An Intelligent Energy System

21
An Intelligent Energy System An Intelligent Energy System An Intelligent Energy System An Intelligent Energy System Singapore’s Smart Grid Initiative Singapore’s Smart Grid Initiative Energy Regulators Forum on Regulation and Energy Sustainability Energy Regulators Forum on Regulation and Energy Sustainability Bangkok, 23 March 2011 Bangkok, 23 March 2011

Transcript of An Intelligent Energy System

Page 1: An Intelligent Energy System

An Intelligent Energy SystemAn Intelligent Energy SystemAn Intelligent Energy System An Intelligent Energy System Singapore’s Smart Grid InitiativeSingapore’s Smart Grid Initiative

Energy Regulators Forum on Regulation and Energy Sustainability Energy Regulators Forum on Regulation and Energy Sustainability Bangkok, 23 March 2011Bangkok, 23 March 2011

Page 2: An Intelligent Energy System

Agenda

• Background on Singapore’s System

• The Intelligent Energy System (IES)

&• The Pilot Project – challenges & status

Page 3: An Intelligent Energy System

Singapore’s Electricity Industry

FUEL OIL & GENERATORSFUEL OIL & NATURAL GAS SUPPLIERS

GENERATORS

GENERATION

400/230/66KV TRANSMISSION & 22/6.6KV DISTRIBUTION SUB-STATIONS

CONSUMERS

GRID SYSTEMCONSUMPTION

Page 4: An Intelligent Energy System

Electricity Market Structure

Generation Companies

Energy Market Authority

Energy Market CompanyTransmission &

Distribution

Market Support

Distribution (SPPA/SPPG)Industry

Regulator, Developer

Wholesale

Retailerspp

Services(SP Services)

Power

eveloper Market Operator

ContestableCustomers

(>10,000kWh)

Non-Contestable Customers

(<10,000kWh)

System Operator

Electricity FlowsElectricity Charges

Page 5: An Intelligent Energy System

Typical Energy Demand & Price

2007000

180

5000

6000

140

160

3000

4000

120

140

1000

2000

1000

1000

0 2 4 6 8 10 12 14 16 18 20 22

Demand (MW) Energy Price ($/MWh)

Page 6: An Intelligent Energy System

Singapore’s Grid System

400kV Network

230kV Network

66kV Network66kV Network

22kV and 6.6kV Network

Low Voltage Network 400/230 Volts

Low Tension Consumers

Network automated down to MV distribution levelNetwork automated down to MV distribution levelNetwork automated down to MV distribution levelNetwork automated down to MV distribution level

Page 7: An Intelligent Energy System

System Average InterruptionDuration Index (SAIDI)

35

Minutes

25

30 Our Grid is already highly reliableOur Grid is already highly reliable

33 1

20

25

33.1

27.4

10

15

10.77.4 6.2

3.9 5.0 3.7 4.0 3.92.2 2.0 2.2

5.40.5 1.2 1.1 0.7 0.3 0.7

0

5

91/92 92/93 93/94 94/95 95/96 96/97 97/98 98/99 99/00 00/01 01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11

Page 8: An Intelligent Energy System

Key DriversTechnology assessment for a scalable end-to-end Advanced Metering Infrastructure (AMI) g ( )solution

Enable the management of Di t ib t d E RDistributed Energy Resources including renewable and embedded generation

Enable the integration of new initiatives such as demand response and Electric Vehicles (G2V and V2G)

Integration of new Outage Management System (OMS) to enhance management of powerenhance management of power outage

Page 9: An Intelligent Energy System
Page 10: An Intelligent Energy System

An Intelligent Energy System

Flexible• Demand response• Home automation

Accessible• Embedded generation• Renewable energy

ConsumerConsumerChoicesChoices Home automation

• Building managementRenewable energy

• Energy storageChoicesChoices

ConsumerGeneration DistributionTransmission

SCADA / EMS SCADA / DMS A M I

ConsumerConsumerExpectationsExpectations

Economic• Network Optimization• Assets utilization

Reliable• 7x24 monitor & control• Outage detection and ExpectationsExpectationsAssets utilizationOutage detection and supply restoration

