WTF Concrete Formwork System (Wall-Ties & Forms, Inc.)WTF aluminum formwork is a rapid paced construction system for forming cast in place concrete structures. WTF provides aluminum formwork for reinforced concrete construction of single and multi-story buildings and enables the walls and slab to be placed monolithically in the same operation. This increases efficiency, and also produces an extraordinarily strong structure with excellent concrete finish. Due to the fine tolerances achieved in the aluminum formwork components, consistent concrete shapes and finishes are obtained floor after floor, building after building, conforming to the most exacting standards of quality and accuracy. This allows plumbing and electrical fittings to be prefabricated with the certain knowledge that there will be an exact fit when formwork is assembled. The dimensional accuracy of the concrete work also results in consistent fittings of doors and windows. The smooth finish of the concrete greatly reduces or eliminates the need for costly plastering. The WTF formwork system has been used in the construction of hundreds of thousands of structures including residential and commercial structures in single story, low rise, and high-rise construction. It has been proven to be very successful in the construction of mass housing projects worldwide. It is fast, simple, adaptable and very cost effective. The WTF formwork system is unique because it forms all of the concrete in the structure including, walls, floor slabs, columns, beams, stairs, window details, balconies and various decorative features in exact accordance with the architect’s design. No other system can match WTF formwork flexibility to handle all design conditions. The WTF system also allows for the most efficient and cost effective insulation for areas of the world where it is required for extreme temperature conditions.The WTF system can be erected by unskilled labor and without the need for hoisting cranes. The largest panel weight is not more than 32 kgs (70 Lbs). This enables a single worker to handle the WTF formwork components. The panels and other sections are secured and fixed by steel pins and wedges with formwork ties. The only tool required is a hammer. The WTF system can save as much as 15% of the total cost of construction vs. traditional methods such as block or post and beam construction.

Transcript of Aluminum Formwork

Page 1: Aluminum Formwork
Page 2: Aluminum Formwork

Residential Construction With Aluminum Formwork

In the past decade the world has had tremendous growth in residential construction. During this period developers have sought faster and more cost efficient methods of construction. This has led to a large number of developers abandoning traditional methods such as block or post/beam construction in favor of cast in place concrete construction.

Page 3: Aluminum Formwork

While the move to monolithic cast in place construction has been more of a monetary decision based on speed, labor savings, and reduced finishing cost, this has led to exceptionally disaster resistant structures.

Page 4: Aluminum Formwork

These structures are being constructed on a mass scale in such places as Mexico, Venezuela, Costa Rica, Guatemala, and many others countries.

Mexico

Page 5: Aluminum Formwork

Venezuela - 1250 Single Story Duplex's

Page 6: Aluminum Formwork

Chile – 650 Large Single Family Homes

Page 7: Aluminum Formwork

Costa Rica – 300 Two Story Single Family Homes

Page 8: Aluminum Formwork

Guatemala - 800 Unit Townhouse Project

Page 9: Aluminum Formwork

Pachuca, Mexico – 5,800 Home Project

Page 10: Aluminum Formwork

Ensenada, Mexico 12,000 Home Project

Page 11: Aluminum Formwork

Venezuela - 12 Story 36 Building Apartment Project

Page 12: Aluminum Formwork

The Construction Process

After compaction of site, slab forms are erected, trench footings are dug, plumbing and electrical are installed.

Guatemala

Page 13: Aluminum Formwork

The Construction Process

Steel is placed in slab to include wall verticals

Guatemala

Page 14: Aluminum Formwork

The Construction Process

Slab concrete is placed following normal practices.

Mexico

Page 15: Aluminum Formwork

The Construction Process

Wall Steel attached to vertical steel.Dominican Republic

Page 16: Aluminum Formwork

The Construction Process

Electrical boxes and conduit are then attached to the wall steel.Mexico

Page 17: Aluminum Formwork

The Construction Process

The conduit used in Mexico is flexible and includes the wiring pre-installed

Page 18: Aluminum Formwork

The Construction Process

Electrical Boxes attached to steel

Page 19: Aluminum Formwork

The Construction Process

The WTF formwork used around the world is handset. This may seem labor intensive, but crews of five to ten men can strip, set, and pour a structure a day depending on size.

Brazil

Page 20: Aluminum Formwork

The Construction Process

Handset formwork enablesthe developer to cast most if not all elements of the structure.

This includes structural,non-structural, andarchitectural elements

Guatemala

Page 21: Aluminum Formwork

The Construction Process

Formwork setting begins in a corner. Typically multiple corners arestarted depending on size of crews used.

Page 22: Aluminum Formwork

The Construction Process

Forming continues until all walls are closed. The structure is then ready to receivethe deck formwork.

