AND EQUIPMENT SELECTION/CALGARY/CANADA/31 … · Mine Planning and Equipment Selection ... 1 Design...
Transcript of AND EQUIPMENT SELECTION/CALGARY/CANADA/31 … · Mine Planning and Equipment Selection ... 1 Design...
PROCEEDINGS OF THE FOURTH INTERNATIONAL SYMPOSIUM ON MINE PLANNINGAND EQUIPMENT SELECTION/CALGARY/CANADA/31 OCTOBER-3 NOVEMBER 1995
Mine Planning andEquipment Selection 1995Edited by
RAJK.SINGHALUniversite Laval, Quebec I Federal Government of CanadaInternational Journal of Surface Mining, Reclamation and Environment, Canada
ANILK.MEHROTRAThe University of Calgary, Alberta, Canada
JOHN HADJIGEORGIOUUniversite Laval, Quebec, Canada
RICHARD POULINThe University of British Columbia, Vancouver, B.C., Canada
Associate editors
KOSTAS FYTAS & JEAN-LUC COLLINSUniversite Laval, Quebec, Canada
E.M.DESOUZAQueen's University, Kingston, Canada
A. A. B ALKEM A / ROTTERDAM / BROOKFIELD /1995
Mine Planning and Equipment Selection 1995, Singhaletal. (eds)& 1995Balkema, Rotterdam. ISBN 90 5410 5690
Table of contents
Foreword xvn
Organization xix
1 Design and planning of surface and underground mines
Economic evaluation; Mine production; Mine simulation; Production scheduling;Computerized mine planning
Pit optimization of Sapan Dalam multi-seam coal deposit of Indonesia 3EY.Baafi, EMilawarma & CCusack
A dragline simulation model for complex multi-seam operations 9KY.Baafi, H.Mirabediny & K.Whitchurch
Planning of ore recovery parameters based on economical and mathematical modelling 15of ore drawingV.S.Bolkisev, V.N.Shashkin & KAAmiralin
A rational approach to the design of underground marble quarries 19M.Bosu, R.Ciccu & P.P.Manca
'INFRA' - Computer-aided planning of mine transportation systems 29C Buhrow
Managerial aspects of mining projects in remote sites 39AP.Chaves
Optimum open pit limit of Hekimhan-Deveci iron mine: Determination by the moving cone 45optimising techniqueADag&U.Ozer
Planning for safety: The use of risk assessment 49P.J. Foster & J. S. Edwards
Development of a short term planning tool at the Compagnie Miniere des Guemassa, 57ONA, MoroccoD.Goetz, P.Masurel, S.M.AitRahou & M.Sellami
Numerical methods and their user-friendly applications 65M.K.G6kay
Prediction of gas-geomechanic situation of coal-gas deposit during underground mining 71in panelG.I.Gritsko, B.VVlasenko & V.AFedorin
Top coal caving technology in dip thick coal seams 77Yu Haiyong, Wu Fengdong, Li Chongxun, Zhang Yongjiu, Zhang Yuliang & Yan Zhongyang
Meaningful rates of return for project evaluation 81M. M. Hajdasihski
Precision drilling extends the range of long hole blasting 89H.Hamrin
Peculiarities of recultivation by placer deposit mining 97V.F.Hnykin
Short-term production scheduling for open pit mines by PERT network with resource 103constraintsQinghuai Hu, Wei Wei & Shihong Fang
The study of rational bench height of deep open pit mines based on haulage cost 109Wang Jiachen & Liu Qi
The forecasting report of the moment of the mine retirement from the coal area mine fund 113/. G. Kondratova & N. S. Bulychev
Three dimensional modeling in planning ornamental stone quarries 117J.C. Koppe, AC.Zingano &J.F.C.L.Costa
Study and analysis of problems and disturbances caused by oversize boulders in a mine 121production system: A case studyU.Kumar
An intelligent system of optimizing the mine production planning of underground mine 127Yinglong Li, Xiaohua Chen & Guangxu Tong
Intellectual supporting system of VACS operator based on the fuzzy diagnostic model 131I.V.Lockshina
Computerized mine planning at Brunswick Mining & Smelting 137G.EMacPherson, P.G.Stothart & J.G.Torrance
Hydrotransport system simulation modeling for Syncrude's North Mine 143J.McTurk, P.Batty & D.W.Ellis
Hard dimension stone production by splitting and cutting methods in Italian quarries 151R. Mancini, M. Cardu & M. Fornaro
Layout and equipment of a modern high productive mine operation at great depths: 157The Ensdorf MineA Meyer & D.Gessner
UBC mining method selection 163L Miller-Tait, R. Pakalnis & R. Poulin
An expert system controlling ore flow in large scale orepass systems 169GMogi, J.Yamatomi & T.Adachi
VI
Block modelling and long range mine planning using SURPAC 177J.Nachmias & Y.Pavlov
Technogenic potash seams and their mining prospects 183M.P.Nesterov & V.Y.Marakov
