Annexure -Proforma required for contract Award Notice to...
Transcript of Annexure -Proforma required for contract Award Notice to...
Sd/-Superintending Engineer,
Irrigation Circle, Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATPWebsite
Name & Address of the Employer: K.V.L.N.P. Choudary (SE/ICNJA)
Name & Reference No. of the Contract being awarded: Rehabilitation of Kundapalem Tank(Independent) in Kalagara (v) in Vissannapet (M) in Krishna District. ECVRs:l,42,88,310
Selection Method used: N.O.C.P. (NatiorialOpen Competitive Procurement)
Place of work: District/Mandai/village Krishna District
S.No. Requirements Details Remarks
1 Name of all the bidders 1.T.N.Mohan reddy, 4.02 % Exccssubmitted Bids along with Bid 2. M/s sudhakar Infra Tech pvt, Ltd, 62.63 Exccs
Prices 3. M/s SPRInfra, 4.99 % Exccs4. swarna Constructions. Vijayawada, Not Qualified5. M/s Varunys Constructions, -- 00--
khazipet.
2 Name of all bidders whose bids 1.swarna Constructions. Vijayawada, Not Qualifiedwere rejected 2. M/s Varunys Constructions, -- 00--
3 Reason for Rejection of the Bids Rates Not Quoted
4 Name of the Successful bidder Sri T.N.MohanReddy 5/0 NarayanaReddy, D.No:8/1088, Sathi somireddyComplex,Ravulapalem, East Godavaridisrict.
5 Final Total Contract Price Rs: 1,48,62,447/-
6 contract Duration 12 Months
7 Summary of the scope of Survey, Investigation, Design andcontract Preparation of Detailed Project; WUA
Formation and Capacity Building;Review and monitoring of Agricultureextension, anti poverty and Pro- healthComponents; Overall projectManagement/ Operation andMaintenance.
Annexure - Proforma required for contract Award Notice to be displayed in AfWATP,. Website
Name & Address of the Employer: K.V.LN.P. Choudary (SE/ICNJA)Name & Reference No. of the Contract being awarded: Rehabilitation of Diguva Vaddu Tank -(Independent)in Bahubalendruni Gudem (v) in Gannavaram (M) inKrishna District .ECVRs:1,46,75,599/-Selection Method used: N.O.C.P. (National Open Competitive Procurement)
Place of work: District/MandaI/village Krishna District
S.No. Requirements Details Remarks
1 Name of all the bidders 1. T.N.Mohan reddy, 4.88% Excesssubmitted Bids along with Bid 2. M/s Sudhakar Infra Tech pvt, Ltd, 29.94% Excess
Prices
2 Name of all bidders whose bids --Nil--were rejected
3 Reason for Rejection of the Bids --Nil--
4 Name of the Successful bidder Sri T.N.MohanReddy 5/0 NarayanaReddy, D.No:8/1088, Sathi SomireddyComplex,Ravulapalem, East Godavaridisrict.
5 Final Total Contract Price Rs; 1,53,91,329/-
6 contract Duration 12 months
7 Summary of the scope of Survey, Investigation, Design andcontract Preparation of Detailed Project; WUA
Formation and Capacity Building;Review and monitoring of Agricultureextension, anti poverty and Pro-health Components; Overall projectManagement/ Operation andMaintenance.
Sd/-Superintending Engineer,
Irrigation Circle, Vijayawada.
Irrigation Circle, Vijayawada.
~~'f)f
----- - ---- ------------------------------------------------------------~---
Sd/-SuperintendingEngineer,
Irrigation Circle,Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATPWebsite
Name & Address of the Employer: K.V.L.N.P. Choudary (SE/IC/VJA)Name & Reference No. of the Contract being awarded: Rehabilitation of Nalla Tank(Independent) in Tatakuntla (v) in Vissannapet (M) in Krishna District. ECV RS:64,24,338/-
Selection Method used: N.O.C.P. (National Open Competitive Procurement)
Place of work: District/Mandai/village Krishna District
S.No. Requirements Details Remarks
1 Name of all the bidders 1.T.N.Mohan reddy, 4.88% Excesssubmitted Bids along with Bid 2. M/s Sudhakar Infra Tech pvt, Ltd, 35.65% Excess
Prices 3. M/s SPRInfra, Not qualified4. Swarna Constructions. Vijayawada, -oc-
2 Name of all bidders whose bids 1. M/s SPRInfra, Not qualifiedwere rejected 2. Swarna Constructions. Vijayawada, -oo-
3 Reason for Rejection of the Bids Rates Not Quoted
4 Name of the Successful bidder Sri T.N.MohanReddy 5/0 NarayanaReddy, D.No:8/1088, Sathi SomireddyComplex,Ravulapalem, East Godavaridisrict.
