith re
spec
t to
disi
nfec
tion,
circ
ulat
ion,
vol
ume
and
fire
prot
ectio
n.
85.0
2%
2016 SRF ANNUAL REPORT | 48
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
M
erri
mac
D
W
$860
,000
Th
e To
wn
of M
errim
ac, i
n co
njun
ctio
n w
ith M
assD
OT
is re
cons
truct
ing
a on
e m
ile se
gmen
t of M
ain
Stre
et (R
oute
110
) thr
ough
the
Stat
e Tr
ansp
orta
tion
Impr
ovem
ent P
lan.
Run
ning
ben
eath
the
road
way
is
an
agin
g 12
inch
dia
met
er w
ater
mai
n in
nee
d of
repl
acem
ent i
n or
der t
o en
sure
stab
ility
and
im
prov
e w
ater
dis
tribu
tion.
Thi
s pro
ject
will
repl
ace
that
wat
er m
ain
as a
par
t of t
he la
rger
Mas
sDO
T ro
adw
ay a
nd in
fras
truct
ure
impr
ovem
ent p
roje
ct.
100%
MFN
Reg
iona
l W
aste
wat
er
Dis
tric
t
CW
$1
,012
,310
Th
is p
roje
ct is
for t
he p
urch
ase
of tw
o pa
rcel
s of l
and
that
will
be
used
for g
roun
dwat
er d
ispo
sal f
or
the
Man
sfie
ld, F
oxbo
ro a
nd N
orto
n R
egio
nal W
aste
wat
er D
istri
ct.
The
plan
t pre
sent
ly h
as a
surf
ace
wat
er d
isch
arge
. Th
e pl
ant n
eeds
add
ition
al tr
eatm
ent c
apac
ity fo
r exp
ande
d gr
owth
in th
e th
ree
com
mun
ities
bas
ed u
pon
findi
ngs f
rom
thei
r com
preh
ensi
ve w
aste
wat
er m
anag
emen
t pla
nnin
g ef
forts
.
The
expa
nded
pla
nt w
ill re
ceiv
e a
com
bina
tion
of g
roun
dwat
er a
nd su
rfac
e w
ater
dis
char
ges.
The
to
wn
purc
hase
d th
e fir
st p
arce
l in
Dec
embe
r 201
0 an
d ha
s rea
ched
an
agre
emen
t for
the
seco
nd p
arce
l.
100%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
$2
,611
,847
Th
e pr
imar
y ob
ject
ive
of th
e co
mbi
ned
sew
er o
verf
low
(CSO
) con
trol p
lan
is to
brin
g C
SO d
isch
arge
s in
Bos
ton
Har
bor a
nd it
s trib
utar
ies i
nto
com
plia
nce
with
stat
e an
d fe
dera
l req
uire
men
ts.
This
co
mpo
nent
of t
he p
lan
will
invo
lve
nine
sew
er se
para
tion
proj
ects
. A
ll th
e pr
ojec
ts w
ill b
e ac
com
plis
hed
by c
onst
ruct
ing
new
stor
m d
rain
s and
allo
win
g th
e ex
istin
g co
mbi
ne se
wer
s to
func
tion
as se
para
te sa
nita
ry se
wer
s, or
by
cons
truct
ing
new
sani
tary
sew
ers a
nd a
llow
ing
the
exis
ting
com
bine
d se
wer
to se
rve
as st
orm
dra
ins.
The
pro
ject
will
resu
lt in
the
elim
inat
ion
of C
SO d
isch
arge
s at
seve
ral o
utfa
lls.
100%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
$6
,255
,873
Th
is p
roje
ct is
for u
pgra
des t
o th
e di
gest
er a
nd c
ryog
enic
syst
ems a
t the
Dee
r Isl
and
Trea
tmen
t Pla
nt
(DIT
P).
The
dige
ster
upg
rade
invo
lves
repl
acin
g th
e pu
mps
that
send
the
slud
ge fr
om D
ITP
to th
e Fo
re R
iver
Pel
letiz
ing
Plan
t. T
he p
umps
will
be
repl
aced
with
cen
trifu
gal p
umps
with
hig
her f
low
ra
tes,
redu
cing
pot
entia
l grit
settl
emen
t. In
add
ition
, dur
ing
dige
ster
pip
e cl
eani
ng, d
eter
iora
tion
was
no
ted
of th
e gl
ass l
inin
g in
the
pipe
s fee
ding
slud
ge m
ater
ial t
o th
e di
gest
ers.
The
cas
t iro
n pi
ping
is
sign
ifica
ntly
deg
rade
d an
d w
ill b
e re
plac
ed in
ord
er to
mai
ntai
n re
gula
tory
requ
irem
ents
.
