AN PE. INTELLECTUAL PROPERTY WHICH BELONGS TO...
Transcript of AN PE. INTELLECTUAL PROPERTY WHICH BELONGS TO...
MPE 225 MPE 225 MPE 225 MPE 225 MPE 225
MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225
MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225MPE 225 MPE 225 MPE 225
MPE 225
MPE 225
PZ1
SHEET NO:
PUBLISHED:
SHEET NAME:
DRAWN: CHECKED:SB AG
EN
LAR
GE
D V
IEW
ING
& H
YP
ER
LIN
KS
:P
RIN
T V
ER
SIO
N O
F T
HIS
PLA
N P
RO
VID
ES
MIN
IMU
M I
NF
OR
MA
TIO
N N
EE
DE
D B
Y U
SE
RS
.
ELE
CT
RO
NIC
VE
RS
ION
(E
V)
PR
OV
IDE
S M
AG
NIF
IED
VIE
WIN
G U
P T
O 6
40
0%
. E
V A
LSO
PR
OV
IDE
S H
YP
ER
LIN
KA
CC
ES
S T
O O
EM
MA
NU
ALS
AN
D A
BU
ND
AN
T O
TH
ER
SU
PP
LEM
EN
TA
RY
IN
FO
RM
AT
ION
.EV
MA
Y B
E
AC
CE
SS
ED
AT
: W
WW
.GE
ZE
LMA
NP
E.C
OM
/PV
/0
12
9P
_D
ura
n_
Dis
cove
ryB
ay_
CA
.dw
g
REVISIONS:
ALLEN GEZELMAN16502 HANNA RD.LUTZ, FLORIDA 33549
PH. 813 650 7246FX. 866 397 9050Allen@Gezelman PE.COM
www.GezelmanPE.com
PE. # 34825
I CERTIFY THAT THIS DESIGN &SPECIFICATIONS MEET THEREQUIREMENTS OF THE CURRENTCALIFORNIA BUILDING CODE.
08SCALE: NTS
BILL OF MATERIALS
01SCALE: N.T.S.
BUILDING - ACTUAL ROOF PHOTO02
SCALE: N.T.S.
PARCEL - CONTRA COUNTY ASSESSOR
I CERTIFY THAT THE FRAMING OF THIS STRUCTURE WILL SAFELY ACCOMMODATE CALCULATED WIND UPLIFT AND LATERAL FORCES ANDEQUIPMENT DEAD LOADS. THIS IS ATTESTED TO BY MY SIGNATURE AND SEAL ON THIS DRAWING AT THE UPPER RIGHT.
CERTAIN DETAILS OF THIS PROJECT MAY DIFFER, REFER TO OEM LITERATURE WHICH SHALL PREVAIL.
03SCALE: 1" = 1'-0"
BUILDING AERIAL PHOTO
INSTALLATION LOCATION
05http://www.civicsolar.com/sites/default/files/library/collateral/tilehook-install.pdf
MOUNTING SYSTEM - UNIRAC TILE HOOK
CONTRACTER RESPONSIBLE TO VERIFY THE FIT OF THIS ARRAY PRIOR TO INSTALLATION:THE SOLAR MODULE ARRAY SHOWN HERE IS BASED ON THE FIELD DATA PROVIDED BY THECONTRACTOR. CONTRACTOR SHALL CONTACT THE ENGINEER IF THE ARRAY MAY NOT FIT ASPROJECTED AND CHANGES TO LAYOUT OR LOCATION MAY BE REQUIRED.
C
OP
Y R
IGH
T &
IN
TE
LLE
CT
UA
L P
RO
PE
RT
Y N
OT
ICE
•T
HIS
PLA
N S
ET
IS
CO
PY
RIG
HT
PR
OT
EC
TE
D A
ND
CO
NT
AIN
S I
NT
ELL
EC
TU
AL
PR
OP
ER
TY
WH
ICH
BE
LON
GS
TO
ALL
EN
GE
ZE
LMA
N P
E.