Page 11: An Intelligent Energy System

Pilot Project Approach

Establish technical solutions for roll-out

Quantify the costs and benefits

4500 smart meters to be deployed

Nanyang Technological University to be the focal i t h th f ll it f li ti d l tipoint, where the full suite of applications and solutions

will be tested

Page 12: An Intelligent Energy System

Key Phases of the IES Pilot

Phase 1 – develop backend systems and infrastructure

Commenced in October 2010

2012Expected to be completed by mid 2012

Phase 2 – evaluate customer applications which ride on advanced metering infrastructure

Expected to commence in Q1 2012 and completed p pby mid 2013

Page 13: An Intelligent Energy System

Phase 1 – Developing the Enabler

Establish two-way data communicationd d i i f (AMI)advanced metering infrastructure (AMI)

Develop applications to ride on AMItime-of-use tariffdistributed generation managementdemand response and energy managementdemand response and energy managementoutage managementintegration of EV charging and V2G

Page 14: An Intelligent Energy System

System Architecture

Application• Demand Response• Home Automation

Application• Demand Response• Energy Portal

ApplicationApplicationServerServer

IIHHUU

Home Automation• Building Management

Application• TOU Pricing• EVS (Prepaid)

BillingSystem Smart

Meter

CCOOMMMM CC

IIOMSOMS

Application• Outage Mgt

CommunicationCommunication

SmartMeter

CCOOMMMM

SmartCCOONetwork

S

O

Meter DataMgt System

HeadHead--HHUU

SCADA/

OMSOMS

GIS

CommunicationCommunicationNetworkNetwork

SmartCCOO

SmartMeter

OOMMMM

Mgt SystemAHeadHeadEndEnd

IIHHUU

Application• DG/ES Mgt• G2V/V2G MgtSCADA/

EMS

DMS

CIS

GIS SmartMeter

OOMMMM

SmartMeter

CCOOMMMM

Page 15: An Intelligent Energy System

Design Consideration

Design with the end in mind

Ability to integrate new technologies in future

Leverage industry-adopted standardsLeverage industry adopted standards

Data live in one place

Utilise standard/best-fit functionality and avoid customisations

Customisations developed outside the core system

Page 16: An Intelligent Energy System

Smart Meter – Open and Modular

Basic metering:Basic metering:

Half-hour interval metering

At least 30 days interval data

DLMS-COSEM compliance

Remote turn-on and cut-off

Prepaid and postpaid functions

Alarms – tampering, powerAlarms tampering, power outage

plugplug--in in communicationcommunicationcommunication communication

modulemodule

Page 17: An Intelligent Energy System

Smart Meter Communication

Access meter data via Access meter data via DLMSDLMS--COSEM protocolCOSEM protocolDLMSDLMS COSEM protocolCOSEM protocol

22--channel communication channel communication gatewaygatewaygatewaygateway

able to pair different able to pair different communication methodcommunication methodcommunication methodcommunication method

Page 18: An Intelligent Energy System

Communication Concept

PLC/RF MESH

Last-milepoint-to-multipoint

DataConcentrator

Fixed Broadband (IP VPN)point-to-point

ConcentratorUHC100

Wireless: 3G, 4G, WiMax

point-to-point

WAN

Meter Network Management

SystemFixed Broadband (IP VPN)

point-to-point

Home Area Network Utility NetworkSmart Meter Network

Page 19: An Intelligent Energy System

Phase 2 – Engaging the Consumers

Applications trial with the “enabler” infrastructureC i l / i d t i l / h h ldCommercial / industrial / household consumersInclude CleanTech Park and Eco-Precinct

Electricity retailers offer to consumersTime-varying packagesValue added services such as energy efficiencyValue added services such as energy efficiency measures riding on Building Management Services and Home Automation Systems

Page 20: An Intelligent Energy System

Phase 2 – Challenges

Engaging the consumersb fitbenefits

Engaging the retailers and service providersbusiness model

Regulatory framework revisiong yparadigm shift

Page 21: An Intelligent Energy System

ConclusionCentrally managed intelligent communications Centrally managed intelligent communications interconnects various smart grid technologiesinterconnects various smart grid technologies