ANNEXURES -...
Transcript of ANNEXURES -...
ANNEXURES
ANNEXUREA-1
WHAT A MHATAMA GANDHI NATIONAL RURAL EMPLOYMENT
GUARANTEE SCHEME SHOULD HAVE?
Mahatma Gandhi NREGS) will be expected to clarify, inter alia, the following matters:
(a) Specify the implementing Department in the State.
(b) Specify a senior officer in the State as State Programme Coordinator.
(c) Specify the District Programme Coordinator.
(d) Lay down the mode of recruitment for Programme Officers, supportive staff and other
required professional services, and make interim arrangements till regular Programme
Officer is appointed.
(e) Define the relationship with the Block Development Officer.
(f ) Clearly delineate Agency–wise the roles and responsibilities for each task mandated in
the Act and elaborated in the Guidelines. Establish coordination mechanisms among
them, fixing clear accountability for each task, since activities under the Act are
justiciable and the people and the Implementing Agency should know in whom the legal
obligation for getting a task done vests.
(g) Delineate the Fund Flow system for the Rural Employment Guarantee Scheme.
(h) Specify the cheque-signing authorities at the District, Block (Programme Officer) and
Gram Panchayat levels.
(i) Specify the procedure for payment of unemployment allowance.
(j) Specify the authorities for administrative and technical approval of works and define
their powers.
(k) Specify the procedure for maintenance of accounts, maintenance of muster rolls,
material, unskilled wage and skilled wage content of the works and audit arrangements
for internal and social audit.
(l) Specify procedures for making entries in the job cards and for cross-checking them to
avoid wrong entries.
(m) Specify systems for measurement of works and rates of payment thereof and methods
for making this information transparent.
(n) Specify the system of payment of wages. Possibility of payment through accounts in the
bank or post office may be considered.
(o) Specify procedures for social audit, public accountability and implementation of the
Right to Information Act.
(p) Specify grievance redressal mechanisms at the Gram Panchayat, Intermediate
Panchayat, District and State levels.
(q) Specify the terms and conditions of the Chairperson and Members of the State
Employment Guarantee Council, time, place and procedure of meetings.
Any other matter considered necessary by the State Government.
ANNEXURE A-2 SUMMARY OF MAIN TASKS UNDER THE MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT
GUARANTEE ACT (MGNREGA)
Function
Activity
Levels of Implementation
Centre State District Block Gram Panchayat
DP DPC IP PO GP GS
Policy & Standards formulation
Core rules formulation ###
State REGS formulation ###
Formulation of State rules ###
Guidelines on implementation of MGNREGA
###
Creation of CEGC/SEGC ### ###
Designation of District Programme Coordinator
###
Appointment of Programme Officer at Block level
###
Time motion studies ###
Norms for measurement of work ###
District Schedule of Rates formulation ### ###
Fixation of wage rates ###
Planning Mobilization of demand ### ### ### ###
Estimation of demand ### ###
Activity selection ### ###
Preparation of Annual Plan ### ### ### ### ###
Perspective Plan Approval ### ### ###
Annual Plan approval ### ### ### ###
Preparation of labour budget ### ### ### ###
Function
Activity
Levels of Implementation
Centre State District Block Gram Panchayat
DP DPC IP PO GP GS
Communication and Publicity
Communication Strategy ### ### ###
Communication & Publicity in local language ### ### ### ### ### ###
Setup State Employment Guarantee Fund (SEGF)
###
Open Bank Accounts in REGS Districts & Blocks
### ### ###
Fund flow from DRF to PO to Implementing Agency
### ### ###
Training State level personnel ### ###
Training of State level & District level officials, PRIs and other Stakeholders
### ###
Training on RTI/Social Audit ### ###
Develop training module/ material ### ###
Training of trainers ### ###
Organising training programs for PRIs/government functionaries
### ###
Operation Mobilisation of application ###
Registration of application ###
Registration & verification of application ### ###
Issuance of Job Card ###
Annual updation of employment seekers register
### ###
Function
Activity
Levels of Implementation
Centre State District Block Gram Panchayat
DP DPC IP PO GP GS
Implementation Preparation of estimates ### ###
Technical & financial sanction ### ###
Selection of executing agency ### ###
Allotment of work to agencies ### ###
Application of work
### ###
Provision of wage employment ### ###
Provision of muster roll ###
Publicity of wage rate ### ### ### ### ### ### ###
Display of wage rates ### ###
Payment of wages ### ###
Measurement of works
Formulation of norms of measurement ###
Time motion studies ###
Prepare District Schedule of Rate (DSR) ### ### ### ###
Publicity of DSR in vernacular language ### ###
Social Audit Conduct of Social Audit ### ### ### ###
Integration of Social Audit in 4 stages of implementation i.e. pre planning, planning, implementation and monitoring & evaluation -
###
Local Vigilance Committee for every work ### ### ###
Local Beneficiary Committee
### ### ###
###
Monitoring of registration, employment provided, unemployment allowance paid, social audit & payment of correct wages
### ### ### ### ### ### ###
###
Function Activity
Levels of Implementation
Centre State District Block Gram
Panchayat
DP DPC IP PO GP GS
Grievance Redressal
Grievance against PO ### ### ### ###
Grievance against GP ### ### ### ### ### ###
Action against irregularities ###
Helpline for grievance redressal ### ### ### ### ###
Transparency & Accountability
Yearly Physical & Financial Audit ### ###
Comptroller and Auditor General’s Audit ###
Accountant General’s Audit
###
District Internal Audit ### ###
Monitoring &Evaluation
Setup National Monitoring System ###
Report of Local Vigilance Committee ### ###
MIS for management of Data ### ###
Yearly average wage earned data to be presented before SEGC
###
Verification & Quality Audit by external monitors
### ###
Periodic evaluation & Research studies on implementation
### ### ###
DP: District Panchayat DPC: District Programme Coordinator IP: Intermediate Panchayat PO: Programme Officer GP: Gram Panchayat GS: Gram Sabha
ANNEXURE B-1
MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT
DETAIL FORMAT for APPLICATION FOR REGISTRATION UNDER MGNREGS
Registration No. (to be assigned by Gram Panchayat)
1 Details of the Applicants
2 Name of Village:
Sl.
No
.
Name Age Sex
Specimen
Signature/
Thumb impression
of adult
Member
willing to work.
Photograph of
Adult members
willing to work
i)
ii)
iii)
iv)
3 Name of Gram Panchayat:
4 Name of Block:
5 SC/ ST/:
6 Beneficiaries under IAY/Land Reforms/
other Traditional Forest Dwellers and
Small or Marginal Farmers.
7 AADHAR No.
I/We certify that the particulars given above are correct ----------------------------------
Note: The Application for registration will be available at free of cost at the Gram Panchayat to workers willing to work under MGNREGA.
ANNEXURE B-2
FORMAT FOR JOBCARD
COVER PAGE Job Card of the Household seeking wage employment under MGNREGA
Job Card No.
(State Code / District Code / Block Code / GP Code / Job Card No)
Validity Period From
To
Note: a. All entries in the Job Card shall be duly authenticated by signature of an authorised
officer. b. The Job Card shall bear the photographs of only the registered adult members of the
households to whom the Job Cards has been issued. c. No photograph, name or details of any person other than that of the registered adult
members of the household to whom that Job Card belongs shall be affixed or recorded in the Job Card.
d. All Job Cards shall be in the custody of the Job Card holders to whom they belong. e. Job Cards shall be issued by Gram Panchayat.
JOB CARD PARTICULARS
1. Job Card Number of the Household
State Code/District Code/Block Code/G.P. Code/Village/Family Member
2. Name of Head of Household:
3. Category:
4. Date of Registration:
5. Address:
6. Village:
7. Panchayat
8. Block:
9. District:
10. Whether BPL:
11. Family – Id:
12. RSBY No.
13. Details of the applicants of the Household willing to work
Sl. No.
Name
Father’s/Husband’s Name
Male/Female
Age on Date of Registration
P.O./Bank A/C No. including name of the Branch (if any)
Insurance Policy No.
Electors Photo Identity Card No. (EPIC No.)
AADHAR No.
14. Address
16. Date of Registration
Signature/Thumb
impressions of applicants Seal & Signature of
Registering Authority
Photograph(s) of
members of
Household willing
to work, duly
attested by
Sarpanch and
Panchayat
Secretaray
ANNEXURE B-2 (Contd.)
DETAILS OF EMPLOYMENT DEMANDED AND PROVIDED
Sl. No.
Name of Member
Date of Application for work
Employment Demand
Employment Provided
Description of Work
Muster Roll ID in which attendance recorded and wages paid
Amount of wages paid
Unemployment Allowance paid, if any
Signature of Authorised Officer
From To No. of Days
From To No. of Days
Note: 1. No Row will be left blank in any case. 2. Details will be entered separately for separate family member. 3. When wage employment of 100 days have been provided to the household, it has to be enterd in the next row in red ink.
4. There should be 20 rows available for entries on one page. There must be at least 5 such pages having 20 rows for making entries during the 5
years.
ANNEXURE B-2 (Contd.)
DETAILS OF UNEMPLOYMENT ALLOWANCE GIVEN
Sl. No.
Name of Member Dates and Number of Days for which unemployment allowance provided
Rate at which Unemployment Allowance given
Total Amount paid
Reasons for not providing work
Signature of Authorised Officer
From To No. of Days
ANNEXURE B-2(i)
FORM NO.1A
APPLICATION FORM FOR WORK
(See Section 3(1) and Paragraph 9 of Schedule II of MGNREG Act, 2005)
To, To,
Sarpanch The Programme Officer
Gram Panchayat…………. Block:…………….……….…..
Block:…………...………… District:………….………...
District:………….………...
Date: ........................................ Application Code:……………………………..
(To be filled by Office)
SUBJECT: APPLICATION FOR WORK
Sir/Madam,
I hereby submit my application for work under Section 3(1) and Paragraph 9 of
Schedule-II of Mahatma Gandhi National Rural Employment Guarantee Act. The details of
my request and the period for which work is required are:
I am willing to work for at least 14 continuous days in the work allotted to me.
Signature/ LTI Thumb Impression of the Applicant……………………………
………………………………………………………………………………………………
ACKNOWLEDGEMENT RECEIPT (for office use only)
Received application for work from Sri ............................................................. s/o / w/o
............................................................. of village ........................................... whose Job Card
No is ............................................... on date ...................................... (dd/mm/yy).
Date : Signature of Sarpanch / Programme Officer
Note: 1. Application for work to be submitted to Gram Panchayat/Programme Officer. 2. A worker having a job card may apply for work on work-site.
YOUR RIGHTS UNDER THE MAHATMA GANDHI NATIONAL RURAL
EMPLOYMENT GUARANTEE ACT
WORK APPLICATIONS
1 With this Job Card, you are entitled to apply for work at any time. You can submit
your application to the Gram Panchayat, or to the Block office.
2 If you apply for work, employment has to be given to you within 15 days of work
done.
3 When you apply for work, make sure that you get a dated and signed receipt.
4 If you do not get employment within 15 days, you are entitled to the unemployment
allowance.
WORKERS‟ ENTITLEMENTS
1 All workers are entitled to the notified wage rate.
2 Men and women should be paid equally.
3 Wages should be paid within a week, or fifteen days at most.
4 Wages should be paid in public. When wages are paid, muster rolls should be read out
and Job Card entries should be made.
5 Sign the muster roll after receiving your wages and checking the entries. Never sign a
blank muster roll.
6 If you live more than 5 km away from the worksite, you are entitled to a travel and
subsistence allowance (10% of the minimum wage).
AT THE WORKSITE
1 Muster rolls should be available and maintained at the worksite. You are entitled to
check the muster roll at any time.
2 Shade, drinking water and first-aid should be available at every worksite.
3 If more than five children under the age of six years are present, child care facilities
should also be provided at the worksite.
UNEMPLOYMENT ALLOWANCE
1 If you have not been given work within 15 days of applying, you are entitled to the
“unemployment allowance”.
2 The unemployment allowance amounts to one fourth of the minimum wage for the
first 30 days, and one half thereafter.
3 You can apply for the unemployment allowance to the Gram Panchayat or Block
Office (you will need the receipt showing when you applied for work).
WATCH YOUR JOB CARD!
1 This Job Card (with photograph) should be given to you free of cost. Don‟t let anyone
charge you for it.
2 Every household is entitled to a separate Job Card.
3 Keep this Job Card with you. No-one has the right to take it away.
4 Entries have to be made in front of you when your wages are paid.
5 Make sure that no false entries are made in the Job Card.
6 If you lose this Job Card, you can apply for a new one from the Gram Panchayat.
HELP AND COMPLAINTS
1 If you have a problem, you should first approach the Gram Panchayat. If this does not
help, you can submit a complaint to the Programme Officer at the Block level.
2 If you complain to the Programme Officer, it is his duty to register your complaint and
take action within 7 days.
3 You can also seek help from the following “Helpline”: [INSERT HELPLINE
NUMBER].
ANNEXURE B-2(ii)
FORM NO.1B
APPLICATION FORM FOR WORK
(See Section 3(1) and Paragraph 9 of Schedule II of NREG Act, 2005)
To, To,
Sarpanch The Programme Officer
Gram Panchayat…………. Block:…………….……….…..
Block:…………...………… District:………….………...
District:………….………...
Date: ........................................ Application Code:……………………………..
(To be filled by Office)
SUBJECT: JOINT APPLICATION FOR WORK
Sir/Madam,
We the following applicants submit our joint application for work under Section 3(1)
and Paragraph 9 of Schedule –II of Mahatma Gandhi National Rural Employment Guarantee
Act. The details of our request and the period for which work is required are:
Sl.No. Name of
Applicant
with
Father‟s/
Husband‟s
name
Address Job
Card
Number
Periods from
which
employment is
needed
Requirement
of Creche
(Yes/ No)
Signature
or LTI of
Applicant
From To
We are willing to work for at least 14 continuous days in the work allotted to us.
Note: 1. Application for work to be submitted to Gram Panchayat/Programme Officer. 2. A worker having a job card may apply for work on work-site.
ANNEXURE B-2(iii)
FORM NO.2
DATED RECEIPT OF WORK APPLICATION
(See Paragraph 10 of Schedule-II of MGNREG Act, 2005)
(For issue to every individual applicant separately by the Gram Panchayat/Programme
Officer in case of joint applications for work)
To
Shri/Smt…………………………..
Job Card No.……….…………....
Village:……………………………
Gram Panchayat………………………..
Block………………………………
District…………………………….
Sir/Madam,
This is to acknowledge the receipt of application for work dated (dd/mm/yyyy) under
Paragraph 10 of Schedule-II of MGNREG Act, 2005 from you. The application code is
…………………………………….
1 This is to promise that you will be provided employment at the latest by
……………(date), that is, within 15 days of the date of submitting this application or from
the date when work is sought.
2 In the event of failure to provide you employment as in paragraph 2 above, you will
be given a daily unemployment allowance as per the Act.
Signature of the Authorized Officer ………….……………………
Name.….…………………………………..
Designation...……..……………………….
Date…….………………………………….
Note: Dated receipt will be issued by Gram Rozgar Sahayak
Office Stamp
YOUR RIGHTS UNDER THE MAHATMA GANDHI EMPLOYMENT
GUARANTEE ACT
WORK APPLICATIONS
1 With this Job Card, you are entitled to apply for work at any time. You can submit
your application to the Gram Panchayat, or to the Block office.
2 If you apply for work, employment has to be given to you within 15 days of work
done.
3 When you apply for work, make sure that you get a dated and signed receipt.
4 If you do not get employment within 15 days, you are entitled to the unemployment
allowance.
WORKERS‟ ENTITLEMENTS
1 All workers are entitled to the notified wage rate.
2 Men and women should be paid equally.
3 Wages should be paid within a week, or fifteen days at most.
4 Wages should be paid in public. When wages are paid, muster rolls should be read out
and Job Card entries should be made.
5 Sign the muster roll after receiving your wages and checking the entries. Never sign a
blank muster roll.
6 If you live more than 5 km away from the worksite, you are entitled to a travel and
subsistence allowance (10% of the minimum wage).
AT THE WORKSITE
1 Muster rolls should be available and maintained at the worksite. You are entitled to
check the muster roll at any time.
2 Shade, drinking water and first-aid should be available at every worksite.
3 If more than five children under the age of six years are present, child care facilities
should also be provided at the worksite.
