Amendment No. 1 – 07/19/2018 Project No. CCR-17-5390 Page 1 of 2 AMENDMENT NO. 1 TO THE PLANS AND SPECIFICATION FOR 2252 KA’A’IKE, APO LEO STUDIO RENOVATION UNIVERSITY OF HAWAII, MAUI COLLEGE 310 W. KAAHUMANU AVENUE KAHULUI, HAWAII 96732 PROJECT NO. CCR-17-5390 TAX MAP KEY: 38007040 MAUI, HAWAI‘I FOR THE FACILITIES AND ENVIRONMENTAL HEALTH UNIVERSITY OF HAWAII – COMMUNITY COLLEGES DATE July 19, 2018 This amendment modifies the original Solicitation Documents for the Project dated July 2, 2018. The items in this amendment shall govern the work, taking precedence over previously issued specifications and drawings governing the items mentioned. A. CHANGES TO ATTACHMENT 1 TECHNICAL SPECIFICATIONS: The following pages of the Solicitation Documents are revised: 1. New Sections: The following new specification sections are issued: a. SECTION 08715 – High Security Keying System, 1-3 pages. 2. Revised Sections: The following previously issued specification sections are revised: Revised pages are attached for insertion in the Specifications. a. SECTION 01010 – Summary of Work Part 1-1.02 B], page 1 b. SECTION 1300 –Submittals, Submittal List – 08715 added c. SECTION 08710 – Door Hardware, Part 3 – 3.06 HDW GROUP-001 pp 7-9. d. TECHNICAL SPECIFICATIONS Table of Contents p 2. 3. Deleted Sections: The following specifications have been deleted. a. SECTION 03300 – Cast-in Place Concrete.

Transcript of AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly...

Page 1: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

Amendment No. 1 – 07/19/2018 Project No. CCR-17-5390 Page 1 of 2

AMENDMENT NO. 1

TO THE PLANS AND SPECIFICATION FOR 2252 KA’A’IKE, APO LEO STUDIO RENOVATION UNIVERSITY OF HAWAII, MAUI COLLEGE 310 W. KAAHUMANU AVENUE KAHULUI, HAWAII 96732 PROJECT NO. CCR-17-5390 TAX MAP KEY: 38007040 MAUI, HAWAI‘I

FOR THE FACILITIES AND ENVIRONMENTAL HEALTH UNIVERSITY OF HAWAII – COMMUNITY COLLEGES

DATE July 19, 2018 This amendment modifies the original Solicitation Documents for the Project dated July 2, 2018. The items in this amendment shall govern the work, taking precedence over previously issued specifications and drawings governing the items mentioned. A. CHANGES TO ATTACHMENT 1 TECHNICAL SPECIFICATIONS: The following

pages of the Solicitation Documents are revised: 1. New Sections: The following new specification sections are issued:

a. SECTION 08715 – High Security Keying System, 1-3 pages.

2. Revised Sections: The following previously issued specification sections are revised: Revised pages are attached for insertion in the Specifications.

a. SECTION 01010 – Summary of Work Part 1-1.02 B], page 1 b. SECTION 1300 –Submittals, Submittal List – 08715 added c. SECTION 08710 – Door Hardware, Part 3 – 3.06 HDW GROUP-001 pp 7-9. d. TECHNICAL SPECIFICATIONS Table of Contents p 2. 3. Deleted Sections: The following specifications have been deleted. a. SECTION 03300 – Cast-in Place Concrete.

Page 2: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

Amendment No. 1 – 07/19/2018 Project No. CCR-17-5390 Page 2 of 2

B. CHANGES TO ATTACHMENT 1A DRAWINGS: 3. Revised Drawings: The following previously issued drawings dated May 31,

2018, are revised and reissued. These revised drawings supersede the previously issued drawings:

Sheet Group Sheet

No. Sheet Name or Description ARCHITECTURAL A001 Existing Overall Building Plan A003 Floor Plan & RCP A005 Door Schedule, Legend & Details A007 Interior Elevations STRUCTURAL S001 Framing Plan MECHANICAL M-1 AC Ventilation Plan & revised A/C –Vent’s Plan M-2 AC Ventilation Details & Const. Notes M-3 Section, Equipment Schedule & Details INTERIOR ID-01 Graphics

D. CLARIFICATIONS:

1. Clarify the existing fire alarm system manufacturer. “Simplex” addressable fire alarm system.

2. Will there be a permit on this project? Yes. This project has a permit. BT2018-0257 3. Does the existing switchboard 2SB need to be brought up to 2008 code

standards? Not required.

END OF AMENDMENT NO.1

Page 3: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

07-16-2018

TECHNICAL SPECIFICATIONS

Table of Contents Project No. CCR-17-5390 page -2

DIVISION 7 THERMAL AND MOISTURE PROTECTION

Section 07216 Blanket, Batt Insulation ..................................................................... 1 – 7

Section 07210 EIFS……………………………………… ….…………………..... . . 1 -14

Section 07900 Joint Sealants.................................................................................... 1 – 4

DIVISION 8 DOORS AND WINDOWS

Section 08211 Flush Wood Doors............................................................................. 1 – 4

Section 08370 Sound Control Door Assemblies.................................................... 1 - 9

Section 08710 Door Hardware……………......................................................... .... 1 – 8

Section 08715 High Security Keying………………..…………………………………… 1 - 3

Section 08720 Seals-Perimeter Gasketing…………………………………………..…..1 - 4

Section 08800 Glazing…………………………………………………………… ……..1 - 8

DIVISION 9 FINISHES

Section 09260 Gypsum Board Assemblies................................................................ 1 – 5

Section 09510 Acoustical Ceilings………………………………………………………...1 - 4

Section 09680 Carpet Tile…….................................................................................. 1 – 8

Section 09800 Acoustical Treatment……………………………………………......…..1 - 11

Section 09900 Painting……………………............................................................... 1 - 11

DIVISION 10 SPECIALITIES (NOT USED)

DIVISION 11 EQUIPMENT (NOT USED)

DIVISION 12 FURNISHING (NOT USED)

DIVISION 13 SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14 CONVEY SYSTEMS (NOT USED)

DIVISION 15 MECHNICAL

Section 15800 Air Conditioning and Ventilation.................................................... .. 1 - 15

DIVISION 16 ELECTRICAL

Section 16400 Electrical........................................................................................... 1 – 7

TOTAL TECHNICAL SPECIFICATION PAGES 205

END TABLE OF CONTENTS

Page 4: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

07-16-2018

TECHNICAL SPECIFICATIONS

Summary of Work Project No. CCR-17-5390 01010-1

SECTION 01010 - SUMMARY OF WORK PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS As specified in SECTION 01001-GENERAL REQUIREMENTS 1.02 SUMMARY OF PROJECT A. The work to be done shall include performing all operations and

furnishing all equipment, fixtures, appliances, tools, materials, and labor necessary to execute, complete, and deliver all of the work and related items required for the project as called for on the drawings and as hereinafter specified.

B. The project site is University of Hawaii Maui College: 2252 Ka’a’ike, 310 Kaahumanu Ave. Kahului, HI. C. The project shall in general consist of but not limited to selective

demolition and construction related to the interior renovation of an existing classroom consisting but not limited to: treated rough carpentry, finish carpentry, interior insulation, gypsum board, acoustical ceilings, floor finishes, acoustically tested doors and hardware, wood doors, wood windows with specified glazing, painting, electrical fixtures and wiring, air conditioning rerouting and new equipment installation and balancing, audio-visual work.

D. Contractor shall visit the job site and make certain that he understands

the extent of the work and existing job conditions before he submits a formal bid.

1.03 CODES AND ORDINANCES The Contractor shall comply with all Federal, State, and local laws, ordinances,

rules, and regulations pertaining to the project and shall obtain and pay for all permits, licenses, and certificates and publish or post all notices required.

1.04 SCHEDULING AND COORDINATION A. The premises will be occupied by the faculty, staff, and students of the

University of Hawai‘i Maui College.

Page 5: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

06-07-2018

TECHNICAL SPECIFICATIONS

Submittals Project No. CCR-17-5390 01040-5

SUBMITTAL LIST PROJECT NAME: UHMC Apo Leo Recording Studio Renovation & Programming PROJECT NO.: CCR-17-5360

ITEM NO. SECTION PR

OO

F O

F C

ERTI

FIC

ATIO

N P

RIO

R T

O B

ID O

PEN

ING

SCH

EDU

LE O

F W

OR

K (C

PM)

WEE

KLY

ACTI

VITY

SC

HED

ULE

SHO

P D

RAW

ING

S

PRO

DU

CT

DAT

A - M

ANU

FAC

TUR

ER’S

LIT

ERAT

UR

E

CER

TIFI

CAT

ES

GU

ARAN

TEES

/WAR

RAN

TIES

GU

ARAN

TEES

/WAR

RAN

TIES

EXC

EED

ING

2 Y

EAR

S

PRE

QU

ALIF

ICAT

ION

/QU

ALIT

Y AS

SUR

ANC

E C

ERTI

FIC

ATIO

N

REC

OR

D D

RAW

ING

S

MIS

CEL

LAN

EOU

S

1 01010 - Summary of Work X X X X 2 01040 – Coordination X 3 01300 - Submittals X X X X X

4 01700 - Closeout X X X X X 5 03300 – Cast –in Place Concrete X 6 06100 – Rough Carpentry X 7 06311 – Finish Carpentry X 8 06311 – Preservative Treated Lumber X X X 9 07210 – Building Insulation X 10 07900 – Joint Sealants X X 11 07210 - EIFS X X X X X X 12 08211 – Flush Wood Doors X X X 13 08215 – Acoustical Doors X X X X 14 08710 – Door Hardware X X 15 08715 – High Security Keying System X X X X

Page 6: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

06-07-2018

TECHNICAL SPECIFICATIONS

Submittals Project No. CCR-17-5390 01040-6

ITEM NO. SECTION PR

OO

F O

F C

ERTI

FIC

ATIO

N P

RIO

R T

O B

ID O

PEN

ING

SCH

EDU

LE O

F W

OR

K (C

PM)

WEE

KLY

ACTI

VITY

SC

HED

ULE

SHO

P D

RAW

ING

S

PRO

DU

CT

DAT

A - M

ANU

FAC

TUR

ER’S

LIT

ERAT

UR

E

CER

TIFI

CAT

ES

GU

ARAN

TEES

/WAR

RAN

TIES

GU

ARAN

TEES

/WAR

RAN

TIES

EXC

EED

ING

2 Y

EAR

S

PRE

QU

ALIF

ICAT

ION

/QU

ALIT

Y AS

SUR

ANC

E C

ERTI

FIC

ATIO

N

REC

OR

D D

RAW

ING

S

MIS

CEL

LAN

EOU

S

16 09260 – Gypsum Board Assemblies X X X 17 09680 – Carpet Tile X X X X 18 09900 – Painting X X X 19 15880 – Air Conditioning X X X X X X 20 16400 – Electrical X X X X PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED)

END OF SECTION

Page 7: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

07-16-2018

TECHNICAL SPECIFICATION Door Hardware

Project No. CCR-17-5390 08710-7

appearance, finish and successful operation, assuming joint responsibility of the materials and installation with the Contractor.

