ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S...

145
List of Annexure - Agenda Notes for 26 h TCC & 27 th SRPC Meetings ANNEXURES ANNEXURE-I SRPC secretariat letter dated 15.04.2015 regarding ICTs at Kozhikode S/S of PGCIL ANNEXURE-II Status of upcoming inter-regional transmission schemes under various stages ANNEXURE-III Pictorial form of Over loadings of various transmission lines and ICTs ANNEXRE-IV SRLDC Presentation on the planned transmission system ISTS and important corridors in 2016-17 ANNEXURE-V SRLDC Presentation on the envisaged transformation capacity by 2016-17 in various states ANNEXURE-VI SRPC Secretariat letter dated 12.02.2015 on Utilization of Jeypore - Gazuwaka link ANNEXURE-VII CTU reply dated 11.03.2015 on utilization of Jeypore - Gazuwaka link ANNEXURE-VIII Minutes of the 38 th Meeting of SCPSPSR ANNEXURE-IX SRPC Secretariat Presentation on Reserve Shut Down ANNEXURE-X SRPC Secretariat letter dated 12.03.2015 on ERS ANNEXURE-XI RGMO analysis for 07.04.2015 at 21:02 hrs ANNEXURE-XII RoP (26.02.2015) in CERC Petition 420/MP/2014 ANNEXURE-XIII SRPC secretariat letter dated 15.04.2015 enclosing NLDC Letter 06.04.2015 regarding certification of line rating / equipment rating for the purpose of adopting seasonal rating ANNEXURE-XIV Communication dated 30.01.2015 received from CEA regarding CoD certification from RPCs ANNEXURE-XV Status of data, voice, internet communication and pending field inputs ANNEXURE-XVI SRLDC Issued Caution / Violation messages ANNEXURE-XVII SRTS- II Presentation regarding implementation of AMR

Transcript of ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S...

Page 1: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

List of Annexure - Agenda Notes for 26h TCC & 27th SRPC Meetings

ANNEXURES

ANNEXURE-I SRPC secretariat letter dated 15.04.2015 regarding ICTs at Kozhikode S/S of PGCIL

ANNEXURE-II Status of upcoming inter-regional transmission schemes under various stages

ANNEXURE-III Pictorial form of Over loadings of various transmission lines and ICTs

ANNEXRE-IV SRLDC Presentation on the planned transmission system ISTS and important corridors in 2016-17

ANNEXURE-V SRLDC Presentation on the envisaged transformation capacity by 2016-17 in various states

ANNEXURE-VI SRPC Secretariat letter dated 12.02.2015 on Utilization of Jeypore - Gazuwaka link

ANNEXURE-VII CTU reply dated 11.03.2015 on utilization of Jeypore - Gazuwaka link

ANNEXURE-VIII Minutes of the 38th Meeting of SCPSPSR

ANNEXURE-IX SRPC Secretariat Presentation on Reserve Shut Down

ANNEXURE-X SRPC Secretariat letter dated 12.03.2015 on ERS

ANNEXURE-XI RGMO analysis for 07.04.2015 at 21:02 hrs

ANNEXURE-XII RoP (26.02.2015) in CERC Petition 420/MP/2014

ANNEXURE-XIII SRPC secretariat letter dated 15.04.2015 enclosing NLDC Letter 06.04.2015 regarding certification of line rating / equipment rating for the purpose of adopting seasonal rating

ANNEXURE-XIV Communication dated 30.01.2015 received from CEA regarding CoD certification from RPCs

ANNEXURE-XV Status of data, voice, internet communication and pending field inputs

ANNEXURE-XVI SRLDC Issued Caution / Violation messages

ANNEXURE-XVII SRTS- II Presentation regarding implementation of AMR

Page 2: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Annexure-I (Page1 of 2)

Page 3: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Impl

emen

t-ing

(c

km)/

MVA

Sc

h. C

OD

CO

D/ C

OD

Con

stra

ints

/ Rem

arks

765

KV

D/C

Nar

endr

a(N

ewK

udgi

)-

Kol

hapu

rL

ine

(Ini

tially

char

ged

at40

0K

V)

PGC

IL37

6April’15

Dec’15

Mat

chin

gw

ithK

udgi

S/S

(Lan

dac

quir

edinFeb’

14).

LILO

ofci

rcui

tsof

Kol

hapu

r–

Map

usa

400

kVD

/CK

olha

pur

PGC

IL90

Apr

il’15

Dec

’15

Com

plet

ion

mat

chin

gw

ithS/

S.

400

KV

D/C

Nar

endr

a(N

ew K

udgi

)-N

aren

dra

(Exi

stin

g) L

ine

(Qua

d )PG

CIL

354

Apr

il’15

Dec

’15

Com

plet

ion

mat

chin

gw

ithre

adyn

ess

ofS/

S

Kol

hapu

r76

5/40

0kV

S/S

(GIS

)(in

itial

lych

arge

d40

0kV

)PG

CIL

Apr

il’15

Dec

’15

Awar

dpl

aced

inFe

b,20

14an

dw

ork

isun

derp

rogr

ess

Land

acqu

ired

inFe

b-14

765/

400

KV

Nar

endr

a(N

ewK

udgi

)S/

s(G

IS)

{cha

rged

at40

0K

V}

PGC

ILA

pril’

15D

ec’1

5Aw

ard

plac

edin

Mar

ch,2

014

Land

acqu

ired

inFe

b-14

Extn

.N

aren

dra

(Exi

stin

g)40

0/22

0kV

S/S

PGC

ILA

pril’

15D

ec’1

5Aw

ard

plac

edin

Mar

ch,2

014

Kudg

i TPS

– N

aren

dra

(new

) 2x

D/C

Line

M

/s K

udgi

Li

mite

d (L

&T

Infr

astru

ctur

e D

evel

opm

ent

Proj

ects

Ltd

.)

Feb’

15Se

p’15

Nar

endr

a-K

olha

purl

ine

byD

ec’1

5

Nar

endr

a(n

ew)

-M

adhu

giri

765

kVD

/CLi

neD

ec’1

5Se

pt’1

6

Mad

hugi

ri-

Bid

adi

400

kVD

/C(q

uad)

Line

Dec

’15

Sept

’16

Stat

us o

f upc

omin

g In

ter-

Reg

iona

l lin

ks N

aren

dra-

Kol

hapu

r 765

kV

D/C

line

An

nexu

re- I

II

Page 4: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Impl

emen

t-ing

(ckm

)/ M

VA

Sch.

CO

DA

nt C

OD

/A

ct C

OD

Con

stra

ints

/ Rem

arks

War

dha-

Niz

amab

ad76

5kV

D/C

PGC

IL25

0

War

dha

–R

aipu

rPS

765

kVD

/CPG

CIL

713

Dec

’15

Com

mis

sion

edon

15-1

1-20

14

Extn

.ofR

aipu

r765

kVS/

SPG

CIL

Dec

’15

Com

plet

ed

Extn

.ofW

ardh

a76

5kV

S/S

PGC

ILD

ec’1

5Ju

ne’1

5Aw

ard

plac

edin

June

,20

13.W

orks

unde

rpro

gres

sW

ardh

a–

Aur

anga

bad

765

kVD

/CPG

CIL

701

Dec

’15

Fe b

’15

Line

1co

mm

issi

oned

inJu

ly14

.Lin

eII

byFe

b’15

Extn

.ofA

uran

gaba

d76

5kV

S/S

PGC

ILD

ec’1

5Fe

b’15

Awar

dpl

aced

inJu

ne,

2013

.Wor

ksun

derp

rogr

ess

Extn

.ofW

ardh

a76

5kV

S/S

PGC

ILD

ec’1

5Fe

b’15

plac

edin

June

’13.

Engg

.,su

pply

,&ar

e

Niz

amab

ad-M

ahes

hwar

amPG

(Hyd

erab

ad)7

65kV

D/C

PGC

IL25

0

Niz

amab

ad-D

ichi

palli

400

kVD

/CPG

CIL

Niz

amab

ad-Y

eddu

mai

lara

m(S

hank

arap

alli)

400

kVD

/C

This

alon

gw

ith“M

ahes

hwar

amPG

-M

ahbo

obna

gar

400

kVD

/Clin

e”w

asth

roug

hba

sed

(TB

CB

)ro

ute.

was

reco

mm

ende

dG

oIfo

r

Mah

eshw

aram

PG76

5/40

0kV

,2x

1500

MVA

S/S

PGC

IL

Niz

amab

ad76

5/40

0kV

,2x

1500

MVA

S/S

PGC

IL

W

ardh

a - N

izam

abad

765

kV D

/C li

ne

Page 5: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Tran

smis

sion

Ele

men

tIm

ple-

men

ting

Age

ncy

Lin

e le

ngth

(c

km)/

MVA

C

apac

ity

CO

DC

onst

rain

ts/

Rem

arks

Sch.

Ant

/ A

ct

WR

-SR

HV

DC

Bip

ole

Lin

k[R

aigh

ar(C

hhat

isga

rh)

-Pu

galu

r(T

amil

Nad

u)]

PGC

IL

The

sche

me

had

been

awar

ded

toPG

CIL

(GoI

circ

ular

date

d10

.12.

2014

)as

info

rmed

in26

thSR

PCm

eetin

g .

Rai

garh

(exi

stin

g)-R

aiga

rh(H

VD

CSt

n)–4

00kV

2xD

/C(q

uad)

lines

6000

MW

,HV

DC

Term

inal

Stat

ion

atR

aiga

rh60

00

6000

MW

,HV

DC

term

inal

Stat

ion

atPu

galu

r(o

ral

tern

ativ

ely

(i)w

ith40

00M

WH

VD

Cte

rmin

al,

and

(ii)

2000

MW

HV

DC

term

inal

atM

adak

atha

ra,a

ndin

ter-c

onne

ctio

nw

ithex

istin

g40

0kV

AC

Subs

tatio

nat

Mad

akat

hara

.

6000

Rai

garh

(HV

DC

Stn)

-Pug

alur

(HV

DC

Stn)

6000

MW

,+/

-80

0kV

HV

DC

bipo

le.

Puga

lurH

VD

Cst

atio

n-Pu

galu

rexi

stin

gS/

S40

0kV

D/C

(Q)

Line

Puga

lurH

VD

Cst

atio

n-A

rasu

rS/S

400

kVD

/C(Q

)lin

ew

ith80

MVA

Rsw

itcha

ble

line

reac

tora

tAra

sure

nd.

Puga

lur

HV

DC

stat

ion-

Thiru

vala

mS/

S40

0kV

D/C

(Q)

line

with

80M

VAR

switc

habl

elin

ere

acto

ratb

oth

ends

Puga

lurH

VD

Cst

atio

n-Ed

ayar

pala

yam

S/S4

00kV

D/C

(Q)l

ine

with

63M

VAR

switc

habl

elin

ere

acto

ratE

daya

rpal

ayam

end

Eday

arpa

laya

mS/

S-U

dum

alpe

tS/S

400

kVD

/C(Q

)Lin

e40

0/23

0kV

,2x5

00M

VA,

Eday

arpa

laya

mS/

Sw

ith2x

125

MVA

Rbu

sre

acto

rs.

2x50

0

WR-

SR 6

000

MW

HVD

C Bi

pole

Link

[Rai

garh

(Chh

atis

garh

) -Pu

galu

r/Tr

ichu

r (TN

/KER

)]

Page 6: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Tran

smis

sion

Ele

men

tIm

plem

entin

g A

genc

y

Lin

e le

ngth

(c

km)/

MVA

C

apac

ityC

OD

Con

stra

ints

/ R

emar

ks

Sch.

Ant

/ A

ct

Ang

ul-

Srik

akul

amPS

765

kVD

/Clin

ePG

CIL

552

Jun'

15D

ec'1

5Pr

oces

sing

of f

ores

t cas

e ve

ry sl

ow a

t sta

te g

ovt.

leve

l; C

ritic

al.

Extn

.76

5/40

0kV

Ang

ulSu

bst

atio

nPG

CIL

1x15

00Ju

n’15

Jun'

15Aw

ard

plac

edin

Aug

ust,

2013

765

kVD

/CA

ngul

-Jh

arsu

guda

line

PGC

IL57

0D

ec'1

5D

ec'1

5R

oWbe

ing

face

d

765

kVD

/CJh

arsh

ugud

a-D

hara

mja

yaga

rhlin

ePG

CIL

230

Dec

'15

Dec

’15

Awar

dpl

aced

inM

ay,2

014

Hug

efo

rest

invo

lvem

ent

Extn

.of7

65/4

00kV

Ang

ulSS

PGC

ILD

ec'1

5D

ec’1

5Aw

ard

plac

edin

Aug

,13.

Engi

neer

ing

&C

ivil

wor

ksun

derp

rogr

ess

Extn

.of

765/

400

kVJh

arsh

ugud

aSS

PGC

ILD

ec'1

5D

ec’1

5Aw

ard

plac

edin

Aug

,13.

Engi

neer

ing

&C

ivil

wor

ksun

derp

rogr

ess

Extn

.of

765/

400

kVD

hara

mja

igar

hSS

PGC

ILD

ec'1

5D

ec’1

5Aw

ard

plac

edin

Aug

,13.

Engi

neer

ing

&C

ivil

wor

ksun

derp

rogr

ess

Angu

l - S

rikak

ulam

PS

765

kV D

/C li

ne

Page 7: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Srik

akul

amP

P-Ve

mag

iri-

IIPo

olin

gst

atio

n76

5kV

D/C

line

M/s

Viz

ag

Tran

smis

sion

Li

mite

d(A

subs

idia

ry o

f PG

CIL

)

30.0

8.20

16

July

’16

Und

erim

plem

enta

tion

Srik

akul

amPo

olin

gSt

atio

n76

5/40

0kV

,2x1

500

MVA

PS(4

00kV

-A

IS&

765

kV–

GIS

)

PGC

IL2x

1500

Jun'

15Ju

n'15

Wor

k un

der p

rogr

ess

Srik

akul

amPo

olin

gSt

atio

n–

Gar

ivid

i40

0kV

(Qua

d)D

/Clin

ew

ith80

MVA

Rsw

itcha

ble

line

reac

tor

atG

ariv

idie

nd.

PGC

IL

The

line

hasb

een

appr

oved

asIS

TSsc

hem

efo

rim

plem

enta

tion

inSC

PSPS

R-

37.

400/

220

kVS/

Sat

Mar

adam

(Gar

ivid

i)A

PTR

AN

SCO

Tend

ers

will

beca

lled

for

shor

tlyB

ehra

mpu

r-G

azuw

aka

400

kVD

/Clin

eM

/sTa

lche

rTr

ansm

issi

onC

ompa

nyLi

mite

d(S

ubsi

diar

yof

M/s

Rel

ianc

ePo

wer

Tran

smis

sion

Com

pany

Lim

ited)

290

CER

CR

OP

(for

18.1

1.20

14)

encl

osed

CEA

lette

r17

.11.

2014

:N

oph

ysic

alpr

ogre

ssvi

sibl

eon

grou

nd.

The

sche

me

need

edto

beim

plem

ente

dw

ithou

tan

yfu

rther

dela

y

Talc

her

II–

Beh

ram

pur

400

kVD

/Clin

e22

0

Talc

her

II-

Rou

rkel

a40

0kV

D/C

Qua

dlin

e16

1

Beh

ram

pur

400/

220

kV,

2x31

5M

VAS/

S2x

315

Angu

l - S

rikak

ulam

PS

765

kV D

/C li

ne

Page 8: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Tran

smis

sion

E

lem

ents

Li

ne L

engt

h (c

km)/

MVA

C

apac

ity

Impl

emen

ting

Agen

cy

Sch

CO

D

Con

stra

ints

/ Rem

arks

a E

stab

lishm

ent

of76

5/40

0kV

subs

tatio

nsat

War

anga

l (N

ew)

with

2x15

00M

VAtra

nsfo

rmer

and

2x24

0M

VAR

bus

reac

tors

.

The

sche

me

exce

pt

trans

mis

sion

ele

men

t at (

g)

has

been

app

rove

d as

ISTS

sc

hem

e fo

r im

plem

enta

tion

in

SC

PS

PS

R-3

7 (h

eld

on

31.0

7.14

). Th

e sc

hem

e w

as

reco

mm

ende

d to

the

GoI

for

impl

emen

tatio

n th

roug

h TB

CB

by

the

Em

pow

ered

C

omm

ittee

in it

s 33

rdm

eetin

g he

ld o

n 30

.09.

14. T

he

sche

me

was

not

ified

by

CE

A vi

de it

s no

tific

atio

n da

ted

09.0

2.15

. The

sch

eme

is

unde

r bid

ding

with

RE

CTP

CL

as it

s B

PC

.

The

trans

mis

sion

elem

ent

at(g

)w

asid

entif

ied

for

impl

emen

tatio

nun

der

com

pres

sed

time

sche

dule

thro

ugh

regu

late

dta

riff

mec

hani

smby

PG

CIL

.

b W

aror

aP

ool-

War

anga

l(N

ew)

765

kVD

/Clin

ew

ith24

0M

VAR

switc

habl

elin

ere

acto

ratb

oth

ends

.

c W

aran

gal(

New

)–H

yder

abad

765

kVD

/Clin

ew

ith33

0M

VAR

switc

habl

elin

ere

acto

ratW

aran

gale

nd.

d W

aran

gal

(New

)–

War

anga

l(e

xist

ing)

400

kV(q

uad)

D/C

line.

e H

yder

abad

–K

urno

ol76

5kV

D/C

line

with

240

MVA

Rsw

itcha

ble

line

reac

tora

tKur

nool

end.

f W

aran

gal(

New

)–

Chi

laka

lurip

eta

765

kVD

/Clin

ew

ith24

0M

VAR

switc

habl

elin

ere

acto

rat

both

ends

.

g LI

LOof

Kurn

ool-T

hiru

vala

m76

5kV

D/C

atC

udda

pah

h C

udda

pah-

Hoo

dy40

0kV

(qua

d)D

/Clin

ew

ith63

MVA

Rsw

itcha

ble

line

reac

tora

tbot

hen

ds.

Addi

tiona

l int

er-R

egio

nal A

C lin

k fo

r im

port

into

Sou

ther

n Re

gion

, i.e

., W

aror

a-W

aran

gal -

H

yder

abad

- Kur

nool

765

kV

link

C

EA N

otifi

catio

n da

ted

06.

02.2

015,

CEA

app

oint

ed P

FC C

L as

BPC

Page 9: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Tran

smis

sion

E

lem

ents

Li

ne L

engt

h (c

km)/

MVA

C

apac

ity

Impl

emen

ting

Agen

cy

Sch

CO

D

Con

stra

ints

/ Rem

arks

a Ve

mag

iriII

–C

hila

kalu

ripet

a76

5 kV

D/C

line

with

24

0 M

VAR

sw

itcha

ble

line

reac

tor a

t bot

h en

ds.

The

sche

me

has

been

ap

prov

ed a

s IS

TS s

chem

e fo

r im

plem

enta

tion

in

SC

PS

PS

R-3

7 (h

eld

on

31.0

7.14

). Th

e sc

hem

e ex

cept

the

trans

mis

sion

el

emen

t at (

e) a

nd (h

) was

re

com

men

ded

to th

e G

oIfo

r im

plem

enta

tion

thro

ugh

TBC

B b

y th

e E

mpo

wer

ed

Com

mitt

ee in

its

33rd

mee

ting

held

on

30.0

9.14

. The

sc

hem

e w

as n

otifi

ed b

y C

EA

vide

its

notif

icat

ion

date

d 09

.02.

15. T

he s

chem

e is

un

der b

iddi

ng w

ith R

EC

TPC

L as

its

BP

C.

The

trans

mis

sion

elem

ents

at(e

)an

d(h

)w

ere

iden

tifie

dfo

rim

plem

enta

tion

unde

rco

mpr

esse

dtim

esc

hedu

leth

roug

hre

gula

ted

tarif

fm

echa

nism

byP

GC

IL.

b C

hila

kalu

ripet

a–

Cud

dapa

h76

5 kV

D/C

line

with

24

0 M

VAR

sw

itcha

ble

line

reac

tor a

t bot

h en

ds.

c C

hila

kalu

ripet

a –

Nar

sara

opet

a 40

0 kV

(qua

d)

D/C

line

d C

udda

pah

–M

adhu

giri

400

kV (q

uad)

D/C

line

w

ith 8

0 M

VAR

sw

itcha

ble

line

reac

tor a

t bot

h en

ds.

e C

udda

pah-

Hin

dupu

r 400

kV

(qua

d) D

/C li

ne w

ith

80 M

VAR

sw

itcha

ble

line

reac

tor a

t Hin

dupu

r end

.

f S

rikau

kula

m P

oolin

g S

tatio

n –

Gar

ivid

i 400

kV

(Q

uad)

D/C

line

with

80

MVA

R s

witc

habl

e lin

e re

acto

r at G

ariv

idi e

nd.

g E

stab

lishm

ent o

f 2x1

500

MVA

, 765

/400

kV

su

bsta

tion

at C

hila

kalu

ripet

a w

ith 2

x240

MVA

R

bus

reac

tors

.

h E

stab

lishm

ent o

f 2x1

500

MVA

, 765

/400

kV

su

bsta

tion

at C

udda

pah

with

2x2

40 M

VAR

bus

re

acto

rs.

