ANJUM CV-1

11
MUHAMMAD SIDDIQUE ANJUM Mobile :+923435090570 Residence:+92572610545 E-mail : [email protected] Mohella Nasir Abad Al-Noor Public School Near Mosque Awaisia Dhoke Fateh, Attock City-Pakistan Dear hiring Manager; Please review the enclosed resume in connection with your open position. I believe you will find the qualifications, experience, and background you are looking for; FTTH/ISP/OSP Projects Rollout Support Quality Assurance & Quality Control FTTH O&M SDH FOC O&M Thank you for your kind consideration! Sincerely, Muhammad Siddique Anjum Enclosure: Resume

Transcript of ANJUM CV-1

Page 1: ANJUM CV-1

MUHAMMAD SIDDIQUE ANJUM

Mobile :+923435090570

Residence:+92572610545

E-mail : [email protected]

Mohella Nasir Abad Al-Noor Public School Near Mosque Awaisia Dhoke Fateh, Attock City-

Pakistan

Dear hiring Manager;

Please review the enclosed resume in connection with your open position. I believe you will find the qualifications, experience, and background you are looking for;

FTTH/ISP/OSP Projects Rollout Support Quality Assurance & Quality Control FTTH O&M SDH FOC O&M

Thank you for your kind consideration!

Sincerely,

Muhammad Siddique Anjum

Enclosure: Resume

Page 2: ANJUM CV-1

EDUCATIONMaster in Business Administration- MBA

Muhammad Ali Jinnah University Islamabad, Pakistan.

Graduation

University of Peshawar ,Pakistan

Diploma in Electronics

Telephone Industries of Pakistan

Faculty of Science

(Pree-Engineering)

BISE Rawalpindi, Pakistan

Secondary School Certificate

(Science)

BISE Islamabad, Pakistan

Summary of work experience: Over 24 years of experience in designing and Implementation of OSP/FTTH,Quality Assurance and

Quality Control, Testing & Commissioning/Operations & Maintenance ,Project Management and Business Development in Telecom ISP and OSP works. FOC networks)

Possesses a clear understanding of the industry, technology trends with the distinction of instituting quality assurance practices to achieve business excellence at the lowest overall cost.

Deft in handling installation and commissioning of telecom systems Expertise in conducting technical audit & internal audits periodically to assess the status of

deployment of systems and taking corrective measures for achieving organizational objectives. Experienced in multi vendor and multi discipline systems for telecom Systems. Ability to train and organization capacity building for Fiber Optic Cables, OSP works trainings. Expertise in handling projects from inception till completion & overseeing all the resource planning An effective communicator with strong logical, problem solving & organizational abilities. Work experience encompasses Manufacturing, Construction, O&M and Business Development

disciplines based of personal advancement through experience and academic growth and personal improvement.

Core Competencies

FTTH/OSP Rollout Support Managing Turnkey roll out project of GPON Migration. Responsible for the complete process (Site acquisition, engineering, Civil OSP Works, Integration and

Acceptance). Responsible for Installation of OLTs, ODF, Splitters and ONTs along with all the fiber cabling and

splicing for FTTH. Manage network rollout customer projects and secures that the project goals are met and the

customer expectations are fulfilled. Monitoring the sub contractors and creating an inspiring working environment. Technical support for planning of fiber allocation, duct design (PVC) And Route design. Onsite support for trouble shooting the optical fault. Induction, training and development of team members. FTTM: Implementation, installing, commissioning and Testing of ONU and OLT, FTTH: Implementation of OSP and ISP work in residential compounds, from FDT to ONTs. FTTT: Implementation of ISP and OSP work in residential buildings, from Aggregator POP room to

Building MDF and ONTs in Building IDFs.

Page 3: ANJUM CV-1

Telecom Engineering ISP and FTTH/OSP Telecom Systems, Utilization of Test Meters, Machines, Test Equipments and Telecom System and

Office Engineering & Telecom Transmission Systems SDH, DRS, PDH & PCM Transmission Systems STC Saudi Arabia.

