ANAVE- Launch of Recommended Practice for LNG bunkering JATE

16
Lars Petter Blikom, Segment Director Natural Gas, Jan Tellkamp, Project Manager R&D October 2013 Launch of Recommended Practice for LNG bunkering Proposed future governance of LNG bunkering

Transcript of ANAVE- Launch of Recommended Practice for LNG bunkering JATE

Lars Petter Blikom, Segment Director Natural Gas, Jan Tellkamp, Project Manager R&D

October 2013

Launch of Recommended Practice for LNG bunkering

Proposed future governance of LNG bunkering

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

Flemish StudyEMSA Study

SEVESO at GATE

Gothenburg Project

Bungas StudyGerman StudyIMO infrastructure US

Operation

Commissioning

Construction

Design

Feasibility

Strategy

Yesterday’s picture – fragmented studies

2

Large scale storage &

distribution

Intermediate distribution

Intermediate storage

Bunker / Break Bulk

Marine fuel / other

markets

ISO guide-lines

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

Basics of LNG safety

3

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

Scope of the Recommended Practice

4

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

ISO guideline states 24 performance objectives…

Selected examples:

[F18] The transfer system shall be capable of being disconnected rapidly to minimise damage to the transfer system in case of ships drift or vehicle movement….

[F21] A safety zone shall be implemented around the bunkering operation into which only essential personnel shall have access.

5

… the RP suggests how to meet them

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

ISO guideline defines 3 layers of defence …

6

… the RP suggests how to work with them

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

RP shows how to integrate key elements of LNG bunkering

7

1 – Safe design and operation

2 – Safety Management

System

3 – Risk Assessment

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

1 – Safe design and operation

8

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

2 – Safety Management System

9

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

3 – Risk Assessement

10

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

Safety Zones

11

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

Main elements, main actors, main activities in one context

12

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

Operation

Commissioning

Construction

Design

Feasibility

Strategy

Today’s picture – consistent frame and approach

13

Large scale storage &

distribution

Intermediate distribution

Intermediate storage

Bunker / Break Bulk

Marine fuel / other

markets

DNV RP for development,design and operation of LNG bunkering facilities

ISO guide-lines

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

Safeguarding life, property and the environment

www.dnv.com

14

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

Foreseen governance of LNG bunkering operations

Port and state

legislation

• Safety philosophies• Performance objectivesISO standard

• How to meet performance objectives

• Practical approach• As detailed as possible,

but still generic

DNV RP

• Site and ship specific issuesOperational procedures

15

© Det Norske Veritas AS. All rights reserved.

Launch of Recommended Practice for LNG bunkering

October 2013

Risk assessment

16