DAM FAILURES and CONSTRUCTION INSPECTION by Hal Van Aller Maryland Dam Safety

Transcript of and CONSTRUCTION INSPECTION

Page 1: and CONSTRUCTION INSPECTION

DAM FAILURESand

CONSTRUCTION INSPECTION

by

Hal Van AllerMaryland Dam Safety

Page 2: and CONSTRUCTION INSPECTION

Embankment Dam Schematic

Page 3: and CONSTRUCTION INSPECTION
Page 4: and CONSTRUCTION INSPECTION

Medford Quarry Wash Pond CMP failure

Page 5: and CONSTRUCTION INSPECTION

Velvet Hills sinkhole

Page 6: and CONSTRUCTION INSPECTION

Sinkhole in crest of new MD dam

Page 7: and CONSTRUCTION INSPECTION
Page 8: and CONSTRUCTION INSPECTION

WCC (Joe Kula) Testpit along pond CMP spillway

Page 9: and CONSTRUCTION INSPECTION

AACounty CMP with void

Page 10: and CONSTRUCTION INSPECTION

Loveton Dam Failure (1989) Breach

Page 11: and CONSTRUCTION INSPECTION

Anti-seep collars do

not prevent seepage failures!

Page 12: and CONSTRUCTION INSPECTION

Loveton 78” CMP viewed from downstream

78 inch CMP viewed from downstream

Page 13: and CONSTRUCTION INSPECTION

Failed PVC pipe with anti-seep collar

Page 14: and CONSTRUCTION INSPECTION

Annap Mall collapsed CMP d.s. of Riser

Page 15: and CONSTRUCTION INSPECTION

Annap Mall u.s. view

Page 16: and CONSTRUCTION INSPECTION

What caused these failures?• Design• Construction• Inspection• All of the

above??

Page 17: and CONSTRUCTION INSPECTION

Spillways are “Confined Space”

Page 18: and CONSTRUCTION INSPECTION

Ray Martin cave

Page 19: and CONSTRUCTION INSPECTION

Typical Problems schematic

Page 20: and CONSTRUCTION INSPECTION
Page 21: and CONSTRUCTION INSPECTION

Compaction in Haunches

Page 22: and CONSTRUCTION INSPECTION

Pipe Installation in DamDam Embankment

Filter Diaphragm

Flowable FillPipe in vertical trench

Page 23: and CONSTRUCTION INSPECTION
Page 24: and CONSTRUCTION INSPECTION
Page 25: and CONSTRUCTION INSPECTION

Excavation through dam

• Side slopes must be 2(H):1(V) or flatter

15 ft

Page 26: and CONSTRUCTION INSPECTION
Page 27: and CONSTRUCTION INSPECTION
Page 28: and CONSTRUCTION INSPECTION

FILTER DIAPHRAGM

Page 29: and CONSTRUCTION INSPECTION

Centennial Park dam chimney drain construction

Page 30: and CONSTRUCTION INSPECTION

Filter Diaphragmflooding with water for

compaction

Page 31: and CONSTRUCTION INSPECTION

Merkle Filter Diaphragm with vibrator

Page 32: and CONSTRUCTION INSPECTION
Page 33: and CONSTRUCTION INSPECTION

CONSTRUCTIONExperienced contractor desired

• must realize that ponds are different from roads and utilities

• must work with design engineer• compaction along spillway is critical--

don’t construct embankment and then cut trench

• spillway joints must be watertight

Page 34: and CONSTRUCTION INSPECTION

Alternative Designs• Avoid large diameter CMP• User weir or drop box structure• If pipes unavoidable, use:

– Concrete pressure pipe (min. ASTM C-361)– Complete concrete cradle or flowable fill– Watertight joints– Filter diaphragm

• Avoid combining pond with road embankment

Page 35: and CONSTRUCTION INSPECTION

CHUTE SPILLWAYS SCHEMATIC

Page 36: and CONSTRUCTION INSPECTION
Page 37: and CONSTRUCTION INSPECTION

Concrete flumes on embankment have problems too

Page 38: and CONSTRUCTION INSPECTION
Page 39: and CONSTRUCTION INSPECTION

CMP spillway on steep slope through dam embankment

Page 40: and CONSTRUCTION INSPECTION

Tasker’s Chance concrete weir

Page 41: and CONSTRUCTION INSPECTION

Crooksville, OHIO-COMPLETED WEIR

Page 42: and CONSTRUCTION INSPECTION

Parker Pond new sheet pile spillway

Page 43: and CONSTRUCTION INSPECTION

Do's and Don’ts for Pond Design and Construction

• Don’t use anti-seep collars to “stop” leakage• Do use filter diaphragms• Don’t allow spillway installation in trench• Do require watertight joints• Do inspect each pipe joint as it is put together

so it can be redone if necessary• Do consider alternative spillway design that

eliminates pipe through dam or foundation

Page 44: and CONSTRUCTION INSPECTION

InspectionMore than just testing Compaction!

