1
PT.PLN (Persero) WRKR LISDES RIAU MATERIAL JASA MATERIAL JASA (Rp.) (Rp.) (Rp.) (Rp.) 1 3 4 5 6 7=4*5 8=4*6 9=7+8 A JARINGAN TEGANGAN MENENGAH 1 Kons. Tiang Penyangga pd T.Besi (TM-1) Unit 1 MDU 1 Isolator Tumpu 20 KV / Pin / Post Insulator (komplit) Bh 3 NON-MDU 1 Crossarm UNP 100x50x6x2000 mm (galvanized) Bh 1 2 All bending Wire 3,2 mm / Preformed Top Tie Mtr 3,6 3 Bolt & nut M16x300 (galv.) u/ Cross Arm & Brace Bh 0 4 Arm Brace Besi L 40.40.4 (galvanized) Bh 2 5 Bolt & nut M16x50 + Washer (galvanized) Bh 4 6 Band For Arm Brace Galvanis Set 1 7 U-Bolt/Beugel 7-8" Set 1 JASA KONSTRUKSI 1 Kepala Tukang Listrik / Mandor HO 0,250 2 Tukang Listrik HO 0,250 3 Pekerja HO 0,250 ANGKUTAN 1 Angkutan Darat TonKM 0,000 2 Angkutan Laut TonKM #REF! 2 Konst. T.Penyangga Ganda pd T.Besi (TM-2): Unit 1 MDU 1 Isolator Tumpu 20 KV / Pin / Post Insulator (komplit) Bh 6 NON-MDU 1 Crossarm UNP 100x50x6x2000 mm (galvanized) Bh 2 2 Alluminium Bending Wire 70 mm 2 Mtr 7,2 3 Double arm bolt & nut M14x300 + Washer (galv.) Bh 4 4 Arm Brace Besi L 40.40.4 (galvanized) Bh 4 5 Bolt & nut M16x50 + Washer (galvanized) Bh 6 6 Band For Arm Brace Galvanis Bh 1 JASA KONSTRUKSI 1 Kepala Tukang Listrik / Mandor HO 0,333 2 Tukang Listrik HO 0,333 3 Pekerja HO 0,333 ANGKUTAN 1 Angkutan Darat TonKM #REF! 2 Angkutan Laut TonKM #REF! 3 Konstruksi Tiang Tarik Ganda pd. T.Besi (TM-5) Unit 1 MDU 1 String Insulator 20 kV lengkap Acc.& Strain Clamp Set 6 2 Isolator Tumpu 20 KV / Pin / Post Insulator (komplit) Bh 1 NON-MDU 1 Crossarm UNP 100x50x6x2000 mm (galvanized) Bh 2 2 Alluminium Bending Wire 20 mm 2 Mtr 1,2 3 Joint Sleeve 70 / 150 mm2 Bh 3 4 Double arm bolt & nut M14x300 + Washer (galv.) Bh 0 5 Arm Brace Besi L 40.40.4 (galvanized) Bh 4 6 Bolt & nut M16x50 + Washer (galvanized) Bh 4 7 Band For Arm Brace Galvanis Bh 1 JASA KONSTRUKSI 1 Kepala Tukang Listrik / Mandor HO 0,500 2 Tukang Listrik HO 0,500 3 Pekerja HO 0,500 ANGKUTAN 1 Angkutan Darat TonKM #REF! 2 Angkutan Laut TonKM #REF! 2 SATUAN VOLUME HARGA SATUAN URAIAN MATERIAL ANALISA HARGA SATUAN PEKERJAAN UNTUK RENCANA KERJA T-A 2013 No. JML HARGA JML HARGA Page 1 of 1

description

analisa tiang besi

Transcript of ANALISA KONSTRUKSI TIANG BESI.pdf

Page 1: ANALISA KONSTRUKSI TIANG BESI.pdf

PT.PLN (Persero) WRKR

LISDES RIAU

MATERIAL JASA MATERIAL JASA

(Rp.) (Rp.) (Rp.) (Rp.)

1 3 4 5 6 7=4*5 8=4*6 9=7+8

A JARINGAN TEGANGAN MENENGAH

1 Kons. Tiang Penyangga pd T.Besi (TM-1) Unit 1

MDU

1 Isolator Tumpu 20 KV / Pin / Post Insulator (komplit) Bh 3

NON-MDU

1 Crossarm UNP 100x50x6x2000 mm (galvanized) Bh 1

2 All bending Wire 3,2 mm / Preformed Top Tie Mtr 3,6

3 Bolt & nut M16x300 (galv.) u/ Cross Arm & Brace Bh 0

4 Arm Brace Besi L 40.40.4 (galvanized) Bh 2

5 Bolt & nut M16x50 + Washer (galvanized) Bh 4

6 Band For Arm Brace Galvanis Set 1

7 U-Bolt/Beugel 7-8" Set 1

JASA KONSTRUKSI

1 Kepala Tukang Listrik / Mandor HO 0,250

2 Tukang Listrik HO 0,250

3 Pekerja HO 0,250

ANGKUTAN

1 Angkutan Darat TonKM 0,000

2 Angkutan Laut TonKM #REF!

2 Konst. T.Penyangga Ganda pd T.Besi (TM-2): Unit 1

MDU

1 Isolator Tumpu 20 KV / Pin / Post Insulator (komplit) Bh 6

NON-MDU

1 Crossarm UNP 100x50x6x2000 mm (galvanized) Bh 2

2 Alluminium Bending Wire 70 mm2

Mtr 7,2

3 Double arm bolt & nut M14x300 + Washer (galv.) Bh 4

4 Arm Brace Besi L 40.40.4 (galvanized) Bh 4

5 Bolt & nut M16x50 + Washer (galvanized) Bh 6

6 Band For Arm Brace Galvanis Bh 1

JASA KONSTRUKSI

1 Kepala Tukang Listrik / Mandor HO 0,333

2 Tukang Listrik HO 0,333

3 Pekerja HO 0,333

ANGKUTAN

1 Angkutan Darat TonKM #REF!

2 Angkutan Laut TonKM #REF!

3 Konstruksi Tiang Tarik Ganda pd. T.Besi (TM-5) Unit 1

MDU

1 String Insulator 20 kV lengkap Acc.& Strain Clamp Set 6

2 Isolator Tumpu 20 KV / Pin / Post Insulator (komplit) Bh 1

NON-MDU

1 Crossarm UNP 100x50x6x2000 mm (galvanized) Bh 2

2 Alluminium Bending Wire 20 mm2

Mtr 1,2

3 Joint Sleeve 70 / 150 mm2 Bh 3

4 Double arm bolt & nut M14x300 + Washer (galv.) Bh 0

5 Arm Brace Besi L 40.40.4 (galvanized) Bh 4

6 Bolt & nut M16x50 + Washer (galvanized) Bh 4

7 Band For Arm Brace Galvanis Bh 1

JASA KONSTRUKSI

1 Kepala Tukang Listrik / Mandor HO 0,500

2 Tukang Listrik HO 0,500

3 Pekerja HO 0,500

ANGKUTAN

1 Angkutan Darat TonKM #REF!

2 Angkutan Laut TonKM #REF!

2

SATUAN VOLUME

HARGA SATUAN

URAIAN MATERIAL

ANALISA HARGA SATUAN PEKERJAAN

UNTUK RENCANA KERJA T-A 2013

No.

JML HARGA

JML HARGA