Tariff regulations of the Regulatory Commissionsto be guided by promotion of generation of electricity from renewable energy sources
State Electricity Regulatory Commissions(SERCs) required to specify RenewablePurchase Obligations (RPOs)
The National Electricity Policy to aim for optimalutilisation of resources including renewablesources
Regulatory Commissions required to promote
the development of power markets. 4
-
7/31/2019 Alok Ppt for South Korea Workshop India
5/30
SERCs in all major States have specified RPOs
RPOs vary from 1% to 10% in different States
Presently the share of renewable energy isabout 4% in total electricity generation
Share of solar energy presently is negligible.
5
-
7/31/2019 Alok Ppt for South Korea Workshop India
6/30
-
7/31/2019 Alok Ppt for South Korea Workshop India
7/30
7
-
7/31/2019 Alok Ppt for South Korea Workshop India
8/30
Published by the Government in year 2008
8 key areas chosen for National Missions
National Solar Mission is one of these 8Missions.
Suggests RPO at 5% in year 2010, increasing1% every year for 10 years.
8
-
7/31/2019 Alok Ppt for South Korea Workshop India
9/30
The Constitutional Commission dealingwith devolution of funds has
recommended a support of US 1 billiondollars over the next five years for rewarding the States which facilitateaddition of renewable basedgeneration and support access tomarkets for renewables.
9
-
7/31/2019 Alok Ppt for South Korea Workshop India
10/30
10
-
7/31/2019 Alok Ppt for South Korea Workshop India
11/30
Present installed capacity based onrenewables is about 15 GW
This requires to be increased to 65 GW innext five years if RPO level is to go up to 10%
nationally, as suggested in NAPCC.But a large part of untapped potential islocated in the States which have alreadyachieved high levels of RPO.
REC mechanism is expected to overcomegeographical constraints and provide flexibilityto achieve RPO compliance
11
-
7/31/2019 Alok Ppt for South Korea Workshop India
12/30
TOTAL GENERATIONCAPACITY
155859.23
MW
(As on 31-11-09 )
-
7/31/2019 Alok Ppt for South Korea Workshop India
13/30
13
45000
15000
61000
5000 7000
50000
10891
2519 816 1241 67 60
10000
20000
30000
40000
50000
60000
70000
Wind Small Hydro Bioenergy Cogeneration Waste toenergy
Solar
Potential Installed Capacity
Source : MNRE as on Oct09
-
7/31/2019 Alok Ppt for South Korea Workshop India
14/30
14
State RPO Target RPO Met
Maharashtra 4% 3%
Gujarat 2% 2%
Karnataka 10% 11.5%
Tamil Nadu 10% 11%
Punjab 1% 0.74%Haryana 4% 0%
Madhya Pradesh 10% 0.07%
Source : SERCs Orders
-
7/31/2019 Alok Ppt for South Korea Workshop India
15/30
Wind- 11,531MW SHP- 643 Mw
Wind 10645 MW SHP- 196 MW
Wind -4,584MW SHP- 762MW
Wind- 8968 MW SHP 552 MW
Wind - 1171MW
SHP- 708 MW
Wind- 1019MW SHP 400 MWMW
Wind 255 MW SHP 295 MW
Wind-4858MW SHP-63 MW
Wind- 5530MWSHP 499MW
SHP- 2268 MW
SHP- 1411 MW
SHP- 1609MW
SHP- 292MW
SHP- 390 MW
SHP- 213MW
SHP- 1609MW
SHP- 1333MW
SHP- 213MW
Source : MNRE Annual Report 2008-09
-
7/31/2019 Alok Ppt for South Korea Workshop India
16/30
RE Generation
Sale at PreferentialTariff
ConventionalElectricity Component REC Component
Obligated EntitiesDistribution Company
/ Third Parry SaleObligated Entities
16
-
7/31/2019 Alok Ppt for South Korea Workshop India
17/30
RE generators with capacity untied in PPAwill have an option to sell electricity and RECseparately
REC will be issued to RE Generators only
1 MWhr 1 REC
Purchase of REC would be considered aspurchase of RE for purpose of RPOcompliance.