100%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
$8
13,7
00
This
pro
ject
is fo
r upg
rade
s to
Dee
r Isl
and
Trea
tmen
t Pla
nt (D
ITP)
that
are
dire
ctly
rela
ted
to w
aste
w
ater
pro
cess
ing
or c
ontro
l of t
he p
roce
ssin
g an
d ar
e fo
cuse
d on
long
-term
pla
nt re
liabi
lity.
The
se
proj
ects
are
inde
nted
to p
reve
nt e
quip
men
t/sys
tem
failu
res t
hat c
ould
resu
lt in
odo
r pro
blem
s for
the
Tow
n of
Win
thro
p an
d th
e in
abili
ty o
f DIT
P to
mee
t dis
char
ge p
erm
it re
quire
men
ts.
The
faci
lity
impr
ovem
ents
incl
ude:
upg
rade
s to
the
Proc
ess I
nstru
men
tatio
n an
d C
ontro
l Sys
tem
to a
ssur
e its
co
ntin
ued
oper
atio
n, w
hich
is e
ssen
tial f
or e
nviro
nmen
tal c
ompl
ianc
e re
porti
ng a
nd p
lant
opt
imiz
atio
n ef
forts
, rep
lace
men
t of o
bsol
ete,
unr
elia
ble
and
inef
ficie
nt c
ompo
nent
s of t
he M
otor
Con
trol C
ente
rs
in th
e N
orth
Mai
n Pu
mpi
ng S
tatio
n an
d V
aria
ble
Freq
uenc
y D
rive
Rep
lace
men
t Con
stru
ctio
n to
re
plac
e ob
sole
te V
aria
ble
Freq
uenc
y D
rives
rang
ing
from
50
thro
ugh
300
hors
epow
er.
100%
2016 SRF ANNUAL REPORT | 49
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$8
06,8
74
This
pro
ject
requ
ires c
lean
ing,
reha
bilit
atio
n an
d re
pair
of 2
0 m
iles o
f old
wat
er m
ains
whi
ch a
re
curr
ently
func
tioni
ng a
t 50%
of t
heir
orig
inal
cap
acity
. In
add
ition
, the
re is
nee
d to
repl
ace
man
y in
oper
able
val
ues i
n th
e sy
stem
. Th
e m
ains
beg
in in
Bro
oklin
e an
d en
d at
the
Blu
e H
ills R
eser
voir
in
Qui
ncy.
The
mai
ns se
rve
the
Sout
hern
Hig
h an
d So
uthe
rn E
xtra
Hig
h Sy
stem
com
mun
ities
of B
osto
n,
Bro
oklin
e, M
ilton
, Qui
ncy,
Nor
woo
d an
d C
anto
n.
100%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$6
,876
,818
M
WR
A w
ill b
e co
nduc
ting
impr
ovem
ents
to th
e di
strib
utio
n sy
stem
nec
essa
ry fo
r con
stru
ctin
g a
redu
ndan
t mai
n to
pre
vent
the
loss
of w
ater
to se
vera
l com
mun
ities
, inc
ludi
ng W
alth
am, i
n th
e ev
ent
the
prim
ary
mai
n fa
ils.
100%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$3
,000
,000
Th
e w
ork
incl
udes
the
cons
truct
ion
of in
terc
onne
ctio
ns b
etw
een
the
Met
ro W
est T
unne
l and
the
Hul
tman
Aqu
educ
t, as
wel
l as r
ehab
ilita
tion
of th
e aq
uedu
ct th
at in
clud
es re
plac
emen
t or r
epai
r of a
ir re
lief s
truct
ures
, blo
w-o
ff v
alve
s, cu
lver
ts b
enea
th th
e aq
uedu
cts a
nd re
plac
emen
t of e
xist
ing
valv
es.
100%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
$3
,000
,000
Th
is p
roje
ct is
for t
he c
onst
ruct
ion
of a
20
mill
ion
gallo
n po
tabl
e w
ater
stor
age
tank
in th
e To
wn
of
Ston
eham
at i
ts te
rmin
al re
serv
oir a
t the
nor
thea
st e
xtre
mity
of t
he M
WR
A w
ater
serv
ice
to
met
ropo
litan
Bos
ton.
The
pro
ject
will
pro
vide
impr
oved
stor
age
(16-
20 m
illio
n ga
llons
) but
will
als
o pr
ovid
e su
rge
relie
f, pr
otec
ting
MW
RA
and
com
mun
ity m
ains
, allo
w m
ore
effic
ient
use
of t
he e
xist
ing
MW
RA
dis
tribu
tion
syst
em a
nd p
rovi
de e
mer
genc
y ba
ckup
relie
f to
21 c
omm
uniti
es in
the
Nor
ther
n In
term
edia
te H
igh
and
Nor
ther
n H
igh
Syst
ems.
