    Tariff regulations of the Regulatory Commissionsto be guided by promotion of generation of electricity from renewable energy sources

    State Electricity Regulatory Commissions(SERCs) required to specify RenewablePurchase Obligations (RPOs)

    The National Electricity Policy to aim for optimalutilisation of resources including renewablesources

    Regulatory Commissions required to promote

    the development of power markets. 4

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    5/30

    SERCs in all major States have specified RPOs

    RPOs vary from 1% to 10% in different States

    Presently the share of renewable energy isabout 4% in total electricity generation

    Share of solar energy presently is negligible.

    5

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    6/30

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    7/30

    7

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    8/30

    Published by the Government in year 2008

    8 key areas chosen for National Missions

    National Solar Mission is one of these 8Missions.

    Suggests RPO at 5% in year 2010, increasing1% every year for 10 years.

    8

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    9/30

    The Constitutional Commission dealingwith devolution of funds has

    recommended a support of US 1 billiondollars over the next five years for rewarding the States which facilitateaddition of renewable basedgeneration and support access tomarkets for renewables.

    9

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    10/30

    10

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    11/30

    Present installed capacity based onrenewables is about 15 GW

    This requires to be increased to 65 GW innext five years if RPO level is to go up to 10%

    nationally, as suggested in NAPCC.But a large part of untapped potential islocated in the States which have alreadyachieved high levels of RPO.

    REC mechanism is expected to overcomegeographical constraints and provide flexibilityto achieve RPO compliance

    11

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    12/30

    TOTAL GENERATIONCAPACITY

    155859.23

    MW

    (As on 31-11-09 )

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    13/30

    13

    45000

    15000

    61000

    5000 7000

    50000

    10891

    2519 816 1241 67 60

    10000

    20000

    30000

    40000

    50000

    60000

    70000

    Wind Small Hydro Bioenergy Cogeneration Waste toenergy

    Solar

    Potential Installed Capacity

    Source : MNRE as on Oct09

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    14/30

    14

    State RPO Target RPO Met

    Maharashtra 4% 3%

    Gujarat 2% 2%

    Karnataka 10% 11.5%

    Tamil Nadu 10% 11%

    Punjab 1% 0.74%Haryana 4% 0%

    Madhya Pradesh 10% 0.07%

    Source : SERCs Orders

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    15/30

    Wind- 11,531MW SHP- 643 Mw

    Wind 10645 MW SHP- 196 MW

    Wind -4,584MW SHP- 762MW

    Wind- 8968 MW SHP 552 MW

    Wind - 1171MW

    SHP- 708 MW

    Wind- 1019MW SHP 400 MWMW

    Wind 255 MW SHP 295 MW

    Wind-4858MW SHP-63 MW

    Wind- 5530MWSHP 499MW

    SHP- 2268 MW

    SHP- 1411 MW

    SHP- 1609MW

    SHP- 292MW

    SHP- 390 MW

    SHP- 213MW

    SHP- 1609MW

    SHP- 1333MW

    SHP- 213MW

    Source : MNRE Annual Report 2008-09

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    16/30

    RE Generation

    Sale at PreferentialTariff

    ConventionalElectricity Component REC Component

    Obligated EntitiesDistribution Company

    / Third Parry SaleObligated Entities

    16

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    17/30

    RE generators with capacity untied in PPAwill have an option to sell electricity and RECseparately

    REC will be issued to RE Generators only

    1 MWhr 1 REC

    Purchase of REC would be considered aspurchase of RE for purpose of RPOcompliance.

    17

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    18/30

    Grid Connected RE technology approved byMNRE would be eligible for REC mechanism

    Separate category of Solar REC

    Provision of regulatory charge to enforcecompliance of RPO.

    RECs are intra-country tradable certificatesand are distinct from carbon credits.

    It is proposed to make RECs eligible for compliance with energy saving obligations.

    18

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    19/30

    Accreditation would be done at State level byState Agency (SA) to be designated bySERC.

    Registration by Central Agency

    Issuance of REC by Central Agency based

    on injection certificate.

    19

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    20/30

    REC exchange through power exchangesapproved by CERC.

    Certificates will be exchanged within floor (minimum) price and forbearance (ceiling) pricedecided by CERC time to time.

    Monitoring Mechanisms : Appointment of Compliance Auditors by CERC for postmonitoring of the REC Transactions.

    20

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    21/30

    The framework of REC settled byForum of Regulators (FOR)

    Model SERC Regulations finalized

    CERC Regulations notified

    21

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    22/30

    Designation of Central Agency

    National Load Despatch Centre has been notifiedas Central Agency.

    Capacity building and skillsets for Central Agency& State Agencies.

    22

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    23/30

    Adoption of REC mechanism in SERC

    regulations

    Setting of RPOs in line with NAPCC

    We are doing a comprehensive study for impact

    analysis of different scenarios.

    Framework for absorption of infirm power within

    the home state23

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    24/30

    Notification of forbearance price and floor

    price

    CERC is preparing a consultation paper on the

    basis of criteria specified in the regulations.

    Preparedness of Power Exchanges

    24

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    25/30

    25

    Website : www.cercind.gov.in Email : [email protected]

    http://www.cercind.gov.in/mailto:[email protected]:[email protected]://www.cercind.gov.in/
  • 7/31/2019 Alok Ppt for South Korea Workshop India

    26/30

    ObjectivesTo establish India as global leader in solar energyand achieve a scale to drive down costs to levelsrequired to achieve grid parity as soon as possible.

    Mission TargetsTo create enabling policy framework for deploymentof 20,000 MW of solar power by 2022.

    To ramp up capacity of grid connected solar power to1000 MW by 2013 and additional capacity of 3000MW by 2017.

    26

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    27/30

    Mission Targets contd ..

    To create favourable conditions for developing solar manufacturing capability in the country.

    To promote programme of off-grid applications,reaching 1000 MW by 2017 and 2000 MW by 2022.

    To promote deployment of 20 Million solar lights by2022.

    To achieve solar thermal collector area of 15 Mn sqmby 2017 & 20 Mn sqm by 2022.

    27

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    28/30

    SERCs should specify RPOs immediately

    Procurement of energy from renewables to beat preferential tariffs

    Central Electricity Regulatory Commission topublish guidelines for pricing non-firm power from renewable sources

    Procurement through competitive route to beadopted to the extent possible.

    28

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    29/30

    29

    67%3%

    12%

    1% 2%15%

    Coal LIGNITE BASED Gas Turbine Gas Turbine(Liquid)

    MULTI FUEL Diesel NUCLEAR HYDRO

    Source: CEA

  • 7/31/2019 Alok Ppt for South Korea Workshop India

    30/30

    Detailed procedure of Central Agency to include- Requirements for registration of eligible

    generator - Issue of REC

    - Interface with power exchanges- Depository functions- Monitoring through reports of compliance

    auditors.- Revocation of registration

    Draft detailed procedure being prepared.

    30