ADDENDUM TO INVITATION FOR BID (IFB) Issued By: Addendum No. 3 Date of this Addendum April 10, 2015 Number of Pages 6 Plus Attachments PURCHASING OFFICE BOARD OF EDUCATION OF PRINCE GEORGE’S COUNTY UPPER MARLBORO, MARYLAND 20772-9983 IFB No. 041-15 Date IFB Issued March 19, 2015 Date & Hour of Return of IFB April 15, 2015 @ 2:00 P.M. TITLE: Bowie HS Air Conditioning EEI Project The above IFB is amended as follows. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. The purpose of this Addendum is to provide changes to PGCPS Prequalified Asbestos Contractors, Revisions to Drawings and Specifications. CHANGES TO IFB Item 1-1: Section IV A. - Bid Form (April 10, 2015) CHANGES TO DRAWINGS Item 1-16: Sheet A-001: REVISED: General Note #6 revised Item 1-17: Sheet A-107 thru A-116: REVISED: Reflected Ceiling Plan Ledged revised Item 1-18: Sheet C-001: REVISED: Added sheet M-201E, Mechanical New Work First Floor, Condensate Piping, part plan F. Item 1-19: Sheet M-001: REVISED: Added sheet M-201E, Mechanical New Work First Floor, Condensate Piping, part plan F. Item 1-20: Sheet M-405: REVISED: Sequence of Operation section on the Heat Wheel Operation was removed and note on Hot Gas Reheat relay output was also removed. Item 1-21: Sheet M-601: REVISED: CFM's for the Outside Air Units were revised. Item 1-22: Sheet M-602: REVISED: Energy Recovery Unit schedule was revised. Item 1-23: Sheet M-201E: NEW: This sheet is a newly created drawing of the refrigerant piping for part plan F. QUESTIONS: Q1 Do you have an estimated price range for the above project? A1 No estimated price range will be provided. Contractor will provide cost proposal for all associated work

Transcript of AMENDMENT TO INVITATION FOR BID (IFB) - BidNet ADDENDUM TO INVITATION FOR BID (IFB ... Mechanical...

ADDENDUM TO INVITATION FOR BID (IFB)

Issued By:

Addendum No.

3

Date of this Addendum

April 10, 2015

Number of Pages

6 Plus Attachments

PURCHASING OFFICE

BOARD OF EDUCATION OF

PRINCE GEORGE’S

COUNTY

UPPER MARLBORO,

MARYLAND 20772-9983

IFB No.

041-15

Date IFB Issued

March 19, 2015

Date & Hour of Return of IFB

April 15, 2015 @ 2:00 P.M.

TITLE:

Bowie HS Air Conditioning EEI Project

The above IFB is amended as follows. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

The purpose of this Addendum is to provide changes to PGCPS Prequalified Asbestos Contractors, Revisions to Drawings

and Specifications.

CHANGES TO IFB

Item 1-1: Section IV A. - Bid Form (April 10, 2015)

CHANGES TO DRAWINGS

Item 1-16: Sheet A-001: REVISED: General Note #6 revised

Item 1-17: Sheet A-107 thru A-116: REVISED: Reflected Ceiling Plan Ledged revised

Item 1-18: Sheet C-001: REVISED: Added sheet M-201E, Mechanical New Work First Floor, Condensate Piping, part

plan F.

Item 1-19: Sheet M-001: REVISED: Added sheet M-201E, Mechanical New Work First Floor, Condensate Piping, part

plan F.

Item 1-20: Sheet M-405: REVISED: Sequence of Operation section on the Heat Wheel Operation was removed and note

on Hot Gas Reheat relay output was also removed.

Item 1-21: Sheet M-601: REVISED: CFM's for the Outside Air Units were revised.

Item 1-22: Sheet M-602: REVISED: Energy Recovery Unit schedule was revised.

Item 1-23: Sheet M-201E: NEW: This sheet is a newly created drawing of the refrigerant piping for part plan F.

QUESTIONS:

Q1 Do you have an estimated price range for the above project?

A1 No estimated price range will be provided. Contractor will provide cost proposal for all associated work

Q2 The Technical Specifications on the CD appear to be missing the following sections: 15700 Air-To-Air Energy

Recovery Units, 15738 Packaged Rooftop Air Conditioning Units, 15739 Variable Refrigerant Volume Air

Conditioning, 15840 Ductwork, and 15830 Fans has page 1/3 of a page and then the bottom goes to 15060. Is this

the complete fan specification?

A2 Specifications for Sections 15080, 15700, 15738, 15739, 15840, and 15850 have been submitted.

Q3 There seems to be several sections of the specifications missing, in particular sections 15080, 15700, 15738,

15739, 15840, and 15850 and possibly more.

A3 Specifications for Sections 15080, 15700, 15738, 15739, 15840, and 15850 have been submitted.

Q4 We are going to bid Bowie and want to make sure we are on the bid list. I am setting up subs that will need to

look at the job and will send out and email to coordinate.

A4 A bid walk was previously provided. No additional bid walks will be held.

Q5 I was able to download the documents from the website that was in the ad, but I wasn’t able to find any drawings.

I see that the ad mentioned the plans and specs are currently being processed, is this still the case or are they

available now?

A5 Drawings and specification are available for pick up in accordance with instructions outlined in the solicitation.

Q6 Would it be possible to get lists of contractors who attended the pre-bid meeting, and site visit for this project? Is

a current plan holder list available as well?

A6 Prebid attendee list was posted to PGCPS website.

Q7 Do you have a value “parameter” for this project already set? If so, please can you let me know what it is.

A7 No value “parameter” is set.

Q8 Please advise if a site visit is still possible on this bid.

A8 No additional site visits will be conducted.

Q9 Is there any asbestos present in any of the work locations or the school. If yes where?

A9 Yes, the “Red Book” reviewed during the walk-thru at the site will identify HAZMAT also see revised general

note #6 on sheet A-001.

Q10 Can you provide a copy of the ACM log book on site?

A10 No copies are available. Copy is available for review on site

Q11 Will the project be phased and section turned over to the contractor with students moved out of that area so work

can be completed. If yes, how many sections can/will be turned over to the contractor?

A11 See addendum #2.

Q12 Will PGCPS move furniture so work can be completed?

A12 No, Contractor will be required to move and relocate furniture.

Q13 Will the contractor be allowed to remove ceiling tile and or grid in occupied area to complete work. Ceiling tile

and grid will have to remain removed until all work is completed.

A13 Ceiling will need to be in place while building is occupied.

Q14 What type of control system exist and how is the contractor required to tie into this system.