Syst

em st

reng

then

ing

with

in S

R fo

r tra

nsm

ittin

g po

wer

bey

ond

Vem

agiri

CEA

Not

ifica

tion

date

d 0

6.02

.201

5, C

EA a

ppoi

nted

REC

TPC

L as

BPC

Page 10: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Tran

smis

sion

line

cons

trai

nts

Anne

xure

-IV

Annexure-III

Page 11: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

0%

5%

10%

15

%

20%

25

%

30%

35

%

40%

45

%

50%

55

%

60%

65

%

70%

75

%

80%

85

%

90%

95

%

100%

MW

% o

f Tim

e

Dura

tion

Curv

e of

400

kV

Kola

r-H

osur

D/C

Lin

e flo

w

OCT

-201

4 N

OV-

2014

DE

C-20

14

400k

V Ko

lar-

Hosu

r DC

line:

•S2

bid

are

a dr

awl i

s lim

ited

by N

-1 o

f the

se li

nes

Page 12: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

400k

V Ko

lar-

Hosu

r DC

line

flow

in Ja

nuar

y 20

15

Page 13: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

0%

5%

10%

15

%

20%

25

%

30%

35

%

40%

45

%

50%

55

%

60%

65

%

70%

75

%

80%

85

%

90%

95

%

100%

MW

% o

f Tim

e

Dur

atio

n Cu

rve

of 4

00 k

V H

iriyu

r-N

elam

anga

la D

/C L

ine

Flow

OCT

-201

4 N

OV-

2014

DE

C-20

14

400k

V Hi

riyur

-Nel

aman

gala

DC

line:

With

Ful

l gen

erat

ion

at J

inda

l and

BTP

S, a

nd w

ind

gene

ratio

n hi

gh, t

he fl

ow o

n 40

0kV

Hiri

yur-

Nel

aman

gala

DC

line

con

tinuo

usly

nea

r to

550M

W.

•40

0kV

Goo

ty-M

adhu

giri-

Yela

hank

a D

Clin

e w

ill re

lieve

con

stra

int s

ome

exte

nt

•Ye

ram

arus

Eva

cuat

ion

syst

em m

ay re

lieve

the

cons

trai

nt

•22

0 kV

DC

Hiri

yur-

Gbn

ur c

omm

issi

oned

rece

ntly

- Rel

ief o

f abo

ut 3

0-40

MW

eac

h lin

e ob

tain

ed

Page 14: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

0%

5%

10%

15

%

20%

25

%

30%

35

%

40%

45

%

50%

55

%

60%

65

%

70%

75

%

80%

85

%

90%

95

%

100%

MW

% o

f Tim

e

Dura

tion

Curv

e of

400

kV U

dum

alpe

t-Pa

lakk

ad D

C Li

ne F

low

OCT

-201

4 N

OV-

2014

DE

C-20

14

400k

V U

dum

alpe

t-Pa

lakk

ad D

C lin

e:

•K

eral

a dr

awl i

s m

ainl

y th

roug

h 40

0kV

Udu

mal

pet-P

alak

kad

DC

line

. •

Ker

ala

draw

l cap

abili

ty w

ill b

e lim

ited

by th

is li

ne.

•D

raw

al c

apab

ility

wou

ld in

crea

se w

ith 4

00 k

V D

/C M

ysor

e-K

ozhi

kode

line

Page 15: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0

100

200

300

400

500

600

700

800

900

0%

5%

10%

15

%

20%

25

%

30%

35

%

40%

45

%

50%

55

%

60%

65

%

70%

75

%

80%

85

%

90%

95

%

100%

MW

% o

f Tim

e

Dura

tion

Curv

e of

400

kV

Jinda

l-BTP

S S/

C Li

ne

OCT

-201

4 N

OV-

2014

DE

C-20

14

400k

V Jin

dal-B

TPS

SC L

ine:

With

the

full

gene

ratio

n at

Jin

dal,

this

line

is g

ettin

g lo

aded

bey

ond

650

MW

. •

Oth

er e

vacu

atio

n pa

ths

are

400k

V Ji

ndal

-Gut

tur a

nd T

wo

ICTs

. •

But

at 2

20kV

sid

e al

so g

ener

atio

n is

ava

ilabl

e.

•Ye

ram

arus

sys

tem

may

relie

ve th

e co

nstr

aint

Page 16: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

ICT

load

ing

cons

trai

nts

Page 17: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0 25

50

75

100

125

150

175

200

225

250

275

300

325

350

375

400

425

450

475

500

525

550

0%

5%

10%

15

%

20%

25%

30

%

35%

40

%

45%

50

%

55%

60

%

65%

70

%

75%

80

%

85%

90

%

95%

10

0%

MW

% o

f Tim

e

Dura

tion

Curv

e of

400

/220

kV G

azuw

aka

ICTs

Flo

w(2

x315

MVA

)

OCT

-201

4 N

OV-

2014

DE

C-20

14

Due

to H

uhud

ICT

load

ing

was

less

Page 18: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0 50

100

150

200

250

300

350

400

450

500

550

0%5%

10

%

15%

20

%

25%

30

%

35%

40

%

45%

50

%

55%

60

%

65%

70

%

75%

80

%

85%

90

%

95%

10

0%

MW

% o

f Tim

e

Load

Dur

atio

n Cu

rve

of 4

00/2

20kV

Nel

lore

ICTs

Flo

w(2

x315

MVA

)

OCT

-201

4 N

OV-

2014

DE

C-20

14

Page 19: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0 50

100

150

200

250

300

350

400

450

500

550

600

0%

5%

10%

15

%

20%

25

%

30%

35

%

40%

45

%

50%

55

%

60%

65

%

70%

75

%

80%

85

%

90%

95

%

100%

MW

% o

f Tim

e

Load

Dur

atio

n Cu

rve

of 4

00/2

20kV

Vem

agiri

ICTs

Flo

w(2

x315

MVA

)

OCT

-201

4 N

OV-

2014

DE

C-20

14

Page 20: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0 50

100

150

200

250

300

350

400

450

500

550

600

650

700

750

800

850

900

950

1000

0%

5%

10%

15

%

20%

25

%

30%

35

%

40%

45

%

50%

55

%

60%

65

%

70%

75

%

80%

85

%

90%

95

%

100%

MW

% o

f Tim

e

Dura

tion

Curv

e of

400

/220

kV S

oman

ahal

li IC

Ts F

low

(2x5

00 M

VA)

OCT

-201

4 N

OV-

2014

DE

C-20

14

Page 21: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0 50

100

150

200

250

300

350

400

450

500

550

600

0%

5%

10%

15

%

20%

25

%

30%

35

%

40%

45

%

50%

55

%

60%

65

%

70%

75

%

80%

85

%

90%

95

%

100%

MW

% o

f Tim

e

Dura

tion

Curv

e of

400

/220

kV M

ysor

e IC

Ts F

low

(2x3

15 M

VA)

OCT

-201

4 N

OV-

2014

DE

C-20

14

Page 22: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

100

150

200

250

300

350

400

450

500

550

600

0%

5%

10%

15

%

20%

25

%

30%

35

%

40%

45

%

50%

55

%

60%

65

%

70%

75

%

80%

85

%

90%

95

%

100%

MW

% o

f Tim

e

Dura

tion

Curv

e of

400

/220

kV K

aliv

enda

patt

u IC

Ts F

low

(2x3

15 M

VA)

OCT

-201

4 N

OV-

2014

DE

C-20

14

Page 23: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

0 50

100

150

200

250

300

350

400

450

500

550

600

0%

5%

10%

15

%

20%

25

%

30%

35

%40

%

45%

50

%

55%

60

%

65%

70

%

75%

80

%

85%

90

%

95%

10

0%

MW

% o

f Tim

e

Load

Dur

atio

n Cu

rve

of 4

00/2

20kV

Pug

alur

ICTs

Flo

w(2

x315

MVA

)

OCT

-201

4 N

OV-

2014

DE

C-20

14

Page 24: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Futu

re N

etw

ork

2016

-17

TIM

E FR

AME

Anne

xure

- VII

Annexure-IV

Page 25: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Dem

and

As p

er 1

8th E

PS D

ata

and

Dem

and

cons

ider

ed fo

r 20

16-1

7 St

udie

s

•As

per

stud

ies ,

SR

is st

ill in

def

icit

of a

bout

500

0 M

W d

urin

g 20

16-1

7.

Page 26: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Nun

na

Tiru

vala

m

Som

anah

alli

Dhar

map

uri

Nel

lore

Goo

ty

Karn

ool

Raic

hur

Shol

apur

Mad

ugiri

Vem

agiri

PS

Kham

mam

HY

D

War

da

Plan

ned

Tran

smiss

ion

syst

em IS

TS &

impo

rtan

t cor

ridor

s in

2016

-17

Khol

apur

Tutic

orin

PS

Nag

apat

tinam

PS

Kudi

gi

Yela

hank

a

Srik

akul

am P

S

Angu

l

Sale

m

Jun1

5

Jun1

5

Jun1

5

Dec1

5

Dec1

5 TB

CB

Jun1

5

MTP

S

Mar

15

Row

Mys

ore

Kojh

ikod

e

Row

Coch

in

Edam

an

Tiru

nelv

elli

C’Pe

ta

Kada

pa

NZB

AD

Nar

endr

a

H’pu

r

ST’P

alli

Podi

li

N T

richu

r IL

&FS

Coas

tal

NTP

L

Mad

urai

Kudi

gi

(3x8

00)

Bida

di

Jun1

5 Feb1

5

Row

Aug1

6

Dec1

5

Dec1

5

Mar

15

Aug1

6

Aug1

6

Dec1

5 TB

CB

Dec1

5 TB

CB

Mar

15

Page 27: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Karn

ool

Mad

ugiri

Vem

agiri

AP

Shan

kara

palli

Oth

er P

lann

ed T

rans

miss

ion

syst

ems

2016

-17

H’pu

r

Hidu

ja

(104

0 M

W)

Kalp

akka

KVKo

ta

Sury

apet

M

ehab

oobn

ager

Kond

apur

U

’kon

da

Gul

barg

a

Yera

mar

us

(2x8

00)

Edla

pur

1x80

0)

NLM

Tala

gupp

a CN

Hal

li

Hass

an

BTPS

PS

BTP

S (2

x500

+1x7

00)

Jinda

l (1

200)

Man

ikon

da

SDST

PS

(2x8

00)

Nel

lore

Chitt

ur

Hin

duja

ATS

Ye

ram

arus

& E

dlap

ur

Evac

uatio

n Sy

stem

SDST

PS(2

x800

)N

ello

re

Chitt

ur

Kris

napa

tnam

ATS

Vem

agiri

AP

Shan

kara

palli

Hidu

ja(1

040

MW

)

Kalp

akka

KVKo

ta

Sury

apet

Man

ikon

da

Mad

ugiri

Gul

barg

a

Yera

mar

us(2

x800

)Ed

lapu

r1x

800)

NLM

Tala

gupp

app

CNHa

lli

Hass

an

BTPS

PS

BTPS

(2x5

00+1

x700

) Jin

dal

(120

0)

Aug1

6 Au

g16

Jun1

5 Se

p 15

Jul1

5

Jul1

5 Ju

l15

Mar

15

Page 28: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Oth

er P

lann

ed T

rans

miss

ion

syst

ems

2016

-17

Upe

t

Eday

apal

ayam

An

ikad

avu

Kaliv

enda

patt

u

Thap

paku

ndu

Rasi

pala

yam

Tiru

nelv

elli

Kana

rpat

ty

Kaya

thar

Kara

ikud

i

Puga

lur

Kaliv

enda

patt

u

Tiru

nelv

elli

Kana

rpat

tyKaya

thar

Kara

ikud

i

Puga

lur

TN W

ind

Evac

uatio

n Ph

ase-

II

Dhar

map

uri

Upe

t

Eday

apal

ayam

Anik

adav

uuu

Thap

paku

ndu

Rasi

pala

yamDh

arm

apur

i

TN W

ind

Evac

uatio

n Ph

ase-

I

Feb1

5

May

15

May

15

?

?

Page 29: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Sr. N

o.

Subs

tatio

n Dr

awl s

how

n in

20

16-1

7 St

udy

(MW

)

Pres

ent

Tras

form

er

Capa

city

(MVA

)

Appr

oved

Aum

enta

tion

(MVA

)

1 40

0kV

Gazu

wak

a 65

2 63

0 -

2 40

0kV

Kalp

akka

28

1 63

0 -

3 40

0kV

Vem

agiri

10

08

630

- 4

400k

V N

unna

35

8 63

0 50

0 5

400k

V Sa

tten

apal

li 41

1 63

0 -

6 40

0kV

Talla

palli

15

1 94

5 -

7 40

0kV

Podi

li 47

1 -

630

8 40

0kV

Hind

upur

51

5 -

630

9 40

0kV

Goot

y 44

7 63

0 50

0 10

40

0kV

Karn

ool

593

630

315

11

400k

V Ch

inak

ampa

lli

364

630

500

12

400k

V Ch

ittur

40

0 63

0 -

13

400k

V N

ello

re

685

630

-

Tota

l 63

36

7245

30

75

Andh

ra p

rade

sh:

Envi

sage

d tr

ansf

orm

atio

n ca

paci

ty in

201

6-17

An

nexu

re- V

III

Page 30: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Sr. N

o.

Subs

tatio

n

Draw

l sh

own

in

2016

-17

Stud

y Pr

esen

t Tra

sfor

mer

Cap

acity

(MVA

) Ap

prov

ed

Aum

enta

tion

(MVA

) (M

W)

2 40

0kV

Nor

th T

richu

r 49

8 94

5 -

3 40

0kV

Pala

kkad

49

4 63

0 -

4 40

0kV

Coch

in

382

630

- 5

400k

V Tr

iven

drum

37

6 94

5 -

To

tal

1750

31

50

Sr. N

o.

Subs

tatio

n

Draw

l sh

own

in

2016

-17

Stud

y Pr

esen

t Tra

sfor

mer

Cap

acity

(MVA

) Ap

prov

ed

Aum

enta

tion

(MVA

) (M

W)

2 40

0kV

Gut

tur

413

630

- 3

400k

V M

unira

bad

202

630

- 4

400k

V Ra

ichu

r 35

3 63

0 -

5 40

0kV

Hiriy

ur

365

630

6

400k

V M

adug

iri

396

10

00

7 40

0kV

Hass

an

292

630

8

400k

V M

ysor

e 78

2 63

0 50

0 9

400k

V Ko

lar

514

1000

10

400k

V Ye

laha

nka

948

10

00

11

400k

V N

elam

anga

la

551

1500

12

400k

V Bi

dadi

53

6 10

00

13

40

0kV

Som

anah

alli

987

1000

50

0 14

40

0kV

Hood

y 65

6 15

00

- 15

40

0kV

elec

tron

ic ci

ty

292

10

00

To

tal

7287

97

80

3000

Envi

sage

d tr

ansf

orm

atio

n ca

paci

ty in

201

6-17

Kera

la

Karn

atak

a

Page 31: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Sr. N

o.

Subs

tatio

n

Draw

l sh

own

in

2016

-17

Stud

y

Pres

ent T

rasf

orm

er

Capa

city

(MVA

)

Appr

oved

Au

men

tatio

n (M

VA)

(MW

) 2

400k

V Sr

iper

umbu

dur

442

1345

-

3 40

0kV

SV c

hath

ram

67

9 63

0 -

4 40

0kV

kaliv

enda

patt

u 57

0 63

0 50

0 5

400k

V Sh

olin

gana

llur

566

63

0 6

400k

V Ti

ruva

lam

79

3 63

0 -

7 40

0kV

Tric

hy

543

630

500

8 40

0kV

Kara

ikud

i 50

9 63

0 -

9 40

0kV

Puga

lur

877

630

500

10

400k

V U

dum

alpe

t 67

3 94

5 -

11

400k

V Ka

yath

ar

161

630

- 12

40

0kV

Mad

urai

45

6 63

0 -

13

400k

V Ti

rune

lvel

li 37

6 63

0 -

14

400k

V Ka

napa

tty

79

?

To

tal

6724

79

60

2130

Envi

sage

d tr

ansf

orm

atio

n ca

paci

ty in

201

6-17

Ta

miln

adu

Page 32: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Envi

sage

d tr

ansf

orm

atio

n ca

paci

ty in

201

6-17

Te

lang

ana:

Sr. N

o.

Subs

tatio

n Dr

awl s

how

n in

20

16-1

7 St

udy

(MW

)

Pres

ent

Tras

form

er

Capa

city

(MVA

)

Appr

oved

Aum

enta

tion

(MVA

)

1 40

0kV

Dich

ipal

li 31

1 63

0 -

2 40

0kV

Ram

agun

dam

86

6 12

15

- 3

400k

V W

aran

gal

648

630

500

4 40

0kV

Kham

mam

24

5 63

0 50

0 5

400k

V M

ehab

oobn

ager

45

6 94

5 -

6 40

0kV

Gajw

el

626

945

- 7

400k

V Gh

anap

ur

1321

94

5 50

0 8

400k

V M

amid

ipal

li 97

6 94

5 31

5 9

400k

V M

alka

ram

87

3 94

5 -

10

400k

V Sh

anka

rapa

lli

986

945

- 11

40

0kV

Sury

apet

54

0 -

630

To

tal

7848

87

75

2445

Page 33: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

•40

0/22

0 kV

Tra

nsfo

rmat

ion

Capa

city

Huge

220

kV E

vacu

atio

n is

requ

ired

as p

er

tran

sfor

mat

ion

capa

city

Also

Tra

nsfo

rmer

aug

men

tatio

n is

appr

oved

som

e pl

aces

Wha

t is t

he 2

20/2

30kV

Net

wor

k Pl

anne

d fo

r ev

acua

tion

? •

How

muc

h ev

acua

tion

is po

ssib

le a

t the

se p

lace

s in

the

2016

-17

time

fram

e?

•W

hat i

s the

qua

ntum

of D

raw

l exp

ectin

g in

201

6-17

fr

om th

e G

rid b

y co

nstit

uent

s?