100%
Tow
n of
N
eedh
am
CW
$7
8,49
1
This
pro
ject
con
sist
s of r
epla
cing
the
exis
ting
Res
ervo
ir B
Pum
p St
atio
n bu
ildin
g an
d pu
mps
. C
onst
ruct
ion
incl
udes
add
ition
of a
new
bui
ldin
g to
hou
se th
e th
ree
new
hig
hly
effic
ient
pum
ps, n
ew
wet
wel
ls, c
ontro
l sys
tem
, ala
rms a
nd n
ew b
acku
p ge
nera
tor.
100%
City
of N
ew
Bed
ford
C
W
$8,0
63,1
24
This
pro
ject
con
sist
s of i
nsta
lling
new
val
ves,
blow
off
s, ai
r rel
ease
ass
embl
ies,
hydr
ants
and
te
mpo
rary
pip
ing.
Tw
in 3
6 in
ch c
ast i
ron
trans
mis
sion
mai
ns c
onve
y po
tabl
e w
ater
from
the
city
’s 7
5 m
illio
n ga
llon
Hig
h H
ill fi
nish
ed w
ater
rese
rvoi
r to
the
east
ern
and
cent
er se
ctio
ns o
f New
Bed
ford
. Th
e 10
3 ye
ar o
ld m
ains
can
not b
e is
olat
ed o
r shu
t dow
n as
the
valv
es a
re in
oper
able
and
in si
gnifi
cant
di
srep
air.
The
mai
ns a
re a
lso
inte
rcon
nect
ed in
man
y pl
aces
. Th
e m
ains
are
with
in 7
feet
of e
ach
othe
r, so
a p
rolo
nged
failu
re o
f one
wou
ld li
kely
cau
se fa
ilure
to e
ach
othe
r. T
hose
tran
smis
sion
m
ains
are
crit
ical
com
pone
nts w
hich
wou
ld c
ause
cat
astro
phic
con
sequ
ence
s to
the
city
shou
ld th
ey
fail.
91.4
9%
Tow
n of
N
orw
ood
CW
$1
10,1
27
The
proj
ect i
s the
reha
bilit
atio
n of
sew
ers i
n th
e H
awes
Bro
ok a
rea
of N
orw
ood
in o
rder
to re
duce
ex
cess
ive
infil
tratio
n an
d in
flow
into
the
syst
em a
nd to
min
imiz
e th
e oc
curr
ence
of s
anita
ry se
wer
ov
erflo
ws.
The
tow
n is
und
er a
n A
dmin
istra
tive
Ord
er fr
om E
PA th
at in
clud
es im
plem
enta
tion
of
21.3
2%
2016 SRF ANNUAL REPORT | 50
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
corr
ectio
n ac
tion
in th
e H
awes
Bro
ok a
rea.
Env
ironm
enta
l ben
efits
of t
his p
roje
ct a
re th
e el
imin
atio
n of
surc
harg
ing
and
sani
tary
ove
rflo
w in
to H
awes
Bro
ok, a
n im
paire
d w
ater
bod
y th
at is
trib
utar
y to
the
Nep
onse
t Riv
er.
Tow
n of
N
orw
ood
CW
$
2,63
8,95
2
The
obje
ctiv
e of
this
pro
ject
is to
per
form
com
preh
ensi
ve se
wer
reha
bilit
atio
n in
a p
ortio
n of
the
Mea
dow
broo
k se
wer
are
a in
Nor
woo
d to
elim
inat
e ex
filtra
tion
of sa
nita
ry se
wag
e in
to th
e ad
jace
nt
stor
m w
ater
syst
em th
at u
ltim
atel
y di
scha
rges
to M
eado
wbr
ook
(a tr
ibut
ary
of th
e N
epon
set R
iver
).
Wor
k w
ill b
e pe
rfor
med
in th
e ar
ea tr
ibut
ary
to th
e M
eado
wbr
ook
outfa
ll at
Sun
nysi
de R
oad.
Wor
k in
clud
es b
ut n
ot li
mite
d to
: the
inst
alla
tion
of a
ppro
xim
atel
y 7,
995
linea
r fee
t cur
ed-in
-pla
ce li
ning
in
mai
nlin
e se
wer
and
287
serv
ice
late
rals
, man
hole
reha
bilit
atio
n, T
V in
spec
tion,
and
pro
trudi
ng ta
p re
mov
al.
98.4
8%
Tow
n of
Pal
mer
C
W
$5,9
50,1
03
The
obje
ctiv
e of
the
Palm
er S
ewer
Rep
lace
men
t pro
ject
is to
repl
ace
agin
g an
d de
terio
rate
d in
fras
truct
ure
that
is n
ot fu
lly fu
nctio
ning
as i
nten
ded.
Sev
eral
sew
er re
ache
s hav
e sa
gs, a
dver
se
slop
es, c
rack
ed p
ipes
and
off
set j
oint
s whi
ch im
pair
carr
ying
cap
acity
of t
he c
olle
ctio
n sy
stem
. Th
e pr
ojec
t will
repl
ace
appr
oxim
atel
y 22
,650
line
ar fe
et o
f san
itary
sew
er in
five
dist
rict l
ocat
ions
in th
e to
wn
(Bra
iner
d St
reet
, Riv
ervi
ew S
treet
, Chu
dy S
treet
, Sou
th H
igh
Stre
et a
nd H
igh
Stre
et a
reas
).