•A
CC
ES
S I
S G
IVE
N T
O T
HE
IN
FO
RM
AT
ION
HE
RE
ON
SO
LELY
FO
R T
HE
PU
RP
OS
E O
F C
OM
PLE
TIO
N O
F T
HE
PR
OJE
CT
FO
R W
HIC
H I
T I
S I
NT
EN
DE
D.
•N
O O
TH
ER
US
E M
AY
BE
MA
DE
OF
TH
E I
NF
OR
MA
TIO
N,
DR
AW
ING
S,
OR
ID
EA
S H
ER
EO
N W
ITH
OU
T T
HE
EX
PR
ES
S,
WR
ITT
EN,
PE
RM
ISS
ION
OF
ALL
EN
GE
ZE
LMA
N P
E
ALL AFFIDAVITS, DESIGNS, OPINIONS, CALCULATIONS & OTHER ENGINEERING SERVICES PROVIDED BY ALLEN GEZELMAN PE AND
HIS ASSOCIATES ON ANY AND ALL PROJECTS ARE SUBJECT TO THE PROVISIONS OF EJCDC C-700 (ENGINEERS JOINT
CONSTRUCTION DOCUMENT COMMITTEE - STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT) CURRENT ATTHE TIME. THOSE OBJECTING TO SAID EJCDC C-700 OR PROVISIONS THEREOF ARE DIRECTED NOT TO USE THE AFFIDAVIT,
DESIGN, OPINION, CALCULATION OR OTHER ENGINEERING SERVICE OFFERED BY BRUCE TOZIER PE AND HIS ASSOCIATES ON THE
PROJECT. EJCDC C-700 MAY BE VIEWED AT: HTTP://GEZELMANPE.COM/REFERENCE/AG/C-700.PDF
THIS PLAN IS VOID WITHOUT MY SIGNATURE & RAISEDSEAL. THIS PLAN MAY NOT BE PLACED ON FILE FOR PULLINGMULTIPLE PERMITS.EACH PERMIT PULLED REQUIRES ITS
OWN RAISED SEAL COPY OF THIS PLAN.
DESIGNED PER: ASCE 7-05,
APPLICABLE CODE:
2010 CALIFORNIA BUILDING CODE
OWNER:
2254 WINCHESTER LOOP, DISCOVERY BAY, CA 94505
DIANE DURAN
INS
TA
LLA
TIO
N O
F A
SO
LAR
ELE
CT
RIC
SY
ST
EM
22
54
WIN
CH
ES
TE
R L
OO
P,
DIS
CO
VE
RY
BA
Y,
CA
94
50
5
RO
OF
MO
UN
T
EXPOSURE:
DESIGN WIND SPEED:
BLDG. IP. CATEGORY:
85MPHB
II
CONTRACTOR:
KERRY DURANT,
DURANT CONSTRUCTION & SOLAR ADD.
902 MOUNT CASEY CT,
EL DORADO HILLS CA 95762
LICENSE #653460
THIS PLAN IS ONLINE FOR REVIEW @WWW.GEZELMANPE.COM/PV/0129P_DURAN_DISCOVERYBAY_CA.PDF
06SCALE: 1" = 1'-0"
SCHEMATIC ROOF ATTACHMENT DETAIL
07SCALE: N.T.S.
PV MODULE - MPE 225 PS09
MAX. UPLIFT: PZ1_9.8 PSF; PZ2_17.0 PSF; PZ3_25.1 PSF
.
