allvisual agdonar.messe.de/exhibitor/cebit/2017/A461505/allvisual-company... · SAP Development...
Transcript of allvisual agdonar.messe.de/exhibitor/cebit/2017/A461505/allvisual-company... · SAP Development...
allvisual ag© allvisual ag | Andreas Renker 1||
PLM and Digital Twin Services in context of Industry 4.0 and IoT
3D visuals are worth a thousand words
allvisual ag
allvisual ag© allvisual ag | Andreas Renker 2|| Jan. 2017
allvisual company profileBackground and Competencies
Product LifecycleManagement (PLM) Concepts & Projects
BroadIndustry Expertise
Best PracticeKnow-How
First Swiss developed helicopter- Digital Product implementation
2015
Business Consulting• PLM along extended SCM• Industry 4.0 & IoT
SW App Development• for Business User
SAP Development Partner• 3D Visual Enterprise• Systems Engineering
allvisual
allvisual ag© allvisual ag | Andreas Renker 3||
"best practice" Product Lifecycle and Configuration Management► Aerospace, Life Science, Automotive, Industrial Machinery and Components, etc.
► Switzerland, Germany, Austria and globally
from practice – for practice
3D Visualisation of the Digital Product for all Lines of Business► 3D Visualisation, Industry 4.0, Internet of Things, Digital Twin, BIM, etc.
► Reuse of Engineering data along the entire Value Chain (closing the gap)
3D visuals are worth a thousand words
Development of innovative Solutions together with the Ecosystem► Comprehensive and holistic Solutions for existing and new digital business models
► For long-term established and newly set up business models
prepare the best practice of tomorrow
Jan. 2017
allvisual company profileBusiness Concept and allvisual USP
allvisual ag© allvisual ag | Andreas Renker 4|| Jan. 2017
allvisual company profile
Technology Trends
Holistic Master Data Model
Integrated Solutions
Visualised Digital Product
allvisualbest practice
allvisual – doing business more clever
allvisualexperience
“All Stakeholders need simplified and visualised Business Information”
Industry Trends Company Strategy
Driven by Best Practice and today Trends
Internet of Things IoT
Industry 4.0
Big Data
simplify
increase efficiency
Digital Twin
paperless factory
lot size one
change to premium
digital transformation
time to marketsmart maintenance
BIM
reduce costs
PLM
product as a service
allvisual ag© allvisual ag | Andreas Renker 5|| Jan. 2017
Digital Twin Services From Master Data to Product
Operation / MRO
Product Development
Order FulfilmentSystem Engineering Production EngineeringEngineering Service Engineering
Continued Worthiness
Phase out
Business Processes
Engineering ProductionEngineering
ServiceEngineering
Supply Chain Customer Service
Customer Customer Customer
Physical Product
Sales
Sales
Customer
As-ConfiguredConfigurationTo-Be Configuration
Technical To-Be Config.
Supply Chain To-Be Config.
As-Is Configuration
As-Built Configuration
As-Maintained Configuration
Customer Service To-Be Config.
Development Configuration
EBOM MBOM CSBOM SBOM As-Built Structure
As-Maint.Structure
Master Data Management
Digital TwinServices
LoB
LogicalStructure
allvisual ag© allvisual ag | Andreas Renker 6||
3D ManufacturingInstructions
Digital Twin Services Digital Twin Services supporting all Lines of Business
3D Service Manuals
3D QualityManagement
3D EBOM – MBOM Transformation
3D Parts Catalog
3D BusinessAnalytics
Building Information Modeling (BIM)
HDR RenderingMarketing & Sales
3D VisualEngineering
Augmented Reality
Mobile Service
Jan. 2017
allvisual ag© allvisual ag | Andreas Renker 7||
Digital Twin Use Case System Engineering: Development Configuration
Jan. 2017
Race Bike
Wheels
Wheel rear
Wheel front
Logical Structure (PSM)
Chassis
Drive
Brakes
Fork
Wheel Assy Compound
Wheel rear Compound
Wheel front Compound
SAP VE Instance PlannerEBOM (150%)
Wheel Assy Spoke
Wheel rear Spoke
Wheel front Spoke
allvisual ag© allvisual ag | Andreas Renker 8|| Jan. 2017
Digital Twin Use Case Engineering: To-Be Configuration and Effectivities
allvisual ag© allvisual ag | Andreas Renker 9||
► 3D enabled EBOM – MBOM Transformation
► Creation of Routings in SAP ECC PP
► Step by step animation of Work Instructions
► Exit to Quality Management
Jan. 2017
Digital Twin Use Case Production Engineering: easy handover to Manufacturing
