Annexure-A
Clarification on the RfP “Short listing of Agency to Setup Project Management Unit (PMU) for EV Charging Infrastructure in India” reference
pre-bid meeting held on 26th April, 2019.
Bureau of Energy Efficiency issued an RfP for hiring of an Agency to set-up PMU for EV charging infrastructure in India. In this regard a pre-bid meeting
on the aforementioned project was held at BEE on 26th April,2019. List of Participants is enclosed at Annexure-B. Clarification issued to prospective bidders
against queries raised as follows:-
S.No Pg. No Section in RfP Clause Query Clarification/Amendments
made by BEE after pre-bid
1 8 4. Scope of work
The Agency will provide
three numbers dedicated
resources….
Our assumption is that the
resources will be deployed in
Delhi at BEE head office and
any travel outside of Delhi
will be re-imbursed on actuals
as per clause 8 (a) & 8 (b).
Please clarify if resource are
to deployed in any other
location.
Manpower resources sought
will be deployed at
BEE/Ministry of Power
office, New Delhi as per
prerogative of BEE.
2 12 6.1. Pre-qualification criteria
1. Should have the work
experience in Transportation
Sector or E-Mobility
1> Request you to kindly
allow Market assessment, bid
advisory support,
Experience in E-Mobility,
public transport monitoring,
covering the aspects of
standards related to transport.
development of SBD's. policy
formulation etc. in charging
infrastructure shall also be
allowed as relevant
experience, since a large part
of the PMU work is of a
similar nature
operation & planning shall be
considered.
3 13 6.3.1. Technical Evaluation S.No 2
Team Leader
Educational Qualification:-
MBA/M.Tech or equivalent
Experience:- More than 6
years of experience in
electric mobility, charging
infrastructure & related
standards
Since the EV sector is
relatively new, the specific
experience in Electric
mobility, charging
infrastructure & related
standards may be relaxed.
The overall experience for the
team leader can be retained at
6 years with experience in
Power/transport to be
considered as relevant
Total experience of Team
leader shall be more than 8
years (total) with 5 years’
experience in electric
mobility and its related
charging infrastructure &
standards. (Atleast 3 Nos. of
project )
Additionally, Number of
project done in Public
transport, Monitoring,
operations & planning shall
also be considered.
4 14 6.3.1. Technical Evaluation S.No 2
Team Member
Educational Qualification:-
B.Tech or equivalent
Since the EV charging space
is relatively new, the specific
experience in Electric
As per RfP
Experience:- More than 3
years of experience in
electric mobility, charging
infrastructure & related
standards
mobility, charging
infrastructure & related
standards may be relaxed.
The overall experience can
still be retained at 3 years
with experience in
Power/transport to be
considered as relevant
5 14 6.3.1. Technical Evaluation S.No 2
Average Relevant
Experience: year of exp./total
team strength (4 Nos.)
Avg Exp between 3-4 years:
15 marks
Avg Exp between 5-6 years:
18 marks
Avg Exp more than 6 years:
20 marks
As per RFP document, a team
of 3 members are to be
engaged for the project. How
ever the scoring criteria
calculates the average for 4
Nos. Please clarify how many
CV's are to be submitted for
evaluation
Typo error, Agency has to
submit 3 CVs as part of its
bid.
( Team Leader and 2 team
members)
6 15 6.3.1. Technical Evaluation S.No 4 Approach and methodology
Presentation by Consultant to
BEE Should be included as
part of the evaluation. This
will help the consultant
present his approach and
methodology in details and
Agency shall submit a
proposal on approach &
methodology it intends to
follows for deploying
charging infrastructure in any
one city as per clause 9.1
also enable interaction of
BEE with the prospective
team members.
Guidelines issued by Ministry
of Power (MoP) dated 14th
December,2018.
