AN EVALUATION OF THE IMPLEMENTATION OF THE PREFERENTIAL
PROCUREMENT POLICY FRAMEWORK ACT (No 5 OF 2000) WITH REFERENCE TO SELECTED MUNICIPALITIES IN THE PROVINCE OF THE
EASTERN CAPE
BY
NANDIPHA NANO
Submitted in partial fulfilment of the requirements for the degree of
Master of Public Administration
AT
Nelson Mandela Metropolitan University
Supervisor: Prof. R. S. Masango
December 2008
i
DECLARATION BY STUDENT FULL NAME: Nandipha Nano STUDENT NUMBER: 206015534 QUALIFICATION: Master of Public Administration DECLARATION: In accordance with Rule G4.6.3, I hereby declare that the above-mentioned treatise/ dissertation/ thesis is my own work and that it has not previously been submitted for assessment to another University or for another qualification. SIGNATURE: ___________________________________________________ DATE: 25 March 2009
ii
ACKNOWLEDGEMENT
The successful completion of this research project would have been impossible
without the advice, assistance and support of other people.
My indebtedness and gratitude is dedicated especially to the following people:
• My Supervisor, Prof Masango, you motivated me whilst I was on the brink of
giving up. Your support, supervision, motivation, constructive criticism and
guidance resulted into the existence of this product.
• My parents – Velile and Notheko, sister Buli and brother Siv for your support
whilst I persuaded my dream.
• My daughter – Zinny “Hamle” you never doubted my ability to succeed. I
hope this achievement will be a source of inspiration.
• To the Nano Family, relatives and friends, I couldn’t be with you when you
needed me most, thanks for understanding.
• To all Municipal Managers who approved my research and to respondents
who provided the empirical data, you made my studies a success.
• To my fellow students (Niki) in particular you gave me strength to carry on.
THANKS GOD, ALMIGHTY, YOU HEARD ALL MY PRAYERS It is Well With My Soul.
i
TABLE OF CONTENTS CHAPTER 1- GENERAL INTRODUCTION 1 1.1 The Introduction 1 1.2 Background and Rationale 1 1.3 Objective of Study 3 1.4 Problem Statement 4 1.5 Research Methodology 5
1.5.1 Primary Research Options 5
1.5.2 Secondary Research Options 5 1.6 Literature Review 6
1.6.1 Evolutionary Development of Supply Chain 8 Management 1.6.2 Reforms in Procurement Management in 8 South Africa 1.6.3 Regulatory Guidelines for Supply Chain 8 Management
1.7 Ethical Consideration 10 1.8 Definition of Terms 10 1.9 Overview of Chapters 11
CHAPTER 2 - LITERATURE REVIEW 13 2.1 Introduction 13
2.2 Legislative Environment 13
2.3 Procurement defined 16
2.4 Implementation of the Preferential Procurement Policy 17
Framework Act (Act 5 of 2000) by municipalities
2.4.1 Procurement Reform 18
2.4.1.1 Objectives of a Reformed Procurement System 18
ii
2.4.2 Policy Development and implementation 25
2.4.3 Procurement methods 26
2.4.3.1 Uniformity in Tender Procedures 26
2.4.3.2 Management of Procurement Requirements 27
2.4.3.3 Petty Cash Purchases 28
2.4.3.4 Written or Verbal Quotations 29
2.4.3.5 Formal Written Quotations 31
2.4.3.6 The Preferential Point System 32
2.4.3.7 Competitive Bidding 32
2.4.3.8 Handling of Bids 33
2.4.4 Committee System for Competitive Bids 33
2.4.5 Duties of Committees 33
2.4.5.1 Bid Specification Committee 33
2.4.5.2 Bid Evaluation Committee 36
2.4.5.3 Bid Adjudication Committee 37
2.4.6 Subcontracting and Joint Ventures 38
2.5 Monitoring & Evaluation 39
2.5.1 Duties of the Accounting Officers 39
2.5.2 Monitoring Organisations 41
2.5.2.1 Auditor General 42
2.5.2.2 Procurement Compliance Office 43
2.5.3 Other Remedies 43
2.6 Challenges Facing Procurement Process 44
2.6.1 Corruption and Collusive Tendering 48
iii
2.7 Conclusion 49
CHAPTER 3 - RESEARCH METHODOLOGY 52 3.1 Introduction 52
3.2 Research Question 52
3.3 Objectives of study 52
3.4 Research Design 53
3.5 Research methodology 54
3.6 Target Population 54
3.7 Sampling method 55
3.8 Data Collection method 55
3.9 Conclusion 56
CHAPTER 4 - DATA COLLECTION AND INTERPRETATION 57 4.1 Introduction 57
4.2 Research Paradigm 58
4.3 Methods of data collection 58
4.4 Data collection procedure 59
4.5 Data analysis and interpretation 60
4.6 Conclusion 71
CHAPTER 5 - CONCLUSION AND RECOMMENDATIONS 72 5.1 Introduction 72
5.2 Main findings and recommendations 72
5.2.1 Competence of Supply Chain Management Unit staff 74
5.2.2 The Role of Local Private Sector and Academic 75
Institutions
5.2.3 Joint Venture Agreements 78
5.2.4 Capacity availability versus Budget availability 79
5.2.5 Risk Capital 80
5.2.6 Social Responsibility by Private Sector 81
5.2.7 Engaging retired Skilled Citizens 81
5.2.8 Monitoring and Control System 82
iv
5.3 Conclusion 84
REFERENCES 86
ANNEXURE: A ANNEXURE: B
1
CHAPTER 1
GENERAL INTRODUCTION 1.1 The Introduction This chapter presents a general introduction to the study entitled; An
evaluation of the implementation of the preferential procurement policy
framework Act (No. 5 of 2000) with reference to selected municipalities in the
Province of the Eastern Cape. It presents, among others, a background and
rational to the study, objectives, literature review, and an overview of
chapters.
1.2 Background and Rationale South Africa is in its second decade of democracy. Since the introduction of
democracy in 1994, the South African government and its citizens are making
strides into overhauling the country to make it one of the best habitable
countries in the world. All these changes are accompanied by challenges
regarding the types of resources required to accomplish this when delivering
services to the communities. In order for the government to accomplish this,
systems and procedures which are supported by legislation and operational
frameworks should be developed, implemented, monitored and reviewed
when necessary. Legislation which has been developed to guide and regulate
public procurement includes the Preferential Procurement Policy Framework
Act (Act 5 of 2000).
The previous procurement approaches had various fallacies. For example,
there was no accountability, no transparency, no equitable distribution of
economic resources and no supporting structures to oversee the process. The
government then realised the need for having an integrated approach towards
public acquisition of goods and services. The public service should operate in
an environment where there will be fair, equitable, transparent, competitive
and value for money in procurement.
2
The objective of the Preferential Procurement Policy Act (Act 5 of 2000) is to
give effect to section 217(3) of the Constitution of the Republic of South Africa
(Act 108 of 1996). Section 217 (3) stipulates that national legislation must
prescribe a framework within which the procurement policy may be
implemented. Preferential Procurement Policy Framework Act (Act 5 of 2000)
aims at redressing the past racial imbalances, where race and gender were
used to control productive resources.
In order to address the shortfalls of the previous systems which failed to
provide equal competition opportunities to all the people of South Africa, the
mandate, as stipulated in the amended Section 217 of the Constitution of the
Republic of South Africa (Act 108 of 1996), has been implemented. This
section calls on government and organs of the state to apply a preference
point system to enhance and give preference to the historically disadvantaged
individuals or designated groups, who in the past, were victims of unfair
discrimination on the basis of race, gender or disability.
The Preferential Procurement Policy Framework Act (Act 5 of 2000) and its
related regulations and systems emanate from Section 217 (3) of the
Constitution of the Republic of South Africa, (Act 108 of 1996). The
government has, since 1995, started engaging in a number of initiatives with
the purpose of restructuring the procurement.
One of the initiatives was the development of the Green Paper on Public
Sector Procurement Reform in South Africa in 1997. This paper is a
discussion document which contains various proposals aimed at achieving the
objectives of good governance, developing and utilising the country’s human
resources potential to the full, and encouraging a well-developed and
competitive business sector
(http://www.info.gov.za/greenpapers/1997/publicproc.htm).
3
Subsequent to the Green Paper on Public Sector Procurement Reform the
government published the Preferential Procurement Regulations in 2001, in
terms of Section 5 of the Preferential Procurement Policy Framework.
The government’s aim was to elicit contributions and discussions from role-
players and interested parties. These inputs are crucial in a country that is
committed to democracy.
It can be deduced that the Preferential Procurement Policy Framework is a
tool that is intended to provide direction and guidance to public officials when
they engage in the acquisition of goods and services whilst giving leverage
and preference to those who have been victims of the past imbalances.
There is a perception that business opportunities favour individuals and
businesses that are well established and the emerging business owners are
marginalised. The reforms in the procurement processes that have been put
in place are intended to ensure that there is equality, transparency and
accountability in the allocation of business opportunities. Preference has to be
afforded to the previously marginalised people to play a role in the public
sector procurement and enhance income generation. The aims of the
Preferential Procurement will be defeated if there are no systems to control
and monitor the engagement of historically disadvantaged individuals. The
affirming of such business owners should be viewed as a tool for the
distribution of wealth, job creation and a poverty alleviation strategy from the
side of government. The rationale for the research, therefore, is to establish
whether the historically disadvantaged individuals’ lives are improving and
bringing about sustainable economic development in their lives.
1.3 Objective of Study The objective is to determine whether the promulgation of the Preferential
Procurement Policy Framework Act, (Act 5 of 2000) is improving the quality of
lives of South Africans and whether it is bringing lasting economic
transformation with reference to designated groups, HDI’s in particular. The
4
policy that will be used to guide the procurement process must not be in
contravention of the current financial management legislation.
For the purpose of this study the legislation applicable is the Municipal
Finance Management Act, Act 56 of 2003. Chapter 11, Section 111 of the
MFMA, clearly refers to the requirement stated above. Therefore correlation
between the legislation and the procurement policy should exist.
There specific objectives of this research are:
• To establish the level of awareness of the officials responsible for the
procurement about the constitutional mandate of implementing the
Preferential Procurement Policy Framework Act.
• To establish the institutional arrangement for the implementation of the
Preferential Procurement Policy Framework Act within selected
municipalities.
• To analyse and evaluate the processes of selecting and awarding tenders
with reference to selected cases within the selected municipalities.
• To establish the extent to which the implementation of the Preferential
Procurement Policy Framework Act, (Act 5 of 2000) contributes towards
the empowerment of the Historically Disadvantaged Individuals (HDI’s)
within the selected municipalities.
• To evaluate the effectiveness of the implementation of the Preferential
Procurement Policy Framework in terms of service delivery.
In order to arrive at the answers, it becomes important that a careful and
systematic analysis of the implementation of the supply chain management
processes by the public sector be carried out in the form of research
.
1.4 Problem Statement There are many allegations, relating to irregularities in the procurement
processes, which are levelled to South African municipalities. They tend to
feature in the media reports. These allegations include bid-rigging, provision
of kickbacks and fronting in the procurement processes. If indeed this is the
5
case, the matter should be addressed in order to ensure that corruption is
eliminated and the objectives of the Preferential Procurement legislation
pursued such that the intended beneficiaries of the preferential procurement
process actually benefit.
The research study will be conducted to determine whether the Preferential
Procurement Policy Framework Act (Act 5 of 2000) is applied to allocate
business opportunities to small, medium and micro enterprises owned by
HDI’s and communities previously marginalised by the imbalances of the past.
The communities referred to are those who, due to apartheid policies, could
not own business, who are females and those who have a disability.
1.5 Research Methodology Primary and Secondary information will be used as basis for research.
1.5.1 Primary research options
The most common primary research resources are:
• Social surveys:
Questionnaire surveys
Interviews – informal or structured
• Observation:
Participants overt or covert (masked identity)
1.5.2 Secondary research options
• Published statistics: census, housing and social data and
so on.
• Published texts: theoretical work, secondary analysis by
experts and reports
• Media: documentaries as source of information
• Personal documents: diaries
http://ec.hku.hk/acadgrammar/report/resProc/research.htm
6
Mouton, (2006:69), defines Primary Information in research as the
researcher’s own data, whether you have collected it yourself of whether it
already exists in one form or another, usually available in textual information
(qualitative data) and numeric information (quantitative data).
According to David and Sutton, (2004: 69), primary research involves the
researcher undertaking the data collection him/herself, and the secondary
data involves the researcher identifying an existing dataset that has been
collected from a previous study.
In this study the researcher undertook to search for existing information from
various sources and used this data as a basis for own research which
involved the use research tools, a sample and a research method. The
qualitative approach was applied and self-administered questionnaires were
used to solicit information relating to the objectives of this study.
The population was municipalities in the Province of the Eastern Cape and
the sample comprised of selected municipalities and certain selected
municipal employees within the selected municipalities with a particular focus
in the supply-chain management unit.
The researcher personally collected data by telephone interviews, structured
face-face interviews, distributed and collected questionnaires and made
personal visits to supply-chain management departments or divisions in
targeted municipalities.
1.6 Literature Review Van der Walt, Van Niekerk, Doyle, Knipe, and Du Toit, (2002: 7) state that the
government is expected to create conditions within which each individual in
the country, but especially the less privileged members of the community, can
develop his or her own social welfare and physical well-being.
7
The regulatory framework is in the form of Legislation, Green Paper,
Regulations and Procedures that provide steps to be followed in the
affirmative public procurement.
According to Van der Walt et al, the constitution impacts on procurement in
two ways. Firstly, it affects the principles of good governance with reference to
Section 195 (1) and secondly, the procurement must be done in a fair,
equitable, transparent, competitive and cost-effective manner which takes into
consideration the provision of preference-tendering for the categories of
previously disadvantaged individuals.
What is known to be happening frequently within the ranks of the public sector
are the annual audits aimed at verifying how the rands and cents of the state
have been received and expended. This is called the ex-facto auditing which
normally focuses on the availability of all source documents to substantiate
the transaction, authorisation and adherence to pertinent legislative
framework. The audit processes does not go deeper into determining how the
preferred service provider has been solicited; authenticity of the bid
adjudication process; structures involved in the process, declarations and all
other related standard requirements. It is biased towards financial accounting
and financial management. Therefore compliance to procurement process
standards are seldom audited and reported to except when there is a court
battle between the service provider and the government department or other
organ of state. The study is trying to unravel the build-up process towards
what is called the affirmative procurement where preferential point awarding
system has been applied.
The primary sources to be used in the literature review will include
contemporary records, confidential records, public reports and expressions of
opinion (editorials), government documents (regulations; policies).
8
1.6.1 Evolutionary Development of Supply Chain Management Hugo, W. M. J.; Barderhost-Weiss, J. A.; Van Biljon, E. H. B.; (2004: 13)
states that there are four phases of development in supply chain of which one
of them refers to the establishment of the planning framework and process
designs that represents the holistic view of an integrated approach to supply
chain management, develop and solidify the skills of the cross functional
teams.
It can be deduced that it is very important for the government and the organs
of state to ensure that there is adequate resources to develop an integrated
process plan to drive the affirmative procurement process to ensure that the
organisational objectives and targets are achieved.
1.6.2 Reforms in Procurement Management in South Africa Van der Walt (2002: 26) states that the government systems reviews have
suggested that a common framework should be created within which all public
institutions should conduct their procurement activities. The framework should
include uniform treasury norms, standard procurement process; common
performance measures. The key principle underlying the reforms is value for
money; commitment to competition and commitment to best practices and
innovative procurement processes.