Safety during filling of underground cavern gas storage 189AOtdhal&LHdjek
Underground hard-rock mining strategy development 193LD.Pareja & CW.Pelley
Re-examination of a century old mining area: Boleo, Baja California, Mexico 199D.M.Parkes
Exploitation planning in slate quarries by merging the recovery and quality indices 205H.G.Pereira, AJ.Sousa, T.Albuquerque, J. Ribeiro ScJ.Taboada
Coal mine pollution flows monitoring 209LAPuchkov, V.D.Ayurov &N.O.Kaledina
The mathematical model of interaction of mining and transport equipment at the quarry' s 215working zoneB.Rakishev, U.Djarlkaganov & J.Marat
Turning mining enterprises in Russia into private and joint-stock companies 221M.Revazov & S.Likhterman
Short term mining operation sequencing and control: The B2 approach as a case study 227J. Schleifer, M. Ismail & E. Caumartin
Application of deposit simulation model in mine design 231Hang Shu, Peng Yang & Guangxu Tong
Discussion on the mechanism of cut pulling in underground mines 235S. P. Singh
A field study of sources of hole alignment deviations 243T.Sinkala
On the issues of the solution of dynamics simulation of coal production within the coal 249mining process in coal facesP.Snapka
Fundamental considerations on a mining technology beyond continuous and longwall mining 255K. Spies
Contribution to ventilation of shafts during their closing 261V.Strakos&V.Kebo
Long term open pit scheduler 265B.Tolwinski & T.SGolosinski
Simulation for design, planning and control in the automated mine 271N.Vagenas, M.Scoble & G.Baiden
VII
An integrated approach to the extraction of the Rio Grande silver/ lead/ zinc orebodies 277at Mount IsaEMillaescusa, G.Karunatillake & T.Li
An interactive multiple criteria decision support system for production sequencing 285in an underground longwall hard coal mineF.LWilke & B.M.Winkler
Mine planning, pit design and production scheduling for Eshidiya phosphate mines 291J.Woreikat & F.Hayek
BEGS - A simulation model for assessing risks in mineral resources estimation 297EAWright
Mining's new frontier: The Fording Coal g.p.s. experience 303E.Wusaty&LPaulhus
Self-adaptive control of productional operations for surface mining 313Q.X.Yun & G.Q.Huang
Analysis of stability of gate entries in retreating longwall mining 319M. Zhang & A K. Bhattacharyya
Oil content estimation in sedimentary rock assisted by geostatistics 327AC.Zingano, J.F.C.L.Costa & J.C.Koppe
2 Mine equipment, materials handling and equipment maintenanceEquipment selection procedures; Pipeline transportation; Continuing mining systems;Drilling and blasting equipment; Change over to continuous mining systems; Dredging;Truck/shovel, draglines, conveyors, etc.; Mine maintenance; In-pit crushing!conveying
A detailed classification of rotating excavators 339LAdler & S.D.Thompson
Determination of equipment downtime/ breakdown and availability coefficients 343for continuous surface mining systemsZ.G.Agioutantis & CKavouridis
The economics and logistics of moving car bunker systems applied to modem underground 351coal minesP.M. Barlow
Equipment selection in the Iranian marble quarries (dimension-stone industry): Procedures 357and problemsS.H.Bassir
Conversion from bucketwheel to truck-shovel operation at Suncor, Oil Sands Group 363ABlazo
A systematic decision making model for optimum surface mining equipment selection 369T.Cebesoy, M.Go'zen & S.Yahsi
VIII
Equipment selection for small scale mining 379M.W.Chanda
Estimation of the air quality index in the case of operation of numerous diesel-powered units 385in Greek underground bauxite minesJ.N.Economopoulos & P.T.Kontothanassis
Intelligent dispatch system for technological monitoring 391N.I.Fedunec, O. E. Fomicheva & D.G. Lasht
Research on the interval between equipment examinations 395Liu Fengtai, Gao Hongwei, Ma Yundong & Hu Mingdong
Diagnosis of machines running at unstable speeds of revolution 399B.Geropp, H.-W.Kefiler & P.Burgwinkel
Application of high angle conveyor at Majdanpek open pit copper mine 403M.Grujic & Z Stanisic
Selection of opencast mine equipment using knowledge base and genetic algorithm 409A Haidar & S. Naoum
Selection of drill rigs for development drifting in underground mines 415H.Hamrin & LGustafsson
