ALROSA Operational overview - The Diamond Loupe...2016/01/28 · ALROSA assumes no obligation to...
Transcript of ALROSA Operational overview - The Diamond Loupe...2016/01/28 · ALROSA assumes no obligation to...
28 January 2016
IR-release: Q4 and FY 2015 Operational Overview
2Disclaimer
The below applies to the presentation (the “Presentation”) following this important notice, and you are therefore advised to read this important notice carefully before
reading, accessing or making any other use of this Presentation.
This Presentation contains statements about future events and expectations that are forward-looking statements. Any statement herein (including, without limitation, a
statement regarding our financial position, strategy, management plans and future objectives) that is not a statement of historical fact is a forward-looking statement that
involves known and unknown risks, uncertainties and other factors which may cause ALROSA’s actual results, performance or achievements to be materially different
from any future results, performance or achievements expressed or implied by such forward-looking statements. Past performance should not be taken as an indication
or guarantee of future results, and no representation or warranty, express or implied, is made regarding the future performance. The information and opinions contained
in this document are provided as at the date hereof (unless indicated otherwise) and are subject to change without notice. ALROSA assumes no obligation to update,
supplement or revise the forward-looking statements contained herein to reflect actual results, changes in assumptions or changes in factors affecting these statements.
The diamond resources and reserves estimates provided in this Presentation have been prepared and presented in accordance with the standards and classifications of
the JORC Code (the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves as promulgated by the Australasian Joint Ore
Reserves Committee), which differ in significant respects from the standards and classifications applicable to the disclosure of mineral resources and reserves under
the laws and regulations of certain other jurisdictions, including the regulations of the U.S. Securities Exchange Commission (the “SEC”) with respect to registration
statements and other documents filed with the SEC. Among other things, in accordance with the JORC Code, this Presentation provides certain mineral resources
estimates classified as “inferred”, “indicated” or “measured”, which differ in significant respects from “probable” and “proven” mineral reserves estimates and are not
disclosed in certain jurisdictions, including in SEC filings. There can be significant uncertainty as to whether mineral resources can ever be feasibly and commercially
mined. For further explanation of the JORC Code, see the JORC website at www.jorc.org.
This Presentation does not constitute or form part of and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire any
securities in any jurisdiction or an inducement to enter into any investment activity. The contents hereof should not be construed as investment, legal, tax, accounting or
other advice, and investors and prospective investors in securities of any issuer mentioned herein are required to make their own independent investigation and
appraisal of the business and financial condition of such issuer and the nature of the securities and consult their own advisers as to legal, financial, tax and other related
matters.
This Presentation has not been independently verified. No representation or warranty or undertaking, express or implied, is made as to the accuracy, completeness or
fairness of the information or opinions contained in this Presentation. None of ALROSA nor any of its shareholders, directors, officers or employees, affiliates, advisors,
representatives nor any other person accepts any liability whatsoever for any loss howsoever arising from any use of this Presentation or its contents or otherwise
arising in connection therewith. No reliance may be placed for any purpose whatsoever on the information contained in this Presentation or on its completeness,
accuracy or fairness.
This Presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or
other jurisdiction where such distribution, publication, availability or use would be contrary to law or regulation or which would require any registration or licensing within
such jurisdiction. Persons in whose possession this Presentation and/or such information may come are required to inform themselves about and to observe such
restrictions.
Some numerical figures included in this Presentation have been subject to rounding adjustments.
By reviewing and/or attending this Presentation you acknowledge and agree to be bound by the foregoing.