5 Final Total Contract Price Rs:67,37,913/-
6 contract Duration 12 months
7 Summary of the scope of Survey, Investigation, Design andcontract Preparation of Detailed Project; WUA
Formation and Capacity Building;Review and monitoring of Agricultureextension, anti poverty and Pro-health Components; Overall projectManagement/ OperationMaintenance.
Irrigation Circle,Vijayawada.
- .------
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName& Addressof the Emplover.Kv.Llv.P. Choudary (SE/ICNJA) ,Name& ReferenceNo. of the Contract being awarded: Rehabilitation of Ura Tank(Independent) in Veleru (v) in Bapulapadu(M) in KrishnaDistrict. ECVRs:l,47,73,OO8/-
SelectionMethod used:N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/Mandai/village KrishnaDistrict
S.No. Requirements Details Remarks
1 Nameof all the bidders 1.T.N.Mohan reddy, 4.91%Excesssubmitted Bidsalongwith Bid 2. M/s SudhakarInfra Techpvt, Ltd, 29.54%Excess
Prices
2 Nameof all bidderswhose bids --Nil--were rejected
3 Reasonfor Rejectionof the Bids --Nil--
4 Nameof the Successfulbidder SriT.N.MohanReddy5/0 NarayanaReddy,D.No:8/1088,SathiSomireddyComplex,Ravulapalem,EastGodavaridisrict.
5 FinalTotal Contract Price Rs:67,37,913/-
6 contract Duration 12 Months
7 Summaryof the scopeof Survey,Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
0, s"'''~'''.Irrigation Circle, Vijayawada.
Sd/-Superintending Engineer,
Irrigation Circle, Vijayawada.
--- -------
Annexure - Proforma required for contract Award Notice to be displayed in APIIATPWebsite
Name & Address ofthe Employer: K.V.L.N.P. Choudary (SE/ICNJA)-:
Name & Reference No. of the Contract being awarded: Rehabilitation of Gajula Cheruvu CascadeNo.7 in Putrela (v) in Vissannapet (M) in Krishna District. ECVRs:Selection Method used: N.O.C.P. (National Open Competitive Procurement)
Place of work: District/MandaI/village Krishna District
S.No. Requirements Details Remarks
1 Name of all the bidders 1. T.N.Mohan reddy, 4.80%Excesssubmitted Bids along with Bid 2. M/s Sudhakar Infra Tech pvt, Ltd, 28.62% Excess
Prices
2 Name of all bidders whose bids --Nil--were rejected
3 Reason for Rejection of the Bids --Nil--
4 Name of the Successful bidder Sri T.N.MohanReddy S/o NarayanaReddy, D.No:8/1088, Sathi SomireddyComplex,Ravulapalem, East Godavaridisrict.
5 Final Total Contract Price
6 contract Duration 12 months
7 Summary of the scope of Survey, Investigation, Design andcontract Preparation of Detailed Project; WUA
Formation and Capacity Building;Review and monitoring of Agricultureextension, anti poverty and Pro-health Components; Overall projectManagement/ Operation andMaintenance.
Sd/-Superintending Engineer,
Irrigation Circle, Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
Website -c
Name & Address of the Employer: K.V.L.N.P. Choudary (SE/ICNJA)Name & Reference No. of the Contract being awarded: Rehabilitation of Yellappa Tank CascadeNo. 13 in Narasapuram (v) in Vissannapet (M) in Krishna District. ECV Rs: 1,44,66,894/-
Selection Method used: N.O.C.P. (National Open Competitive Procurement)
Place of work: District/MandaI/village Krishna District
S.No. Requirements Details Remarks
1 Name of all the bidders 1.T.N.Mohan reddy, 4.81%Excesssubmitted Bids along with Bid 2. M/s Sudhakar Infra Tech pvt, Ltd, 29.42% Excess
Prices 3.Swarna Constructions. Vijayawada Not qualified
2 Name of all bidders whose bids 1. Swarna Constructions. Vijayawada, Not Qualifiedwere rejected
3 Reason for Rejection of the Bids Rates Not Quoted
4 Name of the Successful bidder Sri T.N.MohanReddy S/o NarayanaReddy, D.No:8/1088, Sathi SomireddyComplex,Ravulapalem, East Godavaridisrict.
5 Final Total Contract Price Rs:l,51,63,202/-
6 contract Duration 12 months
7 Summary ofthe scope of Survey, Investigation, Design andcontract Preparation of Detailed Project; WUA
Formation and Capacity Building;Review and monitoring of Agricultureextension, anti poverty and Pro-health Components; Overall projectManagement/ Operation andMaintenance.
~~Dy.superi~n~i~eer,Irrigation Circle,Vijayawada.
Sd/-SuperintendingEngineer,
Irrigation Circle,Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName & Address of the Employer: K.V.L.N.P. Choudary (SE/IC/VJA)
Name & Reference No. of the Contract being awarded: Rehabilitation of Pedda Tank(independent) in Somavaram (v) in Chatrai (M) in Krishna District. ECV Rs:97,48,437/-
Selection Method used: N.O.C.P. (National Open Competitive Procurement) ~
Place of work: District/Mandai/village Krishna District
S.No. Requirements Details Remarks
1 Name of all the bidders M/s Varunya Constructions,Khazipet, 12.95%(-) Lesssubmitted Bids along with Bid M/s S.R.Edifice, Vijayawada, 4.04%(-) Less
Prices M/s K.A.Ramarao Not qualified
2 Name of all bidders whose bids M/s KARamarao Not qualifiedwere rejected
3 Reasonfor Rejectionof the Bids RatesNot Quoted
4 Nameof the Successfulbidder M/s VarunyaConstructions, H.No:1-1-1044,Sidhardhanagar,Khazipet,WARANGALDisrict.
5 FinalTotal Contract Price Rs:84,85,602/-
6 contract Duration 12months
7 Summaryof the scopeof Survey, Investigation, Designandcontract Preparation of Detailed Project; WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
Dy.superi~er,Irrigation Circle,Vijayawada.
Sd/-SuperintendingEngineer,
Irrigation Circle,Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName& Addressofthe Employer: K.V.L.N.P.Choudary (SE/ICNJA)
.,
Name& ReferenceNo. of the Contract being awarded: Rehabilitation of Reddygudipati Tank(independent) in Pulluru (v) in Mylavaram (M) in KrishnaDistrict. ECVRs:97,37,829/-
SelectionMethod used:N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/Mandai/village KrishnaDistrict
S.No. Requirements Details Remarks
1 Nameof all the bidders M/s Varunya Constructions,Khazipet, 4.28%(+)Excesssubmitted Bidsalongwith Bid M/s S.R.Edifice,Vijayawada, Not qualified
Prices .,
2 Nameof all bidderswhose bids M/s S.R.Edifice,Vijayawada Not qualifiedwere rejected
3 Reasonfor Rejectionof the Bids RatesNot Quoted
4 Nameof the Successfulbidder M/s VarunyaConstructions, H.No:1-1-1044,Sidhardhanagar,Khazipet,WARANGALDisrict.
5 FinalTotal Contract Price Rs:1,01,54,266/-
6 contract Duration 12 months
7 Summaryof the scopeof Survey,Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
ov "'"':~~'''Irrigation Circle, Vijayawada.
Sd/-Superintending Engineer,
Irrigation Circle, Vijayawada.
"
Annexure - Proforma required for contract Award Notice to be displayed in A~IIATP. .. '. " '"
Website, "
"Name& Addressof the Employer: K.V.L.N.P.Choudary (SE/ICNJA)Name& ReferenceNo. of the Contract being awarded: Rehabilitation of Malavagu Tank -e.