A14 The units are provided with on-board controllers. The school needs to provide options to the contractor to tie into

the units' on-board controllers.

Q15 Will the school be occupied for summer school? If yes what sections.

A15 Summer school will not be in session.

Q16 Will phasing areas be available during the summer if so which ones.

A16 See addendum #2.

Q17 Unit description under items 1,2,&3 ask for unit prices but do not provide size or type. What size and type of pipe

and valves is to be priced under unit pricing.

A17 Not clear which units are being discussed. Contractor needs to be specific.

Q18 What hours will the contractor be allowed to work during the school year.

A18 Contractor will be allowed to work after school hours and on weekends.

Q19 What hours will the contractor be allowed to work when school is out.

A19 After school hours and weekends.

Q20 What hours will the contractor be allowed to work when school is out for the summer.

A20 After school hours and weekends.

Q21 Specifications note 2 on MD-100A- MD-101B indicates "disconnect/cap and seal outside air" no detail is

provided or specified. Please provide a spec and detailed drawing. Someone could simply cap with galvanized

sheet metal to meet current specifications.

A21 This note is referring to the outside air connection of the unit ventilators which is to be closed off/cut off/sealed so

that the unit is not pulling in outside air through that connection.

Q22 Mechanical drawings do not have a legend and there are symbols on the drawings. Need a legend to clearly

indicate what the symbols are.

A22 Mechanical drawing sheet M-001 has a Mechanical symbols list.

Q23 No specifications provided for the ductwork.

A23 Specifications for DUCTWORK has been provided.

Q24 No specifications provided for the control system.

A24 None is required. The units are packaged units equipped with on-board controllers come supplied with equipment

specifications manual.

Q25 RCP symbol legend on A-107 show existing flat ceiling to remain in the locker room. What type of ceiling is this

and how is it to remain with new ductwork required to be installed above.

A25 See revised legend sheets A-107 thru A-116. Based on field survey Locker room ceiling appeared to be plaster on

lath; only those portions deemed necessary for installation of new ductwork should be removed. If portions or

entire ceiling is removed new ceiling shall be installed to match existing height, texture and finish.

Q26 In the Invitation for Bid, Section XXXII, Paragraph B it states that the Contractor will be responsible for the

removal and abatement of all asbestos and to include the cost in the bid. The prior paragraph states that the

Contractor is not to disturb the asbestos and additionally states that the successful Contractor will be responsible

for making arrangements to review the current abatement plan to ensure that it is not disturbed. The drawings

state all asbestos will be removed by the Owner. As the Contractor will not know what asbestos conditions are

until after they have been awarded the contract there is no way that any such cost could be included in the bid.

Therefore Paragraph B., of Section XXXII should be deleted.

A26 See Q9 this document and revised general note #6 on sheet A-001. Contractor should provide an appropriate

allowance for such abatement.

Q27 Drawing M-101F shows VRF ceiling cassettes; which are scheduled; being installed, however; unlike the other

area drawings; there is no piping, or branch controllers, shown for these units.

A27 See drawings M-101F, M-103F, and M-201E for the scheduled units, branch controllers, refrigerant piping and

drain piping.

Q28 We received the CD that contains all of the contract documents, we are missing various sections of the

specification (too many to list). We would like to confirm that all spec sections are supposed to be on the CD? If

so, what will be the protocol to obtain these missing specifications?

A28 All Specification sections are on the CD that was submitted.

Q29 Please provide a safety/phasing plan of the sequence of work for this project and also the detailed placement of

students while the phased construction is going on.

A29 See addendum #2.

Q30 Is there an existing warranty on the roof, if so, who?

A30 Yes, two years remaining on John Mansfield roof warranty.

Q31 Will all of the work during the school year be done during off hours and weekends? If not, please provide a

placement plan for all of the students for each class and/or room that will be disturbed.

A31 See Addendum #2

Q32 Please provide ceiling types and locations throughout the entire school.

A32 Ceiling types and locations throughout the entire school is not available, see reflected ceiling plan drawings

provided in construction documents as they relate to ceiling types in areas defined for new work. See revised

schedule on sheets A-107 thru A-116.

Q33 Will there be a need for structural steel upgrades under the new rooftop equipment? If so, who will be responsible

for providing the engineering and also the engineered stamped drawings for this scope of work?

A33 If existing field conditions require additional structural steel upgrades, the Design Engineer will provide design

drawings for such upgrade. General Contractor shall be responsible for providing engineered stamped shop

drawing for such design.

Q34 Will we be required to provide professional cleaning after each day/night of work?

A34 A professional cleaning will be required at project turn over, the areas of work will need to be cleaned from

construction items (debris & dust, etc.) prior to student occupancy.

Q35 Will we be able to utilize the existing bathroom facilities or will we be responsible for our own facilities?

A35 Contractor to provide separate toilets.

Q36 Will there be a location(s) set aside for laydown area(s) for all of our construction materials? If so, where?

A36 To be negotiated with PM after award.

Q35 Who will be responsible for moving all classroom furniture and materials?

A37 The Contractor is responsible.

Q37 Drawing M-101F shows VRF ceiling cassettes; which are scheduled; being installed, however; unlike the other

area drawings; there is no piping, or branch controllers, shown for these units.

A38 See drawings M-101F and M-201E for the refrigerant piping and drain piping.

Q39 Drawing M-103F; area F roof plan; shows two (2) condensing units; CU-1-1 and CU-1-2 which are scheduled

though there are no piping trees for these two CU’s, unlike all the other scheduled CU’s. This seems to indicate

that there should be units in the second floor also, however there is no drawing for this second floor area.

The architectural reflected ceiling plan for this area; A-112; also does not show these cassettes.

The condensate piping drawings; M-200 series; also do not include a drawing for this area, whereas there are

drawings for areas A through D, as needed per floor.

A39 See drawings M-101F, M-103F and M201E for the scheduled condensing unit CU-1-1 and piping. CU-1-2 has

been removed from the drawings.

Q40 M101F shows 10 Indoor Air Conditioning Units (ACU F 1-1—1-10), however, no outdoor condensing units are

scheduled, no refrigerant pipe is shown, and no drain piping is shown; please advise.

A41 See drawings M-101F, M-103F, and M-201E for the scheduled condensing units, refrigerant piping and drain

piping.

Q42 The form 7419 for the MBE Program lists several attachments, but the attachments aren’t available on the

website.

A42 The MBE 7419 forms were included with the original solicitation that was posted to PGCPS Purchasing website

and eMarylandMarketplace.

Q43 The Spec Table of Contents lists a number of sections that are not in the specs; are those sections missing or were

they not used? We are missing: 05120, 05210, 05310, 15080, 15700, 15738, 15739, 15840, 15850, and EMS

Temperature Controls.

A43 All listed items on the Specifications Table of Contents have been submitted including Sections 05120, 05210,

05310, 15080, 15700, 15738, 15739, 15840, and 15850.

Q44 Will all of the work during the school year be done during off-hours and weekends? If not, please provide a

placement plan for all of the students for each class and/or room that will be disturbed.

A44 See addendum #2

Q45 There is a conflict between drawings M405 and M602. RTU's and ERU's sequence of operation call for hot gas

reheat and energy recovery wheel. Respective schedules don't show any performance data for those options.

Moreover, there is no cooling capacity for the ERU's. There is no way that an accurate cost could be included in

our bid. Please provide a review.

A43 See revised drawings M-405 and M-602.

Q44 Do you have your own Bid Bond form or can I use the standard AIA Bid Bond form? Please let me know.

A44 Standard AIA Bid Bond Form.

ATTACHMENTS

Revised Bid Form (April 9, 2015)

Reflected Ceiling Plan Ledged revised

Sheet A-001

Sheet A-107 thru A-116

Sheet C-001

Sheet M-001

Sheet M-201E

Sheet M-405

Sheet M-601

Sheet M-602

Sheet M-201E

Bidders must complete, sign, and return two copies of this Addendum on or before bid opening date. Failure to do so

MAY be cause for your offer to be ruled non-responsive and not considered for award.

If your Bid has already been submitted and, because of this Addendum, you desire to modify your offer, you may do so by

letter or email provided such notice makes reference to this Addendum and is received prior to the time specified for

return of Bid.

Donna Parks April 10, 2015 Buyer’s Signature Date

Company Name of Bidder

Signature of Person Authorized to Sign

Address

Type or Print Name and Title

1

SECTION IV

REVISED BID FORM (April 9, 2015) IFB 041-15 Bowie A/C EEI Project

A. BASE BID The total BASE BID, including the cost of all work and the cost of Builder’s All Risk Insurance, which shall be provided separately as informational prices. Please Note: Base bid must include taxes. Vendors are not allowed to submit invoice separately for taxes paid for supplies. Base Bid: (in words) ________________________________________ Total $__________________ BREAKDOWN – Costs for Allowance, Abatement and Phase I-III should be included in base bid as requested below See Cd's and all addenda for phasing plan: ASBESTOS ABATEMENT - DEDUCTIVE ALTERNATE (included in base bid, above): $__________________ PHASE I - [30-May-15 thru 24-Aug-15] (included in base bid, above): $__________________ PHASE II 18-Aug-15 thru 10-Jun-16: (included in base bid, above): $__________________ PHASE III 13-Jun-16 thru 15-Aug-16: (included in base bid, above): $__________________ ALLOWANCE: Allowance (included in base bid, above): $_________250,000.00 TOTAL BASE BID COST $__________________ B. COMPLETION DATE

I/We agree to erect and achieve project completion, no later than August 15, 2016.

2

C. UNIT PRICES - Not applicable D. AFFIDAVIT

______________________________________________ being first duly sworn deposes and says that he is an officer in the building construction organization known as ______________________________________________, and the party making a certain proposal or bid dated ________________________, to the Board of Education of Prince George’s County for the Air Conditioning,EEI at Bowie High School – 15200 Annapolis Road, MD 20715, and that this bid is genuine and not collusive or sham; that said bidder has not colluded, conspired, connived or agreed, directly, or indirectly, with any bidder or person to put in a sham bid or to refrain from bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference, with any person to fix the bid prices of the affidavit or any other bidder, or to fix any overhead, profit, or cost element of said bid price, or that of any bidder, or to secure any advantage against the Board of Education of Prince George’s County or any other person interested in the proposed contract; and that all statements in said proposal or bid are true. Signature of:

x___________________________________ (Bidder if the bidder is an individual)

x___________________________________

(Bidder if the bidder is a partnership) x___________________________________

(Bidder if the bidder is a corporation) Subscribed and sworn before me this ___day of _______.

x___________________________________ Notary Public

My commission expires: _________________________.

END OF BID FORM

CALLOUT HEAD

DOOR TYPE

KEYNOTE

REVISIONS

WINDOW TYPE

WALL TYPE

101

1

1

SIM

A102 A103

SECTIONS

1t

1

A102A108

ALIGN NOTE

T

R

U

E

N

O

R

T

H

N

1

A102A108

1

A102A108

1

A102A108

BUILDING

SECTIONS

EXTERIOR

ELEVATIONS

1

2

4

2

A-203

INTERIOR

ELEVATIONS

XX

VERT. ELEVATION

VIEW TITLE

GRID SYMBOL

0.00

-

ALIGN

NORTH ARROW

ROOM TITLE

101

ROOM

VOLUME

GRAPHIC SCALE

4 0 4 8

XX

INTERIOR PARTITION

GLAZING

LOW WALL PARTITION

EARTH / COMPACT FILL

POROUS FILL

CONCRETE

CONCRETE MASONRY

UNITS

BRICK

SAND

STONE

STEEL

RIGID INSULATION

BATT INSULATION

GYPSUM WALLBOARD

EXTERIOR SHEATHING /

PLYWOOD

FINISH WOOD

ACOUSTICAL TILE

VINYL TILE

View Name

1/8" = 1'-0"

1

SIM

A102A108

SECTION TITLE

VIEW TITLE

SYMBOLS

GENERAL DEMOLITION FLOOR PLAN NOTES

1. DEMOLITION WORK SHOWN IS BASED ON EXISTING FIELD VERIFIED CONDITIONS.

THE CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS AND IS

RESPONSIBLE FOR PERFORMING THE WORK AS INDICATED. IF ACTUAL CONDITIONS

DIFFER FROM CONDITIONS SHOWN ON THE DRAWINGS THE CONTRACTOR SHALL

NOTIFY THE ARCHITECT AND/OR THE OWNERS REPRESENTATIVE.

2. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS

DASHED LINES TO BE REMOVED. THE EXTENT OF DEMOLITION SHALL INCLUDE ALL

INCIDENTAL DEMOLITION WORK NECESSARY TO PROVIDE FOR NEW WORK SHOWN

AND SPECIFIED AND SHALL INCLUDE MECHANICAL, ELECTRICAL & PLUMBING ITEMS.

3. ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY INCLUDING

ANCHORS, HANGERS, FASTENERS, PIPES, CONDUIT, DUCTS, ETC. uNLESS OTHERWISE

INDICATED TO BE ABANDONED IN PLACE.

4. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL AND

MAINTAINING EMERGENCY EGRESS DURING DEMOLITION AND CONSTRUCTION.

5. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF

EXISTING BUILDING ELEMENTS TO REMAIN THROUGHOUT SEQUENCE OF WORK. ANY

DAMAGE TO EXISTING BUILDING CONDITIONS SHOWN TO REMAIN SHALL BE RESTORED

TO NEW CONDITION AT NO ADDITIONAL COST TO THE OWNER.

6. ANY ITEMS NOTED TO BE REMOVED OR DISTRUBED WHICH ARE ASBESTOS

CONTAINING MATERIALS SHALL BE THE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. GENERAL CONTRACTOR SHALL RETAIN AN ABATEMENT CONTRACTOR

FROM THE OWNERS APPROVED ABATEMENT CONTRACTOR LIST . THE GENERAL

CONTRACTOR SHALL NOTIFY THE OWNERS REPRESENTATIVE IF ANY HAZARDOUS

MATERIALS ARE ENCOUNTERED PRIOR TO OR DURING DEMOLITION.

7. GENERAL CONTRACTOR SHALL COORDINATE ALL WORK, LOCATIONS AND DATES

WITH THE OWNERS REPRESENTATIVE PRIOR TO START OF WORK.

8. GENERAL CONTRACTOR SHALL SUPPLY AND COORDINATE LOCATION OF

CONSTRUCTION DUMPSTER WITH OWNER PRIOR TO START OF WORK.

9. THE CONTRACTOR IS DIRECTED TO LOCAL CODES AND BUILDING REGULATIONS

TO FAMILIARIZE THEMSELVES WITH ALL RELATING TO DEMOLITION, INCLUDING, BUT

NOT LIMITED TO THE FOLLOWING: REMOVAL OF DEBRIS RESULTING FROM DEMOLITION,

GENERAL STAGING AND ACCESS TO AND FROM WORK AREA, BUILDING

MANAGEMENT RULES AND REGULATION.

10. REFER TO ALL OTHER DRAWINGS FOR INCIDENTAL DEMOLITION WORK NOT

NOTED ON THE DEMOLITION PLANS.

11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND

REMOVAL OF ALL EXISTING BUILDING COMPONENTS, MATERIALS, EQUIPMENT, AND

APPURTENANCES AS REQUIRED TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL

NEW CONSTRUCTION, WITH THE OWNER HAVING FIRST RIGHT OF REFUSAL ON ALL

REMOVED ITEMS.

12 ALL EXISTING SURFACES AND EQUIPMENT TO REMAIN SHALL BE PROTECTED

FROM DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL

BE SOLELY RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY DAMAGED

DONE BY HIM OR HIS SUB-CONTRACTORS.

13. IF FOUND PROPOSED OR ACTUAL DIMENSIONS, MEASUREMENTS, CEILING

HEIGHTS, ETC. CONFLICT WITH EACH OTHER, THE CONTRACTOR SHALL IMMEDIATELY

CONTACT THE ARCHITECT IN WRITING FOR CLARIFICATION PRIOR TO COMMENCING

WITH THE WORK. THE CONTRACTOR ASSUMES LIABILITY FOR ANY REPAIR OR

RETROFIT CAUSED BY WORK DONE WITHOUT CLARIFICATION.

14. COORDINATE DEMOLITION OF ALL STRUCTURAL ITEMS (COLUMNS, BEAMS,

JOISTS, SLABS, ETC.) WITH STRUCTURAL DRAWINGS. EXTENT OF DEMOLITION SHALL

BE IN ACCORDANCE WITH STRUCTURAL REQUIREMENTS AND COORDINATED WITH ALL

NEW WORK.

16. LINTELS, PORTIONS OF WALLS, ETC., SHALL NOT BE DISTURBED BY DEMOLITION

WORK, UNTIL THEY ARE RE SUPPORTED BY NEW WORK. TEMPORARY STRUCTURAL

SUPPORT INCLUDES SHORING, BRACING AND UNDERPINNING TO EXISTING

STRUCTURE AS REQUIRED.

17. CONC. SLABS TO REMAIN SHALL BE PATCHED, SCRAPED, LEVELED AND

CLEANED TO RECEIVE NEW FLOOR FINISHES. IN AREAS THAT ARE RECEIVING NEW

UNDERGROUND MECHANICAL, PLUMBING, ELECTRICAL OR ADDITIONAL FOUNDATION

WORK, SEE MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL AND

ARCHITECTURAL DRAWINGS TO DETERMINE EXTENT OF REQUIRED CUT AND PATCH OF

EXISTING SLAB. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL

CONC. SLAB DEMOLITION AND REPLACEMENT NECESSARY TO INSTALL THE NEW

WORK. BACK FILL ALL BELOW GRADE DEMOLITION WORK WITH FILL MEETING

STRUCTURAL REQUIREMENTS FOR NEW WORK.

18. CONCRETE SLAB PATCHES SHALL BE FLUSH WITH REMAINING SURFACE AND

MATCH TEXTURE OF EXISTING SURFACE. PATCHES SHALL BE PREPARED TO RECEIVE

NEW FINISHES. FOR PATCH AREAS LARGER THAN (4)FOUR SQUARE FEET PROVIDE

WELDED WIRE MESH.

19. WHERE FINISHES ARE INDICATED TO BE REMOVED, REMOVAL SHALL INCLUDE

GROUT, ADHESIVES, FASTENERS AND OTHER ITEMS USED TO ATTACHED FINISHES

TO THE SURFACES THEY COVER.

GENERAL FLOOR PLAN NOTES:

1. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE IN QUESTION, THE CONTRACTOR SHALL

BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE ARCHITECT BEFORE

CONTINUING WITH CONSTRUCTION.

2. DIMENSIONS SHOWN ON THE FLOOR PLANS ARE TO FACE OF GYP. BD., MASONRY,

CONCRETE, ETC., UNLESS OTHERWISE INDICATED OR DETAILED AND DO NOT INCLUDE

ANY APPLIED FINISHES. DIMENSIONS TO MASONRY ARE NOMINAL. ROUND OFF FOR WALLS

ARE TO THE NEAREST 1/8" UNLESS NOTED OTHERWISE.

3. FOR FURTHER DIMENSIONING, SEE LARGE SCALE PLANS, SECTIONS, EXTERIOR

ELEVATIONS AND INTERIOR ELEVATIONS.

4. LOCATE ALL DOORS 1'-6" ON THE PULL SIDE OF DOOR AND 1'-0" ON THE PUSH SIDE OF

THE DOOR FROM THE NEAREST PROJECTION. UNLESS OTHERWISE DIMENSIONED ON

PLANS.

