Allegro - Pipeline Risk Management Information System (PRIMIS)

23
Allegro Allegro Energy Consulting Y Y February 7, 2007 New Orleans, LA © The Oil Pipeline Industry Had an Idea . . . The Oil Pipeline Industry Had an Idea . . . Learning from PPTS 1999 Learning from PPTS 1999 - - 2005 2005 Cheryl J. Trench Cheryl J. Trench President Allegro Energy Consulting Presented to PHMSA PHMSA s s R&D Forum, 2007 R&D Forum, 2007

Transcript of Allegro - Pipeline Risk Management Information System (PRIMIS)

Page 1: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Allegro Energy Consulting���������������� ��� ���������������

� ��!��"���#�$%$&'����� ()�!����"���#�$��&���%*����* + �*��*,

February 7, 2007New Orleans, LA

© ��� -��.���* �����$

The Oil Pipeline Industry Had an Idea . . .The Oil Pipeline Industry Had an Idea . . .

Learning from PPTS 1999Learning from PPTS 1999--20052005

Cheryl J. TrenchCheryl J. TrenchPresidentAllegro Energy Consulting

Presented to

PHMSAPHMSA’’ss R&D Forum, 2007R&D Forum, 2007

Page 2: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

TodayToday’’s Presentations Presentation

Why the Pipeline Performance Tracking SystemWhy the Pipeline Performance Tracking SystemWhat have we learned?What have we learned?How do we learn from it?How do we learn from it?The basics of the dataThe basics of the dataSome new lessons Some new lessons –– and surprises and surprises –– from the datafrom the data

Page 3: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

1990-2005

50

100

150

200

25090 92 91 93 95 97 99

2001

2003

2005

Ann

l 000

Bar

rels

0

50

100

150

200

250

Ann

l Num

ber

Volume Number3 per. Mov. Avg. (Volume) 3 per. Mov. Avg. (Number)

The Oil Pipeline Spill Record:The Oil Pipeline Spill Record: What the Public SeesWhat the Public Sees

Source: PHMSA Form F 7000-1, from http://ops.dot.gov/stats/lq_sum.htm.Results for 2002 - 2005 reflect incidents reportable under criteria in place prior to February 2002, i.e., 50 bbls liquid, 5 bbls HVL, death, injury, fire, explosion, $50K damages.

Page 4: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Small and Large Releases in PHMSA DataSmall and Large Releases in PHMSA Data

"Pipeline Statistics" pageOnly those releases that meet the pre-2002 criteria: >=50 barrels, e.g. Larger spills haven't declined sharply in PPTS either. Like PPTS, PHMSA shows a decline in the smaller spills. Some differences in asset coverage, maintenance exclusion 0

50100150200250300350400450500

2002 2003 2004 2005

Volume >=50 barrels

Don't Meet Old Criteria

Other Criteria

Number of Incidents, 2002-2005

Page 5: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ���� What is the What is the

Pipeline Performance Tracking System?Pipeline Performance Tracking System?

““PPTSPPTS””: voluntary; open to all liquids pipeline : voluntary; open to all liquids pipeline operatorsoperatorsNo membership No membership reqreq’’dd, no fee imposed, no fee imposedIndustryIndustry--run and maintainedrun and maintainedCollecting info since 1999Collecting info since 1999Records spills of 5 gallons or more on land, all Records spills of 5 gallons or more on land, all spills to water (compare old OPS @ 50 barrels)spills to water (compare old OPS @ 50 barrels)In 2005, PPTS participants operated about 85% of In 2005, PPTS participants operated about 85% of OPS miles and total barrelOPS miles and total barrel--milesmiles

1. Measure 2. Learn 3. Manage 4. Improve1. Measure 2. Learn 3. Manage 4. Improve

Page 6: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

The PPTS Record Per Mile, 1999The PPTS Record Per Mile, 1999--20052005

0.0

1.0

2.0

3.0

4.0

5.0

'01 '02 '03 '04 '050

200

400

600

800

1000

Dotted lines exclude Ivan, Katrina & Rita

Number per 1000 Miles Barrels per Mile

Number (Left Scale)