Conveyor belt selection criteria 419M. Hardygora
Current collectors for trolley mine locomotives 423AB.Ivanov
Determination of the distribution function of conveyor belt operating time based on the belt 427modelL.Jurdziak & M. Hardygora
On-line fault diagnosis of a bucket wheel gear box in a German open cast coal mine 431H.-W.Kefiler, B.van den Heuvel, B.Bauer & B.Geropp
Double roll crusher - Tooth base and bimetallic cap developments 437A Khan, D. Reid, K. Obaia & D.Adamic
Modern mine maintenance: Toolbox, blackbox, or tribo-technology? 445R.LKincaid
The pipeline transportation of grinded copper ore at Cerovo mine - From concept 457to implementationD. Knezevic, Z Markovic, S Stupar, D. Dragic & D. Dumitrasknvic
Planning and keeping in operation of coal-cavings 463T.Kovacs & LNemeth
On the property of hydraulic coupling 469Li Guang Bu
Design of an economic mobile slasher for underground coal extraction 4755. N. Maity, S. K. Chaulya & B. B. Dhar
IX
BEdisp - A computer-based truck dispatching system for small-medium scale mining 481operationsG.N.Panagiotou & T.N.Michalakopoulos
Magnetic defectoscopy of steel ropes 487J.Pistora, M.Leshdk, D.Ciprian & V.Mddr
The problems of control of power consumption in the mining enterprises 493G. Pivnyak
The development of welded structures for mining equipment 497B. Powers
Maintenance characteristics of mobile mine equipment at Falconbridge Strathcona mine 505N. Runciman, N. Vagenas & R.A Howes
Simple and exact mining using surface miners 511B. Schimm
Measurement and analysis of dragline operating parameters for block excavation 517G.B. Sharrock, T.O.Aspinall & A Scott
Estimation of applicability of a drilling machine in Japanese open pit limestone quarry 523H.Shimada & KMatsui
An introduction of a continuous mining system in hard rock open pit mines using a modified 529surface minerEX. Spachtholz & F.LWilke
The use of off-the-road tyres in a Turkish opencast lignite mine and its importance in mine 535economicsM.ZSunu &AO.Yilmaz
Appropriate technology for the cleaner mining of coal by smaller operators 541LWade & T.T.H.Woodyatt
Performance analysis of PDC pin and hybrid core bits in rock drilling 547M. D. Waller & A Ersoy
Automatic selection of aggregate images from a moving conveyor belt 553W.Wang
Availability control and equipment monitoring on large hydraulic shovels with the aid 559of on-board computersU.Wulfert
Experimental study on estimation of leakage discharge through concrete crack 565H.Yanagi, S.Matuoka & T.Fukuhara
Semi-continuous coal haulage system in Chinese surface mines 571Y.D.Zhang, D.X.Zhang, X.C.Li, S.C.Yang & X.F.Wang
3 Innovative mining systemsMachine automation and control; Mine-wide data gathering and monitoring; Expertsystems; Automation in surface and underground mining; Equipment health andperformance monitoring systems
Research on the global optimization theory for mining engineering systems 579Jianshe Chai, Xianping Xie & Guangxu Tong
Fully automated laser system for surveying a stockpile from a tripper car 585B. Clifford
Integrating communications and applications in the automated underground mine 591J. Hackwood & R. Poole
Intelligence decision-making system for selecting tunnelling equipment 597Gao Hongwei, Zhang Youxiang, Liu Fengtai, Ma Yundong & Hu Mingdong
The system design principles of mining machines with the combined main parts 601Y.I.Klimov
Applications of a flexible automation and robotics in mining: Database for designers 605V.Konyukh
TMS™ - Total Mining Systems: An intelligent management, production control 611and planning facilityJ.Peck&CHendricks
Power- and resources saving technology of rockmass destruction 619AV.Rashkin, V.F.Kuzin & V.P.Myazin
Integrated computer system for planning and controlling mining 623P.Stepanov & G.Piven
Simulation and animation of surface mines in the Western United States 627J.R.SturgulJ.Tiedemann, CRitter & T.Fliess
Apparatus and programme providing microprocessory means of mining automation 635V.V.Tkachov & G.G.Pivniak
4 Surface mining and the environmentOff-site impacts of surface mining operations on reclaimed land; Self-sustainablereclamation and recultivation; Minesite closure decommissioning and reclamation ofcontaminated sites; Acid mine drainage
