Analyst day – Russia & CIS
Grid
Grégoire Poux-Guillaume
15/03/2012
Agenda
Grid market size & drivers
Alstom Grid presence and achievements
Alstom Grid strategy in Russia & CIS
2
Market trends in Russia & CIS 2011-2014
• Russia Grid Market expected to increase by 7% / year for the period 2011-2014
- Large scale HVDC projects expected in Moscow area and border with EU
• Heterogeneous market in CIS
Source: Alstom
1.51.8 1.8 1.8
0.2 0.30.5
0.5
0.5 0.5
2011 2012 2013 2014
CISRussia (HVDC)Russia (traditional)
B€2.0
2.32.5 2.6
3
Grid Market evolution
Grid market in Russia
Power Generation
300 M€
Utilities750 M€
Oil & Gas150 M€
Industry & Infrastructure
300 M€
2011 Grid Market Breakdown by End Users • Transmission & Distribution companies are
the main players on the market
- FSK is modernising and investing in new technology – Smart Grid, Digital substations, R&D
- Power Generation sector led by RusHydro and Rosatom + foreign investors will start development
- Big plans for railways: tramways and high speed trains
- Oil & Gas: focus on modernisation and automation of refinery process
- Approaching Sotchi Olympic games will serve as driver to ensure growth
€ 1.5 bn
4
Grid market in CIS
• All countries recovering after severe economical crisis impact
• Kazakhstan: main CIS market (~50%)
• Flat global market with opportunities
- Transmission network rehabilitation launched in 2010 in Kazakhstan
- Grid rehabilitation and grid connections of new renewable energy projects in Ukraine
Kazakhstan
Tajikistan
Azerbaijan
Belarus
Ukraine
2011 Grid Market Breakdown by Countries
€ 500 M
5
ПетродворецЛенинградскаяАЭС-2
Преобразовательныйпункт (ПП)
Преобразовательныйпункт (ПП)
КЛ 300 кВпостоянного тока
26 км
ВЛ 300 кВпостоянного тока
62 км
ВЛ 330 кВпеременного тока
25 кмФинский залив
•Back-to-Back Vyborg• 4 x existing 350 MW to be reconstructed , with a Go for 500 MW• Start with new multi-terminal 1,000 MW
•HVDC line Point-to-Point Vyborg to LAES• 2 x (300 kV, 500 MW) • approximately 150km Submarine cable and Over-head lines
B2B Vyborg
HVDC Projects in Russia2012-2016
Back-to-back Vyborg RUS-FIN
Point-to-Point LAES NPP terminal
• Sibiria-Ural-Centre • Russia-Turkey • Russia-Norway Back-to-Back• Russia-Central Asia-India • Kaliningrad – Poland Back-to-Back• Kaliningrad – Germany Point-to-Point with submarine cable• Russia – China (2-3 projects) • HVDC Back-to-Back in St.-Petersburg and Moscow
Other potential HVDC Projects (2012-2016)Vyborg-LAES HVDC Scope in Russia (2012)
6
Smart Grid projects in Russia
FSK challenge: control of a large network with periodically distributed generation and loadsAlstom Grid closely cooperating with FSK on Cluster Pilot Project in Volga Region
SMART FACTSfor improved current
stability
Already under deployment with FSK
(Nadhezda)
DIGITAL SUBSTATIONboosting the performance
of grid substations
ON-LINE STABILITY SOLUTIONS
tracking power oscillations on wide area networks
SMART CITY MICROGRIDIntegrating and piloting
Distributed Energy Resources and Loads in local grids
Smart Grid Cluster Pilot Project in Volga Region
7
Competition
• ABB engineering and production capabilities in Russia
• SIEMENS entered the market through Power Generation
• HYUNDAI entering the market
• Russian Players (ELECTROZAVOD, TT, UETM)- Covering all power transformers (except HVDC and special transformers) and AIS switchgear- Developing GIS
8
Competitive market with international and local companies
Agenda
9
Grid market size & drivers
Alstom Grid presence and achievements
Alstom Grid strategy in Russia & CIS
Grid orders in Russia & CIS
2011/12 (e)
CISRussia
14%market share
10%market share
10
• 2011/12 (e) orders based on recurrent business
• Multiple channels to market: active cooperation with many EPCs
• Additional opportunities in aluminum and HVDC projects
App. € 200 M
Alstom Grid order intake
Grid in Russia Regional presence
North-West
Center
South
Ural
West Siberia
East Siberia
Far East
Main office -1Sales Offices -6
Factory of JV Alstom-Rusal
Joint Venture with RUSAL
Automation Business
Service Business
S. Petersburg
Moscow
Yekaterinburg Surgut
Irkutsk
Krasnoyarsk
New offices to be opened
KhabarovskRostov-on-Don
150 employees for Alstom Grid in Russia
11
Grid achievements in Russia
• Alstom Grid has signed a JV (51/49) agreement with KER to work jointly on HVDC projects in Russia
• Alstom Grid is working to boost the traditional AC business
- Active cooperation with FSK
- Strong relationships with a lot of local contractors
- On-going discussions to localise production in Russia (AIS and GIS switchgears)
• JV (50/50) with RUSAL – #1 Russian Aluminiumproducer. Good opportunities to continue in Mines & Metals and joint work in Power Generation
12
Recent achievement in Russia: Kubanski Cascade - Alstom(110 kV, 330 kV Gas-Insulated Substation)
End customer: RusHydro
Customer: Alstom Power
Project scope: Kubanski Cascade HPP (9 HPPs in cascade)
Turnkey project Installation of:- GIS (110 kV, 330 kV)- CBR (330 kV)- PTR (Power Transformer and Autotransformer) (110 kV, 330 kV) - AIS (110 kV)
Particularity: in cooperation with Alstom Power
Volume: over € 35 M
Commissioning: 2013 - 2015
13
Recent achievement in Russia: Alstom - RUSAL(Tajshet Aluminium Smelter)
End Customer: RUSAL
Project Scope: Tajshet smelter (Sayanogorsk, Siberia): 2007 to present, 2 potlines, 750,000 t/year of aluminium.