B. Inform the University five (5) working days minimum before performing an

operational testing so that it can be witnessed. 3.04 ADJUSTING A. Adjust hardware for smooth operation. 3.05 ACCEPTANCE A. Demonstrate to the University Representative and the Architect that each

lock functions properly as intended, and together with both inspect each lock. Adjust or replace each hardware item not properly functioning at no additional cost to the State.

B. Inspect each other hardware item and demonstrate to the University

Representative and the Architect that each functions properly as intended. Adjust or replace each hardware item not properly functioning at no additional cost to the State.

3.05 PROTECTION OF FINISHED WORK A. After installation, protect the hardware from paint, stains, blemishes, and

other damage until acceptance of the Work. B. Do not permit adjacent work to damage hardware or finish. 3.06 FINISH HARDWARE SCHEDULE A. Manufacturers and their abbreviations used in this schedule: MANUFACTURER LIST CATEGORY VENDOR NAME MFG REMOVABLE CORE CYL. BY DORMAKABA USA, INC. BES HINGE BY McKINNEY PRODUCTS COMPANY MCK AUTO. DOOR BOTTOM BY PEMKO PEM DOOR SEAL BY PEMKO PEM THRESOLD BY PEMKO PEM DOOR STOP BY ROCKWOOD MANUFACTURING CO. ROC CLASSROOM LOCKSET BY SARGENT MANUFACTURING COMPANY SAR DOOR CLOSER BY SARGENT MANUFACTURING COMPANY SAR ELEC. STOREROOM LOCK BY SARGENT MANUFACTURING COMPANY SAR OFFICE LOCKSET BY SARGENT MANUFACTURING COMPANY SAR ELEC. POWER TRANSFER BY SECURITRON MAGNALOCK CORP. SEC POWER SUPPLY BY SECURITRON MAGNALOCK CORP. SEC

Page 8: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

07-16-2018

TECHNICAL SPECIFICATION Door Hardware

Project No. CCR-17-5390 08710-8

HW GROUP - 001 1.0 EA ELEC. POWER TRANSFER EPTL SEC 1.0 EA ELEC. STOREROOM LOCK 72-73-8271 LNL US26D WBX SAR 1.0 EA REMOVABLE CORE CYL. 1C7 CORMAX 626

(SUPPLIED UNDER 08715) BES 1.0 EA DOOR CLOSER 351 O EN SAR 1.0 EA DOOR STOP 445H 626 ROC 1.0 EA POWER SUPPLY BPS-24-2 SEC LOCATE POWER SUPPLY AS DIRECTED CAM LIFT HINGES, DOOR SEALS, DOOR BOTTOM AND THRESHOLD BY STC DOOR MANUFACTURER PER SECTION 08370 REUSE EXISTING CARD READER WIRING BY ELECTRICAL CONTRACTOR HW GROUP - 002 1.0 EA CLASSROOM LOCKSET 72-73-8237 LNL US26D WBX SAR 1.0 EA REMOVABLE CORE CYL. 1C7 CORMAX 626

(SUPPLIED UNDER 08715) BES 1.0 EA DOOR CLOSER 351 O EN SAR 1.0 EA DOOR STOP 445H 626 ROC CAM LIFT HINGES, DOOR SEALS, DOOR BOTTOM AND THRESHOLD BY STC DOOR MANUFACTURER PER SECTION 08370 HW GROUP - 003 1.0 EA OFFICE LOCKSET 72-73-8205 LNL US26D WBX SAR 1.0 EA REMOVABLE CORE CYL. 1C7 CORMAX 626 (SUPPLIED UNDER 08715) BES 1.0 EA DOOR CLOSER 351 O EN SAR 1.0 EA DOOR STOP 445H 626 ROC CAM LIFT HINGES, DOOR SEALS, DOOR BOTTOM AND THRESHOLD BY STC DOOR MANUFACTURER PER SECTION 08370 HW GROUP - 004 3.0 EA HINGE T4A3386 4.5 X 4.5 US26D MCK 1.0 EA OFFICE LOCKSET 72-73-8205 LNL US26D WBX SAR VERIFY LOCKSET FUNCTION REQUIRED 1.0 EA REMOVABLE CORE CYL. 1C7 CORMAX 626

(SUPPLIED UNDER 08715) BES 1.0 EA DOOR CLOSER 351 O EN SAR 1.0 EA AUTO. DOOR BOTTOM PDB411AE 36" PEM

Page 9: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

07-16-2018

TECHNICAL SPECIFICATION Door Hardware

Project No. CCR-17-5390 08710-9

2.0 EA DOOR SEAL 29310 CS 84" @ JAMBS PEM 1.0 EA DOOR SEAL 29310 CS 36" @ HEAD PEM 1.0 EA DOOR STOP 445H 626 ROC 1.0 EA THRESOLD 2007STC X Q380 36" PEM

VERIFY THRESHOLD TYPE REQUIRED

END OF SECTION

Page 10: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

High Security Keying System 08715-1

Project No.: CCR-17-5630

7/16/2018

SECTION 08715 - HIGH SECURITY KEYING SYSTEM PART 1 -GENERAL 1.01 GENERAL REQUIREMENTS

A. As specified in GENERAL REQUIREMENTS Section 01001.

1.02 SUMMARY A. Provide all materials, labor, equipment, and tools necessary for high security cylinders

(see Hardware Groups in Section 08710 - FINISH HARDWARE) and keys for all locksets, to match the Maui Community College Campus key system - Best Cormax high-security key system.

B. Related Work Described Elsewhere: Section 08710 - FINISH HARDWARE for locksets, construction cylinders and construction keys.

1.03 SUBMITTALS

A. Submit in accordance with Section 01300 - SUBMITTALS. B. Manufacturer's Data: Submit manufacturer's descriptive data for verification purposes. C. Keying Schedule: Keying of locks shall be as indicated on a University of Hawaii Key

Schedule form submitted by the supplier with information obtained from the University of Hawaii Community Colleges, Facilities & Environmental Health Office. Door designations shall be the same as those used on drawings and hardware schedule.

D. Project Record Documents: Record of actual door locations of installed cylinders and their master key codes for submittal to the University.

1.04 DELIVERY

A. Delivery: Coordinate delivery to appropriate locations (shop or field). Permanent keys and cores to be installed by Contractor and accepted by the University.

B. Acceptance at Site: Items individually packaged in manufacturers' original containers, complete with proper fasteners and related pieces. Clearly mark packages to indicate content, locations in hardware schedule and door numbers.

C. Storage: Provide securely locked storage area for hardware, protect from moisture, sunlight, paint, chemicals, dust, excessive heat and cold, etc.

1.05 REPRESENTATIVE

A. Provide services of a qualified hardware specialist who is familiar with installation and operation of Campus Best Cormax high security key system. Representative shall be available for meetings with University of Hawaii Representatives and Contractor, to establish keying system.

Page 11: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

High Security Keying System 08715-2

Project No.: CCR-17-5630

7/16/2018

PART 2 -PRODUCTS 2.01 CYLINDERS AND KEYING

A. Manufacturer:

1. Scheduled Manufacturer: Best Cormax, No Substitute. B. Requirements: Provide cylinders/cores complying with the following

requirements. 1. Cylinders/cores compliant with ANSl/BHMA A 156.5; latest revision,

Section 12, Grade 1; permanent cylinders; cylinder face finished to match lockset, manufacturer's series as indicated.

a. High Security: Best Cormax cylinder, high security, dual-locking cylinder with permanent interchangeable core requiring distributor exclusive, restricted, patented keyway.

2. Keying:

a. Manufacturer-keyed permanent cylinders/cores, configured into campus keying system.

b. Permanent Keys: Quantity 6 ea. 3. Features: Cylinders/cores shall incorporate the following features.

a. Patent Protection: Cylinders/cores requiring use of restricted, patented keys, patent-protected until the year, 2029.

4. Identification:

a. Mark permanent cylinders/cores and keys with applicable blind code per DHI publication "Keying Systems and Nomenclature" for identification. Blind code marks shall not include actual key cuts.

b. Identification stamping provisions must be approved by the Architect and University.

c. Failure to comply with stamping requirements shall be cause for replacement of cylinders/cores involved at no additional cost to the University.

PART 3 -EXECUTION 3.01 PRE-INSTALLATION MEETING

A. Call for a "pre-installation" meeting between Contractor, hardware installer, and hardware manufacturer's representative or supplier or competent hardware specialist, the Architect, and the University to review the hardware installation instructions and installation conditions.

3.02 INSTALLATION, GENERAL

A. Remove temporary construction cylinders/cores. B. Install permanent cylinders/cores in compliance with the manufacturer’s

instructions and recommendations.

3.03 CYLINDER SUPPLIER'S INSPECTION A. Verify the installation and operation of the hardware and cylinders/keys to final

Page 12: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

High Security Keying System 08715-3

Project No.: CCR-17-5630

7/16/2018

acceptance. B. All keys cut for the project shall be tested to ensure proper operation with a

designated University representative present during testing. C. After all required permanent keys have been tested in cylinders to ensure proper

operation, keys shall be delivered to the designated University representative. D. Instruct the University's staff on the cylinders maintenance procedures (type of

lubricant needed and frequency of maintenance).