ASCE 7 PRESSURE ZONE DIAGRAM MAY BE VIEWED AT:
http://www.unirac.com/pdf/ii227.pdf
CALIFORNIA PHOTO-VOLTAIC (PV) SYSTEM INSTALLATION NOTES:
THE DETAILS SPECIFIED ON THIS “PAPER” PLAN ARE CONSIDERED TO BE THE MINIMUM NEEDED BY USERS (AHJ -AUTHORITY HAVING JURISDICTION AND
INSTALLERS). USERS ARE ENCOURAGED TO ACCESS EV (ELECTRONIC VERSION) OF THIS PLAN:
WWW.GEZELMANPE.COM/PV/0129P_DURAN_DISCOVERYBAY_CA.PDF. ACTIVE HYPERLINKS EMBEDDED IN EV PROVIDE SEAMLESS ACCESS TO VALUABLE
SUPPLEMENTARY INFORMATION - SUCH AS OEM (ORIGINAL EQUIPMENT MANUFACTURER/DISTRIBUTOR) DOCUMENTS. EV ALSO ALLOWS VIEWER TO
STUDY THE PLAN AND OEM DETAILS AT A MAGNIFICATION OF HIS CHOICE UP TO 6400%. IF A CONFLICT SHOULD OCCUR BETWEEN A DRAWING AND/ORSPECIFICATION HEREON AND AN OEM DETAIL, OEM SHALL PREVAIL. WIND IS THE ONLY LOAD OF SIGNIFICANCE FOR A ROOF-MOUNTED PV SYSTEM. PV
MODULES (INCLUDING MOUNTING HARDWARE & RACKING) IMPOSE A LOAD OF LESS THAN 4-PSF. SNOW LOADS ARE UNAFFECTED BY AND DO NOTADVERSELY AFFECT THE SOLAR EQUIPMENT. PV MOUNTING SYSTEM ALLOWS THE SOLAR EQUIPMENT TO ADJUST TO MOVEMENT IMPARTED BY SEISMICEVENTS.
THESE DRAWINGS AND ENGINEERING ESTABLISH THE INSTALLATION REQUIREMENTS FOR SPECIFIED PV EQUIPMENT ON BUILDINGS IN CALIFORNIA 60FEET OR LESS IN HEIGHT AND AT ROOF ANGLES FROM FLAT UP TO 45 DEGREES. ENGINEER HAS EVALUATED THE INSTALLATION COMPONENTS ANDHARDWARE CURRENTLY PROVIDED BY OEM AS ITS' OEM INSTALLATION KITS AND FOUND THEM TO MEET THE REQUIREMENTS OF THE CURRENT CBC
(CALIFORNIA BUILDING CODE). THERE SHALL BE NO SUBSTITUTION OF OTHER VENDOR MATERIALS WITHOUT PRIOR APPROVAL OF ENGINEER. MATERIALSMANUFACTURED BY PROFESSIONAL SOLAR PRODUCTS INC.
1. ENGINEER OF RECORD (EOR) HAS DETERMINED THAT THE HOLD-DOWN HARDWARE AND FASTENERS SUPPLIED BY SOLAR ELECTRIC SUPPLY ARE
ADEQUATE FOR DESIGN WIND SPEEDS EXCEEDING 120-MPH. ATTACHMENT MAY BE MADE BY LAGGING TO THE ROOF SHEETING IN ASCE ROOF PRESSURE
ZONE 1 (PZ1) USING (MINIMUM) #14, CORROSION RESISTANT STEEL(CRS), LAGS. SELECT LENGTH ADQUATE TO FULLY PENETRATE ROOF SHEETING. IN PZ2
AND PZ3, LAGS SHALL PENETRATE A MINIMUM OF TWO INCHES INTO TRUSSES, BLOCKING, OR OTHER STRONG POINT. CONTRACTOR IS ENCOURAGED TO
INSTALL IN PRESSURE ZONE 1 (PZ1) ONLY. THERE SHALL BE TWO RAILS UNDER EVERY PV MODULE. 4-HOLD-D0WNS SHALL ATTACH THE MODULES TO THE
RAILS. RAILS SHALL ATTACH TO ROOF AT NOT GREATER THAN* 6-FT CENTER-TO-CENTER IN PZ1, NOT GREATER THAN* 4-FT CENTER TO CENTER IN PZ2,
NOT GREATER THAN* 2-FT IN PZ3 (*NOTE THAT THESE DISTANCES CAN BE EXCEEDED BY UP TO 6-INCHES TO ACCOMMODATE IN-SITU RAFTER/TRUSS
SPACING).