95.6
1%
Tow
n of
Pax
ton
DW
$1
,370
,000
Th
ere
is o
nly
one
serv
ice
area
in P
axto
n an
d bo
th st
orag
e ta
nks s
ervi
ce a
ll of
the
cust
omer
s. T
he
syst
em se
rves
app
roxi
mat
ely
3,68
0 pe
ople
. Th
is ta
nk is
crit
ical
to m
aint
ain
due
to th
eir v
ulne
rabi
lity
with
the
agin
g in
fras
truct
ure
of th
e C
ity o
f Wor
cest
er. T
his p
roje
ct in
clud
es a
maj
or sy
stem
co
mpo
nent
. Lo
ss o
f thi
s tan
k w
ould
aff
ect m
ore
than
50%
of t
he p
opul
atio
n. T
he M
aple
Stre
et T
ank
is th
e pr
imar
y ta
nk fo
r the
nor
ther
n po
rtion
of t
he sy
stem
, whi
ch in
clud
es th
e fa
culty
and
stud
ent
popu
latio
n fo
r Ann
a M
aria
Col
lege
and
the
new
seni
or h
ousi
ng c
ompl
ex lo
cate
d on
Gro
ve S
treet
, w
hile
the
Asn
ebum
skit
Tank
is th
e pr
imar
y ta
nk fo
r the
sout
hern
por
tion
of th
e To
wn.
Hav
ing
two
stor
age
tank
s pro
vide
s a re
dund
ant s
tora
ge th
at a
llow
s the
tow
n to
take
one
tank
off
line
for r
outin
e m
aint
enan
ce o
r in
the
even
t of a
n em
erge
ncy
and
still
hav
e ad
equa
te st
orag
e fo
r the
syst
em.
In
addi
tion
to p
rovi
ding
redu
ndan
t sto
rage
, the
new
tank
will
be
equi
pped
with
a b
oost
er c
hlor
inat
ion
syst
em to
impr
ove
wat
er q
ualit
y. I
n N
ovem
ber 2
012
the
City
of W
orce
ster
exp
erie
nced
a la
rge
wat
er
mai
n br
eak
that
shut
the
wat
er o
ff fo
r hou
rs.
Paxt
on's
sole
sour
ce o
f wat
er c
omes
from
the
city
and
th
ey w
ere
able
to su
stai
n pr
essu
res a
nd w
ater
in to
wn
beca
use
they
hav
e tw
o ta
nks.
99.6
5%
City
of Q
uinc
y C
W
$2,7
87,0
04
The
obje
ctiv
e of
the
Fort
Squa
re P
ump
Stat
ion
Reh
abili
tatio
n Pr
ojec
t is u
ltim
atel
y to
avo
id sa
nita
ry
sew
er o
verf
low
s (SS
O's)
, whi
ch a
re a
thre
at to
pub
lic h
ealth
. Th
e Fo
rt Sq
uare
Pum
ping
Sta
tion
is o
ne
of Q
uinc
y's l
arge
r was
tew
ater
pum
ping
stat
ions
. Th
e pu
mp
stat
ion
was
con
stru
cted
in 1
985,
and
al
thou
gh so
me
upgr
ades
hav
e be
en m
ade
over
the
year
, the
stat
ion
is st
ill u
sing
mos
t of i
ts o
rigin
al
100%
2016 SRF ANNUAL REPORT | 51
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
equi
pmen
t. D
ue to
the
dete
riora
ting
cond
ition
of t
he F
ort S
quar
e Pu
mpi
ng S
tatio
n, a
com
plet
e re
habi
litat
ion
has b
een
reco
mm
ende
d in
ord
er to
avo
id a
SSO
.
City
of Q
uinc
y D
W
$233
,275
Th
e pr
ojec
t con
sist
s of f
our c
ontra
cts:
1.
Rep
lace
men
t of w
ater
met
er a
nd in
stal
latio
n of
aut
omat
ed m
eter
read
ing
syst
em
2.R
epla
cem
ent o
f exi
stin
g 6
inch
and
8 in
ch d
iam
eter
wat
er d
istri
butio
n m
ains
and
serv
ice
conn
ectio
ns3.
Inst
alla
tion
of a
supe
rvis
ory
cont
rol a
nd d
ata
acqu
isiti
on sy
stem
and
secu
rity
impr
ovem
ents
4.
