Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The...

19
© 2011 Ammeraal Beltech Holding BV All Rights Reserved Confidential and Proprietary Intellectual Property Ammeraal Beltech Sp. Z.o.o. PDCC, Herning Kenneth Thomsen, 7/2-2013

Transcript of Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The...

Page 1: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

© 2011 Ammeraal Beltech Holding BV All Rights Reserved

Confidential and Proprietary Intellectual Property

Ammeraal Beltech Sp. Z.o.o. PDCC, Herning

Kenneth Thomsen, 7/2-2013

Page 2: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

• Headquarter in The Netherlands • Affiliates in 25 countries • Worldwide distribution network makes our products available in 150

countries • 7 manufacturing plants • 80 fabrication centers • 2.120 employees worldwide • 2011 turn over of 302 million euros

2

About Ammeraal Beltech

Page 3: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

3

Ammeraal Beltech – belts

Page 4: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Ammeraal Beltech - Synthetic belts

4

Page 5: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Ammeraal Beltech – Modular belts

5

Page 6: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Corrugated Applications

Page 7: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Heavy load applications

Advantages:

• Extreme loads

• No lubrication

• Low maintenance

• Safety

• Less noise

Page 8: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Food applications

Advantages:

• Hygienic

• Doesn’t expand

• Take high temp

• Efficiencies

• Less waste/loss

Page 9: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Food applications

Advantages:

• Hygienic

• Allow cutting

• Positive drive

• Low maintenance

• Impact resistant

Page 10: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Ammeraal Beltech in Poland

10

Page 11: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Ammeraal Beltech in Poland

• 2005: • Ammeraal Beltech began collaboration with a Polish supplier

for the assembly of modular belts • 2010:

• Established a sales company in Bestwina • Ammeraal Beltech decided to insource assembly of modular

belts • 2011:

• The project begins in May with the goal of insourcing all assembly of modular belts during 2012

11

Page 12: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Timeline for establishing our plant

• 23/5 2011: Project start • Poznan vs Szczecin

• Logistic setup • Capabilities • Salaries

• 1/8 2011: Szczecin was decided • 01/10 2011: we started S&S process • 01/11 2011: we rented a building for our assembly plant • 14/11 2011: the first employees started working for us • 23/12 2011: Last working day before Christmas 2011 we

assembled our first belt in Szczecin. GREAT DAY!

12

Page 13: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Facilities

13

2012: 2100 m2 in 2 locations 2014: 3000 m2 in 1 location

Warehouse: 860 m2 Assembly: 1000 m2 Offices: 240 m2

Page 14: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Volume in Szczecin, Poland

14

0,00%

2,00%

4,00%

6,00%

8,00%

10,00%

12,00%

14,00%

16,00%

18,00%

jan feb mar apr maj jun jul aug sep okt nov dec

Sum of Number of m2

Sum of Actual units

Page 15: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Status, December 2012

• 86 workers in total • 2 shifts (6-14 / 14-22) • More than 80% of all assembly orders for modular belts • 4 deliveries of components from DK every week • Direct deliveries to all countries within the EU

15

Page 16: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Organization

16

Managing Director

Production Manager

Constructors Logistic Coordinators

Team Leader, production

Assembly

Team Leader, warehouse

Warehouse

Financial Manager

HR & Payroll

Page 17: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Ammeraal Beltech in Poland

• 2005: • Ammeraal Beltech began collaboration with a Polish supplier

for the assembly of modular belts • 2010:

• Established a sales company in Bestwina • Ammeraal Beltech decided to insource assembly of modular

belts • 2011:

• The project begins in May with the goal of insourcing all assembly of modular belts during 2012

• 2012: • Collaboration with suppliers in Poland and Germany is

terminated and all assembly is insourced

17

Page 18: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

Ammeraal Beltech in Poland

• 2011: • The project begins in May with the goal of insourcing all

assembly of modular belts during 2012 • 2012:

• Collaboration with suppliers in Poland and Germany is terminated and all assembly is insourced

• 2013: • Stability and structure in performance • Improve efficiency • Improve utilization of the capacity (tables, buildings) • Development of assembly process, tools, quality aso. • Challenge the company best practice in assembly

• 2014: • New plant in Dabie

18

Page 19: Ammeraal Beltech Sp. Z.o.o. PDCC, Herning€¦ · Ammeraal Beltech in Poland • 2011: • The project begins in May with the goal of insourcing all assembly of modular belts during

© 2011 Ammeraal Beltech Holding BV All Rights Reserved

Confidential and Proprietary Intellectual Property

Thank you for your attention