5. ALL FIRE-RATED WALLS AND PARTITIONS SHALL EXTEND TO UNDERSIDE OF

CONSTRUCTION ABOVE AND SHALL BE INSTALLED SO AS TO ALLOW 1/2" DEFLECTION IN

STRUCTURE WHILE MAINTAINING THE INTEGRITY OF THE RATING.

6. ITEMS WITH A SURFACE AREA GREATER THAN 16 SQUARE INCHES SHALL NOT BE

RECESSED IN A RATED AND/OR RATED SMOKE WALL.COORDINATE WITH THE OWNERS

VENDORS TO INSURE THAT THERE ARE NO VENDOR FURNISHED ITEMS WITH A SURFACE

AREA GREATER THAN 16 SQUARE INCHES RECESSED IN RATED WALL OR RATED SMOKE

WALL.

7. WHERE A ONE HOUR PARTITION IS SHOWN AS A CONTINUATION OF A TWO-HOUR

PARTITION OR COLUMN ENCASEMENT, THE FACE OF THE GYPSUM BOARD SHALL BE

ALIGNED. STUDS SHALL BE OFFSET AND ADDITIONAL LAYERS OF GYPSUM BOARD SHALL

BE PROVIDED AS REQUIRED TO PROVIDE FACE ALIGNMENT OF GYPSUM.

8. ALL DEVICES INSTALLED IN FIRE-RATED PARTITIONS,FLOORS OR CEILINGS SHALL BE

CONSTRUCTED AS REQUIRED TO MAINTAIN INTEGRITY OF FIRE-RATING.

9. ALL CONCEALED SPACES IN WALLS, COLUMNS ENCLOSURES, BULKHEADS AND SIMILAR

LOCATIONS, NOT COMPLETELY FILLED WITH INSULATION, ARE TO BE FIRE STOPPED AT

THE CEILING LEVEL.

10. REFER TO MISCELLANEOUS DETAILS SHEET FOR TYPICAL DETAILS WHICH MAY APPLY

TO THIS FLOOR PLAN BUT MAY NOT BE SPECIFICALLY KEYED IN ON THIS PLAN OR TO A

SPECIFIC SECTION.

11. ALL GYP. BD. SHALL BE 5/8" THICK. GYPSUM BOARD SHALL EXTEND TO ROOF DECK IN

AREAS OF EXPOSED STRUCTURE. UNLESS NOTED OTHERWISE.

12. SEE REFLECTED CEILING PLAN FOR LOCATIONS OF CEILING FURR DOWNS AND

CEILING MOUNTED ITEMS.

HC.

HOLLOW CORE OR

HANDICAP ACCESSIBLE

WELDED WIRE FABRIC

VINYL COMPOSITION TILE

UNLESS OTHERWISE

NOTED

JANITOR

JANITOR'S CLOSET

HOLLOW METAL

HORIZONTAL

HOUR

HARDWOOD

INCH

HEATING VENTILATING

AND AIR CONDITIONING

INCANDESCENT

IN.

JAN.

JC.

INCAN.

HORIZ.

HDWD.

HR.

HVAC.

H.M.

U.O.N.

W.W.F.

W.

W/O

WT.

W/

WD.

V.C.T.

VERT.

WIDE

WEIGHT

WITHOUT

WOOD

WITH

VERTICAL

PANIC HARDWARE

PROPERTY LINE

PLASTIC LAMINATE

ROUGH OPENING

ELECTRIC WATER COOLER

FIRE EXTINGUISHER CABINET

GYPSUM

GENERAL CONTRACTOR

FLOOR

FLUORESCENT

FIRE HOSE CABINET

GC.

GYP.

F.H.C.

FLUOR.

FLR.

ELECTRICAL

ENCLOSURE

EACH

EXISTING

EXPANSION

EXTERIOR

FINISH FLOOR

EQUAL

EXIST.

F.E.C.

F.F.

EXP.

EXT.

ELEC.

ENC.

E.W.C.

EQ.

EA.

CONCRETE MASONRY UNIT

CORR.

CORRIDOR

DIMENSION

DOOR OPENING

DOWN

DRAWING

DINNING ROOM

D.O.

DWG.

DR

DN.

DIM.

CEILING

COLUMN

CLOSET

CONTINUOUS

CONSTRUCTION

CONCRETE

C.M.U.

CONST.

CONT.

CONC.

CLO.

COL.

CLG.

PLYWD.

REINF.

RESIL.

REQ 'D.

RECEP.

RM

R.O.

R.

R.D.

RAD.

PTD.

RECEPTACLE

REINFORCED

RESILIENT

ROOM

REQUIRED

ROOF DRAIN

RADIUS

RISER

PAINTED

PLYWOOD

P.LAM.

P.L.

PL.

P.H.

PLATE

PNT.PAINT

D

C

E

I

J/K

O

R

W

V

U

JOINTJT.

BLOCK

BOARD

BITUMINOUS

BEAM

BUILDING

BUILT-UP ROOFING

BRICK COURSE

BOTTOM

BLK'G

BC.

B.U.R.

BOT.

BLDG.

BM.

BD.

BIT.

B

ABOVE FINISH FLOOR

ACOUSTICAL CEILING TILE

ADDITIONAL

ALUMINUM

ADJUSTABLE

APPROXIMATELY

AFF

APPX.

ADJ.

ALUM.

ACT.

ADD.

A

CLEARCLR.

COMPRESSIBLECOMP.

CONTROL JOINT

CJ.

CAST-IN-PLACE

CIP.

CAST IRON

C.I.

CHALKBOARD

CBD.

CPT.

CARPET

CRS.

COURSES

CT.

CERAMIC TILE

ELEVATORELEV.

EXPANSION JOINTE.J.

ELEVATIONEL.

EQUIPMENTEQUIP.

FINISHED FLOOR TRANSITIONFFT.

FINISHFIN.

FACE OF CONCRETEFOC.

FACE OF FINISHF.O.F.

GYPSUM WALLBOARD

GLASSG.L.

GWB.

H

HIGH POINT

HEIGHT

HP.

HTG.

HEATERHTR.

INSULATION

INTERIOR

INSUL.

INT.

INCLUDING

INCL.

TOILET PAPER

T.O.C.

T.P.D.

T.O.W.

T.O.B.

TYP.

T.O.S

TR

TEL.

THK.

TH

TOP OF BEAM

TOP OF WALL

TOP OF SLAB

TOP OF CURB

TYPICAL

TELEPHONE

THICK

THRESHOLD

TREAD

TLT.TOILET

T

DISPENSER

ACOUSTICALACOUS.

ARCHITECTURALARCH.

BATHROOM

BA.

