ADDENDUM NO. 1 TO: ALL BIDDERS PROJECT: ITB PW 37-19 – FOY SHAW PARKWAY BID TIME AND DATE: 3:00 PM LOCAL TIME, September 04, 2019 (NO CHANGE) August 22, 2019 The following items are hereby incorporated into the project manual, procurement documents, contract documents, plans and specifications: ITEM NO. 1 – SECTION 00100 INSTRUCTIONS TO BIDDERS Revised Article 9.01 of Document 00100 to read: 9.01 The number of days within which, or the dates by which, the Work is to be (a) Substantially Completed, and (b) also completed and ready for final payment, are set forth in Article 3 of the Agreement. ITEM NO. 2 – SECTION 00100 INSTRUCTIONS TO BIDDERS Revised Article 10.01 of Document 00100 to read: 10.01 Provisions for liquidated damages, if any, are set forth in Article 3 of the Agreement. ITEM NO. 3 – SECTION 00410 BID FORM WITH ATTACHMENTS Revised Article 6.01 of Document 00410 to read: 6.01 BIDDER agrees that the Work will be substantially complete within 270 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 330 calendar days after the date when the Contract Times commence to run.

Transcript of ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages...

Page 1: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

ADDENDUM NO. 1

TO: ALL BIDDERS

PROJECT: ITB PW 37-19 – FOY SHAW PARKWAY

BID TIME AND DATE: 3:00 PM LOCAL TIME, September 04, 2019 (NO CHANGE)

August 22, 2019

The following items are hereby incorporated into the project manual, procurement documents, contract documents, plans and specifications:

ITEM NO. 1 – SECTION 00100 INSTRUCTIONS TO BIDDERS

Revised Article 9.01 of Document 00100 to read:

9.01 The number of days within which, or the dates by which, the Work is to be (a) Substantially Completed, and (b) also completed and ready for final payment, are set forth in Article 3 of the Agreement.

ITEM NO. 2 – SECTION 00100 INSTRUCTIONS TO BIDDERS

Revised Article 10.01 of Document 00100 to read:

10.01 Provisions for liquidated damages, if any, are set forth in Article 3 of the Agreement.

ITEM NO. 3 – SECTION 00410 BID FORM WITH ATTACHMENTS

Revised Article 6.01 of Document 00410 to read:

6.01 BIDDER agrees that the Work will be substantially complete within 270 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 330 calendar days after the date when the Contract Times commence to run.

Page 2: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

ITEM NO. 4 – SECTION 00410 BID FORM WITH ATTACHMENTS

The Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace Pages 00410-3 through 00410-5 with the revised sheets 000410-3 through 00410-5 (transmitted herewith and labeled as Addendum No. 1 in the heading).

ITEM NO. 5 – PROJECT DRAWINGS

The following project drawings are revised: Sheet Number 1, Sheet Number 2, Sheet Number 4, Sheet Number 154 and Sheet Number 155. Copies of the revised drawings are attached and labeled as Addendum No. 1 in bottom left corner.

ITEM NO. 6 – QUESTIONS RECEIVED PRIOR TO THE PRE-BID MEETING

Question 1 – In reference to the geo report. What will be the required depth for the stripping of the existing topsoils after clear and grub operations?

Answer: Clearing and Grubbing depths should meet the requirements of FDOT Specification Section 110-2.2

Question 2 – Sheet No. 155: What is the traffic control plan for Skyline Dr and John Givens Rd

Answer: The intent is to utilize a Detour along Fairchild Road and Airport Road during the construction of the Skyline Drive and John Givens Road intersection. This detail will be added to sheet 155.

Question 3 – Where is the sheet for "Special Detour 1"

Answer: The “Special Detour 1” pay item should have not been included in the plans and will be removed.

Question 4 – Sheet No. 18: For clarification: Is the widening detail on Sheet 18 to be used at the Inter. of Cavalier and Register Ln?

Answer: The widening pavement design shown on sheet 18 will apply to the intersection of Cavalier and Register Lane

Question 5 – Sheet 47 & 52: What will the wall thickness be required for the steel casing?

Answer: The wall thickness needs to meet the requirement of FDOT Specification Section 556-2.1, Bullet 3: “All steel pipe may be bare inside and out, with the manufacturer’s recommended minimum nominal wall thicknesses to meet the greater of either installation, loading or carrier requirements.”

Page 3: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

Question 6 – Sheet 47 & 52: Will an exterior and interior coating be required for the steel casing?

Answer: Per FDOT Specification Section 556-2.1, Bullet 3 all steel pipe may be bare inside and out

Question 7 – Sheet 47 & 52: How much clearance will be required between the OD of the carrier pipe and ID of the steel casing?

Answer: Per FDOT Specification Section 556-2.1, Bullet 1: “The size of the steel casing must be at least 6 inches larger than the largest outside diameter of the carrier. Casing size must accommodate pressure pipe or carrier pipe joint restraints.” The plans show 12 inches for flexibility in construction.

Question 8 – Sheet 47 & 52: Will HDPE be allowed for the carrier pipe as an alternative for the specified pipe?

Answer: HDPE pipe can be used as the carrier pipe as long as it meets the requirements of FDOT Specification Section 556-2 requiring smooth interior and exterior walls:“…only use encasement pipe or uncased carrier pipe material that is new and has smooth interior and exterior walls.”

Question 9 – Sheet 47 & 52: Will the flowable fill be required to encompass all of the anular space of the carrier pipe or just over the top and sides allowing the carrier pipe to rest in the bottom of the steel casing?

Answer: Just the top and sides to allow the pipe to rest in the bottom of the steel casing.