HARDWARE SCHEDULE See Section 08710 – Door Hardware

END OF SECTION

Page 13: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

1 2 3 4 5 6 7 8 9 10180' - 0"

A

B

C

D

E

F

G

20' - 0" 20' - 0" 20' - 0" 20' - 0"20' - 0"

20' - 0" 20' - 0" 20' - 0" 20' - 0"

20' -

0"20

' - 0"

20' -

0"20

' - 0"

20' -

0"20

' - 0"

2' - 1

0"

8' - 0

"

30' - 4" 5' - 0" 10' - 4" 6' - 8" 36' - 8"

8 1/2"

23' -

3 1/2"

73' -

4 1/2"

3' - 4

"

12' -

10 1/

2"36

' - 6"

24' -

0"

5' - 6"

20' -

0"5'

- 0"

20' -

0"5'

- 0"

11' -

2"8'

- 0"

19' -

6"5'

- 6"

7' - 2" 25' - 0" 8' - 2"

8' - 8" 6' - 8"1' - 10"

8' - 0

"7'

- 4"

9' - 10"

8' - 7

7/8"

17' -

8"

12' - 0"

6' - 0

"

7' - 4" 12' - 8"

2' - 6 1/2"6' - 11 1/2"

1' - 0"

6' - 11 1/2"2' - 6 1/2"

5' - 6"6' - 8" 36' - 8"

29' - 6"

14' - 0"14' - 0"

5' - 6

"18

' - 6"

30' - 4" 5' - 0"

8' - 0"

10' - 0" 10' - 0"

TYP

16' -

7 1/2"

30' - 0"30' - 0"

3' - 0"3' - 0"

CORRIDOR

MEN

GENUTIL

WOMENELEC RM

ELEV

ELEV

T.V. PRODUCTION STUDIO

SHOP

VIDEO CONF. RM

PRODUCTION CONTROL

VESTIBULE

LOBBY

STAIR

H.I.T.S CLASSROOM

SKYBRIDGE CLASSROOM

CABLE T.V. CLASSROOM

SKYBRIDGE CLASSROOMPRODUCTION MGR

MASTER CONTROL RM

VESTIBULE

CORRIDOR

CORRIDOR

CORR

IDOR

MACH RM

GARAGE/STUDIO STORAGE

COMPUTER GRAPHICS VIDEO EDIT 'A' STAFF VIDEO EDIT 'B' TRANSMISSION EQPT

STAIR

VEST

IBUL

EVE

STIB

ULE STOR

STOR

Room111

Room112

NEW DRYWELL

EXISTING PANELS

MECH RM ABOVE

AREA OF WORK

MIN

5' - 0

"

SEE MECH DWGS

11

4' - 0

"

7' - 0"

THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY

UNIVERSITY OF HAWAII

AS NOTED

STATE OF HAWAIII

725 KAPIOLANI BOULEVARD, SUITE C400HONOLULU, HAWAII 96813PHONE (808) 592-2345FAX (808)[email protected]

ARCHITECT

CONSULTANT

DRAWING TITLE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

DRAWING SCALE:

UH PROJECT NO.

DATE

SHEET NO.PHASE:WCIT PROJECT NO.

PROJECT

ROBERT K. IOPA, AIA LICENSE EXPIRES APRIL 30, 2018CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AT JOB BEFORE PROCEDING WITH WORK

professional stamp and signature

0' 1' 2' 4' 8'

SCALE : 1/8" = 1'-0"

of 16

FINAL

RCF

RCF

MH

Approver

17127

5/31/18

A001

EXISTING OVERALL BUILDING PLAN

APO LEO STUDIORENOVATION

CCR-17-5390

SCALE: 1/8" = 1'-0"1 KA'A'IKE BUILDING - OVERALL PLAN -GROUND FLOOR

PROJECT LOCATION

RevisionNumber

RevisionDate

1 7/17/18

Page 14: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

3 4 5

F

G

19' -

3"

1' - 10"

3A002

TALENTROOM111B

SOUNDLOCK111A

CLASSROOM111

3

4

10' - 2"

1' - 8

"

4"

6' - 2 1/4"

15' - 11"

7' - 2 1/2"

5' - 8

1/4"

A007

1

2

3

4

A007

7

A00712

68

5

11

9A007

10

A

B1

A004

3A004

2A004

2A004

4A004

REPLACE ACCESS FLOOR PANELS W/ EXISTING PANELS FROM DEMOLITION

SEE ROOM FINISH SCHEDULE FOR FINISH FLOORING.

TD-1

TD-2

TD-3

TD = TRAP DOOR SEE /5 A004

AP-2 AP-2

AP-2

AP-2

AP-1AP-1

AP-1

AP-1

AP-1

AP-1

A3

A1

A1

A4

A6

NEW WALLS @ WINDOW BAYS

REMOVABLE ACCESS PANEL

WIRING GROMMET [TYP]

EXISITING WALL

ALIGN

1"

A3

CLR

R 2'

- 6"

1

2

2' - 0

"

1' - 0"

FILL CAVITIES W/BATT INSULATION [TYP]

5' - 0

1/2"

1' - 4"

2' - 0"

90.00

°

AP-3

3 4 5

F

G

3A002

FABRIC CEILING

FABRIC CEILING

SEE ROOM FINISH SCHEDULE FOR CEILING FINISHES

ACT-1

P-1A

P-1A

EL. 11' - 0"

EL. 11' - 0"

EL. 11' - 0"

REPLACE EXISTING CEILING TILE WITH NEW TILEADJUST EXISTING CEILING GRID AS REQUIRED

±

±

±

10' -

8"

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS AND DIMENSIONS AND ANY DISCREPANCIES AND CONFLICTS SHALL BE RESOLVED PRIOR TO PROCEEDING WITH THE WORK.

2. THE CONTRACT DOCUMENT DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY AND PROVIDE DESIGN INTENT FOR THE CONSTRUCTION OF THE PROJECT. THE CONTRACT DOCUMENTS MAY NOT INCLUDE EVERY DETAIL OR CONSTRUCTION CONDITION AND THE CONTRACTOR SHALL PROVIDE A COMPLETED STRUCTURE WITHIN THE BASIC SCOPE AND BUDGET OF THE PROJECT.

3. ANY DISCREPANCIES OR OMISSIONS IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT.

4. ALL WORK SHALL BE IN CONFORMANCE WITH THE APPLICABLE PLANNING AND BUILDING CODES, LOCAL AMENDMENTS AND ORDINANCES, ADAAG AND OTHER APPLICABLE REGULATIONS.

5. THE ADAAG 2010 REQUIREMENTS AND GUIDELINES SHALL APPLY TO THIS PROJECT.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING APPROPRIATE ENVIRONMENTAL PROTECTION TO COMPLY WITH NOISE AND DUST CONTROL, SITE RUN-OFF OF WATER, OIL, CHEMICALS, ETC. HAZARDOUS MATERIALS SUCH AS ASBESTOS, LEAD, FUEL, ETC. SHALL BE REMOVED PER ENVIRONMENTAL PROTECTION REQUIREMENTS.

7. THE GENERAL CONTRACTOR SHALL PROVIDE APPROPRIATE SAFETY MEASURES TO ENSURE PROTECTION OF CONSTRUCTION PERSONNEL AND THE GENERAL PUBLIC WITH PROPER BARRICADES, SIGNAGE, GATES, OVERHEAD AND FALL PROTECTION, AND FIRE PROTECTION. PROPER TRAINING PER OSHA SHALL BE PROVIDED FOR ALL WORKERS ON SITE.

8. THE GENERAL CONTRACTOR SHALL MAINTAIN A CLEAN AND ORDERLY WORK SITE AND WASTE MATERIALS SHALL BE REMOVED FROM THE PROJECT SITE IN A TIMELY MANNER.

9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY COORDINATION OF THE WORK AMONG ALL TRADES AND MATERIAL SUPPLIERS TO AVOID CONFLICTS AND DELAYS IN THE PROJECT CONSTRUCTION SCHEDULE.

10. ALL DRAWING DIMENSIONS SHALL BE VERIFIED WITH ACTUAL FIELD MEASUREMENTS BY THE CONTRACTOR AND SUBCONTRACTORS. NO SCALING OF DRAWINGS.

A

B

C

D INTELEV

RCP NOTES1. HVAC DEVICES , REGISTERS, GRILLES AND VENTS: REFER

TO MECHANICAL DRAWINGS FOR SIZES AND TYPES.2. LIGHT FIXTURES [LUMINAIRES] AND ILLUMINATED SIGNS:

REFER TO ELECTRICAL DRAWINGS FOR SIZES AND TYPES.3. CEILING MOUNTED DEVICES AND LIGHTS; CENTER IN

CEILING UNLESS NOTED OTHERWISE; CENTER SMALL ROOMS, CENTER ISOLATED CEILING PANELS AND SOFFITS WITH ONLY ONE [1] FIXTURES LIGHT UNLESS NOTED OTHERWISE.

4. ALIGN CEILING MOUNTED DEVICES, LIGHTS AND SIGNAGE AS SHOWN.

MANUFACTURERSTYLE SIZE/COLORGRID

ACT1

ROCKFON

24" X 48"

MANUFACTURERSTYLESIZE/COLORREMARKS

CPT1

SHAW

2'X2' SLATE 335955T134

RM INSTALL - ALIGN WITH ACCESS FLOOR - MONOLITHIC

ERICK [email protected]

CONTACT808-387-8594

P-1AMANUFACTURERCOLOR NO.SIZE/COLORFINISHREMARKS

BENJAMIN MOOREOC-131WHITE DOVEFLATGENERAL PAINT, ECO SPEC

P-1BBENJAMIN MOOREBABY'S BREATH OC-62EGG SHELLGENERAL PAINT, ECO SPEC

MANUFACTURERCOLOR NO.SIZE/COLORFINISHREMARKS

WB-1MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

CONTACT: RICK WAGATSUMA808-626-1900 [email protected]

CEI

LIN

GC

ARPE

TPA

INT

ACO

OU

STIC

PA

NEL

S

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

SOUND QUALITY S-2000ANTARES WC1480/4 SAROSSEE ELEVATIONS1" THICK - KNOLL TEXTILES

AP-1

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

SOUND QUALITY S-2000CUSTOM PRINT 2'-6" SQUARE - BEVEL 1" THICK -GUILFORD OF MAINE

AP-2

P-3BBENJAMIN MOORE777SUMMER NIGHTSSEMI-GLOSSGENERAL PAINT, ECO SPEC

MANUFACTURERCOLOR NO.SIZE/COLORFINISHREMARKS

SONAR 1610124" X 48" X 1" WHITE

B-1 JOHNSONITE20 CHARCOAL WG4" BASE - ROLLED GOODS ONLYSTRAIGHT BASE @ CARPET

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

BASE

METRIEMAK4309/16" X 4 1/2" NATURAL ALDER - P-3B FINISHhttps://metrie.com

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

CLIPSO4052 ASHEN495 AC OVER 2 LAYERS OF LA 53STRETCH FABRIC

AP-3

808-222-8720 [email protected]: SONNY LESSARY

1

THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY

UNIVERSITY OF HAWAII

AS NOTED

STATE OF HAWAIII

725 KAPIOLANI BOULEVARD, SUITE C400HONOLULU, HAWAII 96813PHONE (808) 592-2345FAX (808)[email protected]

ARCHITECT

CONSULTANT

DRAWING TITLE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

DRAWING SCALE:

UH PROJECT NO.