Barrels (Right Scale)

3-Year Averages Ending in Year Shown

Page 7: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ���� Onshore Pipe Incidents, '99Onshore Pipe Incidents, '99--'05'05

33--Yr Average Ending Year ShownYr Average Ending Year Shown

TOTAL, ALL CAUSES CORROSION THIRD PARTY

EQUIP./NON-PIPE OPERATOR/OPER'N MAT'L/SEAM/WELD

‘01 '05 ‘01 '05 ‘01 '05

‘01 '05 ‘01 '05 ‘01 '05050

100150200250300

0

50

100

150

0

10

20

30

40

50

05

101520

2530

0

5

10

15

20

0

10

20

30

40

Page 8: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

PPTS Participants Use PPTSPPTS Participants Use PPTS

To measure operator/Industry performanceTo measure operator/Industry performanceTo allocate $To allocate $

MaintenanceIMPR&D

To direct regulatory/advocacy effortTo direct regulatory/advocacy effortTo find new approaches to keeping people and To find new approaches to keeping people and communities safecommunities safe

Page 9: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Data Mining HighlightsData Mining Highlights

Operator Advisories (Operator Advisories (www.api.org/pptswww.api.org/ppts))Causes/locations with a large shareConsequencesNew perspective via PPTSGuidelines for reporting

Reports and Fact SheetsReports and Fact Sheets

Also, Performance Excellence TeamAlso, Performance Excellence Team

The data doesn’t go in and not come out!

Page 10: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Number of Releases by Spill SizeNumber of Releases by Spill Size

3.3

1.6

0.5

0.9

0.50.7

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

1999

2000

2001

2002

2003

2004

2005

4.8 per 1000 miles in 1999, 4.8 per 1000 miles in 1999, 2.6 per 1000 miles in 2005, 2.6 per 1000 miles in 2005, a 47% declinea 47% decline2/3 are less than 5 barrels 2/3 are less than 5 barrels (but share dropping)(but share dropping)15% are 50 barrels or 15% are 50 barrels or larger (old OPS threshold)larger (old OPS threshold)Number of releases of 50 Number of releases of 50 barrels or more has barrels or more has remained flat since 2001, remained flat since 2001, while small spills declined. while small spills declined. Spills of 5Spills of 5--49 barrels have 49 barrels have also flattened.also flattened.

Number per 1000 Miles, 1999-2005

Updated 1106Excludes incidents on unregulated gathering systems; excludes releases from hurricanes Ivan, Katrina and Rita

< 5 Bbls

5-49 Bbls

50+ Bbls

Page 11: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ���� Releases by Commodity;Releases by Commodity;

Number of Incidents per 1000 MilesNumber of Incidents per 1000 Miles

0.01.02.03.04.05.06.07.08.09.0

10.0

'99 '00 '01 '02 '03 '04 '050.01.02.03.04.05.06.07.08.09.0

10.0

'01 '02 '03 '04 '05

Number per 1000 Miles, Yearly Number per 1000 Miles, 3-Yr Avg

3-Yr. Avg Ending in Year Shown

Excludes incidents on unregulated gathering systems; excludes releases from hurricanes Ivan, Katrina and Rita

Crude

Refined Prod

HVL

Crude

Refined Prod

HVL

-45%

-24%

-39%

Page 12: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

0%10%20%30%40%50%60%70%80%90%

100%

<5 Bbls 5-49Bbls

50+Bbls

Total

It's About Risk: System Location, It's About Risk: System Location, Number of Releases by Spill SizeNumber of Releases by Spill Size

Updated 1106

508 per year; 2/3 less than 508 per year; 2/3 less than 5 barrels; 15% are 50 5 barrels; 15% are 50 barrels or larger barrels or larger