OSP Works management, Designing, Installation, Implementation, Testing & Commissioning and acceptance testing of Field Equipment Cabinets for Fiber Optics.

GPON (FTTH) deployment works of Mobily & Oman Fiber leading Sub contractor. Acceptance Testing Procedures and Record Preparation (PAT & FAT). Preventive and corrective maintenance of Telecom Transmission Systems. Optical Fiber Cable Projects testing & splicing testing, fault rectification, installation, PAT procedures

and report writing. Telecom Transmission Systems SDH, PDH, PCM Systems testing, fault rectification, installation, PAT

procedures and report writing. Network integration, Customer Care, team work. Thorough understanding of reading as built diagrams (both on PC and hand drawn drawings. FTTH & FTTH (Low level design, survey and implementation ) Installation (new, up-gradation and retro-fitting), Testing (PAT, FAT, corrective & preventive),

Commissioning and Operation & Maintenance. Experience of Using O.T.D.Rs and Cable Analyzers, Fusion Splicing Machines and other testing

equipments and computer Softwares, Bit Error Rate Meters and Transmission Analyzers

Quality Assurance & Quality Control Experienced Client representative and Third Party Field Inspector for mega projects of national and

international repute for Telecom and Construction in Pakistan, KSA, Oman. Fully conversant with the ITP, SIT, SAT, FAT and PAT procedures, inspection techniques and appraisal

on behalf or client and as TPI. Developing Quality Control by monitoring incoming, in-process and final inspection of procedures,

records & ISO documentations Developing processes to ensure smooth establishment of product commercially. Conducting regular

audits for process compliance Implementing various techniques for cycle time reduction and entailing identification of opportunities,

analysis of data, conduction of tests, cost benefit analysis, implementation & post audits (internal & external)

Operations and Maintenance Planning and effecting preventive maintenance schedules of various equipments/ to increase machine

up time and equipment & systems’ reliability Identifying areas of obstruction/ breakdowns and take steps to rectify the equipments through

application of trouble shooting tools Planning effective and efficient corrective and preventive measures and processes.

Installation, Testing & Commissioning Conversant with installation, testing & commissioning of Telecom systems, low current systems, fiber

optics and structured cabling systems. Conversant with installation testing and commissioning standards and procedures, on sited acceptance

testing, factory acceptance and laboratory acceptance and final acceptance testing for telecom systems and construction projects.

Conversant with use of testing equipment and software’s utilized in testing and commissioning.

Business Development Evolving market segmentation and segmentation strategies to achieve desired targets Forecasting periodic sales targets & driving sales initiatives to achieve business goals Conducting competitor analysis by keeping abreast of market trends & competitor moves

Organizational Experience (Oman Fiber Optics SAOG Sultanate of Oman(Omantel & Hya Water Projects),Telephone Industries of Pakistan (PTCL Projects) & Detecon al Saudia Co. KSA (Mobily & STC Projects)

Employment History

Page 4: ANJUM CV-1

From 2015 to 16 May 2015.

Designation: Senior Projects Engineer - FTTH/OSP

Company: Oman Fiber Optics Company SAOG Sultanate of Oman

Project: OMANTEL/ HAYA Water Project (FTTH/OSP Implementation)

Main Responsibilities:

To manage and follow-up FTTH/OSP activities in the OMANTEL/HAYA projects. Handling of 06 Engineers, 12 supervisors and 15 technician team against HAYA Projects. Handling of 08 Engineers, 10 supervisors and 18 technician team against Omantel Projects. Responsible to assign the jobs to the teams and resolves their issues and take the progress from the

team on daily bases. Maintain progress as per project schedule with all related sub-contractors. Agree monthly targets with Senior Projects Manager and manage the team against these targets. Prepare Project plans and Project procedures. Establish mechanism to track, review and clarify problem issues raised in the project and to identify

actions needed to resolve project blocking issues. Chair meetings with sub-contractors and participate in other project coordination meetings. Immediate escalation to the Senior Projects Manager for any blocking issues. Coordinate with Govt. authorities for proper and timely deliver for the project as per the PIP. Ensure that results are compiled, documented and forwarded to Client in required format, quantity

and quality and ensure timely and correct presentation and explanation of results. Prepare section related reports and provide project information to the Project Control group for

incorporation in Project reports Conduct regular reviews of changing project requirements and resource needs and provide

recommendation for changes accordingly. Time to time visits on sites and checks the ongoing work progress of the sub-contractors regarding the

trenching/ installation of feeder cable from POP to FDHs, trenching/ installation of distribution cable from FDHs to NAPs, Installation of FDHs/NAPs, trenching/ installation of drop cable from NAPs to ONTs and final termination inside the customer premises.

Conduct the civil/electrical test where check the quality of civil work and mandrel test to verify the blockage of conduits and electrical test to verify the budget loss against end to end and section wise with OTDR and power/source meter.

When the sites are 100 % ready and no deficiency both civil/electrical testing verify the IAT/PAT binders of the sub-contractors and forward to the concerned department.

From 2008 to 21 August, 2014.

Designation: Manager- FTTH Projects Rollout Support

Company: Detecon Al-Saudia Company Saudi Arabia

Project: Mobily Project (Planning & Design)

Main Responsibilities:

Bid support for OSP and FTTx tenders for regions Site Surveys Build up OSP offers subcontractor evaluation Project Setup support Customer consultancies OSP Network modelling FTTH, FTTB Network planning Access and Backbone networks Service calculation for telecommunication implementation services, civil works, project management

and logistics Preparation of solution descriptions Preparation of Service item Descriptions Pre selection of OSP materials Cost Review for running OSP projects

Page 5: ANJUM CV-1

Checking & Verifying the Design BOQs/AS-Built BOQs/Additional BOQs of the all Regions of the Mobily. Responsible, if there is any calculation mistakes or any other technical issues in the BOQs or other

attached documents send back to regions for their correction. Preparation of PRs against the DBOQs/Additional BOQs of FTTH/OSP and ODN+OLTs of the all regions

of the Mobily. Responsible to take approval from Mobily Director/GM/EGM on DBOQs/PRs. Responsible to forward approved BOQs/PRs to the FBN support office Mobily to raise the PRs. Responsible to forward approved BOQs to the Mobily Regions & the vendors. Checking & Verifying the claim Invoices against the RFS of the all Regions of the Mobily. Checking & Verifying the claim Invoices against the PCC of the all Regions of the Mobily. Responsible for the integrity of the project database in order to ensure proper follow-up with the FBN

support office/ Contract & Purchasing (C&P) Department and Budgeting department. Responsible, weekly reconciliation of PR tracking sheet and Master database of Mobily. Responsible to share all the rejected PRs with the Director and GM Planning & Design. Responsible to take POs from C&P department and forward to the concerned region of Mobily. Maintained the Budget more than Billions of SR of Mobily in year 2008, 2009, 2010, 2011, 2012,2013&

2014.From 2006-2008

Designation: Senior Engineer-Planning & Design

Company: Detecon Al-Saudia Company Saudi Arabia

Project: Mobily (FTTX Design)

Main Responsibilities:

• Design and planning of FTTH & FTTB (GPON) network.• Prepare Fundamental design showing Street cabinet boundaries, Hand holes and Manholes locations.• Prepare designs for Fiber Optic Cable routes, Duct lay out, Cable lay out and splicing details.• Planning of future expansion of FTTH (GPON) access network.• Manage Network design & selection of futuristic services or network segments.• Implementation of database for FTTH outside Plant (OSP) Network using GIS system.• Control and support timely updating various data sheets for work order completion.