DATE

SHEET NO.PHASE:WCIT PROJECT NO.

PROJECT

ROBERT K. IOPA, AIA LICENSE EXPIRES APRIL 30, 2018CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AT JOB BEFORE PROCEDING WITH WORK

professional stamp and signature

0' 1' 2' 4'

SCALE : 1/4" = 1'-0"

of 16

FINAL

RCF

RCF

MH

Approver

17127

5/31/18

A003

FLOOR PLAN & RCP

APO LEO STUDIORENOVATION

CCR-17-5390

SCALE: 1/4" = 1'-0"1 CONSTRUCTION PLAN - LEVEL 01

SCALE: 1/4" = 1'-0"2 REFLECTED CEILING PLAN - LEVEL 01

Name Number Wall Finish-A Wall Finish-B Wall Finish-C Wall Finish-D Ceiling Finish Floor Finish Base Finish Comments

CLASSROOM 111 P-1B P-1B P-1B P-2B ACT-1 CPT-1 B-1SOUND LOCK 111A AP-1 P-1B P-1B AP-1 P-1A CPT-1 WB-1TALENT ROOM 111B P-1B P-1B AP-1 AP-1 P-1A/AP-1 CPT-1 WB-1 AP-1 PANELS PER PLAN

GENERAL NOTES

ROOM FINISH SCHEULE

COLOR - MATERIAL SCHEDULEELEVATION KEY

1. FOR MORE INFORMATION, SEE ROOM FINISH SCHEDULE, INTERIOR ELEVATIONS, DETAILS AND SPECIFICATIONS.

2. ALL MANUFACTURER INSTALLATION GUIDELINES TO BE FOLLOWED.

3. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING LEAD TIMES AND AVAILABILITY OF ALL MATERIAL SUCH THAT MATERIALS ARE ON SITE WHEN READY FOR INSTALLATION. THE RE-SELECTION OF MATERIAL BECAUSE OF LONG LEAD TIME WILL NOT BE PERMITTED.

4. UPON COMPLETION, ALL WORK SHALL BE FREE OF DAUBS, SPOTS AND SPLATTERS OF PAINT AND ADHESIVES.

5. ALL MISCELLANEOUS ITEMS, GRILLES, REGISTERS, METAL PANELS, ETC., ON CEILINGS AND WALLS ARE TO MATCH THE SURFACE COLOR ON WHICH THEY OCCUR, UNLESS OTHERWISE NOTED.

6. TYPICAL GYP CEILINGS TO BE FLAT SHEEN, UNLESS OTHERWISE NOTED.

7. TYPICAL WALL FINISH TO BE EGGSHELL SHEEN, UNLESS OTHERWISE NOTED.

8. ALL PAINTED DOORS, DOOR FRAMES AND TRIMS TO BE SEMI-GLOSS SHEEN, UNLESS OTHERWISE NOTED.

FINISH NOTES

RevisionNumber

RevisionDate

Page 15: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

3' - 0" 3' - 0"

7' - 0

"

2 31

7' - 0

"

3' - 0"

7' - 0

"

4

SOLID ACOUSTICAL DOORACOUSTICAL DOOR W/ VISION PANEL CUSTOM WOOD DOOR

3' - 6

"2'

- 6"

8"

[2]R-19 INSULATION

5/8 TYP X GYP BD

1" AIR SPACE

CARPET TILE OVER 3/4" PLY PANEL

[2] R-19 INSULATION

1000S200-54 CEILING JOIST

3/4' PLY

CARPET TILE

[2] R-19 INSULATION

3/4' PLY

FLOOR JOIST

1/2" NEOPRENE PAD

[2] R-19 INSULATION

3/4" PLY

JAMB HEAD

TRIM

SHIM SPACEFILL ALL VOIDS W/ EXPANSIVE FOAM [TYP]

PERIMETER SEAL

DOOR AS SHEDULED

DROP DOWN DOOR SEAL

THRESHOLD

CONTINOUS BREAK & SEALANT TO AVOID BRIDGING [TYP]

R-11 INSULATION

2X4 @16" 0C

1" AIR SPACE

1"

1"

2X ROUGH BLOCK

1/2" M

AX

THRESHOLD SHALL BE 1/2" HIGH MAX TYP

5/8 TYP X GYP BD

1" AIR SPACE

JAMB

PERIMETER SEAL

DOOR AS SHEDULED

R-11 INSULATION

2X4 ROUGH BLOCK

TRIMSHIM SPACE

FILL ALL VOIDS W/ EXPANSIVE FOAM [TYP]

1"

THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY

UNIVERSITY OF HAWAII

AS NOTED

STATE OF HAWAIII

725 KAPIOLANI BOULEVARD, SUITE C400HONOLULU, HAWAII 96813PHONE (808) 592-2345FAX (808)[email protected]

ARCHITECT

CONSULTANT

DRAWING TITLE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

DRAWING SCALE:

UH PROJECT NO.

DATE

SHEET NO.PHASE:WCIT PROJECT NO.

PROJECT

ROBERT K. IOPA, AIA LICENSE EXPIRES APRIL 30, 2018CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AT JOB BEFORE PROCEDING WITH WORK

professional stamp and signature

of 16

FINAL

Designer

Author

SC

MH

17127

5/31/18

A005

DOOR SCHEDULE, LEGEND & DETAIL

APO LEO STUDIORENOVATION

CCR-17-5390

ROOM NAMEROOM

NO. DOOR

NUM

BER

SIZE DOOR FRAME

HARD

WAR

E GR

OUP

HEAD JAMB THRESHOLD SPECIAL NOTES AND COMMENTSWIDTH HEIGHT TYPE

MAT

ERIA

L

FINI

SH

MAT

ERIA

L

CLASSROOM 111 1 3' - 0" 7' - 0" ACOUSTIC METAL PAINT METAL 001 MANUF MANUF MANUF COORDINATE CARD READER W/ MAUI COLLEGECLASSROOM 111 2 3' - 0" 7' - 0" ACOUSTIC METAL PAINT METAL 002 MANUF MANUF MANUFSOUND LOCK 111A 3 3' - 0" 7' - 0" ACOUSTIC METAL PAINT METAL 003 MANUF MANUF MANUF SAFETY GLASSTALENT ROOM 111B 4 3' - 0" 7' - 0" CUSTOM WOOD PAINT WOOD 004 1/A005 2/A005 1/A005

SCALE: 1 1/2" = 1'-0"1 DOOR DETAIL - DOOR 4SCALE: 1 1/2" = 1'-0"2 DOOR DETAIL - JAMB DOOR 4

RevisionNumber

RevisionDate

1 7/17/18

DOOR SCHEDULE DOOR LEGEND

1

1

Page 16: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

LEVEL 010"

ACOUSTIC PANELS

B-1

P-1BAP-2 AP-2

ALIGN

2' - 6

"2' - 6"

TYPSIZE

5' - 4"

ACOUSTIC PANELS

B-1

AP-2P-1BAP-2

B-1

REMOVE [E] WINDOWS AND FRAME OPENING

11' -

0"

SEE /3 A004

AP-3STRETCH FABRIC W/ 2 LAYERS OF 0.037" ACOUSTIC BATTING

1 P-1B

P-3B

B-1

P-3B

P-3B

P-3BP-3B

P-1B

WB-1

AP-1AP-1

P-3B

P-1B

AP-1P-1B

WB-1

P-3B

P-3B

P-3B

AP-1

AP-1P-1B

P-3B

WB-1

AP-1AP-1

ACOUSTIC PANELS P-1B

B-1

P-3B

AP-2

MANUFACTURERSTYLE SIZE/COLORGRID

ACT1

ROCKFON

24" X 48"

MANUFACTURERSTYLESIZE/COLORREMARKS

CPT1

SHAW

2'X2' SLATE 335955T134

RM INSTALL - ALIGN WITH ACCESS FLOOR - MONOLITHIC

ERICK [email protected]

CONTACT808-387-8594

P-1AMANUFACTURERCOLOR NO.SIZE/COLORFINISHREMARKS

BENJAMIN MOOREOC-131WHITE DOVEFLATGENERAL PAINT, ECO SPEC

P-1BBENJAMIN MOOREBABY'S BREATH OC-62EGG SHELLGENERAL PAINT, ECO SPEC

MANUFACTURERCOLOR NO.SIZE/COLORFINISHREMARKS

WB-1MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

CONTACT: RICK WAGATSUMA808-626-1900 [email protected]

CEI

LIN

GC

ARPE

TPA

INT

ACO

OU

STIC

PA

NEL

S

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

SOUND QUALITY S-2000ANTARES WC1480/4 SAROSSEE ELEVATIONS1" THICK - KNOLL TEXTILES

AP-1

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

SOUND QUALITY S-2000CUSTOM PRINT 2'-6" SQUARE - BEVEL 1" THICK -GUILFORD OF MAINE

AP-2

P-3BBENJAMIN MOORE777SUMMER NIGHTSSEMI-GLOSSGENERAL PAINT, ECO SPEC

MANUFACTURERCOLOR NO.SIZE/COLORFINISHREMARKS

SONAR 1610124" X 48" X 1" WHITE

B-1 JOHNSONITE20 CHARCOAL WG4" BASE - ROLLED GOODS ONLYSTRAIGHT BASE @ CARPET

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

BASE

METRIEMAK4309/16" X 4 1/2" NATURAL ALDER - P-3B FINISHhttps://metrie.com

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

CLIPSO4052 ASHEN495 AC OVER 2 LAYERS OF LA 53STRETCH FABRIC

AP-3

808-222-8720 [email protected]: SONNY LESSARY

1

THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY

UNIVERSITY OF HAWAII

AS NOTED

STATE OF HAWAIII

725 KAPIOLANI BOULEVARD, SUITE C400HONOLULU, HAWAII 96813PHONE (808) 592-2345FAX (808)[email protected]

ARCHITECT

CONSULTANT

DRAWING TITLE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

DRAWING SCALE:

UH PROJECT NO.

