    Anholt Offshore Wind Farm case study

    Optimisation - cost reduction

    20 Nov. 2012Kim AndersenDirectorOffshore

    Claus KramhftDesign ManagerOffshore

    mth.com/offshore7 November 20121

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    2/32

    Kim Andersen

    Director

    Claus Kramhft

    Design Manager

    [email protected]

    +45 2270 9547

    [email protected]

    +45 2270 9823

    2 27 November 2012

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    3/32

    MT Hjgaard Offshore has installed 1/3 of the

    ncs un ee an ser ng am oan o

    Lynn & InnerRhyl Flats Burbo BankRobin Rigg

    Middel-grundenHorns RevKentish Flats Vindeby

    3 27 November 2012

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    4/32

    MT Hjgaard Offshore has installed 1/3 of the

    Sheringham Shoal (2010)

    Robin Ri 2008

    Lincs (2011-2012)

    Anholt (2012)

    Middelgrunden (2000)

    Burbo Banks (2006)

    Rh l Flats 2008

    Gunfleet Sands (2008-2009)

    Kentish Flats (2004)

    Vindeby (1992)

    Horns Rev (2002)

    Up until today we have a track record of 631 offshore foundations

    corresponding to 2GW wind power

    4 27 November 2012

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    5/32

    -

    en : nergy n oOffshore A/S

    Main contract

    Scope: supply & installation of 111foundations

    -

    AnholtOffshoreWind Farm

    WTG: Siemens 3.6 MW GrenJutland

    Total capacity: 400 MW

    27 November, 20125

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    6/32

    Grout connection

    Transition piece(weight 200-300 t)

    Monopile(weight 400-650 t)

    Scour protection- if necessary

    J-tube

    27 November 20126

    (cable conduit)

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    7/32

    7 27 November 2012

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    8/32

    8 27 November 2012

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    9/32

    9 27 November 2012

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    10/32

    Players in the value chain need to approach allphases of the development of an offshore wind farm

    in an industrialised way

    27 November 201210

    ource: enewa e , orecast o uture costs an ene ts, une

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    11/32

    The tender phase accounts for approximately the sameamount of time as that spent on the planning, production

    and installation phase

    Time spent onpreparation of thetender by client

    Tender phase

    12 months

    Planning,production,

    installation phase

    More time allocated to the lannin roductionand installation phase would ensure a moreoverall robust and effective project.

    27 November 201211

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    12/32

    We handle foundation projects from engineering to installation- and ossibl be ond

    InstallationOperation &

    maintenanceProcurement Installation

    Substation Cables Turbines

    ConstructionEngineering

    QHSE

    27 November 201212

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    13/32

    oss e o op m se es gn, a r ca on aninstallation

    Incorporation of practical experience in theinstallation concept

    Better and more robust solutions

    -

    encourage innovation

    Design &

    Engineering

    Fabrication Installation

    27 November 201213

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    14/32

    Our proven track record of innovating new solutions

    Grout packer Levelling system Pile gripper Cable protectionsystem

    Combined noisereduction and guidanceconceptUK Patent Application No. 1206596.7

    6 November 201214

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    15/32

    Operation & Maintenance Tendering

    ProcurementQHSE

    DesignInstallation

    CertificationLogistics

    PlanningEngineering

    6 November 201215

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    16/32

    Anholt Offshore Wind Farm case studyEffective and safe installation

    20 Nov. 2012

    Claus KramhftDesign Manager

    mth.com/offshore27. november 201216

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    17/32

    anu ac urer: a n us r es

    -

    OD transition piece: 5 - 5.65 m

    Conical grouted connection with double grout sealand grout inlet contingencies

    Water depths: var. 15.5 18 m

    MP installation vessel: HLV Svanen

    TP installation vessel: HLV Jumbo Javelin

    27 November 201217

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    18/32

    Mock-u of transitionpiece. Clash check andfabrication improvements

    27 November 201218

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    19/32

    Thorough preparation forinstallation. Installation aspects

    anal sed. Em lo eracknowledgement

    27 November 201219

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    20/32

    Second eneration lu sfor more severe seastates. Recycling of plugs

    27 November 201220

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    21/32

    The MP was towed tosite for installation. Feedto main vessel

    27 November 201221

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    22/32

    Offshore installation during winter:

    Equipment used for MP installationare es gne or w nter env ronment.Special oils and consumables areused for hydraulic systems.Standby icebreaker assistance.

    27 November 201222

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    23/32

    The MP was installed by

    Trunnions for fast up-ending and pile retrieval

    27 November 201223

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    24/32

    Full scale test of internalunderwater MP cutting tool

    27 November 201224

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    25/32

    The TP installation vessel HLVJumbo Javelin was capable ofcarrying 9 TPs on each load

    27 November 201225

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    26/32

    Large installation guides forsea fastening, more severesea states and easierinstallation

    27 November 201226

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    27/32

    The TP is clamped during

    grouting and grout curing foror zon a , ors ona anoverturning moment capacity toallow for increased sea states

    27 November 201227

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    28/32

    All 111 foundationsinstalled on time

    27 November 201228

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    29/32

    The next generation has already started

    29 27 November 2012

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    30/32

    MonopileGravity Jacket

    27 November 201230

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    31/32

    s a s ng an secur ng ong-time relationships betweencustomers and suppliers

    Integrated cooperation acrossthe value chain

    Price setting in relation to share.

    27 November, 201231

  • 8/22/2019 Anholt Offshore Wind Farm - Case Study

    32/32

    Offshore

    6 November 201232