Page 34: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Annexure-VI

Page 35: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Annexure-VII

Page 36: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Annexure –VIII (Minutes of 38th Meeting of SCPSPSR)

<47 Pages>

Page 37: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 38: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

���� �����/�Government�of�India�

��� � �����/�Ministry�of�Power�

�� ��� ��� �������/�Central�Electricity�Authority�

����� ����� � �������� ��!�� �� ���"��System�Planning�&�Project�Appraisal�Division��#� ��, $�.�# . ����,��% &'!������110066�

Sewa�Bhawan,�R.K.�Puram,�New�Delhi�–�110066���

����������������Sub:� 38th� meeting� of� the� Standing� Committee� on� Power� System� Planning� of� Southern�

Region����Minutes�of�the�meeting�� �

Sir,��The�38th�meeting�of�the�Standing�Committee�on�Power�System�Planning�of�Southern�Region�was�held�on�7th�March,��2015�in�NRPC�Committee�room,�Katwaria�Sarai,�New�Delhi.�The�Minutes�of�the�meeting�are�enclosed.��The�Minutes�are�available�at�CEA’s�website�(�www.cea.nic.in�).���

�Yours�faithfully,�

�����������������������������������������������������������������������������������������������������������

��(�'�� (� '��/Pardeep�Jindal)�

��'#)��(���� � �� ���)/Director�(SP&PA)�Division,�(Tel:��011�26198092,�Fax:�011�26102945)�

��To�

1.�The�Member�Secretary,���Southern�Regional�Power�Committee,���29,�Race�Course�Cross�Road,���Bangalore�560�009.� ������FAX�:�080�22259343�

2.��The�Director�(Projects),�������Power�Grid�Corp.�of�India�Ltd.����“Saudamini”,�Plot�No.2,�Sector�29,�����Gurgaon�122�001,�Haryana.��������FAX�:��95124�2571932�

[ISO : 9001 : 2008]

Page 39: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

2

3.��CEO,�POSOCO,������B�9,�Qutub�Institutional�Area,�������Katwaria�Sarai,������New�Delhi�110016�

4.�The�Director�(Transmission),�����Karnataka�State�Power�Trans.�Corp.Ltd.,������Cauvery�Bhawan,������Bangalore�����560�009.�����FAX�:��080��22228367�

5.The�Director�(Transmission),����Transmission�Corp.�of�Andhra�Pradesh�Ltd.,�����(APTRANSCO)���������Vidyut�Soudha,������Hyderabad�–�500�082.�����FAX�:�040�66665137�

6.�The�Director������(Grid�Transmission�and�Management),�����Transmission�Corp.�of�Telangana�Ltd.,�����(TSTRANSCO)�����Vidyut�Soudha,�Khairatabad������Hyderabad�–�500�082.�����FAX�:�040�23321751�

7.�The�Director(Trans�&�System�op.),���Kerala�State�Electricity�Board�Ltd,���Vidyuthi�Bhawanam,�Pattom,���P.B.�No.�1028,��Thiruvananthapuram���695�004.�����FAX�:�0471�2444738�

8.�Member�(Distribution),�����Tamil�Nadu�electricity�Board�(TNEB),�����6th�Floor,�Eastern�Wing,�800�Anna�Salai,�����Chennai���600002.�����FAX�:�044�28516362�

9.�The�Director�(Power),���Corporate�Office,�Block�–�I,�����Neyveli�Lignite�Corp.�Ltd.,�����Neyveli�,�Tamil�Nadu�–�607�801.������FAX�:�04142�252650�

10.�The�Superintending�Engineer�–I,������First�Floor,�Electricity�Department,������Gingy�Salai,�����Puducherry�–�605�001.�����FAX�:�0413�2334277/2331556�

11.�Director�(Projects),�National�Thermal�Power�Corp.�Ltd.�(NTPC),�NTPC�Bhawan,�Core�7,��Scope�Complex,�Lodhi�Road,��New�Delhi�110003.������FAX�011�24360912�

12.�Director�(Operations),������NPCIL,�12th�Floor,������Vikram�Sarabhai�Bhawan,������Anushakti�Nagar,�����Mumbai�–�400�094.��������FAX�:�022��25991258������

�Copy�to:�1.� The�Director�(Projects),��

Power�Grid�Corp.�of�India�Ltd.�“Saudamini”,�Plot�No.2,�Sector�29,�Gurgaon�122�001,�Haryana.�FAX�:��95124�2571932�

2.� GM,�SRLDC,�29,�Race�Course�Cross�Road,�Bangalore�560�009�FAX�–�080�22268725��

Page 40: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

3

MINUTES OF MEETING

Draft-Minutes of 38th Meeting of the Standing Committee on Power System Planning in Southern Region (SCPSPSR) held on 7th March, 2015 at NRPC, Katwaria Saria, New Delhi

1. Introduction

1.1 Chairperson, CEA welcomed the participants and informed that a total of 19 agenda points and two additional agenda items will be discussed in the meeting. He requested Chief Engineer(SP&PA) to apprise the committee on the recent development regarding implementation of transmission projects.

1.2 CE(SP&PA), CEA welcomed the participants and informed the constituents about the schemes awarded through TBCB route and Compressed time Schedule. He stated that following schemes have been allocated to PGCIL under compressed time schedule:

(i) HVDC Bipole link between Western region (Raigarh, Chhattisgarh) and Southern region (Pugalur, Tamil Nadu)(iii) Erection of 220 kV line to Karaikal scheme

He also informed that the said that the “Additional inter-Regional AC link for import into Southern Region i.e. Warora – Warangal and Chilakaluripeta - Hyderabad - Kurnool 765kV link” scheme would be implemented through TBCB route.

He also informed the constituents that MoP has delegated the power for grant of prior approval u/s 68 of EA 2003 to Chairperson, CEA. Further, the Ministry is also in the process of issuing an order regarding timelines for concept to commissioning of transmission schemes, and according to which, the SCPSP meetings would be held on fixed dates.

With these views he requested Director (SP&PA) to take up agenda items.

1.3 List of participants is given at Annex-I.

1.4 These Minutes may be read along with the Agenda circulated for this meeting.

Page 41: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

4

2.0 Confirmation of the minutes of 37th meeting of the Standing Committee

2.1 Director(SP&PA), CEA stated that minutes of the 37th meeting of the Standing Committee on Power System Planning of Southern Region were issued vide. CEA’s letter No. 51/4/(37th)/ SP&PA-2014/ 1729-42 dated 22nd September, 2014. SRLDC gave their observations regarding Vemagiri rearrangement and Hinduja Plant evacuation and additional agenda related to Vemagiri- Khammam- Hyderabad corridor. POSOCO vide their letter No NLDC/Planning/761 dated 24th Sept, 2014 cited a correction in para 12.3 of the minutes regarding 400/230 kV S/S at Tirunelveli Pooling Station. POSOCO suggested ‘one and a half breaker scheme’ instead of ‘double bus scheme for increased reliability’. Accordingly, corrigendum#1 was issued vide CEA letter no 51/4/(37th )/SP&PA-2014/1796-1809 dated 09-October, 2014.

2.2 Transmission Corporation of Andhra Pradesh Ltd(APTRANSCO) vide their letter No CE(IPC&PS)/ SE(PS)/DE(SS&LTSS) ADE-2/ F.37thSCM/ D.No.156/2014 dated 05.11.2014 have commented that the Cuddapah-Hindupur 400kV (quad) D/c line with 80 MVAr switchable line reactor at both ends may be implemented as ISTS instead of by APTRANSCO. Accordingly, corrigendum#2 was issued vide CEA letter no 51/4/(37th )/SP&PA-2014/2417-30 dated 22-December, 2014.

2.3 TNEB requested to include 2X125 MVAr reactor at Udangudi Power Project Stage-I (2x660MW).

2.4 Accordingly, the minutes of 37th Standing Committee of Power System Planning of Southern Region along with the Corrigendums, as circulated were confirmed.

Further, the scope under Connectivity for Udangudi Power Project Stage-I (2x660MW) of Para 3.8 of the Minutes is now modified as below:

Connectivity for Udangudi Power Project Stage-I (2x660MW):

(i) 400kV DC Quad line to the Udangudi Pooling station.

(ii) 2X125 MVAr, 400kV bus reactor at Udangudi Pooling station.

3.0 Augmentation of Transformer Capacities in SR

3.1 Director (SP&PA), CEA stated that studies have been carried out for the augmentation of transformers at a number of 400kV Substations for 2018-19 time frames.

3.2 He informed that in the above studies augmentation requirement at 17 Nos. of POWERGRID substation emerges.

Page 42: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

5

Slno

Substation Existing / Approved trf.

Transformer Augmentation

Required

Remarks

1 HYDERABAD 3*315+500=1445 1000 Space not available 2 GAZUWAKA 2x315=630 500 Space not available 3 WARANGAL 2*315+500=1130 500 Space not available 4 MUNIRABAD 2*315=630 500 Can be carried out 5 MYSORE 2*315+500=1130 500 Space not available 6 KOLAR 2*500=1000 500 Space not available 7 NARENDRA 2*500=1000 500 Space not available 8 MADHUGIRI 2*500=1000 500 Can be carried out

9 MUVATTUPUZHA (KOCHIN) 2*315=630 500 Can be carried out

10 PALAKKAD 2*315=630 500 Can be carried out

11 TRICHY 2*315=630 2*500 One unit already

approved. No space for second

12 HOSUR 3*315=945 1000 Space not available

13 PUGALUR 2*315=630 2*500 One already

approved. No space for second

14 ARASUR 2*315=630 500 Can be carried out 15 KARAIKUDI 2*315=630 500 Can be carried out 16 TIRUNELVELI 2*315=630 500 Can be carried out

17 PONDICHERRY 2*315=630 500 Can be carried out

3.3 In sub-stations where in space is not available, it is proposed that joint studies can be carried out to finalise the various options like augmentation/Replenishing the transformers, shifting of loads, creation of new stations to meet the load.

3.4 Accordingly, the following transformer additions are proposed:

Slno

Substation Existing / Approved trf.

Transformer Augmentation Required

1 MUNIRABAD 2*315=630 500

2 MADHUGIRI 2*500=1000 500

3 MUVATTUPUZHA (KOCHIN) 2*315=630 500

4 PALAKKAD 2*315=630 500

5 ARASUR 2*315=630 500

6 KARAIKUDI 2*315=630 500

7 TIRUNELVELI 2*315=630 500

8 PONDICHERRY 2*315=630 500

Page 43: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

6

3.5 COO(CTU),PGCIL stated that transformer augmentation of 500 MVA should be accompanied with two nos. of 220kV bays. They enquired about the requirement of additional 220kV bays by the states.

3.6 Director(T), KPTCL requested to wait till next meeting for the finalization of bays requirement at Munirabad and Madhugiri.

3.7 Director(T&SO), KSEBL stated that the evacuation feeders at 220 kV level from Palakkad and Kochi are to be firmed up before enhancing the ICT capacity. The load growth as projected is not likely to occur at Palakkad and Kochi. Commissioning of Mysore Areakode feeder and HVDC link to Madakkathara are also to be considered in this regard. Hence up-gradation of existing ICT s at Palakkad and Kochi may be considered in the next meeting. PGCIL replied that their Udumalpet- Palakad line is already overloaded and even if Areakod 400kV comes it would not relieve the loading. It was decided that KSEBL would revert back after detailed system studies and evaluation of feasibility of 220kV outlets.

3.8 CEO, POSOCO stated that along with augmentation of transformer, the 220kV outlets should be planned to take benefit of the additional transformation capacity. The states agreed to give their plan to CEA before next meeting of SCPSPSR. He also opined that ratio of fault level to transformation capacity should also be indicated.

3.9 After deliberations augmentation at Arasur, Karaikudi, Tirunelveli and Pondicherry were agreed and for the rest of the four locations, the decision was postponed till the next Standing Committee meeting and based on input provided by KSEB and KPTCL.

4.0 Transmission System for Coastal Tamil Nadu Power Ltd. (4000 MW) Cheyyur UMPP in Kanchipuram of Tamil Nadu

4.1 Director (SP&PA), CEA stated that M/s Costal Tamil Nadu Power Ltd.,(CTNP Ltd.) which is a SPV of PFC had applied for connectivity and LTA to CTU for evacuation of power from Cheyyur UMPP. The beneficiaries of the project are as given below :

Southern Region (3100 MW)

Western Region (400 MW)

Northern Region (500 MW)

Tamil Nadu -1600 MWKarnataka - 800 MWAndhra Pradesh - 400 MWKerala - 300 MW

Maharastra - 400 MW Uttar Pradesh -300 MW Punjab - 200 MW

Page 44: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

7

The project is expected to be commissioned progressively from March 2019 to 2021.

4.2 He informed that the study has been carried out for 2020-21 condition with all generations expected in that time frame and the same has been furnished with the agenda. Considering the quantum of power to be evacuated following 765kV lines have been considered

� Cheyyur UMPP - Thiruvalam 765kV D/c line � Cheyyur UMPP –Salem 765 kV D/c line � Charging of Salem - Madhugiri 765kV D/c line at its rated voltage.

4.3 CE (SP&PA), CEA said that it is learnt that the Government has presently terminated the bidding process for the generation project.

4.4 COO(CTU), PGCIL expressed that as per regulation, they may not be able to hold the application for LTA and only when the applicant withdraws the application then its LTA can be cancelled.

4.5 Chairperson, CEA said that as the Government itself has terminated that bidding process for the generation project, we may keep the transmission planning in abeyance for the time being. The transmission that we plan now may have to be revised when the bidding resumes again.

4.6 It was decided that PGCIL would ask M/s Costal Tamil Nadu Power Ltd, the PFC SPV company to inform latest status of the generation project or if they may like to withdraw their application in view of termination of the bidding process.

5.0 Converting Fixed Line Reactors into Switchable Line Reactors in Over Compensated lines

5.1 Director(SP&PA), CEA stated that due to reduction in line lengths generally after LILO at certain nodes, some lines are being overcompensated with the existing fixed Reactors.

5.2 It is proposed that fixed Line Reactors installed in these lines be converted to switchable Line Reactors so that they may be utilised as Bus Reactors, as and when needed.

Capacity (MVAr)

Switchable (S) / Fixed(F)S.N

o.

Name of the Line Length(ckt km)

End I End II End I End II

%Compensation

Page 45: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

8

1 Malakaram - Hyderabad-II (upto LILO point) *

27.87 -- 50 -- F 326.1

2 Kurnool – Gooty ** 112.60 -- 50 -- F 80.7

* - LILO of the one circuit of RTPS – Hyderabad(Ghanapur) 400 kV line at Malkaram.

** - LILO of N.Sagar – Gooty line at Kurnool 5.3 He stated that PGCIL have also proposed following lines where the existing

fixed Line Reactor(s) is over compensating the transmission line. And hence, may be converted into switchable line reactor.

Capacity (MVAr) Switchable (S) / Fixed(F)S.No.

Name of the Line Length(ckt km)

End I End II End I End II

%Compensation

1 Gazwel-Hyderabad-II 62.5 - 50 - F 132

2 Nellore-Tiruvellam-I & II 173 50 50 f f 95

3 Sriperumbdur-chitoor 105.7 50 - F - 78

4 Thiruvananthapuram-

Tirunelvelli

160 63 - F 65

5 Trichur-Palakkad- I & II 84 50 - f - 98

6 Udumalpet-Salem -II 137 63 - F - 76

7 Madurai-Karaikudi 130 63 - F 80

8 Sriperumbadur-SV Chatram 18 50 - F 458

9 Bangalore-Gooty 302 63 63 F F 69

10 Kochi-Tirunelveli-I & II 231 63 63 90

11 Madurai-Trichy 130 50 - F 63

12 Trichy-Nagapattinam-I 159 50 F 52

13 Trichy-Nagapattinam-II 159 63 F 65

14 Salem-Hosur-II 125 50 - F 66

5.4 PGCIL said that due to over compensation in the above lines there are resonances in the fixed line reactors leading to vibration in Reactors causing damage to Reactor windings, core and bushings. There is need to make these as switchable line reactors wherever the compensation is more than 80%.

5.5 CEO, POSOCO said that whenever LILO of a line is planned at that time itself the Dynamic Over Voltage (DOV) studies should be done, especially for line length above 100km DoV studies should necessarily be performed. He also

Page 46: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

9

informed that from system operator point of view, they may charge the line without reactor, if the reactor is switchable.

5.6 Director(SP&PA), CEA enquired about status of NGR and the issue of higher voltages across circuit breaker contacts during switching off when these reactors are used as bus reactors. PGCIL explained that the necessary arrangement for bypassing of NGR and Controlled switching of Circuit breaker would be provided at these locations.

5.7 After deliberations, it was decided that the studies will be included to substantiate the requirement of converting fixed Line Reactor(s) into switchable line reactor.

6.0 Reactive compensation at Vemagiri S/S

6.1 Director(SP&PA), CEA informed that the following scheme was agreed under Constraints in 400 kV bays extensions at 400 kV Vemagiri S/s:

(i) LILO of both circuits of Gazuwaka/Simhadri-II –Vemagiri-I(AP) 400kV D/C line at Vemagiri-II(PG)

(ii) Straighten Nunna- Gazuwaka 400kV D/C line (by disconnecting the LILO at Vemagiri-I) so as to make Nunna – Vemagiri-II (PG) 400 D/C link

(iii) Use one LILO D/C portion (of Gazuwaka-Nunna at Vemagiri-I(AP)) to connect with K.V.Kota.

(iv) Second LILO D/C portion to be extended to Vemagiri-II(PG)

6.2 He informed that PGCIL has proposed that the 2x63 MVAr line reactors at Gazuwaka end on Simhadiri-II –Gazuwaka line (11 km) are proposed to be shifted to Vemagiri-II(PG) end of Simhadiri-II-Vemagir-II(PG) 400kV D/c line (200km) instead of planning new reactors.

6.3 CEO, POSOCO said that either the line reactor be converted into fixed line reactor or study need to be furnished. After discussions it was decided that

Page 47: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

10

though the proposal seem to be in order, however the proposal needs to be substantiated with studies.

7.0 Termination of Narendra-Madhugiri line under TBCB

7.1 Director (SP&PA), CEA informed that as a part of Transmission system for evacuation of power from Kudgi generation(3x800 MW) project, Narendra-Madhugiri 765kV D/c line, charged at 400kV, has been proposed. The transmission line is being developed through Tariff Based Competitive Bidding route and has already been awarded to M/s L&T IDPL. Narendra-Madhugiri 765kV D/c is to be charged initially at 400kV and subsequently would be charged at 765kV. As the line is to be charged at 400kV, presently only 400kV bays are being provided at both ends of line by POWERGRID.

7.2 POWERGRID stated that at a later date when line is to be charged at 765kV, lines shall have to be reoriented for termination at 765kV bus, and the 765kV bays shall have to be provided.

7.3 It was agreed that the provision of 765kV line bays and work required to re-orient the transmission lines to the 765kV bus of PGCIL would be part of ISTS.

8.0 Charging for Kurnool - Thiruvalam 765kV D/c at 400kV

8.1 Director(SP&PA), CEA stated that Kurnool-Thiruvalam 765 kV D/c line of POWERGRID shall facilitate in import of power through Raichur - Sholapur 765 kV D/c lines to the power deficit states of Southern Region. However due to certain unavoidable circumstances there is delay of about 4-5 months in supply of 765kV equipment’s at Thiruvalam end. As an interim measure, till 765kV equipment’s are available, the line was proposed to be charged at 400kV level. CEA vide its letter dated 29/10/2014 has given in-principle clearance to charge Kurnool - Thiruvalam 765kV D/c at 400kV. This line along with Thiruvalam-MTPS Stage-III 400 kV D/c line of TANTRANSCO would help in enhancement of TTC between NEW Grid-SR Grid which shall facilitate in transferring the much required power to the Southern Region states.

8.2 PGCIL has informed that they have charged the line at 400kV on 27-11-2014 and that the line is expected to be charged at 765kV level by March 2015.

8.3 TNEB informed that reactor at Kayathar end of Kayathar- Karaikudi line was not shifted and instead a new reactor was installed at Mettur Stage III end of Thiruvelum- MTPS Stage III 400kV D/C line.

8.4 Members noted.

Page 48: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

11

9.0 Re-orientation of Nellore –Vijayawada 400kV D/c line

9.1 Director(SP&PA), CEA stated that most of the works in VijayawadaPG (Nunna).-Nellore 400kV D/c has been completed. However, severe ROW problem is being encountered in termination of line at Vijayawada PG (Nunna). PGCIL has proposed to commission the line by reorientation of one circuit of Vijayawada TPS-IV –Vijayawada 400kV D/c.

9.2 He informed that PGCIL has proposed to terminate this line at Vijayawada end by LILO of one circuit of the VTPS-Nunna link of APTRANSCO. Study was carried out with original arrangement and with proposed arrangement. It is seen that the power flow on Nellore - Vijayawada 400kV lines is identical in both the cases

9.3 He informed that APTRANSCO while conveying its agreement has stated that PGCIL would need to do the following:

- Land to be acquired by PGCIL from APGENCO on payment for market value.

- Any short falls such as PIR for breakers at Vijayawada TPS and, PLCC equipment and any other civil structure works/shortfalls if required, to be borne by PGCIL.

- One 63 MVAr line reactor shifting to Vijaywada TPS (APGENCO switchyard) and of Vijaywada TPS - Nellore 400 kV line to be implemented by PGCIL.

9.4 After further deliberation re-orientation of Nellore –Vijayawada 400kV D/c line was agreed and it was decided that the issues raised by APTRANSCO would be mutually resolved by APTRANSCO and PGCIL.

Page 49: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

12

10.0 Tapping of Uravakonda- Jammalamadagu D/c Quad line with Gooty –Madhugiri 400kV D/c line:

10.1 Director (SP&PA), CEA informed that Transmission Corporation of Andhra Pradesh Ltd. has proposed to tap Gooty - Madhugiri twin moose D/C ISTS line with their Uravakonda- Kondapur (Jammalamadugu) 400kv Quad moose line for one wind season i.e. from Apr 2015 to Oct 2015.

10.2 He informed that Uravakonda400kV S/s is expected to be commissioned by March’15 for evacuation of about 400MW wind generation expected in the similar time frame. However 400kV lines, envisaged from Uravakonda to Jammalmadugu and Mahaboobnagar substations, would not be completed by this time frame.

