Altwern AGI
1
Felindre Compressor Station Altwern AGI Western Gas Network Project N Date: 20th September 2021 Verison: 3.0 0 0.5 0.25 0 0.5 1 0.25 Kilometres Miles national gr d Site Location Plan: Felindre Compressor Station & Altwern AGI Existing Gas Pipeline Gas Site Key
Transcript of Altwern AGI
FelindreCompressorStation
Altwern AGI
Western GasNetwork Project
N© National Grid Copyright – No part of this work may be reproduced ortransmitted in any form or by any means, or stored in a retrieval system of anynature, without the prior written permission of the copyright holder.
Ordnance Survey © Crown Copywrite
Date: 20th September 2021Verison: 3.0
0 0.50.25
0 0.5 10.25
Kilometres
Miles
nationalgr d
Site Location Plan:
Felindre Compressor Station &
Altwern AGI
Existing Gas Pipeline
Gas Site
Key