ITEM NO. 7 – QUESTIONS RECEIVED AT PRE-BID MEETING AND LATER

The following questions were posed during the Pre-Bid meeting or later:

Question 1 – Jack and Bore:

Answer: The plans call for both a 54” and 72” jack and bore. It should be noted that these pipes will not actually be jacked and bored. The geotechnical engineer anticipates several inches of “short-term” settlement at these two culvert locations. In order to mitigate adverse impacts from the anticipated settlement, the contractor is to install these casings prior to constructing the embankment. The contractor will then follow-up by installing the carrier pipe, grout and proposed headwalls.

Question 2 – Lane Closures:

Answer: Per the FDOT Driveway connection permit and Note 14 on sheet 153 of the plans, all lane closures, detours and lane shifts of any lanes along the state highway system must be reviewed by and approved by FDOT before

Page 4: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

commencement of work. The request must be in writing and received 2 weeks prior to the lane closure. It should be noted that the plans utilize lane shifts for the construction of both the eastbound left turn lane and westbound right turn lane along US 90. It should be noted that there are no lane closure restriction per FDOT’s methodology for lane closure analysis.

Question 3 – Auburn Water Relocation:

Answer: Prior to construction, Auburn Water will remove as much of their existing water lines as possible. In order to complete Auburn Water’s relocations, they will need the contractor to cut back the existing ground to the proposed grades at the intersection of Cavalier and US 90. Prior to the contractor doing sub-grade and base work, Auburn Water will excavate down to their existing water line tie-in and complete relocation of their water line crossing at Cavalier/Foy Shaw. Auburn Water will need 2 weeks, excluding holidays, to complete this work.

Question 4 – Sheet Piling

Answer: Sheet piling is to be placed prior to any earthwork operations and shall remain in place until permanent erosion control measures (sod and erosion mats) are in place and established.

END OF QUESTIONS

RECEIPT OF THIS ADDENDUM SHALL BE ACKNOWLEDGED BY WRITING THIS ADDENDUM NUMBER AND DATE IN THE SPACE PROVIDED ON DOCUMENT 00410-8, ‘ADDENDUM ACKNOWLEDGEMENT - ATTACHMENT A.’

/s/ Roy Petrey Roy Petrey, P.E. Project Manager

Page 5: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

Foy Shaw Parkway ADDENDUM NO. 1 June 19, 2019

BID TABULATION FOR FOY SHAW PARKWAY - FPN 425617-2-94-01 Item No.

Pay Item No. Description UNIT

ESTIMATED QUANTITY

BID UNIT PRICE BID PRICE

1 0101-1 MOBILIZATION LS 1 $ $

2 0102-1 MAINTENANCE OF TRAFFIC LS 1 $ $

3 0102-3 COMMERIAL MATERIAL FOR DRIVEWAY MAINTENANCE CY 27 $ $

4 0102-60 WORK ZONE SIGNS ED 11070 $ $

5 0102-74-1 CHANNELIZING DEVICES - DRUMS ED 4050 $ $

6 0102-74-2 CHANNELIZING DEVICES - TYPE III ED 3240 $ $

7 0102-99 PORTABLE CHANGEBLE MESSAGE SIGN ED 1080 $ $

8 0102-911-2

REMOVABLE TAPE PAVEMENT MARKING -WHITE/BLACK LF 620 $ $

9 0102-912-2

REMOVABLE TAPE PAVEMENT MARKING -YELLOW LF 460 $ $

10 0104-1 ARTIFICIAL COVERINGS/ROLLED EROSION CONTROL SY 58356 $ $

11 0104-10-3 SEDIMENT BARRIER LF 12178 $ $

12 0104-12 STAKED TURBIDITY BARRIER LF 3159 $ $

13 0104-15 SOIL TRACKING PREVENTION DEVICE EA 4 $ $

14 0104-18 INLET PROTECTION DEVICE EA 25 $ $

15 0110-1-1 CLEARING AND GRUBBING LS/AC 1/17.59 $ $

16 0110-4-10 REMOVAL OF EXISTING CONCRETE SY 386 $ $

17 0120-1 REGULAR EXCAVATION CY 49296 $ $

18 0120-4 SUBSOIL EXCAVATION CY 4450 $ $

19 0120-6 EMBANKMENT CY 136151 $ $

20 0160-4 TYPE B STABILIZATION SY 20268 $ $

21 162-1-11 PREPARED SOIL LAYER, FINISH SOIL, 6" SY 58356 $ $

22 285701 OPTIONAL BASE GROUP 01 SY 4366 $ $

23 285706 OPTIONAL BASE GROUP 06 SY 15064 $ $

Path To Project Manual PDF

Bid Form with Attachments Page 00410-3

Page 6: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

Foy Shaw Parkway ADDENDUM NO. 1 June 19, 2019

BID TABULATION FOR FOY SHAW PARKWAY - FPN 425617-2-94-01 (Continued) Item No.