Location: Facilities piping & Location: Facilities piping & equipment: 52%; Onshore equipment: 52%; Onshore pipe: 39%pipe: 39%

Percent, 1999-2005

Location by size: Facilities Location by size: Facilities piping & equipment: 24% of piping & equipment: 24% of 50+ 50+ bblsbbls; Onshore pipe: ; Onshore pipe: 62% of 50+ 62% of 50+ bblsbbls

Facility Piping/Equip.59% 47% 24% 52%

Onshore Pipe31% 46% 62% 39%

Excludes incidents on unregulated gathering systems; excludes releases from hurricanes Ivan, Katrina and Rita

Tanks

Page 13: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ���� Focus on Risk, #2:Focus on Risk, #2:

System Part, By YearSystem Part, By Year

Releases from facilities Releases from facilities piping account for 52%; piping account for 52%; from onshore pipe, 39%; from onshore pipe, 39%; from tanks and offshore from tanks and offshore pipe [and cavern], 9%.pipe [and cavern], 9%.Thru 2003, onshore pipe Thru 2003, onshore pipe releases had fallen, and releases had fallen, and facilities releases were facilities releases were ~flat.~flat.Since then, facilities down, Since then, facilities down, and onshore pipe ~flat.and onshore pipe ~flat. 48 39

193

124

326

270

0

50

100

150

200

250

300

350

'99 '00 '01 '02 '03 '04 '05

Facilities Piping

Onshore Pipe

All Other Parts

Number, 1999-2005

Excludes incidents on unregulated gathering systems; excludes releases from hurricanes Ivan, Katrina and Rita

Tanks

Page 14: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ���� Facilities and Onshore Pipe, Facilities and Onshore Pipe,

by Cause, Yearby Cause, Year--byby--YearYear

020406080

100120140160180200

'99 '00 '01 '02 '03 '04 '050

20406080

100120140160180200

'99 '00 '01 '02 '03 '04 '05

Corrosion

CorrosionEquipment

Equip.

TP

All Other

All Other

Onshore PipelineFacilities Piping ##

Oper. Error

Page 15: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Cause Incidents Empl. Contr. Other Total (#, ’99-‘05) (# People)

Third Party Damage 4 0 0 10 10Operator Error 2 0 2 0 2Other 1 1 0 0 1

Fatalities

Total 7 1 2 10 13Third Party Damage 7 0 0 16 16Operator Error (incl.

excavation) 5 4 6 0 10

Pipe mat’l/seam 2 1 0 2 3Corrosion 1 0 0 1 1Equipment Malfunction 1 0 0 1 1“Other failure” in a Tank 1 1 0 0 1Other Cause 1 0 1 0 1

Injuries

Total 18 6 7 20 33

Assessing Consequences:Assessing Consequences: Deaths and InjuriesDeaths and Injuries

Page 16: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Cause Incidents Empl. Contr. Other Total (#, ’99-‘05) (# People)

Facilities Piping 1 1 0 0 1Onshore Pipeline 6 0 2 10 12

Fatalities

Grand Total 7 1 2 10 13Aboveground Storage Tank 1 1 0 0 1Cavern/belowground 1 1 0 0 1Facilities Piping 3 2 6 0 8Onshore Pipeline 13 2 1 20 23

Injuries

Grand Total 18 6 7 20 33

Where Are People Getting Hurt or Killed? Where Are People Getting Hurt or Killed? Deaths and Injuries by System PartDeaths and Injuries by System Part

Page 17: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ���� Why Focus on Third Party Damage?Why Focus on Third Party Damage?

Disproportionate share of consequencesDisproportionate share of consequences

6%

29%

57%

39%

23%

29%

0% 10% 20% 30% 40% 50% 60%

All Incidents

Public safety impact

Fatalities

Injuries

Release >= 50 Barrels

Release >=2,200 Barrels

Third Party Damage Share of Incidents Involving:Total incidents, '99-'05: 3,581; Total from Third Party Damage: 230

Page 18: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Who Does the Damage?Who Does the Damage?

