An Initial Draft Of Pakistan Student Satellite Program

download An Initial Draft Of Pakistan Student Satellite Program

of 21

Transcript of An Initial Draft Of Pakistan Student Satellite Program

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    1/21

    CONTENTSGROUPMEMBERS.................................................................. 4MISSION STATEMENT .......................................................... 5MAIN OBJECTIVE.................................................................. 5REPORT OVERVIEW .............................................................. 5SUB SYSTEMOVERVIEW......................................................5TOP LEVELREQUIREMENTS..............................................5

    TOP LEVELREQUIREMENTS..............................................6SUB-SYSTEM OVERVIEW ..................................................... 7INDIVIDUAL SUBSYSTEMS:STRUCTURE SUBSYSTEM.................................................... 8

    PAYLOAD................................................................................ 10POWER SUB-SYSTEM.......................................................... 12THERMAL CONTROL SUB-SYSTEM................................. 15

    1

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    2/21

    GROUND STATION AND TELEMETRY SUBSYSTEM17COMMAND AND DATA HANDLING SUB-SYSTEM........ 19

    ATTITUDE DETERMINATION AND CONTROL.............. 21INTERFACING OF COMPONENTS:THERMAL SUB-SYSTEM......24STRUCTURAL SUB-SYSTEM............................................... 25POWER SUB-SYSTEM

    .......................................................... 26TELEMETRY SUB-SYSTEM................................................. 27 ATTITUDE C&D SUB-SYSTEM........................................... 28PAYLOAD SUB-SYSTEM......................................................29PROCESSOR....................................................

    ....................... 30REFERENCES:......................................................................32

    2

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    3/21

    GROUP MEMBERSNames Position in Team NTTS

    Ahmad Usman: Project Manager Khalid Shaikh: Assistant Project Manager Abid Anwar: Payload Naveed Shoukat: Onboard Computer and DatahandlingAsad Abbass Sangi: Telemetry and CommunicationHaider Ali: Power and Electrical DistributionSystem

    3

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    4/21

    Mission StatementMain objective

    Report Overview

    Sub System overview

    4

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    5/21

    Top Level RequirementsTechnical Requirement:

    (the cubesat shall be: )Functional Requirements:AutomatedAll top-level requirements are guidelines to which all sub-systemsadhere to. For more detailed requirements of how these top-tierrequirements shall/should be achieved, refer to section 3 for thespecific sub-system requirements.)Design Considerations:

    5

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    6/21

    Sub-System OverviewStructures:Payload:Power:Thermal:Telemetry and command:Data handling:Attitude:

    STRUCTURE SUBSYSTEMObjective:

    6

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    7/21

    Technical Requirements:

    Functional Requirements:

    7

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    8/21

    PayloadTechnical Requirements:Over All Functional Requirements:

    Design Options:

    8

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    9/21

    POWER SUB-SYSTEMPower RequirementsObjective:To provide enough power to run the various electrical componentsonboard the cubesat for a minimum period of 6 months.Overview:

    9

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    10/21

    functional

    Functional requirements:Power collection:

    Power storage:Power distribution:

    Thermal Control Sub-systemPrimary Requirements:

    10

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    11/21

    External Factors:

    Orbital Heat Loads at typical LEO

    Internal factors:

    11

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    12/21

    Ground Station and Telemetry SubsystemFunctional requirementsO

    O

    Technical requirements

    COMMAND AND DATA HANDLING SUB-SYSTEM

    IntroductionFunctional specifications:

    12

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    13/21

    Technical specifications:

    ATTITUDE DETERMINATION AND CONTROL1 Introduction:2 Subsystem Objectives:3 Requirements and Specifications:

    13

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    14/21

    3.1 Technical Requirements:

    3.2 Functional Requirements:

    14

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    15/21

    4. Possible Problems:5. Linkage to overall requirements:

    THERMAL SUB-SYSTEM

    Processor:Structure:Power:

    15

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    16/21

    STRUCTURAL SUB-SYSTEM

    Processor:Thermal:Power:Telemetry:Internal sub-systems:Payload:

    POWER SUB-SYSTEM

    16

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    17/21

    Processor:Payload:Thermal:Structure:Attitude control and determination:Telemetry:

    TELEMETRY SUB-SYSTEM

    17

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    18/21

    Processor:Ground Station:Power:Structure:

    ATTITUDE C&D SUB-SYSTEM

    Power:Processor:

    18

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    19/21

    PAYLOAD SUB-SYSTEM

    Processor:Power:Structure:

    19

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    20/21

    PROCESSOR

    Thermal:Structure:Power:Telemetry:Attitude C & D:

    Payload:

    20

  • 8/14/2019 An Initial Draft Of Pakistan Student Satellite Program

    21/21

    References:Thermal:Telemetry:C&DH:Power:Cubesat 2002 CDRDesign and Test of a Solid State Charged Particle Detector for CubesatPower generation and distributionSelf-Steering Antennas for Cubesat NetworksURL:

    Structure:Payload:ACDS: