Anatomy of an Effective PM Program at United Water Springfield

42
1 Anatomy of an Effective PM Program at United Water Springfield

Transcript of Anatomy of an Effective PM Program at United Water Springfield

Page 1: Anatomy of an Effective PM Program at United Water Springfield

1

Anatomy of an

Effective PM

Program at United

Water Springfield

Page 2: Anatomy of an Effective PM Program at United Water Springfield

2

Presentation Highlights

¢ PM Basics

¢ Origin of the Springfield Program

¢ Developing the Program

¢ Conclusions

Page 3: Anatomy of an Effective PM Program at United Water Springfield

3

Effective Preventative Maintenance

What is

Preventative Maintenance?

Page 4: Anatomy of an Effective PM Program at United Water Springfield

4

Effective Preventative Maintenance

The care and servicing by personnel for the

purpose of maintaining equipment and

facilities in satisfactory operating condition by

providing for systematic inspection, detection,

and correction of incipient failures either

before they occur or before they develop into

major defects

Page 5: Anatomy of an Effective PM Program at United Water Springfield

5

Effective Preventative Maintenance

Part 1

“care and servicing by personnel for the

purpose of maintaining equipment”

Page 6: Anatomy of an Effective PM Program at United Water Springfield

6

Effective Preventative Maintenance

Part 2

“inspection, detection, and correction of

incipient failures either before they

occur or before they develop into major

defects”

Page 7: Anatomy of an Effective PM Program at United Water Springfield

7

Effective Preventative Maintenance

RPM Work Order – A Repair Work Order

generated from the performance of a

Preventative Maintenance Work Order

An important metric to track and helps to

prevent Emergency Work Orders

Page 8: Anatomy of an Effective PM Program at United Water Springfield

8

Effective Preventative Maintenance

wear on centrifuge discharge port

Page 9: Anatomy of an Effective PM Program at United Water Springfield

9

Effective Preventative Maintenance

Preventative Maintenance

Program for facility centrifuges

and associated equipment

Page 10: Anatomy of an Effective PM Program at United Water Springfield

10

Effective Preventative Maintenance

2 Centrifuges were installed in 2008

replacing 4 belt filter presses and

became operational in 2009 as part

of a sludge dewatering upgrade

Page 11: Anatomy of an Effective PM Program at United Water Springfield

11

Effective Preventative Maintenance

2 Centrysis 21HC Centrifuges

1 Spare Rotating Assembly

Polymer Storage, Makeup, and Pumping

Systems

Conveying Systems – 5 Conveyors

Page 12: Anatomy of an Effective PM Program at United Water Springfield

12

Effective Preventative Maintenance

Centrifuge Production

40,000 Wet Tons Per Year

@ 25% Solids

Polymer – 14 lbs Active Polymer / DT

Page 13: Anatomy of an Effective PM Program at United Water Springfield

13

Effective Preventative Maintenance

A great opportunity to start a

PM program from scratch on

new equipment

Page 14: Anatomy of an Effective PM Program at United Water Springfield

14

Effective Preventative Maintenance

Where do PM’s come from?

¢  Manufacturers Recommendations*

¢  Staff Recommendations

¢  Experience

* To avoid warranty issues

Page 15: Anatomy of an Effective PM Program at United Water Springfield

15

Effective Preventative Maintenance

Example of Staff Recommendation/Experience:

¢ Metal greased bearings on shafted sludge

conveyors that required monthly maintenance

replaced with nylon bearings that only

required maintenance every six months

Page 16: Anatomy of an Effective PM Program at United Water Springfield

16

Effective Preventative Maintenance

Example of Staff Recommendation/Experience:

¢ Combine multiple short PM’s into one larger

PM

¢ Shorten or lengthen the time between PM’s

Page 17: Anatomy of an Effective PM Program at United Water Springfield

17

Effective Preventative Maintenance

Who does the PM?

The person that can add the

most value to the task

Page 18: Anatomy of an Effective PM Program at United Water Springfield

18

Effective Preventative Maintenance

In general:

Assign 90-day or less PM tasks or

simple PM tasks to your Operators

and free up Mechanics for higher

level functions.

Page 19: Anatomy of an Effective PM Program at United Water Springfield

19

Effective Preventative Maintenance

Today’s operators are smarter and more

capable than ever before, not only in terms of

formal academic achievement, but relative to

interest and desire to be part of the

maintenance solution.

Avoid the “I operate it, you fix it” mentality!

Page 20: Anatomy of an Effective PM Program at United Water Springfield

20

Effective Preventative Maintenance

Components of a PM Task

•  Accurate Task Instructions (SOPs)

•  Job Safety Analysis

•  Equipment Specific LO/TO Procedures

•  CMMS – Computerized Maintenance

Management System

Page 21: Anatomy of an Effective PM Program at United Water Springfield

21

Effective Preventative Maintenance Equipment Specific LO/TO Procedure

Page 22: Anatomy of an Effective PM Program at United Water Springfield

22

Effective Preventative Maintenance

United  Water  Springfield  Job  Hazard  Analysis  

   Job:  Monthly  Centrifuge  Polymer  Make  Up  Units  PM  

Job  Description:  Perform  monthly  PM  on  centrifuge  polymer  make  up  units,  LO/TO  and  test      equipment,  remove  flow  sensor  and  clean  tip,  take  apart  polymer  check  valve  and  clean      components  