Landowner, 37%

One-Call Partners,28%

All Other, 24%Road Work, 11%

*PPTS classifies operator excavation as Operator Error, not Third Party Damage. Also included in "All Other" is res/comm dev. (4%), waterway activity (2%) and rail (1%)

Page 19: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ���� A Closer Look at A Closer Look at

Who Does the Damage: We Do.Who Does the Damage: We Do.

"Other" activity14%

Road work8%

Underground operator

14%

Oth. pipeline oper9%

Operator Excav.*

20%

Homeowner8%

Farming21%

Landowner/Tenant, 29%

Oper. Excav., 20%

One-Call Partners,23%

All Other, 20%

Road Work, 8%

*PPTS classifies operator excavation as Operator Error, not Third Party Damage. Also included in "All Other" is res/comm dev. (4%), waterway activity (2%) and rail (1%)

6%*

70% are 70% are contractorscontractors

Similar shareSimilar sharecontractors?contractors?

Page 20: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Capitalizing on PPTS: DIRT Module Capitalizing on PPTS: DIRT Module

For releases involving mechanical damage, new For releases involving mechanical damage, new navigation to navigation to DDamage amage IInfo nfo RReporting eporting TTool addool add--onon

1st/2nd party from Operator Error section3rd party from Third Party section Mapped from PPTS + DIRT-only questions addedMandatory for PPTS reporters

For incidents involving contact w/no release, or For incidents involving contact w/no release, or threat of contact, newly reportable in DIRT addthreat of contact, newly reportable in DIRT add--onon

Voluntary for PPTS reportersAPI uploads to DIRT periodicallyAPI uploads to DIRT periodicallyAvailable to DIRT Available to DIRT andand for PPTS analysis/QCfor PPTS analysis/QCMinimize duplication & error opportunityMinimize duplication & error opportunity

Page 21: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Key Elements in PPTS SuccessKey Elements in PPTS Success

CommitmentCommitmentPipeline LeadershipAPI/AOPL

Care and Feeding (APICare and Feeding (API’’s Commitment)s Commitment)QC: Transparency, credibilityProgram Software/MechanicsData Mining Team

LearningLearningData Mining TeamLecturesWebsite

Page 22: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Data Mining TeamData Mining Team

BukkyBukky Adefemi (API)Adefemi (API)Hazem Arafa (API)Hazem Arafa (API)Kevin Kevin BadgettBadgett (Exxon Mobil)(Exxon Mobil)Tom Kelly (Colonial)Tom Kelly (Colonial)Frank Gonzales (Buckeye)Frank Gonzales (Buckeye)Dave Knoelke (BP)Dave Knoelke (BP)Peter Lidiak (API)Peter Lidiak (API)Dan Mihalik (AOPL)Dan Mihalik (AOPL)Debbie Price (Shell)Debbie Price (Shell)Tom Price (ConocoPhillips)Tom Price (ConocoPhillips)Cheryl Trench (Allegro Energy Consulting)Cheryl Trench (Allegro Energy Consulting)Marc Marc WolgamottWolgamott (Koch Pipeline)(Koch Pipeline)TressaTressa Young (Marathon)Young (Marathon)

Page 23: Allegro - Pipeline Risk Management Information System (PRIMIS)

Allegro���������� ����

Allegro Energy Consulting���������������� ��� ���������������

� ��!��"���#�$%$&'����� ()�!����"���#�$��&���%*����* + �*��*,

February 7, 2007New Orleans, LA

© ��� -��.���* �����$

The Oil Pipeline Industry Had an Idea . . .The Oil Pipeline Industry Had an Idea . . .

Learning from PPTS 1999Learning from PPTS 1999--20052005

Cheryl J. TrenchCheryl J. TrenchPresidentAllegro Energy Consulting

Presented to

PHMSAPHMSA’’ss R&D Forum, 2007R&D Forum, 2007