10.3 He stated that according to CEA’s safety standard Para 44.6 tapping of transmission line for any purpose is not allowed. He enquired about the commissioning schedules of Uravakonda –Jammalamadugu, Uravakonda - Mehboobnagar, Uravakonda- Hindupur 400kV lines to which APTRANSCO informed the schedule as August 2015, October 2015 respectively for the first two lines while for Uravakonda –Hindupur line tendering process has started.

10.4 Director, APTRANSCO said that they would bunch the D/C line from Uravakonda and connect it with portion of the Gooty –Madhugiri line at the place where the two lines cross.

10.5 PGCIL raised its concern about the effect of tapping after the commissioning of Gooty- Madhugiri 400kV line, to which APTRANSCO replied that they would make LILO of one circuit of the Gooty- Madhugiri 400kV D/C line at Uravakonda.

10.6 PGCIL then cited the issue of metering and transmission charges for use of the ISTS line.

10.7 DGM,SRLDC said that the tapping of Gooty – Madhugiri 400kV line may adversely effect the import capacity from New Grid. He suggested to perform system study for the Monsoon period.

10.8 KSEB said that injection at Gooty will affect the schedule through the 765kV

Raichur – Sholapur link and reduce the import capability of SR. The injection

proposed is only for short duration upto October 2015. However, this is

inclusive of the high demand period in SR. He further said that as per Clause

4.2 ( c ) of IEGC “Any new or modified connections, when established, shall

neither suffer unacceptable effects due to its connectivity to the ISTS nor

impose unacceptable effects on the system of any other connected User or

Page 50: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

13

STU”. Therefore, when power is injected to Gooty transmission system, it will

adversely affect the import of power from WR, hence the proposal cannot be

accepted by KSEB.

10.9 KPTCL suggested that tapping the said line is in fact direct injection of 400MW at Gooty.

10.10 After further deliberations, it was decided that joint studies including SRPC, SRLDC, PGCIL and CEA would be performed and the issue would be re-discussed in the next SCPSPSR.

11.0 YTPS- Providing start-up power for Boiler light up and commissioning activities of unit 1:

11.1 Director(Trans), KPTCL informed that 100 MVA start up power would be required to start boiler light up and other commissioning activities of Yermarus TPS. KPTCL also informed that EPC contract has been awarded for executing work of LILO’ing the existing SC line between RTPS and Davanagere to facilitate drawl of power at 400kV level. The said LILO line crosses RTPS-Gooty 400kV Quad D/c line at a distance of 4.5 km from YTPS. Therefore, KPTCL has requested for permission for tapping/LILO’ing of RTPS-Gooty 400kV Quad D/c line, owned by PGCIL.

11.2 Director(SP&PA), CEA said that Tapping/LILO’ing of RTPS-Gooty 400kV Quad D/c line for start up power may have adverse implication on TTC and ATC and also involves commercial issues, metering, reduction of dispatch at Raichur TPS etc.

11.3 DGM, SRLDC said that the issue of Tap Connection from Raichur New-Gooty line for Yermaras startup cannot be agreed due to reliability risk and Protection issues and commercial constraints as well.

11.4 Director(SP&PA), CEA also said that presently one of the main constraints in import of power is loading on Gooty-Neelmangla and Gooty- Somanhalli lines.

11.5 KPTCL informed that as Edlapur TPS is not coming in the near future therefore, Yermarus to Gulbarga 400kV line is not taken up. He also said that they have carried out the studies and the result shows that 800 MW of power can be pumped without any constraints except issue of fault level at Raichur 220kV bus. He informed that the work at Bellary PS has been started and the transmission line from Yermarus to Bellary Pool would take another 24 months.

Page 51: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

14

11.6 KSEBL opined that as requested by KPTCL, only start up power may be

allowed to draw from this for the commissioning activities and no injection from

YTPS should be allowed in ISTS without commissioning of their complete

evacuation system. The injection of power from YTPS reduces the import

capability of SR. As per Clause 4.2 ( c ) of IEGC “Any new or modified

connections, when established, shall neither suffer unacceptable effects due to

its connectivity to the ISTS nor impose unacceptable effects on the system of

any other connected User or STU”. Further, as per Clause 8 . 6 of CERC

connectivity regulations “connectivity does not mean that the utility can inject

power” KPTCL may avail start up power through the temporary LILO

arrangement. However, for injection of power the originally planned ATS has to

be in place.

11.7 After further deliberations, it was decided that joint studies including SRPC,

SRLDC, PGCIL and CEA would be performed and the issue would be re-

discussed in the next SCPSPSR. This can be taken up along with studies of

Uravakonda as mentioned above in these minutes.

12.0 Provision of space at various substations of POWERGRID

12.1 Director (SP&PA), CEA informed that TANTRANSCO has approached POWERGRID for execution of line bays at POWERGRID substations, agreed during the 37th Standing committee meeting of Southern Region held on 31/7/2014 :

� Kayathar – Koilpatty(PG) (Tuticorin Pooling point) 400kV DC � Kamuthi – Karaikudi(PG) 400kV D/c � Ariyalur – Thiruvalam(PG) 765kV D/c � Two no of 230kV Bays at Arasur � Two no of 230kV Bays at Shoolagiri (Hosur) � One no of 230kV Bays at Abhishekpatty

12.2 After discussions it was agreed that termination of the line from Kayathar may be considered at Tirunelvelli(PG) in place of Koilpatty(PG).

12.3 It was also agreed that after provision of above bays at Karaikudi, no further space would be available for any future line bays at Karaikudi 400kV. The bays for Thiruvalam(PG) 765kV line can be accommodated.

12.4 It was also decided that the bays for Abhishekpatty 230kV line can be

Page 52: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

15

accommodated. Further it may be mentioned after provision of above bays no further space would be available for future line bays at Arasur 230kV.

12.5 At Shoolagiri (Hosur) 2nos of 230 kV line bays can be accommodated.

13.0 Evacuation of SEPC IPP(1x525 MW) –Proposed by TNEB:

13.1 SE, TNEB informed that M/S SPIC Electric Power Corporation Private Ltd (SEPC) has proposed to establish 1X525 MW power plant in Tuticorin as an IPP. To evacuate power from this project, TNEB has proposed following transmission system:

“400kV D/C line to the proposed Ottapidaram 400/230-110kV substation ”.

He said TNEB had informed that the earlier envisaged Udangudi projects (2x660 MW+ 1x800 MW) are being reviewed.

13.2 Director(SP&PA), CEA said that during 37th SCPSPSR, following transmission system was agreed for Udangudi projects:

a. 400kV D/C Quad line to the Kayathar 400kV S/S. b. 400kV D/C Quad line to the proposed Samugarengapuram 400/230-110

kV S/s c. 400kV D/C Quad line to the proposed Ottapidaram 400/230-110 kV S/s.

13.3 SE, TANGEDCO informed that Udangudi Phase-II is dropped as of now. Udangudi Phase-II and Phase-III will come later and their evacuation would be planned at 765kV level. He said that since the evacuation scheme of Udangudi is approved for the entire capacity of 2X660 MW+1X800 MW, SEPC of 1X525 MW may be accommodated in already approved evacuation system of Udangudi project taking the capacity to 2X660 MW+ 1X 525 MW.

13.4 MS, SRPC pointed out that the change in bus voltages are not exhibited in the studies furnished by TANGEDCO. Director(SP&PA), CEA said that in the load flow results sent by TNEB there is overloading in the Kanarpatti – Tirunelveli 400kV line.

13.5 After deliberation, following was decided

i) Prima-facie the transmission system that was earlier agreed for Urangudi Stage I and II may be sufficient to evacuate power from Udangudi 2x660 MW and SEPC 1x525 MW.

ii) TANGEDCO will furnish fresh studies.

13.6 Further CEA urged that TNEB should comply with the regulations of TNERC while planning and implementing the above transmission system. Specially

Page 53: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

16

they should comply with “(i) Tamil Nadu Electricity Grid Code dated 19.10.2005 and its amendment from time to time, (ii) Tamil Nadu Electricity Regulatory Commission-intra-State Open Access Regulations 2005 and its amendment from time to time, (iii) Grid connectivity and intra-State Open Access Regulations 2004 and its amendment from time to time of TNERC and its amendments from time to time. TNEB would also ensure that they would follow the “Technical standards for connectivity to the grid Regulation 2007” of Central Electricity Authority and its amendments from time to time while planning and implementing the above transmission system

14.0 Modifications for the Pulianthope 400/230kV S/s:

14.1 Director (SP&PA), CEA stated that the following scheme was approved for Pulianthope 400/230kV S/s during 37th SCPSPSR:

“400kV D/C Quad line from the proposed North Chennai Pooling Station and 400kV D/C line from Manali 400/230-110kV S/s”

14.2 SE, TANGEDCO stated that to cater the future load demand of Chennai city Pulianthope 400/230kV S/s has been proposed. The North Chennai Pooling Station may take some time to materialize, thus 400 kV SC line is proposed from North Chennai Stage II power plant to Pulianthope as a temporary measure.

14.3 Director (SP&PA), CEA suggested 400 kV DC line may be erected from North Chennai Stage II power plant to Pulianthope so that the same could be used subsequently.

14.4 MS, SRPC pointed out that no load flow has been furnished for the changed scheme of Pulianthope 400/230kV S/s, by TANGEDCO.

14.5 After deliberation, it was decided that TANGEDCO will furnish the studies considering 400kV D/C line from North Chennai Stage II power plant to Pulianthope. The studies will also show the complete 220kV and above transmission network in and around Chennai area under various operating scenarios.i.e peak, off peak, low wind, high wind etc.

14.6 Further CEA urged that TNEB should comply with the regulations of TNERC while planning and implementing the above transmission system. Specially they should comply with “(i) Tamil Nadu Electricity Grid Code dated 19.10.2005 and its amendment from time to time, (ii) Tamil Nadu Electricity Regulatory Commission-intra-State Open Access Regulations 2005 and its amendment from time to time, (iii) Grid connectivity and intra-State Open Access Regulations 2004 and its amendment from time to time of TNERC and its

Page 54: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

17

amendments from time to time. TNEB would also ensure that they would follow the “technical standards for connectivity to the grid Regulation 2007 of Central Electricity Authority and its amendments from time to time while planning and implementing the above transmission system

15.0 New 400kV Load Substation at Usilampatty

15.1 Director (SP&PA), CEA stated that TANTRANSCO has proposed 400kV load substation at Usilampatty with the following connectivity:

a. 400kV D/C connectivity with Kamuthi 400 kV S/s. b. 400kV D/C connectivity with Thappagundu 400 kV S/s.

15.2 SE, TANGEDCO stated that 400kV Load Substation at Usilampatty is not needed as of now, he requested 400kV Usilampatty S/s to be deferred.

16.0 Edayarpalayam 400/230-110kV S/s under the scope of TANTRANSCO:

16.1 Director (SP&PA), CEA stated that during the 37th SCPSPSR held on 31st

July, 2014, the following scheme was agreed under The scheme - “ HVDC Bipole link between Western region (Raigarh, Chhattisgarh) and Southern region (Pugalur, Tamil Nadu) :

(i) Raigarh(HVDC Stn) – Pugalur (HVDC Stn) 6000 MW HVDC bipole

(ii) Establishment of Raigarh HVDC Stn with 6000 MW HVDC terminals

(iii) Establishment of Pugalur HVDC Stn with 6000 MW HVDC terminals (or Alternatively: (i) with Pugalur HVDC Stn with 4000 MW terminal, and (ii) Madakkathara, in Kerala HVDC Stn with 2000 MW terminal and inter-connection with existing 400kV AC S/S at Madakkathara)

(iv) Raigarh HVDC Station – Raigarh(Existing) 400kV (quad) 2xD/c lines (or with bay extension)

(v) Pugalur HVDC Station – Pugalur (Existing) 400kV (quad) D/c line.

(vi) Pugalur HVDC Station – Arasur 400kV (quad) D/c line with 80 MVAr switchable line reactor at Arasur end.

(vii) Pugalur HVDC Station – Thiruvalam 400kV (quad) D/c line with 80 MVAr switchable line reactor at both ends.

Page 55: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

18

(viii) Pugalur HVDC Station – Edayarpalayam 400 kV (quad) D/c line with 63 MVAr switchable line reactor at Edayarpalayam end.

(ix) Edayarpalayam – Udumalpet 400 kV (quad) D/c line.

(x) Establishment of 400/220kV substation with 2x500 MVA transformers at Edayarpalayam and 2x125 MVAr bus reactors.

In respect of above TANGEDCO has proposed establishment of Edayarpalyam 400/230-110 kV substation will be under the scope of TANTRASCO.

16.2 SE, TANGEDCO stated that for establishment of Edayarpalyam S/s, land has been purchased and the tendering work is under progress and the establishment of Edayarpalyam 400/230-110 kV substation will be under the scope of TANTRASCO. Also, there is no scope for 400kV bay extension at Udumalpet S/s as earlier communicated by PGCIL. Therefore, TANGEDCO has suggested that Udumalpet- Anikadavu 400kV S/c line may be LILOed at Edayarpalyam S/s. Thus TANGEDCO, has requested following works under their scope:

a. LILO of Udumalpet- Anikadavu 400kV S/c line at Edayarpalyam S/s. b. Establishment of 400/230-110 kV substation with 2x500MVA transformer

at Edayarpalyam and 2x125 MVAr bus reactors.

16.3 PGCIL informed that the space for bays at 400kV Udumalpet S/s is available and 400kV bays for Edayarpalyam- Udumalpet line can be accommodated. COO(CTU), PGCIL stated that delay in establishment of Edayarpalyam 400/230-110 kV substation and Edayarpalyam- Udumalpet line would effect the dispersal of power from Pugalur HVDC and the power may be bottled up.

16.4 In this regard it was suggested that if there is delay in commissioning of Edayarpalyam S/S , the Pugalur- Edayarpalyam line can be connected with Edayarpalyam- Udumalpet bypassing Edayarpalyam for the interim period.

16.5 After deliberations, following was decided:

i) Following will be in the scope of TANTRANSCO/TANGEDCO:

a. Establishment of 400/230-110 kV substation with 2x500MVA transformer at Edayarpalyam and 2x125 MVAr bus reactors

(The LILO of Udumalpet- Anikadavu 400kV S/c line at Edayarpalyam S/s is dropped for the time being in view of availability of bays at Udumalpet and the Edayarpalyam – Udumalpet 400kV D/C line, as in the scope of PGCIL).

Page 56: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

19

ii) Edayarpalyam- Udumalpet D/C line would remain in the scope of PGCIL as ISTS

iii) TANGEDCO will commission Edayarpalyam S/S in the time frame matching with the requirement of Raigarh- Pugalur HVDC system.

iv) PGCIL will prepare a list of all the existing, under construction 400kV and above substations in SR indicating the number of transformers, reactors, lines, bays occupied, space for future bays for the 765kV, 400kV and 220kV buses. The format for this information may be decided in consultaion with CEA. Similar list may be prepared by other state also for their network. This list would be helpful for planning future transmission systems.

17.0 Construction of 400kV Quad D/C line from UPCIL (Karnataka) to Kasargod( Kerala).

17.1 Director (SP&PA), CEA stated that during the 35th meeting of SCPSPSR the following scheme was discussed and agreed:

Mangalore(Udipi PCL) – Kasargode – Kozhikode 400kV Link

(i) Mangalore(Udipi PCL) – Kasargode, 400kV quad D/c line

(ii) Kasargode – Kozhikode(Areacode), 400kV quad D/C line

(iii) Establishment of 2x500 MVA, 400/220kV GIS substation at Kasargode

17.2 In the 31st Empowered Committee recommended the schemes for implementation through TBCB subject to the commitment from the Kerala Government that the land compensation only for Right of Way (RoW) for the tower footing area will be paid, instead of the entire corridor. EC also suggested that firm commitment from UPCL for providing 400 kV bays at Mangalore (UPCL) switchyard may be obtained.

17.3 Director (SP&PA), CEA further said that UPCL has communicated the following:

“a) UPCL facility do not have any surplus land where 2 nos. of 400 kV bays can be erected as desired by you.

b) Under the provision of Power Purchase Agreement entered into between UPCL and ESCOM’s of Karnataka, UPCL and Punjab State Power Corporation Limited, Punjab, power is sold to the Buyers ex our switchyard and transmission facility is the responsibility of the Buyers.

Page 57: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

20

c) Any additional Capital expenditure required to be incurred by UPCL needs to be approved by the Buyers as per the provisions of Power Purchase Agreement referred to above.

17.4 He informed that during site visit to UPCL generation switchyard, it was observed that there is space for additional two nos. of 400 kV line bays. These line bays can be constructed by extending the existing generation switchyard and dismantling some of the civil structures for creating gantry for the proposed 400 kV DC transmission line. During this visit it was also observed that the route from Kozikode to Kasargode has a thick plantation of coconut, rubber and beetle nut trees. Building transmission lines having sufficient clearance over and above these tall trees would require high rise transmission towers or cutting of these trees under the shadow of transmission lines

17.5 PGCIL said that these bays can be built as ISTS on Deposit work basis and there will not be any tariff impact on Karnataka DISCOMs because of these bays.

17.6 KSEB informed that the route between UPCL to Kasargode is comparatively better for laying transmission line.

17.7 Director(Trans),KPTCL said that the proposed 400 kV DC line to link UPCL to Kasargod may not serve the purpose of strengthening S1-S2 corridor. KPTCL further observed that since UPCL is an ISGS with 90% share of Karnataka, with the construction of 400kV line from UPCL to Kasargode, the 400kV D/C line from UPCL to Hasan will be under utilized. Also, Manglore( Udupi PCL)- Kasargod, 400kV D/C Quad line would not relieve S1-S2 congestion since the upstream 400kV lines beyond Hassan are not having capacity.

17.8 KSEBL informed that once the Kasaragod substation is commissioned adjacent to 220kV substation, Mylatty where land is available, the Kasaragod – Areakode portion can be constructed by extending the RoW of the existing 220kV line and constructing 400/220kV multi circuit multi voltage line. KSEBL do not expect much difficulty in extending the RoW to that of 400kV requirement.

17.9 KPTCL wanted more time and informed that their views will be communicated within two weeks after getting the views of the ESCOMs also.

17.10 It was decided that implementation of the UPCL- Kasargode 400kV D/C line can be initiated after considering views of Karnataka ESCOMS, if communicated within a month.

18.0 Start up power requirement of under construction NCC PPL Power Plant.

Page 58: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

21

18.1 Director (SP&PA), CEA informed that as per NCC Power Projects Limited(NCCPPL) the NCCPPL (2X660MW) and Thermal Powertech Corporation India Ltd(2X660MW) (TPCIL) are geographically located adjacent to each other. The evacuation system for TPCIL (TPCIL- Nellore 400kV (QUAD)D/C) is already commissioned in Aug,2013.. They have informed that TPCIL is expected to commission in December, 2014 and NCCPPL by the end of 2015. NCCPPL- Nellore 400kV D/C (Quad) line, to be built by PGCIL, is expected to commission in Dec, 2015. However, back charging of 400kV switchyard of NCCPPL is expected in May, 2015. As a solution, NCCPPL have proposed LILO of one of the existing TPCIL- Nellore 400kV D/C line at NCCPPL bus bar to meet the start up power requirement.

18.2 COO(CTU), PGCIL informed that TPCIL- Nellore 400kV D/C line and NCCPPL- Nellore 400kV D/C (Quad) line would cross each other at one point. He suggested that PGCIL can construct NCCPPL- Nellore 400kV D/C (Quad) line from NCCPL switchyard upto this meeting point and connect it with one circuit of TPCIL- Nellore 400kV D/C line.

18.3 The above was agreed.

19.0 Cost impact of new and ongoing transmission schemes in Southern Region

19.1 Director (SP&PA), CEA informed that during the 37th Meeting of the Standing Committee on Power System Planning in Western Region held on 5.9.2014, it was decided that the tentative cost of new schemes would be included in the agenda/ minutes. In this meeting, the WR constituents have also expressed that it would be prudent if impact of new schemes on the transmission tariff is indicated in the agenda/minutes of the meeting. Accordingly the estimated costs of various transmission schemes were given in the agenda. This includes (i) list of transmission schemes that were discussed in the recent meetings of the Empowered Committee, (ii) list of schemes under construction by PGCIL and (iii) list of schemes that were awarded through TBCB and which are under construction.