Impr
ovem
ents
to th
e Pe
nns H
ill, R
iccu
iti D
rive,
Wes
t Stre
et a
nd R
oose
velt
Boo
ster
Pum
p St
atio
ns
100%
City
of R
ever
e C
W
$767
,322
Th
is p
roje
ct w
ill a
llow
the
city
of R
ever
e to
con
tinue
to id
entif
y, a
sses
s, pr
iorit
ize
and
com
plet
e im
prov
emen
ts to
the
city
's se
wer
and
stor
m d
rain
syst
ems.
The
sew
er sy
stem
eva
luat
ion
surv
ey
activ
ities
will
incl
ude
field
inve
stig
atio
ns a
nd d
eskt
op e
valu
atio
n of
the
city
's m
unic
ipal
was
tew
ater
an
d st
orm
wat
er sy
stem
s. T
he fi
eld
inve
stig
atio
ns in
clud
e TV
Insp
ectio
n, d
ye w
ater
test
ing
and
smok
e te
stin
g, w
hich
will
hel
p to
com
plet
e th
e ev
alua
tion
of th
e w
aste
wat
er c
olle
ctio
n sy
stem
alo
ng w
ith
supp
ort f
or o
ngoi
ng a
sses
smen
t of t
he st
orm
wat
er sy
stem
incl
udin
g ill
icit
disc
harg
e de
tect
ion
and
elim
inat
ion
in a
dditi
on to
rout
ine
mai
nten
ance
pro
gram
s cur
rent
ly u
nder
way
in th
e ci
ty.
100%
City
of R
ever
e C
W
$1,5
00,0
00
This
pro
ject
is c
ompr
ised
of t
wo
cons
truct
ion
cont
ract
s whi
ch w
ill in
clud
e w
aste
wat
er a
nd st
orm
dra
in
syst
em im
prov
emen
ts to
add
ress
def
icie
nt se
wer
pip
ing
and
redu
ce in
filtra
tion
and
sour
ces o
f ex
trane
ous i
nflo
w.
The
wor
k w
ill d
rast
ical
ly re
duce
the
volu
me
of in
filtra
tion
and
inflo
w w
ithin
the
syst
em.
The
wor
k w
ill a
lso
redu
ce th
e am
ount
of s
torm
wat
er e
nter
ing
the
city
's w
aste
wat
er c
olle
ctio
n sy
stem
and
unn
eces
saril
y be
ing
treat
ed a
t the
Dee
r Isl
and
Sew
age
Trea
tmen
t Pla
nt.
In a
dditi
on, t
he
proj
ects
will
als
o se
rve
to im
prov
e th
e pe
rfor
man
ce o
f the
city
's co
llect
ion
syst
em a
nd re
duce
or
elim
inat
e sa
nita
ry se
wer
ove
rflo
ws d
urin
g w
et w
eath
er e
vent
s
100%
City
of R
ever
e C
W
$7,2
18,5
81
This
pla
nnin
g pr
ojec
t foc
uses
on
the
asse
ssm
ent o
f the
was
tew
ater
syst
em a
long
with
supp
ort o
f the
ci
ty's
ongo
ing
deve
lopm
ent o
f a st
ate-
of-th
e-ar
t GIS
syst
em.
Furth
er te
chni
cal s
uppo
rt fo
r im
plem
enta
tion
and
use
of th
e G
IS sy
stem
will
be
avai
labl
e th
roug
h th
e pl
anne
d sc
ope
of w
ork
for t
his
plan
ning
stud
y to
allo
w R
ever
e to
con
tinue
to id
entif
y as
sess
, prio
ritiz
e an
d co
mpl
ete
impr
ovem
ents
to
the
city
's se
wer
syst
em.
Sign
ifica
nt c
ompo
nent
s of t
he p
lann
ing
effo
rts in
clud
e fie
ld in
vest
igat
ions
an
d ev
alua
tion
of th
e ci
ty's
was
tew
ater
syst
em.
The
follo
win
g fie
ld in
vest
igat
ions
and
tech
nica
l ac
tiviti
es a
re p
lann
ed: s
uppl
emen
tal f
low
isol
atio
n, c
lose
d ci
rcui
t tel
evis
ion
insp
ectio
n, d
ye te
stin
g,
smok
e te
stin
g, a
nd h
ouse
-to-h
ouse
insp
ectio
ns.
Thes
e in
vest
igat
ions
will
lead
to th
e ev
alua
tion
of th
e w
aste
wat
er c
olle
ctio
n sy
stem
and
will
pro
vide
supp
ort f
or o
ngoi
ng a
sses
smen
ts o
f inf
iltra
tion/
inflo
w
rem
oval
.
97.7
9%
2016 SRF ANNUAL REPORT | 52
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
Sau
gus
CW
$1
,579
,841
Th
e To
wn
of S
augu
s ent
ered
into
an
Adm
inis
trativ
e C
onse
nt O
rder
(AC
O) w
ith th
e M
assD
EP in
200
5,
requ
iring
the
tow
n to
add
ress
sani
tary
sew
er o
verf
low
s and
exc
essi
ve in
filtra
tion
and
inflo
w (I
/I).