To date so much has developed around the country, the paradigm shift is
visible, and the new public management approach has been adopted which
includes the generic management tasks. The generic duties of management
have been in practice in the private sector for decades and as such those
techniques are being implemented by government.
1.6.3 Regulatory Guidelines For Supply Chain Management The regulatory framework is in the form of Legislation; Green Paper;
Regulations and Procedures that provide steps to be followed in the
affirmative public procurement.
9
According to Van der Walt et al, the Constitution impacts on procurement in
two ways, firstly it affects the principles of good governance with reference
section 195 (1) and secondly the procurement must be done in a fair;
equitable; transparent, competitive and cost effective manner that takes into
consideration provision for preference tendering for the categories of
previously disadvantaged individuals.
The Green Paper on Public Procurement Reform published in 1997 indicates
government commitment to use as an instrument to achieve socio-economic
objectives and to contribute to the transformation and democratisation of
South African society. The government therefore seeks to implement a policy
that would support international best practice also introducing new
procurement management concepts such as affirmative procurement policy;
life cycle costing, value for money and appropriate risk management
strategies that would respond to the needs of the South African society.
The following legislation has a bearing in procurement processes:
Chapter 11 of the Municipal Finance Management Act (Act 56 of 2003)
also reiterates the need for public offices, municipality in this case to
develop and implement a Supply Chain Management which policy
seeks to accommodate the objectives of the Act whose objectives are
defined above.
Broad Based Black Economic Empowerment Act (Act 53 of 2003)
whose objective is first and foremost to promote economic
transformation such that black people participate in main stream
economy.
Construction Industry Development Board Act (Act 38 of 2000) whose
objective is to provide for the establishment of the Construction
Industry Board to implement an integrated strategy for the
reconstruction, growth and development of the construction industry
and to provide matters connected therewith.
10
Preferential Procurement Policy Framework Act (Act 5 of 2000) aims at
redressing the past racial imbalances where race was used to control
productive resources, who are females and have been discriminated due to
their physical disabilities.
1.7 Ethical Consideration Ethical consideration involves the code of conduct of the researcher before
and after the study has been completed. The researcher must determine the
right and the wrong approach when engaging in the research activity. The
manner in which people conduct themselves says so much about one’s
behaviour, how they communicate and interact with one another. Ethical
behaviour plays a very important role in society. Behaviours in most cases
stem from prior learning, discipline exercised by parents and other associates.
According to Neuman (2006: 129 - 141) the research has an ethical-moral
dimension towards the researcher who has the moral and professional
obligation even if the research subjects are unaware of or unconcerned about
ethics. To this effect, the ethical principles that the researcher must follow will
include commitment such as:
• Never cause physical or irreversible harm, psychological
abuse and legal jeopardy harm to subjects;
• Prior voluntary consent, no humiliation, degrading or
release of harmful information.
1.8 Definition of Terms In order to eliminate confusion relating to the use of terms, the meanings
attributed to certain selected terms and phrases in this document are briefly
described below.
“Affirmative Procurement” comprises participative programmes aimed at
the engagement of small, medium and micro-enterprises owned by previously
disadvantaged categories of people or companies. It aims to increase the
11
volume of work available to the poor and marginalised sectors of the
community falling within this definition.
“Disability” means a permanent impairment of a physical, intellectual or
sensory function, which results in restricted, or lack of the ability to perform an
activity in the manner, or within range, considered normal for a human being.
“Historically Disadvantaged Individuals – (HDI)” refers to a South African
citizen or any service provider who, due to the apartheid policy had no
franchise prior to the introduction of the Constitution of the Republic of South
Africa, 1993, (Act 200 of 1993), who is a female and/or who has a disability;
provided that a person who obtained South African citizenship on or after the
coming into effect of the Interim Constitution, is deemed not to be an HDI.
“Procurement” means the acquisition of goods and services occurring daily
in all levels of government. Craythorn, (2003: 297) defines procurement in
simple terms as the acquisition of goods and services which occurs virtually
daily at all levels of government.
“Supply Chain Management” is a management philosophy aimed at
integrating a network of upstream linkages in performing a specific process
and activities that will ultimately create and optimise value for the customer in
the form of products and services which are specifically aimed at satisfying
customer needs.
1.9 Overview of Chapters Chapter 1 of the study provides a general background to the study. It deals
with aspects which include: background and rationale to the study, problem
statement, and research objectives.
Chapter 2 focuses on literature study.
12
Chapter 3 focuses on research methodology of the study. In this chapter, an
explanation relating to data collecting instruments and data collection
procedure is given.
Chapter 4 deals with data analysis of the study. Chapter 5 concludes the study by providing the findings and
recommendations of the study.
13
CHAPTER 2
LITERATURE REVIEW
2.1 Introduction The government of any country is the largest buyer and consumer of goods
and services to meet the primary objectives of delivering according to the
needs of the citizens and also requires goods and services for its operations
and existence. The government has to procure services from various sources
to implement its programmes.
There are various statutes that have been enacted to regulate government
programme implementation. In South Africa the supreme law is the
Constitution of the Republic of South Africa Act (Act108 of 1996). The statutes
that regulate the operations of the government are the products of the
constitution. The Preferential Procurement Policy Framework Act (Act 5 of
2000) is one such product.
It is vital to examine the nature and scope of the legal framework to examine
the impact of the enforcement of legislation by state officials. The study
evaluates the extent to which the effect on Section 217 of the Constitution is
with special reference to the implementation and monitoring of the Preferential
Procurement Policy Framework Act (Act 5 of 2000) within the municipal
governance sector.
2.2 Legislative Environment Considering the democratic dispensation in South Africa, the government has
to ensure that the lives of the majority of its citizens are changed for the
better. Therefore, the magnitude of government procurement cannot be over-
emphasised. The Preferential Procurement Policy Framework Act is one of
the statutes that have been passed by parliament which seek to reverse the
discriminatory laws, policies and practices of the past and overhaul
procurement processes, while empowering the citizens and reducing
corruption.
14
The legislation attempts to balance business ownership and encourage the
participation of previously marginalised communities in the mainstream
economy. Affirmative procurement has been identified as a tool that can bring
about economic development and allows for the participation of previously
disadvantaged individuals. Similarly, Van Weele (2000: 325) supports and
argues that government purchases often serve political objectives, whilst
there is a need to utilize their financial resources as efficiently as possible.
Reddy (1995:40) states that, when addressing infrastructural backlogs in
terms of the Reconstruction and Development Programme (RDP), local
authorities should encourage small businesses in the manner in which
contracts are let. He argues that the process of tendering can be modified to
allow greater access for small enterprises, dividing large contracts either
geographically or by size, to allow small, community-based enterprise the
opportunity to bid. Municipalities should also have the opportunity to
demonstrate their capacity on small jobs, and then be allowed to progress
rapidly to bid for larger projects. They could also insist on labour intensive
bids to undertake capital works and require contractors to employ people from
the local community.
Both Van Weele and Reddy support the reasoning by the South African
government that its political objective is to focus on business opportunities for
those who, due to past imbalances and discrimination were unable to
participate actively in the economy. To achieve positive outcomes the
government is inclined to implement affirmative procurement processes which
are supposed to give priority to black business owners.
It can be deduced that the primary objective of the government and
municipalities is to create an environment that will enable small, medium and
micro enterprises and emerging businesses to have meaningful participation
in public procurement. Meaningful participation can be achieved by giving
priority to tenders and bids received from businesses owned and controlled by
those previously disadvantaged by unfair discrimination.
15
A suitable public procurement intervention strategy should be implemented,
based on the Preferential Procurement Policy Framework Act, (Act 5 of 2000),
so that the political objectives stated above can be achieved. The enactment
of the Preferential Procurement Policy Framework Act clearly provides
confirmation that the government is addressing the past imbalances and
challenges and has undertaken a radical overhaul of its mandate, introducing
many new and innovative methods to service delivery and getting closer to its
constituencies.
The Preferential Procurement Policy Framework Act, (Act 5 of 2000) is
provided in accordance with the provisions of the Constitution of the Republic
of South Africa Act 108 of 1996 and other subsequent legislation.
The constitutional provisions stated in Section 217 (1) of the Constitution of
the Republic of South Africa Act 108 of 1996 determine that:
“When the organ of state in the national, provincial or local sphere of
government, or any other institution identified in the national legislation,
contracts for goods and services, it must do so in accordance with a
system which is fair, equitable, transparent, competitive and cost-
effective”
Section 217(3) of the constitution mandates the national government to
prescribe a framework providing for preferential procurement to
address the social and economic imbalances and discriminating laws
of the past.
The Municipal Finance Management Act, (MFMA) 2003 (Act 56 of 2003),
section 2(a), (b) and (f) which was promulgated to regulate and secure sound
municipal financial management, is applicable to all municipalities and
municipal entities by establishing norms and standards. The act ensures the
following standards:
16
• Transparency, accountability and appropriate lines of
responsibility in the financial affairs of municipalities and
municipal entities.
• Appropriate systems are established to manage
revenues, expenditures, assets and liabilities, supply
chain management and integrated budget and planning
processes.
The promulgation of the Preferential Procurement Policy Framework Act, (Act
5 of 2000) was followed by the establishment of the Supply Chain
Management Regulations in the Government Gazette no 27636 Vol. 479
dated 30 May 2005, which provides the framework for the establishment and
implementation of the Supply Chain Management Policy by the municipality.
The Preferential Procurement Policy Framework Act, 2000 (Act 5 of 2000),
and its accompanying regulations, were promulgated to prescribe a
framework for the implementation of the preferential procurement system. The
preferential system includes, among other considerations, the 80/20 and the
90/10 preference point system applicable in the evaluation of bids and
tenders, procurement methods and the establishment of committee systems
for competitive bids.
2.3 Procurement Defined Bates et al, (2006: 200) define procurement as the activity of finding and
buying goods that businesses need in order to operate. Components, raw
materials, and supplies is known are examples and this is known as
procurement or purchasing. The words buying, purchasing and procurement
all refer to transactions, which means exchanging one thing of value, usually
money, for another thing of value.
Bolton, P; (2007: 1 - 3), describes procurement as the function of purchasing
goods and services from an outside body as contained in the heading of
17
Section 217 of the constitution should be given a wide interpretation.
Procurement in the South African context should be understood as referring to
instances where government acquires goods and services and when it sells or
lets assets.
Therefore, procurement is a process of deciding on what is to be bought,
objectives that are to be fulfilled, the method of acquisition and exchange
value, and choosing the best or most appropriate service provider with
regards to value for money. Within the South African government context,
procurement is intended to facilitate the socio-economic upliftment of all those
who fall within the category of historically disadvantaged demographics of the
country.
2.4 Implementation of the Preferential Policy Framework Act, (Act 5 of 2000) by Municipalities The supply chain management regulations which became effective on 1 July
2005 require the Municipal Council to approve a transparent policy that will
regulate municipal procurement systems. Municipalities were categorised as
high, medium and low capacity regarding their capabilities to recruit or use
existing human resources to implement the policy and its ability to generate
revenue.
The categories of municipalities’ involvement were first high capacity
municipalities, followed by those referred to as medium capacity, effective on
the 1 January 2006, and lastly the low capacity municipalities on 1 July 2006.
The aim of standardising the regulations was to bring about uniformity in
procurement between the 3 levels of government. These regulations were
developed to put in place the administrative and financial accountability under
the supervision of the accounting officers.
The accounting officers or municipal managers are responsible for ensuring
that there are maximum controls in place to prevent mischievous actions,
fraud, favouritism, corruption, and unfair practices and ultimately be in full
control of the procurement process.
18
Craythorne (297: 2003) states that the constitutional provision contains two
levels. At the first level, when organs of state, such as the council award
contracts, they must do so in accordance with a system devised by them, but
subject to financial management legislation, which will be the MFMA. The
system must be fair to council and other potential contractors; must be
equitable (impartial in its substance); transparent (open and not secret);
competitive (so that tax payers get the best deal for money); and cost
effective (public goods are not beyond the reach of the public).
At the second level the principle is that those persons who, on the grounds of
race or colour, were excluded from being suppliers of goods and services, can
be given preference in the award of contracts and be given protection.
2.4.1 Procurement Reform The Green Paper on Public Procurement recognises that certain institutional
reforms need to take place in order to promote an efficient and effective
procurement system and to achieve value for money and world class
procurement systems
(http://www.info.gov.za/greenpapers/1997/publicproc.htm).
The reason for the institutional reforms is to establish and develop an
environment which that will accommodate the vision and the objectives of the
legislation. There are a number of suggestions on key elements, regarded as
focus areas, of the reforms in the application of the procurement system.
2.4.1.1 Objectives of a Reformed Procurement System Socio-economic objectives, supported by good governance, have been
identified by government as indications for bench-making the success of the
procurement reforms.
The Green Paper on the Public Procurement Reform in South Africa states
that the socio-economic objectives involve access to tendering information;
simplification of tender documents; drafting of an affirmative small-medium-
and micro-enterprise participation programme and affirming marginalised
19
sectors of the society in the construction projects with special focus on the
development of human resources.
Good governance includes aspects such as value for money, a financial
management control system, meeting tax and service charge obligations and
adhering to prescribed labour practices
(http://www.info.gov.za/greenpapers/1997/publicproc.htm).
In the past, public tendering favoured the well-established companies and it
was difficult to enter the market. Now there is a constitutional mandate that
the system must be fair, competitive, transparent and cost-effective, so that
there is an enabling environment for the participation of the previously
disadvantaged people of the country.
Secondly, structures must be in place to regulate and maintain good
governance with special focus on financial management. There should be
organisational restructuring plans to provide guidance for the establishment of
the Supply Chain Management Unit. This unit will ensure that the process of
procurement is accountable, fair, equitable, transparent and a competitive
environment is created.
The implementation process by municipalities must be done, monitored and
evaluated by people who have the required expertise. Regulation 2.6.1 states
that the National Treasury will provide support by facilitating the development
of appropriate training material in conjunction with the South African
Management Development Institute, and the Institute for Public Finance and
Auditing (IPFA).
The implementation of the Preferential Procurement Policy Guidelines as a
product of the Preferential Procurement Policy Framework requires that the
Accounting Officer, and the Municipal Manager, in the case of the municipal
entity, establish the Bid Specification, Evaluation and Adjudication
Committees. The functions of the committee range from the evaluation of
quotations or tenders received, to adjudication of evaluated tenders.
20
Affirmative Procurement requires that the implementation of the procurement
system should have clearly defined parameters targeting small-medium-and
micro-enterprises with specific focus on businesses owned and managed by
previously disadvantaged individuals. As municipalities should develop and
implement their own procurement policies, as stated in the constitution
Section 217, the Affirmative Procurement Reforms should be incorporated
into the policy.
The inclusion of the consideration of the previously disadvantaged people in
the policy will force the Supply Chain Management personnel to follow the
requirements of the policy. The existence of the policy that seeks to engage
small-medium-and-micro enterprises will also serve as a tool to protect the
interests of the government and hold the supply chain management unit,
together with the municipality, accountable for their actions.
Failure to implement and follow the policy is complete disregard and
contravention of the law at the expense of individuals who were not protected
by the laws of the previous regime. The Affirmative Procurement Reform and
the Preferential Procurement Regulations are the product of the Preferential
Procurement Policy Framework Act, (Act 5 of 2000) which prescribes a
particular process and steps that have to be followed when procurement is
allocated to business people.
It can be deduced that, to achieve the objectives stated above, there should
be transformation of the procurement process and practices within the Supply
Chain Management and also bring about significant improvements to financial
management. The municipal manager has the duty of instituting and
maintaining the supply management system, which is transparent, efficient,
equitable, competitive and accessible to HDI’s. This objective can be best
achieved if there is ethical consideration, accompanied by the highest
possible ethical standards, subject to structured monitoring and reporting
mechanisms.