UNEMPLOYMENT ALLOWANCE
1 If you have not been given work within 15 days of applying, you are entitled to the
“unemployment allowance”.
2 The unemployment allowance amounts to one fourth of the minimum wage for the
first 30 days, and one half thereafter.
3 You can apply for the unemployment allowance to the Gram Panchayat or Block
Office (you will need the receipt showing when you applied for work).
WATCH YOUR JOB CARD!
1 This Job Card (with photograph) should be given to you free of cost. Don‟t let anyone
charge you for it.
2 Every household is entitled to a separate Job Card.
3 Keep this Job Card with you. No-one has the right to take it away.
4 Entries have to be made in front of you when your wages are paid.
5 Make sure that no false entries are made in the Job Card.
6 If you lose this Job Card, you can apply for a new one from the Gram Panchayat.
HELP AND COMPLAINTS
1 If you have a problem, you should first approach the Gram Panchayat. If this does not
help, you can submit a complaint to the Programme Officer at the Block level.
2 If you complain to the Programme Officer, it is his duty to register your complaint and
take action within 7 days.
3 You can also seek help from the following “Helpline”: [INSERT HELPLINE
NUMBER].
ANNEXURE B-2(iv) (See Paragraph 11 of Schedule-II of Mahatma Gandhi NREG Act, 2005)
WORK ALLOTMENT FORM
Letter No. ……………………….. Date: ........................................
To
Shri/Smt………………
Job Card No.……….……………..
Village:………………………..……
Gram Panchayat…………………..
Block…………………………..……
District………………………….….
SUBJECT: INFORMATION REGARDING THE ALLOTMENT OF WORK
With reference to your work application of …………….. (date) bearing application code no
………………………., you are hereby notified under paragraph 11 of Schedule-II of Mahatma
Gandhi NREG Act to report for work to ………………………………………………...(project name)
(a) on ……………(date of seeking work, in case of advance application),
or (b) within 15 days of the date of application
(Strike out (a) or (b) whichever is not applicable)
.……………………… (location) at…..……………….……..(village),……………………….(Gram
Panchayat), ………… …….(Block), ………………………………….(District).
The implementing agency of the project is ………………………………………. 1 You are also informed that in the case you fail to report to work within 15 days of the receipt of this letter, you shall not be eligible to claim the unemployment allowance for a period of three months as per Section 9 of the Mahatma Gandhi NREG Act. However, you shall be eligible to seek employment at any time. 2 You are also informed that you shall be paid wages every week, or in any case not later than a fortnight after the date on which work is done as per Section 3(3) of the Mahatma Gandhi NREG Act.
Signature of the Authorized Person* ………….…………
Name.….………………………………
Designation...……..…….
Date…….………………
*Authorised person may be either the Sarpanch or Programme officer or any other person authorised on their
behalf ................................................................................................................................................
Number…………………………. Date: .............................................
Copy forwarded to the Authorised Person(Gram Panchayat)/ Programme Officer……………………….. (Block), for information and necessary action.
Signature of the Authorized Person…………………… Name.….………………………… Designation...……..…………….. Date…….…………………………
Office Stamp
YOUR RIGHTS UNDER THE MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT
WORK APPLICATIONS 1 With this Job Card, you are entitled to apply for work at any time. You can submit your application to the Gram Panchayat, or to the Block office. 2 If you apply for work, employment has to be given to you within 15 days of work done. 3 When you apply for work, make sure that you get a dated and signed receipt. 4 If you do not get employment within 15 days, you are entitled to the unemployment allowance.
WORKERS’ ENTITLEMENTS 1 All workers are entitled to the notified wage rate. 2 Men and women should be paid equally. 3 Wages should be paid within a week, or fifteen days at most. 4 Wages should be paid in public. When wages are paid, muster rolls should be read out and Job Card entries should be made. 5 Sign the muster roll after receiving your wages and checking the entries. Never sign a blank muster roll. 6 If you live more than 5 km away from the worksite, you are entitled to a travel and subsistence allowance (10% of the minimum wage).
AT THE WORKSITE 1 Muster rolls should be available and maintained at the worksite. You are entitled to check the muster roll at any time. 2 Shade, drinking water and first-aid should be available at every worksite. 3 If more than five children under the age of six years are present, child care facilities should also be provided at the worksite.
UNEMPLOYMENT ALLOWANCE 1 If you have not been given work within 15 days of applying, you are entitled to the “unemployment allowance”. 2 The unemployment allowance amounts to one fourth of the minimum wage for the first 30 days, and one half thereafter. 3 You can apply for the unemployment allowance to the Gram Panchayat or Block Office (you will need the receipt showing when you applied for work).
WATCH YOUR JOB CARD! 1 This Job Card (with photograph) should be given to you free of cost. Don’t let anyone charge you for it. 2 Every household is entitled to a separate Job Card. 3 Keep this Job Card with you. No-one has the right to take it away. 4 Entries have to be made in front of you when your wages are paid. 5 Make sure that no false entries are made in the Job Card. 6 If you lose this Job Card, you can apply for a new one from the Gram Panchayat.
HELP AND COMPLAINTS 1 If you have a problem, you should first approach the Gram Panchayat. If this does not help, you can submit a complaint to the Programme Officer at the Block level. 2 If you complain to the Programme Officer, it is his duty to register your complaint and take action within 7 days. 3 You can also seek help from the following “Helpline”: [INSERT HELPLINE NUMBER].
ANNEXURE B-3 MUSTER ROLL FORMAT
Sl. No. of Muster Roll
Measurement Book (Page No.) Description of Work
Sanction Order No
Sanction Date (dd/mm/yy)
Sl. No.
Name of Worker
Job Card Registration No.
Sex (Male/ Female)
Savings Account No. (Bank or Post Office, if any)
Day 1* Day
2*
Da
y
3*
Da
y
4*
Da
y
5*
Da
y
6*
Day
7*
Amount paid or credited to Bank PO. A/C
Signature/ LTI of Payee
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Total Amount Paid in Rs
Mode of Payment
Number Total of the Day
Post Office A/C
Signature of person recording attendance
Bank A/C Signature of inspecting Authority
Business Correspondent
Cash
Total
* To mark attendance Workers may put their signature or LTI below the days’ column
ANNEXURE B-3 (Contd.)
No. of Differently abled Person
Verified by
Name
Designation
Date
Signature
Signature and Seal of Sarpanch
Date
Note: 1. Programme Officer shall issue the Muster Roll. 2. Numbered Muster Rolls will be maintained on the work site.
Prepared by
Name
Designation
Date
Signature
ANNEXURE B-3(i)
Wage Slip Format 1. Name of Worker
2. Address
3. Job Card No.
4. Description of the Project where the worker has performed the work
5. Muster Roll I.D.
6. Credited amount Rs…………………(in
words…………………………………………………………………………………………….
………………………………………………………..………………………….)
7. Work done by you during the period from…………………(Date) to ………………………..
(Date)
8. Pay Order No…………………….Dated…………………
You are requested to please collect the amount personally or through an authorised
representative from ……………………………..(name of the Bank Branch)
on………………………….(Date) on production of this wage slip.
Thanking you, Yours faithfully,
(Name & Designation of authorised
Person with contact details)
ANNEXURE B-4
Muster Roll Issue Register (To be Maintained by the Issuing Authority i.e. Programme Officer at the Block Level)
Sl. No.
Date of
Issue of
Muster
Roll
Muster
Roll No.
Name of
work for
which issued
Financial Sanction Number and Date
of Work Name of Agency
to whom Muster
Roll Issued
Name, Designation and
Signature of the Official
receiving Muster Roll Sanction
No. Amount Date
1 2 3 4 5 6 7 8 9
ANNEXURE B-5
MUSTER ROLL RECEIPT REGISTER (TO BE MAINTAINED BY GRAM PANCHAYATS and BLOCK)
Sl. No.
Muster Roll No.
Name of Work for
which issued
Financial Sanction Number and Date of Work
For Muster Rolls of Works for which Gram Panchayat is
the Implementing Agency
For Muster Rolls of Works for which Implementing
Agencies are other than the Gram Panchayat
Sanction
No. Amount (in Rs.)