BULKHEAD

B.H.

BEDROOM

BR

CATCH BASIN

CB.

CABINET

CAB.

CHANNEL

C

CERAMIC

CER.

CLEARANCECLRE.

D

DEEP

D

DOUBLE

DETAIL

DOWN SPOUT

DRINKING FOUNTAIN

DET .

DBL.

DS.

D.F.

DRAWINGSDWGS

EXISTING

(E)

FINISH FLOOR ELEVATIONF.F.E.

FIXTURE

FLOW LINEF.L.

FIXT.

FACE OF MASONRYFOM.

FT.

FOOT/FEET

FR.

FIRE-RATED

FLOOR UTILITY BOXFUB.

FTG.

FOOTING

KITCHENKIT.

LAVATORYLAV

L

LINEN CLOSETLIN

LOW POINTLP.

LIVING ROOMLR.

MASONRYMAS.

M

MAXIMUMMAX.

GALVANIZED

GAUGE

GALV.

GA.

G

MECHANICALMECH.

MEZZANINEMEZZ.

MANUFACTURERMFR.

MANUFACTURERMFR.

MASONRY OPENING

MOUNTED

MISCELLANEOUS

MIN.

MTD.

M.O.

MISC.

MINIMUM

METAL

MTL.

GALVANIZED

GAUGE

GALV.

GA.

G

NUMBER

NOT IN CONTRACT

N/A

NO.

N.I.C.

NOT APPICABLE

N

OUTSIDE DIAMETER

OWNER FURNISHED

EQUIPMENT

OVERHEAD

ON CENTER

OPG.

O.R.OUTSIDE RADIUS

OPENING

OH.

OA.

OFE

OFF

O.D.

O.C.

OVERALL

OFFICE

P

SHT.

SIM.

SECT.

S.C.

S.D.

SCHED.

SECTION

SHEET

SIMILAR

SOAP DISPENSER

SCHEDULE

SOLID CORE

S

STL.

STOR.

STD.

SPEC.

S.S.

SQ./

STANDARD

STEEL

STORAGE

STAINLESS STEEL

SQUARE

SPECIFICATION

ST.STORIES

FIRE EXTINGUISHERF.E.

F

FLOOR DRAINFD.

FOUNDATIONFDN.

GENERAL DEMOLITION ROOF PLAN NOTES

1. CONTRACTOR IS TO FIELD VERIFY ALL DIMENSIONS.

2. REMOVE GRAVEL, BUILT-UP ROOF MEMBRANE AND FLASHINGS, AND INSULATION

DOWN TO EXISTING METAL DECK.

3. INSPECT METAL DECK FOR AREAS THAT NEED TO BE REPLACED. IN THE EVENT

DAMAGED METAL DECK IS DISCOVERED, PROVIDE A NEW UNIT COST TO OVERLAY

EXISTING METAL DECK WITH NEW DECKING MATCHING EXISTING PROFILE AND

GAUGE

4. REVIEW EXTENT OF DAMAGED DECK WITH OWNER/ ARCHITECT BEFORE

REPLACING

ABBREVIATIONS GENERAL NOTES

GENERAL DEMOLITION REFLECTED CEILING

PLAN NOTES

1. THE CONTRACTOR IS DIRECTED TO LOCAL CODES AND BUILDING REGULATIONS TO

FAMILIARIZE HIMSELF WITH ALL RELATING TO DEMOLITION, BUT NOT LIMITED TO THE

FOLLOWING:

1. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION.

2. USE OF EXISTING CORRIDORS IN OTHER AREAS OF THE BUILDING.

3. GENERAL STAGING AND ACCESS TO AND FROM AREA OF WORK.

4. BUILDING MANAGEMENT RULES AND REGULATIONS.

2. DEMOLISHED AND NON-SALVAGEABLE ITEMS NOT TO BE RE-USED SHALL BE REMOVED

FROM THE THE PREMISES EACH DAY, UNLESS DIRECTED OTHERWISE. REMOVE ITEMS SO

AS TO MINIMIZE DAMAGE TO EXISTING WORK TO REMAIN. REPAIR ALL EXISTING WORK SO

DAMAGED.

2. REMOVE CEILING TILE CAREFULLY. STORE CEILING TILE UNTIL WORK IS COMPLETED,

REINSTALL CAREFULLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY TILE THAT IS

DAMAGED BY THIS WORK. IF TILE IS DAMAGED,IT SHALL BE REPLACED BY THE

CONTRACTOR AT NO COST TO THE OWNER. ALL NEW TILE MUST MATCH EXISTING TILE.

3. WHEN CEILING TILE IS REMOVED, TEMPORARILY SUPPORT DEVICES LOCATED IN

CEILING, REINSTALL DEVICES IN REINSTALLED OR NEW CEILING ASSEMBLY.

4. REMOVE CEILING GRID SECTIONS AS NECESSARY TO WORK ABOVE THE CEILING.

REINSTALL.

5. PROVIDE TEMPORARY BARRIERS AS REQUIRED TO ASSURE SAFE CIRCULATION TO

ADJACENT SPACES THAT WILL REMAIN OCCUPIED DURING CONSTRUCTION. FREE AND

CLEAR ACCESS TO EGRESS ELEMENTS MUST BE MAINTAINED THROUGHOUT THE

PROJECT. SEAL ALL HVAC GRILLES AND VAV BOX INTAKES IN AFFECTED WORK AREA AS

REQUIRED. REPLACE ALL AFFECTED HVAC FILTERS AS REQUIRE. COORDINATE WITH

BUILDING MANAGER.

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-001

SYMBOLS, ABBREVIATIONS, AND

GENERAL NOTES

GAH

3

MA

TC

H L

IN

E S

EE

2

/ A

-1

07

DRAFTING # 1

DRAFTING # 2

RE

PR

OD

UC

TIO

N

RM

.

STOR # 2

MATH # 1

TYPING # 1

BUSINESS

ED # 1

BUSINESS

ED # 2

BUSINESS

ED # 3

COST

GIRLS

TOIL.#1

BOYS

TOIL.#1

CO

NF

.

MATH # 2

CO

NF

.

44

49

47

45

43B

41

42

40

43

STOR # 1

DRAFTING # 1B

44B

MA

TC

H L

IN

E S

EE

1

/ A

-1

07

MATH # 5

MATH # 6

COST

GIRLS

TOIL.#1

BOYS

TOIL.#1

CONF.

CONF.

CLASSROOM

# 14

CLASSROOM

# 13

CLASSROOM

# 12

CLASSROOM

# 11

CLASSROOM

# 10

CLASSROOM

# 9

MATH # 7

MATH # 8

CO

NF

.