21
Part 4 of the Reconstruction and Development Programme states that the
South African economy is in a deep-seated structural crisis and as such
requires fundamental reconstruction. For decades forces within the white
minority have used their exclusive access to political and economic power to
promote their own sectional interests………..A particular weakness of the
economy, aggravated by racist and sexist policies, is the inability to maintain a
dynamic small-scale and micro-enterprise sector. Smaller firms, especially if
owned by black people, can rarely develop productive linkages with the large-
scale sector. Most people in the informal sector lack productive and
managerial skills and access to business sites, capital and markets
(http://www.anc.org.za/rdp/rdp4.html).
It is against this background and the adoption of the Reconstruction and
Development Programme that the concept of Affirmative Procurement came
into being. The distribution of business opportunities must then be used by the
new South African government as an instrument for the creation of wealth and
reduce disparities in business ownership. It can thus be deduced that the
main objective of affirming small-medium-and micro-enterprises participation
is to provide equal access to public procurement and contracting
opportunities.
Furthermore, whilst the government is proposing the process of involving
black-owned businesses into main stream economy, there is a dire need to
expose these targeted demographics into skills development initiatives
necessary in enhancing quality business management. The process should
provide mechanisms for the participation of targeted segments of the South
African population and is engaged in providing goods and services.
• The Reconstruction and Development Programme Chapter 4 (4.4.7.3)
cite constraints which are facing the small-medium-and micro-
enterprises being:
• Access to markets
• Credits
22
• Skills
• Supportive institutional arrangements
The government must ensure that an environment is created whereby the
small businessman is able to access funds to start a business. He or she
should also have access to merchandise, the market and to sell products.
The previously marginalised groups are faced with skills shortage reality due
to various reasons. The quality of education that has been applied by the
apartheid regime was never intended to empower people to have life skills
and be responsible for their destiny.
There were a number of by-laws and legislation that prevented black people
from participating actively in the economy. The Group Areas Act of 1950
separated people in terms of geographic areas for each race and the Bantu
Education Act of 1953 enforced racial segregation of schools, and imposed an
inferior system and training on black people.
The majority of the blacks were never hands on in the business environment.
They were mere labourers, taking instructions and implementing what they
had been told by their masters. The government has realised that previously
marginalised people lack expertise and the necessary skills which are crucial
when one intends to establish an enterprise.
The institutional arrangements have been identified as another area of
importance. In order for the small-medium-and micro-enterprises to take off,
there should be institutions which are dedicated to providing guidelines to
those who wish to start businesses. Support in terms of standard business
management skills such as finance management, marketing, planning and
operating aspects are very important for the success of any business. South
African governments’ willingness to support this very important is visible.
23
There are government institutions like the Small Business Development
Agency (SEDA), established by the Department of Trade and Industry, to
support small business enterprise. According to Bates et al (2006: 87), the
purpose of SEDA is to ensure a co-ordinated approach to design and
implement development programmes and create a service delivery network
for small businesses throughout South Africa.
Bates (2006: 80-81) argues that it has recently been realised that the
contribution of small businesses to the economic growth and development is
on average higher than that of big business. The sum total of jobs created
through small business or small organisations is much higher than that of big
businesses or organisations combined. Many countries’ economies are now
doing all they can to enable small businesses or organisations to thrive. This
is because governments have realised the enormous contributions that small
business organisations make to the economy.
Supportive institutional arrangements have a bearing on the public service
where any type of procurement is taking place. Public institutions must
establish Supply Chain Management Units to have help desks to provide
assistance and support to service providers. The government passes
legislation and creates policies, guidelines and frameworks that set the limits
within which business can take place.
If the major constraints, according to the Restructuring and Development
Programme as stated above, are encouraged and dealt with properly, small
businesses have the potential to bring about economic development, job
creation and social stability within the area. It is also very clear that the South
African government has realised the potential small business people have
towards the building of the economy of this country. The derivatives of the
Constitution of the Republic of South Africa, the Preferential Procurement
Policy Framework Act, (Act 5 of 2000), Preferential Procurement Regulations
and the Affirmative Procurement Regulations demonstrate the government’s
intention to develop the economy through the consideration of small-medium-
and micro-enterprises when awarding business contracts.
24
The Green Paper on Public Sector Procurement Reforms states, that in order
to achieve the ideals of good governance and to address the changed
environment, some fundamental institutional reform will have to be
implemented. The reform could promote effective and efficient procurement
systems and practices which enable government to deliver the required
quality and quantity of service.
According to Shah (2005: 40-1) governance is a multifaceted concept
encompassing all aspects of the exercise of authority through formal and
informal institutions in the management of the resource endowment of a state.
The quality of governance is thus determined by the impact of this exercise of
power on the quality of life enjoyed by the citizens.
The establishment of uniformity in procedures, policies, documentation and
contract options and implementation of sound systems of control and
accountability need to form the cornerstone of institutional reform.
This very broad objective can be summarised as putting in place an integrated
standard generic approach towards the acquisition systems. These systems
will direct government resources towards service delivery in the most
economical and transparent way without losing sight of the targeted business
communities. The standardised procurement process will also assist in
drawing up conclusions when competitive procurement is carried out.
It will be equally difficult for government to keep a large number of labourers
due to the costs associated with employee benefits. However government
should create jobs and permanent employment. Most private companies
employ people only on a contractual basis and are normally paid on an hourly
basis.
Wilson and Hinton (1993: 93) argue that private contractors may achieve
savings by offering lower wages, worse working conditions and cutting jobs.
Public authorities begin the tendering process at a disadvantage given the
25
labour-intensive nature of many services and their commitment to nationally-
determined wage levels.
In other words saving to the local tax-payers for instance, may be at the
expense of the poorly paid members of the society. This could be the same
situation facing government’s labour intensive programmes headed by private
companies. Professional bodies for specialised individuals regulate their rates
per hour so far the wages paid out by to labourers employed by these
professional are not regulated and monitored to guard against labourer
exploitation.
2.4.2 Policy Development and Implementation The implementation of the procurement process by municipalities is the
profound commitment to legislative requirements. This has to be achieved
through the establishment of the Supply Chain Management Unit.
The duty of this unit, as a municipal structure, is to manage the working
capital invested in the procurement of goods and services with the objective of
maximising the economic return from such spending. If the municipality has
established this unit, it is complying and observing all pertinent legislation.
This includes the Preferential Procurement Policy Framework Act, (Act 5 of
2000) and the Municipal Finance Management Act (MFMA) including the
regulations regarding the prescribed framework for the supply chain
management.
When officials dealing with the supply chain management processes have
been given training regarding the implementation process, they are entrusted
with the duty of ensuring that the procurement policy is followed. They have to
analyse all documentation required and provide guidelines and technical
assistance to the officials.
The Municipality must establish a Supply Chain Establishment Policy
Committee which will develop a document on how the Municipality intends to
conduct its procurement. This should be in line with the Preferential
26
Procurement Policy Framework Act, (Act 5 of 2000) and the Municipal
Procurement Regulations forming the basis for the formation of the policy.
The committee should pay attention to detail to eliminate any ambiguity whilst
incorporating the five pillars of procurement: value for money, effective
competition, fair procedures, transparency and control and equity.
After establishment Council should approve and adopt the policy. At the
adoption stage there will be delegation consideration, establishment and
placement of the of the Supply Chain Management Unit within the
municipality, threshold values, bid committee structures and bid documents
including the General Conditions of Contract (GCC).
After the policy has been put in place practitioners should be provided with the
necessary training including data-base management for the registration of
various service providers and end-users of the policy should also be taken on
board.
2.4.3 Procurement Methods Bolton (2007: 133) mentions various methods of a procurement process that
can be used for various reasons and categories. Procurement differs based
on the amount which has to be spent or be available as budget, quality and
quantity. All these categories of procurement are subject to fairness, equity,
competition, transparent, accountability and value for money.
2.4.3.1 Uniformity in Tender Procedures Bolton (2007:144 - 5) states that the National Treasury requires that
accounting officers base their bid invitations on the General Conditions of
Contract (GCC) issued by the National Treasury. All bids and contracts should
be subject to the GCC and the standard wording should not be amended. If
the guidelines are applied, genuine competition should be ensured, because
they emphasise the importance of uniformity in bid documentation. Uniformity
in procurement documentation ensures improved understanding by emerging
contractors in particular and so ensures the maximum degree of competition
and cost effectiveness both in financial and human resource terms.
27
According to the Green Paper on Public Sector Procurement Reform in South
Africa, uniformity in tender and contract documentation will promote effective
participation by emerging enterprises. This understanding and interpretation
of the document process will thus be enhanced and the process simplified.
This initiative on the side of the government shows their intention to broaden
the scope of participation by targeted segments of business owners. The use
of the standardised procurement documents and the repeatable exposure to
these contract documents, even the least literate segments of our community,
will, over time, learn and manage the complex task of completing a contract
and tender documents.
The purpose of the help desk is to ensure the equitable treatment of
prospective bidders and service providers who do not have the educational
skills to complete the required documentation in response to notices calling
for quotations or tenders. The information regarding this type of assistance
can also be indicated in the relevant notices.
2.4.3.2 Management of Procurement Requirements Chapter 2 of the Municipal Supply Chain Management Regulations states that
the Supply Chain Management Policy must provide an effective system of
demand management in order to ensure that the resources required to
support the strategic and operational commitments of the municipality are
delivered at the right time, at the right place, at the right price and that the
quality and quantity satisfy the needs of the municipality.
This statement talks to the circumstances and reasons why any type of
procurement may be required. It starts with the needs analysis per strategic
plans, resource requirements, sourcing options, scheduling, for whom and
when. The results from this analysis lead to the acquisition process and
management, which forms the gist of the procurement policy.
The Acquisition Process
28
Chapter 2 of the Municipal Supply Chain Management Regulations,
Government Gazette No. 27636 states that the Supply Chain Management
Policy must make provision for various methods of acquisition. Regulation 12
prescribes four types of procurement:
(a) Petty cash purchases not exceeding R 2000
(b) Written or verbal quotations. The threshold is between R 2 001 and R 10
000
(c) Formal written price quotations for procurements of a transaction value
over R 10 000 up to R 200 000 (VAT included) and
(d) A competitive bidding process for procurement above the transaction
value of R 200 001 (VAT included) and R 500 000 and the long term
contracts in excess of R 500 000.
2.4.3.3 Petty Cash Purchases Depending on the strategic demands of the municipality, the categories listed
above will be applied for acquisition of specific objectives. The petty cash not
exceeding R 2 000 should be kept by an official who has been delegated the
duty by the accounting officer of the municipality.
The cash is used for the day-to-day procurement of relatively cheap items for
activities of the office. When the cash is used up it has to be reconciled and
reimbursed as soon as possible. The accounting officer has to ensure that
there are controls in place to regulate petty cash purchases, otherwise could
be abused. It is still within the ambit of the accounting officer or the delegated
manager to have spot checks of the petty cash. This is also a very important
step towards ensuring that the cash is used and replenished appropriately.
Regulation 15 of the Municipal Supply Chain Management states that a
supply chain management policy must stipulate conditions for the
procurement of goods by means of petty cash purchases; referred to in
regulation 12 (1) (a) which includes:
• Determining terms under which a manager may delegate responsibility
for petty cash to an official reporting to the manager
29
• Limiting the number of petty cash purchases or the maximum amount
per manager per determined period
• The need for monthly reconciliation accompanied by the appropriate
documents.
Bolton (2007: 149) also argues that even though the value of these purchases
are low, compared to contracts that are subject to competitive bidding
procedures, it is important for proper safeguards to be in place to ensure that
public money is spent wisely and in the most efficient manner. Sufficient
safeguards should be in place to guard against corrupt practices, which, in
turn ensure compliance with the principle of cost-effectiveness.
2.4.3.4 Written or Verbal Quotations Regulation 16 of the municipal supply management policy must stipulate the
conditions for the procurement of goods and services through written or verbal
quotations, which must include conditions stating-
(a) That quotations must be obtained from at least three different
providers, preferably from, but not limited to, providers whose
names appear on the list of the accredited prospective providers of
the municipality. If quotations are obtained from providers who are
not listed, such providers must meet the listing criteria in the supply
chain management policy required by regulation 14 (1) (b) and (c).
(b) Service providers be requested to submit quotations in writing.
(c) If it is not possible to obtain three quotations, the reasons must be
recorded and reported quarterly to the accounting officer or another
official designated by the accounting officer.
(d) If the quotation is submitted verbally, the selected service provider
may place the order only against written confirmation.
This category of procurement requires that, when a demand for a particular
service has been identified, the supply chain management unit must call for
written estimates from prospective service providers. Written or verbal
estimates should be solicited from at least three service providers who are
30
listed in the supplier database of the municipality. If, for some reason, quotes
cannot be received from the database suppliers, they can be solicited from
those not listed in the database. Approaching outside suppliers could be a
deviation from the required process, which must be incorporated when
reporting time arrives.
The estimates in this category must exceed R 2 000 but be below R 10 000.
Regulation 16 © is provides a condition and a control mechanism to ensure
that, even if the three estimates for some reason cannot be secured, the
reasons to this effect must be in writing and form part of the report to be
submitted to the accounting officer when the time comes.
The accounting officer must ensure that the database of accredited
prospective service providers and contractors is established and updated by
the supply chain management unit or delegated official. The updating of the
database is normally done through an advertisement in the local newspaper
and the website of the municipality calling for various categories of service
providers.
According to Regulation 14 (2) of the Municipal Supply Chain Management
prospective service providers must be allowed to submit applications for
listing at any time. The contents of these applications are used to ensure and
promote competition amongst potential suppliers. Coupled with this database
listing, the activity of supplier rotation is normally kept for consultants. The
municipality approaches the supplier to submit a quote, proposal or offer on a
rotating system to be appointed to provide the service.
This reporting requirement sends a clear message that controls are in place
and this control measure bears a potential to reduce unethical and
mischievous behaviours by some corrupt elements within the municipality. If
there were no such control, it would mean that, at any given time,
procurement officers or those delegated the function, would by-pass this
requisite and simply ignore their Constitutional mandate as stipulated in
31
Section 217 (b) of ensuring that prospective service providers are afforded
equal opportunity to compete for the business contract.
2.4.3.5 Formal Written Price Quotations Formal price quotations is another method of procurement for items in excess
of R 30 000 but not exceeding R 200 000
The accounting officer must establish conditions for the procurement of goods
and services through formal written price quotation. Procedures according to
Regulation 18 of the Municipal Supply Chain Management Policy lay down
the following process:
(a) All requirements, in excess of R 30 000, must be advertised for at
least seven days on the municipal website as well as on the
municipal notice board.
(b) When using the list of accredited prospective providers the
accounting officer must promote ongoing competition amongst the
suppliers, including by inviting providers to submit quotations on a
rotation basis.
(c) The accounting officer must take all reasonable steps to ensure that
the procurement of goods and services, through written or verbal
quotations or formal written quotations is, not abused.
(d) The accounting officer should keep a record of all verbal and written
quotations received and accepted by a delegated official.
(e) A proper record keeping system must be in place
The above conditions are applicable to all procurement, be it general goods
and services or consulting and engineering contracts. The selection of
suppliers based on rotation or called on expression of offer will not exceed R
200 000. The municipality must regularly evaluate the deals approved to
determine adherence to the empowerment goals, allocation and giving
preference to the previously disadvantaged segments of the community. This
information has to be made public and reported to municipal officials,
councillors and managers as determined in the municipal procurement policy.