The
Tow
n of
Sau
gus h
as c
ompl
eted
seve
ral y
ears
of I
/I re
mov
al p
roje
cts b
ased
on
the
requ
irem
ents
of t
he
AC
O a
nd th
e re
port
title
d, "
Sew
er S
yste
m F
acili
ties a
nd P
rivat
e In
flow
Sou
rce
Rem
oval
Pla
n,"
date
d O
ctob
er 2
006.
Pre
viou
s pro
ject
s inc
lude
the
pilo
t pro
gram
stud
y an
d re
habi
litat
ion
in su
bsys
tem
s 5B
, PS
5, 6
A, 4
C, a
nd 6
B.
The
2014
pro
ject
incl
udes
I/I r
emov
al in
subs
yste
m 5
. R
ehab
ilita
tion
will
in
clud
e m
anho
le re
habi
litat
ion,
cas
t-in-
plac
e-pi
pe li
ning
of s
ewer
mai
n an
d la
tera
l con
nect
ions
, spo
t re
pairs
and
priv
ate
inflo
w re
mov
al.
98.0
9%
Sout
h E
ssex
Se
wer
age
Dist
rict
C
W
$9,
250,
000
Th
is p
roje
ct c
onsi
sts o
f rep
lace
men
t of t
wo
para
llel s
ubaq
ueou
s sew
er p
ipel
ines
that
car
ry a
ll of
the
raw
was
tew
ater
from
the
Tow
n of
Mar
bleh
ead
colle
ctio
n sy
stem
und
er S
alem
Har
bor t
o th
e So
uth
Esse
x D
istri
ct tr
eatm
ent p
lan
in S
alem
. Le
ngth
of e
ach
pipe
line
is a
ppro
xim
atel
y 6,
000
feet
.
96.3
9%
Spri
ngfie
ldW
ater
& S
ewer
C
omm
issi
on
DW
$2
1,64
5,27
5 Th
is p
roje
ct w
ill re
plac
e th
e ex
istin
g 83
- yea
r old
stee
l fin
ishe
d w
ater
tran
smis
sion
mai
n w
hich
pr
ovid
es w
ater
to th
e ci
ty o
f Spr
ingf
ield
and
the
tow
ns o
f Aga
wam
, Lon
gmea
dow
and
Eas
t Lo
ngm
eado
w.
This
pro
ject
is c
ritic
al fo
r im
prov
ing
the
inte
grity
and
relia
bilit
y of
this
tran
smis
sion
m
ain
sinc
e it
is n
ear t
he e
nd o
f its
use
ful l
ife a
nd re
cent
insp
ectio
ns h
ave
unco
vere
d si
gnifi
cant
inte
rnal
an
d ex
tern
al p
ipel
ine
corr
osio
n.
88.6
4%
City
of T
aunt
on
CW
$1
80,5
26
This
mul
ti-ye
ar p
roje
ct is
for r
epai
r and
repl
acem
ent o
f sew
er m
ains
and
serv
ice
late
rals
, rem
oval
of
stor
m w
ater
con
nect
ions
to th
e sa
nita
ry se
wer
, rem
oval
of r
oof l
eade
rs a
nd su
mp
pum
p co
nnec
tions
fr
om th
e se
wer
syst
em, s
epar
atio
n of
com
bine
d m
anho
les a
nd u
pgra
de o
f vita
l pum
p st
atio
ns.
The
proj
ect w
ill e
limin
ate
pote
ntia
l pub
lic h
ealth
thre
ats a
nd n
uisa
nces
resu
lting
from
sew
age
disc
harg
e to
th
e re
ceiv
ing
wat
ers a
nd re
duce
the
risk
of se
wer
ove
rflo
ws.
100%
City
of T
aunt
on
CW
$6
,295
,244
Th
e Ph
ase
10-1
2 Se
wer
Sys
tem
Eva
luat
ion
Surv
ey (S
SES)
is a
con
tinua
tion
of w
ork
begu
n du
ring
prev
ious
pha
ses.
The
obj
ectiv
es o
f the
SSE
S is
to re
mov
e in
filtra
tion
and
inflo
w (I
/I) fr
om th
e sa
nita
ry c
olle
ctio
n sy
stem
, with
the
ultim
ate
goal
of r
educ
ing
and
elim
inat
ing
Com
bine
d Se
wer
O
verf
low
s (C
SOs)
in th
e ci
ty.
Impl
emen
tatio
n of
this
pro
ject
is in
par
tial c
ompl
ianc
e w
ith th
e re
quire
men
ts o
f a M
assD
EP A
dmin
istra
tive
Con
sent
Ord
er.
In a
dditi
on, t
he w
ork
done
und
er th
is
proj
ect w
ill h
elp
the
city
stay
in c
ompl
ianc
e w
ith th
e U
SEPA
Ord
er fo
r Com
plia
nce
(Doc
ket 0
8-04
2).