Pay Item No. Description UNIT ESTIMATED

QUANTITY BID UNIT

PRICE BID PRICE

24 0334-1-12 SUPERPAVE ASPHALT - TRAFFIC B TN 1996.2 $ $

25 0337-7-80 FRICTION COURSE TRAFFIC B FC-9.5 TN 988.5 $ $

26 0400-1-2 CONCRETE CLASS I - END WALL CY 20.9 $ $

27 0400-2-2 CONCRETE CLASS II - END WALL CY 27.4 $ $

28 0415-1-6 REINFORCING STEEL - ROADWAY LB 1648 $ $

29 0425-1351 INLETS, CURB TYPE P5 EA 12 $ $

30 0425-1361 INLETS, CURB TYPE P6 EA 1 $ $

31 0425-1521 INLETS, DBI TYPE C EA 2 $ $

32 0425-1541 INLETS, DBI TYPE D EA 1 $ $

33 0425-1551 INLETS, DBI TYPE E EA 1 $ $

34 0425-1701 INLETS, GUTTER TYPE S EA 3 $ $

35 430-175-118 PIPE CULVERT, 18" LF 2732 $ $

36 430-175-124 PIPE CULVERT, 24" LF 906 $ $

37 430-185-154 PIPE CULVERT, OPT MATL, JACK AND BORE, 54" LF 246 $ $

38 430-185-172 PIPE CULVERT, OPT MATL, JACK AND BORE, 72" LF 328 $ $

39 0430-830 PIPE FILLING & PLUGGING CY 164 $ $

40 430-982-125 MITERED END SECTION, 18" EA 2 $ $

41 430-982-129 MITERED END SECTION, 24" EA 1 $ $

42 455-133-2 SHEET PILING STEEL, TEMPORARY-CRITICAL SF 8917 $ $

43 0520-1-10 CURB AND GUTTER, TYPE F LF 3746 $ $

44 0520-2-5 CURB, SPECIAL (RIBBON CURB) LF 240 $ $

45 0520-6 SHOULDER GUTTER LF 1010 $ $

46 0522-2 6" CONCRETE - DRIVEWAY SY 218 $ $

Path To Project Manual PDF

Bid Form with Attachments Page 00410-4

Page 7: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

Foy Shaw Parkway ADDENDUM NO. 1 June 19, 2019

BID TABULATION FOR FOY SHAW PARKWAY - FPN 425617-2-94-01 (Continued) Item No.

Pay Item No. Description UNIT ESTIMATED

QUANTITY BID UNIT

PRICE BID PRICE

47 0524-1-2 CONC. DITCH PAVEMENT, NON REINFORCED, 4" SY 1825 $ $

48 0530-3-4 RIPRAP - DITCH LINING TN 118.6 $ $

49 0550-10-232 TYPE B FENCING LF 3579 $ $

50 0550-60-213 TYPE B FENCING GATE EA 2 $ $

51 0570-1-1 PERFORMANCE TURF SY 39264 $ $

52 0570-1-2 PERFORMANCE TURF, SOD SY 19092 $ $

53 0571-1-13 PLASTIC EROSION MAT, TYPE 3 SY 15359 $ $

54 0700-1-11 SINGLE POST SIGN (UP TO 12 SF) EA 5 $ $

55 0700-1-60 SINGLE POST SIGN (REMOVAL) EA 2 $ $

56 0705-10-1 OBJECT MARKER, TYPE I EA 3 $ $

57 0706-3 REFLECTIVE PAVEMENT MARKERS EA 352 $ $

58 0710-90 PAINTED PAVEMENT MARKINGS - FINAL SURFACE LS 1 $ $

59 0711-11-125 24" WHITE THERMO PLASTIC STRIPING LF 86 $ $

60 0711-11-141 6" WHITE THERMO 2-4 SKIP GM 0.061 $ $

61 0711-11-170 THERMO STANDARD WHITE ARROW EA 12 $ $

62 0711-14-160 THERMO STANDARD WHITE MESSAGE EA 2 $ $

63 0711-14-170

THERMO PREFORMED ARROW (BIKE THROUGH ARROW) EA 2 $ $

64 0711-16-101 6" WHITE THERMO PLASTIC STRIPING GM 1.973 $ $

65 0711-16-201 6" YELLOW THERMO PLASTIC STRIPING GM 2.000 $ $

SUM OF ITEMS 1 - 65 = TOTAL BID AMOUNT $

Path To Project Manual PDF

Bid Form with Attachments Page 00410-5

Page 8: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

20

29

27

26

25 36

35

34

32

33

31

6

54

32

1 12

11

10

9

87

18

16

15

14

13

29

30

31

32

56

7

8

17

18

19

21

22

23

24

19

20

29

30

25

27

28

30

32

33

34

35

36

31

32

17

Sp

ri

ng

Long

Cr.

CSX

TRANSPO

RTATIO

N

King Br

Ri

ver

Rest

Are

a

26

Old

Spanish

Trail

Cro

ssro

ads

Kil

lin

gsw

ort

h

Bri

dge

Br.

Bear

Cr.

Shoal

Bends

Cr.

Indian Br

.

Mt.

Oli

ve

Midd

le

Cr.

Br.

Cr

.

Mill

Cr.

Rest

Are

a

CR

ES

TV

IEW

Pop. 1

4,766

Cre

stv

iew

Fir

e C

on

tro

l

Hd

q.

Ex

it 5

6

Br.

Br.

P.

Flo

wers

TR

IP

LE

B

AIR

PO

RT

(P

VT

.)

BO

B S

IK

ES

AIR

PO

RT

Auburn

28

Cr.

Springs

Silv

er

30

18

8

18

8

280A

280A

85

85

18

8

N

01

2

Mil

es

R-22-W

R-23-W

R-22-W

R-23-W

T-4-N

T-3-N

T-4-N

T-3-N

T-3-N

T-2-N

T-3-N

T-2-N

SH

EE

T D

ES

CR

IPT

ION

SH

EE

T N

O.

NO

.