32
2.4.3.6 The Preferential Point System The 80/20 preference point system formula must be used to calculate the
points for the price in respect of tenders or procurement with a Rand value
equal to or above R 30 000 and up to R 500 000. A maximum of 20 points
may be awarded to a tenderer for being a Historically Disadvantaged
Individual or for sub-contracting with a Historically Disadvantaged Individual or
for achieving any of the specified goals stipulated in Regulation 17(3) of the
Preferential Procurement Regulations of 2001. The 90/10 formula must be used to calculate the points for price in respect of
tenders or procurement with a Rand value above R 500 000. A maximum of
10 points may be awarded to a tenderer for being a Historically
Disadvantaged Individual, for subcontracting with a Historically
Disadvantaged Individual and / or for achieving any of the specified goals
stipulated in Regulation 17(3) of the Preferential Procurement Regulations of
2001. www.bee.sabinet.co.za
2.4.3.7 Competitive Bidding Process Regulation 19 of the Municipal Supply Chain Management Policy states that
when the Municipality is procuring goods and services in excess of R 200
000, such procurement must be carried out through competitive bidding,
except when procuring goods and services contemplated in section 110 (2) of
the Municipal Finance Management Act 56 of 2003. Furthermore, the
regulations state clearly that bids in excess of R 200 000 must not be
deliberately split to avoid the competitive process. This action is forbidden
simply because it defeats the whole intention of competitive bidding
objectives.
Where appropriate and cost-effective, the unbundling of large projects or
contracts, in accordance with the objectives of the Preferential Procurement
Policy Framework Act, (Act 5 or 2000) may be implemented. This means that
the municipality can decide to award contracts in whole or in parts.
33
It is the responsibility of the accounting officer to establish and enforce
procedures for competitive bidding processes for each of these stages:
• The compilation of the bidding documents
• The public invitation of bids
• The handling of bids submitted in response to the public invitation
• The evaluation of the bids and awarding
• Contract administration and information management
2.4.3.8 Handling of Bids Regulation 23 of the Supply Chain Management requires that a procedure be
determined for the handling, opening and recording of bids. It is stipulated that
bids should be opened in public soon after the closing date and time has
expired. The names of the bidders and their price should be read out in public.
At this time the information is recorded and later forwarded to the accounting
officer.
2.4.4 Committee System for Competitive Bids In terms of Regulation 26 (1) of the Municipal Supply Management Policy the
policy must provide for a committee system for competitive bids consisting of
a bid specifications committee, a bid evaluation committee and bid
adjudication committee. Also the supply chain management states that the
accounting officer must appoint the members of each committee. The
committee system must be consistent with regulations 27, 28 and 29 and
other applicable legislative framework.
2.4.5 Duties of the Committees 2.4.5.1 Bid Specifications Committee
This committee must comprise of one or two officials – preferably a
manager responsible for the supply chain management unit. Their
focus is the compilation of the technical specifications, bid special
conditions of the contract, terms of reference and to determine goals, in
terms of the Preferential Procurement Policy Framework Act, (Act 5 of
2000), for each procurement of goods and services.
34
The specifications decided upon by the committee must be approved by the
accounting officer or delegated official prior to the publication of the bid and
should not promote any trade mark, name or patent design. According to
Bolton (2007: 153) specifications may not create trade barriers in contract
requirements in the form of specifications, plans, drawings, testing and test
methods. As noted above the drafting of specifications in an unbiased manner
boosts competition and prevents the advertising of taylor-made contracts
which defeat competition thus ensuring compliance with the principle of
competitiveness.
The specifications should result in appropriate quality being procured in line
with the user needs and should not be used to exclude the previously
disadvantaged segments of communities. The project manager or the official
in need of this service being procured, joins the committee for discussions
around the development of the bid specifications. Of great importance to this
committee is the discussion of the terms of reference and the scope of works
required for the implementation of the project.
Lovell, R (1994: 221) states that specification will define in clear and precise
terms:
• The scope of work to be undertaken, output required in amount and in
quantity, standards to be met and when and how the work will be
measured
• Responsibilities of the contractor and the department or agency and
the interfaces between them
• Identification of any key milestone events and approvals required
before the next event commences
• Commencement of the contract; completion dates for work to be done
• Contractors’ continuing responsibilities on completion of the work.
35
Furthermore he states that the specification will include quality standards and
monitoring arrangements, for example, random checks, regular inspection,
customer feedback … how the contractor will handle complaints of poor
service.
It can be deduced that the writing of specifications is a very important process
that requires proper controls to be enforced by all parties. Lovell’s approach
also highlights the importance of communication between the contractors, the
municipality and customer feed-back on the quality of service the company is
rendering. Therefore frequent site visits, regular progress inspection and
monitoring is critical to establish, sooner than later, any poor workmanship
and dissatisfaction on the standard and quality of service.
If the official cannot make it to the committee meeting the supply chain
manager may be called to represent the officer in the drawing up of the
specifications. At this meeting the discussions will indicate how the
preferential points to the previously disadvantaged individuals will be
allocated.
It is also important for the bid specifications committee to familiarise itself with
the standard advertisement of the bid to satisfy certain requirements prior to
publication. The bid advertisement must state the closing date, where bid
documents can be collected, and at what cost, the validity period the bid must
hold, information about site visits where applicable. The advertisement should
have clear directions, evaluation and adjudication criteria and where to
deposit the sealed envelopes with bid documents. The box where bids can be
deposited must be in a secured area, lockable and visible to bidders at all
times.
The points to be considered and decided upon by the committee should be in
line with the supply chain policy of the Municipality and also per municipal
procurement guidelines. It is critical that the committee does not deviate from
the gazetted municipal procurement regulations and the procurement policy of
36
the municipality to prevent and alleviate any queries that may emanate from
disgruntled service providers.
2.4.5.2 Bid Evaluation Committee
This committee must be composed of officials from departments
requiring goods or services and at least one supply chain management
practitioner. The formation of the committee also depends on what the
accounting officer may decide to appoint to serve and for how long.
The committee functions include the following:
• Must evaluate bids in accordance with the specification for the specific
procurement.
• Evaluate each bidder’s ability to execute the contract
• Check in respect of the preferred bidder whether municipal rates and
taxes and municipal service charges are not in arrears.
• Submit to the adjudication committee a report and recommendations
regarding the award of the bid or any other related manner
This committee therefore receives the bids submitted by service providers and
evaluates the documents in line with the committees’ specific functions. Their
evaluation should be based on and be in line with the invitation of bids on and
be in line criteria for evaluation cannot be drawn contrary to the advert.
Therefore the process of considering bids, and the critical evaluation thereof,
must be determined by the contents of the bid advertisement.
The information from potential service providers is sought to elucidate
competency, experience in implementing similar projects and the capacity
available to accept the contract. The quality of management and the
workforce, records of past achievements and financial status or the source for
funding should be evaluated.
After all necessary evaluation has been finalised and recorded by the bid
evaluation committee the recommendations agreed upon will be forwarded to
the Bid Adjudication Committee.
37
2.4.5.3 Bid Adjudication Committee
This committee is the body making final decisions on whether to award
the tender or not, and on whether to withdraw the tender. According to
Bolton (2007: 213) bidders prepare their tenders based on the
specifications laid down in a call for bidders. As a standard practice
therefore, organs of the state should not be allowed to make changes
to bid specifications after a call for tenders has been advertised.
It is in the interest of transparency, fairness and competitiveness for
organs of the state to abide by the tender specifications initially
provided. Whatever they decide upon, it must be informed by the
circumstances relating to the handling of the tendering process. The
committee is made up mostly of senior managers, secretariat, the
supply chain manager and any other person as appointed by the
accounting officer.
The committee evaluates the recommendations made by the bid
evaluation committee together with the supply chain manager on the
bids received. They consider and critically evaluate the
recommendations and finalise the process by making final awarding
and any suggestions to the accounting officer.
According to Lovell (1994: 224), the evaluation of the bids process
includes the handing of information to bidders when requested as to
the reasons for the failure of the bid. Such decisions and discussions
are on record to ensure accountability and transparency.
When this committee makes recommendations to award the bid, a
number of factors are taken into account, such as the evaluation of
ownership of the business; the Value Added Tax standing of the
company; sureties and guarantees; the capacity of the company to fully
execute the project; evidence to substantiate levels of experience,
expertise, skilled staff, equipment and plant; possible over-
38
commitment; past service and quality of work and, at times, the credit
worthiness and financial stability of the business.
This committee must be able to decide on the capability, technical and
financial assessment of the bidders under consideration. The financial
standing of the business may not be an issue because few small
business people manage to possess credible bank accounts. What is
important though is how the business will source funds to implement
the project. Most small business enterprise owners will approach
financial institutions and development banks to stand as sureties or get
cession agreements signed by the parties.
2.4.6 Sub-contracting and Joint Ventures
Bolton (2000:7) defines a joint venture as an economic marriage, which
like marriage itself, offers great opportunities to exploit and share
resources, information, skills and financial strength, mutual trust and
confidentiality.
It has been identified that most previously disadvantaged individuals do
have much expertise and relevant skills to deal with the challenges of a
big contract. Provision has been made that sub-contracting be allowed
when the emerging company has been awarded a tender. However the
sublet work should not exceed 25% of the total contract award.
The Municipality should only accept Joint Venture Agreements which
are formed as a new legal entity and where an acceptable and legal
agreement is submitted to the municipality. Any payments due to the
joint venture will be made to the joint venture bank account.
According to Balshaw and Goldberg (2005: 183), there are
disadvantages and advantages to this arrangement and they mention
the following:
39
• It allows the company to build strength in more business areas than it
is capable of achieving alone.
• It provides access to capital at a relatively low cost because partners
see synergy to be gained, including leveraging partners, differing
capabilities, market knowledge, management skills and capital to the
benefit of both parties.
• Disadvantages
• It requires planning, including a realistic feasibility study, an analysis of
risk, budgeting, due diligence and agreements to split rewards based
on risk and performance
• A pitfall could be a breakdown of trust or communication
• Over possessiveness of one partner and vague objectives and goals
The formation of joint ventures and sub-contracting is a form of involving and
exposing emerging companies to big companies through this process. At face
value it is a superb arrangement, but can just as well be a can of worms if no
monitoring is taking place. It can expose the other member to abuse and
exploitation. Hence the municipality should have a system of ensuring that the
engagement by parties if fruitful.
2.5 Monitoring and Evaluation The Green Paper on Public Sector Procurement Reform in South Africa
(1997:23) states the Accounting Officers should be fully accountable for any
expenditures regarding procurement within their line of responsibility.
2.5.1 Duties of the Accounting Officer
The Accounting Officer is fully liable for the implementation of the
procurement policy. He or she should take reasonable steps to ensure
that procurement agreements and contracts rules are enforced and
that there is enough capacity to deal with the foregoing roles and
responsibilities.
40
Regulation 42 of the Municipal Procurement Policy refers to monitoring
activity as performance management. The regulations state that the
supply chain management policy must provide for an effective internal
monitoring system in order to determine, on the basis of retrospective
analysis, whether the authorised supply chain management processes
are being followed and whether the desired objectives are being
achieved.
Lovell (1994: 222-3) alludes to the importance of declarations by those
involved in the bidding process. In his book he makes a very important point
that seems to be lacking on the part of the Municipal Procurement Policy
Regulations that, “Bidders must sign confidentiality agreement to confirm that
there is no collusion with other contractors in bidding for the work and there
has been no canvassing or soliciting of departmental staff.”
In the interest of good governance and adherence to ethical business
practices, it really does make sense that all parties to the process should sign
and make declarations on their interests. The Municipal Procurement Policy
Regulations 46 (e and f) does not specify any visible action to be taken on the
side of the service provider.
In order to combat corruption all parties should make declare clearly that they
understand and will not conduct any unethical actions which may be regarded
as corrupt whilst they are doing business with the Municipality. In the event
that any misconduct is detected, then government can build a strong fraud
case against the perpetrators because they have betrayed the government
and have violated their oaths.
The Accounting Officer must ensure that stakeholders are informed of these
processes through workshops and information sessions prior to the opening
of tenders and /or during the briefing sessions. This action is very important to
the National Treasury which is the office responsible for ensuring that reports
are received from the municipalities.
41
2.5.2 Monitoring Organisations According to Bolton (2007: 312-3) there are institutions that have played a big
role in enforcing compliance with the procurement rules. The institutions are
the Public Protector, the Office of the Auditor General and the National
Prosecuting Authority. The Green Paper on Public Sector Procurement
Reform proposed the establishment of a Procurement Compliance Office
whose main function is to oversee the procurement system in order to ensure
that the procurement of goods, services and works is conducted in a fair,
equitable, transparent, competitive and cost-effective manner.
Bolton (2007:253) states that numerous arguments can be raised in favour of
using procurement as a policy tool. One such argument is that “where
properly employed, procurement may prove a useful and effective instrument.
…………Provided that the use of the procurement as a policy tool has
measurable targets; the processes used are verifiable, auditable and
transparent; and the use of procurement as a policy tool takes place within a
competitive environment, procurement can, to a large extent, contribute to the
development of growing business enterprises that are able to participate
equitably in the global economy. It is therefore appropriate for the use of
procurement as a policy tool to be regulated.
The procurement implementation system in South Africa is a new concept that
has been seen in recent years spearheaded by the National Treasury. The
process implementation, training requirements and monitoring is the
responsibility of the National Treasury. The big question though is whether
this office will be able to monitor and do justice in this very important function.
Accountability is one of the pillars of the affirmative procurement. Therefore
the government must establish avenues for individual complaints.
One of the requirements of reformed public procurement is the affirmation of
the small business owners. Points are allocated in this area at the tender
evaluation stage to ensure that previously disadvantaged individuals have
leverage. It is unfortunate that some mischievous big business owners are
targeting these people and luring them into doing business with them as
42
partners. They also take advantage of their lack of education by using the
identity documents of these helpless individuals to create so called Black
Business Empowerment opportunity and reap profits through fronting. This is
unfair practice that needs proper monitoring and control.
Gildenhuys and Knipe (2000: 71) argue that where the administrative state is
still weak, as in some newly independent countries in Africa in particular, this
situation has barely changed. There is a tendency in South Africa for more
and more public services to be contracted out to private organisations. Even
in more administratively sophisticated countries, it is still difficult to reduce
political spoils in contracting, to prevent excess profits, to ensure quality
performance and eliminate kickbacks, in other words, to eliminate corruption.
South Africa is one of those countries still trying to stabilise their newly
established democracy and therefore requires strong control backup
structures.
2.5.2.1 Auditor - General
The Office of the Auditor General plays an important role of ensuring that the
rights of tenderers in terms of fairness, equity, transparency, competitiveness
and cost-effectiveness are safeguarded and enforced. The Office of the
Auditor General is one of the bodies established by government. The role of
the Office of the Auditor - General is to audit and report to national
government on the public accounts including financial statements and
financial management. The Auditor - General must report on the source and
application of public funds in all levels of government.
On 9 November 2007 Business Report published an article that the
government intended to beef-up and fast-track the expenditure on small-
medium and micro-enterprises and the Auditor - General would be asked to
report on progress made by departments in procurement.
www.busreport.co.za/index.php
43
2.5.2.2 Procurement Compliance Office
The Green Paper on Public Sector Procurement Reform in South Africa
proposed the establishment of a national Procurement Compliance Office to
manage the procurement reform, oversee the way in which the state does
business with the private sector and maintain the procurement system.
The duties of the Procurement Compliance Office involves formulation,
implementation and advice on policy according to the legal framework, carry
performance audit, issue instructions and investigate complaints from the
public regarding tendering procedures.