7 16 7.1.Procedure for Submission of
Proposal
The Consultant should
submit following documents:
a. One Hard Copy of
Financial Proposal, in
original with signature of
authorized personnel and
stamp/seal of the
organization. The sealed
envelope should be super
scribed with the wordings
Financial Proposal for “Short
listing of Agency to Setup
Project Management Unit
(PMU) for EV Charging
Infrastructure in India”.
Bidder has to submit
financial bid in separate
envelope.
b. Demand Draft for the fees
in separate envelope. The
Please clarify if Hard copies
of Technical bid along with
EMD (as per section 9) are
also to be submitted or would
soft copies suffice
One Hard Copy of Financial
Proposal, in original with
signature of authorized
personnel under stamp/seal of
the organization. The sealed
envelope should be super
scribed with the wordings
Financial Proposal for “Short
listing of Agency to Setup
Project Management Unit
(PMU) for EV Charging
Infrastructure in India”.
Bidder shall submit financial
bid in separate envelope.
sealed envelope should be
super scribed with the
wordings Proposal Fee for
“Short listing of Agency to
Setup Project Management
Unit (PMU) for EV Charging
Infrastructure in India” and
name of Bidder
Organization.
8 37 Form 9.11 Format of financial proposal
The financial proposal ask
for the following
1> Monthly retainership fee
for all manpower resources
collectively
2> For online web-portal
development and
management
3> Total amount for monthly
retainership for all manpower
resources and web-portal
development & management
Please clarify if the quarterly
payment will be made as per
the total amount quoted or the
payments would be made
separately for manpower
resources and web-portal
development.
Payment shall be made
quarterly for retainership fee
of manpower.
Activity related to Web portal
stands deleted from the RfP.
9 3 Bid submission Date 7th May 2019 Request you to kindly extend
the bid submission deadline
Last bid submission date is
15th May, 2019
by at least a week for us to
submit a comprehensive
proposal
No. Clause No.
RFP
Page
No
Content in the RFP Clarification Sought Clarification/Amendments made by BEE
after pre-bid
10
6.3.1
Technical
Evaluation
15
Note: Only Bidders with minimum
of 70 marks will be qualified for
the financial bid opening.
Request you to lower minimum technical
evaluation criteria to 60 marks as there are
limited consultancy works that have been
done in the field of Electric Vehicles in
India.
As per RfP.
Bidder with minimum of 70 marks will be
considered qualified for the financial bid
opening.
11
7.3 Earnest
Money
Deposit
17
An Earnest Money Deposit
(EMD) of Rs.2,00,000 (Two lakhs
only) is to be deposited by the
bidders by way of Banker’s
Cheque/ Demand Draft drawn in
favour of “Bureau of Energy
Efficiency” payable at New Delhi.
Request you to accept EMD in the form
of Bank Guarantee
BEE will accept EMD in form of
Banker’s Cheque/ Demand Draft only.
S.No Clause No./Page
no.
Content in the RFP Clarification sought Clarification/Amendments made by
BEE after pre-bid
12 Clause 6.1 Minimum annual turnover in
the last three years shall be INR
2.00 Crores. However there are
four years mentioned, ie FY
2015-16, FY 2016-17, FY
2017-18 and provisional for
2018-19.
Please clarify which three years? It
would be preferable if the audited
profit loss statements are used – ie
FY 2015-16, FY 2016-17 and FY
2017-18
Should have been profitable for at least
two (2) of the last three (3) years i.e. FY
2016-17 and 2017-18.
13 Clause 6.3 ‘Technical Evaluation’, In the
category column there is a
mention of 3 team members –
Team Leader and Team
Strength of 2 nos, However in
the criteria it is mentioned
averages are calculated
assuming 4 team members.
Please clarify what team strength is
required.
Team strength is 3 (Team Leader and 2
team member)
14 Clause 7 only one copy of financial bid is
mentioned
How many copies of technical
proposal are required?
Three copies of technical bid (one
original and two copies) shall be
submitted.