19.2 COO (CTU), PGCIL observed that there is quiet a variance per unit/per km cost of the transmission elements as given in the agenda and the cost of some of the schemes were on higher side. She also observed that the comparison of the levellised YTC with the levellized YTC as per regulated tariff mechanism does not reflect the true picture and therefore may be avoided. She expressed that this difference may be due to unreasonable cost estimates and also because of the fact that the schemes which are being implemented through

Page 59: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

22

TBCB had only transmission line elements and no Substation elements. The levellized tariff for substation and transmission lines is different.

19.3 CE(SP&PA), CEA said that the cost were based on CERC cost benchmarking(2010) as base cost and the costs Matrix as developed by the “cost committee” consisting of CEA, PGCIL, RECTPCL and PFCCL and these are tentative costs. He further informed that CEA is collecting the cost data from states and manufacturers and the cost matrix is being reviewed. Moreover, CERC benchmark cost does not include 765kV D/c and HVDC lines/terminal costs etc.

19.4 Based on the discrepancies indicated by PGCIL the revised cost estimates are given below:

List (i): Transmission schemes that were discussed in the recent meetings of the Empowered Committee

Sl.No.

Name of Transmission Scheme Est.Cost

(RsCrore)

Yearly Trans. Charges(YTC)

(Levelized) Rs Crore

(@17% of cost) 1 Constraints in 400kV bays extensions at 400

kV Vemagiri S/S 439 75

2 Additional inter-Regional AC link for import into Southern Region i.e. Warora – Warangal and Chilakaluripeta - Hyderabad - Kurnool 765kV link

8570 1457

3 HVDC Bipole link between Western region (Raigarh, Chhattisgarh) and Southern region (Pugalur, Tamil Nadu)

HVDC part(as agreed earlier upto TN and Ker) – Rs. 16402 CroreAC Part (in TN only, as agreed earlier) – Rs.3461 Crore

19862 3376

4 Strengthening of transmission system beyond Vemagiri

7032 1195

5 System Strengthening-XXIV in Southern Region

1010 172

6 Connectivity for Kudankulam 3&4 (2x1000MW) with interstate transmission system.

45 8

7 Erection of 220 kV line to Karaikal 50 9

8 Transmission System for evacuation of power from 2x500 MW Neyveli Lignite Corp. Ltd. TS-I (Replacement) (NNTPS) in Neyveli, Tamil Nadu

15 3

Page 60: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

23

Sl.No.

Name of Transmission Scheme Est.Cost

(RsCrore)

Yearly Trans. Charges(YTC)

(Levelized) Rs Crore

(@17% of cost) 9 Connectivity lines for Maheshwaram

(Hyderabad) 765 / 400kV Pooling S/S 396 67

Total (A) 37419 6362

List (ii): Transmission schemes that are under construction by PGCIL

Sl.

No.

Name of Project Cost, in Rs Crore

Yearly Trans. Charges(YTC)

(Levelized) Rs Crore

(@17% of cost)1 Transmission System associated with

KRAISHNAPATNAM UMPP-Part-B. 1927.16

2 Common System associated with East Coast Energy Pvt. Ltd. and NCC Power Proj. Ltd. LTOA Gen. Proj. in Srikakulam – Part-A.

1909.24

3 System Strengthening – XVII in Southern Regional Grid

1508.74

4 Common System associated with East Coast Energy Pvt. Ltd. and NCC Power Proj. Ltd. LTOA Gen. Proj. in Srikakulam – Part-C.

514

5 Common System Associated with ISGS Projects in Krishnapatnam area of Andhra Pradesh

1637.34

6 Common System Asociated with Costal Energen Pvt. Ltd and Ind-Barath Power Ltd. (LTOA) Gen. Proj. in Tuticorin area Part-B.

1940.13

7 System Strengthening – XIII SR Grid 487.49 8 System Strengthening in SR – XIV 297.33 9 Common System associated with East coast

energy and Private Ltd. and Ind-Barath Powe (Madras) Ltd. (LTOA) Gen. Poj. in Tuticorin area Part-A.

90.44

10 Transmission System Associated with Krishnapatnam UMPP – Par – C1

324.33

11 Common transmission Scheme associated with ISGS Project in Vemagiri Area of Andhra Pradesh – Part – A1

206.44

12 System Strengthening in SR – XVIII 1263.26 13 System Strengthening in SR – XIX 1935.35 14 common transmission scheme associated with

ISGS Projects in Nagapattinum/Cuddalore area of Tamil Nadu

182.8

15 Transmission System Associated with Contingency plan for Evacuation of Power from II&FS (2x600MW)

97.95

16 System Strengthening in SR – XXII 243.53 17 Sub station Extn. Works associated with Trans. 167.4

Page 61: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

24

Sl.

No.

Name of Project Cost, in Rs Crore

Yearly Trans. Charges(YTC)

(Levelized) Rs Crore

(@17% of cost)System Required for evacuation of Power from Kudgi TPS (3x800 MW-PhI) of NTPC

18 Trans. System for connectivity for NCC Power Project Ltd.

188.75

19 System Strengthening in SR – XX 288.49 20 Common Transmission Scheme Associated

with ISGS Projects in Nagapattinum/Cuddalore area of Tamil Nadu – Part – A(b)

74.29

21 Sub station works associated with System Strengthening in SR for Import of Power from ER

972.42

Total (B) 16257 2763

List (iii): Transmission schemes that were awarded through TBCB and which are under construction

Sl.No.

Name of Transmission Scheme Est.Cost

(RsCrore)

DiscoveredLevelized YTC

Rs Crore

1 Transmission system associated with IPP’s of Nagapattinam/Cuddalore area – Package ‘A’ (PGCIL)

1025 98.7

2 Raichur – Sholapur line

(Patel Consortium)

440 29.4

3 Vemagiri Package – ‘A’ (PGCIL) 1300 119.7

4 System Strengthening in Southern Region (PGCIL)

1180 231.1

5 Transmission system for evacuation of power from Kudgi TPS (L&T)

1240 179.6

6 Connectivity lines from Maheshwaram

(Bidding is in cess)

396 65

(Indicative only @ 17%)

Total (A) 5581 723

19.5 To have a broad idea of cost impact, following table gives monthly transmission charges(MTC) of Southern Region for the months of March 2014 and January 2015:

Page 62: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

25

(all figures are in Rs. Crore) Sl.�No.�

MTC�/�YTC��

Southern�Region�

All�India��

1� Monthly�charges�for�the�month�of�March�2014�

142� �

2� Monthly�charges�for�the�month�of�January�2015�

172� �

� � �3� Approximate�YTC�for�2013�14�

(12x�Monthly�charges�of�March�2014)�1708� �

4� Approximate�YTC�for�2014�15�(12x�Monthly�charges�of�January�2015)�

2059� �

19.6 The additional Yearly Transmission Charges (YTC) on account of the above three lists might be of the order of Rs 9850 crore per annum. Comparing it with the YTC of SR for 2014-15 i.e. about Rs 2050 crore, the YTC for Southern Region may go up to about 11900 crore in next 4-5 years i.e. is a jump of about more than five(5.5) times.

19.7 COO, POSOCO said that along with the increase in transmission charges, the increase in MW deliverable in SR over the ISTS would give the true impact of cost of transmission. He informed that for 2014-15, the quantum of MW over ISTS is of the order of 13000 MW in SR.

19.8 Accordingly, it was observed that if the MW deliverable also increases five (5) times then the cost impact would remain same. During the discussion it was pointed out that the new transmission schemes that have been planned are based on higher reliability criterion, so part of increase in cost of transmission may be attributed to higher reliability criterion also. Director (SP&PA), CEA said that in the absence of GNA (General Network Access) or a similar mechanism, presently, many of the schemes are planned as system strengthening where, the MW deliverable to the states is not known.

20.0 Transmission system for evacuation of power from Ghani/Panyam Solar project (1000 MW) and in Aspiri Wind project (1000 MW) in Andhra Pradesh

20.1 Director(SP&PA), CEA stated that APTRANSCO has informed following transmission systems for new wind (Aspiri-1000 MW) and solar projects Panayam- 1000 MW) coming in the State of Andhra Pradesh by 2017.

Transmission Scheme for Solar Power Park at Ghani/Panyam (1000 MW )

Phase-I Works:

Page 63: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

26

1) 400/220kV Substation at Gani/Panyam – 3x500 MVA. 2) 400kV QMDC Line from Kurnool to proposed 400kV Gani/Panyam SS–35

km.3) 400kV Bay Extensions at Kurnool SS – 2 Nos.

Phase-II works :

4) 400kV QMDC Line from Jammalamadugu/ Kondapuram to the proposed 400kV Gani/Panyam SS – 90 kM.

Transmission Evacuation Scheme for 1000MW Wind Power at Aspiri:

1) 400/220kV Substation with 3x315 MVA 2) 400kV QMDC line from Aspiri to 400kV Uravakonda SS.

20.2 Director, APTRANSCO informed that the both the phases at Panyam would be of 500 MW each and are scheduled to be commissioned by March 2017. He also proposed that a + 100 MVAr STATCOM at Panayam would be required which would help in the event of Fault /Low Voltage near the Panyam bus.

20.3 COO, POSOCO asked if APTRANSCO is also planning to connect these projects with nearby 220kV sub-stations for meeting load. APTRANSCO informed that they are planning such connectivity. He also said that the wind machines and the Solar inverters should have LVRT capability and must not depend on grid based equipments like STATCOM etc for this requirement.

20.4 Director(SP&PA),CEA said that if the both phases in Panyam are to be commissioned by March 2017 and only a few months of difference between each phase, the transmission system may be implemented as one scheme. He also enquired whether the Aspiri wind machines and Panyam solar inverters meet the LVRT requirements. He also asked about details of sub-pooling of wind and solar power in Aspiri and Panyam at 220kV and that how they are being connected with the proposed main 400kV Pooling Station(s).

20.5 Director, APTRANSCO said the Aspiri machines would be of Type-3 and thus would meet LVRT requirements. Regarding the inverters at Panyam, he said that tendering for the solar panels and invertor stations are yet to be done and the specifications would be similar to those which NTPC is doing for NPKunta project. He also informed that for Aspiri there are no 220kV S/Ss in the vicinity, however, for Panyam, they would plan to connect with a few of the nearby 220kV S/Ss. He also said that the Panyam phases can be combined for the purpose of transmission infrastructure. Regarding sub-pooling of wind and solar power in Aspiri and Panyam at 220kV, he said that the details are being

Page 64: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

27

worked out.

20.6 MS, SRPC suggested to include 2x125 MVAr Bus reactors at Aspiri and Panyam. He also emphasized that these 220kV Pooling Stations at Aspiri and Panyam should have LVRT capability for secure and stable operation of the grid.

20.7 After discussions, following was decided:

(i) Following would be transmission system for evacuation of power from Solar Power Park at Ghani/Panyam (1000 MW ) – to be implemented by APTRANSCO

1) 400/220kV Substation at Gani/Panyam – 3x500 MVA. 2) 400kV QMDC Line from Kurnool to proposed 400kV Gani/Panyam

SS–35 km. 3) 400kV Bay Extensions at Kurnool SS – 2 Nos. 4) 400kV QMDC Line from Jammalamadugu/ Kondapuram to the

proposed 400kV Gani/Panyam SS – 90 km 5) 2x125 MVAr Bus reactors at Panyam

(ii) Following would be transmission system for evacuation of power from Wind projects at Aspiri (1000 MW) – to be implemented by APTRANSCO

1) 400/220kV Substation with 3x315 MVA at Aspiri 2) 400kV QMDC line from Aspiri to 400kV Uravakonda SS 5) 2x125 MVAr Bus reactors at Aspiri

(iii) APTRANSCO would inform CEA the details of 220kV sub-pooling stations within a month, both for the Aspiri and the Panyam projects. They would also inform the connections with nearby 220kV Substations.

(iv) APTRANSCO would submit the studies for the proposed + 100 MVAr STATCOM at Panyam. The studies would consider the alternative locations like Urvakonda and Hindupur S/S which are better connected with the regional grid. They may also consider having a higher rating (the same as planned for STATCOMs in Southern Region for PGCIL under ISTS) for studies.

(v) While planning and implementing the above transmission system APTRANSCO should comply with the regulations of APERC, specially the “Terms and conditions of Open Access Regulations, 2005” of APERC and its amendments from time to time. APTRANSCO would also ensure that they would follow the “Technical standards for connectivity to the grid

Page 65: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

28

Regulation 2007” of Central Electricity Authority and its amendments from time to time while planning and implementing the above transmission systems.

21.0 Transmission system for evacuation of power from NP Kunta Solar project (1500 MW) in Andhra Pradesh

21.1 PGCIL informed that M/s AP Solar Power Corporation Pvt Ltd (APSPCL) has applied for Connectivity and LTA under the CERC regulation for the 1500 MW N.P.Kunta Solar park. Out of this, 90% is for transmitting to AP DISCOMS and rest 10% to Southern Region as target region.

21.2 They further said that M/s APSPCL has informed that NP Kunta Solar park in distt. Anantpur, AP (1500 MW) is being developed in three phases. First and second phases are being developed with 250 MW and 750 MW capacities and target commissioning schedules are December 2015 and September 2016, respectively. The third phase of balance 500 MW capacity is targeted for December 2016. M/s APSPCL has also indicated that NP Kunta Solar park shall be aggregating power from NP Kunta Site (1000 MW) and Galiveedu Site (500 MW), which are contiguous to each other and both shall be connected to the 220/400kV NP Kunta Pooling Station for further dispersal of power. It was also clarified that total six (6) nos. 250 MW blocks (sub-pools) are proposed to be interconnected to 220/400 kV NP Kunta Pooling station through a 220kV D/C zebra transmission line from each sub-pooling station.

21.3 PGCIL also informed that APSPCL who is developing this solar park has entrusted the development of generation projects in Phase I and Phase II of 1000 MW in NPKunta Solar Park to M/s NTPC.

21.4 M/s NTPC informed that they have issued tenders for 250 MW for which price bid have also been opened. For additional 500 MW block also they had issued tenders recently. NTPC also confirmed that they shall abide by the present regulation regarding Technical standards for connectivity to Grid regulation.

21.5 Regarding STATCOM, POWERGRID said that the identified 400kV STATCOM at NP Kunta pooling station shall not only provide Grid Support but also help in voltage ride through support to solar generation. In addition, as NP Kunta is proposed to be connected to 400kV Hindupur, a major wind complex interconnected with other Wind generation pockets in Andhra Pradesh, this STATCOM shall also extend voltage support to generation projects in the event of contingency scenarios. The issue of placement of STATCOM at 220kV or 400kV NP Kunta Pooling Station was also deliberated. POWERGRID

Page 66: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

29

clarified that as STATCOM is primarily identified to provide Grid Support, its effectiveness at 400kV shall be more w.r.t its placement at 220kV. On CEA query, POWERGRID confirmed that other proposed STATCOMS in Southern region viz. at 400 kV Udumalpet, Trichy and Hyderabad have been taken into consideration in studies.

21.6 PGCIL proposed following transmission system for NP Kunta ultra mega solar power park (1500 MW) in three phases.

Phase-I (250 MW)a. Establishment of 3x500 MVA, 400/220KV Substation at NP Kunta

Pooling Station b. LILO of 400KV Kadapa(Cuddapah) - Kolar S/c line at NP Kunta Pooling

Stationc. 2 nos. 220kV line bays at NP Kunta Pooling Station d. 1x125 MVAR Bus Reactor at NP Kunta Pooling Station e. ±100 MVAR STATCOM at 400kV NP Kunta Pooling Station

Estimated Cost – Rs 320 Cr

Phase-II (750 MW)a. LILO of Kadapa(Cuddapah) – Hindupur 400kV D/c (Quad) line at NP

Kunta Pooling Station b. 6 nos. 220kV line bays at NP Kunta Pooling Station

Estimated Cost – Rs 185 Cr

Phase-III(500 MW)a. Augmentation of transformation capacity at NP Kunta station with 4th,

1x500 MVA, 400/220kV transformer b. 4 nos. 220kV line bays at NP Kunta Pooling Station

Estimated Cost – Rs 40 Cr

21.7 Director(SP&PA),CEA said that if these phases in NPKunta are to be commissioned by December 2016 and only a few months of difference between each of the phases, the transmission system may be implemented as one scheme. He also said that, the proposed STATCOM, if required, may be shifted to phase-II. PGCIL said that they would prefer to order the complete transmission system for all the three stages together but with different delivery schedules matching with each phase. The delivery of STATCOM also can be matched with phase-II.

21.8 During discussions it was observed that the present CEA connectivity standards have do not have provision for LVRT compliance for solar power generations. The amendments in CEA technical standards may take one to two years. As being projected, a number of solar power plants/parks may be

Page 67: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

30

implemented within 2 years, therefore, it was suggested that the solar projects coming in this intervening period may have STATCOM at each of their pooling or sub-pooling stations. It was also observed that merit of a ±20 MVAr or similar rating of STATCOM at each of six 220kV sub-pooling stations in the NP Kunta solar park may be evaluated in place of a single ±100 MVAr STATCOM at 400kV level because it being close to the generation inverters.

21.9 CEO, POSOCO stated that each inverter should be treated as a separate generating unit and it is the LVRT characteristic of the inverter which will hold the machine/generator and not STATCOM at 400kV level, as suggested in the evacuation system of N P Kunta. CEA added that if the STATCOMs are being proposed for grid support, as stated by PGCIL, we need to plan next set of STATCOMs (or combination of MSC and STATCOM) in the all-India grid, considering the new enhanced plans of wind and solar additions. CEA also requested PGCIL to submit status of implementation of the STATCOMs that have already been planned and urged them to speed up implementation of STATCOMs planned in September 2013 at Hyderabad, Udumalpet and Trichy for Southern Region grid.

21.10 NTPC replied that they are following German Technical guidelines, for the development the NP Kunta generation project. They also furnished copies of the German technical guidelines and relevant extract of the specifications (Annex-II) that they have requested in the tendering for N P Kunta project. As such NTPC stated that the NPKunta inverters would have LVRT capabilities. After discussions, it was noted that there should be a mechanism to test LVRT capabilities, as stated by Solar generation developers or wind developers.

21.11 KSEBL sought clarification on the cost sharing of the new system being proposed as ISTS. The solar energy was exempted from payment of transmission charges and losses vide CERC regulation from 2011. Hon. CERC vide order dated 2.3.2015 in Petition No 3/SM/2015 stated that the Commission is in the process of finalizing the issue of exemption vide third amendment to the regulation and till then the present exemption could continue. The exemption from sharing of transmission charges and losses by solar generators is based on the CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 which was notified on 15th June 2010 and came into effect from 01-07-2011. The status of solar energy industry has seen sea changes during this intervening period. KSEBL apprehended that the impact of the proposed schemes like that of NP Kunta UMSP with huge capacity of 1500 MW on the transmission charges of users of ISTS could be appreciable if the developer is continued to be exempted from paying the transmission charges. KSEB wanted to place on record the concerns in the

Page 68: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

31

matter of exempting the transmission charges of solar evacuation especially when the installed capacity is at par with conventional generating stations. Further KSEBL supported the suggestion of CEO POSOCO to have the evacuation possibilities at 220kV level during the initial phase

21.12 Director (SP&PA), CEA asked whether the 220kV substations and transmission lines within N P Kunta Solar Park are being implemented by APTRANSCO or APSPCL. The LTA and connectivity application indicates that these works are being implemented by APTRANSCO.

21.13 APTRANSCO clarified that the internal transmission system at 220kV level is being carried out by them on deposit work basis from M/s APSPCL.

21.14 Director (SP&PA), CEA further enquired whether APSPCL is a transmission licensee in AP who is implementing these transmission works or whether they would be implementing these 220kV transmission systems as ‘dedicted transmission line’ in the capacity of a generator. He also enquired about eligibility of APSPCL to apply for connectivity and LTA with respect to the CERC regulations. He also enquired whether a PPA has been made with the AP DISCOMs for the 90% of the Capacity as given in the LTA application.

21.15 PGCIL clarified that till date they have not received PPA information from the applicant i.e. APSPCL. So, practically, the 90% part of the applied LTA is also a target State (to AP). APTRANSCO said that the PPA may be signed either by the APSPCL or by the generation developer e.g. NTPC in case of phase-I and II. Accordingly, it was observed that whether the LTA, in this case, should be applied by NTPC, or by APSPCL.

21.16 Regarding eligibility of APSPCL to seek ‘Connectivity’ or ‘LTA’, it was decided that CTU would approach CERC in this matter.

21.17 An issue of multiple injections at the 400kV S/S of PGCIL by the APSPCL was also raised, as in the ‘LTA’ application of CERC, more than one injection is allowed only for Drawl and not for Injection. In case of NPKunta, multiple injections are being proposed (six number of injections at the proposed 220/400kV S/S). On this issue also, it was decided that CTU would approach CERC.

