Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

28
Month Year Amsterdam Avenue Proposed Northbound Bike Route New York City Department of Transportation Presented by the Bicycle and Greenway Program on November 10, 2015 to Community Board 7

description

Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Transcript of Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Page 1: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Month Year

Amsterdam Avenue Proposed Northbound Bike Route

New York City Department of Transportation Presented by the Bicycle and Greenway Program on November 10, 2015 to Community Board 7

Page 2: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Outline

2

• Background

• Design Discussion

• Making it Work

• Alternatives

• Summary

• Next Steps

Page 3: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Background Network History

3

2010 • Columbus Avenue Parking Protected Bicycle

Lane (96th St to 77th St)

2013 • Columbus Avenue Parking Protected Bicycle

Lane (110th St to 96th St and 77th St to 69th St)

2015 • Lincoln Center Bowtie / Columbus Avenue

Parking Protected Bicycle Lane (69th St to 59th St)

Northbound Route • No corresponding northbound protected

route serves the community • CB 7 and electeds asked DOT to study

Amsterdam Avenue • DOT has looked at several NB possibilities

Page 4: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

4

• Logical northbound pairing for Columbus Avenue

• Plaza at the 72nd Street subway station forces Broadway traffic to Amsterdam

• High traffic volumes, bus route, local truck route, active curbside loading

Background Amsterdam Avenue

Page 5: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

5

• North of 72nd Street • Amsterdam carries traffic from 10th

Ave and Broadway • Connected to network via CPW and

77th/78th

• South of 72nd Street • Network connections • Bowtie considerations

Background Northbound

Page 6: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

6 Citi Bike station map inside CB 7 is approximated.

In October 2015, 29% of Citi Bike trips that started in CB 7 also ended in CB 7

Citi Bike expanded to W 86th Street in the fall of 2015

In October 2015, 45% of Citi Bike trips that started in Midtown ended in CB7 (CB 4, 5, or 6)

Source: Citi Bike trip data between September 1st and September 30th 2015

Background Citi Bike

Citi Bike will expand to 130th St by 2018

Page 7: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

7

Amsterdam Ave W 85th to W 86th St

12-hour Bike Volume

October 2007 217

October 2011 515

October 2015 609

Source: ATI Data, Bicycles btw. W 85th St and W 86th St on Amsterdam Ave and btw. W 87th St and W 86th St on Columbus Ave in October 2007, 2011, and 2015. 7am-7pm.

Columbus Ave W 87th to W 86th St

12-hour Bike Volume

October 2007 486

October 2011 594

October 2015 724

Background Bike Volumes

• A three fold increase in cycling on Amsterdam since 2007 and almost double on Columbus.

Page 8: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

8

Amsterdam Avenue W 72nd St to W 110th St

Injury Summary 2009-2013 (5 years)

Injuries Severe Injuries

Fatalities

Pedestrian 157 16 1 Cyclist 62 3 0 Motorist 294 17 1 Total 513 36 2

Indicates the number of injuries Indicates that a fatality occurred at this location

Amsterdam Ave has a KSI (killed or severely injured) of 8.9 per mile for pedestrians (KSI of 19.7 for all).

Background Injuries

Source: NYPD AIS/TAMS Crash Database

Page 9: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

9

Design Existing Issues

59% of vehicles are speeding at off-peak times

Long crossing distances

High peak vehicle volumes

Current design encourages bad driver behavior

Not designed to a neighborhood

scale Source: Radar speed study taken on October 6, 2015 btw. W 81th St and W 82th St on Amsterdam Avenue

Page 10: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Design Proposal

Existing

Proposed

Curbside parking protected lane

Pedestrian safety islands

Lane reduction with turn lanes

Updated curb regulations

10

Page 11: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Design Proposal

11

Bicycle lane protected

from traffic

Reduced crossing distances

Off-peak traffic calming

New trees

Columbus Avenue at W 107th St A

mst

erda

m A

ve

W 79th

Neighborhood scale design

Page 12: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

12

In general protected bike lanes in Manhattan improve safety for all users:

• Crashes with injuries have been reduced by 17%

• Pedestrian injuries are down by 22%

• Cyclist injuries show a minor improvement even as bicycle volumes have dramatically increased

• Total injuries have dropped by 20%

Protected bicycle lane projects with 3 years of after data include the following: 9th Ave (16th-31st), 8th Ave (Bank-23rd, 23rd-34th), Broadway (59th-47th, 33rd-26th, 23rd-18th), 1st Avenue (Houston to 34th), 2nd Ave (Houston-34th), Columbus Ave (96th-77th) Note: Only sections of projects that included protected bicycle lanes were analyzed Source: NYPD AIS/TAMS Crash Database

-25% -22%

-2%

Design Safety

514

221

280

100

601

426

166

220

98

484

0

100

200

300

400

500

600

700

Crasheswith

Injuries

MVOccupantInjuries

PedestrianInjuries

CyclistInjuries

TotalInjuries

Num

ber o

f Inj

urie

s

Protected Bicycle Lanes with 3 yrs of After Data:

Before vs After

Before After

-17%

-20%

Page 13: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

13

W 86: v/c - 0.81

W 96: v/c - 0.91

W 79: v/c - 0.85

Existing Condition v/c Ratios

Making it Work Existing Capacity

Cross Street Amsterdam 6-7 PM Peak

Volumes (veh/hr)

Delay (s)

Volume-to-

Capacity Ratio

W 96th 1,687 12.8 0.91

W 86th 1,704 6.5 0.81

W 82nd 1,545 3.0 0.66

W 79th 1,330 40.9 0.85

W 77th 1,377 4.8 0.62

The volume-to-capacity ratio is a measure of how “full”  a  roadway  feels  and  is  calculated  as  a  ratio  between the measured traffic volume and calculated capacity of the roadway. The result is expressed as a number  between  0  and  1.    A  value  of  “1”  would  indicate  that  the  roadway  is  “full.”

W 77: v/c - 0.62

W 82: v/c - 0.66

Delay is a measure of the average time a vehicle will spend processing through an intersection

Existing Traffic Conditions

Page 14: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Making it Work Daily Volumes

14 Source: ATI Data, Vehicles btw. W 95 St and W 96 St, May 2014

0

200

400

600

800

1000

1200

1400

1600

1800

12:00AM

1:00AM

2:00AM

3:00AM

4:00AM

5:00AM

6:00AM

7:00AM

8:00AM

9:00AM

10:00AM

11:00AM

12:00PM

1:00PM

2:00PM

3:00PM

4:00PM

5:00PM

6:00PM

7:00PM

8:00PM

9:00PM

10:00PM

11:00PM

Amsterdam Avenue Daily Vehicle Volumes Between W 95th St and W 96th St

Page 15: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

15 Source: ATI Data, Vehicles btw. W 78 St and W 79 St, October 2014

0

200

400

600

800

1,000

1,200

1,400

1,600

Amsterdam Avenue Daily Vehicle Volumes Between W 78th St and W 79th St

Making it Work Daily Volumes

Page 16: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Making it Work Taxi Usage

16 Note: Study period occurred from 4pm to 7pm on weekdays in April 2015.

• From 4pm to 7pm on weekdays there are approximately 16,065 yellow cab trips that start or end in CB 7

• 50% of trips (8,090) are 1.5 miles or less

• 44% of trips (7,000) are wholly within CB 7 (both start and end)

• 32% of afternoon traffic on Amsterdam Ave is taxis (approximately 400 per hour)

• Large potential for a protected lane to shift trips from taxi to Citi Bike

Page 17: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Mixing zones at all non-two way left turns

Improves visibility of cyclists

Provides space to negotiate conflict

Removes left turns from through lanes

Making it Work Left Turns

Creates left turn vehicle storage

Page 18: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Bike lane continues the length of the block

