Allied African Co. Ltd.We are bulk bitumen traders mainly the bulk bitumen. Head office is located in Khartoum – Sudan.Our bulk bitumen terminal is located in Port Sawakin – 60 km from Portsudan- We have a vertical tank capacity of 2,500 M Ton.A 100 units of ISO TANKS the capacity of each is 20 M Ton with a total capacity of 2,000 M Ton.We have two boilers (thermal oil operated),3 Generators sets.Weight bridge.All these facilities enable us to provide a smooth delivery of bitumen to our customers.We are looking for bulk bitumen supply on C&F basis at Portsawakin from Greece .
![Page 2: Allied African Co. Ltd.](https://reader035.fdocuments.in/reader035/viewer/2022081504/56813556550346895d9cbb3d/html5/thumbnails/2.jpg)
Receiving bitumen From VesselThe approved draft is 8.0 m
![Page 3: Allied African Co. Ltd.](https://reader035.fdocuments.in/reader035/viewer/2022081504/56813556550346895d9cbb3d/html5/thumbnails/3.jpg)
The Jetty & Receiving Pipeline At Allied African's Terminal
Receiving Pipeline
The Jetty
![Page 4: Allied African Co. Ltd.](https://reader035.fdocuments.in/reader035/viewer/2022081504/56813556550346895d9cbb3d/html5/thumbnails/4.jpg)
Storage Tanks (Total Capacity 2,500 M Tons)
T1= 2,,000 M TONT2= 500 M TON
![Page 5: Allied African Co. Ltd.](https://reader035.fdocuments.in/reader035/viewer/2022081504/56813556550346895d9cbb3d/html5/thumbnails/5.jpg)
)2 (No. Boilers To heat the bitumen inside the t storage tanks up to 145 C
before loading he ISO TANKS
![Page 6: Allied African Co. Ltd.](https://reader035.fdocuments.in/reader035/viewer/2022081504/56813556550346895d9cbb3d/html5/thumbnails/6.jpg)
The approved bitumen
grade to be used in the
SUDAN is 60 / 70.
Since the boiler is
used to heat the bitumen
inside the storage tanks
up to 145 C before
loading the ISO TANKS,
that insures the bitumen
is not grade 80 / 100.
Inlet Heating Valves
![Page 7: Allied African Co. Ltd.](https://reader035.fdocuments.in/reader035/viewer/2022081504/56813556550346895d9cbb3d/html5/thumbnails/7.jpg)
100 No. Of ISO TANKS each of 20 M TON Capacityused to deliver the bitumen to our customers’ sites.
+249 155 18 18 25 20 M TON
![Page 8: Allied African Co. Ltd.](https://reader035.fdocuments.in/reader035/viewer/2022081504/56813556550346895d9cbb3d/html5/thumbnails/8.jpg)
Loading Rack & Weight BridgeThe use of the weight bridge insures that we deliver to our
clients the exact quantities they have ordered.
Weight Bridge
2No.Loading Arms
![Page 9: Allied African Co. Ltd.](https://reader035.fdocuments.in/reader035/viewer/2022081504/56813556550346895d9cbb3d/html5/thumbnails/9.jpg)
Bitumen Pumps + Mobile CraneThe use of the bitumen pumps to load the ISO TANKS
insures that there are no rubbish (sand, old cloth, …etc) in our bitumen
2 No. Pumps
![Page 10: Allied African Co. Ltd.](https://reader035.fdocuments.in/reader035/viewer/2022081504/56813556550346895d9cbb3d/html5/thumbnails/10.jpg)
Loading The Bitumen Into The ISO Tanks