21.18 COO, POSOCO asked if APTRANSCO is also planning to connect the 220kV sub-pooling stations with their nearby 220kV sub-stations for meeting load. He opined that as the solar power would not be available after evening, the 400kV S/s and the 220kV infrastructure in the park can meet loads in the local area. Also, if there is some disruption in the 400kV network, these 220kV interconnections can meet local loads. APTRANSCO informed that they are

Page 69: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

32

planning such connectivity.

21.19 In regard to above, following extracts of the MNRE letter are worth considering:

As per Implementation scheme for Development of Solar Parks and Ultra Mega Solar Power Projects in the country commencing from 2014-15 and onwards (i.e. from the year 2014 – 15 to 2018 – 19) issued by the Government (MNRE) vide their letter No. 30/26/2014-15/NSM dated 12-Dec-2014, the following are mentioned:

“The Implementing Agency will also be entrusted with providing the following facilities to the solar project developers:

vii. Transmission facility consisting pooling station (with 400/220, 220/66 KV switchyard and respective transformers) to allow connection of individual projects with pooling station through a network of underground cables or overhead lines.”

“8. Transmission and evacuation of power from solar park

Interconnection of each plot with pooling stations through 66 KV /other suitable voltage underground or overhead cable will be the responsibility of the solar project developer.

The designated nodal agency will set up the pooling stations (with 400/220, 220/66 kV or as may be suitable switchyard and respective transformers) inside the solar park and will also draw transmission to transmit power to 220 kV/400 kV sub-station.

The responsibility of setting up a sub-station nearby the solar park to take power from one or more pooling stations will lie with the Central Transmission Utility (CTU) or the State Transmission Utility (STU), after following necessary technical and commercial procedures as stipulated in the various regulations notified by the Central/State Commission.

If the State Government is willing to buy over 50% of the power generated in the solar park, preference will be given to STU, which will ensure setting up of sub-station and development of necessary infrastructure for transmission of power from substation to load centres.

The designated implementing agency will intimate POWERGRID and CEA at least 6 months before so that the planning and execution can be carried out in time.

If the state is not willing to buy at least 50% of the power generated in the solar park, then CTU may be entrusted with the responsibility of setting up 400 KV or bigger sub-station right next to the solar park and its connectivity with the CTU.”

21.20 In this regard, as per letter no. 11/64/2014-PG dated 08-01-2015 of Ministry of Power regarding implementation of work related to transmission system for evacuation of power from 9 Solar Parks with a total capacity of 7020 MW being set up in seven states viz. Gujarat, Madhya Pradesh, Andhra Pradesh, Karnataka, UP, Meghalaya and Rajasthan, following has been stated:

Page 70: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

33

“(i) The transmission line connecting solar parks to ISTS be declared as part of ISTS. (ii) PGCIL is assigned to take up construction of transmission lines including pooling stations from the solar generating parks on compressed time schedule basis.”

21.21 In view of above discussions it was agreed that though the proposed scheme is technically in order, however, it can be firmed up subject to resolving the regulatory issues. Regarding the proposed STATCOM at N P Kunta the same was agreed due to urgency in the matter as a special case, however, its delivery would be along with Phase-II of the project. Regarding the regulatory aspects, CTU would get clarification on - (i) eligibility for LTA, Connectivity, (ii)the issue of Multiple Injections, (iii) whether the proposed 400/220kV S/s which is in the premises of the solar park should be under scope of park developer or in STU/CTU, and (iv) whether LTA should be applied by actual generation developers who may sign PPA with AP DISCOMs or the APSPCL.

It was also decided that APTRANSCO would study planning of connecting its nearby 220kV S/S with the 220kV sub-pooling stations in NP Kunta Park.

CTU would carry out studies with CEA and respective STUs for finding optimum size and location of other STATCOMs in Southern Region that would provide grid support in view of upcoming wind and solar projects.

22.0 Modification for the System Strengthening-XXIV in Southern Region – GIS for Cuddapah 765kV S/s

22.1 Director(SP&PA), CEA stated that during 37th Standing Committee Meeting in SR held on 31/07/2014 System Strengthening-XXIV in Southern Region was agreed which covered: (i) Establishment of 765/400kV substation at Cuddapah with 2x1500 MVA transformers and 2x240 MVAr bus reactors.(ii) LILO of Kurnool-Thiruvalam 765 kV D/c at Cuddapah along with associated bays and (iii) Cuddapah-Hindupur 400 kV (Quad) D/C line along with associated bays and 80 MVAr switchable line reactor at Hindupur.

22.2 COO(CTU), PGCIL stated that the new 765/400KV substation at Cuddapah is proposed to be established in the land available adjacent to the existing substation. Keeping in view the requirement of 765kV and 400kV under present scope of work, it is not possible to accommodate these works as AIS in the available land. Acquisition of new land for Cuddapah Substation with the above scope of work would take considerable time. Keeping in view the

Page 71: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

34

system requirement above works are to be implemented under compressed time schedule, therefore POWERGRID proposed that the new Cuddapah765/400kV S/s may be implemented as GIS type in the land available adjacent to the existing 400/220kV Cuddapah substation.

22.3 PGCIL informed that at Cuddapah the total land area is 106 Acres(existing 50 Acres and vacant 56acres). The additional land required for building AIS type would be 70acres and if it is built as GIS 50 acres more would be required. The difference in cost of establishing AIS and GIS would be Rs 50 crore only.

22.4 The matter was discussed and it was agreed that POWERGRID would implement the 765kV part as GIS and the augmentation of 400kV part as AIS for the Cuddapah765/400kV S/s.

23.0 ATS Tuticorin JV (2x500 MW) TPS of M/s NTPL

23.1 Director, CEA stated for power evacuation from the Tuticorin JV TPS, a 400 kV Tuticorin JV TPS – Chekkanurani (Madurai) D/C Quad line with 2 x 315 MVA, 400 kV/220 kV ICT at Tuticorin JV TPS had been agreed. Accordingly, M/s. PGCIL has erected 2 nos. of 400kV NTPL - Madurai DC Quad feeder lines. For evacuation of power from Coastal Energen, LILO of one circuit of the NTPL – Madurai D/C line was agreed as an interim arrangement.

23.2 Further, as per NTPL’s letter M/s. PGCIL is scheduled to commission 400kV system of its 400kV/765kV pooling station at Ettayapuram, near Tuticorin shortly with 4 nos. of 400 KV bays. The existing 400kV NTPL – Madurai and 400kV Coastal Energen – Madurai feeders will be shifted to pooling station. However, the 400kV tie between NTPL and M/s Coastal Energen would continue. So, with only 2 nos. of 400kV Ettayapuram PS – Madurai feeders being available, stability of power evacuation system of NTPL would be of concern.

23.3 PGCIL informed that as per the agreed scope of power evacuation system of Costal Energen is to construct a 400kV Quad D/C line from its switchyard to Tuticorin Pooling Station. As an interim arrangement, this line has been part completed by making LILO of one circuit of the NTPL – Madurai D/C line. After commissioning of the Costal Energen - Tuticorin P.S. 400kV Quad D/C line, the NTPL – Madurai/ Tuticorin Pooling Station D/C line would be restored.

23.4 Accordingly, the NTPL apprehension regarding the tie line between NTPL – Coastal Energen line, it was clarified that this tie line would be disconnected after commissioning of Costal Energen - Tuticorin P.S. 400kV Quad D/C line.

Page 72: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

35

24.0 Change in SCCL Evacuation scheme:

24.1 Director(SP&PA),CEA said that M/s TSTRANSCO (Transmission Corporation of Telangana Limited) had proposed that SCCL – Nirmal 400 kV D/c line which was planned as evacuation system for 2x600 MW of SCCL, may be planned as Quad Moose line instead of Twin Moose line for evacuation of power from 3rd unit of 1x600 MW at the Singareni TPS at Jaipur location near Nirmal in Telangana.

24.2 The proposal was discussed and it was felt that to evacuate power from SCCL having total capacity of 1800 MW and meeting the reliability requirements as per the Transmission Planning Criteria, detailed system studies are needed.

24.3 To go ahead, the SCCL –Nirmal 400 kV Twin Moose D/C line may be planned as Quad D/C instead of Twin as envisaged earlier.

24.4 Additional transmissions system strengthening beyond Gajwel and Nirmal may be needed. Thus the transmission system for evacuation of power from the 3rd

unit may be firmed up only after the detailed studies.

24.5 TSTRANSCO agreed to carry out the required studies and bring the matter in the next meeting of Standing Committee.

24.6 CEA urged that TSTRANSCO should comply with the regulations of Telangana State Electricity Regulator Commission and the regulations of APERC as applicable to them in accordance with TSERC (adoption Regulation 2014) i.e of Regulation no. 1 of 2014 while planning and implementing the above transmission system. Especially, they should comply with the “Terms and conditions of Open Access Regulations, 2005” of APERC and its amendments from time to time. TSTRANSCO would also ensure that they would follow the “Technical standards for connectivity to the grid Regulation 2007 of Central Electricity Authority and its amendments from time to time while planning and implementing the above transmission system.

25.0 Additional Agenda from PGCIL - following was decided:

25.1 Procurement of ERS substation: It was decided that PGCIL would discuss this issue with CEA and thereafter, the matter would be taken up in next meeting.

25.2 Converting Fixed Line Reactors into Switchable Line Reactors in Over Compensated lines: This item has already been covered earlier in the Minutes.

25.3 Replacement of 50 MVAr bus reactor with 125 MVAr at Mysore: This

Page 73: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

36

matter would be re-discussed in the next meeting of this committee.

25.4 Procurement of 500 MVA ICT as spare instead of 315 MVA ICT approved under Ramagundum Transmission System, and Procurement of 3 NOS. 125 MVAr reactors instead of 3 NOS. 50 MVAr Reactors approved under Ramagundum Transmission System: This matter would be re-discussed in the next meeting of this committee.

26.0 Modifications in the scope of Raigarh – Pugalur – Kerala 6000 MW HVDC transmission system

In the meeting, it was noted that PGCIL has proposed modifications in the scope of the Raigarh – Pugalur - North Trichur 6000 MW HVDC system. The change in scope mainly is having a set of 2000 MW HVDC terminals at Pugalur and North Trichur in addition to the set of 6000 MW terminals at Raigarh and Pugalur. Also, the Pugalur – N.Trichur terminals have been proposed to be built using VSC based technology instead of the earlier conventional HVDC technology. The part of the Pugalur – N. Trichur is proposed to be built using DC cables. It was decided that PGCIL would provide detailed note on this modification along with documents on the new VSC technology.

Page 74: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

37

Annex-I

List of participants for the 38th Standing Committee on Power System Planning in Southern Region held on 07-03-2015 at NRPC Office, Katwaria Sarai, New Delhi

Sl. No. Name and Organization Designation

Central Electricity Authority (CEA)

1. Major Singh Chairperson (I/c) and Member (PS) 2. K K Arya Chief Engineer(SP&PA) 3. Pardeep Jindal Director (SP&PA) 5. Manjari Chaturvedi Deputy Director (SP&PA) 6. Shivani Sharma Deputy Director (SP&PA)

Southern Region Power Committee (SRPC)

1. S.R.Bhat Member Secretary 2. Anil Thomas EE

Power Grid Corporation of India Ltd (PGCIL)

1. Seema Gupta COO-CTU 2. Y K Sehgal ED 3. Rakesh Prasad GM(Commercial) 4. Subir Sen GM(STF-SG) 5. Mukesh Khanna AGM(CTU-Plg.) 6. B. B. Mukherjee DGM 7. Anil Kumar Meena DCDE(SG) 8. Kashish Bhambhani Manager(SS) 9. Ankita Singh Sr. Engineer(CTU-Plg.)

10. G. Venkatesh Engineer(CTU-Plg.)

Power System Operation Corp. Ltd (POSOCO)

1. S K. Sonee CEO 2. S. R. Narasimhan AGM(SytemOp) (NLDC) 3. N Nallarasan DGM (SO)NLDC

Page 75: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

38

Sl. No. Name and Organization Designation

4. S.P. Kumar DGM(SRLDC) 5. G Madhukar Dy. Manager(SRLDC)

National Thermal Power Corp. (NTPC)

1. Sagarika Mohanty AGM AGM2. Vinod Kumar Jain DGM(Commercial) 3. Vinay Garg Sr. Manager(Commercial) 4. Abhishek Khanna Dy. Manager

Transmission Corp. of Andhra Pradesh Ltd. (APTRANSCO)

1. S. Subramanyan Director (Projects) 2. K. Surendra Babu CE/IPC&PS 3. C H V S Subbarao SE/PS 4. B. Srinivasa Rao DE/System Studies 5. Y V Ramakrishna ADE/System Studies

Karnataka Power Transmission Corp. Ltd. (KPTCL)

1. S Sumanth Director(Transmission) 2. A J Hosamani CEE (P&C)

Kerala State Electricity Board (KSEB limited)

1. K Venugopal Director(T&SO) 2. S R Anand EE 3. S S Biju AEE/PSE

Tamil Nadu Electricity Board (TNEB)/Tamil Nadu Transco1. S Ravichandran SE/System Studies(TANGEDCO) 2. R Santhana Kumar EE/System Studies(TANGEDCO) 3. R Kumuda AEE/System Studies(TANGEDCO)

TSTRANSCO

Page 76: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

39

Sl. No. Name and Organization Designation

1. T Jagat Reddy Director(GTM) 2. K Ashok DE/SS 3. M Sheshagiri ADE/SS

Electricity Department, Puducherry

1. K Mathivanan SE 2. R Murali EE

Page 77: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 78: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

��������� � ��� ������������������

�������������������������������������������������������� ���� �����������������

������������� !!���"�# ������� �$%&�#�'(�"�)

��������������*�����

�'+�,� �'-./0/'-/-�� �-/0� ������ 1233� 4'-1/10� '(� /-5�,0�,� 3'-�� +/02�11'4/0�.� 4'-0,'3� 6� 7,'0�40/'-8� (/30�,/-�8�9�1:,/-�� /-10,:9�-01�-.� .0�3'��/-��.�5/4�1��2������1233�;��.�1/�-�.�0'�1:773<�02��02,���721�����7'+�,�0'�02���,/.�4'-(',9/-��0'�02��,�=:/,�9�-0�'(� ��������8��������>�',� �=:/53�-0� 10-.,.� ��2�� 7'+�,� 4'-./0/'-/-�� :-/0� 1233� ;�� 47;3�� 0'�.?:10� 02�� ':07:0� 5'30���6� (,�=:�-4<� 0'�1:/0� 02���,/.� 4'-./0/'-��0/-�� '(��42�����1233�-'0�;��3�11�02-�����@���-.�02��4'9;/-�.�@���,0/-��'(�33� ���1� 1233� -'0� ;�� 3�11� 02-� ������ @��� 0� 9A/9:9� '7�,0/-��0�97�,0:,���-3<�/-.'',�0<7������1233�;��44�70�.�

!��� � �����������������

�������� �2'0'5'30/4� ����� 1<10�91� �� �2,40�,/10/41� '(� 02��:0/3/0<�/-0�,(4��

������>B� �2'0'5'30/4�1<10�9�,'4�.:,��(',�9�1:,/-���((/4/�-4<�

��������� �9/11/'-C� 99:-/0<�,�=:/,�9�-0��,9'-/41 �������� ��4'99�-.�.� �,40/4�1� -.� ��=:/,�9�-01� (',�

�,9'-/4��'-0,'3�/-��3�40,/43��'+�,��<10�91� �������>� �-5/,'-9�-03���10/-�� ��������� �0/3/0<�/-0�,4'--�40�.� 72'0'5'30/4� /-5�,0�,1� �� ��10�

7,'4�.:,��'(�/13-./-��7,�5�-0/'-�9�1:,�1� ��������� �(�0<� '(� 7'+�,� 4'-5�,0�,1� (',� :1�� /-� 72'0'5'30/4�

7'+�,�1<10�91�����B�B�� �5�,33� �((/4/�-4<� '(� �,/.� 4'--�40�.� 72'0'5'30/4�

/-5�,0�,1��������>� ��42-/43� :/.�3/-�1� (',� �-�,0/-�� 73-0� 4'--�40�.�

0'�!�./:9�5'30���-�0+',D�

���� � *��������E���������

�� ����9:10� 25�� 7,'5/1/'-� 0'� ;�� /1'30�.� (,'9��,/.� 02,':�2��/,��/,4:/0��,�D�,1�+2/42�1233�;��/-;:/30�+/02�02��/-5�,0�,�',�1�7,0��10-.3'-��7-�3�

�� ����1233�4'-(/,9�0'� ���������',��=:/53�-0�/-0�,-0/'-3�10-.,.�(',�4'973/-4�� 0'� ,�=:/,�9�-01� (',� �3�40,'9�-�0/4� 4'970/;/3/0<� -.� 0'� ������>��� ',� �=:/53�-0� /-0�,-0/'-3� 10-.,.� (',� ,�=:/,�9�-0� '(��-5/,'-9�-03�0�10/-��

��������>� ��42-/43� :/.�3/-�1� (',� �-�,0/-�� 73-0� 4'--�40�.0'�!�./:9�5'30���-�0+',D�

�������>�

Page 79: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

��������� � ��� ������������������

�������������������������������������������������������� ���� �����������������

������������� !!���"�# ������� �$%&"��'(�"�)

B� �2�� 9/-/9:9��:,'� �((/4/�-4<� '(� 02������1� 7�,� ������>B� 1233� ;����F� �2�� ;/..�,� 1233� 17�4/(<� 02�� 4'-5�,1/'-� �((/4/�-4<� 0� ('33'+/-��3'.� 4'-./0/'-1� /�� ��F8� ��F8� ��F� -.� ���F� .:,/-�� .�0/3��-�/-��,/-�8�+2/42�1233�;��4'-(/,9�.�;<�0<7��0�10�,�7',01�

#� �2������ 1233� ,�9/-� 4'--�40�.� 0'� 02�� �,/.� 1� 7�,� -./-� 0�42-/43�10-.,.1�(',�4'--�40/5/0<�0'��,/.������+/02�33�30�10�9�-.9�-01�-.�/01�4'97'-�-01�1233�;��.�1/�-�.�44',./-�3<��

�� �2������1233�25��7,'0�40/'-��/-10�-<�1:10/-�.�(:30�/-�02��(��.�,�3/-��-.��/-10�3/�20-/-��./142,���/-�02��(��.�,�3/-��

�� �2�� ���� 1233� 31'� 25�� 02�� .�=:0�� 7,'0�40/'-� �/-10� �,02�3�D���(:301�

�� �2�� /-4'9/-����� (��.�,�'(�����1233�25��1:/0;3<�,0�.� /1'30',1� 0'�33'+� 1(�� 10,0� :7� -.� 12:0� .'+-� '(� 02�� 1<10�9� -.� /01� 0�,9/-31�12':3.� ;�� 12,':.�.� �2����� (��.�,� 1233� 0�,9/-0�� /-� 02�� (:1�� ;'A�02,':�2��1:/0;3��(:1��,0/-���2������(:1��;'A�1233�25��'-��17,��0�,9/-3� +/02� (:1�� -.� 2'3.�,� (',� 02�� (:0:,�� :1�� �2�� 4'--�40/'-�;�0+��-� 02�� (:1�� ;'A�-.� /-5�,0�,� 1233� ;�� 02,':�2� 4'77�,� ;:1� ;,1�'-3<

>� -0�,-3��:,����,'0�40/'-���5/4�� ������1233� ;�� 7,'5/.�.� /-� 02������'-����-.����1/.�� 0�1233�4'-1/10�'(�!�03��A/.���,/10�,��!����0<7��,,�10',1��2��./142,���47;/3/0<�'(�02������1233�;��0�3�10���D��0�>C���9/4,'�1�4'-.�+5��1�7�,� ������#B�����:,/-���,02�(:30�-.�(/3:,�� '(�!��8� 02������ 1233� 1(�3<� ./14'--�40� 02�� 2�302<� 1<10�9����� 1233� 25�� 02�,93� ./14'--�40',� 0'� /-0�,,:70� 02�� 1:,��� 4:,,�-0�,/1/-�� (,'9� /-0�,-3� -.� �A0�,-3� (:301� -� ',.�,� 0'� 5'/.� 02�� (/,��2G,.� .:�� 0'� 7'11/;3�� ��� ,4/-�� /-� 02�� ���� .:�� 0'� '7�,0/'-� '(�02�,93�./14'--�40',8�02������1233��A0/-�:/12�02��,4��

�� �2������ 12':3.� ;�� .�1/�-�.� (',� 7,33�3� '7�,0/'-� 02,':�2� �35-/4�/1'30/'-� �'3/.� 100�� �3�40,'-/4� .�5/4�1� 1233� ;�� 7,'0�40�.� 0'� �-1:,��19''02�(:-40/'-/-��1�+�33�1��-1:,��3'-��3/(��'(�02��/-5�,0�,�

����2�� ���� 1233� 25�� -0/�/13-./-�� 7,'0�40/'-� 1� 7�,� ��� ������ ',��=:/53�-0�/-0�,-0/'-3�10-.,.