(independent) in Reddigudem (v) in Reddigudem(M),in KrishnaDistrict. ECVRs:44,63,730/-SelectionMethod used:N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/Mandai/village KrishnaDistrict
S.No. Requirements Details .' ": Remarks
1 Nameof all the bidders M/s VarunyaConstructions,Khazipet, 4.55%(+)Excesssubmitted Bidsalongwith Bid M/s S.R.Edifice,Vijayawada, Not qualified
Prices
2 Nameof all bidderswhose bids M/s S.R.Edifice,Vijayawada, Not qualifiedwere rejected
3 Reasonfor Rejectionof the Bids RatesNot Quoted
4 Nameof the Successfulbidder M/s Varunya Constructions,H.No:1-1-1044,Sidhardhanagar,Khazipet,WARANGALDisrict.
5 FinalTotal Contract Price Rs:46,66,932/-
6 contract Duration 12months
7 Summaryofthe scopeof Survey,Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
Dy.superi~eer,irrigation Circie,Vijayawada.
Sd/-SuperintendingEngineer,
irrigation Circle,Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName& Addressof the Employer: K.V.L.N.P.Choudary (SE/ICNJA) ./
Name& ReferenceNo. ofthe Contract being awarded: Rehabilitation of Gangula Tank(independent) in Maddulaparva (v) in Reddigudem(M) in KrishnaDistrict. ECV Rs: 1,10,53,240/-
SelectionMethod used:N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/MandaI/village KrishnaDistrict
S.No. Requirements Details Remarks
1 Nameof all the bidders M/s VarunyaConstructions,Khazipet, 4.76%(+)Excesssubmitted Bidsalongwith Bid M/s S.R.Edifice,Vijayawada, Not qualified
Prices
2 Nameof all bidderswhose bids M/s S.R.Edifice,Vijayawada, Not qualifiedwere rejected
3 Reasonfor Rejectionof the Bids RatesNot Quoted
4 Nameofthe Successfulbidder M/s VarunyaConstructions, H.No:1-1-1044,Sidhardhanagar,Khazipet,WARANGAl Disrict.
5 FinalTotal Contract Price Rs:1,15,78,973/-
6 contract Duration 12months
7 Summaryof the scopeof Survey,Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
Oy.superi~jneer,Irrigation Circle,Vijayawada.
Sd/-SuperintendingEngineer,
Irrigation Circle,Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName & Addressof the Employer: K.V.l.N.P.Choudary (SE/ICNJA)Name& ReferenceNo. of the Contract being awarded: Rehabilitation of Dharma Tank(independent) in Muchinapalli (v) in Reddigudem(M) in KrishnaDistrict. ECVRs:69,58,463/-
SelectionMethod used:N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/MandaI/village KrishnaDistrict
S.No. Requirements Details Remarks
1 Nameof all the bidders M/s VarunyaConstructions,Khazipet, 4.70%(+)Excesssubmitted Bidsalongwith Bid M/s S.R.Edifice,Vijayawada, Not qualified
Prices
2 Nameof all bidderswhose bids M/s S.R.Edifice,Vijayawada, Not qualifiedwere rejected
3 Reasonfor Rejectionof the Bids RatesNot Quoted
4 Nameof the Successfulbidder M/s VarunyaConstructions,H.No:1-1-1044,Sidhardhanagar,Khazipet,WARANGALDisrict.
5 FinalTotal Contract Price Rs:72,85,731/-
6 contract Duration 12months
7 Summaryof the scopeof Survey,Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
Dy.superi~ineer,Irrigation Circle,Vijayawada.