Date
Date of issue of muster roll
by Programme
Officer
Name, Designation
and Signature of the Official receiving
Muster Roll
Date on which copy of
the paid Muster Roll given to the
Gram Panchayat
Date and Signature of the receiving
Gram Panchayat
Official
1 2 3 4 5 6 7 8 9 10
ANNEUXRE B-6
MUSTER ROLL RECEIPT REGISTER (To be maintained by Block and Gram Panchayats)
Sl. No.
Date of Issue/Receipt of
Muster Roll
Muster Roll No.
Name of work for which issued Financial Sanction Number and
Date of Work
Name, Designation
and Signature of the Official
receiving Muster Roll
Date on which copy of
the paid Muster Roll given to the
Gram Panchayat for
record
Date and Signature of the receiving
Gram Panchayat
Official
Sanction
No. Amount (in Rs.)
Date
1 2 3 4 5 6 7 8 9 10
ANNEUXRE B-7
PROFORMA FOR JOB CARD APPLICATION REGISTER
Sl. No Name of Applicant Date of Receipt of
Application of Job
Card
No. and Date of Job
Card Issued
Reasons, if Job Card
not issued and any
other reasons
ANNEUXRE B-8
PROFORMA FOR JOB CARD REGISTER
INDEX OF JOB CARD REGISTER
Sl. No Job Card No. Name of Registered
Person in the Household
Page No.
ANNEXURE B-8 (Contd.)
PROFORMA OF PAGES IN THE JOB CARD REGISTER
1. Registration Number of the Household
State Code/District Code/Block Code/G.P. Code/Village/Family Member
2. Name of Head of Household:
3. Category:
4. Date of Registration:
5. Address:
6. Village:
7. Panchayat
8. Block:
9. District:
10. Whether BPL: 11. Family – Id:
12. Epic No.
13. RSBY No.
14. Details of the applicants of the Household willing to work
Sl. No.
Name Father’s/Husband’s Name
Male/ Female
Age on Date of Registration
P.O./Bank A/C No. including name of the Branch (if any)
Insurance Policy No.
Electors Photo Identity Card No. (EPIC No.)
AADHAR No.
15. Address
16. Date of Registration
Seal and Signature of Registering Authority
Photograph(s) of
members of
Household willing
to work, duly
attested by
Sarpanch and
Panchayat
Secretary
ANNEXURE B-9
EMPLOYMENT REGISTER
Sl.No
.
Date of
Applicatio
n for work
Name of
Applicant
with
Father‟s
or
Husband‟
s name
Addres
s
Job
Car
d
No.
Date of Issue of
Dated
Acknowledgeme
nt receipt
Date of
work
allotmen
t
Date
of
Joinin
g
Work
Descriptio
n of work
Total
No. of
days
worke
d
Total
amoun
t paid
as
wages
(in Rs)
Muste
r Rolls
Uniqu
e ID
Nos.
Total Amount
paid as
Unemployme
nt Allowance,
if any
1 2 3 4 5 6 7 8 9 10 11 12 13
Sub-Total for the page to be carried forward to the next page
ANNEXURE B-10
FORMAT FOR WORKS REGISTER
Wo
rk
ID
Na
me
of
Wo
rk
Villa
ge
Gram
Pancha
yat
Locat
ion of
Work
(Khas
ra
No./
Plot
No.)
Impl
eme
ntin
g
Age
ncy
Sanction
Order No
and Date
Da
te
of
Sta
rt
Date of
Comple
tion
IDs
of
mus
ter
roll
used
Expenditure
Date
of
com
pleti
on
of
Soci
al
Audi
t
Condi
tion of
the
work
(Post-
projec
t)
Benefits
derivable in
terms of
description of
capacity in
area (Square
meters),
volume
(cubic
meter),
length
(meters),
numbers etc.
Current
status
(useful/p
artly
derelict/
derelict)
AS &
FS
T
S
Expendi
ture on
wage
Expendi
ture on
material
Tot
al
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
AS & FS: Administrative Sanction and Financial Sanction TS: Technical Sanction
ANNEXURE B-11
MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT COMPLAINT REGISTER TO BE MAINTAINED AT BLOCK AND DISTRICT LEVEL
Sl. No.
Date Name and Address of
Complainant
Name of Gram Panchayat and
Block
Type of Complaint
Complaint against whom
Action Taken Date of Final
Disposal
1 2 3 4 5 6 7 8
Annexure B-12 (i)
EMPLOYMENT GENERATION: MONTHLY PROGRESS REPORT PART I
1 2 3 4 5 6 7 8 9 10 11 12
a b c d a b c d e
Sl.
No.
District Cumulative No. of
Household issued
Jobcards (Till the
reporting month)
Cumulative
No. of
Household
demanded
employment
(Till the
reporting
month)
Cumulativ
e Labour
Budget
estimatio
n of
employm
ent
provided
(till the
reporting
month)
Cumulative
No. of
Household
provided
employment
(Till the
reporting
month)
No. of
HH
workin
g
under
MGNR
EGA
during
the
reporti
ng
month
Cumul
ative
Labour
Budget
estima
tion of
person
days
(Till
the
reporti
ng
month)
Cumulative persondays generated
(in lakh) (till the reporting month)
Cumul
ative
numbe
r of
HH
compl
eted
100
days
(Till
the
reporti
ng
month)
Number of
HH
beneficiary
of category
SC and ST
or BPL
families or
land
reforms or
IAY or
small
farmers or
marginal
farmers or
Tribes &
other
traditional
forest
dwellers
No.
of
dis
abl
ed
ben
efic
iary
indi
vid
ual
s
SC ST Other Total SC ST Others Total W
om
en
1
2
3
4
5
6
7
8
9
10
11
12
Total
Annexure B-12 (ii)
FINANCIAL PERFORMANCE: MONTHLY PROGRESS REPORT PART II
S.
No
.
Distric
t
O.B
. as
on
1st
Apri
l of
the
yea
r
Release of
last year
received
during
current year
Release
during
current year
Misc.
receip
t
Total
availabilit
y
Cumulativ
e labour
budget
estimation
of total
expenditur
e (Till the
reporting
month)
Cumulative Expenditure
Centr
e
Stat
e
Centr
al
Stat
e
On
wage
s
On
semi-
skille
d and
skille
d
wage
s
On
materi
al
Administrativ
e expense
Non
Recurrin
g
Tota
l
Recurring Non
Recurrin
g
Annexure B-12 (iii)
PHYSICAL PERFORMANCE INDICATING ASSETS CREATED: MONTHLY PROGRESS REPORT PART III
DURING THE YEAR……………………………………. UPTO THE MONTH OF ……………………………………………
Sl.
No
.
Works/Activiti
es
Name of District Total sum of all districts to give pictures of the State as a
whole
Completed works Ongoing Works Completed works Ongoing works
Unit Expenditure Unit Expenditure Unit Expenditure Unit Expenditu
re
1 Water
conservation
and water
harvesting
(number and
cubic mtrs as
well) digging
of new
tanks/ponds
percolation
tanks, small
check dams
etc to be
indicated
Nos. Cu. Mt.
(Earth work)
Nos. Cu. Mt. (Earth
work)
Nos. Cu. Mt. (Earth
work)
Nos. Cu. Mt.
(Earth
work)
separately
2 Drought
proofing (in
numbers and
hectare as
well)
including
afforestation
and tree
plantation)
Nos. Hectare Nos. Hectare Nos. Hectare Nos. Hectare
3 Irrigation
works (in
nos. and
length in km.)
(minor
irrigation
canals and
other
activities to
be indicated
separately)
Nos /Length in Km Nos /Length in Km Nos /Length in Km Nos /Length in
Km
4 Provision of
irrigation
facility, horticulture
plantation
and land
development
Nos./Length
in Kms
Nos./Length
in Kms
Nos./Lengt
h in Kms
Nos./Length in
Kms
facilities to
land owned
by (in nos.)