Turnkey project
Alstom equipment: - GIS (220 kV)
- 12 rectifiers 82.5 kA each, total current 400 kA- PTR (Power and Rectifier Transformers)
Volume: over € 110 M
Commissioning: 2013
14
Recent achievement in Russia: Alstom - RUSAL (Boguchany Aluminium Smelter)
End Customer: RUSAL
Customer: RUSAL & RusHydro
Project Scope: Boguchany smelter (Kodinsk, Siberia): 2007 to present, 2 potlines, 600,000 t/year of aluminium.
Turn key project
Alstom equipment: - GIS (220 kV)
- 10 rectifiers 82.5 kA each, total current 320 kA- PTR (Power and Rectifier Transformers)
Volume: over € 100 M
Commissioning: 2013
15
U K R A I N E
BELARUS
ROMANIA
MOLDOVA
HUNGARY
LITHUANIA
LATVIA
ESTONIA
CZECH REP.
SLOVAKIA
BULGARIA
Sofia
Bucharest
Budapest
Bratislava
Prague
Katowice
Vilnius
Riga
Kiev
Grid commercial representationGrid commercial representation
K A Z A K H S T A N
Astana
Almaty
CIS countries –Grid Organisation and Customers(Kazakhstan, Ukraine, Belarus, Tajikistan and Azerbaijan)
~30 Nb of Grid employees
KEGOC – State-owned 220 kV, 500 kV, 1150 kVconnected to Uzbekistan, Kyrgyzstan, Russia
Transmission customers
BELENERGO – state owned
220 kV, 330 kV, 750 kV6 regional utilities ~ 20 OHL connected to Russia, Lithuania, Ukraine, Poland
Ukrenergo – state owned
8 regional grids40.357 km OHLconnected to Belarus, Russia, Hungary,Moldova, Poland, Slovakia, Romania
POLAND
Tajikistan
Azerbaijan
BarkiTajik
AzerEnergy
16
Recent achievement in CIS: 500 kV Gas-Insulated Substation
Customer: Tajikistan National Utility Barki Tajik
Project: Substation for Nurek Hydroelectric Power Plant (Nurek HPP), the largesthydropower station in Central Asia, installed generation capacity of 3 gigawatts toproduce over 75% of Tajikistan's electricity
Particularity: The first ever project to use 500 kV Gas-insulated switchgear (GIS) technology in Central Asia
Volume: approx. € 30 M
Commissioning: January 201417
Agenda
18
Grid market size & drivers
Alstom Grid presence and achievements
Alstom Grid strategy in Russia & CIS
Strategic plan for Russia
Be a leading player in Russia through partnerships and localisation
• Continue cooperation with RUSAL to capture a big part of Aluminiumbusiness and develop joint work in industries
• Localise HVDC engineering with KER and be the main HVDC player in Russia
• Localise products (AIS and GIS Switchgear and Power Transformers) and secure long-term contracts with FSK
• Develop Smart Grid in Russia (on-going discussions with local actors & FSK)
• Continue strong partnership with local contractors and design institutes
• Enhance Service capabilities in Russia
Ambition
Action plan
19
Strategic plan for CIS
Increase Alstom Grid presence through turnkey projects and local partnershipsAmbition
Action plan
• Focus local teams on selected projects
- Transmission network rehabilitation in Kazakhstan and Ukraine- Hydro generation in Tajikistan in coordination with Alstom Power
• Develop local partnership
- Partnership in Ukraine and Azerbaijan with local partners - Build-up efficient channels-to-market in Kazakhstan
20