The National Treasury Office in the absence of the Procurement Compliance
Office is actually playing the role of the Procurement Compliance Office,
overseeing the procurement system in order to ensure that the procurement
of goods, services and works is conducted in a fair, equitable, transparent,
competitive and cost- effective manner in accordance with the prevailing
legislation and within the parameters of government policy.
2.5.2.3 Other Remedies
There are other remedies available to service providers who feel strongly that
they have been treated unfairly during the procurement process. There are
services of the Public Protector, the Ombudsman and the National
Prosecuting Authority (NPA) which investigate alleged criminal acts in the
application of the procurement system, and legislation like the Promotion of
Administrative Justice Act (PAJA). The aggrieved parties can forward their
complaints with reference to these institutions for action.
The other legislation pertinent to the appointment of contractors is the
Construction Industry Development Board Act 38 of 2000. The legislation
forces contractors to register, all parties do business according to the Code of
Conduct, promotion of contractor development and are categorised according
to the nature of work, value and distribution of projects.
44
According to Fourie and Opperman (2007: 266 – 67), the legislation provides
municipalities with considerable degree of protection as the risk of
inadvertently appointing an inexperienced, unsuitable or incompetent
contractor is considerable reduced.
Therefore, when contractors are appointed, adherence to the requirements of
this legislation will provide guidance to the bid committees when awarding the
contracts.
2.6 Challenges Facing Procurement Process Bolton (2007: 181) states that there are common strategies to defeat fairness
and transparency in government procurement procedures, which are the
following:
• Fictitious quotes or tenders – are generally used to corroborate an
actual quote or tender. A public official may agree with the contractor to
use fictitious quotes to convince the evaluation panel of the
reasonableness of his quote or tender to win the contract.
• Acceptance of bribes – taking bribes defeats the rationale behind fair
and transparent procurement process. Contractors are prevented from
competing for contracts on an equal footing.
• Unequal time in the submission of quotes and tenders – affording time
to certain contractors for the submission of quotes or tenders
constitutes unfair behaviour. The acceptance of late tenders may also
undermine fairness and transparency because it enables contractors to
alter their tenders to take account of tenders already submitted.
• Changes to tender specifications – tenders are prepared on the basis
of specification. An organ of state should not be allowed to make
changes after a call to tender has been advertised.
45
• Amendment and withdrawal of tenders – allowing tenders to amend or
withdraw their tenders after submission may lead to unfairness
• Negotiating and/or varying the terms of contracts – to amend or
withdraw their tenders after submission has the potential to defeat the
requirements of fairness and transparency.
• Other strategies – these include influencing the work of evaluators,
influencing the choice of procurement method, over-and under-
invoicing and the approval of inappropriate tenders.
The above listed strategies are acts against the fair presentation of the
Preferential Procurement Policy Framework and the Procurement Policy
Regulation. It is important to understand that it is very difficult or even
impossible for the prospective service providers to implement these corrupt
tendencies alone.
For them to succeed they need internal arrangements which is none other
than the public official, who in most cases, is very influential or in charge of
the procurement process with regards to larger costs of the contract. The
actions of collusion could exist between the prospective service provider and
the official or even the project manager who knows not only the specifications
of the contract, but also the budget available or allocated towards the project.
It is worthwhile to mention that the same could be happening with petty cash
related quotes where there is little or no policy monitoring at all. The maximum
petty cash amount stands at R 2 000 and there is no limit to the number of
reimbursements per month, or certain period, as long as there are cash slips
to support the purchase. It applies to the R 10 000 threshold normally
authorised by middle managers. Also at this level, restrictions, checks and
controls should be in place.
46
There is a tendency of calling for a quote today priced very close to R 10 000
which can be followed by another, called from the same service provider after
a day or two. The motivation for this act is unforeseen deviation, which has
now led to call for another quote from the same company. The other area of
exploitation by the corrupt role players is the process of soliciting bids from
one service provider due to a so-called emergency.
The other area open to corruption is the type of business where the service
provider is regarded as the sole provider of the required service and therefore
there is no competition. Training, advertising and media and information
technology services are some areas of closed competition.
Certain departments like Communications, Training and Information and
Technology departments within the Public Service and Municipalities can be
regarded as posing a high risk. The specifications committee may have
technical difficulty in developing the terms of reference, which is a threat
leading to vulnerability of the committee. By and large they will depend on the
information supplied by the project manager.
• Gildenhuys (2000: 74) proposes some ways of minimising possible
fraud, corruption, ineffectiveness and the poor quality in the delivery of
goods and services applying some of these methods:
• Investigate the unused capacity of the institution. Public authorities
should only contract for what they really need.
• Ascertain going market rates and fair estimations of probable costs
before signing contracts and also assist authorities to negotiate better
contract prices
• More economic contract management is obtained through
centralisation, elimination of subcontracting and re-negotiation.
47
• Non-negotiable ceilings should be set on costs and profit margins
should be fixed before hand. The agreed contract price should be final
and non-negotiable.
• Where it is possible to estimate costs, product performance, reliability,
quality and delivery dates, contractors should be awarded incentives
for superior performance according to a sliding scale bonus, and a
penalty if they fall below targets.
• The government should protect itself against the mistakes of its own
contracting officers and administration and exclude itself from business
law as interpreted by the courts.
• Public authorities could reserve all rights to new discoveries made
under their contracts (patent rights and copyright)
• Periodic scandals that erupt over contracts have encouraged public
authorities to intensify security procedures and fraud detection efforts.
Public service officials and service providers should remember that one of the
responsibilities of government is to protect public funds. The strategies
proposed by Gildenhuys can go a long way in providing more security around
the tax-payer’s money. It must take immediate action on culprits found to be
defrauding the state. The public wants to see swift and tough action being
taken against perpetrators, and decisive action on all such public officers
found to be defeating the intentions of this noble objective.
Perhaps it will assist the government to have a Procurement Implementation
Outcomes Measure that will indicate problem areas, identify the extent to
which service quality has made an impact to the targeted segments of the
business community as well as having the means of obtaining feedback from
citizens. According to the Green Paper on Preferential Procurement, the
48
performance related to the achievement of the targets per municipality must
be reported quarterly or at least once annually
Customer feedback or surveys can be useful in obtaining regular feedback on
government targets – giving priority to black-owned businesses The feedback
will help government track trends and also make assessment on the extent of
improvement subsequent to the implementation of the affirmative
procurement.
According to Shah (2005: 144) the implementation of a performance
measurement system has a number of advantages. It allows consumers and
providers to compare performance over time, strengthen accountability,
because consumers are in a better position to evaluate the service, enhance
transparency and reinforce managerial accountability.
It is therefore important that the impact on the improved standard of living of
previously disadvantaged individuals be measured, to determine whether the
implementation of the Preferential Procurement Policy Framework Act is really
making difference to the beneficiaries. Presently the emphasis is on municipal
implementation of the policy through procurement policy adoption,
establishment of the supply chain management unit, training and reporting to
Council, Provincial and National Treasury Offices.
There is no mention on how the report from the businesses which received
contracts will be reported. The reporting process is missing critical information
from those awarded business contracts. Perhaps the widespread problem of
fronting, bribery, corruption and tender flouting can be reduced through this
measure.
2.6.1 Corruption and collusive tendering According to Bolton (2007: 57), corruption in the government procurement
context can take a number of forms. Bidders may collude in the submission of
tenders, influencing the work evaluators, inciting breaks of confidentiality,
49
offering bribes, over-and under-invoicing, fronting and/or inaccurate
disclosures in the submission of tenders.
In the light of increased levels of corruption, it really makes sense to ensure
that all parties involved in the procurement process be forced to sign a
declaration attached to a quotation or a tender document prior to handing it
over to the procurement officer. This means that parties to procurement
should all make declarations. The procedure may be able to reduce
corruption.
It is perhaps time for the government to dedicate teams to each district to visit
these companies to make a proper evaluation on the outcomes of the
implementation of the legislation. Waiting for whistle blowers and blacklisting
may not provide enough protection to the vulnerable historically
disadvantaged individuals.
2.7 Conclusion The implementation of the Preferential Procurement Policy Framework Act
requires appropriate monitoring. It is not only about the policy implementation,
but the percentage of tax-payers money allocated to the procurement of
services in general across the country.
There are indeed some municipalities that through their proximity to better
conditions of living, find themselves unable to recruit capacity of high level of
personnel. People refuse to move from urban areas and work in rural areas.
Perhaps for the benefits of the poor constituencies proposing attractive salary
packages will entice people of high calibre to consider the offer of coming to
the smaller municipalities which are struggling to provide even basic services
to their communities.
In such cases the municipalities which have an interest in such people, should
be allowed to apply to National Government for the salary assistance for the
acquisition of these much needed skills. The National Government should
50
confirm its willingness to pay such salaries to those people for the benefits of
its citizens and the fulfilment of its constitutional mandate.
The National Government is accountable to the citizens of the country, rather
than the provincial level of government. If this is the case it should consult
with municipalities, proving to be excellent in service delivery assist the ailing
smaller municipalities. One has to bear in mind that people on the ground are
eagerly awaiting basic services from the government and just cannot
understand why their areas cannot be provided if other municipalities are able
to deliver.
The government is calling for big, well-established businesses to form joint
ventures with emerging contractors. This approach is intended to help the less
skilled previously disadvantaged individuals with the opportunity of being
coached by big businesses so that they are able to implement projects and
sustain themselves. Few of such joint ventures are bearing fruit; most are just
providing an opportunity for fronting.
Black small business owners get into partnership or joint ventures with the
hope maturing in business, but the opposite is the true. Some blacks get into
business knowingly whilst others fall victims by virtue of being labourers in a
business owned by the white men. These fallacies are calling for stringent
measures and controls from the supply chain management unit and bid
committees to identify these culprits and bring them to book.
If the programme of skills transfer and capacity building of emerging
contractors is to bear fruit there should be clear exit strategies to ensure that
the emerging contractor will benefit from the joint ventures. Right now it is not
clear for how long the transfer of skills, coaching and mentoring should end
and the joint venture will cease to exist.
The awarding of business to emerging contractors has brought in a wave of
service providers bidding for business contracts who, in some cases have no
technical know-how of what is expected. Contracts have been awarded on the
51
basis of skills that the business owner will in a previously disadvantaged
person, hoping to recruit and appoint relevant people to implement the
project.
Such awarding forces them to fall victim to subcontracting and at times results
in the inability to deliver the service. The prize is none other than being
blacklisted for failure to deliver on the contract, although the action can be
regarded as unfair because sub-contracting was allowed by the bid evaluation
committee without any monitoring.
Just as it is in the interest of government to award contracts to emerging
contractors on the basis of information supplied in the tender document, it is
also dangerous. There is no guarantee that the project will be completed
according to specification. Some of the terms to relating to sub-contracting
and joint ventures are not so binding; emerging contractors are still falling
victims of circumstances.
There are well-developed countries which have technical skills in abundance
and are gathering dust. Perhaps calls should be made to these countries for
such individuals to assist and provide guidance for emerging business
owners.
52
CHAPTER 3
RESEARCH METHODOLOGY 3.1 Introduction The process of conducting research involves a stage or a situation where
tests should be applied to determine what reasons for certain behaviours and
actions in various environments could be. The purpose and the objectives of
the study are fundamental in the application of various tests and a link has to
be created so that the researcher’s concerns can be answered at least
generalisation can be drawn from the responses.
The purpose of this chapter is to indicate the methodology which was applied
when the study was conducted. Questionnaires consisting of open and closed
ended questions were distributed to respondents and later collected.
Questions are based on the implementation of the Preferential Procurement
Framework Act, (Act 5 of 2000) and the Constitution of the Republic of South
Africa Act 108 of 1996. The design of the questions is such that it would
establish whether the municipalities have systems, policies and procedures as
well as structures to execute their Constitutional mandate. .
3.2 Research Question Is there a disregard for the implementation of the Preferential Procurement
Policy Framework Act, (Act 5 of 2000) in selected municipalities in the
Province of the Eastern Cape as a result of legislation not achieving its
objectives?
3.3 The Objectives of the Study The objective is to determine whether the promulgation of the Preferential
Procurement Policy Framework Act, (Act 5 of 2000) is assisting in giving
priority to the Historically Disadvantaged Individuals (HDI’s) when contracts
for the procurement of goods and services are awarded by municipalities.
53
The study also evaluates whether there is any contravention of the legislation
during procurement processes, and whether the implementation is improving
the quality of life of South Africans. The objectives of this study are:
• To establish the level of awareness of the officials responsible for
procurement regarding the constitutional mandate of implementing the
Preferential Procurement Policy Framework Act, (Act 5 of 2000).
• To establish the institutional arrangement for the implementation of the
Preferential Procurement Policy Framework Act, (Act 5 of 2000) within
selected municipalities.
• To analyse and evaluate the processes of selecting and awarding
tenders with reference to selected cases within the selected
municipalities.
• To establish the extent to which the implementation of the Preferential
Procurement Policy Framework Act, (Act 5 of 2000) contributes
towards the empowerment of the HDI’s within the selected
municipalities.
• To evaluate the effectiveness of the implementation of the Preferential
Procurement Policy Framework in terms of service delivery.
3.4 Research Design Babbie and Mouton (2006: 74), define research design as a plan or blueprint
of how one intends conducting the research. It focuses on the end product,
what kind of study is being planned, and what kinds of results are sought.
David and Sutton (2004: 134) state that the research design provides logical
framework upon which the research project is conducted and enables the
researcher to gather evidence that will enable the research question to be
addressed.
The plan of this study entailed the distribution of questionnaires to the supply
chain management units of the identified municipalities within the Province of
the Eastern Cape. The objective of the research questionnaires is to
54
determine whether the promulgation of the Preferential Procurement Policy
Framework Act, (Act 5 of 2000) is in line with the constitutional mandate.
3.5 Research Methodology Babbie and Mouton, (2006: 647) defines Research Methodology as methods,
techniques and procedures that are employed in the process of implementing
the research design or the research plan as well as the underlying principles
and assumptions that underlie the use.
It can be concluded that the method is a systematic procedure administered
to the respondents which will ensure that the data collected relate to the
motive behind the study.
Qualitative Research refers to the generic research approach to social
research according to which research takes as the departure point the
insider’s perspective on social action. The primary goal of this approach is
based on describing and understanding rather than explaining human
behaviour. (Babbie and Mouton, 270).
Alveeson and Deetz, (2000: 9) contends that qualitative method refers to an
array of interpretive techniques which seeks to describe, decode, translate
and come to terms with the meaning, and not the frequency of naturally
occurring phenomena.
The Qualitative Research method is one of the types of research processes
applied systematically to produce knowledge about the social world. The
researcher collected data to build theory on the research topic in order to
draw conclusions.
3.6 Target Population Newman (2006: 224) states that a population is an abstract idea of a large
pool of many cases from which a researcher draws a sample and from which
results are generalised.
55
Therefore the population in a study will refer to a list of elements selected
from various areas depending on what that researcher wishes to study. The
outcomes of the research will enable the researcher to analyse and draw
conclusions. With reference to this study, the population of the researcher
were municipal officials.
3.7 Sampling Method Following approval of request to undertake research by the Municipal
Manager, personnel in the supply chain management department and
municipal officials who take part in procurement and tender evaluation
committees were selected in order to participate in the in study.
3.8 Data-Collection Method Data was collected by means of questionnaires, which were distributed to
selected participants in the identified municipalities both in senior positions
and lower echelons of the municipality.