Scheduled
Castes and
the
Scheduled
Tribes or
below
poverty line
families or to
beneficiaries
of land
reforms or to
the
beneficiaries
under the
Indira Awas
Yojana of the
Government
of India or
that of the
small farmers
or marginal
farmers as
defined in the
Agriculture
Debt waiver
& debt relief
schemes or
beneficiaries
under the
Scheduled
Tribes &
other
traditional
forest
dwellers
(recognition
of forest
right) Act
2006”
5 Renovation
of traditional
water bodies
(in nos. and
cubic mtr as
well)
(desilting of
tanlks/ponds,
desilting of
old canals,
desilting of
traditional
open well etc
to be
indicated
separately)
Nos. Current earth
work
Nos. Current earth
work
Nos. Current earth
work
Nos. Current
earth
work
6 Land
development
(in nos. and
hectare as
well)
plantation,
land levelling
other
activities to
be indicated
separately)
Nos. hectare Nos. hectare Nos. hectare Nos. hectare
7 Flood control
and
protection (In
nos. and
length in km)
(drainage in
water logged
areas,
construction
and repair of
embankment
to be
indicated
separately)
No./Length No./Length No./Length No./Length
8 Rural
connectivity
(in nos and
No. Length in Km No. Length in Km No. Length in Km No. Length in
Km
legth in kms)
9 Any other
activity
(notified by
MoRD)
No./Length/
hectare
No./Length/
hectare
No./Length
/hectare
No./Length/hect
are
Total
Unit in nos.
and
expenditure
be reported
in this row)
Note: (1) information in the column indicating ‘completed works’ must be given in cumulative till the reporting month. (2) The district-wise details will have to be given for each district separately in the dedicated columns (shown above as name ‘Name of District’) and the last segment will be the total (horizontal) sum of all Mahatma Gandhi NREGA districts of the State under each category of works/activities to give consolidated picture of the State as a whole.
ANNEXURE B-12 (IV)
BANK AND POST OFFICE ACCOUNTS REPORT: MONTHLY PROGRESS REPORT PART IV
Sl. No. Name of
the
District
No. of Banks Account
Opened
Amount
of Wages
disbursed
through
Bank
Account
(Rs in
lakh)
No. of Post Office
Accounts Opened
Amount
of Wages
Disbursed
through
post
Office
Accounts
(Rs in
lakh)
Total Accounts Total
amount
disbursed
(Rs in
lakh)
Individual Joint Individual Joint Individual Joint Total
1 2 3 4 5 6 7 8 9=3+6 10=4+7 11=9+10 12=5+8
1
2
3
4
5
6
7
8
9
10
11
12
13
Total
All values should be cumulative upto the reporting month.
Annexure B-12 (v)
TRANSPARENCY REPORT: MONTHLY PROGRESS REPORT PART V
Sl.
No
.
Name
of the
Distric
t
No. of Muster
Rolls verified
Social Audits Inspection conducted Gram Sabhas held Complaints
No. of
Muste
r Rolls
used
Verifie
d
Total Gram
Panchayat
s
No.
of GP
wher
e
Socia
l
Audit
held
Total
work
s
taken
up
No. of
works
inspecte
d at
District
level
No. of
works
inspecte
d at
Block
level
Total Gram
Panchayat
s
No. of
Gram
Sabha
s held
No. of
VCMC
meeting
s held
No. of
complaint
s received
No. of
complaint
s
disposed
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Total
All values should be cumulative upto the reporting month.
ANNEXURE B-12 (vi)
CAPCITY BUILDING (PERSONNEL REPORT): MONTHLY PROGRESS REPORT PART VI-A
Sl
.
N
o.
Nam
e of
Distr
ict
Gram Panchayat level Block level
Gram Rozgar
Sahayak
New Personnel Programme
Officer
Engineers/Technical
Assistant
Computer
Assistant
Accountants New Personnel
Targ
et
Achieve
ment
Targ
et
Achieve
ment
Targ
et
Achieve
ment
Achieve
ment
Achieve
ment
Targ
et
Achieve
ment
Targ
et
Achieve
ment
Targ
et
Achieve
ment
1 2 3 4 5 6 7 8 9 10 11 12
Total
All values should be cumulative upto the reporting month
ANNEXURE B-12 (vi) (Contd…)
CAPCITY BUILDING (PERSONNEL REPORT): MONTHLY PROGRESS REPORT PART VI-A
Sl.
No
.
Name
of
Distri
ct
District level
Works Manager
and Technical
Assistant
IT Manager &
Computer
Assistants
Training
Coordinator
Coordinator for
Social Audit and
Grievance
Redressal
Accounts Manager New Personnel
Targ
et
Achieveme
nt
Targ
et
Achieveme
nt
Targ
et
Achieveme
nt
Targ
et
Achieveme
nt
Targ
et
Achieveme
nt
Targ
et
Achieveme
nt
1 2 3 4 5 6 7 8 9 10 11 12
Total
All values should be cumulative upto the reporting month
ANNEXURE B-12 (vii)
CAPCITY BUILDING (PERSONNEL REPORT): MONTHLY PROGRESS REPORT PART VI-A
Sl.
No
.
Name
of
Distric
t
Gram Panchayat level Block level
Gram Rozgar
Sahayak
New Personnel Programme
Officer
Engineers/Technica
l Assistant
Computer
Assistant
Accountants New Personnel
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
Nos. to
be
trained
Nos.
trained
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
1 2 3 4 5 6 7 8 9 10 11 12
Total
All values should be cumulative upto the reporting month
ANNEXURE B-12 (vii) (Contd…)
CAPCITY BUILDING (Training REPORT): MONTHLY PROGRESS REPORT PART VI-A
Sl.
No
.
Name
of
Distri
ct
District level PRI
Functionaries
Vigilance and
Monitoring
Committee
members
New
Personnel Works
Manager and
Technical
Assistant
IT Manager &
Computer
Assistants
Training
Coordinator
Coordinator
for Social
Audit and
Grievance
Redressal
Accounts
Manager
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
Nos.
to be
traine
d
Nos.
traine
d
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Total
All values should be cumulative upto the reporting month
ANNEXURE B-12 (viii)
STATE LEVEL MONTHLY PROGRESS REPORT
Sl.
No
State Staffing Status
IEC Coordinator Social Audit
Coordinator
Grievance Redressal
Coordinator
Training Coordinator IT Manager M&E Coordinator
Total
Posts
Total
personnel
recruited
Total
Posts
Total
personnel
recruited
Total
Posts
Total
personnel
recruited
Total
Posts
Total
personnel
recruited
Total
Posts
Total
personnel
recruited
Total
Posts
Total
personnel
recruited
1 2 3 4 5 6 7 8
All values should be cumulative upto the reporting month
ANNEXURE B-12 (viii) (Contd…)
Sl
.
N
o
Stat
e
Staffing Status Inspectio
n
Complaints Minimum Wages State
Fund
Notifie
d Works
Manager
Data Entry
Operator
Finance
Manager
Accounts
Manager
No. of
works
inspecte
d by
State
Receive
d
Dispose
d
Wage
s
Date of
last
notificati
on Tota
l
Post
s
Total
personn
el
recruite
d
Tota
l
Post
s
Total
personn
el
recruite
d
Tota
l
Post
s
Total
personn
el
recruite
d
Tota
l
Post
s
Total
personn
el
recruite
d
1 2
All values should be cumulative upto the reporting month
ANNEXURE B-13
MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT DETAILS OF WORK
(To be displayed at site of work)
Name of Work : Vill./G.P.: ..............................................
Details (Location- Khasra No.:
From A to B*:
Project (Yojna) : Year :
Executing Agency : Schedule of Rates (SoRs):
Sanctioned Amount : Material Labour ratio
Date of Start : Completion Date
Material Required Technical Specifications of
work Name of Material Qty. with local Unit Rate per unit
Labour Required
Skilled
Semi skilled
Unskilled
Documents available at site:
For further information contact:
*From A to B: construction of road from A village to B village.
ANNEXURE B-14 MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT
(Information to be Displayed at Public places) Information of construction works done by Gram Panchayat/Other implementing Agencies
Panchayat Samiti: District: Gram Panchayat: Ward/Village:
Year Executing
Agency
Sl. No. Name of
work
Village Ward Sanctioned Amount Expenditure Amount
Labour Material Total Labour Material Total Physical
position
of work
ANNEXURE B- 15(i)
LABOUR BUDGET FORMAT: PART I (TO BE FILLED BY THE DISTRICT)
S.