Diamonds produced (mln cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore and gravels processed (mln t) 5.4 10.3 13.0 7.3 5.5 10.8 13.5 7.4
Grade (cpt) 1.47 0.78 0.75 1.45 1.52 0.89 0.86 1.17
2015
38.3 mln cts
37.1 mln t
1.03 cpt
2014
36.2 mln cts
35.9 mln t
1.01 cpt
Diamond production
7.9 8.09.7 10.6
8.4 9.611.6
8.6
3
2015 results
2015 diamond production totalled 38.3 million carats, an increase of 6% y-o-y
Production results were driven by the following factors:
- launch of Botuobinskaya pipe,
- diamond output growth at Karpinskogo-1 pipe of Lomonosov deposit (Severalmaz),
- growth in diamond production at the Mir underground mine as a result of measures to stabilize its hydrogeological conditions,
- the Udachny underground mine development
+6%
Operational overview of ALROSA
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Open-pit mining (55%)
Underground mining (25%)
Alluvial mining (21%)
Arkhangelskaya pipe (2%)
Republic of Sakha (Yakutia)
Nyurbinskaya pipe (13%)
Komsomolskaya pipe (less than 1%)
Zarnitsa pipe (less than 1%)
Udachnaya pipe (10%)
Nizhne-Lenskoye (5%)
Almazy Anabara (9%)
RussiaKarpinskogo-1 pipe (3%)
Yakutsk
Botuobinskaya pipe (2%)
Aikhal
Udachny
Nyurba
Aikhal Division (32%)
Udachny Division (11%)
Nyurba Division (20%)
Lomonosov Division (5%)
Alluvial deposits (5%)
Mirny
Mining methods:
Arkhangelsk
Note: percentage in brackets indicates the share of region/division/pipe in 2015 ALROSA diamond production
Arkhangelsk
Region (5%)
Russia
Republic of Sakha
(Yakutia) (95%)
4ALROSA’s production footprint
Jubilee pipe (25%)
Aikhal pipe (7%)
Mir pipe (6%)
International pipe (11%)
Mirny Division (18%)
Alluvial deposits (2%)
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Alluvial deposits (less than 1%)
5
AIKHAL DIVISION
Aikhal Division overview 6
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Share in 2015 ALROSA production:
32%
Division structure
Aikhal
Yakutsk
Udachny
Nyurba
Aikhal Division
Udachny Division
Nyurba Division
Mirny Division
Nizhne-Lenskoye
Almazy Anabara
0 200 400 km
Mining methods:
Location of operations
Underground mining
Open-pit mining
Processing Plant No. 8
• Aikhal pipe
• Komsomolskaya pipe
Processing Plant No. 14
• Jubilee pipe
Aikhal pipe
Jubilee pipe
Komsomolskaya pipe
Processing Plant No. 14Capacity: 10 mln t annually 18 km
Processing Plant No. 8Capacity: 1.7 mln t annually
1 km
8 km
MirnyResources inclusive of reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
215,804 1.01 218,694
Reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
117,227 1.04 121,578
* according to JORC Code (as of 01.07.2013)
2015 Results
2015
2015
vs.
2014
Diamonds produced (‘000 cts) 12,322 (2%)
Ore processed (‘000 t) 9,141 (4%)
201512,322 ‘000 cts
9,141 ‘000 t
1.35 cpt
201412,565 ‘000 cts
9,478 ‘000 t
1.33 cpt
7
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 2,436 2,244 2,168 2,630 2,203 2,249 2,069 2,620
Grade (cpt)
Diamond production
3,0002,368
2,981
4,216
2,596 2,676
3,8493,201
1.181.23 1.06 1.38 1.60 1.19 1.86
2015 results
2015 diamond production was 12,322 thousand carats, down by 2% y-o-y
Lower diamond output was a result of lower production at the Aikhal underground mine, driven by longer than planned maintenance
works at Processing Plant No. 8
1.22
(2%)
Operational overview of Aikhal Division
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
current mining area
8
Commissioned:
1985
Current open pit depth:
370 m
Mining method:
Open-pit mining
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
129,017 0.84 108,166
Inferred
65,977 0.62 40,594
Total
194,994 0.76 148,760
0 msurface
-370 mcurrent open pit depth
-1,300 mboundary of exploration
-720 mtarget open pit depth;
boundary of indicated
resources
-1,100 mboundary of inferred
resources
eastern lobe
central lobe
western lobe
Indicated resources
Inferred resources
Resources not classified in accordance with JORC Code*
* potential resources according to the Russian State Commission for Mineral Reserves classification
Jubilee pipe
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2014
9,122 ‘000 cts
8,506 ‘000 t
1.07 cpt
2015
9,405 ‘000 cts
8,355 ‘000 t
1.13 cpt
Jubilee pipe: production overview
Share in 2015 ALROSA production25%
9
2,325 2,357
2,141
2,2982,383 2,381 2,416
2,225
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 2,225 2,215 1,783 2,283 2,174 2,190 1,721 2,270
Grade (cpt) 1.101.04 1.06 1.20 1.01 1.09 1.40 0.98
+3%
• Increase in diamond production in 2015 by 3% y-o-y was driven by mining of higher grade ore from the pipe’s central lobe
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
current mining area
10
Open pit depth:
305 m
Start of underground mining
operations:
2005
Mining method:
Underground mine
Period of open-pit mining:
1961-1996
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
7,729 4.68 36,159
Inferred
8,269 3.87 31,967
Total
15,998 4.26 68,126
south-western ore body
north-eastern ore body
western lobe
eastern lobe
-305 mopen pit depth
-500 mboundary of indicated
resources
-700 mboundary of inferred
resources of south-
western ore body
0 msurface
-900 mboundary of exploration
* potential resources according to the Russian State Commission for Mineral Reserves classification
Indicated resources
Inferred resources
Resources not classified in accordance with JORC Code*
Aikhal pipe
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2015
2,841 ‘000 cts
526 ‘000 t
5.40 cpt
2014
3,292 ‘000 cts
589 ‘000 t
5.59 cpt
Aikhal pipe: production overview
639
0
743
1,910
213 296
1,406
926Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 116 0 147 326 29 59 261 177
Grade (cpt)
7%
11
Share in 2015 ALROSA production
5.51 0.00 5.05 5.86 7.34 5.01 5.39
• Decrease in diamond output in 2015 by 14% y-o-y was a result of lower production, driven by longer than planned maintenance works at Processing Plant No. 8 in
2015
5.23
(14%)
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
12
current mining areaCommissioned:
2000
Current open pit depth:
337 m
Mining method:
Open-pit mining
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
4,812 0.38 1,808
Total
4,812 0.38 1,808 Indicated resources
-337 mcurrent open pit depth
-460 mtarget open pit depth;
boundary of indicated
resources
0 msurface
Komsomolskaya pipe
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2014
152 ‘000 cts
383 ‘000 t
0.40 cpt
2015
77 ‘000 cts
260 ‘000 t
0.30 cpt
36
11
97
80 0
27
50
Komsomolskaya pipe: production overview
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 95 29 238 21 0 0 87 173
Grade (cpt) 0.00
13
Share in 2015 ALROSA production
0.38 0.38 0.41 0.37 0.00 0.31
• Decrease in diamond production in 2015 by 50% y-o-y was driven by planned maintenance works at Processing Plant No. 8 from mid-January to June 2015
0.29
(50%)
less than 1%
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
14
MIRNY DIVISION
15Mirny Division overview
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Processing Plant No. 3• Mir pipe• International pipe• Vodorazdelnye Galechniki placer• Tailings of Processing Plant No. 5Dredges No. 201, 202, 203• Irelyakhskaya placer• Gornoye placer
Share in 2015 ALROSA production:
18%
Aikhal Division
0 200 400 km
Mining methods:
Processing Plant No. 3Capacity: 2 mln t annually
VodorazdelnyeGalechniki placer
Irelyakhskaya placerGornoye placer
Internationalpipe
Dredges No. 201, 202, 203Capacity: 4 mln t annually
Mir pipe
10 km
4 km
16 km
Underground mining
Alluvial mining
Division structure Location of operations
Aikhal
Yakutsk
Udachny
Mirny
Nyurba
Udachny Division
Nyurba Division
Mirny Division
Nizhne-Lenskoye
Almazy Anabara
* according to JORC Code (as of 01.07.2013)
2015 Results
2015
2015
vs.
2014
Diamonds produced (‘000 cts) 6,908 +13%
Ore and gravels processed
(‘000 t), incl.:5,706 +16%
Processing Plant No.3 2,205 +14%
Dredges No. 201, 202, 203 3,501 +18%
Resources inclusive of reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
45,874 4.07 186,765
Reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
34,141 3.92 133,815
20156,908 ‘000 cts
5,706 ‘000 t
1.21 cpt20146,088 ‘000 cts
4,903 ‘000 t
1.24 cpt
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore and gravels processed (‘000 t) 469 1,325 1,479 1,630 486 1,693 1,918 1,609
Grade (cpt)
Operational overview of Mirny Division
Diamond production
1,477 1,553
621
2,4381,941 1,922
1,509 1,536
3.15
16
1.17 0.42 1.50 3.99 1.14 0.79
2015 results
2015 diamond production totalled 6,908 thousand carats, an increase of 13% y-o-y
Growth in diamond production was due to a 50% increase in output at the Mir underground mine, which resulted from measures to
decrease water inflow in the mine detected in Q1 2014
0.95
+13%
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
0 msurface
-315 mopen pit depth
-1,085 mboundary of indicated
resources
-1,475 mboundary of exploration
-1,215 mboundary of inferred
resources
17International pipe
current mining area
Open pit depth:
315 m
Start of underground mining
operations:
1999
Mining method:
Underground mining
Period of open-pit mining:
1971-1981
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
4,208 8.73 36,739
Inferred
1,542 7.98 12,304
Total
5,750 8.53 49,043
Period of open pit
development:
2005-2011
* potential resources according to the Russian State Commission for Mineral Reserves classification
Indicated resources
Inferred resources
Resources not classified in accordance with JORC Code*
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2015
4,024 ‘000 cts
486 ‘000 t
8.29 cpt
2014
3,862 ‘000 cts
445 ‘000 t
8.68 cpt
18International pipe: production overview
Share in 2015 ALROSA production11%
1,312
777
173
1,5341,397
1,139
678810Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 151 97 21 176 171 134 84 96
Grade (cpt) 8.69 8.01 8.24 8.71 8.17 8.53 8.04
• Increase in diamond production in 2015 by 4% y-o-y was driven by longer than planned maintenance works at Processing Plant No. 3 in 2014 and the replacement
of a number of the underground mine’s skip shaft components in May–July 2014
8.41
+4%
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
19Mir pipe
current mining area
Open pit depth:
525 m
Start of underground mining
operations:
2009
Mining method:
Underground mining
Period of open-pit mining:
1959-2001
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
29,211 3.55 103,782
Inferred
10,913 3.11 33,940
Total
40,124 3.43 137,722
Indicated resources
Inferred resources
0 msurface
-1,235 mboundary of exploration
dry shutdown
-545 mupper boundary of indicated
resources
-525 mopen pit depth
-950 mboundary of indicated
resources
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2014
1,463 ‘000 cts
481 ‘000 t
3.04 cpt
2015
2,198 ‘000 cts
647 ‘000 t
3.40 cpt
20Mir pipe: production overview
Share in 2015 ALROSA production6%
52
480
139
774
488559
633518
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 20 141 64 256 145 182 176 144
Grade (cpt) 3.372.60 3.40 2.17 3.03 3.07 3.60
• Growth in diamond production in 2015 by 50% y-o-y resulted from measures to mitigate the increased water inflow in the underground mine detected in Q1 2014,
as well as from higher grade ore processing
3.60
+50%
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2015
686 ‘000 cts
4,574 ‘000 t
0.15 cpt
2014
764 ‘000 cts
3,978 ‘000 t
0.19 cpt
21Alluvial and technogenic deposits
2015 Results
Gravels
processed
(‘000 t)
Grade
(cpt)
Diamonds
produced
(‘000 cts)
4,574 0.15 686
Share in 2015 ALROSA production2%
113
296 309
130
56
224199 207
Diamonds produced
(‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Gravels processed
(‘000 t)298 1,087 1,394 1,199 169 1,378 1,658 1,369
Grade (cpt) 0.38 0.27 0.22 0.11 0.33 0.16 0.12
• Decrease in diamond production in 2015 by 10% y-o-y was driven by processing of lower grade gravels from tailings of
Processing Plant No. 5 and placers
0.15
(10%)
Resources and reserves of Mirny Division
alluvial placers were not included into JORC
Code valuation
Deposits
• Vodorazdelnye Galechniki
placer
• Irelyakhskaya placer
• Gornoye placer
• Tailings of Processing Plant
No. 5
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
22
UDACHNY DIVISION
Udacnhy Division overview 23
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Processing Plant No. 12
• Udachnaya pipe
• Zarnitsa pipe
• Delluvialny placer
• Ruchey Piropovy placer
Share in 2015 ALROSA production:
11%
Division structure
0 200 400 km
Aikhal DivisionAikhal
Yakutsk
Udachny
Mirny
Nyurba
Udachny Division
Nyurba Division
Mirny Division
Nizhne-Lenskoye
Almazy Anabara
* according to JORC Code (as of 01.07.2013)
Resources inclusive of reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
223,976 1.07 239,771
Reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
150,642 0.88 132,358
2015 Results
2015
2015
vs.
2014
Diamonds produced (‘000 cts) 4,297 +17%
Ore processed (‘000 t) 5,377 +12%
Zarnitsa pipe
Udachnaya pipe
2 km
21 km
Delluvialny placer
Ruchey Piropovy placer
Processing Plant No. 12Capacity: 12 mln t annually Mining method
Underground mining
Open-pit mining
Alluvial mining
Location of operations
20143,679 ‘000 cts
4,814 ‘000 t
0.76 cpt
20154,297 ‘000 cts
5,377 ‘000 t
0.80 cpt
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore and gravels processed (‘000 t) 1,570 1,226 455 1,563 1,575 1,583 570 1,649
Grade (cpt)
Operational overview of Udachny Division
Diamond production
0.860.71
24
0.85
1,117 1,039
293
1,229 1,349 1,454
362
1,132
0.64 0.79 0.92 0.64
2015 results
2015 diamond production was 4,297 thousand carats, up by 17% y-o-y