SH

EE

T

8:5

3:3

2 A

MP

W:\

JB

UR

CH

FI

8/2

2/2

01

9

FIN

AN

CIA

L P

RO

JE

CT

ID

425617-2

-94-0

1

1

IND

EX

OF

RO

AD

WA

Y P

LA

NS

BE

E L

INE

EX

PR

ES

SW

AY

TU

RNPIK

E

10

PE

NS

AC

OL

AF

OR

T W

AL

TO

N

BE

AC

H

PA

NA

MA

CIT

Y

CH

IPL

EY

TA

LL

AH

AS

SE

E

75

10

29

5

95

JA

CK

SO

NV

ILL

E

ST

AU

GU

ST

INE

GA

INE

SV

ILL

E

OC

AL

AD

AY

TO

NA

BE

AC

H

DE

LA

ND

4

NE

W P

OR

T R

ICH

EY

TA

MP

A

75

4

LA

KE

LA

ND

ME

LB

OU

RN

E -

CO

CO

A

OR

LA

ND

O

BA

RT

OW

ST

PE

TE

RS

BU

RG

27

5

SA

RA

SO

TA

-

BR

AD

EN

TO

N

75

95

FT

PIE

RC

E

FT

MY

ER

S

WE

ST

PA

LM

BE

AC

H

FT

LA

UD

ER

DA

LE

MIA

MI

75

75

NA

PL

ES

KE

Y W

ES

T

CIT

Y

LA

KE

LE

NG

TH

O

F

PR

OJE

CT

P

RO

JE

CT

LE

NG

TH

IS

BA

SE

D O

N â

„„ O

F C

ON

ST

RU

RO

AD

WA

Y

GR

OS

S L

EN

GT

H O

F P

RO

JE

CT

NE

T L

EN

GT

H O

F P

RO

JE

CT

BR

IDG

ES

EX

CE

PT

ION

S

LIN

EA

R F

EE

TM

ILE

S

FLO

RID

A'S

OK

AL

OO

SA

CO

UN

TY

, F

LO

RID

A

FR

OM

US

90

TO

JO

HN

GIV

EN

S R

OA

DF

OY

SH

AW

PA

RK

WA

Y

LO

CA

TIO

N O

F P

RO

JE

CT

PR

EP

AR

ED

BY

:

(850)

432-6

800

ww

w.h

dri

nc.c

om

Pensacola

, F

lori

da 3

2502

25

West

Ced

ar

Str

eet,

Su

ite 2

00

HD

R E

ngin

eeri

ng, In

c.

Cert

ific

ate

of

Au

tho

rizati

on

No

. 4

21

3

DIS

TR

ICT

ON

E

PU

BL

IC W

OR

KS

DIR

EC

TO

R:

DIS

TR

ICT

TW

O

DIS

TR

ICT

TH

RE

E

DIS

TR

ICT

FIV

E

DIS

TR

ICT

FO

UR

CO

MM

ISS

ION

ER

S

CO

UN

TY

AD

MIN

IST

RA

TO

R

CA

RO

LY

N K

ET

CH

EL

NA

TH

AN

BO

YL

ES

TR

EY

GO

OD

WIN

KE

LL

Y W

IND

ES

JO

HN

HO

FS

TA

D

JA

SO

N A

UT

RE

Y,

P.E

.

68451

EN

GIN

EE

R O

F R

EC

OR

D:

JO

NA

TH

ON

BU

RC

HF

IEL

D,

P.E

.

ST

A. 100+

97.3

7

BE

GIN

PR

OJE

CT

ST

A. 144+

20.0

0

EN

D P

RO

JE

CT

CO

MP

ON

EN

TS

OF

CO

NT

RA

CT

PL

AN

S S

ET

KE

Y S

HE

ET

OF

EA

CH

CO

MP

ON

EN

T

A D

ET

AIL

ED

IN

DE

X A

PP

EA

RS

ON

TH

E

L UO

C

AK

O

YN

TOO

SA

4322.6

30.8

19

TO

LA

UR

EL

HIL

L

TO

TA

LL

AH

AS

SE

E

TO

PE

NS

AC

OL

A TO

NIC

EV

ILL

E

0.8

19

4322.6

3

0.8

19

4322.6

3

OK

AL

OO

SA

CO

UN

TY

PR

OJE

CT

MA

NA

GE

R:

SC

OT

T B

ITT

ER

MA

N P

.E.

RO

AD

WA

Y P

LA

NS

GR

AH

AM

FO

UN

TA

IN

NOTICE: THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE SIGNED AND SEALED UNDER RULE 61G15-23.003, F.A.C.

GO

VE

RN

ING

DE

SIG

N S

TA

ND

AR

DS

:

GO

VE

RN

ING

ST

AN

DA

RD

SP

EC

IFIC

AT

ION

S:

GU

IDE

SIG

N W

OR

KS

HE

ET

165

SIG

NIN

G A

ND

PA

VE

ME

NT

MA

RK

ING

PL

AN

160-164

PR

OJE

CT

CO

NT

RO

L S

HE

ET

159

UT

ILIT

Y A

DJU

ST

ME

NT

SH

EE

TS

156-158

TR

AF

FIC

CO

NT

RO

L P

LA

NS

153-155

WE

TL

AN

D D

EL

INE

AT

ION

SH

EE

TS

149-152

ER

OS

ION

CO

NT

RO

L P

LA

N 141-148

ST

OR

MW

AT

ER

PO

LL

UT

ION

PR

EV

EN

TIO

N P

LA

N 139-140

CR

OS

S S

EC

TIO

NS

68-138

PO

ND

DE

TA

IL

S

57-67

DR

AIN

AG

E S

TR

UC

TU

RE

S 41-56

INT

ER

SE

CT

ION

LA

YO

UT

/DE

TA

IL 38-40

DR

IVE

WA

Y P

RO

FIL

ES

3

7

SID

E S

TR

EE

T P

RO

FIL

ES

3

6

RO

AD

WA

Y P

RO

FIL

E

29-35

RO

AD

WA

Y P

LA

N 22-28

PR

OJE

CT

NO

TE

S 2

1

PR

OJE

CT

LA

YO

UT

2

0

TY

PIC

AL

SE

CT

IO

N D

ET

AIL

S 1

9

TY

PIC

AL

SE

CT

IO

NS

16-18

DR

AIN

AG

E M

AP

13-15

OP

TIO

NA

L M

AT

ER

IAL

S T

AB

UL

AT

ION

1

2

SU

MM

AR

Y O

F Q

UA

NT

ITIE

S 3-11

SU

MM

AR

Y O

F P

AY

IT

EM

S 2

KE

Y S

HE

ET

1 AP

PL

ICA

BL

E I

Rs:

fo

llo

win

g w

eb

sit

e:

htt

p:/

/ww

w.f

dot.

gov/d

esig

n/s

tandardpla

ns

Standard P

lans f

or R

oad a

nd B

ridge C

onstruction a

nd a

ssociated I

Rs a

re a

vailabe a

t t

he

and B

rid

ge C

onstr

ucti

on a

nd a

ppli

cable

inte

rim

revis

ions (

IR

s)

Flo

rid

a D

ep

artm

en

t o

f T

ran

sp

orta

tio

n,

FY

20

19

-2

0 S

tan

dard

Pla

ns f

or R

oad

ST

AT

E O

F

��

� REE

NIG

NE

LA

NOI

SS

E

FORP

ES

NE

CI

L

ADI

RO

LF

DLEIF

HC

RU

B .

D

NO

H

TANOJ

No

68

45

1

ON

AN

Y E

LE

CT

RO

NIC

CO

PIE

S.

AN

D T

HE

SIG

NA

TU

RE

MU

ST

BE

VE

RIF

IE

D

NO

T C

ON

SID

ER

ED

SIG

NE

D A

ND

SE

AL

ED

PR

IN

TE

D C

OP

IE

S O

F T

HIS

DO

CU

ME

NT

AR

E

ON

TH

E D

AT

E A

DJA

CE

NT

TO

TH

E S

EA

L

SIG

NE

D A

ND

SE

AL

ED

BY

TH

IS I

TE

M H

AS

BE

EN

DIG

ITA

LL

Y

htt

p:/

/ww

w.f

do

t.g

ov

/pro

gram

man

ag

em

en

t/Im

ple

men

ted

/Sp

ecB

oo

ks

for R

oad a

nd B

rid

ge C

onstr

ucti

on a

t th

e f

oll

ow

ing w

ebsit

e:

Flo

rid

a D

ep

artm

en

t o

f T

ran

sp

orta

tio

n,

Jan

uary

20

19

Sta

nd

ard

Sp

ecif

icati

on

s

RE

VIS

ION

S

01

RO

AD

WA

Y P

LA

NS

: 2

, 4

, 1

54

AN

D 1

55

(R

EV

IS

ED

8/2

2/1

9)

Add

endu

m N

o. 1

Page 9: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

$D

AT

E$

$T

IME

$$F

ILE

$

DE

SC

RIP

TIO

ND

AT

ED

ES

CR

IPT

ION

DA

TE

RE

VIS

IO

NS

NO

.

SH

EE

T

$U

SE

R$

OK

AL

OO

SA

CO

UN

TY

Jo

nath

on

D. B

urchfield,

P.E

.

P.E

. L

IC

EN

SE

NU

MB

ER

68451

HD

R E

ng

in

eerin

g, In

c.

25

West C

ed

ar S

treet,

Su

ite 2

00

Pen

saco

la,

FL

3

25

02

-5

94

5

CE

RT

IF

IC

AT

E O

F A

UT

HO

RIZ

AT

IO

N 4

21

3

NOTICE: THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE SIGNED AND SEALED UNDER RULE 61G15-23.003, F.A.C.

S

UM

MA

RY

OF

PA

Y I

TE

MS

SU

MM

AR

Y O

F P

AY

IT

EM

S

NO

.

ITE

M

PA

Y

DE

SC

RIP

TIO

NU

NIT

TO

TA

L

NO

.

ITE

M

PA

Y

DE

SC

RIP

TIO

NU

NIT

TO

TA

L

01

01

- 1

-M

OB

ILIZ

AT

ION

LS

1

04

30

-1

75

-1

24

PIP

E C

UL

VE

RT

, O

PT

MA

TE

RIA

L, R

OU

ND

, 24"S

/CD

LF

01

02

- 1

-M

AIN

TE

NA

NC

E O

F T

RA

FF

ICL

S1

01

02

- 3

-C

OM

ME

RC

IAL

MA

TE

RIA

L F

OR

DR

IVE

WA

Y M

AIN

TE

NA

NC

EC

Y

0102- 60-

WO

RK

ZO

NE

SIG

NE

D

01

02

- 7

4- 1

CH

AN

NE

LIZ

IN

G D

EV

IC

E- T

YP

ES

I, II, D

I, V

P, D

RU

M, O

R L

CD

ED

0102- 74- 2

CH

AN

NE

LIZ

IN

G D

EV

IC

E, T

YP

E I

II, 6'

ED

04

30

-9

82

-1

25

MIT

ER

ED

EN

D S

EC

TIO

N, O

PT

IO

NA

L R

OU

ND

, 18" C

DE

A2

0102- 99-

PO

RT

AB

LE

CH

AN

GE

AB

LE

ME

SS

AG

E S

IGN

, T

EM

PO

RA

RY

ED

04

30

-9

82

-1

29

MIT

ER

ED

EN

D S

EC

TIO

N, O

PT

IO

NA

L R

OU

ND

, 24" C

DE

A1

0104- 10- 3

SE

DIM

EN

T B

AR

RIE

RL

F

0104- 12-

ST

AK

ED

TU

RB

IDIT

Y B

AR

RIE

R-

NY

LO

N R

EIN

FO

RC

ED

PV

CL

F

05

20

- 1

- 1

0C

ON

CR

ET

E C

UR

B &

GU

TT

ER

, T

YP

E F

LF

0104- 15-

SO

IL T

RA

CK

ING

PR

EV

EN

TIO

N D

EV

ICE

EA

4

0104- 18-

INL

ET

PR

OT

EC

TIO

N S

YS

TE

ME

A2

5

05

30

- 3

- 4

RIP

RA

P,

RU

BB

LE

, F

&I,

DIT

CH

LIN

IN

GT

N

0110- 1- 1

CL

EA

RIN

G &

GR

UB

BIN

G

01

10

- 4

-R

EM

OV

AL

OF

EX

IST

ING

CO

NC

RE

TE

PA

VE

ME

NT

SY

01

20

- 4

-S

UB

SO

IL E

XC

AV

AT

ION

CY

01

20

- 6

-E

MB

AN

KM

EN

TC

Y

01

60

- 4

-T

YP

E B

ST

AB

IL

IZ

AT

IO

NS

Y

05

70

- 1

- 2

PE

RF

OR

MA

NC

E T

UR

F,

SO

DS

Y

02

85

-7

01

-O

PT

IO

NA

L B

AS

E,

BA

SE

GR

OU

P 0

1S

Y

GM

02

85

-7

06

-O

PT

IO

NA

L B

AS

E,

BA

SE

GR

OU

P 0

6S

Y

03

34

- 1

- 1

2S

UP

ER

PA

VE

AS

PH

CO

NC

, T

RA

FF

IC

B, P

G76-22, P

MA

TN

03

37

- 7

- 8

0A

SP

HA

LT

CO

NC

RE

TE

FR

IC

TIO

N C

OU

RS

E,T

RA

FF

IC

B,

FC

-9

.5,

PG

76

-2

2,

PM

AT

N

EA

12

04

25

- 1

-5

41

IN

LE

TS

, D

T B

OT

, T

YP

E D

, <

10'

EA

1

04

30

-1

75

-1

18

LF

04

00

- 1

- 2

CO

NC

RE

TE

CL

AS

S I

, E

ND

WA

LL

SC

Y

04

15

- 1

- 6

RE

INF

OR

CIN

G S

TE

EL

- M

ISC

EL

LA

NE

OU

SL

B

04

25

- 1

-3

51

IN

LE

TS

, C

UR

B, T

YP

E P

-5, <

10'

05

20

- 2

- 5

LF

CO

NC

RE

TE

CU

RB

, S

PE

CIA

L (

RIB

BO

N C

UR

B)

01

20

- 1

-R

EG

UL

AR

EX

CA

VA

TIO

NC

Y

04

25

- 1

-7

01

EA

3IN

LE

TS

, G

UT

TE

R, T

YP

E S

SY

05

22

- 2

IN

LE

TS

, D

T B

OT

, T

YP

E C

, <

10

'0

42

5- 1

-5

21

EA

2

04

25

- 1

-5

51

IN

LE

TS

, D

T B

OT

, T

YP

E E

, <

10

'1

EA

PIP

E C

UL

VE

RT

, O

PT

MA

TE

RIA

L, R

OU

ND

, 18"S

/CD

LF

FE

NC

IN

G, T

YP

E B

, V

IN

YL

CO

AT

IN

G

2E

AF

EN

CE

GA

TE

, T

YP

E B

0550-10-232

0550-60-213

SH

OU

LD

ER

GU

TT

ER

- C

ON

CR

ET

E0

52

0- 6

LF

CO

NC

RE

TE

SID

EW

AL

K A

ND

DR

IVE

WA

YS

, 6

" T

HIC

K

SY

01

04

- 1

-A

RT

IFIC

IAL

CO

VE

RIN

GS

/RO

LL

ED

ER

OS

ION

CO

NT

RO

L P

RO

DU

CT

S

12

0711-11-141

TH

ER

MO

PL

AS

TIC

PA

VE

ME

NT

MA

RK

IN

GS

, W

HIT

E, S

KIP

, 6"

0711-11-170

EA

TH

ER

MO

PL

AS

TIC

PA

VE

ME

NT

MA

RK

ING

S,

WH

ITE

, A

RR

OW

2E

A0711-14-170

2E

A0711-14-160

TH

ER

MO

PL

AS

TIC

PA

VE

ME

NT

MA

RK

ING

S,

WH

ITE

, M

ES

SA

GE

TH

ER

MO

PL

AS

TIC

PA

VE

ME

NT

MA

RK

ING

S,

PR

EF

OR

RM

ED

, A

RR

OW

S (

BIK

E T

HR

U A

RR

OW

)

05

70

- 1

- 1

SY

PE

RF

OR

MA

NC

E T

UR

F

32

40

10

80

12178

31

59

386

20268

43

66

15064

1996.2

98

8.5

EA

10

42

5- 1

-3

61

IN

LE

TS

, C

UR

B, T

YP

E P

-6, <

10'

27

32

906

37

46

240

10

10

05

24

- 1

- 2

CO

NC

RE

TE

DIT

CH

PA

VE

ME

NT

- N

ON

RE

IN

FO

RC

ED

, 4"