According to Newman (2006: 277) a good questionnaire forms an integrated
whole. Babbie (2006: 239) also shares this notion as he contends that the
format of a questionnaire is just as important as the nature and wording of the
questions asked. An improperly laid-out questionnaire can lead the
respondents to miss the questions, confuse them about the nature of the data
desired and even lead them to throw the questionnaire away.
Gliner and Morgan, (2000: 339), define a questionnaire as any group of
written questions to which participants are asked to respond in writing, often
by checking or circling responses. They can be mailed or administered
directly to the respondents.
Thus it is critical that the researcher prepare the questionnaire in a systematic
and simple manner, so that what transpires from the participants is in line with
the objectives of the study.
56
According to Collins and Hussey (2003: 178) the following rules should be
considered when a questionnaire is developed.
• Phrase each question so that only one meaning is possible
• Avoid vague, descriptive words such as large and small
• Avoid asking negative questions, as it may be easy to misinterpret
• Avoid leading or value-laden questions which imply what the required
answer might be
• Do not use jargon or specialist language
• Include questions that serve as crosschecks on the answers to other
questions
• Avoid questions that are nothing more than a memory test
3.9 Conclusion The qualitative research method was used in conducting this study.
Information was gathered through questionnaires in selected municipalities in
the Province of the Eastern Cape.
57
CHAPTER 4
DATA COLLECTION AND INTERPRETATION
4.1 Introduction This chapter focuses on the analysis and a discussion of the methods and
techniques employed by the researcher in conducting this study. The analysis
of this data contributed on, among others, clarifying the procedures and
systems that are applied by municipalities when they engage in procurement
of goods and services.
The procurement implementation process that is currently used is evaluated
against the requirements of the Preferential Procurement Policy Framework
Act, (Act 5 of 2000). The intention of this legislation, among others, is to
ensure that the systems of procurement are targeted at redressing the
imbalances in distribution, and the awarding of business contracts to those
who were disenfranchised by the apartheid laws.
According to Mouton J (2006: 108) the analysis of data involves the breaking
up of data into manageable themes, patterns, trends and relationships. The
aim of the analysis is to understand the various constitutive elements of one’s
data through an inspection of the relationship between concepts, constructs or
variables and see whether there are any patterns or trends that can be
identified or isolated or to establish themes in the data.
Therefore data-analysis requires that the researcher critically outlines how the
respondents have expressed their understanding of the procurement
processes within their working environment. The researcher then has to
synthesise the responses, interpret and come up with own judgment on what
the responses indicate.
The researcher targeted five municipalities with the Eastern Cape as the
population for the study and the Supply Chain Management Unit represents
58
the sample frame. Out of the five targeted municipalities, four welcomed the
study and the researcher was given authority to proceed with the research.
The distribution of the questionnaires was between eight and 15 per
municipality per municipality and the overall number of questionnaires
distributed was 46.
4.2 Research Paradigm Paradigm can be defined as the basic belief system or world view that guides
investigation. www.nova.edu/sss/RQ/RQ10-4/krauss.pdf. Gliner and Morgan,
(2000: 17) define paradigm as a way of thinking about and conducting
research, a philosophy that guides how the research is to be conducted.
For qualitative research, it is best to become immersed in it and to move into
the culture or organisation being studied, and experience what is like to be
part of it (www.nova.edu/sss/RQ/RQ10-4/krauss.pdf).
4.3 Methods of Data-Collection The researcher personally distributed the questionnaires and collected data in
all the identified municipalities. She interacted directly and made her own
observations of the reception of her project, and how it unfolded within the
natural settings of the municipalities whilst workers are in the office
environment.
It is important to make a distinction between two types of questions that are
normally used. First there are open-ended questions which are not based on
already conceived answers. They are well adapted to exploratory studies,
case studies or studies based on the qualitative analysis of data. In contrast,
structured questions are restricting the number of possible answers. This is
according to Bless and Higson – Smith (1995: 122)
Some negative aspects of structured questions, like over-restrictive response
possibilities or exclusion of important ones, can be greatly reduced by adding
an open – ended option. These two types can be used to gain the confidence
59
and co-operation of participants in different ways. The researcher has opted
to apply both types of questions to try and extract as much information as
possible and also allow for the respondent’s own input.
This combination is intended to allow respondents to communicate their
experiences and what they understand to the best of their knowledge. The
disadvantage with structured questions is that the respondent is guided
towards a specific direction or ideal response and may feel inhibited to elicit
their opinions.
Terre Blanche & Durrheim (2002: 294) also states that closed questions have
the disadvantage of eliciting a standard set of responses from all the
respondents and thus allow for easier comparative data-analysis.
To that effect the researcher developed the questionnaires as survey
instruments that were later distributed to targeted municipalities. Each
questionnaire contained eight main questions and five 5 sub-questions -
structured and unstructured. The questionnaires were structured so that the
first few questions are easy and specific. The intention was to encourage
meaningful participation at first glance.
4.4 Data - Collection Procedure The researcher conducted the research single-handedly. The process started
by calling the offices of the Municipal Managers of the targeted sample
municipalities to briefly talk to the Municipal Manager about the study and also
secure an appointment with the supply-chain unit staff.
Out of five selected municipalities, four responded positively and a written
confirmation was also signed by the Municipal Managers (see Annexure B to
E)
The researcher visited each municipality, met with the teams and briefly
introduced herself, explained the purpose of the study and what was to be
expected after the distribution of the questionnaires.
60
Furthermore the participants were informed by the researcher of the following
ground rules which would be in force during the study:
• confidentiality assured
• voluntary participation
• one can withdraw from participating at any moment
• the process is not harmful in any way
• not degrading to any of the participants or the institution itself
• that the information they would provide, would be used solely for the
purposes of study by the researcher.
The response was positive and the researcher could clearly see that in some
municipalities staff were already briefed of what had to happen and the
reasons why some of their colleagues were not participating in the study.
Setting up appointments and even communication with the Municipal
Managers’ office was not easy. The researcher did observe at times some
scepticism as the process was unfolding. Nevertheless the study went
smoothly and 46 questionnaires (Annexure A) were distributed. Some were
later collected by the researcher because not everybody who was targeted
who was available at the time of the first visit.
Out of the 46 questionnaires, 28 (61%) were returned. The rest could not be
collected due to unavailability or refusal to participate. The researcher decided
to proceed with the analysis of data.
4.5 Data Analysis and Interpretation
4.5.1 Awareness of provisions for procurement in the Constitution. Respondents were asked if they were aware of any provisions for
procurement in the Constitution of the Republic of South Africa.
The question was thought to be of importance by the researcher because it
deliberately tries to determine how the contents of the Constitution of the
61
Republic of South Africa bear meaning and therefore is the most important
legislation in the country.
Within the Municipality environment the question is supposed to determine
whether staff of the Municipality are able to understand how the Preferential
Procurement Policy Framework Act, (Act of 2005) is linked to the Constitution.
The respondents had to make a choice of either “Yes” or “No”
TABLE 4.1
OVERALL RESPONSE RATE TO QUESTION 1
RESPONSES FREQUENCY PERCENTAGE
Positive answers 27 96
Negative answers 1 4
No indication 0 -
Total 28 100
Source: Researcher’s own initiative
4.5.2 Knowledge about the Preferential Procurement Policy Framework Act (Act 5 of 2000)
Knowledge about the Preferential Procurement Policy Framework Act (Act 5
of 2000) was tested by asking the respondents to choose one legislation
which relates to the management and the implementation of the procurement
processes in South Africa.
The question was designed to reveal any ambiguities and to establish how
much knowledgeable the respondents were of the applicable legislation which
they were employed to implement on a daily basis.
The respondents have once again responded positively, except for one who
did not attempt to respond to the question.
62
TABLE 4.2
RESPONSE RATE TO QUESTION 2
RESPONSES FREQUENCY PERCENTAGE
Positive answers 27 96
Negative answers 1 4
No indication 0
Total 28 100
4.5.3 In terms of Section 111 of the MFMA each municipality must develop and implement a supply chain management policy. The researcher wanted to determine if the policy was in place and fully implemented.
The question was seen as critical by the researcher, as it could have been
difficult to determine whether the objectives of the study as stated in Chapter
1 of the study could be denied or confirmed. Here the responses must clearly
indicate whether the municipality has a procurement policy in place and
whether there are committees and/or staff members to execute.
If the municipalities have implemented what is required by legislation, then
they have complied with chapter 1 (7) (1) and 8 of the Municipal Supply Chain
Management Regulations per gazette notice No. 27636 dated 30 May 2005.
According to the regulations the Municipality must establish a supply chain
management unit to implement the policy and ensure that officials have been
provided with the relevant training in accordance with any National Treasury
guidelines of supply chain management training.
The Institute of Municipal Finance Management Officers (IMFO) in its Best
Practice Manual, Policy: IA Supply Chain Management Policy say the
63
municipal management, in the event that they should provide training, must
do so in accordance with the requirements stated in the Framework for
Minimum Training and Deployment issued by the National Treasury, can
access information regarding the training of officials in the procurement unit of
the municipality. www.imfo.co.za/downloands.htm
According to the responses, it cannot be disputed that to a certain extent,
municipalities are aware there are certain mechanisms which should be in
place with regards to the implementation of the Preferential Procurement
Policy Framework Act, (Act 5 of 2000) and the Municipal Supply Chain
Management Regulations.
TABLE 4.3
RESPONSE RATE TO QUESTION 3
RESPONSES FREQUENCY PERCENTAGE
Positive answers 28 100
Negative answers 0 0
No indication 0 0
Total 28 100
4.5.4 The implementation of the procurement policy
The implementation of the procurement policy requires that three levels of bid
committees be formed to oversee a fair, equitable, competitive, and a
transparent value for money process. The researcher wanted to determine the
existence of these committees
The question was aimed at evaluating the existence of the arrangements
within the municipality in terms of human resources responsible for the
procurement of goods and services.
64
There was no doubt about the existence of dedicated personnel. It also
transpired that some municipalities’ procurement processes and
implementation of the policy was executed by Senior Managers whilst the
Accounting Officer was chairing the proceedings. A few responses reflected
that the Accounting Officer approved recommendations made by Managers in
this regard.
It should be noted that, according to Section 26 (1) (a), the supply chain
management policy must provide a committee system for competitive bids
consisting of at least:
• A bid specification committee
• A bid evaluation committee
• A bid adjudication committee
At least 43% of the positive responses indicated the availability of the all three
levels of the committees and the rest, which equates 57% have by indication
less than the legislatively required 3 levels. This is a very important aspect of
the Municipal Supply Chain Management Regulations of 2005 and Section
115(1)(b) because different role players exercise thorough scrutiny. There is
clear segregation of duties between the three bid committees to minimise the
likelihood of fraud, corruption, favouritism and unfair and irregular practices.
TABLE 4.4
RESPONSE RATE TO QUESTION 4
RESPONSES FREQUENCY PERCENTAGE
Positive answers 12 43
Negative answers 16 57
No indication 0 0
Total 28 100
65
4.5.5 In terms of the Supply Chain Regulations Gazette notice no 26736 Section 7, supply chain management units must be established to implement the supply chain management policy. Responses should indicate whether there are institutional arrangements to execute this mandate
This question seeks to establish whether there have been arrangements,
which are internal to the Municipality, designed to accommodate the changes
as a result of the implementation of the Supply Chain Management Policy by
the municipality.
Ideally the Municipality should establish the Supply Chain Management Unit
to put into practice its procurement policy. The institutional arrangement
includes training provisioning to the officials involved in the execution of the
supply chain management policy, and also in accordance with the National
Treasury guidelines regarding the officials implementing the policy.
Half of the responses indicated the existence of a fully operational supply
chain management unit. Some respondents’ answers were ambiguous, as it
was difficult for the researcher to determine the type of structural and
institutional arrangements that were in place.
Judging from the responses one can say there is an endeavour to fully
implement the procurement policy on the side of the municipal senior
managers although must still has to be done to meet the requirements of
section 115 (1) (a; b) of the Municipal Finance Management Act 56 of 2003.
The Section states that, when implementing the supply chain management
policy, the Accounting Officer must ensure that there are mechanisms and
separation of duties in the supply chain management system to reduce
likelihood of corruption, favouritism, unfair and irregular practices.
66
It is surprising to note that there is a of lack of training in the supply chain
management unit, because capacity building and training is what the National
Treasury is willing to provide to the officials in municipalities.
Section 119 (1 to 3) of the MFMA emphasizes the competency levels of the
officials involved in the municipal supply chain management. The National
and the Provincial Treasury offices may provide assistance to this effect. This
means the onus is on the Municipality to come forward in the interest of
ensuring that they have high a capacity and that mechanisms are in place to
meet their obligations.
It is also important to mention that the government has identified the training
of personnel in all sectors of the public sector as key to providing of quality
and seamless service delivery. The Skills Development Act 97 of 1998 allows
employers to recoup some of the expenses incurred when they have engaged
their employees in capacity building. Government Gazette No 21752
(November, 2000), part 10 (a; b).
This commitment, on the side of the government, clearly demonstrates how
far government is prepared to go to ensure that public servants are fully
capacitated and in possession of the necessary skills to execute their
mandate.
TABLE 5
RESPONSE RATE TO QUESTION 5
RESPONSES FREQUENCY PERCENTAGE
Positive answers 20 71
Negative answers 1 4
No indication 7 25
Total 28 100
67
4.5.6 The supply chain regulations provide a framework on how the tender evaluation process should be executed. The respondents were asked whether they were aware of the processes to evaluate tenders
The responses indicate clearly that more than 70% have knowledge that there
must be bid committees, application of the 80:20 and 90:10 scoring system,
25% are not sure about the process whilst only one respondent did not bother
to answer.
There are three levels of bid committees that should exist within the municipal
environment formed by various municipal officials and have various functions
to execute reporting to the Accounting Officer.
The committees are ranked as follows:
• The Bid Specifications Committee
• Is appointed in writing by the Accounting Officer
• Their role is to compile technical specifications, bid special conditions
of the contract, determine goals in terms of the Preferential
Procurement Policy Framework Act (Act 5 of 2000) and do market
research.
• The official who requires the service should be available to provide
clarity in some areas. www.thedplg.gov.za/index.hml
• The Bid Evaluation Committee
• The Accounting Officer appoints the Chairperson and the members.
• One Supply Chain Management member to ensure compliance with
the Supply Chain Management Regulations.
• Officials who are technical experts from the Department procuring
goods, works and services to ensure compliance with technical
specifications.
• Evaluate according to criteria, technical specifications and point.
68
• Evaluate the bidders’ ability to execute the contract
www.thedplg.gov.za/index.hml
• The Bid Adjudication Committee must:
• Be determined and appointed in writing by the Accounting Officer
• Consisting of at least four cross functional Senior Managers, including
the Chief Accounting Officer or delegated staff, who report directly to
the Senior Manager. One of them should be the Supply Chain
Management Practitioner in order to guide and ensure compliance with
the Supply Chain Management Regulations.
• Be Chairperson, Deputy Chairperson and Secretariat from the supply
chain management section. www.thedplg.gov.za/index.hml
TABLE 6
RESPONSE RATE TO QUESTION 6
RESPONSES FREQUENCY PERCENTAGE
Positive answers 17 61
Negative answers 9 32
No indication 2 7
Total 28 100
4.5.7 Respondents were asked who the Preferential Procurement Policy Framework Act, (Act 5 of 2000) is targeting to benefit and give reasons for their responses.
This was a “Yes” or “No” question with a follow-up question where
respondents were asked to elaborate on their responses. At this point, almost
64% were unanimous, reflecting a positive response. The remaining 36%
either did not respond or disputed the statement.