Sd/-SuperintendingEngineer,
Irrigation Circle,Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName& Addressof the Employer: K.V.L.N.P.Choudary (SE/IC/VJA)Name& ReferenceNo. of the Contract being awarded: Rehabilitation of Ravula Tank(independent) in KothaNaguluru (v) in Reddigudem(M) in KrishnaDistrict. ECV Rs:94,Ol,748/-
SelectionMethod used: N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/MandaI/village KrishnaDistrict
S.No. Requirements Details Remarks
1 Nameof all the bidders M/s Varunya Constructions,Khazipet, 3.88%(+)Excesssubmitted Bidsalongwith Bid M/s S.R.Edifice,Vijayawada, Not qualified
Prices
2 Nameof all bidderswhose bids M/s S.R.Edifice,Vijayawada, Not qualifiedwere rejected
3 Reasonfor Rejectionof the Bids RatesNot Quoted
4 Nameof the Successfulbidder M/s VarunyaConstructions, H.No:1-1-1044,Sidhardhanagar,Khazipet,WARANGALDisrict.
5 FinalTotal Contract Price Rs:97,66,513/-
6 contract Duration 12months
7 Summaryofthe scopeof Survey,Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
0,S"P'":~'''Irrigation Circle, Vijayawada.
Sd/-Superintending Engineer,
Irrigation Circle, Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName& Addressof the Employer: K.V.L.N.P.Choudary (SE/ICNJA)Name& ReferenceNo. of the Contract beingawarded: Rehabilitation of JogiRaju TankCascadeNo.4 in Gullapudi (v) in Musunuru (M) in KrishnaDistrict. ECVRS:76,86,531/-SelectionMethod used:N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/MandaI/village KrishnaDistrict
S.No. Requirements Details Remarks
1 Nameof all the bidders 1.T.N.Mohan reddy, 22.97%Excesssubmitted Bidsalongwith Bid 2. M/s SudhakarInfra Techpvt, Ltd, 29.79%Excess
Prices 3.M/s VarunyaConstructions, 3.73%Excess
2 Nameof all bidderswhose bids --Nil--were rejected
3 Reasonfor Rejectionof the Bids --Nil--
4 Nameof the Successfulbidder M/s VarunyaConstructions,H.No:1-1-1044,Sidhardhanagar,Khazipet,WARANGALDisrict.
5 FinalTotal Contract Price RS:79,73,103/-
6 contract Duration 12months
7 Summaryofthe scopeof Survey,Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
Dy.supe~eer,Irrigation Circle,Vijayawada.
Sd/-SuperintendingEngineer,
Irrigation Circle,Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName & Address of the Employer: K.V.L.N.P. Choudary (SE/IC/VJA)Name & Reference No. of the Contract being awarded: Rehabilitation of Borragudem TankCascade No.2 in Borragudem (v) in Mylavaram (M) in Krishna District. ECV Rs:l,87,45,202/-
Selection Method used: N.O.C.P. (National Open Competitive Procurement)
Place of work: District/MandaI/village Krishna District
S.No. Requirements Details Remarks
1 Name of all the bidders 1.M/s Varunya Constructions 4.12% Excesssubmitted Bids along with Bid 2.Lotous Infra Tech, Not Qualified
Prices 3.Swarna Constructions. Vijayawada, -do-4.Sri M.V.Subbarao -do-
2 Name of all bidders whose bids 1. Lotous Infra Tech, Not Qualifiedwere rejected 2.Swarna Constructions. Vijayawada, -do-
3.Sri M.V.Subbarao -do-
3 Reason for Rejection of the Bids Rates Not Quoted
4 Name of the Successful bidder M/s Varunya Constructions, H.No:1-1-1044, Sidhardhanagar, Khazipet,WARANGAL Disrict.
5 Final Total Contract Price RS;l,95,18,361/-
6 contract Duration 12 months
7 Summary of the scope of Survey, Investigation, Design andcontract Preparation of Detailed Project; WUA
Formation and Capacity Building;Review and monitoring of Agricultureextension, anti poverty and Pro-health Components; Overall projectManagement/ Operation andMaintenance.
Oy.superi~eer,Irrigation Circle,Vijayawada.