Source window (EBOM) Working panel
Final transformation,plant panel (MBOM)
MBOMAnimated work instructionbased on the routing steps
allvisual ag© allvisual ag | Andreas Renker 10|| Jan. 2017
Digital Twin Use Case Order fulfilment: 3D animated Work Instructions
allvisual ag© allvisual ag | Andreas Renker 11|| Jan. 2017
Digital Twin Use Case Order fulfilment: Manufacturing Cockpit
Routing• Work steps• Materials• Production tooling
Animated assembly steps
Digital product
In collaboration with
allvisual ag© allvisual ag | Andreas Renker 12||
► Reuse of PMI data out of 3D CAD models
► Quality inspection criteria
► Quality inspection plans
► Quality inspection specifications and protocols
► Integrated Quality Management data with engineering changes
Jan. 2017
Digital Twin Use Case Quality Management: smart Quality Assurance
Digital product with PMI dataQuality inspection plan
Associative integrated, drag and drop
Quality inspection criteria
Indication after an item change
allvisual ag© allvisual ag | Andreas Renker 13|| Jan. 2017
Digital Twin Use Case Quality Management: smart Quality Inspection App
allvisual ag© allvisual ag | Andreas Renker 14|| Jan. 2017
Digital Twin Use Case Customer Service: Integrated 2D/3D Spare Parts Management
allvisual ag© allvisual ag | Andreas Renker 15|| Jan. 2017
Digital Twin Use Case Customer Service: 3D visualised Assets and Manuals
allvisual ag© allvisual ag | Andreas Renker 16|| Jan. 2017
Digital Twin Use Case Customer Service: Predictive Maintenance Cockpit
Equipment StructureInformation
Logistic Information• Warehousing• Spare Parts• Minimized Down Time
Sensor readings3D Digital Product
allvisual ag© allvisual ag | Andreas Renker 17|| Jan. 2017
Customer Service: mobile Augmented Reality MRO App Digital Twin Use Case
Animated 3D Service Manual
Equipment structureAugmented Reality
Main Menu with As-Maintained data
allvisual ag© allvisual ag | Andreas Renker 18|| Jan. 2017
Digital Twin Use Case Supply Chain: 3D visualised Business Analytics
allvisual ag© allvisual ag | Andreas Renker 19||
allvisual ‘s added value:
► long time industry and solution expertise (since 1990)
► use of innovative technologies (e.g. 3D and AR, etc.)
► from executive to bottom level
► from practice – for practice
► consulting and implementation of best practice templates
► strong focus on benefit and cost ratio solutions
► long term trust and partnership
Business Consulting Expertise and Know-How Transferallvisual company profile
Jan. 2017
allvisual ag© allvisual ag | Andreas Renker 20|| Jan. 2017
Thank you very much for your attentionListening to you would be our pleasure
Benjamin Kaulich Chief Commercial Officer
mobile +41 79 250 20 85phone +41 55 552 05 95email [email protected]
Daniel SchultheissChief Technology Officer
mobile +41 76 349 49 00phone +41 55 552 05 85email [email protected]
3D visuals are worth a thousand words
allvisual ag
Industriestrasse 556312 Steinhausen Switzerland
www.allvisual.ch
Andreas RenkerChief Executive Officer
mobile +41 79 341 02 72phone +41 55 552 05 85email [email protected]
allvisual ag© allvisual ag | Andreas Renker 21||
Legal Disclaimer
allvisual ag, refers to protection notice ISO 16016:The reproduction, distribution and utilisation of this publication as well as the communication or transmission, in any form or for any purpose, of its contents to others without express authorization of allvisual ag is prohibited. Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
Products or services mentioned in this publication as well as respective logos are trademarked or registered trademarks of allvisual ag or appropriate partners.
These information is provided by allvisual ag for information purpose only, without representation or warranty of any kind and allvisual or its appropriate partners shall not be liable for errors or omissions with respect to the information.In particular, allvisual ag has no obligation to pursue any course of business, any functionality displayed or any related presentation or to develop or release any functionality mentioned therein. This publication or any related content are all subject to change and may be changed by allvisual ag or its appropriate partners at any time for any reason without notice.
Jan. 2017