17
-
7/31/2019 Alok Ppt for South Korea Workshop India
18/30
Grid Connected RE technology approved byMNRE would be eligible for REC mechanism
Separate category of Solar REC
Provision of regulatory charge to enforcecompliance of RPO.
RECs are intra-country tradable certificatesand are distinct from carbon credits.
It is proposed to make RECs eligible for compliance with energy saving obligations.
18
-
7/31/2019 Alok Ppt for South Korea Workshop India
19/30
Accreditation would be done at State level byState Agency (SA) to be designated bySERC.
Registration by Central Agency
Issuance of REC by Central Agency based
on injection certificate.
19
-
7/31/2019 Alok Ppt for South Korea Workshop India
20/30
REC exchange through power exchangesapproved by CERC.
Certificates will be exchanged within floor (minimum) price and forbearance (ceiling) pricedecided by CERC time to time.
Monitoring Mechanisms : Appointment of Compliance Auditors by CERC for postmonitoring of the REC Transactions.
20
-
7/31/2019 Alok Ppt for South Korea Workshop India
21/30
The framework of REC settled byForum of Regulators (FOR)
Model SERC Regulations finalized
CERC Regulations notified
21
-
7/31/2019 Alok Ppt for South Korea Workshop India
22/30
Designation of Central Agency
National Load Despatch Centre has been notifiedas Central Agency.
Capacity building and skillsets for Central Agency& State Agencies.
22
-
7/31/2019 Alok Ppt for South Korea Workshop India
23/30
Adoption of REC mechanism in SERC
regulations
Setting of RPOs in line with NAPCC
We are doing a comprehensive study for impact
analysis of different scenarios.
Framework for absorption of infirm power within
the home state23
-
7/31/2019 Alok Ppt for South Korea Workshop India
24/30
Notification of forbearance price and floor
price
CERC is preparing a consultation paper on the
basis of criteria specified in the regulations.
Preparedness of Power Exchanges
24
-
7/31/2019 Alok Ppt for South Korea Workshop India
25/30
25
Website : www.cercind.gov.in Email : [email protected]
http://www.cercind.gov.in/mailto:[email protected]:[email protected]://www.cercind.gov.in/ -
7/31/2019 Alok Ppt for South Korea Workshop India
26/30
ObjectivesTo establish India as global leader in solar energyand achieve a scale to drive down costs to levelsrequired to achieve grid parity as soon as possible.
Mission TargetsTo create enabling policy framework for deploymentof 20,000 MW of solar power by 2022.
To ramp up capacity of grid connected solar power to1000 MW by 2013 and additional capacity of 3000MW by 2017.
26
-
7/31/2019 Alok Ppt for South Korea Workshop India
27/30
Mission Targets contd ..
To create favourable conditions for developing solar manufacturing capability in the country.
To promote programme of off-grid applications,reaching 1000 MW by 2017 and 2000 MW by 2022.
To promote deployment of 20 Million solar lights by2022.
To achieve solar thermal collector area of 15 Mn sqmby 2017 & 20 Mn sqm by 2022.
27
-
7/31/2019 Alok Ppt for South Korea Workshop India
28/30
SERCs should specify RPOs immediately
Procurement of energy from renewables to beat preferential tariffs
Central Electricity Regulatory Commission topublish guidelines for pricing non-firm power from renewable sources
Procurement through competitive route to beadopted to the extent possible.
28
-
7/31/2019 Alok Ppt for South Korea Workshop India
29/30
29
67%3%
12%
1% 2%15%
Coal LIGNITE BASED Gas Turbine Gas Turbine(Liquid)
MULTI FUEL Diesel NUCLEAR HYDRO
Source: CEA
-
7/31/2019 Alok Ppt for South Korea Workshop India
30/30
Detailed procedure of Central Agency to include- Requirements for registration of eligible
generator - Issue of REC
- Interface with power exchanges- Depository functions- Monitoring through reports of compliance
auditors.- Revocation of registration
Draft detailed procedure being prepared.