69
TABLE 7
RESPONSE RATE TO QUESTION 7
RESPONSES FREQUENCY PERCENTAGE
Positive answers 18 64
Negative answers 5 18
No indication 5 18
Total 28 100
At this point the researcher encountered numerous discrepancies, varying
views that did not relate to the main question. When the researcher posed this
question, the aim was find answers to Objective 4 of the study.
Seventy percent of the responses led towards the inability of the Preferential
Procurement Policy Framework Act (Act 5 of 2000) to assist the historically
disadvantaged individuals of this country.
The researcher observed the trend because the responses were pointing
towards the failure of the Preferential Procurement Policy Framework Act (Act
5 of 2000) to assist the HDI’s. The responses highlight too much competition
which involves big well-established companies. Ten and 20 points allocation
to affirmative procurement targets is far too little to make any difference to the
lives of the HDI’s.
It should be noted that the HDI’s are competing with companies whose roots
are all over South Africa, known for achievements, and have capacity to
implement large projects. The affirmative procurement point system and
preferential procurement does not help when competing with big businesses.
One cannot stop wondering how the Preferential Procurement Policy
Framework Act (Act 5 of 2000), and affirmative procurement really assist the
development of HDI’s in a competitive environment.
70
4.5.8 Respondents were asked what they view or understand as the role of the Preferential Procurement Policy Framework Act (Act 5 of 2000).
This question carries three options from where the respondents have to
choose from the following:
Do they improve service delivery?
Do they retard service delivery?
You are not sure?
This question has a follow-up question which asks the respondent to
elaborate on the answer provided.
Twenty eight percent the respondents did not answer the question, 46%
indicated that the procurement policy processes retard service delivery, 19%
were positive that the implementation of the processes were good for service
delivery whilst 7% were not sure about the impact of the procurement policies
on service delivery.
TABLE 8
RESPONSE RATE TO QUESTION 8
RESPONSES FREQUENCY PERCENTAGE
Yes 5 19
No 13 46
Not sure 2 7
Did not respond 8 28
Total 28 100
With regards to the sub-question, 58.3% are saying the Preferential
Procurement Policy Framework Act (Act 5 of 2000) is not assisting the HDI’s;
25 % did not substantiate on the responses they provided in question 8 whilst
16.66% believe the Preferential Procurement Policy Framework Act (Act 5 of
2000) is creating a fair competition amongst the service providers.
71
4.6 Conclusion The aim of this chapter was to analyse responses and generalise on these
responses relative to the objective of study. The questionnaire contained
open-ended and closed-ended questions to allow respondents to
communicate their views.
The first three questions assisted the researcher to determine the basic
knowledge which Supply Chain Management practitioners should have. The
insight revealed supports, that to some extent, those involved know the
source of the Preferential Procurement Policy Framework Act (Act 5 of 2000)
and why this piece of legislation is important for the socio-economic
developments South Africa.
The response to the remaining questions did not reflect any reasonable extent
of sound Supply Chain Management and Affirmative Procurement results.
The ideal situation would be visible economic changes on the side of the
HDI’s.
On the last two questions the frequency of negative responses increased,
unlike in the other questions. The analysis of the responses has revealed
various views and has allowed the respondents to communicate their
understanding of how things or should be after the implementation of the
Preferential Procurement Policy Framework Act (Act 5 of 2000) should have
changed. Their comments vary from, capacity and technical know-how,
financial instabilities, too much competition between HDI’s and well developed
companies, the process is open to abuse, mark-up is too high and unrealistic.
In summary, more still needs to be done to ensure that the goals of the
Constitution together with the preferential point system are enhanced to
benefit the targeted individuals.
72
CHAPTER 5
CONCLUSION AND RECOMMENDATIONS
5.1 Introduction The chapter will firstly present the major findings of the study, and draw
conclusions. Secondly it will make recommendation based on the analysis of
the empirical study and literature review presented in Chapter 2.
The study was carried out in order to evaluate the implementation of the
Preferential Procurement Policy Framework Act, (Act 5 of 2000) within
selected municipalities of the Eastern Cape. The questionnaire was structured
such that it expose two main factors:
• Reveal just how well the Act is understood.
• To determine whether the Supply Chain Management unit of the
Municipality is implementing the policy in accordance with the
legislative framework and the Supply Chain Management Regulations
of 2005
Therefore this chapter will focus on comparing the findings with regards to the
research topic and the study objectives discussed in Chapter 1.
5.2 Main Findings and Recommendations With regards to the questionnaires, one would notice the overwhelmingly
positive answers to the first four questions. The rest of the questions dealt
with conflicting views regarding the coherent purpose of the Preferential
Procurement Policy Framework Act, (Act 5 of 2000). What it means is that
there are no visible outcomes flowing from the implementation of the
Preferential Procurement Policy Framework Act, (Act 5 of 2000) in their
municipalities. More than 60% of the responses indicated that more still
needed to be done. There was also no recognisable economic or capacity
development achieved as a result of the implementation of the Preferential
Procurement Policy Framework Act, (Act 5 of 2000)
73
The strategic aim of the Preferential Procurement Policy Framework Act (Act
5 of 2000) is to give effect to Section 217(3) of the Constitution by providing a
framework for the implementation of the procurement policy contemplated in
Section 217(2) of the Constitution, and to Section 217(1) which suggests that
an organ of state must contract goods or services in accordance with a
system which is fair, equitable, transparent, competitive and cost-effective.
Why is there no convincing response regarding the mandate to the
implementers of this policy?
To find out more about how the respondents feel about the Constitutional
mandate the researcher structured the questionnaire so that it contained both
closed-and open-ended questions. The aim was to give respondents the
opportunity to state, in their own words, how they evaluated the supply chain
policy implementation processes and make allowance for more related issues
which the researcher might not have considered. The approach led to various
reasons. For example, there was no evidence to suggest any changes in the
lives of the targeted communities. There were criteria to evaluate the
procurement process to determine its successes and failures. The process
was also open to abuse, and the lack of training of the procurement unit staff
was also problematic.
• Section B of the White Paper on Local Government dated 9 March
1998 states that developmental outcomes of Local Government
means:
• Provision of household infrastructure and services
• Creation of liveable, integrated cities, towns and rural areas
• Local economic development
www.dplg.gov.za/documents/wpaper.htm
It is imperative that the economic development of the emerging service
providers should be targeted more at Local Government level as this tier of
government is very close to the constituencies and, as such, should be
74
vigilant and play a pivotal role in ensuring the successful implementation of
the Preferential Procurement Policy Framework Act, (Act 5 0f 2000)
In line with the Constitution Section 217, the responsibility of bringing
sustainable economic development to the citizens of this country rests
squarely on the shoulders of the Local Government structures and systems.
Local Government, in this case the successes of the municipalities, should be
measured by the improved standard of living of its inhabitants. The contracts
awarded should resemble the coherent purpose of these pieces of the
constitution. Performance evaluation of Municipalities is based on reports or
municipal score cards normally forwarded to the Provincial Treasury.
5.2.1 Competence of Supply Chain Management Unit Staff When the Municipality is recruiting it must ensure that suitable candidates are
employed and that their placements relate to their skills, experience and
qualifications. Once people are misplaced, the employer has already lost the
battle of achieving its mandate, and this is a sign of dismal failure.
Competence of staff cannot be separated from continuous training which the
personnel should receive. Most institutions do not pay attention to the
potential danger of word-of-mouth training which happens when a new
appointee joins the office. Nowadays it’s a one-teach-one-type of environment
limiting, the scope of the new person. Newly employed staff should be
formally introduced to the processes to ensure adaptation and a smooth
transition. This is employees are referred to as “Human Capital” because,
through the proper utilisation of their skills, proceeds will flow into the
institution.
The Delivery Magazine (Edition 1: 70) contends that ………more importantly,
it is the inherent skills in the local government personnel that create a catalyst
to deliver exceptional quality service.
www.sadelivery.co.za/documents/Edition1
75
In the 2008/2009 budget speech, the Minister of Finance allocated R 41,9
billion to 283 municipalities. R 6 159 171 000, being the third biggest
allocation was the given to the Eastern Cape Province for both Equitable
Share and Grants.
www.wordonthestreet.org.za/index.htm
The biggest challenge is to ensure that the budget is applied effectively,
efficiently, with accountability, monitoring, control and transparency. This can
be achieved by ensuring that appointments are made on merit and candidates
are placed in posts which suit them best in terms of expertise, knowledge and
experience.
According to Cloete (1998: 111), efficiency in the public sector means
satisfying the most essential needs of the community to the greatest possible
extent, in qualitative and quantitative terms, using the limited resources that
are available for this purpose. This means that the public service should be
represented by competent personnel capable of putting the Preferential
Procurement Policy Framework Act (Act 5 of 2000) into practice
5.2.2 The Role of Local Private Sector and Academic Institutions Browning, P. (1989: 25) argues that if the concept of Black Economic
Empowerment is to be translated into reality, there must be genuine and
whole-hearted commitment on the part of both the government and the
established business. Government is allocating billions of rands for the
procurement and realises its commitment to the delivery of services, good
governance and achieving socio-economic objectives through procurement.
There are institutions available that are of assistance to the development of
municipal staff in service delivery. The Development Bank of South Africa
(DBSA) is one such institution.
The purpose of DBSA is to accelerate sustainable socio-economic
development by funding physical, social and economic infrastructure. Their
goal is to improve the quality of life of the people in the region. DBSA has
76
since expanded its role by providing support to municipalities for the
implementation of projects such as Project Management and Engineering and
Finance through their initiative called “Siyenza Manje”.
www.dbsa.org/Projects/Documents
Such programmes are a clear indication that the private sector is realising that
they cannot be successful in their endeavours if their local municipality is not
succeeding in its objectives. One one’s cannot be separated from the other.
DBSA has realised this need and is already assisting municipalities in the
implementation of projects although there is still no focus towards the
development of HDI’s.
Academic institutions are another body of knowledge where ties should be
developed for learning and skills development opportunities by not only
bringing and implementing training programmes, but to monitor the results of
these programmes. It could be to the advantage of all to have capacity and
skills development programs introduced at high school level, so that we rid
our young citizens of the HDI concept, which in ten years time will not make
any sense.
Browning (1989: 111), draws attention to the concept “Trade” which he
defines as business, commerce or a skill.
The South African Concise Oxford Dictionary (2006) defines trade as a job
requiring manual skills and special training.
Browning contends that it is usually during a period of apprenticeship, which
involves a certain amount of theory and large amounts of practice, that a
tradesman learns a skill. It’s at this time that one can make mistakes and
learn to correct them under the supervision of the experienced tradesman.
One cannot agree more with him when he says that this process is often
overlooked and assumptions are made when one is evaluated to implement a
project. The point that normally clouds the application of the Preferential
77
Procurement Policy Framework Act, (Act 5 of 2000) is the need to allocate
business to the Historically Disadvantaged Individual (HDI) even if he as
owner has no idea of how the project is to be executed.
The awarding of a tender, without regard for the capacity of the owner and
without evaluating the abilities of the rest of the team is risky undertaking of
government. The tendency is to appoint unemployed people who are qualified
and reflect those skills when submitting tenders. What they disregard is the
fact that people will always market themselves and are free to resign. They
have no obligation to work for the company, whether the project is complete
or not.
In such a situation municipalities are to blame because they award tenders to
HDI’s companies, even if they will depend on their employees to implement
projects on their behalf, as company owners. If what is proposed by Browning
is to be taken seriously, then HDI’s in business will be able to start delivering
finished products.
When a contractor is blacklisted for failure to complete a project, he is not
protected by the team who motivated the awarding of the tender on the basis
of competency of staff, rather than the business owner. If bid committees who
are awarding contracts targeting HDI’s are less concerned about their
capacity to perform, great financial losses will never decline. This destroys the
image of emerging businesses.
The Daily Dispatch dated 05/06/2008 published an article in which a black
owned company was awarded a tender worth R 4,7m despite having no
capacity to wash at least 1000 pieces of laundry a day. No inspection of the
laundry premises was done by the Department of Health to ensure they had
sufficient equipment and necessary chemicals. Instead workers were dealing
with critical washing themselves.
www.dispatchonline.co.za
78
The Regulations in terms of the Public Finance Management Act, (Act 1 of
1999) which came into effect on 5 December 2003, point 6 (2) says the supply
chain management system must provide for:
• The adjudication of bids through a bid committee
• Bidding procedures
• The approval of bid committee recommendations
Supply Chain Management Regulations provide guidelines on how and what
to evaluate in a tender document prior to awarding a business contract. It is
very clear that more still needs to be done in terms of evaluating the
performance of officials and the service providers.
5.2.3 Joint Venture Agreements A Joint Venture is an agreement by two or more individuals or entities to
engage in a single project or undertaking. Joint Ventures are used as a
means for fund-raising and spreading of risks. A Joint Venture is similar to a
general partnership although, in the case of the joint venture, when the project
has been accomplished, the entity ceases to exist.
www.winterandcompany.com/comm
Joint Venture agreements are seen as a means of ensuring that the HDI is
twinned with a bigger company in the form of a joint venture where the bigger,
well-established company is expected to develop the capacity of the other
partner.
The Green Paper on Public Procurement (113: 4.21) is encouraging the
engagement of bigger companies to be sub-contractors and assist the
implementation of projects, although there is a warning victimisation and
fronting. The responses provided in the questionnaires point to problems of
financial instability on the side of the HDI and the process being open to
abuse. Hence 60% of the respondents feel the ruling procurement processes
are not assisting the HDI’s. Their socio-economic status could be deteriorating
79
rather than improving, as they find themselves indebted and their assets
attached.
www.targetedprocurement.com/papers/general/Greenpaper.PDF
It would make sense for municipalities to have an internal capacity that would
see to the formulation of Joint Ventures in a more controlled environment so
that there are roles of parties are clear. Strategies and goals on how skills will
be transferred to the HDI’s and when the bigger company will exit should be
documented. Open ended discretionary powers of big companies over the
HDI must not be too wide and unrestrained. Municipalities should be mindful
of this unintended consequence and reduce this problem.
A team of municipal officials should form a project monitoring cluster with all
departments within the municipality represented. The cluster mandate should
be to ensure that the skills transfer programme of the Joint Venture is adhered
to and to report to specific standing committees of the municipality. The
underlying objective is to provide lifetime development to the HDI to realise
the constitutional mandate.
Key performance areas should be identified and be used as guide for building
the operational plans for the Joint Venture organisation and to measure the
outcomes. It may be better to ensure that there are regular performance
audits to determine the extent to which this interactive approach is benefiting
the HDI.
5.2.4 Capacity Availability versus Budget Availability If municipalities are unable to implement projects which they have identified in
their Integrated Development Plan, is it safe to burden them with large sums
of money they cannot expend? Is this not the reason for roll-overs and
services that are below standard? Perhaps too much pressure on improving
service delivery is being exerted in terms of a budget being made available. It
is important to evaluate what the Municipality can deliver. They have their
mouths full whilst they are unable to chew. Then they are branded non-
performers.
80
The study was carried out in a province regarded as poorest of the poor.
Municipalities have difficulty in recruiting candidates of high calibre because of
this stigma and this reputation should be removed.
The government must introduce allowances to entice candidates from cities to
come and work for these municipalities in predominantly rural areas. The
government must go the extra mile and introduce salary-packages intended
for such recruits. To a certain extent this action will assist in building the
capacity of the municipality to deliver on its IDP projects.
