Alstom Wind Madrid, 20 th May 2010 Félix Urrea, VP Operations EMEA.
-
Upload
george-williamson -
Category
Documents
-
view
215 -
download
0
Transcript of Alstom Wind Madrid, 20 th May 2010 Félix Urrea, VP Operations EMEA.
Alstom Wind
Madrid, 20th May 2010
Félix Urrea, VP Operations EMEA
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 2
Agenda
Topic 1 Our Group: A major industry player
Topic 2 Introduction to Alstom Wind
Topic 3 Technology
Topic 4 Product Platforms: ECO 80 & ECO 100
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 3
Alstom GroupTwo activities
* through Alstom Hydro, a 50/50 joint venture between Alstom and Bouygues set up in 2006
N°1 worldwide in
in high speed and very high
speed
in urban transport(metros and trams)
integrated power plants
air qualitycontrol systems
hydro power*
services for electricity utilities
N°1 worldwide N°2 worldwide
• N°2 worldwide in Rail transport infrastructure
• N°3 worldwide in Power generation infrastructure
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 4
Alstom Group81,700 employees in over 70 countries
17% in Asia & Pacific12,920 employees
60% in Europe45,600 employees
16% in North America12,160 employees
1% in Middle East & Africa 760 employees
6% in Latin America4,560 employees
Source: Alstom 2008/09
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 5
Alstom GroupPower Sector
• Alstom Power offers- Coal-fired and Gas-Fired Power Plants- Hydro Power Plants and Wind Power Solutions- Nuclear Power Plants (Conventional Island)- Power Plant Management (service
packages, maintenance & service agreement)- Retrofit solutions & services for the
installed base
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 6
Our solutions:Technologies adapted to all energy sources
Gas Coal Oil
Hydro Nuclear (Conv. Island) Wind
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 7
Our extensive offering:A strong competitive advantage
Strong presence
(*)(*)
Renewable
Hydro Wind
LargeGas
Turbine
LargeSteam
Turbine
BoilersGene- rators
Heat Recovery
Steam Generator
HeatExchanger
Environ-mental control
systems
PlantNuclear/Conv. Island
Energy mgmt
SYSTEMS PRODUCTS SERVICESSYSTEMS PRODUCTS SERVICES
Medium presence None
Competitor 2
Competitor 1
Competitor 3
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 8
Agenda
Topic 1 Our Group: A major industry player
Topic 2 Introduction to Alstom Wind
Topic 3 Technology
Topic 4 Product Platforms: ECO 80 & ECO 100
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 9
Introduction to Alstom WindInternational Footprint
• Ecotècnia: established in 1981
• More than 2,100 MW and 1,800 wind turbines in 100 Wind Farms
- Spain- Portugal- France- Italy- Japan- UK
• Global headquarters in
Barcelona
• >1 000 employees
• Working for further expansion in Europe, America and Asia
BeijingOperations Asia
Rio del PozoO&M workshop
Somozas Component Assembly
BarcelonaHeadquarter & Operations EMEA
Toulouse
RichmondOperations North America
OFFICES
FACTORIES
R&D
Buñuel Assembly WTG
CoresesTower Manufacturing
BarcelonaR&D
São PauloOperations Latin America
Bahia*Assembly WTG
Amarillo*Assembly WTG
* Assembly unit to be in operation in 2011
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 10
Introduction to Alstom WindEvolution figures
From 765 employees in 2007 to more than 1,000 employees in 2010
Our R&D activities: from 60 dedicated engineers in 2007 to 150 engineers in 2010
Headquarters in Barcelona host 380 employees, over 78% engineers and other university graduates
April 2010: Alstom wins its first contract in the Moroccan wind power market with a wind farm totalling 100 MW
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 11
Introduction to Alstom WindAreas of expertise
Expertise across the entire value chain
•Land localization
•Wind measurement
•Land leaseagreement
•Complete permitting
•Turbine design
•Component and material sourcing
•Manufacturing and assembly
•Transport
•Erection and commissioning
•Civil Work
•Electrical cabling
•Preventive & Corrective maintenance
•Parts delivery
•Upgrade packs
Wind farm development
Wind turbine supply
Wind farm construction
Operation & Maintenance
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 12
Agenda
Topic 1 Our Group: A major industry player
Topic 2 Introduction to Alstom Wind
Topic 3 Technology
Topic 4 Product Platforms: ECO 80 & ECO 100
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 13
Modular
Pitch- VS
ALSTOM PURE TORQUE™
Yaw concept
• Over 1 800 wind turbines of different generations are in operation
• Concepts are coming from a track record in challenging sites
• A safe design is ensured by measurements and validated simulations
• Components fully tested
TechnologyProven technology
Built on the experience of previous WT generations
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 14
Agenda
Topic 1 Our Group: A major industry player
Topic 2 Introduction to Alstom Wind
Topic 3 Technology
Topic 4 Product Platforms: ECO 80 & ECO 100
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 15
Product platforms Onshore Wind - Broad product portfolio
Wind farm development
Wind turbine supply
Wind farm construction
Operation & Maintenance
Output MW
1
2
3
1.67
Low
ECO 100 3MW
Site Wind Speed
ECO 80 1.67ECO 86
1.67
ECO 80 2MW
ECO 110 3MW
Optimizing yield with different site conditions
ECO 100 platform: higher energy yield
• Power: 3MW• Rotor Ø: 100, 110m• Status: ECO 100: series
ECO 110: proto 2009
ECO 80 platform: for complex terrains
• Power: 1.67MW• Rotor Ø: 80, 86m• Status: ECO 74/80: >1 300MW
ECO 86: proto 2010
HighMedium
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 16
1 2 3 4
5 6 7 8
ECO 100 platform Overall Performance & Environmental Benefits
=
Electricity for2000 Households
7000 Tn CO2 Saving/year3MW
© ALSTOM 2010. All rights reserved. Information contained in this document is provided without liability for information purposes only and is subject to change without notice. No representation or warranty is given or to be implied as to the completeness of information or fitness for any particular purpose. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Wind - P 17
Thank you for your attention
www.power.alstom.com