DATE

SHEET NO.PHASE:WCIT PROJECT NO.

PROJECT

ROBERT K. IOPA, AIA LICENSE EXPIRES APRIL 30, 2018CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AT JOB BEFORE PROCEDING WITH WORK

professional stamp and signature

0' 1' 2' 4'

SCALE : 1/4" = 1'-0"

of 16

FINAL

RCF

RCF

SC

MH

17127

5/31/18

A007

INTERIOR ELEVATIONS

APO LEO STUDIORENOVATION

CCR-17-5390

SCALE: 1/4" = 1'-0"1 CLASSROOM - ASCALE: 1/4" = 1'-0"2 CLASSROOM - B

SCALE: 1/4" = 1'-0"3 CLASSROOM - C SCALE: 1/4" = 1'-0"4 CLASSROOM - D

SCALE: 1/4" = 1'-0"7 SOUNDLOCK - CSCALE: 1/4" = 1'-0"8 SOUNDLOCK - D

SCALE: 1/4" = 1'-0"5 SOUNDLOCK - ASCALE: 1/4" = 1'-0"6 SOUNDLOCK - B

SCALE: 1/4" = 1'-0"12 TALENT ROOM - DSCALE: 1/4" = 1'-0"9 TALENT ROOM - A

SCALE: 1/4" = 1'-0"11 TALENT ROOM - CSCALE: 1/4" = 1'-0"10 TALENT ROOM - B

ANGLED

GENERAL NOTES:1. SEE ROOM FINISH SCHEDULE FOR ADDITIONAL INFORMATION2. INSTALL AP-1 FABRIC AFTER WALLS ARE FINISHED AND ACCORDING TO

APPROVED SHOP DRAWINGS.

RevisionNumber

RevisionDate

1 7/17/18

COLOR - MATERIAL SCHEDULE

1

Page 17: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

3 4 5

F

G

19' -

3"

TALENTROOM111B

SOUNDLOCK111A

[3] 4" CONDUIT FOR SOUND WIRING

16" X 24" PLYWOOD TRAP DOOR PANEL [FOR SOUND WIRING]

1000S200-54 FLOOR JOIST @ 16" O.C. [TYP]

1" PERIMETER AIR GAP [TYP]

16" X 24" PLYWOOD TRAP DOOR PANEL [FOR SOUND WIRING]

3/4" PLY SHEATHING STAGGER EDGES [TYP]

REPLACE EXISTING ACCESS FLOOR PANELS AS REQUIRED

CLASSROOM111

ACCESS PANEL

WIRE GROMMET

A3

A3

A3

A1

A6

SOLID MID SPAN BLOCKING

EXISTING FRAMING TO REMAIN.

EXISTING GYP BD TO REMAIN ON ONE SIDE

INSTALL MINERAL FIBER INSULATION FLOOR TO CEILINGDRYWALL CLASSROOM SIDE SEE /6 A004

[1] 4" CONDUIT FOR SOUND WIRING

3 4 5

F

G

1000S200-54 CEILING JOIST @ 16" O.C. [TYP]

1" PERIMETER AIR GAP [TYP]

3/4" PLY SHEATHING TOP & BOTSTAGGER EDGES [TYP]

[2] 5/8" GYP BD CEILING

PERIMETER CONDITION @ ANGLE WALL W/STRINGER

FIELDHEADS

PERIMETER HEADS PLACED AS CLOSE TO THE EDGE AS POSSIBLE 24" O.C. MAX.

ACCESS PANELS

2X WALL PERIMETER WALL

DEMISING WALL

ISOLATION/TALENT ROOM FLOOR FRAMING

APPROX

45.00°

TOP RUNNER

STUD 2" X 2" X 20 GAUGE ANGLE

ATTACHED TO [E] STRUCTURE W/ POWER ACTIVATED FASTENERS

EXISTING STRUCTURE

[2] #10 S-SCREWS

250S162-33 @ 4' O.C. MINALTERNATE BRACE ORIENTATION

EVERY OTHER BRACE

1

THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY

UNIVERSITY OF HAWAII

AS NOTED

STATE OF HAWAIII

725 KAPIOLANI BOULEVARD, SUITE C400HONOLULU, HAWAII 96813PHONE (808) 592-2345FAX (808)[email protected]

ARCHITECT

CONSULTANT

DRAWING TITLE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

DRAWING SCALE:

UH PROJECT NO.

DATE

SHEET NO.PHASE:WCIT PROJECT NO.

PROJECT

ROBERT K. IOPA, AIA LICENSE EXPIRES APRIL 30, 2018CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AT JOB BEFORE PROCEDING WITH WORK

professional stamp and signature

0' 1' 2' 4'

SCALE : 1/4" = 1'-0"

of 16

FINAL

RCF

RCF

SC

MH

17127

5/31/18

S001

FRAMING PLAN

APO LEO STUDIORENOVATION

CCR-17-5390

SCALE: 1/4" = 1'-0"1 FLOOR FRAMING PLAN

SCALE: 1/4" = 1'-0"2 CEILING FRAMING PLAN

SCALE: 1/4" = 1'-0"3 PERIMETER ANGLE WALL

FASTENING SCHEDULE

FLOOR & CEILING 3/4"T&G 10 x 1 7/16" @ 6" 10 x 1 7/16" @ 12" GLUE SHEATHING TO JOISTS W/ 3/8" CONT BEAD

LOCATION THICKNESS EDGE INTERMEDIATE REMARKS

WAFER HEAD PILOT3 PT DRILLER

WAFER HEAD PILOT3 PT DRILLER

GLUE UPPER LAYER W/ NOTCH TROWEL FULL BED ADHESIVE

GENERAL NOTES:

1. ALL PLYWOOD SHEATHING TO BE TREATED WITH CLASS A FIRE RETARDANT AND PRESERVATIVE INTENDED FOR WOOD USED IN INTERIOR, WEATHER-PROTECTED CONSTRUCTION.

2. ALL WOOD COMPONENTS TO BE TREATED WITH A PRESERVATIVE COMPONENT THAT PREVENTS DAMAGE CAUSED BY TERMITES AND FUNGAL DECAY.

3. ALL FLOOR JOISTS TO BE ISOLATED FROM CONCRETE FLOOR SLAB W. 1/2" CONTINUOUS NEOPRENE STRIP.

RevisionNumber

RevisionDate

1 7/17/18

SCALE: 1 1/2" = 1'-0"4 WALL BRACING DETAIL

Page 18: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no
Page 19: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

EXTERIOR CONDENSATE PIPE SUPPORT

UNIVERSITY OF HAWAIISTATE OF HAWAIII

UNIVERSITY OF HAWAIISTATE OF HAWAIII

725 KAPIOLANI BOULEVARD, SUITEC400HONOLULU, HAWAII 96813PHONE (808) 592-2345FAX (808)[email protected]

professional stamp and signature

of 3

RevisionNumber

RevisionDate

Page 20: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no
Page 21: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY

UNIVERSITY OF HAWAII

AS NOTED

STATE OF HAWAIII

725 KAPIOLANI BOULEVARD, SUITE C400HONOLULU, HAWAII 96813PHONE (808) 592-2345FAX (808)[email protected]

ARCHITECT

CONSULTANT

DRAWING TITLE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

DRAWING SCALE:

UH PROJECT NO.

DATE

SHEET NO.PHASE:WCIT PROJECT NO.

PROJECT

ROBERT K. IOPA, AIA LICENSE EXPIRES APRIL 30, 2018CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AT JOB BEFORE PROCEDING WITH WORK

professional stamp and signature

of 16

FINAL

rm

rm

rcf

mh

17127

5/31/18

ID-01

GRAPHICS

APO LEO STUDIORENOVATION

CCR-17-5390

CONCEPT STORY GRAPHIC IMAGE

INTERIOR ELEVATIONS

1 2

3

RevisionNumber

RevisionDate

1 7/17/18

CLASSROOM ELEVATION - A CLASSROOM ELEVATION - B

CLASSROOM ELEVATION - C CLASSROOM ELEVATION - D

GENERAL NOTES1. THE IMAGES AND STORY ARE PRESENTED CONCEPTUAL. 2. FINAL DESIGN AND APPROVAL WILL BE PROVIDED BY THE UNIVERSITY. 3. FINAL COLORS, TEXTURES, FABRIC SELECTION WILL BE PROVIDED BY THE UNIVERSITY.4. CLASSROOM ELEVATION - C IS FABRIC COVERING THE ENTIRE WALL.5. CLASSROOM ELEVATION A,B, AND D ARE CUSTOM PRINTED FABRIC OVER 30' X 30" X 1" ACOUSTIC PANELS 6. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION.

NTS

NTS

2'-6" X 2' 6" TYP.

DELETE GRAPHICS THIS WALL

1

Page 22: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

REVISED NOTICE TO BIDDERS BID FORMS AND PLANS for IFB No. CCR175390 will be available at the SuperQUOTE website (www.commercepoint.com). Bidders are solely responsible to check this website for any modifications to the IFB. To view the details of this solicitation and submit a bid, your company must be registered on SuperQUOTE. The project in general consists of but not limited to selective demolition and construction related to the interior renovation of an existing classroom/recording studio. The work consists of but not limited to: treated rough carpentry, finish carpentry, interior insulation, gypsum board, acoustical ceiling, windows with specified glazing, painting, electrical fixtures and wiring, air conditioning re-routing and new equipment installation and balancing, and audio-visual work. To be eligible to bid, bidders must possess a valid State of Hawai‘i contractor’s license B. Requests for Substitution/Clarification must be submitted to the Technical Representative, Cara Kimura at [email protected] no later than July 10, 2018 at 4:00 pm, Hawai‘i Standard Time. All questions must be received no later than July 10, 2018 at 4:00 pm, Hawai‘i Standard Time. Responses will be posted to the SuperQUOTE website (www.commercepoint.com) by July 20, 2018 at 4:00 pm, Hawai‘i Standard Time. Bids must be submitted on the SuperQUOTE system (www.commercepoint.com) no later than July 26, 2018 at 2:00 pm, Hawai‘i Standard Time. Bids received after the due date and time fixed above will not be considered. Direct all questions to the Technical Representative, Cara Kimura at [email protected].