Growth in diamond production was due to the launch of production at the Udachny underground mine and new placers
Dellyuvialnaya and Ruchei Piropovy, as well as increased planned processing of higher grade stockpiles from the western ore lobe of
the Udachnaya pipe
0.69
+17%
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
current mining area
25
Commissioned:
1971
Current open pit depth:
640 m
Mining method:
Open-pit and
underground mining
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Measured
4,820 1.52 7,329
Indicated
82,297 1.49 122,278
Inferred
78,305 1.25 98,157
Total
165,422 1.38 227,764
Start of underground mining
operations:
2014
Ore stockpile
(measured resources)
-640 mcurrent open pit depth
-890 mboundary of indicated
resources
-1,390 mboundary of inferred
resources
western lobe
eastern lobe
Indicated resources
Measured resources
Inferred resources
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Udachnaya pipe
2015
3,515 ‘000 cts
3,250 ‘000 t
1.08 cpt
2014
3,390 ‘000 cts
3,710 ‘000 t
0.91 cpt
Share in 2015 ALROSA production9%
1,055 1,012
269
1,065
1,290 1,378
222
624Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 1 180 1 055 305 1,170 1,234 1,201 200 615
Grade (cpt)0.89
26
0.96 0.88 0.91 1.05 1.15 1.11
• Growth in diamond production in 2015 by 4% y-o-y was a result of increased planned processing of higher grade stockpiles from the western ore lobe
1.02
+4%
Udachnaya pipe: production overview
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2015
413 ‘000 cts
262 ‘000 t
1.58 cpt
2014
114 ‘000 cts
89 ‘000 t
1.28 cpt
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 0 0 0 89 0 0 50 212
Grade (cpt)
0 0 0
114
0 0
77
336
0.000.00
27
0.00 0.00
1% Share in 2015 ALROSA production
1.28 0.00 1.54
• The Udachny underground mine is developing in line with the Company’s plan; for 2015, the plan implied processing of 262 thousand tonnes of ore and
production of 413 thousand carats of diamonds
1.58
3.6x
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Udachny underground mine: production overview
Zarnitsa pipe
current mining area
28
Commissioned:
1999
Current open pit depth:
90 m
Mining method:
Open-pit mining
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
58,554 0.21 12,007
Total
58,554 0.21 12,007
-90 mcurrent open pit depth
-200 mboundary of indicated
resources; target open pit
depth
-700 mboundary of exploration
0 msurface
* potential resources according to the Russian State Commission for Mineral Reserves classification
Indicated resources
Resources not classified in accordance with JORC Code*
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2014
176 ‘000 cts
1,015 ‘000 t
0.17 cpt
2015
225 ‘000 cts
993 ‘000 t
0.23 cpt
Zarnitsa pipe: production overview
62
27 24
50 5342
64 66
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 390 171 150 304 253 195 320 225
Grade (cpt) 0.16
29
0.16 0.16 0.16 0.21 0.21 0.20
• Increase in diamond production in 2015 by 28% y-o-y was due to processing of higher grade ore
0.29
+28%
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Share in 2015 ALROSA productionless than 1%
2015
145 ‘000 cts
872 ‘000 t
0.17 cpt
30
0 0 0 0 6
34
0
106
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Gravels processed (‘000 t) 0 0 0 0 88 187 0 597
Grade (cpt)0.00 0.070.00 0.00 0.00 0.18 0.00
• In Q1 2015, mining at new alluvial placers in the Udachniy Division was launched
• In Q3 2015, no gravels were proccessed in line with the Company's production plan
0.18
Deposits
• Dellyuvialnaya placer
• Ruchei Piropovy placer
Alluvial placers
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Share in 2015 ALROSA productionless than 1%
31м
NYURBA DIVISION
32Nyurba Division overview
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Processing Plant No. 15• Nyurbinskaya placer• Botuobinskaya placer*Processing Plant No. 16• Nyurbinskaya pipe• Botuobinskaya pipe• Nyurbinskaya placer
Share in 2015 ALROSA production:
20%
Division structure
0 200 400 km
Location of operations
* pre-construction activities and waste stripping
are in progress
Processing Plant No. 16 Capacity: 1.4 mln t annually
Nyurbinskaya
pipe
2 km
Processing Plant No. 15Capacity: 0.5 mln t annually
Nyurbinskaya
placer
Botuobinskaya
placer
Botuobinskaya
pipe
5 km
Mining methods:
Open-pit mining
Alluvial mining
** according to JORC Code (as of 01.07.2013)
Resources inclusive of reserves**
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
47,329 3.72 175,945
Reserves**
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
30,087 4.09 123,178
2015 Results
2014
2014
vs.