15 Clause 8 , under terms of payment it is
mentioned that ‘The Consultant
is required to quote lump sum
Monthly rate for all resources
collectively, which shall be
applicable for one year period.’
However in Scope of Work it is
mentioned that ‘The Agency
will provide three numbers
dedicated resource persons for
supporting activities for initial
period of 2 years which may be
extended subject to satisfactory
performance of the agency
further for a period of 1 year’.
Please clarify the rates are to be
applicable over two years or one
year? And what if contract is
extended by 2 years?
Rates will be valid for two years and
only after satisfactory performance
contract may be extended for one year
on same payment terms.
16 Clause 6.1 ‘No JV/Consortium/Sub-
Contracting allowed’
However under Scope of work,
there is a requirement for PMU to
develop a portal with MIS templates
for reporting project progress of
SNA’s to BEE. Since the PMU will
have expertise in Battery/Charging
Infrastructure/Policy
framing/Feasibility
No JV/Consortium/Sub-Contracting is
permitted, as Activity related to Web
portal has been deleted from the RfP.
Study/Equipment standard, they
might subcontract development of
portal to a domain expert. Will that
be allowed?
17 Clause 7.15 and
Form 1
the numbering of forms differs
from the forms in Clause 9
Please clarify which numbering is to
be followed.
Number has been updated ( 9 Nos. of
form)
18 Clause 6.3.
Evaluation of
Proposals,
20 marks would be awarded to
the bidder if number of average
relevant projects is more than 8.
Usually, more than one team
members are involved in execution
of a single project. Will the common
projects among team members be
considered only once or separately
for every team member?
Common projects among team
members will be considered.
19 Clause 4. Scope of
Work 1.16,
The PMU will support BEE in
preparation of detailed work
implementation plan of any
related project in consultation
with other state nodal
agencies”.
It would be very difficult to gauge
the effort estimation for this task
beforehand. It would be better to put
an upper cap on the number of such
projects.
As per RfP.
20 Clause 6.3.
Evaluation of
Proposals,
15 marks would be awarded to
the bidder if the number of
relevant projects related to e-
What type of projects can come
under power equipment standard
head?
Only projects of E-Mobility, public
transport monitoring, operation &
planning would be considered.
mobility and power equipment
standards were more than 6.
21 Lodging and boarding cost of Rs.
3000/- per day including taxes is on
lower side and it should be
increased as we will have to go to
tier-1 cities as well
As per RfP.
22 On page 16, Demand draft for the fee is
required in a separate envelope.
Is there any bid processing fee to be
attached along with EMD?
Yes, there is a bid processing fee of Rs.
6,000/-. Bidder has to submit Bid
processing fee and EMD (Rs.
2,00,000/-) in separate enclosed
envelope with appropriate
superscription.
Agency4
S.
No
Clause No./Page
No. Details Comments
Clarification/Amendments
made by BEE after pre-bid
23 4. Scope of Work
Page No. 8
The broad scope of the PMU shall be but
not limited to the following:
I. Project Management Activities
II. Project Appraisal/Due-diligence ,
Monitoring and Reporting
III. Consultancy as regard to project
development
As per detailed scope of work
(Pages 8- 12), there is no detailed
list of activities for the third aspect
of the scope of work viz.
“Consultancy as regard to project
development “. Please clarify if
there is a detailed list of activities
charted out for this scope of work.
Activity ‘Consultancy as
regard to project
development, stands deleted
from RfP.
24 4.I.1.1/1.3
The PMU will capture learnings from
regulatory developments in other
countries relevant to EV charging
infrastructure
Please clarify as to which selected
countries are being referred to in
this. We request you to confirm on
probable number of countries to be
researched upon, if the same have
already been finalized.
This is an academic activity
which may need secondary
research by bidder as and
when directed by BEE.