Sylvia Yuen, Executive Director Research Corporation of the University of Hawaii

Advertised: SuperQUOTE system (www.commercepoint.com) Issue of: July 19, 2018

Page 23: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

1

BUSINESS CLASSIFICATION CERTIFICATION STATEMENT CONTRACTORS: Please complete the information below. Terms used are taken from the U.S. Small Business Administration (SBA) Rules and Regulations (https://www.sba.gov/) and the U.S. Code of Federal Regulations (CFR). The term “controlled” refers to the management and daily operation of the business concern. The company identified below (check all that apply): 1. IS NOT a small business concern as defined in the regulations (If you checked here, STOP. GO TO CERTIFICATION BELOW.)

IS a small business concern, defined as one that is independently owned and operated, is organized for profit, is not dominant in its field, meets the SBA size standard eligibility (see reverse side of this form for examples of size standards), is registered and has its status represented in the U.S. Government’s System for Award Management (SAM) database. See http://www.sba.gov/content/what-sbas-definition-small-business-concern.

2. IS a small disadvantaged business concern of which at least 51% is unconditionally and directly owned and controlled by one or more socially disadvantaged and economically disadvantaged persons who are U.S. citizens. See 13 CFR 124.105 for exceptions.

3. IS a women-owned small business concern of which at least 51% is unconditionally and directly owned and controlled by one or more women who are U.S. citizens. See 13 CFR 127.

4. IS a HUBZone small business concern that meets the certification eligibility requirements set by the U.S. SBA. See 13 CFR 126.

5. IS a veteran-owned small business concern of which at least at least 51% is unconditionally and directly owned by one or more veterans or service-disabled veterans. See 38 CFR 74.

6. IS a service-disabled veteran-owned small business concern of which at least 51% is unconditionally and directly owned by one or more service-disabled veterans. In the case of any publicly owned business, not less than 51% of the stock of which is owned by one or more service-disabled veterans. The management and daily business operations of which are controlled by one or more service-disabled veterans, or in the case of a veteran with a permanent and severe disability, a spouse or permanent caregiver of such veteran. See 13 CFR 125.9 et al.

CERTIFICATION I hereby certify the information supplied herein to be true and correct. (Any misrepresentation shall be subject to the provisions stated in item B on the reverse side.) Company Name: Signature of Company Officer Company Address: Print Name: Title: Date: Type of Goods/Services: North American Industry Classification System (NAICS) Code:

Page 24: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

2

A. A small business concern is one that is independently owned and operated, is organized for profit, is not dominant in its field, has a place of business in the U.S., and operates primarily within the U.S. or makes a significant contribution to the U.S. economy. Size standard eligibility is based on the average number of employees for the preceding 12 months or on sales volume averaged over a 3-year period. See 13 CFR 121.201 for size standards identified by NAICS codes. The size standards for a few industries are shown below and are subject to change at any time. 1. SPECIALTY TRADE CONTRACTORS – “Small” if average annual receipts for preceding 3 years do

not exceed $15 million.

2. CONSTRUCTION, GENERAL CONTRACTORS – “Small” if average annual receipts for preceding 3 years do not exceed $36.5 million.

3. MANUFACTURING – “Small” if 500 employees or less, except for some specific products which will

increase the complement of employees to 750 or 1,000.

4. TRANSPORTATION – “Small” if average annual receipts for preceding 3 years do not exceed the amount shown for specific services.

$27.5 million – general freight trucking, local.

5. WHOLESALE TRADE, DURABLE AND NON-DURABLE GOODS – “Small” if 100 employees or less.

6. RETAIL TRADE – “Small” if average annual receipts for preceding 3 years do not exceed the amount

shown for specific products. $7.5 million –hardware stores.

7. SERVICES – “Small” if average annual receipts for preceding 3 years do not exceed the amount

shown for specific services: a) $27.5 million – computer systems design services, custom computer programming

services $20.5 million – security guards and patrol services b) $18 million – janitorial services c) $38.5 million – passenger car rental d) $32.5 million – office machinery and equipment rental & leasing e) $7.5 million – general automotive repair

Annual receipts of a concern which has been in business for less than 3 complete fiscal years means the total receipts for the period the concern has been in business divided by the number of weeks in business, multiplied by 52. See 13 CFR 121.104.

B. Notice. Under 15 U.S.C. 645(d), any person who misrepresents a firm’s status as a small business

concern, a qualified HUBZone small business concern, a small business concern owned and controlled by socially and economically disadvantaged individuals, or a small business concern owned and controlled by women in order to obtain a contract to be awarded under the preference programs established pursuant to 15 U.S.C. sections 637(a), 637(d), 638, 644, or 657(a), shall:

1. Be punished by imposition of fine, imprisonment, or both; 2. Be subject to administrative remedies including suspension and debarment; and 3. Be ineligible for participation in a program conducted under the authority of the Small

Business Investment Act of 1958.

Page 25: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 1

REVISED BID FORM

FOR

IFB NO. CCR175390, 2253 KAAIKE APO LEO STUDIO RENOVATION University of Hawaii Community Colleges – Facilities & Environmental Health Attn: Cara Kimura Email: [email protected] To Whom It May Concern: The undersigned has carefully examined the INVITATION FOR BID for IFB No. CCR175390, 2252 Kaike Apo Leo Studio Renovation, including the Amendment No. 1, and offers to furnish all labor, materials, tools, and equipment necessary to complete all work as specified, in strict accordance with the true intent and meaning of the plans and Invitation for Bid and shall complete all work within 120 consecutive calendar days from the date designated in the Notice to Proceed. BASIC BID: The project shall in general consist of but not limited to selective demolition and construction related to the interior renovation of an existing classroom/recording studio. The work consists of, but is not limited to: treated rough carpentry, finish carpentry, interior insulation, gypsum board, acoustical ceilings, floor finishes, acoustically tested doors and hardware, wood doors, wood windows with specified glazing, painting, electrical fixtures and wiring, air conditioning re-routing and new equipment installation and balancing, and audio-visual work.

For the sum of ______________________________________________________

______________________________________ DOLLARS ($___________________),

including all material and non-material costs, labor costs, equipment costs, foreign taxes, transportation costs, vehicle costs, air freight costs, shipping costs, supply costs, mobilization costs, insurance premiums, warranty costs, administrative support costs, rental costs, overhead costs, building and special permit fees, utilities service fees, expediting fees and all applicable taxes (Federal and State). TO BE ELIGIBLE TO BID, BIDDERS MUST POSSESS A VALID STATE OF HAWAI‘I CONTRACTOR'S LICENSE B. IN ADDITION, BIDDERS MUST LIST ALL SUBCONTRACTORS INCLUDING THOSE WHO POSSESS SPECIALTY CONTRACTOR LICENSES. THE BIDDER SHALL BE SOLELY RESPONSIBLE FOR INSURING THAT ALL THE

Page 26: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 2

SPECIALTY LICENSES REQUIRED TO PERFORM THE WORK ARE COVERED IN ITS BID, AND THAT ALL SUBCONTRACTORS ARE LISTED. FAILURE TO LIST ALL REQUIRED SUBCONTRACTORS MAY BE GROUNDS FOR DISQUALIFICATION. SITE VISIT(S) Bidders shall arrange for an appointment by calling the Auxiliary Officer, Robert Burton at (808) 984-3245. INTERPRETATION OF PLANS AND SPECIFICATIONS Bidders are cautioned to review the Plans and Technical Specifications carefully and thoroughly. In instances where conflicts occur within the Plans and/or between the Plans and Technical Specifications and/or within the Technical Specifications, the more stringent requirement(s) shall be applied by the bidder when formulating its bid amount. Failure by the bidder to apply/adhere to the more stringent requirement(s) shall not constitute the basis for price adjustment(s). Objections to or requests for clarification of the Plans and/or Technical Specifications shall be made in writing to the Technical Representative, Cara Kimura at [email protected], no later than July 10, 2018 at 4:00 pm, Hawai‘i Standard Time. Reponses will be posted to the SuperQUOTE website (www.commercepoint.com) by July 20, 2018, at 4:00 pm, Hawai‘i Standard Time. The submittal of a bid shall be considered as acceptance of the specifications as published. Protest concerning the technical specifications lodged after bid opening shall not be considered. PATENTED DEVICES, MATERIALS AND PROCESSES If the Contractor is required or desires to use any design, device, material or process covered by letters of patent or copyright, the right for such use shall be procured by the Contractor from the patentee or owner. The Contractor and surety shall indemnify and save harmless the State and its Departments and Agencies, any affected third party, or political subdivision from any and all claims for infringement by reason of the use of any such patented design, device, material or process, or any trademark or copyright in connection with the work to be performed under the contract, shall indemnify the State and its Departments and Agencies for any costs, expenses and damages which it may be obliged to pay by reason of any such infringement at any time during the prosecution or after the completion of the work.

Page 27: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 3

PERIODIC INCREASES OF MINIMUM WAGES FOR PUBLIC WORKS CONSTRUCTION CONTRACTS Section 104-2, Hawaii Revised Statutes, provides that laborers and mechanics employed on State construction contracts exceeding $2,000 shall be entitled to any increases in prevailing wage rates as determined by the Director of the Department of Labor and Industrial Relations (DLIR), and as published in the wage rate bulletins, regardless of the prevailing wage rates in effect at the time of contracting. It is the responsibility of the Contractor to keep current of all changes to the prevailing wage rates. Pursuant to Section 12-22-6 (1), Hawaii Administrative Rules, the Apprentice Schedule is applicable only to apprentices who are parties to apprenticeship agreements registered with or recognized by the DLIR. Wage rate bulletins are issued periodically by the Research and Statistics Office, Department of Labor and Industrial Relations and may be found at: http://labor.hawaii.gov/rs/home/wages/72-2/. THE RCUH WILL NOT CONSIDER CHANGES TO THE WAGE RATE BULLETIN AS A BASIS FOR AN INCREASE IN CONTRACT PRICE. CONTRACTORS ARE ALSO CAUTIONED THAT FAILURE TO COMPLY WITH THE REQUIREMENTS OF SECTION 104-2, HAWAII REVISED STATUTES, MAY BE PUNISHABLE BY A FINE OF $1,000 PER OFFENSE BEING ASSESSED AGAINST A CONTRACTOR FOR A FIRST VIOLATION. FEDERAL WAGE RATES This is a federal funded contract subject to the Davis-Bacon Act. Federal law (40 U.S.C. 276a to a-7) provides that laborers and mechanics employed on federal funded construction contracts exceeding $2,000 shall be entitled to any increases in minimum wages specified in a wage determination made by the Secretary of the U.S. Department of Labor. It is the responsibility of the Contractors to ensure that their bids reflect payment of minimum wages pursuant to federal law, and to keep current of all changes to the prevailing wage rates. Wage determinations are issued periodically by the U.S. Department of Labor and can be viewed on the Internet at: https://www.wdol.gov/ THE RCUH WILL NOT CONSIDER CHANGES TO THE MINIMUM WAGES AS A BASIS FOR AN INCREASE IN CONTRACT PRICE. TAX LIABILITY Both out-of-state and Hawai‘i bidders are advised that the amount bid on this solicitation is subject to the general excise tax imposed by Chapter 237, Hawaii Revised Statutes (HRS) and,

