Alternate Project Delivery Methods - ASHE Phoenix Sonoran
Transcript of Alternate Project Delivery Methods - ASHE Phoenix Sonoran
![Page 1: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/1.jpg)
Alternate ProjectAlternate Project Delivery Methodsy
Presented byWylie Bearup, PE, PhD
City of PhoenixCity of PhoenixStreet Transportation Dept
1
![Page 2: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/2.jpg)
ObjectiveObjective
To gain an understanding of Alternate Project Delivery Methods
To understand how the Street Transportation Dept is planning to implement APDM
2
![Page 3: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/3.jpg)
Delivery Methods & jProject Types
METHOD PROJECT TYPEMETHOD PROJECT TYPEDesign-Bid-Build Streets improvements, storm drains,
waterlineswaterlinesDesign-Build Fast tracked projects, speed
premiumCMAR Buildings, water/wastewater &
aviation facilities, phasing challengesJ b O d R ti d l llJob Order Contracts
Renovation, remodel, small new construction < $2M
GOAL U th i ht t l f th j b3
GOAL: Use the right tool for the job.
![Page 4: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/4.jpg)
Delivery Methods BackgroundDelivery Methods Background
State Legislature approved alternate methods State Legislature approved alternate methods in 2000 General Session
Alternate Project Delivery Methods include:Alternate Project Delivery Methods include: Construction Manager at Risk (CMAR) Design-Build (DB) Job Order Contracting (JOC)
Previously, City only allowed to use Design-Bid-Build method Challenges completing projects on time within
budgets4
budgets
![Page 5: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/5.jpg)
Design-Bid-BuildgTraditional, Low Bid
Project Organization
• Linear process – each step must be completed before
di t tDesigner
CITY
proceeding to next
• Longest project durationGeneral
• Adversarial relationships
Sub Sub Sub
Contractor
Typical Project TimelineSelectDesign
Sub Sub Sub
5
BidConstruct
![Page 6: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/6.jpg)
Isaac Pedestrian BridgeIsaac Pedestrian Bridge
Scope: New pedestrian bridge p p gspanning 135 feet, student drop-off area, and bus shelter
Designer: Jacobs Engineering Group Designer: Jacobs Engineering Group Artist: Rosemary Lonewolf Construction: Bison Construction Budget: $6.4 million Factors:
Si ifi t ll b ti b t Significant collaboration between Federal, State, County, City, School
Specialized Art features
6
Status: Opened August 2008
![Page 7: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/7.jpg)
Van Buren: 75th-67th Avenues P i & S D iPaving & Storm Drain
Scope: Paving, curb, sidewalk, storm p g, , ,drain, street lights
Designer: EntellusC t ti St d d C t ti Construction: Standard Construction
Budget: $3 million Factors:Factors:
11,300 tons of asphalt 5,200 linear feet of curb
23 500 square feet of sidewalk 23,500 square feet of sidewalk 1,200 linear feet of storm drain
Status:
7 Began construction November 2009 Scheduled completion May 2010
![Page 8: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/8.jpg)
Design-BuildgQualifications Based & Best Value
Project Organization• Single contract for design and
construction
ll f k
CITYj g
• Allows fast tracking, start construction as complete design
No “finger pointing”
DesignBuilder
• No “finger pointing”
Sub Sub SubTypical Project TimelineTypical Project TimelinePrelim Design Select Design &
8
Design & Construct
![Page 9: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/9.jpg)
ASU School of JournalismASU School of Journalism
Scope: New classroom and Scope: New classroom and office space, TV studios
Designer/Builder: SundtDesigner/Builder: Sundt Construction w/HDR and Steven Ehrlich Architects
Budget: $71M Factors:
Time! Complexity Coordination
9
Coordination
Status: Opened August 2008
![Page 10: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/10.jpg)
Construction Manager at RiskgQualifications Based only
Project OrganizationProject Organization• Separate contracts for design
and constructionCITY
Designer Construction
• CM selected during design, provides input
Designer Manager
Sub
• Work by owner-approved subs Sub
Sub
Typical Project Timeline
SelectDesign
10
DesignConstruct
![Page 11: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/11.jpg)
Phoenix Convention Center E iExpansion Scope: Expand Convention Center, p p ,
Renovate Symphony Hall Designer: LAD/HOK
/ ll/ l d CMAR: Hunt/Russell/Alvarado Budget: $600M Factors: Factors:
Complexity Phasing Schedule
Status: Phase 1 - Complete Symphony Hall Done
11
Symphony Hall - Done Phase 2 – Opened Dec. 27, 2008
![Page 12: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/12.jpg)
Camelback Pedestrian Unde passUnderpass
Grade separated pedestrian Grade-separated pedestrian connection across Camelback between 24th and 26th Streets
Pedestrian enhancements at 20th and 24th Streets.