SY

35

79

11

8.6

218

39264

19092

0706- 3-

RE

TR

O-R

EF

LE

CT

IVE

PA

VE

ME

NT

MA

RK

ER

SE

A352

0711- 1

6-101

TH

ER

MO

PL

AS

TIC

PA

VE

ME

NT

MA

RK

IN

GS

, W

HIT

E,

SO

LID

, 6

"G

M1

.97

3

0711- 1

1-125

TH

ER

MO

PL

AS

TIC

PA

VE

ME

NT

MA

RK

IN

GS

, W

HIT

E, S

OL

ID

, 24"

LF

86

49296

44

50

136151

LF

01

02

-9

11

- 2

PA

VE

ME

NT

MA

RK

ING

RE

MO

VA

BL

E T

AP

E,

WH

ITE

/BL

AC

K,

SO

LID

620

01

02

-9

12

- 2

LF

460

PA

VE

ME

NT

MA

RK

ING

RE

MO

VA

BL

E T

AP

E, Y

EL

LO

W, S

OL

ID

05

71

- 1

- 1

3S

Y15359

PL

AS

TIC

ER

OS

IO

N M

AT

, T

YP

E 3

0999- 2

5IN

ITIA

L C

ON

TIN

GE

NC

Y A

MO

UN

T,

DO

NO

T B

ID1

LS

07

11

- 1

6-2

01

TH

ER

MO

PL

AS

TIC

PA

VE

ME

NT

MA

RK

ING

S,

YE

LL

OW

, S

OL

ID,

6"

GM

2.0

00

04

30

-1

85

-1

72

LF

328

04

30

-1

85

-1

54

LF

246

PIP

E C

UL

VE

RT

, O

PT

MA

TE

RIA

L,

JA

CK

AN

D B

OR

E,

54

",

ST

OR

M A

ND

CR

OS

S D

RA

IN

PIP

E C

UL

VE

RT

, O

PT

MA

TE

RIA

L,

JA

CK

AN

D B

OR

E,

72

",

ST

OR

M A

ND

CR

OS

S D

RA

IN

20.9

16

48

07

00

- 1

- 1

1E

A5

07

00

- 1

- 6

0E

A2

SIN

GL

E P

OS

T S

IG

N, F

&I G

RO

UN

D M

OU

NT

, U

P T

O 1

2 S

F

SIN

GL

E P

OS

T S

IG

N,

RE

MO

VE

LS

/AC

18

25

04

00

- 2

- 2

CY

27.4

CO

NC

RE

TE

CL

AS

S I

I,

EN

DW

AL

LS

0710- 9

0P

AIN

TE

D P

AV

EM

EN

T M

AR

KIN

GS

- F

INA

L S

UR

FA

CE

LS

1

0.0

61

40

50

27

2

0705- 10- 1

OB

JE

CT

MA

RK

ER

, T

YP

E I

EA

3

1/1

7.5

9

CY

164

43

0-8

30

PIP

E F

IL

LIN

G &

PL

UG

GIN

G

58356

SY

58356

0162- 1- 11

PR

EP

AR

ED

SO

IL

LA

YE

R,

FIN

IS

H S

OIL

, 6

"

SF

89

17

04

55

-1

33

-2

SH

EE

T P

IL

IN

G S

TE

EL

, T

EM

PO

RA

RY

-C

RIT

IC

AL

11070

01

01

01

01

8/2

2/1

9U

PD

AT

ED

QU

AN

TIT

IES

Add

endu

m N

o. 1

Page 10: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

$D

AT

E$

$T

IME

$$F

ILE

$

DE

SC

RIP

TIO

ND

AT

ED

ES

CR

IPT

ION

DA

TE

RE

VIS

IO

NS

NO

.

SH

EE

T

$U

SE

R$

OK

AL

OO

SA

CO

UN

TY

Jo

nath

on

D. B

urchfield,

P.E

.

P.E

. L

IC

EN

SE

NU

MB

ER

68451

HD

R E

ng

in

eerin

g, In

c.

25

West C

ed

ar S

treet,

Su

ite 2

00

Pen

saco

la,

FL

3

25

02

-5

94

5

CE

RT

IF

IC

AT

E O

F A

UT

HO

RIZ

AT

IO

N 4

21

3

NOTICE: THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE SIGNED AND SEALED UNDER RULE 61G15-23.003, F.A.C.

SU

MM

AR

Y O

F Q

UA

NT

ITIE

S

4

SU

MM

AR

Y O

F R

EM

OV

AL

IT

EM

S

NO

.

PA

Y I

TE

MP

AY

IT

EM

DE

SC

RIP

TIO

NL

OC

AT

ION

SID

EID

AR

EA

LENGTH

WIDTH

UN

ITS

(IF

LU

MP

SU

M)