• Inspector should:! work for the design engineer, not the

contractor! understand design assumptions and effects

of unanticipated conditions! not allow deviation from design without

design engineer’s approval! observe and document: pipe mfg marks, joint

type, gasket material and size, and installation procedure

Page 45: and CONSTRUCTION INSPECTION

Foundation

• Proof rolling• Inspection by Geotechnical Engineer

Page 46: and CONSTRUCTION INSPECTION

Compaction

• Use STANDARD Proctor (ASTM D-698 or AASHTO T-99)

• Do Not use MODIFIED Proctor (ASTM D-1557 or AASHTO T-180)

• Nuclear gage readings need to be corrected to match lab moisture & density

Page 47: and CONSTRUCTION INSPECTION

Utility Conduits(water, sewer, gas)

• Pipes through the dam must meet spillway requirements

• No granular backfill for pipes parallel to the dam axis

Page 48: and CONSTRUCTION INSPECTION

Pre-cast riser structures

Page 49: and CONSTRUCTION INSPECTION

Anchor Plates

Movement

Page 50: and CONSTRUCTION INSPECTION

Leaky Joints

Page 51: and CONSTRUCTION INSPECTION

Concrete Pipe Installation

• Pipe supports• Clean and Lubricate joints• Lubricate Gasket• Tension Gasket• Full concrete cradle, not just bedding• If not o-ring gaskets then owner and

engineer must approve

Page 52: and CONSTRUCTION INSPECTION
Page 53: and CONSTRUCTION INSPECTION
Page 54: and CONSTRUCTION INSPECTION
Page 55: and CONSTRUCTION INSPECTION

Prepare foundation and supports

Page 56: and CONSTRUCTION INSPECTION

Mudmat is a good idea

Page 57: and CONSTRUCTION INSPECTION

Clean joints

Page 58: and CONSTRUCTION INSPECTION

Lubricate joints

Page 59: and CONSTRUCTION INSPECTION

Lubricate o-ring

Page 60: and CONSTRUCTION INSPECTION

Tension o-ring withround-shaft screwdriver

Page 61: and CONSTRUCTION INSPECTION

Mis-aligned o-ring ...

Page 62: and CONSTRUCTION INSPECTION

...causes broken bell

Page 63: and CONSTRUCTION INSPECTION

Gaskets for Concrete PipeTraditional O-ring joint

•Deep joint allows for substantial extensibility

•Symmetric design accommodates internal or external pressure

Page 64: and CONSTRUCTION INSPECTION

Newer “Profile Gaskets”

Press-Seal Gasket Company states these “advantages” over o-rings:

•Stepped joint is cheaper to manufacture than groove for confined o-ring gasket

•Easier to install, less force needed to “home” joint

•Less bell breakage

Page 65: and CONSTRUCTION INSPECTION

Gaskets for Concrete PipeNew style “Profile Joint”

•Smaller joint separation allowance

•Designed for internal pressure

Page 66: and CONSTRUCTION INSPECTION

Gaskets for Concrete PipeNew style “Profile Joint”

Page 67: and CONSTRUCTION INSPECTION

Formed concrete cradle

Page 68: and CONSTRUCTION INSPECTION

Cradle poured against

soil

Page 69: and CONSTRUCTION INSPECTION

Poor installation

Page 70: and CONSTRUCTION INSPECTION
Page 71: and CONSTRUCTION INSPECTION
Page 72: and CONSTRUCTION INSPECTION
Page 73: and CONSTRUCTION INSPECTION
Page 74: and CONSTRUCTION INSPECTION
Page 75: and CONSTRUCTION INSPECTION
Page 76: and CONSTRUCTION INSPECTION
Page 77: and CONSTRUCTION INSPECTION
Page 78: and CONSTRUCTION INSPECTION
Page 79: and CONSTRUCTION INSPECTION
Page 80: and CONSTRUCTION INSPECTION
Page 81: and CONSTRUCTION INSPECTION
Page 82: and CONSTRUCTION INSPECTION

Take Pictures!

Page 83: and CONSTRUCTION INSPECTION

Dam on Soft Foundation

Page 84: and CONSTRUCTION INSPECTION

Spillway pipe atend of construction

Page 85: and CONSTRUCTION INSPECTION
Page 86: and CONSTRUCTION INSPECTION

Same pipe after excessive foundation settlement