No
Month Total
Rural
HH
(census
2001)
HHs
issued
Job
Cards
Household Demand
HHs provided
employment in
previous
financial year*
HHs provided
employment in
current
financial year*
Specify,
whether
according to
last MPR or
Projected for
the concerned
month
% change
from
previous to
current year
(4b-4a) / 4a)
* 100
HHs projected to
be provided
employment in
the next
financial year*
% change from
current year to
projected
financial year
(4d-4b)/4b)*100
1 2 3 4a 4b A 4c 4d 4e
1 April
2 May
3 June
4 July
5 August
6 September
7 October
8 November
9 December
10 January
11 February
12 March
Total *Previous financial year (FY): Refers to the last financial year, that is, the year preceding the current financial year.
Current financial year: Refers to current financial year in which budget is being made (as per the Guidelines the Labour Budget should be submitted latest by January 31 of
the current financial year).
Next financial year: Refers to the financial year for which projection is being done.
For example: If the labour budget is being prepared for 2009-10, the previous financial year is 2007-08, the present financial year is 2008-09 and the next financial year is
2009-10
ANNEXURE B-15 (i) (PART I) (Contd...)
Sl.
No
Month Persondays Generated Persondays of Employment
Provided/HH
Justification
(if any)
Persondays
provided
in the
previous
financial
year*
Persondays
provided
in the
current
financial
year*
Specify,
whether
according
to last
MPR or
projected
for the
concerned
month
%
change
from
previous
to
current
financial
year*
(5b-5a)/
5a)* 100
Projected
persondays
to be
generated
in the next
financial
year
%Change
from
current
year to
projected
financial
year*
(5d-5b) /
5 b)* 100
Persondays
provided
per HH in
the
previous
financial
year
(5a/4a)
Persondays
provided
in the
current
financial
year* (as
according
to the last
MPR or
projected)
(5b/4b)
Projected
persondays
per HH to
be
provided
in the next
financial
year*
(5d/4d)
1 5a 5b B 5c 5d 5e 6a 6b 6d
1
2
3
4
5
6
7
8
* Previous financial year (FY): Refers to the last Financial Year, that is, the year preceding the current financial year.
Current financial year (FY) : Refers to the current Financial Year in which Budget is being made (As per Guidelines the Labour Budget should be submitted latest by January
31 of the current FY) Next Financial Year (FY): Refers to the Financial Year for which projection is being done ForExample: If the Labour Budget is being prepared for
2009-2010, the previous Financial Year is 2007-2008, the present Financial Year is 2008-2009 and the next Financial Year is 2009-2010.
ANNEXURE B-15 (i) (PART I) (Contd…….) Sl.
No
.
Month Wage Expenditure Material Expenditire (skilled + semi skilled + Material)
Wage
Expenditu
re in the
previous
financial
year*
Wage
expenditu
re in the
current
financial
year
Specify
whetehr
accordin
g to last
MPR or
projecte
d for the
concerne
d month
%Chang
e from
previous
to
current
financia
l year
(7b-7a)
7a)*100
)
Projected
wage
expenditu
re in the
next
financial
year*
%Chang
e from
current
year to
projecte
d
financia
l year*
(7d-7b)
/
7b)*100
Material
expenditu
re in the
previous
financial
year*
Material
expenditu
re in the
current
fiancial
year
Specify
whetehr
e
accordin
g to last
MPR or
projecte
d for the
concerne
d month
%
Change
from
previou
s to
current
fiancial
year*
(8b-8a)
/
8a)*10
0)
Projected
material
expenditu
re in the
nexct
fiancial
year
%
Change
from
current
year to
projecte
d
fiancial
year*
(8d-
8b)/8b)
* 100
1 7a 7b C 7c 7d 7f 8a 8b D 8c 8d 8e
1 April
2 May
3 June
4 July
5 August
6 Septemb
er
7 October
8 Novemb
er
9 Decembe
r
10 January
11 February
12 March
Total * Previous financial year (FY): Refers to the last Financial Year, that is,the year preceding the current Financial Year
Current financial year(FY): Refers to the current Financial Year in which Budget is being made (As per Guidelines the Labour Budget should be submitted latest by January 31 of the current FY) Next financial year
(FY): Refers to the Financial Year for which projection is being done
For Example: If the Labour Budget is being prepared for 2009-2010, the previous Financial Year is 2007-2008, the present Financial Year is 2008-2009 and the next Financial Year is 2009-2010.
Sl.
No.
Month Central Funds received and expenditure (in lakh) (According to last MPR upto reporting month) Justification (if
any) Central Funds Received in the current
financial year (according to last MPR)
Total availability
(according to last MPR)
Total expenditure
(according to last MPR)
Unspent
balance (9b-
9c)
1 9a 9b 9c 9d 1 April 2 May 3 June 4 July 5 August 6 September 7 October 8 November 9 December 10 January 11 February 12 March Total
* Previous Financial Year (FY): Refers to the last Financial Year, that is,the year preceding the current Financial year
Current Financial Year(FY):Refers to the current Financial Year in which Budget is being made (As per Guidelines the Labour Budget should be submitted latest by January31 of the current FY)
Next Financial Year (FY): Refers to the Financial Year for which projection is being done
For example:If the Labour Budget is being prepared for 2009-2010,the previous Financial Year is 2007-2008, the present Financial Year is 2008-2009 and the next Financial Year is 2009-2010
ANNEXUREB-15(ii)
LABOUR BUDGET FORMAT: PART II
ANNUAL PROJECTION OF WORKS TO MEET ESTIMATED EMPLOYMENT DEMAND AND ESTIMATED
EXPENDITURE
Name of District : ......................................... For the Year .............................
Sl.
No.
Nam
e of
Dist
rict
Numbe
r of
Househ
olds
(Job
Card
holders
)
expecte
d to
deman
d wage
employ
ment
Approved activities through which employment to be provided
Water Conservation and water harvesting Drought proofing (including afforestation and
tree plantation)
Irrigation canals including micro
irrigation works
Unit
Mand
ays to
be
gener
ated
Estimated cost (Rs.
in Lakh) Unit
No.
of
sapli
ngs
prop
osed
to be
plant
ed
(Nos.
)
Mand
ays to
be
gener
ated
Estimated cost (Rs.
in Lakh) Unit
Estimated cost (Rs.
in Lakh)
No.
of
wo
rks
Cubic
Mts.
On
unski
lled
Wag
e
On
mater
ial
inclu
ding
killed
&
semi
skille
d
wage
s
To
tal
No.
of
wo
rks
In
H
a.
On
unski
lled
wage
On
mater
ial
inclu
ding
skille
d and
semi
skille
d
wage
s
To
tal
No.
of
wo
rks
Len
gth
in
km.
Mand
ays to
be
gener
ated
On
unski
lled
wage
On
mater
ial
inclu
ding
skille
d and
semi
skille
d
wage
s
To
tal
1 2 3 4 5 6 7 8 9 10 11
12 13 14 15 16 17 18 19 20 21 22
2
TOTAL
ANNEXURE B-15 (ii)
LABOUR BUDGET FORMAT: PARTII (Contd...)
Sl.N
o.
Nam
e of
Distr
ict
Approved activities through which employment to be provided
Provision of irrigation facility to land owned by
SC/ST, beneficiaries of land reforms & IAY
reforms small farmers or marginal farmers or
beneficiaries under the Scheduled Tribes &
other traditional forest dwellers
Renovation of traditional water bodies
including desilting of tanks
Land development (indicate kind of activity)
Unit
Manda
ys to
be
genera
ted
Estimated cost (Rs. in
Lakh) Unit
Manda
ys to
be
genera
ted
Estimated cost (Rs. in
Lakh) Unit
Manda
ys to
be
genera
ted
Estimated cost (Rs. in
Lakh)
No.
of
wor
ks
Land
in Ha.
To be
provid
ed
irrigat
ion
facilit
y
On
unskil
led
Wage
On
materi
al
includ
ing
killed
&
semi
skilled
wages
Tot
al
No.
of
wor
ks
Cub
ic
mtr.
On
unskil
led
wage
On
materi
al
includ
ing
skilled
and
semi
skilled
wages
Tot
al
No.
of
wor
ks
In
H
a.
On
unskil
led
wage
On
materi
al
includ
ing
skilled
and
semi
skilled
wages
Tot
al
23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
1
2
3
Tota
l
ANNEXURE B-15 (ii)
LABOUR BUDGET FORMAT: PARTII (Contd...)
Sl.
No
.