3. CONTRACTOR SHALL ADHERE TO REQUIREMENTS OF 2010 CBC (CALIFORNIA BUILDING CODE) CHAPTER 15 (ROOFING
HTTP://PUBLICECODES.CITATION.COM/ST/CA/ST/B200V10/ST_CA_ST_B200V10_15_SECTION.HTM)AND BEST PRACTICES OF THE NRCA (NATIONAL
ROOFING CONTRACTORS ASSOCIATION) ROOFING & WATERPROOFING MANUAL TO ENSURE THAT THE SOLAR INSTALLATION DOES NOT CAUSE ROOF
LEAKS AT INITIAL INSTALLATION OR AS THE SYSTEM “AGES”.
4. ELECTRICAL GENERAL:
• PV-MODULES PRODUCE ELECTRICITY WHEN EXPOSED TO SUNLIGHT. USE COMMON-SENSE & CAUTION.
• TWISTED (WIRE NUT) CONNECTIONS ARE NOT PERMITTED FOR DC WIRING. USE OEM PLUG CONNECTOR HARNESS BETWEEN PV MODULES.
• MAKE SOLID MECHANICAL CONNECTIONS TO ENSURE ELECTRICAL CONDUCTIVITY BETWEEN ALL PV MODULE ENCLOSURES AND FRAMING MEMBERSWITH NO ELECTRICALLY ISOLATED COMPONENTS, USE #10 AWG BARE COPPER WITH SCREWED CONNECTIONS FOR BONDING JUMPERS AS NEEDED.
OEM BONDING PLATES/LUGS/SPECIAL APARATUS ARE AN ACCEPTABLE SUBSTITUTE.
• DO NOT LEAVE LOOSE, UNSECURED WIRES/HARNESS BETWEEN PV-MODULES, TIE TO THE MOUNTING RAILS WITH UV RESISTANT ZIP TIES ORAPPROVED WIRE CLIPS IN NEAT, PROFESSIONAL MANNER.
• USE APPROVED MEANS AND METHODS PER CURRENT NATIONAL ELECTRIC CODE (NEC).
5. CONTRACTORS, INSPECTORS, & PLAN REVIEWERS HAVING QUESTIONS, CONTACT EOR DIRECTLY -
OFFICE: 813 909 1956, CELL: 813 650 7246, FAX: 866 397 9050, E-MAIL: [email protected]
CONTRA COSTA COUNTYPROPERTY INFO: APN # 011410054
SITE DESCRIPTION: T8429 L54
04http://prosolar.com/prosolar-new/pages/rooftrac-main2.htm
PRO SOLAR - SUPPORT RAIL07
SCALE: 3/16" = 1'-0"
ROOF PLAN W/ 24 FLUSH MOUNT PV MODULES
ST
RU
CT
UR
AL
PE
RM
IT O
NLY
:
ELECTRICAL DRAWINGS BY OTHERS.REVIEWED BY E.O.R. CONSIDERED TO BE CODE COMPLIENT.
PRO SOLAR SUPPORT RAIL - 2.5"
UNIRAC UNIVERSIAL MOUNT HOLD DOWN HARDWARE
UNIRAC UNIVERSIAL MOUNT INSTALLATION
UNIRAC UNIVERSIAL MOUNT HOLD - SAMPLE PHOTO
PZ1
UTILITY (VIF.)GARAGE
DISCONNECT
INVERTER
SYSTEM SPECIFICATIONS
COMPONENT SPECIFICATIONS
OVER CURRENT PROTECTION DEVICES
REF. TYP. CURRENT RATING MAX. VOLTAGECB1 1 30A 240VAC
DISCONNECTS
REF. TYP. POLES CURRENT RATING MAX. VOLTAGEDS1 1 2 30A 240VAC
ARRAY STC POWER 5,400WARRAY PTC POWER 4,898WARRAY ISC 16.54AARRAY IMP 15.1AMODULES IN SERIES 12ARRAY VOC 442.56VARRAY VMP 357.12VMAX SYSTEM VOLTAGE 600VMAX AC OUTPUT 5,000WCEC AC OUTPUT 4,678W
NOTES
2
I15,000W
3
4
CB130A
TO CUSTOMER LOADS
KWHR
TO UTILITY
6
KWHR 5
DS130A
1
OPEN CIRCUIT VOLTAGE OF ARRAY WILLFLUCTUATE WITH TEMPERATURE. STRINGCONFIGURATION MAY NOT BE SUITABLE FORALL REGIONS.