25 4.I.1.4
The PMU will support BEE in
identifying
/prioritizing cities, national highways
and expressways for setting up EV
charging infrastructure in consultation
As per OM issued by MoP dated 10
April, 2019, 12 State Nodal
Agencies have been nominated
under the provisions of “Charging
infrastructure for Electric Vehicles
– Guidelines and Standards”. Please
Focus would be on the cities
and highways as mentioned in
the “Charging Infrastructure
for Electric Vehicles –
Guidelines and Standards” –
with state governments and state nodal
agency.
specify if all those states needs to be
taken into consideration while
documenting the plans for EV
charging infrastructure or there
would be select states from the list
as suggested by BEE. Any
particular suggestion on the names
of the major cities that you would
like us to cover would be helpful.
We understand that selection of
cities would depend on location
specific criteria and that the PMU
would conduct secondary research
as well as detailed discussion with
BEE for shortlisting the same.
Please confirm that there is no need
to conduct a detailed estimation of
charging capacity to be developed
in each of the selected cities / states
by the PMU.
notified on 14 December 2018
by the Ministry of Power.
26 4.I.1.8 The PMU will, in consultation with
BEE, develop
We understand that while providing
the recommendations, the
consultant will provide only the
Both qualitative & monetary
quantification of charging
guidelines or provide recommendation
of the scheme to the State Nodal
Agencies, if so desired
by BEE
qualitative measures / schemes for
EV chargers and will not provide
any monetary quantification of the
same. Please confirm our
understanding.
infrastructure will be
required.
27 4.I.1.9
The PMU will prepare a guidance
document on various contractual
arrangements for setting up EV charging
infrastructure.
We understand that the guidance
document shall include details of
contractual parties, allocation of key
contractual risks and
responsibilities between the parties.
Kindly confirm our understanding.
Preparation of templet
guidance documents on
various contractual
arrangements shall be
responsibility of the agency.
28 4.I.1.13
The PMU will support BEE in
conducting various capacity building
seminars / workshops /meetings
etc. with various stakeholders.
We understand that BEE shall
provide the venues for stakeholder
discussions. Also we understand
that the costs for conducting such
workshops need to be borne by
BEE. Please confirm the same
Venues for such capacity
building seminars /
workshops /meetings
etc. will be finalized by the
consultant in consultation
with BEE. Costs for
conducting such workshops
will be borne by BEE.
29 4.I.1.18
The PMU shall have proven competence
of undertaking GIS mapping and
development/updation/management of
Please clarify whether the same is a
part of qualifying criteria or not.
Also the mentioned requirement is
given as a part of scope of work but
GIS mapping expertise stand
deleted from RfP.
national level dashboard and related
database on behalf of
BEE.
is not included in the technical
evaluation as per RfP. Please clarify
the same.
Moreover, the requirement of
having such experience specifically
with BEE is restrictive and would
prevent eligible bidders with
substantial experience in GIS
mapping and
development/updation/management
of dashboard to participate in the
bidding. We would thereby kindly
request you to relax this
requirement as follows:-
“The PMU shall have proven
competence of undertaking GIS
mapping and
development/updation/management
of national level dashboard”
30 4.I.1.22
PMU shall identify and empanel
National and
International experts from Industry,
Labs, Academia on EV Charging
Please clarify if BEE envisages any
particular frequency of interactions
with national / international experts.
Also, we understand that they
Yes, Agency has to identify,
propose and invite in
consultation with BEE to
International experts from
Infrastructure, storage systems, Battery
Management and Cooling systems etc.
for consultation purpose and workshops
as and when needed by BEE.
would predominantly be needed
only during workshops, as decided
by BEE, and on phone calls at other
times wherever needed.
Industry, Labs, Academia on
EV Charging Infrastructure,
storage systems, Battery
Management and Cooling
systems etc., as and when
directed by BEE or needed
during the workshops/
seminar. Expenses of inviting
international experts will be
borne by BEE.
