CIVIL MANUFACTURING MINING OIL & GAS POWER GENERATION Analysis of Large-Scale Pit Slope Stability — The Aitik Mine Revisited Jonny Sjöberg Itasca Consultants AB Diego Lope Álvarez SKB (previously Itasca) Patricio Gómez Itasca S.A. Per-Ivar Marklund (retired, Boliden) Sara Suikki Itasca summer intern The Spanish Mining Council is organising the 2018 International Symposium in Slope Stability in Open Pit Mining and Civil Engineering at the XIV International Congress for Energy and Resource Mining in Seville.

Transcript of Analysis of Large-Scale Pit Slope Stability The Aitik … · Analysis of Large-Scale Pit Slope...

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Analysis of Large-ScalePit Slope Stability

— The Aitik Mine Revisited

Jonny Sjöberg Itasca Consultants ABDiego Lope Álvarez SKB (previously Itasca)

Patricio Gómez Itasca S.A.Per-Ivar Marklund (retired, Boliden)

Sara Suikki Itasca summer intern

The Spanish Mining Council is organising the 2018 International Symposium in Slope Stability in Open Pit

Mining and Civil Engineering at the XIV International Congress for Energy and Resource Mining in Seville.

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• Design of overall slopes is important – for open pits of all scales –

and further underlined by the push towards larger, and deeper pits

• Evolution of design tools:

❖From simple empirical and limit equilibrium methods to sophisticated

numerical computer modelling

❖Rapid increase in computer capacity, but also an increased understanding of

the behaviour of large-scale slopes

❖Still severely data- and knowledge constrained…

• Illustration of design development and current state-of-the-art

using the Aitik open pit mine as a case in point.

Things we all know…

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Aitik Mine The Aitik Mine

• Owned and operated by

Boliden (from the start)

• Mineralization discovered

in the 1930s

• Mining commenced 1968 –

Boliden's first open pit

• Currently the largest metal

open pit mine in Europe

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

The Aitik Mine 1968 – 2 Mtpa (ore)

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Early 70’s – 6 Mtpa (ore)

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Footwall

Hangingwall

Mill &

workshop

2000 – 18 Mtpa (ore)

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

2010 – 36 Mtpa (ore) Workshop

Crusher

Mill

Railway terminalConveyor belts

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Today – 40 Mtpa (ore)

3000 x 1000 m, 420 m depth, main pit + satellite pit

Main pit hangingwall

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Main pit footwall

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Geological setting

North

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Geology & Geomechanics

North

Hangingwall

• Generally strong, metamorphic rock, with

some weaker units (biotite/muscovite schist)

• Medium to good rock quality; poor quality in

schist units

0

10

20

30

40

50

60

70

80

90

100

0

1000

2000

3000

4000

5000

6000

7000

8000

AM

PH

IBO

LE

-BIO

TIT

E…

AM

PH

IBO

LE

GN

EIS

S

MIC

A G

NE

ISS

BIO

TIT

E S

CH

IST

DIO

RIT

E

PE

GM

AT

ITE

SE

RIC

ITE

SC

HIS

T

AM

PH

IBO

LIT

E

TU

RB

IDIT

E

GA

BB

RO

AN

DE

SIT

E

(bla

nk)

CO

NG

LO

ME

RA

TE

FE

LD

SP

AR

-EP

IDO

TE

ZO

NE

CO

RE

LO

SS

UN

IDE

NT

IFIA

BLE

RO

CK

Length_RMR

Mean_RMR

Max_RMR

Min_RMR

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Structural Characteristics

NORTH

ENDFOOTWALL

NORTH

FOOTWALL

MIDDLE

FOOTWALL

SOUTH

SOUTH

END

HANGINGWALL

NORTH

HANGINGWALL

MIDDLE

HANGINGWALL

SOUTH

• Well-developed foliation

+ cross-joints and

vertical jointing

• Hangingwall contact =

old thrust fault with clay

• No other large-scale

structures identified

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• First major design study in 1976

with follow-up in 1985

• Bench design based on structural

control; Double-benching (2 x 15

m) with offset chosen to match

foliation dip

• Catch bench width based on

original Ritchie criterion – 11 m for

90% of the cases

• Overall slopes not assessed

The early stages…

30 m

11 m

7 m3 m

Berm

Impact Zone

Double Bench

1 m69°

Foliation

Drilling Offset

5.5 m 22.5 m

Effective Bench

Face Angle = 60°

Actual Bench Face

Plane

11 m

Backbreak

Interramp slope angle = 46°

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• Problems:

❖Vertical blast damage

❖Quality control / hole deviation

❖Local crest failures &

bench widths not attained

• Solutions:

❖Blast damage model (PPV)

❖More buffer rows

❖Pre-split with decoupled charges

Blasting can make things better…

8000

4000

2000

1250

PPV [mm/s]

6.0 m

Unacceptable damage

Heave

Diggability limit

Measurable heave

7.5 m 5 m

Back-break

Bench crest

Backbreak limit

990 k

g

990 150

59300

990 k

g

855

280

280

150

290

311

311

165

165

165

311 m

m

311

165

165

165

165

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• Issues for hard rock slopes:

❖No failure observations = no calibration of properties possible

(except that failure should not develop for current mining geometries)