Turning vehicles queue for turn phase

Pedestrians and cyclists have a leading phase to get a head start

Left-turn bays at 79th, 86th, 96th

Making it Work Left Turns

Split phase allows through traffic to move while holding

left turns, up to 23% more green time given to through

Page 19: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

19

Install a paid commercial parking regulation along the east curb of Amsterdam Ave from W. 72nd to W. 96th between 7am and 7pm on weekdays, plus at select locations on west curb

• Maximizes curb space available for

trucks loading or unloading on busy commercial corridor

• Reduces the likelihood of trucks double-parking during peak travel times

• Clear through lanes process traffic more efficiently

Making it Work Deliveries

Existing 1-hr metered parking 9a-7p

Page 20: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Making it Work Overall

20

Existing

Proposed

3 through lanes process efficiently

Traffic is organized into through, turns, and proper

loading zones

Efficient signal progression

Page 21: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

21

W 77: v/c - 0.69

W 82: v/c – 0.83

W 86: v/c – 0.91

W 96: v/c - 0.78

W 79: v/c - 0.72

Proposed Condition v/c Ratios

Cross Street

Amsterdam 6-7 PM Peak Volumes

(veh/hr)

Delay (s)

Volume- to-Capacity

Ratio

* W 96th 1,670 5.0 0.78

W 86th 1,687 12.7 0.91

W 82nd 1,530 5.9 0.83

* W 79th 1,317 35.5 0.72

W 77th 1,363 4.5 0.69

Making it Work Expected Outcome

* Benefit from conversion from LPI to Split LPI

Cross Street

Amsterdam 6-7 PM Peak

Volumes (veh/hr)

Delay (s)

Volume-to-Capacity

Ratio

W 96th 1,687 12.8 0.91

W 86th 1,704 6.5 0.81

W 82nd 1,545 3.0 0.66

W 79th 1,330 40.9 0.85

W 77th 1,377 4.8 0.62

Existing

Proposed

Page 22: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Making it Work Parking Consideration

22

25% of the parking space on the corridor will be repurposed

for left turn treatments and pedestrian safety islands

East curb will be converted to daytime

(7am-7pm) commercial loading zones between W 72nd St and W 96th St,

plus targeted loading on the west curb Columbus Avenue at W 106th St

Page 23: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Alternates Studied

23

DOT has studied potential alternatives on nearby

Broadway and Columbus

Note: Any alternative bike route will be paired with pedestrian improvements on Amsterdam to create a safer corridor without bike facilities

Amsterdam Avenue is the preferred northbound route, however it

comes with parking loss and some vehicular capacity reduction

Page 24: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Broadway Route

24

Existing

Proposed

Buffered bicycle lane against the median in the

northbound direction

Minor traffic impact Design challenges between

95th and 97th

Requires new left turn design

Page 25: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Columbus Ave Route

25

Convert southbound lane to a two way path

No changes to vehicular capacity

Learning curve for users, heavy pedestrian access Requires infrastructure

upgrades

Page 26: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Summary

26

Phase I – Amsterdam Avenue Preferred Route

• Protected bicycle lane provides northbound route for cyclists

• Reduced pedestrian crossing distances with islands

• Design for neighborhood street with safety benefits expected for all users

• Lane reduction with left turn treatments

• High peak hour traffic volumes require some adjustments

• Left turn treatments and paid commercial spaces reduce parkable area

• Traffic flow will be maintained

• Connections to new route via CPW at 77th/78th and 90th/91st

Page 27: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

27

Phase 1 – 72nd – 110th • Incorporate feedback into plan and

present to board for support

• Implement in Spring 2016, nearly two miles of protected lanes and new infrastructure

Phase 2 – South of 72nd • Gather feedback & develop proposals

• Consider network connections

• Coordinate with 2016 capital project at 71st/Amsterdam/Broadway

• Complete improvements at Columbus/65th Street/Broadway

• Any route will require careful planning through complex intersection of 71st/Amsterdam/Broadway

Next Steps

Page 28: Amsterdam Avenue Northbound Bike Route CB 7 20151110 Final

Questions? Thank You