Transcript of AMAR NAYYAR
8/3/2019 AMAR NAYYAR
1/47
PROTECTION OFPROTECTION OF
TRANSFORMERSTRANSFORMERS
Presented byPresented by
AMAR NAYYARAMAR NAYYAR
FINAL YEAR ELECTRICALSFINAL YEAR ELECTRICALS
8/3/2019 AMAR NAYYAR
2/47
WHAT IS A TRANSFORMER?WHAT IS A TRANSFORMER?
TRANSFORMER IS ATRANSFORMER IS ASTATIC DEVICE WHICHSTATIC DEVICE WHICH
TRANSFORMS A.C.TRANSFORMS A.C.
ELECTRICAL POWERELECTRICAL POWERFROM ONE VOLTAGEFROM ONE VOLTAGE
TO ANOTHERTO ANOTHERVOLTAGE KEEPINGVOLTAGE KEEPINGTHE FREQUENCY SAMETHE FREQUENCY SAME
BY ELECTROMAGNETICBY ELECTROMAGNETICINDUCTION.INDUCTION.
8/3/2019 AMAR NAYYAR
3/47
TYPES OF TRANSFORMERTYPES OF TRANSFORMER
BY APPLICATIONBY APPLICATION 1. DISTRIBUTION TRANSFORMER1. DISTRIBUTION TRANSFORMER 2.POWER TRANSFORMER2.POWER TRANSFORMER
3.CURRENT TRANSFORMER3.CURRENT TRANSFORMER 4.POTENTIAL TRANSFORMER4.POTENTIAL TRANSFORMER
5.FURNACE TRANSFORMER5.FURNACE TRANSFORMER
6.BOOSTER TRANSFORMER6.BOOSTER TRANSFORMER 7.RECTIFIER TRANSFORMER7.RECTIFIER TRANSFORMER 8.LOCOMOTIVE TRANSFORMER8.LOCOMOTIVE TRANSFORMER
9.MINING TRANSFORMER9.MINING TRANSFORMER 10.PHASE SHIFTING TRANSFORMER10.PHASE SHIFTING TRANSFORMER
11.WELDING TRANSFORMER11.WELDING TRANSFORMER 1
2.HIGH VOLTAGE TESTING/SC TESTING TRF.12.HIGH VOLTAGE TESTING/SC TESTING TRF.
13.GROUNDING TRANSFORMERS13.GROUNDING TRANSFORMERS 14.CONVERTER TRANSFORMER14.CONVERTER TRANSFORMER
8/3/2019 AMAR NAYYAR
4/47
DISTRIBUTION TRANSFORMERDISTRIBUTION TRANSFORMER
TRANSFORMER WHICH IS USED FORTRANSFORMER WHICH IS USED FOR
THE PURPOSE OF DISTRIBUTION OFTHE PURPOSE OF DISTRIBUTION OF
POWER.POWER. 11KV/433V is the standard voltage rating.11KV/433V is the standard voltage rating.
STANDARD KVA ratings areSTANDARD KVA ratings are
25,63,100
,160,200
,250,315,4
00,500
,630,75
0,25,63,
100,160,200
,250,315,4
00,500
,630,75
0,
1000 , 1250,1500,2000,2500 KVA.1000 , 1250,1500,2000,2500 KVA.
ISIS--2026 is the NATIONAL I S STANDARD.2026 is the NATIONAL I S STANDARD.
8/3/2019 AMAR NAYYAR
5/47
MAIN FEATURESMAIN FEATURES
OUTDOOR,OIL COOLED, 3 PHASE,50HZOUTDOOR,OIL COOLED, 3 PHASE,50HZ
PRIMARY IS DELTA CONNECTED ANDPRIMARY IS DELTA CONNECTED AND
SECONDARY IS STAR CONNECTED.SECONDARY IS STAR CONNECTED. NATURALY COOLED (ONAN TYPE).NATURALY COOLED (ONAN TYPE).
AMONGST ALL THE TYPES OFAMONGST ALL THE TYPES OF
TRANSFORMERS THIS IS THE MOSTTRANSFORMERS THIS IS THE MOSTREQUIRED AND MOST USED TYPE.REQUIRED AND MOST USED TYPE.
8/3/2019 AMAR NAYYAR
6/47
PARTS OF TRANSFORMERPARTS OF TRANSFORMER
MAIN TANKMAIN TANK RADIATORSRADIATORS CONSERVATORCONSERVATOR EXPLOSION VENTEXPLOSION VENT
LIFTING LUGSLIFTING LUGS AIR RELEASE PLUGAIR RELEASE PLUG OIL LEVEL INDICATOROIL LEVEL INDICATOR TAP CHANGERTAP CHANGER WHEELSWHEELS HV/LV BUSHINGSHV/LV BUSHINGS
FILTER VALVESFILTER VALVES OIL FILLING PLUGOIL FILLING PLUG DRAIN PLUGDRAIN PLUG CABLE BOXCABLE BOX
8/3/2019 AMAR NAYYAR
7/47
8/3/2019 AMAR NAYYAR
8/47
8/3/2019 AMAR NAYYAR
9/47
8/3/2019 AMAR NAYYAR
10/47
8/3/2019 AMAR NAYYAR
11/47
8/3/2019 AMAR NAYYAR
12/47
8/3/2019 AMAR NAYYAR
13/47
8/3/2019 AMAR NAYYAR
14/47
8/3/2019 AMAR NAYYAR
15/47
8/3/2019 AMAR NAYYAR
16/47
8/3/2019 AMAR NAYYAR
17/47
8/3/2019 AMAR NAYYAR
18/47
TESTING OF TRANSFORMERTESTING OF TRANSFORMER
TESTING IS CARRIED OUT AS PER ISTESTING IS CARRIED OUT AS PER IS--2026.2026. ROUTINE , TYPE TESTS & SPECIAL TESTSROUTINE , TYPE TESTS & SPECIAL TESTS
ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB)ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB)
1.Measurement of winding resistance1.Measurement of winding resistance 2.Measurement of insulation resistance2.Measurement of insulation resistance 3.Seperate source voltage withstand test (High Voltage tests on HV & LV)3.Seperate source voltage withstand test (High Voltage tests on HV & LV) 4.Induced Over voltage Withstand test (DVDF test)4.Induced Over voltage Withstand test (DVDF test)
5.Measurement of voltage ratio5.Measurement of voltage ratio 6.Measurement of NO LOAD LOSS & current.6.Measurement of NO LOAD LOSS & current.