❖Failure may be rapid and uncontrollable (brittle rock)

• Remedies:

❖Develop methodology for modeling and parameter assessment and

apply to other slopes with failure

❖Design methodology must be conservative => use residual strength

parameters

Large-scale slope stability at Aitik…

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• Project on large-scale slope stability in hard rocks (1990s) &

revision of overall slope angles:

❖Empirical case study database

❖Updated geomechanical model

❖2D numerical modeling – continuum models, rock mass strength +

residual strength parameters + ubiquituos joints (foliation)

• Results

❖Stability assessment to 500 m depth

❖Increase of interrramp and overall angles (+5°) with drainage program

❖Additional modeling for deeper (750 m) pit => additional drainage

Large-scale and 2D – at Aitik…

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• New strategic plan – and deeper mining (2015-2016)!

• New analyses:

❖Numerical modeling, Factor-of-Safety calculations, 2D (& 3D)

❖Perfectly-plastic material model (no softening; peak strength = residual

strength); Hoek-Brown material model

❖Rock mass strength values estimated empirically using

characterization (GSI) and Hoek-Brown failure criterion

❖Experiences and practices from Itasca analysis of large pit slope used

to supplement and refine estimates

❖Acceptance criterion: FoS for the Overall Slope Angle > 1.2

2D and deeper – and the importance of "disturbance"…

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• Design values for GSI and UCS:

❖mean – 0.5 std.dev

❖Corresponds to 30-35 percentile

❖Accounts for heterogeneity in large-scale rock masses, and the ability for the rock to

fail through the weaker components (based on experience and empirical evidence)

• Variation of D (disturbance factor) with depth

❖D=1.0 everywhere proven too conservative

❖Blast damage highest close to slope face

❖Stress relief close to slope face

❖Possible stress damage at depth

2D and deeper – and the importance of "disturbance"…

H (m)

15 (m)

D = 1

D = 0

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

2D and deeper – and the importance of "disturbance"…

PROFILE A PROFILE B

PROFILE

Y4500

PROFILE

Y4000

Geographic

North

+Y

Mine North

+X77.75°

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

2D and deeper – and the importance of "disturbance"…

Current Pit

Previously Planned Final Pit

Level 750/800/850 m Pit

DESIGN PROFILE A

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• Groundwater conditions: ❖Partly depressurized in upper portion; face seepage in lower portion

❖Scenario 1: Depressurized 100 m horizontal distance (upper 2/3 of

slope height)

❖Scenario 2: Depressurized 150 m horizontal distance (upper 2/3 of

slope height).

2D and deeper – and the importance of "disturbance"…

100 m

H

H/3

Water table level

Water table level

Partially depressurized slopes (100 m)

150 m

H

H/3

Water table level

Water table level

Partially depressurized slopes (150 m)

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

Results & design recommendationsHW overall

slope angle []

Pit bottom

[level]

Depressurization

[m]

48 800 m 100 (2/3 H)

52 800 m 150 (2/3 H)

50 850 m 150 (2/3 H)

54 850 m 150 (H)

54 * 600 m 100 (2/3 H)

54 * 600 m 100 (2/3 H)

FW overall

slope angle []

Pit bottom

[level]

Depressurization

[m]

47 800 m 100 (2/3 H)

45 850 m 100 (2/3 H)

47 850 m 150 (2/3 H)

47* 600 m 100 (2/3 H)

* Middle-southern portion

(lower final slope heights)

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• How conservative are 2D-analyses?

• 3D-check for Aitik geometry:

❖Simplified slope, undrained conditions

❖FoS (3D) = 2.0 FoS (2D) = 1.2 for the same case

• Geometry matters (a lot)!

2D or 3D? Or both?

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• Increased reliability in bench slope design❖Presplit blasting on footwall (inclined, 70°) and for modified ramp design

❖Increased safety of benches; maintained catch bench design

❖Revised acceptance criteria

• Improved interramp slope design❖Increase on footwall interramp slope angle from improved blasting

❖Implemented allowed maximum interramp height = 200 m (6–7 double benches)

❖Rock mass stability => steeper interramp angles allowed

• Overall pit slope design❖Verified overall pit slope angles: 47° for footwall; 54° for hangingwall, for a

maximum pit depth of 850 m

❖Depressurized conditions required (150 m horizontal distance)

Aitik findings….

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• Analytical methods are standard for bench-scale design

• Numerical modeling remains the preferred tool for large-scale

stability assessment

❖3D models, DFN input, coupled (water-stress) modeling, etc. are all

increasingly used

❖Computational speed less of an issue…cloud computing emerging!?

• Advances in data collection not on par with advances in

modeling capabilities

❖Are we using the right tools? Volumetric coverage?

❖Is there "unconventional" data to be used? As "proxies" for rock

mechancis parameters?

The future…

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

• Validation efforts required:

❖Partial validation is also of value!

❖Acceptance criteria for validation

The future…

Reality of

Interest

Mathematical

ModelValidation

Verification

Confirmation

Computer

Model

Simulation

Outcomes

Assessment Activities

Modeling, Simulation &

Experimental Activities

CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION

The funding by Boliden is gratefully acknowledged

Special thanks to Anton Bergman, Jansiri Malmgren

& Mats Larsson for review of this paper