H t C t ti l t d Hunter Contracting completed within a compressed (nine month) timeframe
Required coordination with the Biltmore Fashion Square and Camelback Esplanade
12
and Camelback Esplanade management
![Page 13: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/13.jpg)
More Street Transportation C jCMAR Projects Historic Streetlight Restoration (Underway) Historic Streetlight Restoration (Underway)
North Valley Parkway (19th Avenue) Bridge Over CAP Canal (Hunter Contracting)Over CAP Canal (Hunter Contracting)
Sonoran Boulevard (Advertisement Underway)
Arcadia Drive Drainage & Sidewalk Arcadia Drive Drainage & Sidewalk Improvements (Advertisement Underway)
13
![Page 14: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/14.jpg)
CMAR w/ Price CompetitionCMAR w/ Price Competition
Arizona law required “Qualifications Based o a a equ ed Qua cat o s asedSelection” only, prohibits price consideration
Most Federal agencies require price i i l i fcompetition on selection of contractors
2009 legislative session enacted CMAR with price for ARRA onlyprice for ARRA only Format of price competition undefined Options prepared by Alliance for Construction Options prepared by Alliance for Construction
Excellence, ASU Revise 2010 for all Federal funds??
14
![Page 15: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/15.jpg)
Job Order ContractsQualifications Based & Best Value
• Used for small sidewalk projects, Project Organization
CITY
Designer( ti l)
p j ,landscape, local drainage, ADA ramps, bridge repair, etc.
j g
(optional)
Job OrderContractor
• Projects designed and constructed “as needed”
S t d i JOC
Typical Project Timeline
• Separate designer or JOC
Select Award Design & C t t
15
Construct
![Page 16: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/16.jpg)
Street Transportation JOCsStreet Transportation JOCs
Selected on qualifications, experience
Negotiated price based onNegotiated price based on scope
Use historical bid prices to verify cost Roosevelt/39th Ave Beforeverify cost Roosevelt/39 Ave Before
16Roosevelt/39th Ave After
![Page 17: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/17.jpg)
Galvin Parkway Traffic CircleGalvin Parkway Traffic Circle
Scope: Traffic Circle to mitigate p gtraffic through Papago Park and entrance to Desert Botanical Garden
Designer: CMX Designer: CMX Construction: Banicki Construction Budget: $1 million Factors:
Coordination with Water Dept projectproject
Balancing needs of all stake holders
St t Opened Septembe 200917
Status: Opened September 2009
![Page 18: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/18.jpg)
Selection Process SummarySelection Process Summary
METHOD IFB RFQ RFPMETHOD IFB RFQ RFP
Design-Bid-Build X
Design-Build, 1-Step X
Design-Build 2-Step X XDesign Build, 2 Step X X
Const. Mgr @ Risk X
JOC, 1-Step X
JOC, 2-Step X X
18
![Page 19: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/19.jpg)
APDM BenefitsAPDM Benefits
Ability to pick “Best Qualified” contractor Ability to pick Best Qualified contractor Better relationships among all project team
members Contractor involvement throughout design
phase:More control of budget through design phase More control of budget through design phase
True Value Engineering to ensure most cost-efficient systems
Enhanced project communications by selecting entire team early
More time to plan construction activities
19
More time to plan construction activities Better designs through constructability reviews
![Page 20: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/20.jpg)
APDM Benefits, con.APDM Benefits, con.
Better quality from better subcontractors Better quality from better subcontractors Smoother project close out Better contractor performance for repeat Better contractor performance for repeat
business Reduced completion time with fast tracking Reduced completion time with fast tracking
and long lead procurement Greater control of subcontractor selectionGreater control of subcontractor selection Higher levels of M/W/SBE participation Ability to meet Green Building goals
20
Ability to meet Green Building goals
![Page 21: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/21.jpg)
Typical Project TimelinesTypical Project Timelines
DESIGN-BID-BUILDSelectDesignBidConstruct
Very linear process – each step must be completed before proceeding to next. Timep p g
SelectDesign
CMAR Savings
DesignConstruct
Allows “fast tracking” -- contractor can begin
21
site work and foundations before the entire project is fully designed.
![Page 22: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/22.jpg)
Delivery Method ComparisonDelivery Method Comparison
FACTOR CM@R DBBFACTOR CM@R DBBContractor Selection
Subcontractor Selection
D i I t Design Input
Quality
Speed
Relationships
Cost Growth
Schedule Growth Schedule Growth
First Cost
Cost Certainty
Litigation
22
Litigation
Value
![Page 23: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/23.jpg)
Schedule GrowthSchedule Growth
30.0%
24.7%25.0%
15.0%
20.0%
7.0%
10.0%
4.8%
0.0%
5.0%
23
Design-Bid-Build Design-Build CM@Risk
![Page 24: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/24.jpg)
Cost GrowthCost Growth
15.2%
12 0%
14.0%
16.0%
8 0%
10.0%
12.0%
4.7%
4.0%
6.0%
8.0%
0.7%
0.0%
2.0%
24
Design-Bid-Build Design-Build CM@Risk
![Page 25: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/25.jpg)
Construction SpeedConstruction Speed
2,500
2,141
2,000
1,4501,500
/mon
th
9251,000
SF/
0
500
25
Design-Bid-Build Design-Build CM@Risk
![Page 26: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/26.jpg)
ContractorAPDM Designer
Analogy
Owner
26
![Page 27: Alternate Project Delivery Methods - ASHE Phoenix Sonoran](https://reader030.fdocuments.in/reader030/viewer/2022021209/62063efa8c2f7b173005d0f8/html5/thumbnails/27.jpg)
Questions?Questions?
Contact Information:
Wylie Bearup, PE, PhDStreet Transportation DirectorCity of Phoenix ArizonaCity of Phoenix, ArizonaPhone: 602-262-6136E-mail: wylie bearup@phoenix govE mail: [email protected]