Page 28: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 4

if tangible property is being imported into the State of Hawai‘i for resale, the use tax (currently 1/2%) imposed by Chapter 238, HRS. (Refer to TAXES in the GENERAL PROVISIONS.) Bidders are therefore cautioned to consider such taxes in formulating their bids, as no adjustments to the prices bid shall be allowed. TAX CLEARANCE (CERTIFICATE OF VENDOR COMPLIANCE) In accordance with Hawaii Revised Statutes § 103-53, the RCUH requires vendors to provide a valid tax clearance from the Hawaii Department of Taxation and the U.S. Internal Revenue Service, as a prerequisite to entering into any contract, agreement, or purchase order of $25,000 or more, and prior to releasing a final payment for such purchases. A Certificate of Vendor Compliance that reflects a “Compliant” status from Hawaii Compliance Express (HCE), https://vendors.ehawaii.gov/hce/splash/faq.html is acceptable in satisfying the tax clearance requirement. BID DISQUALIFICATION An acceptable bid must conform in all material respects to this INVITATION FOR BID (IFB). Any of the following may be grounds for disqualification: 1. Taking exception to any of the specifications’ terms or conditions contained in the IFB. 2. Placing conditions on the furnishing of solicited goods or services. 3. Inclusion of a quotation or order form containing additional specifications, terms or

conditions. 4. Referencing external documents containing additional specifications, terms or conditions. 5. Evidence of collusion among bidders. 6. Lack of responsibility and cooperation as shown by past work such as failing to complete

all of the requirements to close the project within a reasonable time or engaging in a pattern of unreasonable or frivolous claims for extra compensation.

7. More than one bid for the same project from an individual, firm, partnership, corporation or

joint venture under the same or different name. 8. Lack of responsibility including, but not limited to, arrearages on existing contracts in

litigation with the Research Corporation of the University of Hawai‘i, University, State of Hawai‘i, or defaults on a previous contract.

9. Being in arrears on existing contracts with the Research Corporation of the University of

Hawai‘i, University, or State of Hawai‘i, or having defaulted on a previous contract with the University or the State of Hawai‘i.

Page 29: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 5

10. Submission of bids after the deadline. 11. Failure to follow directions and instructions in the invitation. 12. Failure to pay, or satisfactorily settle, all bills overdue for labor and materials of former

contracts in force at the time of issuance of bid forms. 13. Debarment or suspension consistent with the provisions of Chapters 103D, 104 and 444,

Hawaii Revised Statutes, as amended, or federal statutes. Bidders are advised that bids are evaluated as submitted and requests by bidders to delete conditions contained in their bids after bid opening cannot be considered. Attention of the bidders is directed to the contract performance bond, contract payment bond and insurance requirements of this IFB, which should be carefully considered before submitting a bid. Failure to provide a contract performance bond and contract payment bond will result in forfeiture of your bid security and failure to comply with the insurance requirements will result in forfeiture of your bid security or your contract performance bond. BASIS FOR AWARD The award of contract, if awarded, shall be made to the responsible bidder submitting the responsive bid with the lowest evaluated BASIC BID.

Page 30: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 6

OPRPM FORM 54 (Rev. 09/12)

LISTING OF JOINT CONTRACTOR AND/OR SUBCONTRACTORS (Page 1 of 2)

The following information shall be submitted, on this form, by each bidder as a bid requirement. It is the sole responsibility of the bidder to review the requirements of this project and determine the appropriate specialty Contractor’s licenses that are required to complete the project. Each bidder shall include the name, license number and classification code of each person or firm to be engaged by the bidder as a joint contractor or subcontractor(s) for performance of this contract. Failure to provide correct names and active license numbers as registered with the Contractor's License Board may be grounds for rejection of the bid submitted. The bid shall also indicate the nature and scope of work to be performed by such joint contractor or subcontractor(s). The bidder acknowledges that as a general contractor (‘A’ or ‘B’ license) the bidder is prohibited from undertaking any work solely or as part of a larger project, which would require the bidder (‘A’ or ‘B’ general contractor) to act as a specialty (‘C’ license) contractor in any area in which the bidder (‘A’ or ‘B’ general Contractor) has no specialty Contractor’s

license. The bidder (‘A’ or ‘B’ general Contractor) must have the appropriate ‘C’ specialty Contractor’s licenses either

obtained on its own, or obtained automatically under the rules and regulations of the Contractor’s License Board, Department of Commerce and Consumer Affairs. This list shall not be changed or altered without the written consent of the Procurement Officer. All bids which do not comply with this requirement may be rejected.

Name of Joint Contractor and/or Subcontractor(s) (specify which)

*License Number

Classification Code Nature and Scope of Work

CERTIFICATION REQUIRED ON PAGE 2 OF OPRPM FORM 54

Page 31: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 7

OPRPM FORM 54 (Rev. 09/12)

LISTING OF JOINT CONTRACTOR AND/OR SUBCONTRACTORS (Page 2 of 2)

Name of Joint Contractor and/or Subcontractor(s)

(specify which) *License Number

Classification Code Nature and Scope of Work

The PRIME CONTRACTOR shall indicate its principal contractor's license number and classification code(s) it possesses. _____________________________________ ______________________________________ *License Number Classification Code(s) The contractor hereby certifies that the information provided is accurate and that itself and the joint contractor/ subcontractor(s) listed meet all license or permit requirements for the State of Hawaii for this contract. By __________________________________________________________________ Title: Date *License number in compliance with Chapter 444-9, HRS and the Rules and Regulations of the Contractors License Board, Department of Commerce and Consumer Affairs.

Page 32: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 8

REQUIRED INFORMATION ON PERFORMANCE AND PAYMENT BONDS FOR CONTRACTS EXCEEDING $50,000

In the event the Contractor is awarded the contract for this IFB, it shall provide the following information relating to the Surety's local Attorney-in-Fact: Name: ________________________________________________ Company: _____________________________________________ Address: ______________________________________________ Telephone: ________________________ Facsimile: ________________________ FAILURE TO PROVIDE THE FOREGOING INFORMATION WITH ONE'S BID SUBMITTAL MAY BE GROUNDS FOR DISQUALIFICATION. NOTE: In the event the bidder intends on submitting Performance and Payment Bonds issued by a Surety located outside the State of Hawaii (but which is authorized to transact business as a Surety in this State), such contract securities shall: 1) Be signed and/or countersigned by the Surety's local General Agent;

2) Identify an individual in the State of Hawaii who is given full authority to act as Power of Attorney for the Surety; and

Have all countersignatures acknowledged by a Notary Public in the State of Hawaii.

Page 33: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 9

AUTHORITY TO SUBMIT BID NOTE: FILL IN ALL BLANK SPACES WITH INFORMATION ASKED FOR OR BID MAY BE INVALIDATED

(IF BY INDIVIDUAL) NAME (Signature) TYPED NAME

D.B.A.

SOCIAL SECURITY NUMBER ADDRESS

FEDERAL TAXPAYER IDENTIFICATION NUMBER

CITY STATE ZIP CODE

TELEPHONE NUMBER FAX NUMBER

(IF BY PARTNERSHIP) OFFICIAL/LEGAL NAME OF FIRM

NAME (Signature) TYPED NAME

FEDERAL TAXPAYER IDENTIFICATION NUMBER

PARTNER

ADDRESS

CITY STATE ZIP CODE

TELEPHONE NUMBER FAX NUMBER

(IF BY CORPORATION) OFFICIAL/LEGAL NAME OF COMPANY

FEDERAL TAXPAYER IDENTIFICATION NUMBER

*OFFICER (Signature) TYPED NAME

TITLE

ADDRESS OF COMPANY

CITY STATE ZIP CODE

(SEAL) TELEPHONE NUMBER FAX NUMBER

IF LICENSED OR INCORPORATED TO DO BUSINESS WITHIN THE STATE OF HAWAII AND SUBJECT TO THE PROVISIONS OF THE HAWAII GENERAL EXCISE TAX LAWS, INDICATE GENERAL EXCISE TAX LICENSE NUMBER .

*Please attach to this page evidence of the authority of this officer to submit a bid on behalf of the corporation. Bid Security made payable to the Research Corporation of the University of Hawaii must accompany the bid, if the total amount of the item(s) bid is $50,000 or more. (See GENERAL PROVISION 8, BID SECURITY, for acceptable forms of Bid Security.)

Page 34: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 10

In the event that the undersigned is awarded this contract and its remittance address differs from the address shown on page BID - 9 please indicate remittance address below: ___________________________________ Street Address or P. O. Box ____________________________________ City State Zip Code

Page 35: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

BID - 11

SURETY BID BOND

Bond No. KNOW ALL MEN BY THESE PRESENTS: That we, , as Offeror, hereinafter called the Principal, and , as Surety, hereinafter called Surety, a corporation authorized to transact business as a Surety in the State of Hawai‘i, are held and firmly bound unto the Research Corporation of the University of Hawaii, as Owner, in the penal sum of Dollars ($______________________________) lawful money of the United States of America, for the payment of which sum well and truly to be made, the said Principal and the said Surety bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS: The Principal has submitted an offer for . NOW, THEREFORE: The condition of this obligation is such that if the Research Corporation of the University of Hawaii shall reject said offer, or in the alternate, accept the offer of the Principal and the Principal shall enter into a Contract with the Research Corporation of the University of Hawaii in accordance with the terms of such offer, and give such bond or bonds as may be specified in the solicitation or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof as specified in the solicitation then this obligation shall be null and void, otherwise to remain in full force and effect. Signed this day of , . (Seal) Name of Principal (Offeror) Signature Title (Seal) Name of Surety Signature Title

Page 36: AMENDMENT NO. 1 No. CCR175390 … · Representative and the Architect that eac h functions properly as intended. Adjust or replace each hardware item not properly functioning at no

3 4 5

F

G

19' -

3"

1' - 10"

3A002

TALENTROOM111B

SOUNDLOCK111A

CLASSROOM111

3

4

10' - 2"

1' - 8

"

4"

6' - 2 1/4"

15' - 11"

7' - 2 1/2"

5' - 8

1/4"

A007

1

2

3

4

A007

7

A00712

68

5

11

9A007

10

A

B1

A004

3A004

2A004

2A004

4A004

REPLACE ACCESS FLOOR PANELS W/ EXISTING PANELS FROM DEMOLITION

SEE ROOM FINISH SCHEDULE FOR FINISH FLOORING.