��� -41��'(��,/.�(/3:,�8�02������1233�;��,��1<-42,'-/G�.�+/02��,/.�(0�,�,�5/53�'(�7'+�,�1:773<���-.',�0'�(:,-/12�02��0/9��0D�-�;<�����0'�;���,��1<-42,'-/G�.� (0�,� ,�10',0/'-� '(� �,/.� 1:773<� .:,/-�� .�0/3�.��-�/-��,/-�

The PCU shall remain connected to the grid as per Central Electricity AuthorityTechnical (standards for connectivity to the grid) regulation 2007 with all latestamendments and its components shall be designed accordingly.

as per Central Electricity Authoritygrid per ElectrTechnical (standards for connectivity to the grid) regulation 2007 all latest

Authority

amendmentswith

ctricitylectr007 ith

ity

Page 80: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Technical Guideline „Generating plants connected to the medium-voltage network“

© BDEW, June 2008 page 21/130

2.5.1.1 Steady-state voltage control

Steady-state voltage control means voltage control within the medium-voltage network un-

der normal operating conditions, where slow voltage changes in the distribution network are

kept within acceptable limits.

If required by the network operator and to meet network requirements, generating plants

must participate in steady-state voltage control within the medium-voltage network.

2.5.1.2 Dynamic network support

Dynamic network support means voltage control in the event of voltage drops within the

high and extra-high voltage network with a view to avoiding unintentional disconnections of

large feed-in power, and thus network collapse.

In the light of the strong increase in the number of generating plants to be connected to the

medium-voltage network, the integration of these plants into the dynamic network support

scheme is becoming ever more important. Consequently, these generating plants must gen-

erally participate in dynamic network support even if this is not required by the network op-

erator at the time of the plant’s connection to the network. That means that generating

plants must be able in technical terms

not to disconnect from the network in the event of network faults,

to support the network voltage during a network fault by feeding a reactive current

into the network,

not to extract from the medium-voltage network after fault clearance more inductive

reactive power than prior to the occurrence of the fault.

These requirements apply to all types of short circuits (i.e. to single-phase, two-phase and

three-phase short circuits).

Just like in the Transmission Code 20077, a distinction is made in these guidelines between

type-1 and type-2 generating plants with regard to their behaviour in the event of network

disturbances. A type-1 generating unit exists if a synchronous generator is directly (only

through the generator transformer) connected to the network. All other plants are type-2

generating units.

6 „Tonfrequenz-Rundsteuerung, Empfehlung zur Vermeidung unzulässiger Rückwirkun-gen“, 3rd edition 1997, published by VDEW 7 TransmissionCode 2007 „Network and System Rules of the German Transmission System Operators“, August 2007, published by VDN

Page 81: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Technical Guideline „Generating plants connected to the medium-voltage network“

© BDEW, June 2008 page 22/130

Concerning type-1 plants, the Transmission Code 2007 is put more precisely in the following

respect:

If the voltage drops at values above the red border line in figure 2.5.1.2-1, generating

plans must not be disconnected from the network.

0 150 1.500

100%

70%

Zeit in ms

Zeitpunkt eines Störungseintritts

700

unterer Wert desSpannungsbandes

3.000

15%

45%

Grenzkurve Spannungsverlauf

U/Uc

Figure 2.5.1.2-1: Borderline of the voltage profile at the network connection

point of a type-1 generating plant

The following conditions shall apply to type-2 generating plants, taking the Transmission

Code 2007, Section 3.3.13.5, into account:

Generating units must not disconnect from the network in the event of voltage drops

to 0 % Uc of a duration of 150 ms.

Below the blue line shown in Figure 2.5.1.2-2, there are no requirements saying that

generating plants have to remain connected to the network.

Page 82: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Technical Guideline „Generating plants connected to the medium-voltage network“

© BDEW, June 2008 page 23/130

0 150 1.500

100%

70%

Zeit in ms

Zeitpunkt eines Störungseintritts

700

unterer Wert desSpannungsbandes= 90% von Uc

3.000

15%

45%

Grenzlinie 1Grenzlinie 2

Unterhalb der blauen Kennlinie bestehen keine Anforderungen hinsichtlich des Verbleibens am Netz.

30%

Grenzkurven Spannungsverlauf

U/Uc

Figure 2.5.1.2-2 Borderlines of the voltage profile of a type-2 generating plant at

the network connection point

Note: U means the lowest value of the three line-to-line voltages

Voltage drops with values above the borderline 1 must not lead to instability or to the dis-

connection of the generating plant from the network (TC2007; 3.3.13.5, section 13; ex-

tended to asymmetrical voltage drops).

If the voltage drops at values above the borderline 2 and below the borderline 1, generating

units shall pass through the fault without disconnecting from the network. Feed-in of a

short-circuit current during that time is to be agreed with the network operator. In consul-

tation with the network operator, it is permissible to shift the borderline 2 if the generating

plant’s connection concept requires to do so. Also in consultation with the network operator,

a short-time disconnection from the network is permissible if the generating plant can be

resynchronized 2 seconds, at the latest, after the beginning of the short-time disconnection.

After resynchronization, the active power must be increased with a gradient of at least

10% of the nominal capacity per second (TC2007; 3.3.13.5, section 14).

Below the borderline 2, a short-time disconnection of the generating plant may be carried

out in any case. Prolonged resynchronization times and lower gradients of the active power

Page 83: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Technical Guideline „Generating plants connected to the medium-voltage network“

© BDEW, June 2008 page 24/130

increase after resynchronization as compared to those admissible above the borderline 2 are

permitted if they are agreed with the network operator (TC2007, 3.3.13.5, section 15).

The behaviour of type-2 generating plants in the case of automatic re-closure is described

more precisely in Annex B.3.

Depending on the concrete technical network conditions, the actual duration of the generat-

ing facility’s connection to the medium-voltage network can be reduced by requirements of

the network operator in terms of protection equipment.

For all generating plants, the rule shall apply that a current according to the Transmission

Code 2007 is to be supplied to the network for the duration of a symmetrical fault. Concern-

ing unsymmetrical faults, it is not permissible that during the duration of the fault reactive

currents be fed into the network which give rise to voltages higher than 1,1 Uc in non-faulty

phases at the network connection point.

As a matter of principle, the requirements in terms of dynamic network support apply to all

facilities irrespective of their type and connection variant. They shall be implemented

through setting of the generating plants’ or units’ control equipment.

The network operator shall determine the extent to which generating plants must partici-

pate in dynamic network support. A distinction is made between connections

directly via a separate circuit breaker bay to the bus-bar of a transforming station and

in the system operator’s medium-voltage network.

A general basic requirement is however that all generating plants remain connected to the

network in the case of voltage drops above the borderline in figure 2.5.1.2-1 or the border-

line in figure 2.5.1.2-1. Consequently, the network operator only determines whether or to

which extent a reactive current is to be supplied to the network by the generating facility in

the event of voltage drops.

Customer plants with generating plants turning into isolated operation in the event of dis-

turbances in the higher-voltage network to cover the customer’s own energy demand must

participate in network support until they are disconnected from the system operator’s me-

dium-voltage network. Isolated operation scheduled by the customer has to be agreed by

contract with the network operator.

Page 84: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Annexure –IX (Reserve Shut Down - PPT)

<10 Pages>

Page 85: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Rese

rve

Shut

D

own

SRPC

, Sec

reta

riat

Page 86: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Rese

rve

Shut

Dow

n-(R

SD)

�It

ma

y be

eco

nom

ica

l to

shut

dow

n un

it(s)

if t

otal

an

ticip

ated

URS

of

the

regi

on is

mor

e th

an t

he e

x-bu

s in

stal

led

cap

acity

of

an U

nit

or m

ultip

le u

nits

w

ith in

the

regi

on ,

prov

ided

dur

atio

n of

such

surp

lus

is m

ore

than

the

min

imum

tim

e pe

riod

req

uire

d f

or

econ

omic

al s

hut

dow

n st

art

up o

pera

tion

of t

he

unit(

s).

�Th

e Un

it(s)

sel

ecte

d s

hall

be s

uch

that

it s

houl

d n

ot

impa

ct t

he d

raw

al s

ched

ule

of a

ny b

enef

icia

ry

afte

r ta

king

into

RSD

. If

Dra

wal

sch

edul

e is

getti

ng

affe

cted

con

curre

nce

of t

he a

ffect

ed u

tility

nee

d

to b

e ta

ken

�Th

e Un

it(s)

w

ith

max

imum

va

riabl

e ch

arge

an

d

satis

fyin

g a

bove

crit

eria

ca

n be

sele

cted

for R

SD.

Page 87: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Requ

irem

ents

Ad

vanc

e as

sess

men

t of U

RS b

y th

e be

nefic

iarie

s. �

Intim

atio

n fo

r RSD

Page 88: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Pros

and

Con

s �

Man

agin

g Hu

ge V

aria

tion

Bet

wee

n M

axim

um a

nd

Min

imum

URS

. �

High

URS

dur

ing

Nig

ht (

Up t

o 20

00 M

W)

Hour

s an

d

Virt

ually

no

URS

dur

ing

Peak

Hou

rs.

�A

vera

ge U

RS g

reat

er t

han

200

MW

ava

ilabl

e fo

r C

ontin

uous

3 d

ays

�In

Wes

tern

Reg

ion

Min

imum

per

iod

requ

ired

for R

SD is

3

Da

ys.

�Lo

ad m

anag

emen

t to

be d

one

dur

ing

peak

Hou

rs.

�Tr

ade

off

Betw

een

Econ

omic

s V

s O

pera

tiona

l C

onst

rain

t/Fl

exib

ility.

Page 89: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 90: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 91: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

MW

M

W

MW

22-O

ct-1

4- to

24-

Oct

-14

507

657

1573

25-O

ct-1

4- to

27-

Oct

-14

85

556

1262

Min

URS

A

vg. U

RS

Max

URS

� 2

6 Sl

ots o

f con

tinuo

us th

ree

Day

s whe

n av

erag

e

URS

wa

s mor

e th

an

200

MW

5 Sl

ots o

f con

tinuo

us th

ree

Day

s whe

n av

erag

e

URS

wa

s mor

e th

an

500

MW

RS

D Po

ssib

ility

Jan

201

4- J

an 2

015

Perio

d

Page 92: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Freq

uenc

y C

hart

June

201

4 to

Jan

201

5

Page 93: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

CG

S Po

wer

Pur

chas

e co

st p

er u

nit d

etai

ls fo

r the

Mon

th o

f JAN

UA

RY 2

015

C

ost i

n R

s/K

WH

r

CG

S Fi

xed

cost

Va

riabl

e co

st

Tota

l

NTP

C- R

STP

S 1

&2

0.53

2.

544

3.07

NTP

C- R

STP

S S

tage

3

0.95

2.

707

3.66

NTP

C -T

alch

er S

TPS

0.

80

1.46

5 2.

27

NTP

C -S

imha

dri S

TPS

1.

64

2.73

7 4.

38

NTE

CL-

Val

lur S

TPS

2.

12

2.08

1 4.

20

NLC

-TP

S-I (

Exp

ansi

on)

1.63

2.

125

3.76

NLC

-TP

S II

Sta

ge-1

0.

57

2.22

1 2.

79

NLC

-TP

S I

I Sta

ge-2

0.

60

2.22

1 2.

82

NPC

IL -

MAP

S 2.

057

NPC

IL -

KG

S U

nits

1 -4

3.

020

NPC

IL -

Kud

anku

lam

NPP

3.

545

Page 94: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Estim

ated

Los

s Du

e to

Und

er D

raw

al

Page 95: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Annexure-X

Page 96: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 97: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 98: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 99: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 100: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 101: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 102: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 103: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 104: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 105: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

������������ ���������������������������������� �������������������������������������

�������������� ���� ������� ��

����� ��������� ���

��� ��������� ���

��������� ����� ������ �������

������

��������� ����������

�������� ���������� ��� �!� "� �!�����"���� ���#$� ����� $��$�%�����"���� ���&� ���$� #����'�(�)!����*+�� ����&� �#��#� ���#����)�"���,��*+� $#��-� �-���� ����#���.�.*�/� ������ $��&-� ������'.�.�/� �-�&�� ���-� ���$&�0.�1�2�/� $����� ��-�� �����1/03. � �#��#� ����� &�$��4*+�� �$���� ���#� ���#���*+�� �$�$�� $���� ��-��%+5 � ����#� ����� �����/33%66/� $��#�� $���-� ����#��0 5�*�� -����� ��-&� �������3�� ������ &�$�� �$��&��/��*�� ������ 7��-�� 7&�#��'. %�� $��$�� $-���� ��$�����*+�� �$��#� ���&�� $&��#�05*+�� ������ ������ �&�#��05*+��� �$��#� $�-�� -�#��*���������*+�� �#���� #���� �-����6�8���)��*+�� ������ ����� �����6��������,�*+�� ������ ������ ���$��*���"� �������� ����-�� ����-�

*���������� ������������9� ����� ������������������������������������������:��������������;����<����"������<�"�!� ���<������=���"�>�����?�

Annexure-XI

Page 106: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

$��

$��

$��

$��

$-�

$-�

$��

$��

$#�

#���

����+�

#���

����+�

#���

����+�

#���

����+�

#���

����+�

#��$

����+�

#���

����+�

#���

����+�

#���

����+�

#��-

����+�

#��-

����+�

#���

����+�

#��#

����+�

#��#

����+�

#��&

����+�

&���

����+�

&���

����+�

&���

����+�

&���

����+�

&���

����+�

&��$

����+�

&���

����+�

&���

����+�

&���

����+�

&��-

����+�

&��-

����+�

&���

����+�

&��#

����+�

&��#

����+�

&��&

����+�

#����� $

�9�

@��A

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

$��

$��

$-�

$-�

$��

$��

$#�

$#�

#���

����+�

#���

����+�

#���

����+�

#���

����+�

#���

����+�

#��$

����+�

#���

����+�

#���

����+�

#���

����+�

#��-

����+�

#��-

����+�

#���

����+�

#��#

����+�

#��#

����+�

#��&

����+�

&���

����+�

&���

����+�

&���

����+�

&���

����+�

&���

����+�

&��$

����+�

&���

����+�

&���

����+�

&���

����+�

&��-

����+�

&��-

����+�

&���

����+�

&��#

����+�

&��#

����+�

&��&

����+�

�9�

@��A

#�!! %� &

Page 107: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

� �

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

$��

$�-

$��

$�#

$�&

$-�

$-�

$-�

$-$

$-�

$-�

#���

�$��+�

#���

����+�

#���

��&�+�

#���

��#�+�

#��$

����+�

#��$

��-�+�

#���

����+�

#���

����+�

#���

��$�+�

#��-

����+�

#���

����+�

#���

����+�

#��#

��&�+�

#��#

��#�+�

#��&

�$��+�

&���

��-�+�

&���

����+�

&���

�$��+�

&���

��$�+�

&���

����+�

&��$

�$��+�

&���

����+�

&���

��&�+�

&���

��#�+�

&��-

����+�

&��-

��-�+�

&���

����+�

&��#

����+�

&��#

��$�+�

&��&

����+�

&���

����+�

'. %��%$

�9$

@��A

�&���

�&�$�

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

�����

�����

��-��

��#��

�����

�����

�����

��-��

��#��

�����

������-

���

������-

���

�������

���

������#

���

������#

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

������#

���

������#

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

�������

���

�������

���

�������

���

������-

���

�9�

�����@��A

��3��%�

Page 108: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&���

�&�$�

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

�����

��#��

�����

�����

�����

��-��

��#��

�����

�����

�����

������-

���

������-

���

�������

���

������#

���

������#

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

������#

���

������#

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

�������

���

�������

���

�������

���

������-

���

�9�

�����@��A

��3��%�

�&���

�&�$�

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

�����

�#���

�#���

�&���

�&���

�����

�����

������-

���

������-

���

�������

���

������#

���

������#

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

������#

���

������#

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

�������

���

�������

���

�������

���

������-

���

�9� �����@��A

��3��%�

Page 109: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&���

�&�$�

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

�����

�&���

�����

�����

�����

�����

�����

�����

������-

���

������-

���

�������

���

������#

���

������#

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

������#

���

������#

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

�������

���

�������

���

�������

���

������-

���

�9-

�����@��A

��3��%-

�&��

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

��#

��&

���

���

���

��$

���

���

��-

���

��#

����-���

�������$

��������

��������

����#���

����#��&

����#�$#

����#���

����&��-

����&�$�

����&���

�������$

������$�

��������

��������

�������&

�������#

��������

�������-

��������

����$���

����$��$

����$���

��������

��������

������$&

�������#

��������

������$-

��������

����-���

����-�$$

'���� (�)� $*

�.37B�C�9D �.37/B�C�9D @�2E%205F�C�GD

Page 110: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

��-

��#

���

���

���

��-

��#

���

���

���

��������

������$�

����#���

����#�$�

����&���

����&�$�

��������

������$�

��������

������$�

��������

������$�

����$���

����$�$�

��������

������$�

��������

������$�

����-���

����-�$�

��������

������$�

�9$

@��A����)

05*+��%H$

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

�&#

���

���

���

��-

��#

���

���

���

��-

��#

��������

������$�

����#���

����#�$�

����&���

����&�$�

��������

������$�

��������

������$�

��������

������$�

����$���

����$�$�

��������

������$�

��������

������$�

����-���

����-�$�

��������

������$�

�9�

@��A����)

05*+���%H�

Page 111: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&���

�&�$�

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

�����

�&�

�&�

�&�

�&-

�&#

���

���

���

��-

��������

�������&

�������#

����-���

����-��-

��������

��������

����#��$

����#���

����&���

����&���

�������&

�������#

��������

�������-

��������

��������

����$��$

����$���

��������

��������

�������&

������$#

����-���

����-�$-

��������

������$�

����#��$

����#�$�

����&���

����&�$�

����&��&

@�2E�9

�*+�7%H�

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

�#�

�&�

�&�

���

���

�����

������

�������$

�������-

����-��&

����-�$�

����-���

�������#

��������

����#���

����#���

����#���

����&��$

����&�$-

����&��&

��������

��������

�������#

������$�

��������

��������

��������

����$��$

����$��-

����$��&

��������

������$�

�������#

��������

��������

����-���

����-�$�

����-��$

�������-

������$&

�*+�7%H$

�9

@�2E

Page 112: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

�#�

�&�

�&�

���

���

���

���

��������

��������

�������#

����-���

����-�$-

��������

��������

�������#

����#���

����#�$-

����&���

����&���

����&��#

��������

������$-

��������

��������

�������#

��������

������$-

����$���

����$���

����$��#

��������

������$-

��������

��������

�������#

����-���

����-�$-

��������

��������

�������#

�9

�*+�7%H�

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

�&�

�&�

���

���

���

���

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

�������

���

������#

���

������#

���

������&

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

������$

���

�������

���

�������

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

�������

���

�9�

@�2E

**+�7%�

Page 113: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

���

���

���

��-

��#

���

���

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

�������

���

������#

���

������#

���

������&

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

������$

���

�������

���

�������

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

�������

���

�9�

@�2E

**+��%�

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

���

���

���

��-

��#

���

���

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

������#

���

������#

���

������#

���

������&

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

������$

���

������$

���

�������

���

�������

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

�9$

@�2E

**+��%$

Page 114: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

�&�

�&�

�&-

�&#

���

���

���

��-

��#

���

���

������

����

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

�������

���

������#

���

������#

���

������&

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

������$

���

�������

���

�������

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

�������

���

�9�

@�2E

**+�7%�

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

��#

��#��

��&

��&��

���

�����

���

�����

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

�������

���

������#

���

������#

���

������&

���

������&

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

������$

���

������$

���

�������

���

�������

���

�������

���

�������

���

�������

���

������-

���

������-

���

�������

���

�������

���

�������

���

�9�

@�2E

�**+�7%�

Page 115: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

�&�

�&�

�&�

�&-

�&#

���

���

���

��-

�������

���

�������

��-

�������

�$�

�������

��#

������#

���

������#

���

������#

�$-

������#

���

������&

��#

������&

���

������&

���

������&

��-

�������

���

�������

��#

�������

���

�������

���

�������

��-

�������

�$�

�������

��#

�������

���

�������

���

�������

�$-

�������

���

������$

��#

������$

���

������$

���

������$

��-

�������

���

�������

��#

�������

���

�������

���

�������

��-

�9

@�2E

'*+�7%�

Page 116: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

����

�##

�#&

�&�

�&�

�&�

�&$

�&�

�&����

����

���

�������

��-

�������

�$�

�������

��#

������#

���

������#

���

������#

�$-

������#

���

������&

��#

������&

���

������&

���

������&

��-

�������

���

�������

��#

�������

���

�������

���

�������

��-

�������

�$�

�������

��#

�������

���

�������

���

�������

�$-

�������

���

������$

��#

������$

���

������$

���

������$

��-

�������

���

�������

��#

�������

���

�������

���

�������

��-

�9

@�2E

'*+��%H�

�&���

�&�#�

�&�#�

�&�&�

�&�&�

�����

�����

�����

�--��

�-#��

�����

�����

�����

��-��

��#��

��������

�������#

������$-

��������

����#���

����#�$�

����#��#

����&��-

����&���

����&���

��������

�������#

������$-

��������

��������

������$�

�������#

�������-

��������

��������

����$���

����$��#

����$�$-

����$���

��������

������$�

�������#

�������-

��������

��������

����-���

�9

@��A����)

