ALMA Planning 2014 cominf (archive) Alisdair Manning
description
Transcript of ALMA Planning 2014 cominf (archive) Alisdair Manning
27/01/12 1
ALMA Planning 2014cominf (archive)
Alisdair Manning
26/01/14 1
What do we do all day?
27/01/12 22
JIRA View
27/01/12 33
45
14 6
17
6
5
21
15
10
http://ictjira.alma.cl/secure/Dashboard.jspa?selectPageId=10104
27/01/12 44
Priorities
27/01/12 5
1. ASA – close loop on deliveries with DataTracker
2. Pipeline Integration (including OODT into the RH)
3. Monitoring Database
4. ASA incremental updates• Harvester extensions• AQ features• RH features• performance
5. SourceCat schema restructuring
6. SourceCat cleanup / VO re-architecture
7. NGAS maintenance / performance / merge with ESO codebase
5
Priorities and Resources
27/01/12 66
me Christophe CADC Heiko
1. Schemas2. DataTracker3. ALMA
schema4. Harvester5. SourceCat6. ASDM
Updates7. NGAS
1. Pipeline Int.2. RH - DtD3. RH - OODT4. Harvester5. DataPacker6. NGAS7. Download
Manager
1. AQ 1. Monitoring
Relational ALMA
27/01/12 7
• DelayHarvester and Sourcecat work (2015)• ASDM required for AQUA / ERMA
• create insert / retrieve performance tests • Control’s schema in Garching dev env.• Cost / benefit. Suitable? Performant? Iterate. 16/03• Review by DBAs• Modify module build order ARCHIVE / ICD 31/03• Generate hibernate mappings from model 18/05• Migrate online code, harvester, data packer 20/07
• APDM for ComInf tools (or use Oracle 11gr2 features?)• Feasible? Performance tests 30/09• Hibernate mappings from model. 09/11• Migrate DP, Harvester, online code. 31/12
7
Concretely Releases
27/01/12 8
• 10.8• Harvester corrections, galactic longitude / latitude, spatial resolution• DataTracker 1st release at ARCs
• Detect ingestion of pipeline product from JAO• Does products PI belong to ARC?• Have all pieces made it to the ARC?• Email to PI• Another email one month before end of proprietary period
• 2014.1• Pipeline ingestion into Archive
• 2014.2• SourceCatalogue bugs, refactoring, data model changes, history
• 2014.3• DataPacker expansion to re-assemble pipeline products for delivery
8
Monitoring
• https://ictwiki.alma.cl/twiki/bin/view/CommonInf/MonitorStore2014
• prototype delivery by end of June 2014
• operational system by end of Dec 2014
26/01/14 9
VO
• AQ has been built around OpenCadc, which was lucky….
• AQ features being implemented by CADC
• Requirements for TAP, ObsTap, SIAPv2, VoSpace, Cut-out (ICT-1246)
26/01/14 10