Methods and results of the field measuring of geotechnical rock properties on spoil banks 639of brown-coal minesJ.Aldorf
Ethics, surface mining and the environment 645W.Cragg, D. Pearson & J.Cooney
Monitoring systems in mining environmental management and control 651Lde SallesLeal Filho, W.T.Hennies, D.Owen & S.Durucan
XI
Integrated reclamation planning of disconfigured landscape after surface mining operations 657at Ghana Consolidated Diamonds limited (GCD), Akwatia, GhanaJ.AF.Fenteng, R.K.Asabere & G.B. Solomon
Ferric phosphate coating to prevent pyrrhotite oxidation 667Z Georgopoulou, K. Fytas, H. Soto & B. Evangelou
Surface coal mining in the South Wales environment 675M.J.Haigh
Opencast mine planning creates the prerequisite for environmental compatibility 683M.Hartung
Underground limestone mining in Brazil as an economic environmental issue 691W.T.Hennies, A Stellin Jr &LC. Ghizzi
The social and environmental effects of surface coal mining 699S Hey cock
Mine rehabilitation close to urban areas: The case of Itaquera Quarry, Sao Paulo, Brazil 705M. M. Ibrahim, S. M. Eston &L.E. Sanchez
Study on biochemical treatment of Acid Mine Drainage (AMD) and comprehensive 709utilization of its sludgeZhu Jianwei
Environmental approach and the future of mining in the Urals region of Russia 715AV.Khokhryakov, I.V.Dementyev & V.G.Albrecht
Modelling rainfall/runoff on reclaimed land 717M.P.Kilmartin
Classification of waste rock at Island Copper Mine for acid rock drainage potential 723D.Lister & G.W.Poling
Geotechnical stability of slope of the opencast mine of Czechoslovak army at the foot 729of the Ore MountainsO.Lost'dk
Tracking of heavy metals in drainage from abandoned mines, Big Cottonwood Creek, Utah 733R.LMcNearny
Principles and practises of sustainable development - With TransAlta examples 737D.AMikalson
The identification, location and assessment of abandoned mine hazards - The first step 747toward rehabilitationA Mitchell & W.O.Mackasey
Paniculate emissions from some sources in surface mining 759M.A -K. Mohamed
Lithological and mineralogical influences on pyrite oxidation during the generation of acidic 765drainageKJ.Mountjoy & G.W.Poling
XII
Environmental problems associated with blasting operations and their remedies 773C.B.Navalkar
Saline gold mine wastes in arid Western Australia: Revegetation establishment in the absence 779of topsoilJ.M.Osborne
Self-sustainable reclamation: Shrub and tree establishment on saline mine wastes 787J.M.Osbome
Environmental issues of energy use in mines 793G. G. Pivniak &AB. Ivanov
Risk management for mine waste and tailings 797R.Poulin
Environmental problems associated with mining of bentonite clay deposits at Boa Vista, 803Paraiba, BrazilC. M. M. Silva, S. M. Eston & E. C. Damasceno
Surface mining and the responsibility for environmental impacts: New situations 807and challenges for the Czech coal industry/. Svoboda & M. Vrbovd
Areal dubbing of mining activity in the largest mining company in the Czech Republic: 811Most Coal Joint Stock Company (JSC MUS)J.Tfiska
5 Geotechnical stability in surface and underground miningPre-mining investigation; Blasting and controlled blasting; Slope stability prediction andmonitoring techniques; Haulroad design and construction; In-situ instrumentation;Design and construction of waste dumps; Liquid storage and tailing ponds; Groundwater;Application ofgeotextiles; Slope stability analysis; Remote sensing; Pit slope stabilizationtechniques
Parameter optimization and control in blasting works for ore and coal mines 819V.Arad & SArad
The stability and reliability analysis of development openings in the Valea Jiului 825V.Arad & SArad
The feasibility study of waterproof and water-protection technologies on the basis 829of Ukrainian mining regions geotechnical systemsV.I.Bondarenko & LASadovenko
Buffer action in the carboniferous clays rocks located on hard coal heaps 833ZBzowski
A general stochastic methodology for rock work design 839R.Cotza & B.Grosso
Static collapse of mine waste fills 845R.F.Dawson & N. R. Morgens tern
XIII
The objective laws of itself of landslides in the open pit mines 853AM.Demine & I.AGraur
Backfill in potash mines: Transportation and geotechnical issues 857E.De Souza
