RiskSimulationBusiness Intelligence

AnalysisOptimization

ORGAnIZATIOnAL cHAnGeHow does the skill and experience of staff infl uence the bottom line of the organization? the model combines information about production, staff and related cost.

• Compare if the change cost more to implement than the potential savings in the organization.

• Will the positive effects of changes overshadow the resistance to change?

• Combine traditional hard factors of production, cost and effi ciency with soft factors of human

The user may tune a generic model to suit their own organization and to look for potential improvements.

eDITIOns Powersim studio 8 is the preferred tool when you need to connect the simulation to real-time data. you may collect and export key fi gures using SAP BI NetWeaver, Oracle or Microsoft SQL Server, Microsoft Access and Microsoft Excel.

BUsIness sIMULATIOn• Test your new strategy and follow the change

in behaviour as you simulate the model.

• Reduce costs in your projects by investigating potential

bottlenecks or restraining capacities up-front.

• Minimize uncertainties by running multiple simulations checking your parameter values and fi nd the most trustworthy scenario.

Powersim studio 8 is the ultimate tool for working with complex analyses with many input factors, where information is supplied from many contributors and the need for quality assurance is high.

Run simulations using what-if-scenarios or use the built-in risk analysis to investigate uncertainties.

When using Powersim studio 8 to simulate your next project, you will make more qualifi ed decisions in less time and with greater certainty

feATURes• Graphical building blocks and automatic unit support

• Include feedback and time delays

• Arrays up to 6 dimensions, time is the 7th dimension

• Continuous and discrete modelling

• Build models in hierarchy, easy to share and import

• Create intuitive and dynamic user interfaces

• Password protection of models

MAInTenAnce PLAnnInGThe maintenance planning model load budget and actual data from a database. Management test a new strategy at quarterly reviews before implementing it.

• Keep the overlap in maintenance at a minimum.

• Study how will a change in maintenance schedules infl uence effi ciency, shutdown time and related costs?

• Reduce overall shutdown time of energy plant.

User interface allow top down analysis to fi nd budget discrepancies and to study which scenario had the best effect on the bottom line.

sIMULATIOn WITH GIsSimulation with Geographical Information Systems (GIS) opens new possibilities for doing analysis within the area of Health Environment and Security (HES).

• Study how a gas leakage spread after a collision.

• In emergency exercises the operational manager can practice keeping emergency teams safe.

• Plan extent of evacuating the population or how to redirect traffi c under varying wind conditions.

The user may alter weather infl uences or import weather data to replay a real emergency situation.

ORGAnIZATIOnAL cHAnGeHow does the skill and experience of staff infl uence the bottom line of the organization? the model combines information about production, staff and related cost.

• Compare if the change cost more to implement than the potential savings in the organization.

• Will the positive effects of changes overshadow the resistance to change?

• Combine traditional hard factors of production, cost and effi ciency with soft factors of human

The user may tune a generic model to suit their own organization and to look for potential improvements.

eDITIOns Powersim studio 8 is the preferred tool when you need to connect the simulation to real-time data. you may collect and export key fi gures using SAP BI NetWeaver, Oracle or Microsoft SQL Server, Microsoft Access and Microsoft Excel.

BUsIness sIMULATIOn• Test your new strategy and follow the change

in behaviour as you simulate the model.

• Reduce costs in your projects by investigating potential

bottlenecks or restraining capacities up-front.

• Minimize uncertainties by running multiple simulations checking your parameter values and fi nd the most trustworthy scenario.

Powersim studio 8 is the ultimate tool for working with complex analyses with many input factors, where information is supplied from many contributors and the need for quality assurance is high.

Run simulations using what-if-scenarios or use the built-in risk analysis to investigate uncertainties.

When using Powersim studio 8 to simulate your next project, you will make more qualifi ed decisions in less time and with greater certainty

feATURes• Graphical building blocks and automatic unit support

• Include feedback and time delays

• Arrays up to 6 dimensions, time is the 7th dimension

• Continuous and discrete modelling

• Build models in hierarchy, easy to share and import

• Create intuitive and dynamic user interfaces

• Password protection of models

MAInTenAnce PLAnnInGThe maintenance planning model load budget and actual data from a database. Management test a new strategy at quarterly reviews before implementing it.

• Keep the overlap in maintenance at a minimum.

• Study how will a change in maintenance schedules infl uence effi ciency, shutdown time and related costs?

• Reduce overall shutdown time of energy plant.

User interface allow top down analysis to fi nd budget discrepancies and to study which scenario had the best effect on the bottom line.

sIMULATIOn WITH GIsSimulation with Geographical Information Systems (GIS) opens new possibilities for doing analysis within the area of Health Environment and Security (HES).

• Study how a gas leakage spread after a collision.

• In emergency exercises the operational manager can practice keeping emergency teams safe.

• Plan extent of evacuating the population or how to redirect traffi c under varying wind conditions.

The user may alter weather infl uences or import weather data to replay a real emergency situation.

RefeRences Total • Eni • FSK • Saudi Aramco • Petrochemical Industries CO • Qatar Petroleum Sandia National Laboratories • Bayer MaterialScience AG • Inter Rao EEC • Snam Rete Gas British Telecom • Electrabel • Whirlpool • Battelle Energy Alliance • StatoilHydroElkem • Bergesen • Justisdepartementet • Agder Energi Produksjon • Kjelforeningen Norsk Energi • Accenture • CSC • Deloitte Business Consulting • PriceWaterhouseCoopers

Powersim studio 8 is used by customers across business segments and in a variety of problem areas

ExPERIENCES FROM A TOP 5 OIL COMPANy CLIENT

We have chosen Powersim studio 8 due to its capability to represent complex algorithms that our previous solutions could not handle.

Working with components when building our model makes it easy to transfer the model from one subsidiary to the next and localize.

We aim to streamline the components to make the model recognizable for designated staff members who move between subsidiaries.