Na
me
of
Dis
trict
Approved activities through which employment to be provided
Flood control and Protection works
including drainage in water logged
areas
Rural connectivity roads to provide
all weather access
Any Other works Grand Total
Unit
Man
days
to be
gene
rated
Estimated cost
(Rs. in Lakh) Unit
Man
days
to be
gene
rated
Estimated cost
(Rs. in Lakh)
Unit
Mand
ays to
be
gener
ated
Estimated cost
(Rs. in Lakh)
No
.
of
wo
rks
Le
ngt
h in
Km
s
On
unsk
illed
Wag
e
On
mate
rial
inclu
ding
kille
d &
semi
skill
ed
wag
es
To
tal
No
.
of
wo
rks
Le
ngt
h in
Km
s.
On
unsk
illed
wag
e
On
mate
rial
inclu
ding
skill
ed
and
semi
skill
ed
wag
es
To
tal
Na
me
of
wo
rk No
.
of
wo
rks
Quali
tative
Unit
On
unsk
illed
wag
e
On
mate
rial
inclu
ding
skill
ed
and
semi
skill
ed
wag
es
To
tal
On
unsk
illed
wag
e
On
mate
rial
inclu
ding
skill
ed
and
semi
skill
ed
wag
es
To
tal
42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Total
ANNEXURE B-16
FORMAT FOR STATE / DISTRICT TO CLAIM CENTRAL
FUNDS UNDER MGNREGA
Name of State/ District with full address:
SECTION-A-FINANCIAL
1. Status of receipt of funds during the year in the district:
Sl. No.
Particulars Amount (in Rs. lakhs)
1 Opening balance as on 1st April of the previous financial year (*)
2 Funds released during the previous financial year(a) Central release(b) State release Total (a+b)
3 Misc. receipts credited during the previous year
4 Total funds available (1+2+3) during the previous financial year under NREGA
5 (a) Total funds utilized during the previous financial year(b) Expenditure on administrative infrastructure (out of 5a )(c) Expenditure on unskilled labour component (out of 5a )(d) Material cost including semi-skilled and skilled labour (out of row 5a)
6 Closing balance of the previous financial year/opening balance of the current financial year as on 1st April ( 4-5a)
7 Funds released during the current financial year($)(a) Central release(b) State release(c) Total (a+b)
8 Misc. receipts credited during the current financial year
9 Total funds available during the current financial year under NREGA (6+7+8)
10 Expenditure incurred during the current financial year under NREGA till date…(please mention date)
11 Percentage of utilization to total funds available (9/10x100)
Note :
(*) If the proposal is submitted after 30th of September, it should be as per the audited statement of accounts and if earlier, must be as per UC
that should also be enclosed.
($) If the Central or State release of the previous year has been received during the current year and is shown during the current year, it
must be clearly mentioned in footnotes how much of the amount shown during the current year pertains to the previous year.
SECTION-B(PHYSICALPROGRESS)
1 No. of households issued Job Cards _________________________
SCs STs Others Total
2 No. of households who have demanded employment (up to date) ______________________ 3 No. of households that have been provided employment (up to date)___________________
4 No. of households that have completed 100 days of employment (up to date) ___________ 5 No. of Mandays generated ----------------------------------------(in lakhs)
(Signature and stamp of the District Programme Co-ordinator)
ANNEXURE B-16(A)
MONTHLY ALLOTMENT AND UTILIZATION CERTIFICATE
WATCH REGISTER Month Opening Balance (Rs)*
Sl.No. Date Allotment Expenditure Balance# UC
Submitted UC
pending
1 2 3 4 5 6 7
Month’s Total
* Month’s total of Col.5 will become the Opening Balance of next month
# Balance is calculated by deducting expenditure from the total amount of funds received from Centre and
States, including miscellaneous receipts.
Explanatory Notes to Annexure B-16
FORMATS FOR CLAIMING CENTRAL FUNDS UNDER
MAHATMA GANDHI NREGA Para …………. of the Mahatma Gandhi NREGA Operational Guidelines prescribes
the procedure for release of funds. The formats prescribed for claiming the Central share of funds are given in Annexure …….. All proposals for release of the second instalment should be submitted on this format accompanied by other documents referred in para ……… of the Guidelines.
Districts are advised to keep the following points in view while submitting
information in the proposals.
NFFWP and SGRY programmes have been subsumed in Mahatma Gandhi
NREGA w.e.f. 2nd February 2006. Availability from all these sources should
be reported as indicated for 2005-06 & 2006-07.
Information sought should be fully reported. No column should be left blank
and if there is no data this may be shown as NIL.
Information sought in the format should be as per the source indicated and
not based on any other source.
SECTION A
Funds utilized till date refer to latest expenditure reported by all executing
agencies. The district should report the date up to which expenditure is being
reported.
SECTION B
Point 1 – The number of households issued job cards should reflect the
number of job cards issued since inception of Mahatma Gandhi NREGA till
the reporting date.
Point 2 – The number of households demanding employment should be the
number of households demanding work out of households provided with job
cards as reported at I above.
Point 3 – Refers to the cumulative number of households that have been
provided employment (up to date). If a household was provided employment
in a month and also, in subsequent month(s), it will be counted only once.
Point 4 -Households that have completed 100 days of employment have to be
reported on actual basis as derived from employment registers maintained at
the GP level based on job card data.
Check list on pre-requisites/documents for release of 2nd
Tranche Financial Year………. (For State without State Employment Guarantee Fund)
SN Indicator Response Remarks
1 Is the expenditure in FY ………. more than 60 % of Total Available Fund?
2 Is the updated physical progress incorporating employment generated (person days) and
number of House Hold covered provided with the proposal?
3 Has the updated financial progress report been submitted?
4 Has the Utilisation Certificate (UC) for the year ………. (provisional updated) been furnished
in the prescribed format (Form - )?
4.1 If yes, does it have information on actual expenditure, administrative expenditure, expenditure
on material, no. of persondays generated and households covered?
4.2 Are UC and Audit Report (AR) for 2010-11 furnished with this proposal?
4.3 Are Opening Balance (OB) and Closing Balance (CB) in AR, UC and Monthly Progress
Report (MPR) for FY ………… consistent with one another?
4.4 Is OB in AR/UC for FY …….. consistent with CB in AR/UC for FY ………..?
4.5 Whether AR indicates balances with the Implementing Agencies and the same has been
included in the CB in the UC?
4.6 Is the cost per person-day employment generation equal or less than the upper cap cost as
agreed to in the Labour Budget?
5 Has the State Govt. examined the UCs and AR before sending the proposal to the Ministry
seeking release of funds?
6 Are there any Audit Para/ observations pending for action by the State/District?
7 Has the MoRD ever advised the State/District to conduct a special internal audit?
7.1 If yes, whether such audit has been conducted and report submitted?
8 Is wage and material ratio maintained within the prescribed level of 60:40?
9 Has any household been provided employment more than 100 days?
9.1 If yes, is the excess expenditure (i.e. excess wage payments, material and administrative
expenses) estimated and recouped to the MGNREGA account by the State?
10 Are the wages equal to the notified wage rate paid to MGNREGA workers?
10.1 If the wages are being paid in excess of the notified wage rate, is the excess expenditure has
been estimated and recouped to MGNREGA account.
11 Is the wage payment consistent with the approved working hours under MGNREGA?
12 Has the State Share in FY ……….. been released in full?
12.1 If yes, whether proof (certificate from bank where MGNREGA a/c is maintained) of such
transfer of State share is submitted with the proposal?
13 Has the State/District received funds other than central share and State share?
13.1 If yes, are the sources of such funds mentioned in the UCs & ARs?
14 Was there any diversion of funds from the MGNREGA account during ……….. and ……….
or during earlier years? If so, provide a status on recoupment of such sums.
15 Was there any embezzlement/misappropriation of MGNREGA funds during the year ………
and during the year ………… or in earlier years? If so, action taken in this matter need to be
submitted.
16 Are the certificates on non-diversion and non-embezzlement of programme funds furnished?
17 Has the MIS expenditure reporting reached 100% level?
18 Whether Bharat Nirman Rajiv Gandhi Sewa Kendras in all GPs have been constructed?
19 Is there any complaints/VIP references pending against the State/District for resolution? If so, a
status note on number of complaints/references pending and duration of pendency should be
provided.
19.1 If yes, whether details of action proposed/taken so far complaint-wise have been furnished?
20 Are the social audits regularly (at least twice in a FY) being held? Please indicate number of
social audit so far conducted.