2013
Diamonds produced (‘000 cts) 7,510 +2%
Ore and gravels processed
(‘000 t)2,040 +2%
Aikhal DivisionAikhal
Yakutsk
Udachny
Mirny
Nyurba
Nyurba Division
Mirny Division
Nizhne-Lenskoye
Almazy Anabara
Udachny Division
20157,510 ‘000 cts
2,040 ‘000 t
3.68 cpt
20147,363 ‘000 cts
2,000 ‘000 t
3.68 cpt
Diamonds produced
(‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 410 375 763 452 351 444 775 470
Grade (cpt)
Operational overview of Nyurba Division
Diamond production
2,067
848
2,264 2,184 2,084
1,152
2,064 2,245
5.04
33
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2.26 2.97 4.83 5.84 2.59 2.66
2015 results
Diamond production in 2015 was 7,510 thousand carats, up 2% y-o-y
Increase in diamond production was caused by the launch of production at the Botuobinskaya pipe and by processing of higher grade
gravels
4.78
+2%
-750 mboundary of exploration;
boundary of inferred
resources
-570 mboundary of indicated
resources
-450 mtarget open pit depth
34
current mining area
Commissioned:
2001
Current open pit depth:
300 m
Mining method:
Open-pit mining
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
12,264 4.13 50,661
Inferred
1,192 5.42 6,465
Total
13,456 4.25 57,126
0 msurface
-300 mcurrent open pit depth
* potential resources according to the Russian State Commission for Mineral Reserves classification
Indicated resources
Inferred resources
Resources not classified in accordance with JORC Code*
Nyurbinskaya pipe
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 410 113 305 427 304 121 194 360
Grade (cpt)
2015
4,809 ‘000 cts
978 ‘000 t
4.92 cpt
2014
6,542 ‘000 cts
1,255 ‘000 t
5.21 cpt
35Nyurbinskaya pipe: production overview
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Share in 2015 ALROSA production13%
2,067
597
1,7762,144
1,735
526
1,008
1,539
5.04 5.28 5.82 5.02 5.16 4.35 5.20
• Decrease in diamond production in 2015 by 26% y-o-y was in line with loading of Processing Plant No. 16 with ore from the Botuobinskaya pipe and sands from the
Nyurbinskaya placer
4.28
(26%)
0 msurface
-980 mboundary of exploration
-580 mtarget open pit depth;
boundary of indicated
resources
-780 mboundary of inferred
resources
overburden
-92 mcurrent open pit depth
36
current mining area
Commencement of waste
stripping:
December 2012
Current open pit depth:
92 m
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
13,679 5.19 71,044
Inferred
2,685 5.14 13,790
Total
16,364 5.18 84,834
Indicated resources
Inferred resources
Resources not classified in accordance with JORC Code*
* potential resources according to the Russian State Commission for Mineral Reserves classification
Botuobinskaya pipe
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
2015
942 ‘000 cts
135 ‘000 t
6.98 cpt
37Botuobinskaya pipe: production overview
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
0 0 0 0
313
039
590
Diamonds produced
(‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 0 0 0 0 47 0 12 76
Grade (cpt) 10.160.00 0.00 0.00 0.00 0.00 3.22
• On 10 March 2015 ALROSA started ore mining at the Botuobinskaya pipe
• In Q1 2015, Processing Plant No. 16 handled the first round of ore from the Botuobinskaya pipe
Share in 2015 ALROSA production2%
7.81
2014
821 ‘000 cts
745 ‘000 t
1.10 cpt
2015
1,759 ‘000 cts
927 ‘000 t
1.90 cpt
38Alluvial deposits
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
13,668 1.68 22,989
Share in 2015 ALROSA production5%
0
251
488
39 0
626
1,017
116
Diamonds produced
(‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Gravels processed
(‘000 t)0 262 458 25 0 323 569 35
Grade (cpt)
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Deposits
• Nyurbinskaya placer
• Botuobinskaya placer
0.00 0.96 1.07 1.57 0.00 1.94 1.79
• Increase in diamond production in 2015 by 2.1 times y-o-y was due to the planned processing of higher grade gravels
3.31
2.1x
39СЕВЕРАЛМАЗ
LOMONOSOV DIVISION (SEVERALMAZ)
40Lomonosov Division (Severalmaz) overview
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Processing Plant No. 1• Arkhangelskaya pipe• Karpinskogo-1 pipe
Arkhangelsk
0 200 400 km
Lomonosov Division
Processing Plant No. 1
Module No. 1Capacity: 1 mln t annually
Module No. 2Capacity: 3 mln t annually
Mining method:
Open-pit miningArkhangelskaya
pipe
Karpinskogo-1
pipe
2 km
3 km
* according to JORC Code (as of 01.07.2013)
Resources inclusive of reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
125,790 0.92 115,501
Reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
75,525 0.85 64,107
2015 Results
2015
2015
vs.