TD-1

TD-2

TD-3

TD = TRAP DOOR SEE /5 A004

AP-2 AP-2

AP-2

AP-2

AP-1AP-1

AP-1

AP-1

AP-1

AP-1

A3

A1

A1

A4

A6

NEW WALLS @ WINDOW BAYS

REMOVABLE ACCESS PANEL

WIRING GROMMET [TYP]

EXISITING WALL

ALIGN

1"

A3

CLR

R 2'

- 6"

1

2

2' - 0

"

1' - 0"

FILL CAVITIES W/BATT INSULATION [TYP]

5' - 0

1/2"

1' - 4"

2' - 0"

90.00

°

AP-3

3 4 5

F

G

3A002

FABRIC CEILING

FABRIC CEILING

SEE ROOM FINISH SCHEDULE FOR CEILING FINISHES

ACT-1

P-1A

P-1A

EL. 11' - 0"

EL. 11' - 0"

EL. 11' - 0"

REPLACE EXISTING CEILING TILE WITH NEW TILEADJUST EXISTING CEILING GRID AS REQUIRED

±

±

±

10' -

8"

1. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS AND DIMENSIONS AND ANY DISCREPANCIES AND CONFLICTS SHALL BE RESOLVED PRIOR TO PROCEEDING WITH THE WORK.

2. THE CONTRACT DOCUMENT DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY AND PROVIDE DESIGN INTENT FOR THE CONSTRUCTION OF THE PROJECT. THE CONTRACT DOCUMENTS MAY NOT INCLUDE EVERY DETAIL OR CONSTRUCTION CONDITION AND THE CONTRACTOR SHALL PROVIDE A COMPLETED STRUCTURE WITHIN THE BASIC SCOPE AND BUDGET OF THE PROJECT.

3. ANY DISCREPANCIES OR OMISSIONS IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT.

4. ALL WORK SHALL BE IN CONFORMANCE WITH THE APPLICABLE PLANNING AND BUILDING CODES, LOCAL AMENDMENTS AND ORDINANCES, ADAAG AND OTHER APPLICABLE REGULATIONS.

5. THE ADAAG 2010 REQUIREMENTS AND GUIDELINES SHALL APPLY TO THIS PROJECT.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING APPROPRIATE ENVIRONMENTAL PROTECTION TO COMPLY WITH NOISE AND DUST CONTROL, SITE RUN-OFF OF WATER, OIL, CHEMICALS, ETC. HAZARDOUS MATERIALS SUCH AS ASBESTOS, LEAD, FUEL, ETC. SHALL BE REMOVED PER ENVIRONMENTAL PROTECTION REQUIREMENTS.

7. THE GENERAL CONTRACTOR SHALL PROVIDE APPROPRIATE SAFETY MEASURES TO ENSURE PROTECTION OF CONSTRUCTION PERSONNEL AND THE GENERAL PUBLIC WITH PROPER BARRICADES, SIGNAGE, GATES, OVERHEAD AND FALL PROTECTION, AND FIRE PROTECTION. PROPER TRAINING PER OSHA SHALL BE PROVIDED FOR ALL WORKERS ON SITE.

8. THE GENERAL CONTRACTOR SHALL MAINTAIN A CLEAN AND ORDERLY WORK SITE AND WASTE MATERIALS SHALL BE REMOVED FROM THE PROJECT SITE IN A TIMELY MANNER.

9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY COORDINATION OF THE WORK AMONG ALL TRADES AND MATERIAL SUPPLIERS TO AVOID CONFLICTS AND DELAYS IN THE PROJECT CONSTRUCTION SCHEDULE.

10. ALL DRAWING DIMENSIONS SHALL BE VERIFIED WITH ACTUAL FIELD MEASUREMENTS BY THE CONTRACTOR AND SUBCONTRACTORS. NO SCALING OF DRAWINGS.

A

B

C

D INTELEV

RCP NOTES1. HVAC DEVICES , REGISTERS, GRILLES AND VENTS: REFER

TO MECHANICAL DRAWINGS FOR SIZES AND TYPES.2. LIGHT FIXTURES [LUMINAIRES] AND ILLUMINATED SIGNS:

REFER TO ELECTRICAL DRAWINGS FOR SIZES AND TYPES.3. CEILING MOUNTED DEVICES AND LIGHTS; CENTER IN

CEILING UNLESS NOTED OTHERWISE; CENTER SMALL ROOMS, CENTER ISOLATED CEILING PANELS AND SOFFITS WITH ONLY ONE [1] FIXTURES LIGHT UNLESS NOTED OTHERWISE.

4. ALIGN CEILING MOUNTED DEVICES, LIGHTS AND SIGNAGE AS SHOWN.

MANUFACTURERSTYLE SIZE/COLORGRID

ACT1

ROCKFON

24" X 48"

MANUFACTURERSTYLESIZE/COLORREMARKS

CPT1

SHAW

2'X2' SLATE 335955T134

RM INSTALL - ALIGN WITH ACCESS FLOOR - MONOLITHIC

ERICK [email protected]

CONTACT808-387-8594

P-1AMANUFACTURERCOLOR NO.SIZE/COLORFINISHREMARKS

BENJAMIN MOOREOC-131WHITE DOVEFLATGENERAL PAINT, ECO SPEC

P-1BBENJAMIN MOOREBABY'S BREATH OC-62EGG SHELLGENERAL PAINT, ECO SPEC

MANUFACTURERCOLOR NO.SIZE/COLORFINISHREMARKS

WB-1MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

CONTACT: RICK WAGATSUMA808-626-1900 [email protected]

CEI

LIN

GC

ARPE

TPA

INT

ACO

OU

STIC

PA

NEL

S

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

SOUND QUALITY S-2000ANTARES WC1480/4 SAROSSEE ELEVATIONS1" THICK - KNOLL TEXTILES

AP-1

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

SOUND QUALITY S-2000CUSTOM PRINT 2'-6" SQUARE - BEVEL 1" THICK -GUILFORD OF MAINE

AP-2

P-3BBENJAMIN MOORE777SUMMER NIGHTSSEMI-GLOSSGENERAL PAINT, ECO SPEC

MANUFACTURERCOLOR NO.SIZE/COLORFINISHREMARKS

SONAR 1610124" X 48" X 1" WHITE

B-1 JOHNSONITE20 CHARCOAL WG4" BASE - ROLLED GOODS ONLYSTRAIGHT BASE @ CARPET

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

BASE

METRIEMAK4309/16" X 4 1/2" NATURAL ALDER - P-3B FINISHhttps://metrie.com

MANUFACTURERCOLOR NO.SIZE/COLORREMARKS:

CLIPSO4052 ASHEN495 AC OVER 2 LAYERS OF LA 53STRETCH FABRIC

AP-3

808-222-8720 [email protected]: SONNY LESSARY

1

THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY

UNIVERSITY OF HAWAII

AS NOTED

STATE OF HAWAIII

725 KAPIOLANI BOULEVARD, SUITE C400HONOLULU, HAWAII 96813PHONE (808) 592-2345FAX (808)[email protected]

ARCHITECT

CONSULTANT

DRAWING TITLE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

DRAWING SCALE:

UH PROJECT NO.

DATE

SHEET NO.PHASE:WCIT PROJECT NO.

PROJECT

ROBERT K. IOPA, AIA LICENSE EXPIRES APRIL 30, 2018CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AT JOB BEFORE PROCEDING WITH WORK

professional stamp and signature

0' 1' 2' 4'

SCALE : 1/4" = 1'-0"

of 16

FINAL

RCF

RCF

MH

Approver

17127

5/31/18

A003

FLOOR PLAN & RCP

APO LEO STUDIORENOVATION

CCR-17-5390

SCALE: 1/4" = 1'-0"1 CONSTRUCTION PLAN - LEVEL 01

SCALE: 1/4" = 1'-0"2 REFLECTED CEILING PLAN - LEVEL 01

Name Number Wall Finish-A Wall Finish-B Wall Finish-C Wall Finish-D Ceiling Finish Floor Finish Base Finish Comments

CLASSROOM 111 P-1B P-1B P-1B P-2B ACT-1 CPT-1 B-1SOUND LOCK 111A AP-1 P-1B P-1B AP-1 P-1A CPT-1 WB-1TALENT ROOM 111B P-1B P-1B AP-1 AP-1 P-1A/AP-1 CPT-1 WB-1 AP-1 PANELS PER PLAN

GENERAL NOTES

ROOM FINISH SCHEULE

COLOR - MATERIAL SCHEDULEELEVATION KEY

1. FOR MORE INFORMATION, SEE ROOM FINISH SCHEDULE, INTERIOR ELEVATIONS, DETAILS AND SPECIFICATIONS.

2. ALL MANUFACTURER INSTALLATION GUIDELINES TO BE FOLLOWED.

3. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING LEAD TIMES AND AVAILABILITY OF ALL MATERIAL SUCH THAT MATERIALS ARE ON SITE WHEN READY FOR INSTALLATION. THE RE-SELECTION OF MATERIAL BECAUSE OF LONG LEAD TIME WILL NOT BE PERMITTED.

4. UPON COMPLETION, ALL WORK SHALL BE FREE OF DAUBS, SPOTS AND SPLATTERS OF PAINT AND ADHESIVES.

5. ALL MISCELLANEOUS ITEMS, GRILLES, REGISTERS, METAL PANELS, ETC., ON CEILINGS AND WALLS ARE TO MATCH THE SURFACE COLOR ON WHICH THEY OCCUR, UNLESS OTHERWISE NOTED.

6. TYPICAL GYP CEILINGS TO BE FLAT SHEEN, UNLESS OTHERWISE NOTED.

7. TYPICAL WALL FINISH TO BE EGGSHELL SHEEN, UNLESS OTHERWISE NOTED.

8. ALL PAINTED DOORS, DOOR FRAMES AND TRIMS TO BE SEMI-GLOSS SHEEN, UNLESS OTHERWISE NOTED.

FINISH NOTES

RevisionNumber

RevisionDate