31 4.II
Notes
The PMU agency shall work together
with third parties wherever
commissioned by the BEE. BEE is not
responsible for these third parties or
their performance, when the work is
assigned to PMU agency to coordinate
with them. In addition, the PMU agency
must comprehensively coordinate their
services with its own services, as far as
possible
We understand that the PMU team
is supposed to prepare Standard
bidding documents for selection of
Implementation agency. Please
clarify whether the PMU team is
expected to be involved in selection
of Implementation Agency on
behalf of BEE or only be involved
in supervision, monitoring and
progress reporting.
No, PMU team is not
expected to be involved in
selection of Implementation
Agency by SNAs.
32
6.3.1
Technical
evaluation
Turnover >Rs 2 crore & less than 5
crores: 3
Marks, Turnover >Rs 5 crores: 5 Marks
We understand that the nature of the
assignment involves high technical
skills with respect to e-mobility,
As per RfP.
charging infrastructure
development, batteries etc. as well
as presence of National and
international experts. We would
kindly request you to consider the
following requirement in order to
ensure bidders with requisite
expertise and sound technical skills
participate in the tender:-
Turnover > Rs 300 crore & less than
500 crores: 3 Marks
Turnover >Rs 500 crores: 5 Marks
33
6.3.1
Technical
evaluation
Team Average experience (Years)
Average Relevant Experience:
Avg Exp between 3-4 years: 15 marks
Avg Exp between 5-6 years: 18 marks
Avg Exp more than 6 years: 20 marks
We request you to consider overall
experience instead of e-mobility
related experience and relax this
requirement as follows:-
“Average Overall Experience:
Avg Exp between 3-4 years: 15
marks
Avg Exp between 5-6 years: 18
marks
Avg Exp more than 6 years: 20
marks
Average Relevant
Experience: year of
exp./total team strength (3
Nos.)
Avg Exp between 5-6 years:
15 marks
Avg Exp between 6-7 years:
18 marks
Avg Exp more than 7 years:
20 marks
34
7.5
Liquidated
damages
The agency hired shall attract
Liquidated Damages at the rate 1% of
the total cost of all resources per Quarter
subject to a maximum of 10% of the
total cost of the all resources per quarter
In addition to 1.0 above, Liquidated
damages shall also be imposed @0.5%
per week due to delay in preparation and
delivery of online Web-Portal with
regards the timelines ( in clause 5.0 of
this RfP )subject to a maximum of 10%
of the contract value for development
and management of web-portal.
As per industry standards, a
standard liquidated damages of 10%
is widely accepted and hence we
request you to cap the same to 10%
(5%+5%)
We request you to kindly
incorporate the following clause as
an addition
“The Liquidated Damages will be
applicable only if the delay is solely
attributable to the Bidder.”
As per GFR rules.
35
9.3 Form 3: Team
Composition
Page 28
Signature should be original and signed
in ink by all team members and also
attach self-attested copy of PAN
card/Passport etc. for verification of
signature. Bid will be rejected, if
signatures are
not valid/not signed in original
We understand that the key
personnel proposed might be from
different locations in India, thus,
arranging physically signed CVs
may be difficult. Thus, we would
request you to relax this condition to
digital signature. Alternatively, we
would request that the authorised
Signature may be physical or
digital for team members.
signatory’s physical signature be
considered for the same.
36 9.7 Form 7: Prior
Experience
Note: Please attach Letter of Intent or
Purchase
Order or certificate of successful
completion for each project, from the
respective Client(s).
In some cases, we have signed
confidentiality agreements with our
clients that limit our ability to
disclose these details. We would
thus request you to accept self-
certification for proof of work.
Work completion certificates
are required to be submitted as
a proof of prior experience.
In case of ongoing projects,
certified copies of paid
invoices (80% of project cost)
along with copy of work order
to be submitted along with
bid.