2014
Diamonds produced (‘000 cts) 1,950 +19%
Ore processed (‘000 t) 3,988 +21%
Share in 2014 ALROSA production:
5%
Division structure Location of operations
20141,639 ‘000 cts
3,309 ‘000 t
0.50 cpt
20151,950 ‘000 cts
3,988 ‘000 t
0.49 cpt
Operational overview of Lomonosov Division
Diamond production
41
Diamonds produced
(‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 481 808 1,022 998 885 1,021 1,079 1,003
Grade (cpt)
233
394
523 488 450 488 514 498
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
0.48 0.49 0.51 0.49 0.51 0.48 0.48
2015 results
In 2015, production totalled 1,950 thousand carats, up 19% y-o-y
Diamond production growth was due to higher volumes of ore processed after the processing plant's second module was launched
and diamond production at Karpinskogo-1 pipe commenced
0.50
+19%
0 msurface
-135 mcurrent open pit depth
-940 mboundary of inferred
resources
-324 mtarget open pit depth
-460 mboundary of indicated
resources
42
current mining area
Commissioned:
2005
Current open pit depth:
135 m
Mining method:
Open-pit mining
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
56,226 0.77 43,406
Inferred
39,408 0.98 38,623
Total
95,634 0.86 82,029
Indicated resources
Inferred resources
Arkhangelskaya pipe
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
20141,373 ‘000 cts
2,793 ‘000 t
0.49 cpt
2015
861 ‘000 cts
1,903 ‘000 t
0.45 cpt
233
394
523
222175 163
232291
43Arkhangelskaya pipe: production overview
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Share in 2015 ALROSA production2%
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 481 808 1,022 482 330 539 502 531
Grade (cpt) 0.48 0.49 0.51 0.46 0.53 0.30 0.46
• Diamond production slowdown in 2015 by 37% y-o-y was caused by the planned reduction of ore processing as a result of the launch of Karpinskogo-1 pipe and
processing of lower grade ore
0.55
(37%)
-462 mboundary of indicated
resources
-262 mtarget open pit depth
0 msurface
-98 mcurrent open pit depth
overburden
-662 mboundary of inferred resources
-942 mboundary of exploration
44
current mining area
Commencement of waste
stripping:
2009
Current open pit depth:
98 m
Resources inclusive of reserves
(as of 01.07.2013)
according to JORC Code
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
Indicated
24,988 1.08 26,960
Inferred
5,168 1.26 6,512
Total
30,156 1.11 33,472
Karpinskogo-1 pipe
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
* potential resources according to the Russian State Commission for Mineral Reserves classification
Indicated resources
Inferred resources
Resources not classified in accordance with JORC Code*
2014
266 ‘000 cts
516 ‘000 t
0.51 cpt
45Karpinskogo-1 pipe: production overview
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Share in 2015 ALROSA production3%
2015
1,089 ‘000 cts
2,086 ‘000 t
0.52 cpt
0 0 0
266 275
325282
206
Diamonds produced (‘000 cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Ore processed (‘000 t) 0 0 0 516 555 482 577 472
Grade (cpt) 0.00 0.00 0.00 0.500.52 0.67 0.49
• On 6 October 2014, Severalmaz launched production at Karpinskogo-1
pipe
• In line with the pipe development plan, 2.1 thousand tonnes of ore
was processed and 1.1 thousand carats of diamonds was produced
in 2015
4.1x
0.44
ALMAZY ANABARA
Diamonds produced
(mln cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Gravels processed
(mln t)0 2,200 3,404 0 0 1,898 3,324 0
Grade (cpt)
2015
3 309 ‘000 cts
5 222 ‘000 t
0,63 cpt
2014
3 059 ‘000 cts
5 604 ‘000 t
0,55 cpt
47Almazy Anabara
Share in 2015 ALROSA production9%
0
1,239
1,820
0 0
1,386
1,923
0
0.00
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Deposits
• Morgogor placer
• Istok placer
• Holomolokh placer
• Ebelyakh placer
• Gusinaya placer
• Ruchey 41 placer
• Kurung-Yuryakh placer
Resources inclusive of reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
36,816 0.80 29,597
Reserves*
Tonnage
(‘000 t)
Grade
(cpt)
Contained
diamonds
(‘000 cts)
36,319 0.74 26,749
2015 Results
2015
2015
vs.
2014
Diamonds produced
(‘000 cts)3,309 +8%
Gravels processed
(‘000 t)5,222 (7%)
* according to JORC Code (as of 01.07.2013)
0.56 0.53 0.00 0.00 0.73 0.58
• In Q1 and Q4 2015, no gravels were proccessed due to seasonality of gravel mining
• Diamond production growth in 2015 by 8% y-o-y resulted from processing of higher grade gravels from Gusinaya and
Ebelyakh placers
0.00
+8%
НИЖНЕ-ЛЕНСКОЕ 48
NIZHNE-LENSKOYE
2015
1,964 ‘000 cts
5,640 ‘000 t
0.35 cpt
2014
1,818 ‘000 cts
5,814 ‘000 t
0.31 cpt
0
584
1,234
0 0
551
1,413
0
49Nizhne-Lenskoye
Share in 2015 ALROSA production5%
I. Operational
overviewII. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye
Deposits
• Molodo placer
• Billyakh placer
• Ruchey Shlihovoy placer
2015 Results
2015
2015
vs.