Maintain the all Live and spare fibers record, Inventory record and BOQ record. Site surveys and meetings with contractors and inspection the contractors work/ PAT and REDs. Prepares weekly reports on the progress of the contractors. Maintain up to date information & data on theoretical topics work specific reference material. Assess performance of department & report to Manager of the Department periodically. Manage Design Change activities. To prepare Link Budgeting, Capacity analysis. To Prepare Case Studies. Forecast for future requirements, GPON solution for new sectors. Expanding, upgrading & enhancing the Junction and Access Network (Fixed Fiber Optic Network Provision of Media to GSM and POP sites.From 2003 -2006.

Designation: Engineer- Quality Control

Company: Telephone Industries of Pakistan Islamabad

Project: TIP (OSP-FTTX Quality and Control)

Main Responsibilities:

Enhances the availability of Quality Management System requirements for ISO 9001 within the Network.

Providing Technical Assistance, Support & Technical Management for RF, Microwave, OSP (Fiber and Copper) Access and Transmission Networks, Optical Transmission (SDH, DWDM),DSLAM and Power

Page 6: ANJUM CV-1

monitoring and tracking the projects under budgeting and tendering phase, CAPEX / OPEX and take course of actions accordingly.

Interact with other General Directorates & Business Units to identify loopholes. Develop, Monitor and Audit Processes, Policies, Guidelines, Proposals, RFQ’s etc. Review all existing Network Sector SLA’s, business process reengineering & suggest areas of

improvement. Supply, Installation & Deployment of Fiber Optic Cables (ISP/OSP work), SDH/DWDM Network, FTTx

(GPON) Network ,Generators and electric equipment. Contracting / Sourcing of Project Proposals, Contracts/Bid proposals, RFP’s, Contracting Obligations &

Regulatory affairs & Project Negotiations with Vendors. Analyze projects data for progress, scheduling, budget, invoicing and other key information and

raise/reports to different stockholders accordingly. Provide solutions to managed service in line with their existing SLA’s to improve performance of

overall Network Sector. Develop & implement project quality plan (PQP), Disaster Recovery Plan, H&S guidelines, Business Get the PAT (Provisional Acceptance) conducted with the minimum of snags/problems also to make

sure that the snags are removed within 10 days of the PAT (Provisional Acceptance) so that the site can be handed over to the client.

Continuity, report &monitor its effectiveness. Verifying all the sites BOQ’s as well as additional works if claimed by the subcontractors. Coordinating with the design department to ensure that all the sites are built as per the approved

designFrom 2001 -2003.

Designation: Assistant Project Manager-Implementation

Company: Telephone Industries of Pakistan Islamabad

Project: PTCL (Optical fiber (OFAN-II) Project and wireless)

Main Responsibilities:

Oversee and supervise the project as per plan, execute, and drive projects according to strict deadlines & within budget related to region.

Plan, survey and design Optical Fiber OSP Networks for Access and junction rings. Manage the conduct of technical site survey (TSS) and BOQ preparation. Implement OSP according to standards and specifications. Coordinate production of schematic technical diagrams. Handled installation of LAN via structured cabling systems using optical fiber and copper. Coordinated with the team of splicing of optical fiber (using siecor mini mass and M90 fusion splicers)

and testing (using OTDR and light source/power meter. Carry out quality control and quality assurance (QC/QA) on OSP projects. Direct and manage project development from beginning to end. Define project scope, goals and deliverables that support business goals in collaboration with senior

management and stakeholders. Develop full-scale project plans and associated communications documents. Effectively communicate project expectations to team members and stakeholders in a timely and

clarification. Liaise with project stakeholders on an ongoing basis. Estimate the resources and participants and achieved project goals. Draft and submit budget proposals, and recommend subsequent budget changes where necessary. Where required, negotiate with other department Managers for the acquisition of required personnel

from within the region. Determined and assess for additional staff and/or consultants and make the appropriate recruitments

for project cycle. Dedicated tasks and responsibilities to appropriate personnel. Resolved issues and conflicts within the project team. Managed project dependencies and critical path. Plan and schedule project timelines and milestones using appropriate tools. Coordinate with the Government authorities and autonomous bodies and obtaining NOC. Oversee and supervise the laying of optical fiber cable for Access and Junction. Coordinated with site engineers regarding daily progress of civil works including excavation of trench,

Page 7: ANJUM CV-1

placement of handholds and manholes and cable laid down at trench.From 1996-2001.