'*+�7%�

Page 117: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&���

�&�#�

�&�#�

�&�&�

�&�&�

�����

�����

�����

�&����

�&����

�&����

�&$���

�&����

�&����

�&-���

��������

�������&

������$#

��������

����#��-

����#�$�

����#���

����&��$

����&�$�

����&���

��������

�������&

�������#

��������

�������-

��������

��������

�������$

��������

����$���

����$���

����$�$&

����$��#

��������

������$-

��������

��������

������$$

��������

�9

@��A����)

'*+� %-

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

�-�

�-�

���

���

�#�

�#�

��������

��������

������$&

�������#

����#���

����#�$-

����#���

����&���

����&�$$

����&���

��������

������$�

�������&

�������#

��������

�������-

��������

��������

�������$

����$���

����$���

����$���

����$��&

�������#

������$�

�������-

��������

������$�

�������$

����-���

����-�$�

����-���

�9

@�2E

�F*+��%�

Page 118: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

���

���

���

�-�

�-�

���

�����

������

��������

������$&

�������#

����#���

����#�$-

����#���

����&���

����&�$$

����&���

��������

������$�

�������&

�������#

��������

�������-

��������

��������

�������$

����$���

����$���

����$���

����$��&

�������#

������$�

�������-

��������

������$�

�������$

����-���

����-�$�

����-���

�9

@�2E

�F*+��%�

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

���

��#

��&

���

���

���

��$

���

���

��-

���

��������

��������

������$$

�������&

����#���

����#���

����#�$�

����#��$

����&��&

����&���

����&���

����&���

�������$

�������&

��������

��������

��������

������$$

�������&

��������

��������

������$�

�������$

����$��&

����$���

����$���

����$���

�������$

�������&

��������

��������

��������

�F*+��%$

Page 119: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&��

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

��#

�-�

�-�

�-�

�--

�-#

���

���

���

��-

��#��

������

��������

������$$

�������&

����#���

����#���

����#�$�

����#��$

����&��&

����&���

����&���

����&���

�������$

�������&

��������

��������

��������

������$$

�������&

��������

��������

������$�

�������$

����$��&

����$���

����$���

����$���

�������$

�������&

��������

��������

��������

�9

@�2E

�F*+� %�

�&�$

�&��

�&��

�&�-

�&��

�&�#

�&�&

��

����

���

���

���

�-�

�-�

���

���

�#�

�#�

�&�

�&�

����-���

����-���

����-�$&

����-��#

��������

������$-

��������

����#���

����#�$$

����#���

����&���

����&�$�

����&��&

�������#

��������

�������-

��������

��������

�������$

��������

��������

��������

�������&

����$��#

����$�$�

����$��-

��������

������$�

�������$

��������

������$�

��������

�9

@�2E

�F*+��%�

Page 120: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&�$�

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

���

��#

��&

���

���

���

��$

���

���

��-

���

��#

������#

���

�������

���

�������

��-

�������

���

�������

���

�������

��&

�������

��$

�������

��#

�������

�$�

�������

�$-

�������

���

�������

���

�������

��&

�������

���

�������

��#

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

��#

�������

�$�

�������

�$�

�������

���

�������

���

�������

���

�������

���

�������

��#

�9�

@��A

�/��.3�/7%�

�&�$�

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

���

���

���

��$

���

���

��-

������#

���

�������

���

�������

��-

�������

���

�������

���

�������

��&

�������

��$

�������

��#

�������

�$�

�������

�$-

�������

���

�������

���

�������

��&

�������

���

�������

��#

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

��#

�������

�$�

�������

�$�

�������

���

�������

���

�������

���

�������

���

�������

��#

�9�

@��A

�/��.3�/7%�

Page 121: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

�&�$�

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

�-�

���

�#�

�&�

���

���

���

������#

���

�������

���

�������

��-

�������

���

�������

���

�������

��&

�������

��$

�������

��#

�������

�$�

�������

�$-

�������

���

�������

���

�������

��&

�������

���

�������

��#

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

��#

�������

�$�

�������

�$�

�������

���

�������

���

�������

���

�������

���

�������

��#

�9$

@��A

�/��.3�/7%$

�&�$�

�&���

�&���

�&�-�

�&���

�&�#�

�&�&�

�����

�����

���

���

��-

���

��#

��&

���

���

���

��$

���

������#

���

�������

���

�������

��-

�������

���

�������

���

�������

��&

�������

��$

�������

��#

�������

�$�

�������

�$-

�������

���

�������

���

�������

��&

�������

���

�������

��#

�������

���

�������

���

�������

���

�������

���

�������

���

�������

���

�������

��#

�������

�$�

�������

�$�

�������

���

�������

���

�������

���

�������

���

�������

��#

�9�

@��A

�/��.3�/7%�

Page 122: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

______________________________________________________________________________ ROP in Petition No. MP/420/2014 Page 1 of 3

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

Petition No. 420/MP/2014

Subject : Endangering grid security due to non-implementation of contingency demand disconnection scheme for sudden loss of wind generation as per CERC order dated 22.2.2014 in Petition No. 120/MP/2011, non-availability of LVRT protection, non scheduling of wind generation as per Regulation 6.5.23 (j) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010, Regulation 5.3 regarding lack of necessary demand estimation and not providing real time SCADA data to LDC.

Date of hearing : 26.2.2015

Coram : Shri Gireesh B. Pradhan, Chairperson Shri A.K. Singhal, Member Shri A.S. Bakshi, Member

Petitioner : Southern Regional Load Despatch Centre

Respondents : Tamil Nadu State Load Despatch Centre

Parties present : Shri V. Suresh, SRLDC Shri Pankaj Batra, CEAShri S. Vallinayagam, Advocate, SLDC, Tamilnadu Shri S.K.Sonee, POSOCO

Record of Proceedings

The representative of Southern Regional Load Despatch Centre (SRLDC) submitted as under:

(a) Regulation B (3) of the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007 provides that Low Voltage Ride Through (LVRT) is compulsory for machines installed after 15.4.2014 but for existing wind power generating stations, LVRT should be mutually discussed. It does not exempt any station from installing LVRT.

(b) The issue of installing LVRT has been discussed from the time when the installed capacity of wind in Sothern Regioin was 3000 MW.

Annexure-XII

Page 123: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

______________________________________________________________________________ ROP in Petition No. MP/420/2014 Page 2 of 3

Presently, the installed capacity is around 13,000 MW. Out of this, 9000 MW wind capacity does not have LVRT.

(c) No tangible action has been taken with regard to installation of LVRT. The responsibility of monitoring installation LVRT has not been fixed under any Regulation.

2. The representative of CEA submitted as under:

(a) At the time of framing Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007, it was thought that installation of LVRT on existing machines will have an implication on tariff. Since, ADMS scheme has not been implemented by the States, the grid becomes vulnerable due to emergency situations such as sudden variation of load/loss of wind generation or forced outages are there etc. Therefore, availability of LVRT is very important.

(b) STU/SLDC should be responsible to monitor installation of LVRT. LVRT should fall under the Connectivity Regulations of respective State.

3. In response to the Commission’s query regarding availability of LVRT on new generators, the representative of CEA submitted that status of LVRT on new generators will be filed after checking with generators.

4. The representative of POSOCO submitted that installation of LVRT needs to be ensured at the time of “connection” of the wind generators itself. The strictness of LVRT is necessary.

5. After hearing the parties, the Commission directed to admit the petition and issue notice to the respondents. The Commission directed to issue notice to Wind Energy Association and Solar Power Association of Southern Region.

6. The Commission directed the petitioner to implead Wind Energy Association and Solar Power Association of Southern Region as party to the petition and file revised memo of parties.

7. The Commission directed the petitioner to serve copy of the petition on the respondents, Wind Energy Association and Solar Power Association of SouthernRegion immediately. The respondents were directed to file their replies by 27.3.2015with an advance copy to the petitioner, who may file its rejoinder, if any, on or before17.4.2015.

Page 124: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

______________________________________________________________________________ ROP in Petition No. MP/420/2014 Page 3 of 3

8. The Commission directed the respondents to submit on affidavit by 27.3.2015 status of LVRTs on wind generators in their respective States.

9. The petition shall be listed for hearing on 23.4.2015.

By order of the Commission

Sd/- (T. Rout)

Chief (Law)

Page 125: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Annexure-XIII

Page 126: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 127: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 128: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 129: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Annexure-XIV

Page 130: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Stan

dby

Dat

a C

hann

el S

tatu

s

SCAD

A�&

�CO

MM

UN

ICAT

ION

Ann

exur

e-X

VII

Non

-ava

ilabi

lity

of st

andb

y da

ta c

hann

eat

Nel

aman

gala

,Tal

cher

,Koc

hi,

LAN

CO

& N

ello

rePS

,Nel

lore

SAS,

TPC

IL,N

TPL

Voi

ce C

omm

unic

atio

n st

atus

.N

on-a

vaila

bilit

y of

voi

ce c

omm

unic

atio

n at

Pug

alur

,K

olar

HV

AC

,Hiri

yur.K

aliv

athn

apat

tu,M

ysor

e,N

aren

dra,

Triv

andr

um,T

alch

erH

VD

C,H

assa

n,K

ochi

,Pal

akka

duPu

duch

ery,

Mun

iraba

d,N

TPC

Kay

amku

lam

,MA

PS,K

aiga

,NLC

ST2,

y,

,g

,,

NLC

TS

1Exp

ansi

on.&

NLY

TS

2Exp

ansi

on, N

TEC

L V

ALL

UR

Inte

rnet

com

mun

icat

ion

Rel

iabl

e/ D

edic

ated

inte

rnet

com

mun

icat

ion

for

eb

e/

edc

ede

eco

uc

oo

Syst

em o

pera

tion-

Stat

us o

f con

firm

atio

n.G

atew

ayPr

ovid

ing

Mai

n&

Stan

dby

gate

way

fora

llne

w/u

pcom

ing

stat

ions

Prov

idin

gM

ain

&St

andb

yga

tew

ayfo

rall

new

/upc

omin

gst

atio

ns.

Page 131: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Sum

mar

y�of

�Pen

ding

�Fie

ld�In

puts

Con

stitu

ent

Des

crip

tion

Pend

ing

as o

n 5th

Febr

uary

-20

15Po

ints

Add

edPo

ints

Atte

nded

Pend

ing

as o

n 6th

April

-201

5

Anal

og P

oint

s6

00

6SR

-I

(PO

WER

GR

ID)

gSt

atus

Poi

nts

00

00

Tota

l6

00

6

NTP

C R

amag

unda

mAn

alog

Poi

nts

00

00

Stat

us P

oint

s0

00

0To

tal

00

00

Anal

ogPo

ints

100

010

SR -

II (

POW

ERG

RID

+HVD

C

TALC

HER

)

Anal

ogPo

ints

100

010

Stat

us P

oint

s18

00

18To

tal

280

028

NTP

C T

ALC

HER

STP

PAn

alog

Poi

nts

480

048

Stat

us P

oint

s21

00

21To

tal

690

069

Al

Pi

t0

00

0N

TPC

KAY

AM

KU

LAM

Anal

ogPo

ints

00

00

Stat

us P

oint

s0

00

0To

tal

00

00

NPC

IL-M

APS

Anal

og P

oint

s12

00

12St

atus

Poi

nts

10

01

Tota

l13

00

13A

lP

it

100

10N

PCIL

-KAI

GA

Anal

ogPo

ints

100

010

Stat

us P

oint

s0

00

0To

tal

100

010

NPC

IL-K

KN

PPAn

alog

Poin

ts13

00

13St

atus

Poi

nts

00

00

Tota

l13

00

13A

lP

it

00

00

NLC

Anal

ogPo

ints

00

00

Stat

us P

oint

s0

00

0To

tal

00

00

APAn

alog

Poin

ts0

00

0St

atus

Poi

nts

00

00

Tota

l0

00

0An

alog

Poin

ts0

00

0TE

LAN

GA

NA

Anal

ogPo

ints

00

00

Stat

us P

oint

s0

00

0To

tal

00

00

KAR

NA

TAK

AAn

alog

Poin

ts4

00

4St

atus

Poi

nts

00

00

Tota

l4

00

4An

alog

Poi

nts

00

00

Page 132: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Ann

exur

e-X

IX

Ale

rtE

ME

RG

EN

CY

NC

Ale

rtE

ME

RG

EN

CY

NC

Ale

rtE

ME

RG

EN

CY

NC

Ale

rtE

ME

RG

EN

CY

NC

Ale

rtE

ME

RG

EN

CY

NC

Ale

rtE

ME

RG

EN

CY

NC

Dec

embe

r-14

78

15

100

00

027

201

167

00

00

Janu

ary-

152

70

47

02

10

713

06

90

03

0

Febr

uary

-15

921

15

243

01

111

100

86

00

30

Mar

ch-1

511

221

613

05

30

1017

09

60

00

0

Dec

embe

r-14

119

08

120

11

010

71

2127

20

00

Janu

ary-

153

80

58

05

50

54

112

264

01

0

Febr

uary

-15

915

07

162

22

07

60

1516

10

00

Mar

ch-1

513

273

65

15

20

86

014

282

00

0

Dec

embe

r-14

20

03

00

10

07

92

910

20

00

Janu

ary-

152

30

01

02

30

1329

014

271

00

0

Febr

uary

-15

32

01

30

13

05

120

413

00

00

Mar

ch-1

50

20

02

07

50

629

05

230

00

0

Dec

embe

r-14

26

02

40

02

04

50

410

00

00

Janu

ary-

150

60

18

00

10

14

01

111

00

0

Febr

uary

-15

23

01

20

10

00

10

12

00

00

Mar

ch-1

52

51

14

01

10

31

03

50

00

0

Dec

embe

r-14

76

07

60

46

00

00

76

00

00

Janu

ary-

155

70

47

00

20

02

06

112

01

0

Febr

uary

-15

42

04

10

00

02

00

32

00

00

Mar

ch-1

57

10

51

01

40

60

01

10

00

0

Vol

tage

Vio

latio

n M

essa

ges

Mon

thA

PTR

AN

SCO

TST

RA

NSC

OK

PTC

LK

SEB

TA

NT

RA

NSC

OPU

DU

CH

ER

Y

Zer

o C

ross

ing

Vio

latio

n M

essa

ges

Dev

iatio

n V

iola

tion

Mes

sage

s

Loa

ding

Vio

latio

n M

essa

ges

Freq

uenc

y V

iola

tion

Mes

sage

s

Annexure-XVI

Page 133: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

Annexure –XVII (SRTS-II- PPT on AMR)

<12 Pages>

Page 134: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award
Page 135: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

POPULATION OF SEMS

• NO OF SEMS > 900 (EXPECTED TO INCREASE BEYOND 1000 IN ONE YEAR)

• NO OF LOCATIONS > 150

• NO OF MAKES: AT PRESENT AROUND 4 MAKES (SML, L&T, WALLABY, ELSTER) OF METERS OF DIFFERENT

SERIES ARE INSTALLED AT DIFFERENT LOCATIONS OF SR

Page 136: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

CURRENT METHOD OF RELAY OF DATA TO RLDC

• DATA FROM EACH METER IS DOWNLOADED IN TO A HAND HELD DEVICE (DCD) THROUGH THE OPTICAL

PORT

• THE DATA IS FURTHER DOWNLOADED ON TO THE LOCAL PC USING MANUFACTURER PROPRIETARY

SOFTWARE.

• THIS DATA IS THEN TRANSMITTED TO SRLDC AS EMAIL ATTACHMENT

Page 137: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

• SRPC APPROVED IMPLEMENTATION OF THE AMR SCHEME BY POWERGRID IN THE 24TH MEETING HELD ON

15-03-2014 AT CHENNAI.

• IT WAS ALSO AGREED THAT POWERGRID COULD FIRM UP APPROPRIATE TECHNOLOGY FOR

IMPLEMENTATION, BASED ON THE EXPERIENCE IN OTHER REGIONS/UTILITIES

• ACCORDINGLY THE SYSTEMS BEING IMPLEMENTED IN NORTHERN REGION AND EASTERN REGION WERE

STUDIED

• ALSO NECESSARY INPUTS AND FEEDBACK WAS TAKEN FROM THE IMPLEMENTING AGENCIES (M/S

KALKITECH & M/S TCS)

Page 138: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

PROPOSED AMR IN SR

• THE AMR PROPOSED FOR SR IS ALSO ON THE SIMILAR LINES OF THE SCHEME THAT IS IMPLEMENTED IN NR

& ER WITH FEW MODIFICATIONS

• THE MAJOR ENHANCEMENT SOUGHT IN THE SCHEME IS TO HAVE A BETTER COMMUNICATION CHANNEL

Page 139: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

MAJOR COMPONENTS OF AMR

• DATA CONCENTRATOR UNIT (DCU) – TO BE INSTALLED AT EACH LOCATION

• COMMUNICATION CHANNEL

• CENTRAL DATA COLLECTION SYSTEM – TO BE ESTABLISHED AT RLDC

Page 140: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

PROPOSED HIRARCHY OF AMR IN SR

Page 141: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

ARCHITECTURE OF

THE PROPOSED AMR

SCHEME IN SR

Page 142: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

AMR IN SR

• ESTIMATED COST OF IMPLEMENTATION IS AROUND RS. 4.0-4.5 CRORE

• SYSTEM TO COVER AMC OF 4 YEARS AFTER THE EXPIRY OF WARRANTY OF ONE YEAR

• MAJOR ENDEAVOUR IS TO USE THE BANDWIDTH FROM THE EXISTING FIBER OPTIC NETWORK WHEREVER

POSSIBLE

• EXISTING BROADBAND CONNECTIVITY, IF AVAILABLE, TO INTERNET CAN ALSO BE USED FOR AMR

• GPRS WILL BE THE LAST OPTION WHERE BOTH FIBER/BROADBAND IS NOT AVAILABLE

Page 143: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

AMR IN SR

• AS AGREED IN THE 24TH SRPC MEETING, COORDINATION, OPERATION & MAINTENANCE SUBSEQUENTLY

AFTER THE INSTALLATION OF AMR INFRASTRUCTURE TO BE LOOKED AFTER BY THE RESPECTIVE UTILITY

• RECURRING COMMUNICATIONS EXPENDITURE, IF ANY (GPRS CHARGES) ARE TO BE BORNE BY THE OWNER

OF PREMISES WHERE THE INFRASTRUCTURE IS INSTALLED.

Page 144: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

AMR IN SR

• DETAILED TECHNICAL SPECS AND SCOPE AND EXECUTION GUIDELINES ALONG WITH THE ESTIMATE ARE

UNDER PREPARATION AND SAME SHALL BE FORWARDED TO BENIFICIARIES AND SRLDC.

• AFTER THE RECEPT OF CONCURRENCE OF STAKEHOLEDERS, NECESSARY ACTION FOR TENDERING AND

AWARD SHALL BE TAKEN UP.

COOPERATION FROM ALL THE STAKEHOLDERS IS HIGHLY SOLICITED

Page 145: ANNEXURES - Kar · 2015. 4. 24. · Dec’15 Commissioned on 15-11-2014 Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed Extn. of Wardha 765 kV S/S PGCIL Dec’15 June’15 Award

THANK YOU