20.1 Are the findings of such social audits uploaded on to the MIS and Action taken within the
stipulated period (3 months)?
21 Are ombudsmen instituted in all the districts?
22 Were there any specific conditions mentioned in the Sanction order while releasing the 1st
Tranche of Central Share?
22.1 If yes, whether these conditions were complied with and details submitted with the proposal?
Check list on pre-requisites/documents for release of 2nd
Tranche Financial Year……….
(For State with State Employment Guarantee Fund)
SN Indicator Response Remarks
1 Is the expenditure in FY ………….. more than 60 % of Total Available Fund?
2 Is the updated physical progress incorporating employment generated (person days) and
number of House Hold covered provided with the proposal?
3 Has the updated financial progress report been submitted?
4 Has the consolidated Utilisation Certificate (UC) for the year ………. (provisional
updated) been furnished in the prescribed format (Form ……….)?
4.1 If yes, does it have information on actual expenditure, administrative expenditure,
expenditure on material, no. of persondays generated and households covered?
4.2 Is a consolidated UC for the year ………… furnished with this proposal?
4.3 Has the State Govt. examined the UCs and Audit Reports (ARs) received from all the
districts before sending the proposal to the Ministry seeking release of funds?
4.4 If yes, is a certificate to the effect that „UCs/ARs for the year …………. from all the
districts have been received, examined and found to be in order‟ submitted with this
proposal?
4.5 Whether AR indicates balances with the Districts and other Implementing Agencies and
the same has been included in the CB in the UC?
4.6 Are Opening Balance (OB) and Closing Balance (CB) in UC and Monthly Progress
Report (MPR) for FY …………… consistent with each other?
4.6 Is OB in UC for FY ………… consistent with CB in UC for FY …………..?
4.5 Is the cost per person-day employment generation equal or less than the upper cap cost as
agreed to in the Labour Budget?
5 Are there any Audit Para/ observations pending for action by the State/District?
6 Has the MoRD ever advised the State/District to conduct a special internal audit?
6.1 If yes, whether such audit has been conducted and report submitted?
7 Is wage and material ratio maintained within the prescribed level of 60:40?
8 Has any household been provided employment more than 100 days?
9 If yes, is the excess expenditure (i.e. excess wage payments, material and administrative
expenses) estimated and recouped to the MGNREGA account by the State?
10 Are the wages equal to the notified wage rate paid to MGNREGA workers?
10.1 If the wages are being paid in excess of the notified wage rate, is the excess expenditure
has been estimated and recouped to MGNREGA account.
11 Is the wage payment consistent with the approved working hours under MGNREGA?
12 Has the State Share in FY …………….. been released in full to Districts?
12.1 If yes, whether proof (certificate from bank where MGNREGA a/c is maintained) of such
transfer of State share is submitted with the proposal?
13 Has the State received funds other than central share and State share?
13.1 If yes, are the sources of such funds mentioned in the UCs & ARs?
14 Was there any diversion of funds from the MGNREGA account during the year ……….
and …………… or during earlier years? If so, provide a status on recoupment of such
sums.
15 Was there any embezzlement/misappropriation of MGNREGA funds during the year
……………… and the year ………….. or in earlier years? If so, action taken in this
matter need to be submitted
16 Are the certificates on non-diversion and non-embezzlement of programme funds
furnished?
17 Has the MIS expenditure reporting reached 100% level?
18 Whether Bharat Nirman Rajiv Gandhi Sewa Kendras in all GPs have been constructed?
19 Is there any complaints/VIP references pending against the State/District for resolution? If
so, a status note on number of complaints/references pending and duration of pendency
should be provided.
19.1 If yes, whether details of action proposed/taken so far complaint-wise have been
furnished?
20 Are the social audits regularly (at least twice in a FY) being held? Please indicate number
of social audit so far conducted.
20.1 Are the findings of such social audits uploaded on to the MIS and Action taken within the
stipulated period (3 months)?
21 Are ombudsmen instituted in all the districts?
22 Were there any specific conditions mentioned in the Sanction order while releasing the 1st
Tranche of Central Share?
22.1 If yes, whether these conditions were complied with and details submitted with the
proposal?
UTILISATION CERTIFICATE FOR THE YEAR……………UNDER MGNREGA State ....................................... District………………………… 1. Unspent Balance of the
Previous Year......................
Scheme/ Programme
Balance (Rs in lakh)
MGNREGA
Others*
Total
*Specify the scheme
2. Grant received during the Year …................... Rs…...…lakh.
(Rs in lakh)
Letter No. & Date
Centre State
i)
ii)
iii)
3) Miscellaneous receipts of the Agency, if any, under MGNREGA Rs. ……………………Lakh.
Source of Misc. Receipt
Amount Received (Rs in lakh)
Bank Interest
Excess State Share
Recovery of funds
Others*
Total
*Specify the source 4) Total funds available: (1+2+3) Rs. …………………………Lakh
Certified that a sum of Rs……………… (Rupees.....................only) was received by the State/ District.............………as Grants-in-Aid during…….............. from the Govt. of India vide Ministry of Rural Development Letter No. ………………………dated……………and Rs. ….....………………from the State Government vide Letter No.…………...…Dated………................. Further a sum of Rs…………..…………… (Rupees.....................only) being unspent balance of the previous year……......……….. was allowed to be brought forward for utilization during the current year………............……. The miscellaneous receipt of the agency during the year …….....…… was Rs..............................lakh. It is also certified that out of the above mentioned total funds of Rs.…................…….. (Rupees.....................only) a sum of Rs…....................…...………. (Rupees.....................only) has been utilized by the State/ District during…......………....... for the purpose for which it was sanctioned. The expenditure on wages and materials (including semi-skilled and skilled labour) are Rs ……………(Rupees....................................................only) and Rs..………………… (Rupees.....................only) respectively. Further Rs..………………… (Rupees.....................only) has been utilised on Administrative Contingency permissible under the MGNREGA. It is further certified that the unspent balance of Rs………………(Rupees.....................only) remaining at the end of the ……………… (month) year will be utilised for the programme during the remaining period of current year / next year.
3. Certified that the conditions on which fund was sanctioned have been duly fulfilled /are
being fulfilled and have exercised following checks to see that the money has been actually
utilised district-wise for the purpose for which it was sanctioned:
Kind of checks exercised:
(i) The Agency’s statement of Accounts for the year ……………….duly audited by the Chartered Accountant have been obtained and sanctioned.
(ii) The Utilisation Certificates and Audit/Inspection Reports for the prescribed year of
the district have been obtained and duly scrutinized.
(iii) It has been ensured that the physical and financial performance under
MGNREGA has been according to the requirement, as prescribed in the
guidelines issued by Govt. of India/State Government.
(iv) Certified that muster rolls in all works under MGNREGA have been maintained correctly.
(v) Certified that only permissible items of works under Schedule I of MGNREG Act have been taken up.
(vi) Certified that wages as per the notified wage rates have been paid under MGNREGA.
(vii) The utilization of the aforesaid fund resulted into the following:
a) Physical output)
(i) No. of Mandays Generated :………………(In lakhs) ii) No. of households provided employment: ……………….
b) Outcomes
(i) Works and activities
Works/Activities No. of Works
Completed In Progress
Water conservation and water harvesting
Drought proofing Micro irrigation works Provision of irrigation facility to land owned by SCs and the STs or BPL families or to beneficiaries of land reforms or to the beneficiaries under the IAY of the Government of India or that of the small farmers or marginal farmers as defined in the Agriculture Debt waiver & debt relief schemes or beneficiaries under the Scheduled Tribes & other traditional forest dwellers (recognition of forest right) Act 2006”
Renovation of traditional water bodies Land development Flood control and protection Rural connectivity Bharat Nirman Rajiv Gandhi Sewa Kendra (BNRGSK) Any other activity(approved by MRD) Total
ii) No. of households completed 100 days of employment …………………..
iii) No. of households provided employment in excess of 100 days ………………………..
iv) No. of mandays created in excess of 100 days per households …………………………. v) Expenditure for above No. (iv) ……………………………………. vi) Certified that excess expenditure on above No. (v) has been borne by State Government.
Signature:
Name…………………………………………..
Office Stamp of the District Programme Coordinator of the concerned District
Dated: Note: Strike out whichever is not applicable.