28-C

CO

NF

.

29-C

29 27 25 23 21

28

26

24

22

20

24-C

22-C

ELEV.

CLG HGHT

8' - 0"

CLG HGHT

9' - 6"

GIR

LS

OU

TS

ID

E

TO

ILE

T

BO

YS

OU

TS

ID

E

TO

ILE

T

GIRLS LOCKER

ROOM

LA

UN

DR

Y

RO

OM

CLOSET

CUST

INSTRUCTORS

OFFICE

SHOWER &

DRESSING ROOM

GIRLS

TOILET

DRYING

ROOM

SHOWER

ROOM

DRESSING

ROOM

STORE

OU

TS

ID

E

ST

OR

AG

E

TOWEL

ROOM

EQ

UIP

ME

NT

ST

OR

AG

E

MECHANICAL

EQUIPMENT

EQ

.E

Q.

EQ

.E

Q.

EQ

.E

Q.

EQ

.E

Q.

EQ

.E

Q.

EQ

.E

Q.

EQ. EQ.

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-107

REFLECTED CEILING PLANS

GROUND FLOOR - PARTS A,B & E

REFLECTED CEILING PLAN - GROUND FLOOR - PART A

REFLECTED CEILING PLAN - GROUND FLOOR - PART B

REFLECTED CEILING PLAN - GROUND FLOOR - PART E

2

2

3

CLG HGHT

9' - 0"

CLG HGHT

9' - 0"

CLG HGHT

9' - 0"

MA

TC

H L

IN

E S

EE

2/ A

-10

8

MATCH LINE SEE 1/ A-109

MATCH LINE SEE1/ A-109

CLG HGHT

9' - 0"

CLG HGHT

9' - 0"

CLG HGHT

9' - 0"

CLG HGHT

9' - 0"

MA

TC

H L

IN

E S

EE

2

/ A

-1

08

MATCH LINE SEE 1/ A-109

MATCH LINE SEE 1/ A-110

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-108

REFLECTED CEILING PLAN - FIRST FLOOR - PART A

REFLECTED CEILING PLAN - FIRST FLOOR - PART B

REFLECTED CEILING PLANS

FIRST FLOOR - PARTS A&B

2

3

CLG HGHT

9' - 0"

CLASS RM.

CLASS RM.

CLASS RM.

BIOLOGY

BIOLOGY

PREP. RM.

PREP. RM.

STORE

STORE

BANK

DARK

RM.

PREP.

RM.

CHEM.

GR

OW

IN

G

RM

.

PHYSICS

DRIVER

TRAINING

DRIVER

TRAINING

BOILER RM.

CA

N W

AS

H

EN

GIN

EE

R

SWBD

KITCHEN

LAUNDRY

REFR.

M.T.

W.T.

OFF.

JAN.

GROWING

RM.

BIOLOGY

PHYSICAL SCI.

132

133

131

130

131S

104

106

105

105-C

CA

N W

AS

H

EN

GIN

EE

R

MA

TC

H LIN

E S

EE

1/ A

-1

10

MATCH LINE

SEE 1/ A-107

MATCH LINE

SEE 3/ A-107

MATCH LINE

SEE 1/ A-107

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-109

REFLECTED CEILING PLAN - FIRST FLOOR (PART C)

REFLECTED CEILING PLAN- FIRST

FLOOR - PART C

2

3

CLG HGHT

11' - 0"

CLG HGHT

9' - 0"

CLG HGHT

9' - 0"

CLG HGHT

9' - 0"

CLG HGHT

11' - 0"

CLG HGHT

9' - 0"

CLASS RM.

CLASS RM.

ST

OR

BUSINESS ED.

TYPING

TYPINGOFFICE

PRACTICE

BANK

BOYS'

TOILET

GIRLS'

TOILET

JAN.

BUSINESS ED.

BOOKKEEPING

HEALTH

WALT.

T. T.

SOUND

VAULT

V.PRIN.

CONF.

CONF.

GUIDANCE

VAULT

PRIN.

STOR.

V.P

RIN

.

T.

GENERAL OFF.

BOYS'

RECOVERY

NURSE

CONF.

GIRLS'

RECOVERY

STUDENT

ACTIVITY

114

112

110

111

113

115

105

103

102

MA

TC

H L

IN

E S

EE

1

/ A

-11

1

MATCH LINE SEE 2/ A-107MA

TC

H L

IN

E S

EE

1

/ A

-1

09

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-110

REFLECTED CEILING PLAN- FIRST

FLOOR - PART D

REFLECTED CEILING PLAN - FIRST FLOOR (PART D)

2

3

CLG HGHT

9' - 0"

CLG HGHT

11' - 0"

CLG HGHT

9' - 0"

CLG HGHT

11' - 0"

CLG HGHT

9' - 0"

EXIST. MECH

EQUIP.

OUT

STORE

STORE

BOYS'

TOIL.

GIRLS'

TOIL.

EXERCISE RMS.

GYM

EQUIP.

TEAM RM.

LOUNDRY

UN

IF

OR

M

DR

YIN

G

UNIFORM

STORE

TO

WE

LS

INSTRUCT

BOYS'

LOCKER

EQUIP.

SHOWERS

DR

YIN

G

T.

T.

GYMNASIUM

MATCH LINE SEE 2/ A-111

MA

TC

H LIN

E S

EE

1/ A

-11

0

EQUIP.

STOR.

GIRLS' GYMNASIUM

MATCH LINE SEE 2/ A-111

MA

TC

H L

IN

E S

EE

1/ A

-11

0

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-111

REFLECTED CEILING PLAN - FIRST FLOOR - PART E (SOUTH)

REFLECTED CEILING PLANS

FIRST FLOOR - PARTS E

REFLECTED CEILING PLAN - FIRST FLOOR - PART E (NORTH)

2

2

2

2

STOR

SERV'G

AREA

DISH

WASH

SERVING

AREA

CAFETERIA

SN

AC

K B

AR

CH

AIR

ST

OR

E

STAGE

FOUNDRY

METAL SHOP

PROJECT

STOR.

TOOL &

STOCK

GRAPHIC ARTS

WOOD SHOP

J.T. T.

TOOL &

SUPPLY

STORAGE

STORAGE

TR

AN

S M

IT

'

ELECTRONICS

SHOP

PRACTICE

(FORMERLY STORAGE)

MU

SIC

C

.R

.

(F

OR

ME

RLY

DR

AF

TIN

G R

M.)

ST

OR

AG

E (F

OR

ME

RLY

RE

PR

OD

UC

TIO

N R

M.)

ST.