Seismicity at El Teniente mine 865R.Dunlop & SGaete
Performance tests on short length cable bolts in an underground room and pillar mine 871J.N.Economopoulos, D.H.Kotinis, N.J.Koronakis &AI.Sofianos
Stability of coal pillars in inclined coal seams 875M.H.Foroughi
Variable stress meter for monitoring rock mass structures 881F.Fujimura, W.T.Hennies & AC. Fernandes
Blastability of rocks - Studied cases 887F.Fujimura, L-Soares, W.T.Hennies & M.AResende Silva
Modelling of the underground water filtration in the drainage shaft region of Kremikovtsi 893open-pit mineDAGabeva
Rock mass as a dissipative thermodynamic system - New conception in open pit slope 899stability modellingR.AHalatchev
Selection of ground control instrumentation for potash, coal and hardrock 907G. H.Her get
Resistivity manifestations of slope deformations and subsidence basins 913LHofrichterovd, J.Mullerovd & KMiiller
Dumping patterns of coal wastes in Chinese underground mines 921ZhenqiHu & Hehe Gu
Research of general entropy in mining 927Song hualing. Sun baozeng, Yu bo, Liu lijuan & B.Lambrecht
The prediction of rock quality parameters by using neural network models 933YiHuang & P.-ALindqvist
Truck road slope design by using coefficient of equivalent haulage distance in the Yongping 939copper mineHuaJinyao, Zhoupuhe & Cai Sijing
Model of fines generation in coal blasting 945KKKabongo
Continuum and discontinuum modelling of mine pillars in jointed rock 953AP.Kapenis & C.E.Tsoutrelis
Geomechanical model of rock salt for stress and stability analysis of underground disposal 961cavernZ Kleczek & D. Flisiak
XIV
A computer modelling system for three-dimensional stability assessment of slopes 967H. Kumsar & B. Denby
Codisposal of fine tails and overburden utilizing pipelining techniques 973E.R.F.Lord & W. Maciejewski
Dam construction and utility corridor relocation in-pit at Syncrude Canada Ltd 981J.MacNeil, LPiciacchia, R.Cameron & C.Ashton
Instrumentation of an advancing mine slope in the Athabasca Oil Sands 989G.T.McKenna & M.AB.Shelbourn
Large scale underground stoping of rock for aggregate production and subsequent use 999for storage or waste disposalK. Nielsen & A Myrvang
A computer program for kinematic analysis of rock slopes 1005AOcal &AOzgenoglu
A revegetation option for saline tailings in Western Australia 1011J. M. Osborne & D. R. Brearley
Performance monitoring on the excavability of dragline - A case study 1017M.Ozdogan, AG.Pasamehmetoglu, C.Karpuz, M.AHindistan & T.Bozdag
Stress-deformed state of laminated anisotropic environment with cavity or inclusion 1023N.D.Pankratova & AT.Vasilenko
Developing a mechanical hard rock splitter 1029J.Paraszczak, P.Dupont, J.Hadjigeorgiou & M.Savard
Application of geotextiles for stabilizing underground spaces 1037V.Pipiska, V.Sedlaty, J.Durove, M.Maras & J.Mihal
The application of the concept of brittle-ductile transition to slope behaviour 1041AJ. Poulsom
The effect of cutting pattern geometry on the performance of pick arrays in machine mining 1047F.F.Roxborough, ZCLiu & LChen
Design of up-building the tailing pond in the Copper Mine Majdanpek 1055P.Salatic, SDeusic, V.Salatic, M.Grbovic & M.Grujic
Geotechnical concerns with the design and application of spoil-side dragline operations 1061at the Vesta Mine, East-Central AlbertaC.Simpson & D.W.Horsfield
Bolted voussoir rock roof beds with large deflections 1069A /. Sofianos &AP. Kapenis
The influence of horizontal stresses on the stability of surface coal mine footwall slopes 1075D. Stead, E. Eberhardt & B. Benko
Sequential blasting: Problems faced by Chettinad Cements 1081KSSundar
XV
Integrated mine water management planning for environmental protection and mine 1091profitabilityL. F. Sawatsky, G. Beckstead & D. Long
A simple method to obtain size distribution of a rock heap 1095using its segregation characteristicsM.Ujihira, N.Takagai, KOgawa, SMizushima &N.Marutani
Reduction of environmental pollution caused by transport vehicles in quarries 1101VV.Ushakov
Industrial design and test of a backfill mining system under complex geological conditions 1103in ChinaGenxiang Yang & Jianjun Zhang
The system of geomechanical monitoring for block-layered massif of salt rock 1109M.AZhuravkov, SSAndreyko & M.D.Martunenko
Author index 1115
XVI