7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION)7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION)
8.Vector Group Verification8.Vector Group Verification 9.Oil BDV test.9.Oil BDV test. 10.Tests on OLTC (if Attached)10.Tests on OLTC (if Attached)
8/3/2019 AMAR NAYYAR
19/47
TYPE TESTSTYPE TESTS
THESE TESTS ARE CARRIED OUTTHESE TESTS ARE CARRIED OUT
ONLY ON ONE TRANSFORMER OFONLY ON ONE TRANSFORMER OFTHE LOT.THE LOT.
All routine testsAll routine tests
Additionally following tests are included inAdditionally following tests are included in
type teststype tests
1.1. Lightening Impulse test.Lightening Impulse test.
2.2. Temperature rise testTemperature rise test
8/3/2019 AMAR NAYYAR
20/47
SPECIAL TESTSSPECIAL TESTS
Additional Impulse testAdditional Impulse test
Short circuit testShort circuit test
Measurement of zero Phase sequenceMeasurement of zero Phase sequenceImpedance test.Impedance test.
Measurement of acoustic noise level.Measurement of acoustic noise level.
Measurement of harmonics of the no loadMeasurement of harmonics of the no loadcurrent.current.
Magnetic balance test.Magnetic balance test.
8/3/2019 AMAR NAYYAR
21/47
ROUTINE TESTSROUTINE TESTS
1.Measurement of winding resistance1.Measurement of winding resistance
This test measures the resistance of the HV & LVThis test measures the resistance of the HV & LV
winding. The values of resistance should bewinding. The values of resistance should bebalance for all three phases and should matchbalance for all three phases and should matchthe designed values.the designed values.
Equipment used : Digital resistance meter.Equipment used : Digital resistance meter.
8/3/2019 AMAR NAYYAR
22/47
ROUTINE TESTSROUTINE TESTS
2.Measurement of insulation resistance2.Measurement of insulation resistance
Measures the insulation resistance of HV & LVMeasures the insulation resistance of HV & LV
windings with respect to earth (body) andwindings with respect to earth (body) andbetween LV & HV winding.between LV & HV winding.
INSULATION TESTER OR MEGGER ISINSULATION TESTER OR MEGGER IS
USED.USED.
Recommended Values areRecommended Values are
2000Mohms for HV & 500 Mohms for LV.2000Mohms for HV & 500 Mohms for LV.
8/3/2019 AMAR NAYYAR
23/47
ROUTINE TESTSROUTINE TESTS
3.Seperate source voltage withstand test (High Voltage tests on3.Seperate source voltage withstand test (High Voltage tests onHV & LV)HV & LV)-- This test checks the insulation property betweenThis test checks the insulation property betweenPrimary to earth, Secondary to earth and between Primary &Primary to earth, Secondary to earth and between Primary &Secondary.Secondary.
HV high voltage test : LV winding connected together and earthed.HV high voltage test : LV winding connected together and earthed.HV winding connected together and given 28 KV ( for 11KVHV winding connected together and given 28 KV ( for 11KVtransformer) for 1 minute.transformer) for 1 minute.
LV high Voltage test : HV winding connected together and earthed.LV high Voltage test : HV winding connected together and earthed.LV winding connected together and given 3 KV for 1 minute.LV winding connected together and given 3 KV for 1 minute.
Equipment used : High Voltage tester (100KV & 3KV)Equipment used : High Voltage tester (100KV & 3KV)
8/3/2019 AMAR NAYYAR
24/47
8/3/2019 AMAR NAYYAR
25/47
ROUTINE TESTSROUTINE TESTS
4.Induced Over voltage Withstand test (DVDF test)4.Induced Over voltage Withstand test (DVDF test)--This test checks the inter turn insulation.This test checks the inter turn insulation.
For a 11KV/433V transformer,866 Volts are applied atFor a 11KV/433V transformer,866 Volts are applied atthe 433V winding with the help of a Generator for 1the 433V winding with the help of a Generator for 1minute. This induces 22KV on 11KV side. Theminute. This induces 22KV on 11KV side. Thefrequency of the 866V supply is also increased tofrequency of the 866V supply is also increased to100HZ.100HZ.
Equipment used : MOTOR GENERATOR SETEquipment used : MOTOR GENERATOR SET
8/3/2019 AMAR NAYYAR
26/47
8/3/2019 AMAR NAYYAR
27/47
ROUTINE TESTSROUTINE TESTS
5.Measurement of voltage ratio5.Measurement of voltage ratio
This test measures the voltage ratio as per the customersThis test measures the voltage ratio as per the customersrequirement.requirement.
V1/V2 = N1/N2V1/V2 = N1/N2
The voltage ratio is equal to the turns ratio in aThe voltage ratio is equal to the turns ratio in atransformer. Using this principle, the turns ratio istransformer. Using this principle, the turns ratio is
measured with the help of a turns ratio meter. If it ismeasured with the help of a turns ratio meter. If it iscorrect , then the voltage ratio is assumed to be correct.correct , then the voltage ratio is assumed to b