Sd/-SuperintendingEngineer,
Irrigation Circle,Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName& Addressof the Employer: K.V.L.N.P.Choudary (SE/ICNJA)Name& ReferenceNo. of the Contract being awarded: Rehabilitation of ChilakaSamudram TankCascadeNo.5 in Velupucherla (v) in Musunuru (M) in KrishnaDistrict. ECVRs:3,78,92,244/-
SelectionMethod used: N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/MandaI/village KrishnaDistrict
S.No. Requirements Details Remarks
1 Nameof all the bidders 1.M/s VarunyaConstructions, 4.48%(+)Excesssubmitted Bidsalongwith Bid 2.SwarnaConstructions.Vijayawada, Not qualified
Prices 3.SriM.V.Subbarao Not qualified4.M/s SPRInfra 5.07%(+)Excess5.T.N.mohanreddy, 23.80%(+)Excess6.M/s SudhakarInfra Techpvt, Ltd, 25.31%(+)Excess
2 Nameof all bidderswhose bids l.Swarna Constructions.Vijayawada, Not qualifiedwere rejected 2.SriM.V.Subbarao Not qualified
3 Reasonfor Rejectionof the Bids RatesNot Quoted
4 Nameof the Successfulbidder M/s VarunyaConstructions, H.No:l-l-1044,Sidhardhanagar,Khazipet,WARANGALDisrict.
5 FinalTotal Contract Price Rs:3,95,88,452/-
6 contract Duration 18months
7 Summaryof the scopeof Survey,Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
ov.s"''';~~''Irrigation Circle, Vijayawada.
Sd/-Superintending Engineer,
Irrigation Circle, Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName& Addressof the Employer: K.V.L.N.P.Choudary (SE/IC/VJA)Name& ReferenceNo. of the Contract being awarded: Rehabilitation of RudravaramPedaCheruvu( Independent) in Rudravaram (v) in Reddigudem(M) in KrishnaDistrict. ECVRs:58,31,885/-
SelectionMethod used:N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/MandaI/village KrishnaDistrict
S.No. Requirements Details Remarks
1 Nameof all the bidders M/s. SaiLakshmiConstructions, 4.99%Excesssubmitted Bidsalongwith Bid M/sSwarnaConstructions. 24.73%Excess
Prices
2 Nameof all bidderswhose bids --Nil--were rejected
3 Reasonfor Rejectionof the Bids --Nil--
4 Nameofthe Successfulbidder M/s. SaiLakshmiConstructions& Co,# S9-7-11/2,SriSai Nilayam,AcharyarangaStreet, Vijayawada- 8.
S FinalTotal Contract Price Rs:61,22,623/-
6 contract Duration 12 months
7 Summaryof the scopeof Survey, Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
/~~\~Dy.Superin d~Engineer,Irrigation Circle,Vijayawada.
Sd/-SuperintendingEngineer,
Irrigation Circle,Vijayawada.
Annexure - Proforma required for contract Award Notice to be displayed in APIIATP
WebsiteName& Addressof the Employer: K.V.L.N.P.Choudary (SE/ICNJA)Name& ReferenceNo. of the Contract being awarded: Rehabilitation of Kesevaraju Tank(Independent) in Reddygudem (v) in Reddygudem(M) in KrishnaDistrict. ECVRS:54,54,175/-SelectionMethod used: N.O.C.P.(National Open Competitive Procurement)
Placeof work: District/Mandai/village KrishnaDistrict
S.No. Requirements Details Remarks
1 Nameof all the bidders M/s. Sai lakshmi Constructions, 4.97%Excesssubmitted Bidsalong with Bid M/s. SwarnaConstructions. 24.70%Excess
Prices
2 Nameof all bidderswhose bids --Nil--were rejected
3 Reasonfor Rejectionof the Bids --Nil--
4 Nameof the Successfulbidder M/s. Sai lakshmi Constructions& Co,# 59-7-11/2,Sri Sai Nilayam,AcharyarangaStreet, Vijayawada- 8.
5 FinalTotal Contract Price Rs:57,25,051/-
6 contract Duration 9 months
7 Summaryof the scopeof Survey,Investigation, Designandcontract Preparation of Detailed Project;WUA
Formation and CapacityBuilding;Reviewand monitoring of Agricultureextension, anti poverty and Pro-health Components;Overall projectManagement/ Operation andMaintenance.
ov '"'"'~'''Irrigation Circle, Vijayawada.
~'f
Sd/-Superintending Engineer,
Irrigation Circle, Vijayawada.