Und
er th
e O
rder
, the
city
is re
quire
d to
subm
it a
plan
and
sche
dule
by
June
201
3 fo
r elim
inat
ion
of th
e C
SO o
utfa
ll. P
revi
ous S
SES
Phas
es a
nd in
vest
igat
ions
hav
e re
veal
ed th
at th
ere
are
wid
espr
ead
prob
lem
s with
in th
e ci
ty's
was
tew
ater
col
lect
ion
syst
em.
Prev
ious
con
stru
ctio
n ph
ases
hav
e fo
cuse
d on
the
olde
r sec
tions
of t
he c
ity, k
now
n as
the
"cor
e ar
ea".
Pha
ses 1
0-12
will
ent
ail b
oth
inve
stig
atio
n an
d re
habi
litat
ion
effo
rts in
the
east
ern
porti
on o
f the
city
's sy
stem
, whi
ch h
as n
ot b
een
focu
sed
on
durin
g pr
evio
us in
vest
igat
ions
due
to it
s you
nger
age
and
low
er fl
ows t
han
the
core
are
a. T
his p
roje
ct
100%
2016 SRF ANNUAL REPORT | 53
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
is p
art o
f a c
ost e
ffec
tive,
targ
eted
pla
n to
ass
ess o
pera
tions
and
rem
ove
sour
ces o
f I/I
in th
e ci
ty's
colle
ctio
n sy
stem
. It
is e
xpec
ted
to g
reat
ly re
duce
or e
limin
ate
the
publ
ic h
ealth
pro
blem
of c
ombi
ned
and
sani
tary
sew
er o
verf
low
s to
the
Taun
ton
Riv
er.
City
of T
aunt
on
CW
$4
,021
,122
Th
e Ph
ase
10-1
2 Se
wer
Sys
tem
Eva
luat
ion
Surv
ey (S
SES)
is a
con
tinua
tion
of w
ork
begu
n du
ring
prev
ious
pha
ses.
The
obj
ectiv
es o
f the
SSE
S is
to re
mov
e in
filtra
tion
and
inflo
w (I
/I) fr
om th
e sa
nita
ry c
olle
ctio
n sy
stem
, with
the
ultim
ate
goal
of r
educ
ing
and
elim
inat
ing
Com
bine
d Se
wer
O
verf
low
s in
the
city
. Im
plem
enta
tion
of th
is p
roje
ct is
in p
artia
l com
plia
nce
with
the
requ
irem
ents
of
a M
assD
EP A
dmin
istra
tive
Con
sent
Ord
er.
In a
dditi
on, t
he w
ork
done
und
er th
is p
roje
ct w
ill h
elp
the
city
stay
in c
ompl
ianc
e w
ith th
e U
SEPA
Ord
er fo
r Com
plia
nce
(Doc
ket 0
8-04
2).
Und
er th
e or
der,
the
city
is re
quire
d to
subm
it a
plan
and
sche
dule
by
June
201
3 fo
r elim
inat
ion
of th
e C
SO o
utfa
ll. P
revi
ous S
SES
Phas
es a
nd in
vest
igat
ions
hav
e re
veal
ed th
at th
ere
are
wid
espr
ead
prob
lem
s with
in th
e ci
ty's
was
tew
ater
col
lect
ion
syst
em.
Prev
ious
con
stru
ctio
n ph
ases
hav
e fo
cuse
d on
the
olde
r sec
tions
of t
he c
ity, k
now
n as
the
"cor
e ar
ea".
Pha
ses 1
0-12
will
ent
ail b
oth
inve
stig
atio
n an
d re
habi
litat
ion
effo
rts in
the
east
ern
porti
on o
f the
city
's sy
stem
, whi
ch h
as n
ot b
een
focu
sed
on
durin
g pr
evio
us in
vest
igat
ions
due
to it
s you
nger
age
and
low
er fl
ows t
han
the
core
are
a. T
his p
roje
ct
is p
art o
f a c
ost e
ffec
tive,
targ
eted
pla
n to
ass
ess o
pera
tions
and
rem
ove
sour
ces o
f I/I
in th
e ci
ty's
colle
ctio
n sy
stem
. It
is e
xpec
ted
to g
reat
ly re
duce
or e
limin
ate
the
publ
ic h
ealth
pro
blem
of c
ombi
ned
and
sani
tary
sew
er o
verf
low
s to
the
Taun
ton
Riv
er.
87.3
4%
City
of T
aunt
on
DW
$6
,663
,446
Th
e pr
ojec
t inv
olve
s the
repl
acem
ent o
f app
roxi
mat
ely
10,0
00 li
near
feet
of w
ater
mai
n th
roug
hout
the
City
of T
aunt
on w
ater
dis
tribu
tion
syst
em.