37
Additional matters
Development of web portal
Even though the TOR asks for
development of a web portal for
MIS, there is no evaluation criteria
for the same in the Team / Agency /
Firm Experience. Please clarify. Activity related to Web-
portal has been deleted from
the RfP.
38 Limitation of liability
We request you to kindly
incorporate this clause
“Notwithstanding anything
contained in the contract, Client
agrees that the Consultant shall not
be liable to Client, for any losses,
claims, damages, liabilities, cost or
expenses (“Losses”) of any nature
whatsoever, for an aggregate
amount in excess of the fee paid
under the contract for the services
provided under the contract, except
where such Losses are finally
judicially determined to have arisen
primarily from fraud or bad faith of
the Consultant.
In no event shall the Consultant, be
liable for any consequential
(including loss of profit and loss of
data), special, indirect, incidental,
punitive, or exemplary loss,
damage, or expense relating to the
services provided pursuant to this
Contract.”
S.No Section Existing Provision Query/Suggestion Clarification/Amendments
made by BEE after pre-bid
39
6 and 9.2 :
Pre-
qualification
Turnover and profitability
Besides audited
financial statements,
what all other
documents will serve.
Please clarify if CA
certified statements will
suffice. Also, the audited
and provisional financial
statements of FY 19 are
not yet available. Please
confirm if FY 16-FY 18
statements can be
submitted in lieu.
Apart from this, to
enable quality firms to
submit a
proposal, it is requested
that turnover criteria be
set at Rs 20 crore and
CA certificate statements
for FY-15-16, FY-16-17
and FY-17-18 will be
sufficient. Turnover
criteria will remain same.
Net worth at a
proportionate amount.
40
6.3.1
Technical
Evaluation
PMU Team
Experience and 55
marks allotted to PMU
team: As brought out in
RFP presently EV in
India is less than 1%,
which shows that E
Mobility is in nascent
stage in India.
Ministry of Power has
also recently in
December’2018 viz.
about 4 months back
have come out with
Guidelines & standards
on EV charging
infrastructure. Keeping
in view of above, we feel
that PMU team leader
and team members
having exclusive
experience of 6 years
In terms of RfP, manpower
quality & experience shall
be given the maximum
weightage as the scope of
RfP is majorly for hiring
manpower for PMU.
and 3 years and have
done specifically
number of Projects when
EV in India is at nascent
stage, will restrict the
prospective bidders to
qualify and competition.
For satisfactory
performance of PMU
team, it will be the sole
responsibility of
Company’s/Firm’s
experience and their
strong capabilities,
which plays an
important part. We
therefore request BEE
to consider suitably to
modify the experience
criteria including
number of projects for
the PMU team and also
reduce the marks
accordingly to
encourage competition
so that a greater number
of bidders can
participate in this bid. As
Company/ Firm is sole
responsible for the
performance of PMU
team, Firms experience
be given more
weightage and marks
accordingly.
Experience requirement
seems to be stringent and
would discourage ample
bidding. Since E-
Mobility is in nascent
stage in India, it may be
very rare to find
experienced persons in
this
domain.
Suggestion: the required
team experience should
be in
related and broader areas
such as Energy and
Transport
Marks Allocated:
Currently, 55 marks are
allocated to PMU team
(including qualification
and experience).
Our suggestion is that it
should be reduced
because, onus on firm is
more than team
member’s
responsibilities.
Additional queries:
• Is it permissible that
the three designated
PMU
members can be
appointed on contract by
the PMU firm?
• Kindly clarify whether
CVs of only three
proposed PMU members
will be evaluated or CVs
of other members in the
firm be also considered?
• The experience of
charging infrastructure
& related standards /
equipment standards be
removed from this as
this is not in scope of
work of the assignment
anyway. Moreover, this
experience is also
technical in nature and
beyond the ToR of the
assignment.
41 8. Terms of
Payment Miscellaneous
Since the payment will
be made quarterly,
please confirm how long
will BEE take to process
and pay the invoice
submitted by the PMU.
Generally one month after
receiving the invoices in
BEE office.
42
Scope of Work
Roles and responsibilities of PMU:
The broad scope of the PMU shall
be but not limited to the following:
Project Management Activities
Project Appraisal/Due-diligence ,
Monitoring and Reporting
Consultancy as regard to project
development
Roles and responsibilities
of PMU:
The broad scope of the
PMU shall be but not
limited to the following:
Project
Management/Consultancy
related to project
development.
Project Appraisal/Due-
diligence , Monitoring and
Reporting
43 4.I.1.11
The PMU will develop and manage
online portal with MIS templates for
reporting project progress by SNAs
to BEE.
The PMU will develop
templates for reporting
project progress by SNAs
to BEE.
44 4.I.1.12
The PMU will be responsible for
regular updation of the MIS/Portal
with respect to the size and nature of
various activities being undertaken
by BEE and State Nodal Agencies
for development of EV charging
infrastructure.
The PMU will be
responsible for regular
updation of the MIS with
respect to the size and
nature of various activities
being undertaken by BEE
and State Nodal Agencies
for development of EV
charging infrastructure.
45 4.I.1.22
PMU shall identify and empanel
National and International experts
from Industry, Labs, Academia on
EV Charging Infrastructure, storage
systems, Battery Management and
Cooling systems etc. for
consultation purpose and
PMU shall identify and
empanel National and
International experts from
Industry, Labs, Academia
on EV Charging
Infrastructure, storage
systems, Battery
Management and Cooling
workshops as and when needed by
BEE.
systems etc. for
consultation purpose and
workshops as and when
needed by BEE at cost of
BEE.
46 4.II.7
The PMU will support BEE in
coordination with state nodal
agencies for timely updation of
information on Web portal.
The PMU will support
BEE in coordination with
state nodal agencies for
timely updation of
relevant implementation
Information.
Annexure-B
List of Participants in the pre-bid meeting on “Short listing of Agency to Setup Project Management Unit (PMU) for EV Charging Infrastructure
in India” held on 26th April,2019.
S.No Name & designation Organisation Contact Number E-mail-ID
1. Ashish, VP PFS 9899304044 [email protected]
2. Ankur Satija, Sr.
Manager Deloitte 9871041757 [email protected]
3. Jayanta Bora, Sr.
Manager Deloitte 9560327618 jbora@ deloitte.com
4. Gautam Nagar, Manager KPMG 8588862830 [email protected]
5. Anand Sahoo, Sr.
Analyst IMaCS 9871971159 [email protected]
6. Anchd Gupta, Sr.
Analyst IMaCS 9892375553 [email protected]
7. Ameya, Manager PWC 9717262629 [email protected]
S.No Name & designation Organisation Contact Number E-mail-ID
8. Kumar Gaurav,
Associate Darashaw 7827253962 [email protected]
9. Gagan Shrivastav,
Principal Consultant Idam Infra 9004532525 [email protected]
10. Anoop Singh, Assistant
Manager AKAL Infro 9821817632 [email protected]
11. Vikramaditya, Analyst EY 8527165044 [email protected]
12. Sushovan Bej,
Consultant EY 9013668048 [email protected]
13. Ankit Gupta, Consultant CRIS 9873049690 [email protected]
14. Kanv Garg, Director EY 9711060647 [email protected]
15. Ashish Kulkarni,
Associate Partner EY LLP 9958222583 [email protected]
16. Pavneet Singh,
Consultant EY LLP 9650052555 [email protected]
S.No Name & designation Organisation Contact Number E-mail-ID
17. Gagandeep Singh,
Consultant EY LLP 9878377439 [email protected]
18. S.K.Patra, Associate VP DIMTS 9868531484 [email protected]
19. Nishikant Gupta, AVP DIMTS 9999032710 [email protected]
20. Gurpreet Wadhwa,
Assistant Manager DIMTS 9958100802 [email protected]