Job  Hazards:    

1. Ergonomic  –  bending,  standing  lifting,  congested  area  2. Falls  –  working  on  elevated  platform  3. Stored  Energy  –  process  water  line  under  pressure,  equipment  must  be  depressurized,  

locked  out,  tagged,  and  tested  4. Slips  and  Trips  –  work  area  may  be  wet,  polymer  is  extremely  slippery  

Hazard  Controls:  

1. Test  LO/TO  before  starting  work  2. PPE  –  hard  hat,  safety  glasses,  safety  shoes,  gloves  3. Check  floor  for  polymer  spills  and  clean  if  needed  4. Use  proper  lifting  and  bending  technique  5. Clean  jobsite  after  completion  

 

 

 

 

 

 

Task Related Safety Information

Page 23: Anatomy of an Effective PM Program at United Water Springfield

23

Effective Preventative Maintenance

Accurate Task Instructions

Page 24: Anatomy of an Effective PM Program at United Water Springfield

24

Effective Preventative Maintenance

Grease  fi(ng  for  bearing  –  grease  un1l  fresh  grease  comes  out  of  plug  hole  on  opposite  side  of  sha9

Grease  fi(ng  for  sha9  seal  –  three  squirts

Page 25: Anatomy of an Effective PM Program at United Water Springfield

25

Effective Preventative Maintenance CMMS Program

Page 26: Anatomy of an Effective PM Program at United Water Springfield

26

Effective Preventative Maintenance

Page 27: Anatomy of an Effective PM Program at United Water Springfield

27

Effective Preventative Maintenance PM Assignment Board

Page 28: Anatomy of an Effective PM Program at United Water Springfield

28

Effective Preventative Maintenance

PM Assignment Board Value

• A visual tool that clearly establishes performance expectations

• Promotes accountability

Page 29: Anatomy of an Effective PM Program at United Water Springfield

29

Effective Preventative Maintenance

11 PM’s Done by Operators 4 day – 1

7 day – 2 30 day – 3 90 day – 1

180 day – 2 365 day – 2 730 day – 2

~191 PM’s Per Year

Page 30: Anatomy of an Effective PM Program at United Water Springfield

30

Effective Preventative Maintenance

Completion – Failure Rate 2012 to 2014

   

4  Day  PM  Conveyors  

7  Day  PM  Centrifuges  

30  Day  PM  Poly  Units  

30  Day  PM  Centrifuges  

30  Day  PM  Conveyors  

90  Day  PM  Poly  Units    

180  Day  PM  Centrifuges  

180  Day  PM  Hydraulic  Units  (2)  

365  Day  PM  Belt  

Conveyor  

730  Day  PM  Conveyors  

730  Day  PM  Poly  Pumps   Total  

2012  -­‐  Completed   88   52   12   12   10   4   2   4   1       1     186  2012  -­‐  Failure   3               2                           5  

2013  -­‐  Completed   91   52   12   12   12   4       3   1   1       188  2013  -­‐  Failure                           2   1               3  

2014  -­‐  Completed   92   52   12   12   12   4   2   4   1       1   192  2014  -­‐  Failure                                               0  

Page 31: Anatomy of an Effective PM Program at United Water Springfield

31

Effective Preventative Maintenance

Completion – Failure Rate 2012 to 2014

Total  PM  Work  Orders   574  Total  -­‐  Completed   566  Total  -­‐  Failed   8  CompleMon  Rate   98.6%  

Page 32: Anatomy of an Effective PM Program at United Water Springfield

32

Effective Preventative Maintenance

Page 33: Anatomy of an Effective PM Program at United Water Springfield

33

Effective Preventative Maintenance

Page 34: Anatomy of an Effective PM Program at United Water Springfield

34

Effective Preventative Maintenance

Page 35: Anatomy of an Effective PM Program at United Water Springfield

35

Effective Preventative Maintenance

Page 36: Anatomy of an Effective PM Program at United Water Springfield

36

Effective Preventative Maintenance

Page 37: Anatomy of an Effective PM Program at United Water Springfield

37

Effective Preventative Maintenance

Page 38: Anatomy of an Effective PM Program at United Water Springfield

38

Effective Preventative Maintenance

Page 39: Anatomy of an Effective PM Program at United Water Springfield

39

Effective Preventative Maintenance

Page 40: Anatomy of an Effective PM Program at United Water Springfield

40

Effective Preventative Maintenance

Major Centrifuge Maintenance In House – Every 5,000 Hours Back to Manufacturer – Every 15,000 Hours

Page 41: Anatomy of an Effective PM Program at United Water Springfield

41

Effective Preventative Maintenance

0

10

20

30

40

50

2010 2011 2012 2013 2014

Cent 1 Y Avg

Cent 2 Y Avg

Cent 1 D Avg

Cent 2 D Avg

Shutdown

Alarm

Centrifuge Vibration Levels

Page 42: Anatomy of an Effective PM Program at United Water Springfield

42

Effective Preventative Maintenance

Conclusions •  CMMS System provides strategic value •  Whiteboard provides tactical value •  Our effective preventative maintenance

program is a very important part of our overall maintenance program

•  Use metrics to measure the effectiveness of your program