MUSIC

MUSIC

LIBR.

BAND

INSTR.

STOR.

PRACTICE

GIRLS TOILET

SNACK BAR

COMMONS AND

LUNCH ROOMS

BOYS TOILET

155

156

154

154S

152A

152B

150

153

151

151S

LO

DIN

G

DO

CK

OFFICE

OFFICE

MATCH LINE SEE 1/ B-108

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-112

REFLECTED CEILING PLANS - FIRST

FLOOR - PART F

REFLECTED CEILING PLAN - FIRST FLOOR - PART F

2

2

3

CLASS RM.

CLASS RM.

READING &

STUDY

SKILLS

BIOLOGY

BIOLOGY

PREP. RM.

ST

OR

AG

E

GIRLS TOIL.BOYS TOIL.

CUST.

CO

NF

.

MATHCLASS RM.

CLASS RM. CLASS RM.

STUDENT

ACTIVITY

CONF.

CONF.

VICE

PRIN.

VICE

PRIN.

CO

NF

.

STUDY RM.

STR.

GUIDANCE

OFF.

OFF.

OFF.

249

247

245243

241

248

246

244

242

247-C

245-C

242S

242-C

240

MA

TC

H L

IN

E S

EE

1

/ A

-1

09

MATCH LINE SEE 1/ A-110MATCH LINE SEE 1/ A-110

CLASS RM.

CLASS RM.

PHYSICS LAB

PR

EP

.

RM

.

STORAGE

CO

NF

.

GIRLS

TOIL.

BOYS

TOIL.

CUST.

HOMES ECONOMICS

LANGUAGE LAB

ADMIN

OFFICE

VIC

E

PR

IN

.

T.

GUIDANCE

OFF.

OFF.

LA

NG

UA

GE

ST

OR

E

PH

YS

IC

AL S

CIE

NC

E

ART

AR

T S

TO

RE

CHEM STORE

FOOD STORE

FURN. STORE

224

225

223

221

222

220

222S

214

CO

NF

.

STAIR #4

MA

TC

H L

IN

E S

EE

1

/ A

-10

9

MATCH LINE SEE 1/ A-110 MATCH LINE SEE 1/ A-110

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-113

REFLECTED CEILING PLANS

SECOND FLOOR - PARTS A&B

REFLECTED CEILING PLAN - SECOND FLOOR - PART A

REFLECTED CEILING PLAN - SECOND FLOOR- PART B

2

3

CLG HGHT

8' - 0"

CLG HGHT

9' - 6"

CLG HGHT

10' - 0"

CLG HGHT

9' - 0"

READING &

CLASS RM.

TOILET

#2

TEACHERS

ART #1

STORAGE #2

STOR

STOR #8

FOODS

ART

STORAGE

STORAGE #1

KIT.

HOME

MANAGEMENT

LANGUAGE LAB

CUST.

WORKTOILET

#1

GIRLS

TOIL.

BOYS

TOIL.

LO

CK

ER

S

#2

LAUNDRY

CLOTHING

233

231

232

232S

230S

230

209

LOCKERS

#1

LAUNDRY

STOR #9

T.

#3

MATCH LINE SEE 1/ A-109

MA

TC

H LIN

E S

EE

1/ A

-1

10

MATCH LINE SEE 1/ A-111

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-114

REFLECTED CEILING PLAN - SECOND FLOOR (PART C)

REFLECTED CEILING PLAN-

SECOND FLOOR - PART C

2

3

CLG HGHT

10' - 0"

CLG HGHT

9' - 0"

CLG HGHT

9' - 0"

CLG HGHT

10' - 0"

CLG HGHT

10' - 0"

STOR.

OF

F.

TEACHERS

LIBRARY

AUDIO VISUAL

MEDIA CENTER

LIBRARY C.R.

250

LOCKERS

#1

STAIR #7

MATCH LINE SEE 2/ A-111

CLG HGHT

9' - 0"

CLASS RM.

STOR

STOR.

MATH

CLASS RM.

MATH

MATH

MATH

LANGUAGE LAB

LANGUAGE STORE

TOILET

#1

WORK

C.R.

C.R.

C.R.

C.R.

STOR.

CONF.

JAN.

GIRLS TOILET

BOYS TOILET

STUDENT

ACTIVITY

C.R.

C.R.

C.R.

AUDIO VISUAL

LIBRARY WORK RM.

214

215

213

211

212

210

209

S-6

201

203

205

207

S-5

200

202

204

206

206-C

LOCKERS

#1

CO

NF

.

STAIR #5

STAIR #3

STAIR #4

MA

TC

H L

IN

E S

EE

1

/ A

-11

2

MATCH LINE SEE 1/ A-111

MATCH LINE SEE 2/ A-209

MA

TC

H L

IN

E S

EE

1

/ A

-1

10

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-115

REFLECTED CEILING PLAN-

SECOND FLOOR - PART D

REFLECTED CEILING PLAN - SECOND FLOOR (NORTH)REFLECTED CEILING PLAN - SECOND FLOOR (SOUTH)

2

3

BOTT. BEAM (TYP.)

22'-9"

RIDGE OF CONC.

BEAM (TYP.)

27 - 5"

BOTT. BEAM (TYP.)

22' - 9"

RIDGE OF CONC.

BEAM (TYP.)

27' - 5"

STORAGE

DRESSING

SHOWERS DRYING

BOY'S LOCKER

TOWELS

INST.

T.

UPPER PART

OF GYM

MATCH LINE SEE 2/ A-112

MA

TC

H L

IN

E S

EE

2

/ A

-11

1

EQ

.E

Q.

EQ

.E

Q.

EQ

.E

Q.

3'-6

"

2'-4"

UPPER PART

OF GIRLS GYM

MATCH LINE SEE 1/ A-112

9901 Business Parkway, Suite H

Lanham, Maryland 20706

Ph. No. 301-967-1719 Fax No. 301-967-1766

50155-0005

Project No.

Drawn By:

Checked By:

Scale:

Date:

Sheet Title

Project Name

Sheet Number

Project Adress

Revision

DateDescriptionNo.

SIGN & SEAL“ Professional Certification.: I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed Professional Engineer under the laws of the State of Maryland.License No. 13313, Expiration Date: 2/01/2017."

AS NOTED

PERMIT SET

PERMIT COMMENT

RESPONSES

PEER REVIEW/DGS COMMENTS

BID FINAL

A-116

REFLECTED CEILING PLAN - SECOND FLOOR - PART E (SOUTH)

REFLECTED CEILING PLANS

SECOND FLOOR - PART E

REFLECTED CEILING PLAN - SECOND FLOOR - PART E (NORTH)