3PHOTOVOLTAIC OUTPUT STRINGS ARECOMBINED INSIDE THE INVERTER'S DCINTEGRATED DISCONNECT.INTEGRATED DC DISCONNECT IS PROVIDEDWITH INVERTER. DISCONNECT IS LISTED FORUSE WITH SMA UL 1741 LISTED STRINGINVERTERS.
OUTPUT OF INVERTER CONNECTED TO UTILITYON LOAD SIDE OF SERVICE DISCONNECT.OUTPUT IS BACKFED THROUGH BREAKER INMAIN PANEL.
4
6
OUTDOOR-RATED SPLICE BOX RATED FOR600VDC2
5 OPTIONAL PRODUCTION METER
PM1-24225W
12 INSERIES
12 INSERIES
1
PHOTOVOLTAIC MODULEREF. TYP. MODULE STC POWER PTC POWER ISC IMP VOC VMP FUSE RATINGPM1 24 SCHUCO MPE-225-PS09 225W 225W 204.1W 8.27A 7.55A 36.9V 29.8V 15A
INVERTER
REF. TYP. INVERTERNOMIINALOUTPUTVOLTAGE
NOMINALOUTPUT
FREQUENCY
MAXOUTPUTPOWER
MAX ACCURRENT
MAXINPUT
CURRENT
MAXINPUT
VOLTAGE
CECWEIGHTED
EFFICIENCYI1 1 SMA SB-5000US 240VAC 60HZ 5000W 21A 20.8A 600V 95.5%
SCALE:
1
E1.1NTS
Terms and ConditionsSolar Electric Supply does not prepare or create electrical drawings, provide electrical or engineering services in any form. The technical material attached is provided by Verdiseno, Inc. , an Authorized Solar Electric Supply, Inc. partner. They are provided at no cost as “technical reference material” only. It's is the recipients responsibility to determine if the technical reference material is applicableto their particular project. All technical material should be reviewed by a licensed contractor or engineer. All solar system components should be installed by a licensed experienced electrical contractor or technician and should follow NEC and local building department guidelines. Acceptance and use of any products or materials provided by Solar Electric Supply, Inc and or any of its partners orsubsidiaries constitutes an agreement that all parties agree to fix the amount of actual damages the Customer would incur in the event the products sold or materials provided by Solar Electric Supply, Inc. are defective. It would be impracticable or extremely difficult to determine if any item or material is defective and the parties hereto agree the amount of $500.00 would be fair compensation forany loss sustained by the Customer and further agree this amount is reasonable under the circumstances at this time. Distribution or publication of any technical material, documents or literature provided by Solar Electric Supply, Inc. and or any of its partners or subsidiaries is strictly prohibited without written authorization from Solar Electric Supply, Inc.
1
!
3
2
1
DC GRD ELCTRD (PE)DC GRD.DC GRD. AC GRD.
24 5
3
!
N PE
TO UTILITY SERVICE
MAIN
6 7TO CUSTOMERLOADS
GROUNDED CONDUCTOR MUST BE GREY OR WHITE. IF PV SOURCE CIRCUITS ARE ROUTEDTHROUGH BUILDING, NEC 690.31(E) REQUIRES THAT WIRE BE RUN IN A METAL RACEWAY .3
CONDUCTOR LEADS ON MODULES SHOULD BE SECURELY FASTENED TO RACKING TOPREVENT ABRASIVE DAMAGE. USE A SECURING METHOD THAT WILL WITHSTAND HIGHTEMPERATURES AND SUNLIGHT, SUCH AS STAINLESS STEEL PIPE CLAMPS WITH AN EDPMINSERT (PLASTIC TIES ARE NOT RECOMMENDED).