The intention is not to phase out the Joint Venture business but rather to
address and strike a balance between the constitutional mandate and the key
programmes of the Reconstruction and Development Programs (RDP) of the
government namely:
• Meeting basic needs
• Developing our human resources
• Building the economy
• Democratising the state and society
• Implementing the RDP www.anc.org.za/rdp/rdp2.html
5.2.5 Risk Capital Risk capital is defined as funding for firms with excellent growth capital,
provided mostly by venture capital firms, or other investors who are willing to
take a big risk with the potential for great financial gain.
www.businessfinance.com/risk-capital.htm
Browning (1989: 169), contends that, although providing capital will initially be
a high risky, government could show its commitment to Black Economic
Empowerment HDI’s by allowing financiers to regard this as risk capital with
special tax advantages.
81
The Government should be willing to introduce a programme, aimed at
providing financial assistance on merit, to emerging companies. Such
assistance has, in the past, been enjoyed by farmers where loans were
provided at concessionary rates. There are institutions offering financial
assistance, but conditions are not conducive to circumstances of the small
business contractor.
The Government’s financial assistance comes primarily in the form of Khula
Enterprise Finance Limited. Small business can make use of the many Khula
products through banks and loan providers called Retail Finance
Intermediaries or RFI’s. Although applicants need less security they must still
be profitable. The money is loaned at a higher rate than that which is available
from banks and the repayment periods are shorter.
www.sanlam.co.za/eng/solutionsforyou/cobalt/startinasmallbusiness.htm
5.2.6 Social Responsibility by Private Sector It is time that the private sector redirect their focus and efforts not only
improving sports, but also socio-economic responsibility within their municipal
area of jurisdiction. This is another area that can have productive, fruitful
outcomes towards the up-liftment of the living conditions of the communities
staying around these companies. Mines and industries in the area should
ensure that they assist in bringing out these talents, build schools, and
provide financial assistance, just as they do with sporting bodies around the
country.
5.2.7 Engaging Retired Skilled Citizens Secondment of retired, knowledgeable and qualified, multi-skilled people to
provide much needed mentoring of the Historically Disadvantaged Individuals
of this country is another method of improving knowledge of the HDI.
82
5.2.8 Monitoring and Control System The MFMA Chapter 14, Section 165, requires that municipalities establish
their own internal audit units. Alternatively, they can outsource the function if it
is cost-effective. The unit should, amongst other functions, report on
performance management, risk and risk management and internal controls.
One of the roles of the internal audit should be to authenticate the tender
information such as ownership, shareholding, past projects performance and
customer satisfaction, registration and membership to professional bodies and
so on. Also the Internal Audit should ensure that the segregation of duties is
ensured amongst the role players in the procurement process to reduce fraud
and corruption.
Authentification of tender information is important in curbing fraud and
misrepresentation. On 25 April 2008 the Daily Dispatch exposed a company
which has defrauded the state of close to R 11m as it was awarded tenders
whilst acting as a professional engineer for almost eight years. The article
states that in October 2001 the award was made after amendments had been
made by adding four other directors, only one had professional registration
number. However, the state alleged that by February 2002, two of the
directors, who had 30% interest each, had resigned.
www.dispatchonline.co.za
In most municipalities policies are in place, but one seldom finds a policy on
how to monitor the implementation of projects whilst a huge chunk of
municipal budgets goes towards engineering services and infrastructure
projects. Therefore the internal audit should make regular visits to sites report
first hand information on progress on construction sites.
If then the greater percentage of municipal budgets is spent on procurement
of services, is it enough to report quarterly to the Provincial Treasury on the
preferential procurement?
83
The Green Paper on Public Sector Procurement Reform in South Africa states
that the National Procurement Compliance Office will, amongst other
functions:
• Monitor the manner in which policy is implemented in respect of
development objectives, the manner in which targets are set and
attained, value-for-money is obtained, delivery mechanisms employed
and so on.
• Administer national procurement legislation and assist procurement
offices/centres in executing the National Procurement Policy and
sanction those who are not adhering to or implementing such policy.
• Investigate any complaints received from the public regarding tender
procedures and irregularities
• www.info.gov.za/greenpapers/1997/publicproc.htm
Bolton, (2007: 312) says insofar as can be determined, a procurement
compliance office is not yet in operation. Until such time that a Compliance
Office is established a number of institutions play a role in enforcing
compliance with procurement rules - the Public Protector, the Auditor General
and National Prosecuting Authority.
It would be ideal to have procurement compliance offices in each municipality
which will report to the Accounting Officer and the National Procurement
Compliance Office to reflect on the implementation of the Preferential
Procurement Policy Framework Act (Act 5 of 2000) and what the legislation
has achieved monthly and quarterly. The Project Monitoring Unit of the
Municipality should comprise staff who possess Project Management skills
and quality control and who, upon awarding of tender, supervision will begin.
The researcher has find, through literature review that monitoring
accompanied by decisive action as a gap between the municipalities and
contractors. The closing of this gap will ensure quality basic services delivery,
monitoring and control as key indicators of proper service delivery.
84
5.3 Conclusion The study has revealed that the elements of management, namely planning,
organising, leading and control are not balanced. They are all critical in public
administration.
Projects are mapped out geared towards improving the socio-economic status
of the previously oppressed people of our country. Public servants should not
fail the national ideals and root out the perceptions that the government has
very good programs but cannot implement them. Departments exist for
specific reasons and various responsibilities that should culminate in
satisfying the expectations of the population. The Preferential Procurement
Policy Framework Act (Act 5 of 2000) emanates from South Africa’s Supreme
Constitution, designed to address the socio-economic imbalances, a good
and genuine concern, but the implementation is let down by poor monitoring
and reporting systems.
Policies and procedures should not be manipulated to favour the HDI’s, as
could have been in the case study of the R4.7m tender awarded by the
Department of Health in the Eastern Cape for hospital laundry service, and
also the awarding of tenders to company, posing as an engineer for more
than six years.
Public Service employees should take their work more seriously, rid
themselves of corrupt activities, and inculcate a profound commitment to
deliver seamless integrated services to communities, previously oppressed by
apartheid system, services that they, as public servants can be proud of.
Public and private sectors should strive to complement each other; synergy
must exist to enhance the socio-economic status of HDI’s, and realise the
ideals of the Preferential Procurement Policy Framework Act, (Act 5 of 2000).
According to Gildenhuys, (2006: 503), the performance audit and the auditor
should examine the following:
• Whether policy objectives were actually determined and whether policy
decisions were made legally and legitimately
85
• Whether established policy goals and objectives were clearly defined
• Whether the necessary instructions to the personnel were
subsequently given in accordance with the approved policy goals.
If this is the way to evaluate performance, then municipalities should ensure
that there is ongoing monitoring and reporting by the Municipal Performance
Monitoring Cluster. The Internal Audit Unit should intensify its role to ensure
value for money.
86
REFERENCES Alveenson, M and Deetz, S. 2000. Doing Critical Management Research.
Sage Publications. London
Babbie, E. and Mouton, J. 2006. The Practice of Social Research. Cape
Town: Oxford University Press
Balshaw, T and Goldberg, J; 2005. Cracking Broad-Based Codes and
Scorecard Unpacked. Human and Rousseau and NB Publishers, Cape Town
Bates, B; Botha, M; Botha, S; Goodman, S; Ladzani, W; De Vries, C; de
Vries, L; November, M and Southey, L. 2006. Business Management – Fresh
Perspective. Maskew Miller Longman. Cape Town
Bless & Higson-Smith. Fundamentals of Social Research Methods - (An
African Perspective). 1995. Juta & Co. Ltd, Kenwyn
Bolton, P. 2007. The Law of Government Procurement in South Africa.
LexisNexis Butterworths. Durban
Browning. P. 1989. Black Economic Empowerment. Fortein Publishing
Company, Parklands, Cape Town
Cloete, J. J. N. 1998. South African Public Administration Management. J.L.
Van Schaik Publishers. Pretoria.
Collins, J and Hussey, R. 2003. Business Research: A Practical Guide for
Undergraduate and Postgraduate Students. Palgrave Macmillan. London
Craythorne. D. L.; 2003. Municipal Administration – The Handbook.
Lansdown: Juta & Co. Ltd
87
David, M and Sutton, C. D. 2004. Social Research: The Basics. SAGE
Publications Ltd. London
Fourie, M and Opperman, L. 2007. Municipal Finance and Accounting. Van
Schaik Publishers. Pretoria
Gildenhuys, J. S. H.; Knipe, A.; 2000. The Organisation of Government – An
Introduction. Van Schaik Publishers. Pretoria
Gildenhuys, J. S. H. 2006. Public Finance Management. J. L. Van Schaik
Publishers. Pretoria
Gliner. J. A. and Morgan, G. A. 2000. Research Methods in Applied Settings:
An Integrated Approach to Design and Analysis. Lawrence Erlbaum
Publishers. London
Hugo, W. M. J.; Badenhost-WeissJ. A.; Van Biljon, E. H. B. 2004. Supply
Chain Management. Van Schaick Publishers. Cape Town
Lovell, R.; Managing Change - In the New Public Sector. 1994. Longman
Information and Reference, Longman Group Limited. England
Martin Terre Blanche & Kevin Durrheim. 2002. Research in Practice:
Applied Methods for Social Sciences. University of Cape Town Press
Cape Town.
Matthew David & Carole D, Sutton. 2004. Social Research – The Basics.
SAGE Publications Ltd. London.
Mouton, J. How to succeed in your Masters & Doctoral Studies (A South
African Guide and Resource Book). 2006. Van Schaik Publishers, Pretoria
Neuman, W. Lawrence, 2006. Social Research Methods – Qualitative and
Quantitative Approaches, Pearson Education Inc. United States of America
88
Reddy, P. S.; 1995. Perspectives on Local Government Management and
Development in Africa. Kohler Carton and Print. Pinetown
Shah, A.; 2005. Public Services Delivery. The International Bank for
Reconstruction and Development / The World Bank. Washington DC.
Wilson, J and Hinton, P; 1993. Public Services & The 1990’s: Issues in Public
Service Finance and Management. Tudor Business Publishing Limited. Great
Britain.
Van der Walt, G.; Van Niekerk, D.; Doyle, M.; Knipe, A.; Du Toit, D. 2002.
Managing Results in Government. Sandown: Heinemann Publishers,
Van Weele, Arjan J. 2000 Purchasing and Supply Chain Management –
Analysis, Planning and Practice, Thomson Learning, United Kingdom
LEGISLATION South Africa. 1993. The Constitution of the Republic of South Africa, Act 200
of 1993. Pretoria: Government Printers.
South Africa. 1996. The Constitution of the Republic of South Africa, Act 108
of 1996. Pretoria: Government Printers.
South Africa. 1997. Green Paper on Public Procurement Reform in South
Africa. Pretoria: Government Printers.
South Africa. 2003. Municipal Finance Management Act 56 of 2003.
Pretoria: Government Printers.
South Africa. 2000. Preferential Procurement Policy Framework Act, Act 5 of
2000. Pretoria: Government Printers.
South Africa. 2000. Municipal Systems Act 32 of 2000. Pretoria: Government
Printers
89
South Africa. 1950. Group Areas Act of 1950. Pretoria: Government Printers.
South Africa. 1953. Bantu Education Act of 1953. Pretoria: Government
Printers.
South Africa. 1994. White Paper on Restructuring and Development
Programme. Pretoria: Government Printers.
South Africa. 2003. Broad-Based Black Economic Empowerment Act 53
Pretoria: Government Printers.
South Africa. 2000. Construction Industry Development Board Act 38.
Pretoria: Government Printers.
REGULATIONS Supply Chain Management Regulations. Government Gazette no. 27636, Vol.
479 dated 30 May 2005.
Skills Development Regulations: Government Gazette No 21752 of 2000
DICTIONARY South African Concise Oxford Dictionary. 2006. Oxford University Press
Southern Africa Pty. Ltd. Cape Town
WEBSITES http://ec.hku.hk/acadgrammar/report/resProc/research.htm
http://www.info.gov.za/greenpapers/1997/publicproc.htm
http://ec.hku.hk/acadgrammar/report/resProc/research.htm
http://www.info.gov.za/greenpapers/1997/publicproc.htm
http://www.anc.org.za/rdp/rdp4.html
90
www.bee.sabinet.co.za
www.busreport.co.za/index.php
www.imfo.co.za/downloads.htm
www.nova.edu/sss/RQ/RQ10-4/krauss.pdf
www.businessfinance.com/risk-capital.htm
www.dbsa.org/Projects/Documents
www.disparchonline.co.za
www.dplg.gov.za/documents/wpaper.htm
www.sanlam.co.za/eng/solutionsforyou/cobalt/startinasmallbusiness.htm
www.targetedprocurement.com/papers/general/Greenpaper.PDF
www.winterandcompany.com/comm
www.wordonthestreet.org.za/index.htm
91
ANNEXURE A Research Questionnaire The questionnaire is directed to officials responsible for procurement in a
municipality.
1. Are you aware of any provision for procurement processes in the
Constitution of the Republic of South Africa?
1.1 If Yes, what does the Constitution say about procurement processes?
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
2. From the list given below, choose one legislation which relates to the
management and the implementation of the procurement processes in
South Africa?
Municipal Structures Act
Preferential Procurement Policy Framework Act
Public Service Act
3. Does your municipality deal with procurement
processes?
3.1 If Yes, is there a formal process for dealing with procurement processes in
your municipality?
4. Is your municipality having specific committees and/or officials responsible
for procurement processes?
Yes / No
Yes / No
Yes / No
Yes / No
92
4.1 If Yes, can you mention the designations of these officials and/or
committees?
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
5. Can you describe the organizational (structural) arrangements for the
implementation of the Procurement Policy Framework Act (Act 5 of 2000)
which exist in your municipality?
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
_____________________________________________________________
6. Can you describe the processes of selecting and awarding tenders in your
municipality? You may use examples to do so.
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
7. Would you say that the implementation of the Preferential Procurement
Policy Framework Act (Act 5 of 2000) is to the benefit of historically
disadvantaged individuals?
Yes / No
93
7.1 Can you please elaborate on the answer you have given in 7 above?
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
8. What do you see as the role of the implementation of the procurement
processes in service delivery?
Do they improve service delivery?
Do they retard service delivery? OR
You are not sure?
8.1 If yes or no, can you elaborate on the answer you have given above?
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
Thank you, for your co-operation
94
ANNEXURE B
1093 Zone 5
ZWELITSHA
5608
29 July 2008
The Municipal Manager
Dear Sir/Madam
REQUEST FOR A PERMISSION TO UNDERTAKE RESEARCH I am currently registered for the degree of Master of Public Administration at
Nelson Mandela Metropolitan University. My studies include a treatise with the
following research topic.
“AN EVALUATION OF THE IMPLEMENTATION OF THE PREFERENTIAL
PROCUREMENT POLICY FRAMEWORK ACT (NO. 5 OF 2000) WITH
REFERENCE TO SELECTED MUNICIPALITIES IN THE PROVINCE OF
THE EASTERN CAPE”
I hereby request permission to undertake research in your municipality.
Participation of the respondents will be voluntary with the option of
withdrawing at any stage of the process and there will be no negative
consequences linked to non-participation. An informed consent will be
requested before the respondents’ participation in the research process.
Confidentiality will be ensured. Information obtained will be used for the
purposes of the study only and I undertake to ensure that the information will
be used in such a way that the respondents cannot be identified. Therefore,
the final report will not include identifying information.
95
Questionnaires will be used to collect data from selected officials in Supply
Chain Management Division. Respondents will be informed that they are not
obliged to answer all questions, if they feel uncomfortable to answer certain
questions they may not answer them.
By participating in the study, respondents could contribute towards the
identification and elimination of factors which may negatively affect the
implementation of the Preferential Procurement Policy Framework Act.
The research findings will be disseminated to the municipalities who have
participated in the study
Your assistance in this endeavour is highly appreciated.
Yours sincerely
Ms Nandipha Nano