Designation: Team Leader- Operation & Maintenance.

Company: Detecon Al Saudia Company, Saudi Arabia

Project: STC (O&M)

Main Responsibilities:

I had responsibilities of O&M TEP-6 LDN and Junction Networks. Handling complaints regarding technical problems. Handling the emergency Mechanical Splicing regarding the cable-cut of FOC. Handling Fusion Splicing regarding cable-cut and during approved MDT (maintenance downtime) also

testing with Test Equipment at the fields. Leading Splicing team, testing through OTDR, Power meter and Fiber.

Loop back testing, like system loop, link loop, and transponder loop. Link testing and maintenance using Optical Power Meter, OTDR, Optical Laser Source, PFA Meter,

Splicing m/c etc. Optical Fiber: Route survey, Excavation, Trenching & Ducting, Lying of optical fiber & Backfilling, Pre &

post installation testing, Splicing, Link Testing using OTDR. Expert in the field of OSP for planning, Design, Construction and Installation. Expert for fiber optic and copper cable for installation, jointing and testing. Maintenance of company’s inventory of equipment including telephones etc. Participation in National & International PAT’s for Junction & Long Distance FO Network;

East Region KSA (Junction)

Between KSA – Bahrain (Long Distance)

Between KSA – Kuwait (Long Distance)

Maintenance & Termination of FOC, ODF at the repeater and cabinets. Handling the fault tracing/locating the FOC. Handling the laying of Fiber Optic Cable, Supervision of Civil Work & Protection of FOC. Splicing, testing

and termination of Fibers.From 1991-1996.

Designation: Assistant Engineer-Planning &Design

Company: Telephone Industries of Pakistan Islamabad

Project: TIP (Design)

Main Responsibilities:• Design, Preparation, checking and evaluation of plans for Outside Plant Network.• Conducts OSP survey.• Preparation of Reports, letters, and important correspondences to Client and government.

• Coordination with Implementation Group regarding progress of the project.• Preparation of Site Instructions, Revisions in accordance with the Standard Telecom Design.

• Attend weekly progress meetings with all department heads.• Preparation of Bill of Quantities relative to project requirement.

Trainings

OSP and ISP designing from PTCL with collaboration of GTZ-SIEMENS Germany, Islamabad Pakistan.

Page 8: ANJUM CV-1

GPONs Technology overview, From PTCL Islamabad, Pakistan. Fiber Optics Characteristics and Principals, from TIP Islamabad Pakistan. Emerging Technologies (DSL, IN, DXX, WLL, GSM and NGN) from TIP Haripur Pakistan SDH, ADM Topologies, from SIEMENS Islamabad, Pakistan. Lucent 5ESS Switching, BTS 2000, Training Department CTRL Islamabad, Pakista PCM and Digital Radio Transmission/DRS from PTCL Staff College, Haripur Pakistan Asset Management, AGP, Islamabad Pakistan.

Computer Skills Windows 2000 Professional Windows XP, MS Office 2000, 2003, 2007 (Word, Excel, Power point), SQL Server 2000. MS Project 2007,

Personal Details

Father Name: Maula Bakhsh Date of Birth: 15th August 1969 Nationality: Pakistani Gender: Male Marital Status: Married Driving License: Valid Saudi/Pakistani Driving License Strengths: Positive Attitude, Self Confidence, Hardworking