1
NEC 690.17, 690.53 REQUIRE LABELING ON DC DISCONNECT STATING: "WARNING: ELECTRICSHOCK HAZARD. DO NOT TOUCH TERMINALS. TERMINALS ON BOTH LINE AND LOAD SIDESMAY BE ENERGIZED IN THE OFF POSITION."
5
EXISTING AC LOAD CENTER MUST MEET REQUIREMENTS OF NEC 690.64(b)(2). SUM OF MAINBREAKER PLUS SOLAR BREAKER (S) MUST BE LESS THAN OR EQUAL TO BUS RATING. IFBACKFED BREAKERS ARE MOUNTED AT OPPOSITE END OF BUS FROM MAIN BREAKER ORFEEDER, THE SUM OF SOLAR BREAKERS AND MAIN BREAKER MAY BE EQUAL TO OR LESSTHAN 120% OF BUS RATING.
6
INVERTER IS EQUIPPED WITH AN INTEGRATED DC DISCONNECT. IF INVERTER IS INSTALLEDINDOORS, THE LOCAL JURISDICTION MAY REQUIRE A SECOND EXTERIOR DISCONNECT.4
RECOMMENDED WIRECONDUCTOR WIRE DISTANCE GROUND
NO. TYPE SIZE 1.0% V DROP TYPE SIZE1 USE-2/RWH-2 10AWG 190FT BARE COPPER 6AWG2 THWN-2 10AWG 190FT THWN-2 10AWG3 THWN-2 8AWG 74FT THWN-2 10AWG
RECOMMENDED WIRING LIST IS SUGGESTIVE ONLY. INSTALLER IS RESPONSIBLE FOR DETERMINING HOW THE WIRES WILL BE RUN, CONDUIT SIZING,AND FINAL WIRE SIZING.
MODULE CONNECTORS ARE NOT LISTED TO BE DISCONNECTED UNDER LOAD.!
DC GROUNDING SYSTEM MUST BE BONDED TO AC GROUNDING SYSTEM PER NEC 690.47(C)(1) IN ACCORDANCE WITH 690.47 (C)(2-8)
ALWAYS USE MANUFACTURER'S RECOMMENDED GROUND-BAR KITS TO GROUNDEQUIPMENT. WIRES ONE AND TWO ARE LISTED AS A COMBINED LENGTH.8
7
INSTALLER-PROVIDED OUTDOOR-RATED SPlCE BOX RATED FOR 600VDC.2
OPTIONAL PRODUCTION METER.!
SCALE:
1
E2.1NTS
Terms and ConditionsSolar Electric Supply does not prepare or create electrical drawings, provide electrical or engineering services in any form. The technical material attached is provided by Verdiseno, Inc. , an Authorized Solar Electric Supply, Inc. partner. They are provided at no cost as “technical reference material” only. It's is the recipients responsibility to determine if the technical reference material is applicableto their particular project. All technical material should be reviewed by a licensed contractor or engineer. All solar system components should be installed by a licensed experienced electrical contractor or technician and should follow NEC and local building department guidelines. Acceptance and use of any products or materials provided by Solar Electric Supply, Inc and or any of its partners orsubsidiaries constitutes an agreement that all parties agree to fix the amount of actual damages the Customer would incur in the event the products sold or materials provided by Solar Electric Supply, Inc. are defective. It would be impracticable or extremely difficult to determine if any item or material is defective and the parties hereto agree the amount of $500.00 would be fair compensation forany loss sustained by the Customer and further agree this amount is reasonable under the circumstances at this time. Distribution or publication of any technical material, documents or literature provided by Solar Electric Supply, Inc. and or any of its partners or subsidiaries is strictly prohibited without written authorization from Solar Electric Supply, Inc.