2014
Diamonds produced
(‘000 cts)1,964 +8%
Gravels processed
(‘000 t)5,640 (3%)
Diamonds produced (mln
cts)
Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015
Gravels processed
(mln t)0 2,080 3,734 0 0 1,888 3,752 0
Grade (cpt) 0.00 0.28 0.33 0.00 0.00 0.29 0.38
• In Q1 and Q4 2015, no gravels were proccessed due to seasonality of gravel mining
• Diamond production growth in 2015 by 8% y-o-y resulted from processing of higher grade gravels
0.00
+8%
50
Appendix
51Diamond production
‘000 cts 2014 2015Q1
2014
Q2
2014
Q3
2014
Q4
2014
Q1
2015
Q2
2015
Q3
2015
Q4
2015
Aikhal Division 12,565 12,322 3,000 2,368 2,981 4,216 2,596 2,676 3,849 3,201
Jubilee pipe 9,122 9,405 2,325 2,357 2,141 2,298 2,383 2,381 2,416 2,225
Aikhal underground mine 3,292 2,841 639 0 743 1,910 213 296 1,406 926
Komsomolskaya pipe 152 77 36 11 97 8 0 0 27 50
Mirny Division 6,088 6,908 1,477 1,553 621 2,438 1,941 1,922 1,509 1,536
International underground mine 3,862 4,024 1,312 777 173 1,534 1,397 1,139 678 810
Mir underground mine 1,463 2,198 52 480 139 774 488 559 633 518
Alluvial and technogenic deposits 764 686 113 296 309 130 56 224 199 207
Udachny Division 3,679 4,297 1,117 1,039 293 1,229 1,349 1,454 362 1,132
Udachnaya pipe 3,390 3,515 1,055 1,012 269 1,065 1,290 1,378 222 624
Udachnaya underground mine 114 413 - - - 114 0 0 77 336
Zarnitsa pipe 176 225 62 27 24 50 53 42 64 66
Alluvial deposits - 145 - - - - 6 34 0 106
Nyurba Division 7,363 7,510 2,067 848 2,264 2,184 2,048 1,152 2,064 2,245
Nyurbinskaya pipe 6,542 4,809 2,067 597 1,766 2,144 1,735 526 1,008 1,539
Botuobinskaya pipe - 942 - - - - 313 0 39 590
Alluvial deposits 821 1,759 0 251 488 39 0 626 1,017 116
Lomonosov Division (Severalmaz) 1,639 1,950 233 394 524 488 450 488 514 498
Arkhangelskaya pipe 1,373 861 233 394 524 222 175 163 232 291
Karpinskogo-1 pipe 266 1,089 - - - 266 275 325 282 206
Almazy Anabara 3,059 3,309 0 1,239 1,820 0 0 1,386 1,923 0
Nizhne-Lenskoye 1,818 1,964 0 584 1,234 0 0 551 1,413 0
Total 36,212 38,260 7,894 8,033 9,736 10,555 8,385 9,629 11,635 8,612
52Ore and sands processing
‘000 t 2014 2015Q1
2014
Q2
2014
Q3
2014
Q4
2014
Q1
2015
Q2
2015
Q3
2015
Q4
2015
Aikhal Division 9,478 9,141 2,436 2,244 2,168 2,630 2,203 2,249 2,069 2,620
Jubilee pipe 8,506 8,355 2,225 2,215 1,783 2,283 2,174 2,190 1,721 2,270
Aikhal underground mine 589 526 116 0 147 326 29 59 261 177
Komsomolskaya pipe 383 260 95 29 238 21 0 0 87 173
Mirny Division 4,903 5,706 469 1,325 1,479 1,630 486 1,693 1,918 1,609
International underground mine 445 486 151 97 21 176 171 133 84 96
Mir underground mine 481 647 20 141 64 256 145 182 176 144
Alluvial and technogenic deposits 3,978 4,574 298 1,087 1,394 1,199 169 1,378 1,658 1,369
Udachny Division 4,814 5,377 1,570 1,226 455 1,563 1,575 1,583 570 1,649
Udachnaya pipe 3,710 3,250 1,180 1,055 305 1,170 1,234 1,201 200 615
Udachnaya underground mine 89 262 - - - 89 0 0 50 212
Zarnitsa pipe 1,015 993 390 171 150 304 253 195 320 225
Alluvial deposits - 872 - - - - 88 187 0 597
Nyurba Division 2,000 2,040 410 375 763 452 351 444 775 470
Nyurbinskaya pipe 1,255 978 410 113 305 427 304 121 194 360
Botuobinskaya pipe - 135 - - - - 47 0 12 76
Alluvial deposits 745 927 0 262 458 25 0 323 569 35
Lomonosov Division (Severalmaz) 3,309 3,988 481 808 1,022 998 885 1,021 1,079 1,003
Arkhangelskaya pipe 2,793 1,903 481 808 1,022 482 330 539 502 531
Karpinskogo-1 pipe 516 2,086 - - - 516 555 482 577 472
Almazy Anabara 5,604 5,222 0 2,200 3,404 0 0 1,898 3,324 0
Nizhne-Lenskoye 5,814 5,640 0 2,080 3,734 0 0 1,888 3,752 0
Total 35,922 37,114 5,366 10,258 13,024 7,274 5,500 10,775 13,487 7,351
Thank you!
Corporate Finance and AnalyticsInvestor Relations
1-st Kazachy Per., 10-12 Moscow 119017 Russia
Tel.: +7 495 745 [email protected]