Page 23: Aluminum Formwork

The Construction Process

Decking forms are also started from a corner and are handset

Page 24: Aluminum Formwork

The Construction Process

Deck completed, ready for steel placement.

Page 25: Aluminum Formwork

The Construction Process

Once decking is in place shoring is installed.

Page 26: Aluminum Formwork

The Construction Process

Deck steel, electrical conduit, and boxes installed.

Page 27: Aluminum Formwork

The Construction Process

A majority of builders use boom pumps to place concrete. Also used are trailer pumps and concrete placement buckets

Venezuela

Jamaica

Brazil

Page 28: Aluminum Formwork

The Construction Process

Formwork is remove the next day, ready to repeat the cycle.

Mexico

Page 29: Aluminum Formwork

The Construction Process

Formwork beams are left undisturbed during the deck form removal process.

Venezuela

Page 30: Aluminum Formwork

The Construction ProcessFinishing materials that are needed are typically no different than the traditionalconstruction methods such as block or post/beam. This material is greatly reduceddue to the smooth concrete walls achieved with the formwork.

Mexico

Page 31: Aluminum Formwork

The Construction Process

For areas that require insulation

Mexico

Page 32: Aluminum Formwork

The Construction Process

Insulation is easily incorporated into the formwork

Mexico

Page 33: Aluminum Formwork

The Construction Process

Once concrete is placed and cured the formwork is removedleaving insulation permanently bonded to the concrete.

Mexico

Page 34: Aluminum Formwork

The Construction Process

Finishing materials are applied directly to the foam

Mexico

Page 35: Aluminum Formwork

Example Projects USA

Page 36: Aluminum Formwork

Example Projects USA

Page 37: Aluminum Formwork

Example Projects USA

Page 38: Aluminum Formwork

Example Projects Tanzania

Page 39: Aluminum Formwork

Example Projects Tanzania

Page 40: Aluminum Formwork

Example Projects Tanzania

Page 41: Aluminum Formwork

Example Projects Dominican Republic

Page 42: Aluminum Formwork

Example Projects Dominican Republic

Page 43: Aluminum Formwork

Example Projects Nigeria

Page 44: Aluminum Formwork

Example Projects Nigeria

Page 45: Aluminum Formwork

Example Projects Nigeria

Page 46: Aluminum Formwork

Example Projects Nigeria

Page 47: Aluminum Formwork

Example Projects Nigeria

Page 48: Aluminum Formwork

Example Projects Guatemala

Page 49: Aluminum Formwork

Example Projects Guatemala

Page 50: Aluminum Formwork

Example Projects Guatemala

Page 51: Aluminum Formwork

Example Projects Guatemala

Page 52: Aluminum Formwork

Example Projects Guatemala

Page 53: Aluminum Formwork

Example Projects Venezuela

Page 54: Aluminum Formwork

Example Projects Venezuela

Page 55: Aluminum Formwork

Example Projects Dominican Republic

Page 56: Aluminum Formwork

Example Projects Dominican Republic

Page 57: Aluminum Formwork

Example Projects Dominican Republic

Page 58: Aluminum Formwork

Example Projects Guatemala

Page 59: Aluminum Formwork

Example Projects Guatemala

Page 60: Aluminum Formwork

Example Projects Guatemala

Page 61: Aluminum Formwork

Example Projects Guatemala

Page 62: Aluminum Formwork

Example Projects Guatemala

Page 63: Aluminum Formwork

Example Projects Mexico

Page 64: Aluminum Formwork

Example Projects Mexico

Page 65: Aluminum Formwork

Example Projects Mexico

Page 66: Aluminum Formwork

Example Projects Venezuela

Page 67: Aluminum Formwork

Example Projects Venezuela

Page 68: Aluminum Formwork

Example Projects Venezuela

Page 69: Aluminum Formwork

Example Projects Mexico

Page 70: Aluminum Formwork

Example Projects Mexico

Page 71: Aluminum Formwork

Example Projects Mexico

Page 72: Aluminum Formwork

Example Projects Mexico

Page 73: Aluminum Formwork

Example Projects Mexico

Page 74: Aluminum Formwork

Example Projects Mexico

Page 75: Aluminum Formwork

Example Projects Venezuela

Page 76: Aluminum Formwork

Example Projects Venezuela

Page 77: Aluminum Formwork

Example Projects Venezuela

Page 78: Aluminum Formwork

Example Projects Venezuela

Page 79: Aluminum Formwork

Example Projects Venezuela

Page 80: Aluminum Formwork

Formwork References

www.concrete-forms.blogspot.com

Formwork Blog

Formwork Photos

www.picasaweb.google.com/ConcreteForming

www.youtube.com/user/ConcreteForms

Formwork Videos

Wall-Ties & Forms, Inc.

www.wallties.com