The
proj
ect a
lso
invo
lves
the
cons
truct
ion
of a
new
pu
mpi
ng st
atio
n on
Har
ris S
treet
to re
plac
e th
e or
igin
al st
atio
n co
nstru
cted
in 1
876.
93.8
0%
Tur
ners
Fal
ls
Fire
Dis
tric
t D
W
$794
,103
Th
is p
roje
ct in
volv
es th
e co
nstru
ctio
n of
a p
ump
stat
ion
and
chem
ical
feed
syst
ems t
o br
ing
the
Han
nega
n B
rook
Wel
l on
line
as a
bac
kup
wat
er su
pply
sour
ce fo
r the
Tur
ners
Fal
ls W
ater
D
epar
tmen
t. T
he p
roje
ct n
ot o
nly
serv
es a
s the
bac
kup
for t
he sy
stem
but
will
ass
ist t
he D
epar
tmen
t in
redu
cing
the
vuln
erab
ility
to th
e To
wn
of Ir
ving
wat
er su
pply
and
the
Mon
tagu
e C
ente
r Wat
er D
istri
ct,
sinc
e bo
th th
ese
syst
ems r
ely
on a
sing
le w
ell a
nd u
se T
urne
rs F
alls
Wat
er D
epar
tmen
t as t
heir
back
up.
98.3
1%
Tow
n of
Web
ster
D
W
$196
,585
Th
e pr
ojec
t inc
lude
s the
con
stru
ctio
n of
app
roxi
mat
ely
4,50
0 fe
et n
ew w
ater
mai
n in
Raw
son
Roa
d
Res
ervo
ir A
cces
s Roa
d, R
awso
n R
oad
to G
ore
Roa
d, a
nd se
ctio
n of
Gor
e R
oad,
inst
alla
tion
of
appr
oxim
atel
y 75
line
ar fe
et c
ured
-in-p
ipe
liner
and
inst
allin
g a
Tide
flex
Mix
ing
Syst
em fo
r the
R
awso
n R
oad
Wat
er T
ank.
The
pro
ject
will
redu
ce th
e pr
obab
ility
of f
utur
e fa
ilure
s and
thus
redu
ce
the
risk
of sy
stem
con
tam
inat
ion,
iron
and
man
gane
se w
ater
qua
lity
dist
urba
nces
and
the
loss
of w
ater
fr
om st
orag
e.
86.6
0%
2016 SRF ANNUAL REPORT | 54
Bor
row
er
Prog
ram
A
mou
nt
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
W
estb
orou
gh
CW
$3
02,3
05
The
Wes
tbor
ough
Was
tew
ater
Tre
atm
ent P
lant
dis
char
ges i
ts e
fflu
ent t
o th
e A
ssab
et R
iver
und
er a
n N
PDES
Per
mit.
Wes
tbor
ough
is a
mem
ber o
f the
Ass
abet
Riv
er C
onso
rtium
. Th
e A
ssab
et R
iver
is
dist
ress
ed d
ue to
seve
re e
utro
phic
atio
n as
a re
sult
of e
xces
sive
nut
rient
s suc
h as
Pho
spho
rous
and
N
itrog
en.
The
new
200
5 di
scha
rge
perm
it EP
A is
sued
to th
e to
wn
impo
ses s
tring
ent p
hosp
horu
s and
co
pper
lim
its. T
his p
roje
ct w
ill im
plem
ent a
con
stru
ctio
n up
grad
e of
the
WW
TP th
at w
ill e
nabl
e it
to
achi
eve
com
plia
nce
with
the
perm
it.
100%
City
of
Wor
cest
er
CW
$1
,048
,196
Th
is p
roje
ct w
ill im
plem
ent t
he re
com
men
datio
ns fr
om th
e La
ke A
venu
e A
rea
Sew
er S
yste
m
Eval
uatio
n Su
rvey
to re
mov
e co
st e
ffec
tive
inflo
w/in
filtra
tion
from
the
Lake
Ave
nue
Are
a th
at
cont
ribut
es to
surc
harg
ing
and
over
flow
s int
o La
ke Q
uins
igam
ond.
100%
2016 SRF ANNUAL REPORT | 55
ConTaCT InfoRMaTIonMassachusetts Clean Water Trust
3 Center Plaza, Suite 430Boston, MA 02108
Susan E. Perez, Executive Director(617) 367-9333 Ext. [email protected]
Nathaniel Keenan, Deputy Director(617) 367-9333, x508
My T. Tran, Trust Treasurer(617) 367-9333 Ext. [email protected]
Massachusetts Department of Environmental ProtectionDivision of Municipal Services
One Winter Street, 5th FloorBoston, MA 02108
Steven McCurdy, DirectorDivision of Municipal Services
(617) [email protected]
Jane Peirce, Deputy DirectorDivision of Municipal Services
(617) [email protected]
3 Center Plaza, Suite 430 Boston, MA 02108
www.mass.gov/treasury
1 Winter Street Boston, MA 02108 www.mass.gov/dep