SE

CO

ND

AR

Y U

NIT

SQ

UA

NT

ITY

TO

TA

L

NO

TE

S

DE

SIG

N

RE

MA

RK

S

CO

NS

TR

UC

TIO

N

ST

A. T

O S

TA

.A

RE

A (

AC

)P

FP

F

0110 1

1C

LE

AR

ING

AN

D G

RU

BB

ING

53

1+

21

.14

TO

53

6+

42

.89

LT

28675

LS

AC

1 /0

.2

53

BA

SE

LIN

E S

UR

VE

Y U

S 9

0

10

0+

85

.74

TO

14

4+

25

.00

28710

LS

AC

1 /17.251

CL

CO

NS

T. F

OY

SH

AW

PK

WY

10

5+

05

.13

TO

10

6+

07

.07

LT

28699

LS

AC

1 /0

.0

82

CL

CO

NS

T. F

OY

SH

AW

PK

WY

1 /1

7.5

9

01

10

4R

EM

OV

AL

OF

EX

IST

ING

CO

NC

RE

TE

53

6+

95

.17

TO

54

1+

83

.68

RT

67941

SY

72

.1B

AS

E L

IN

E S

UR

VE

Y U

S 9

0

13

2+

79

.01

TO

13

3+

30

.89

RT

30139

SY

15

4.0

CL

CO

NS

T. F

OY

SH

AW

PK

WY

13

3+

11

.38

TO

13

3+

15

.62

RT

30141

SY

1.0

CL

CO

NS

T. F

OY

SH

AW

PK

WY

14

1+

64

.77

TO

14

2+

36

.19

RT

30137

SY

15

9.4

CL

CO

NS

T. F

OY

SH

AW

PK

WY

38

6

SU

MM

AR

Y O

F E

RO

SIO

N A

ND

SE

DIM

EN

T C

ON

TR

OL

DE

VIC

ES

LO

CA

TIO

N

SID

EID

AR

EA

CO

VE

RIN

GS

AR

TIF

IC

IA

L

BA

SIN

SE

DIM

EN

T

CL

EA

NO

UT

BA

SIN

SE

DIM

EN

T

BA

RR

IER

SE

DIM

EN

T

BA

RR

IER

TU

RB

IDIT

Y

FL

OA

TIN

G

BA

RR

IER

TU

RB

IDIT

Y

ST

AK

ED

DE

VIC

E

PR

EV

EN

TIO

N

SO

IL T

RA

CK

ING

SY

ST

EM

PR

OT

EC

TIO

N

IN

LE

T

NO

TE

S

DE

SIG

N

RE

MA

RK

S

CO

NS

TR

UC

TIO

N

ST

A. T

O S

TA

.

0104 1

0104 7

0104 9

01

04

1

0 3

0104 1

10104 1

20104 1

50104 1

8

SY

EA

EA

LF

LF

LF

EA

EA

PF

PF

PF

PF

PF

PF

PF

PF

12

5+

27

.00

LT

1

12

8+

30

.00

LT

1

12

9+

00

.00

LT

1

13

0+

00

.00

LT

1

13

2+

00

.00

LT

1

13

6+

00

.00

RT

1

SU

B-T

OT

AL

:6

.0

SU

MM

AR

Y O

F T

EM

PO

RA

RY

TR

AF

FIC

CO

NT

RO

L P

LA

N I

TE

MS

NO

.

PA

Y I

TE

MP

AY

IT

EM

DE

SC

RIP

TIO

NU

NIT

PH

AS

E I

TO

TA

L

NO

TE

S

DE

SIG

N

RE

MA

RK

S

CO

NS

TR

UC

TIO

N

DU

RA

TIO

NQ

UA

NT

ITY

TO

TA

L

DA

YS

PP

PF

10

2-6

0W

OR

K Z

ON

E S

IGN

SE

D2

70

41

11070

11070

102-74-1

OR

LC

D

CH

AN

NE

LIZ

IN

G D

EV

IC

E- T

YP

ES

I,

II,

DI,

VP

, D

RU

M,

ED

27

01

54050

4050

102-74-2

CH

AN

NE

LIZ

IN

G D

EV

IC

E- T

YP

E I

II,

6'

ED

27

01

23240

3240

10

2-9

9P

OR

TA

BL

E C

HA

NG

EA

BL

E M

ES

SA

GE

SIG

N,

TE

MP

OR

AR

YE

D2

70

41080

1080

01

02

91

1 2

RE

MO

VA

BL

E T

AP

E P

AV

E M

AR

KIN

G-W

HIT

E/B

LA

CK

LF

46

04

60

46

0B

AS

EL

IN

E S

UR

VE

Y U

S 9

0

01

02

91

2 2

RE

MO

VA

BL

E T

AP

E P

AV

E M

AR

KIN

G-W

HIT

E/B

LA

CK

LF

62

06

20

62

0B

AS

EL

IN

E S

UR

VE

Y U

S 9

0

01

01

01

01

8/2

2/1

9U

PD

AT

ED

QU

AN

TIT

IES

Add

endu

m N

o. 1

Page 11: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

T

RA

FF

IC C

ON

TR

OL

PL

AN

ROAD WORK

END

LIM IT

SPEED

45

PRESENT

WHEN WORKERS

DOUBLED

SPEEDING FINES

MILE2/1W ORK

ROAD

1500 FT

W ORK

ROAD

LIM IT

SPEED

45

1 MILE

W ORK

ROAD

LIMIT

SPEED

55

1000 FT

W ORK

ROAD

500 FT

W ORK

ROAD

PIS

PC

MS

50

0'

50

0'

1640'

US

90

640'

500'

50

0'

50

0'

500'

500'

50

0'

50

0'

500'

154

QUESTIONS OR COM MENTS

US 90 IMPROVEMENTSBY FDOT AND CONTRACTOR

COMPLETION: SEASON YEAR

217909-3-52-01

RO

AD

W

OR

K

EN

D

PR

ES

EN

T

WH

EN

W

OR

KE

RS

DO

UB

LE

D

SP

EE

DIN

G F

INE

S

2'

Media

n

Whit

e R

efle

cto

riz

ed P

avem

ent

Markin

gs

Wo

rk

Area

1500'

WO

RK

RO

AD

AH

EA

D

CL

OS

ED

LA

NE

RIG

HT

54

0'

360'

500'

100'

350'

35

0'

80

0'

40

0'

AH

EA

D

WO

RK

RO

AD

BEGIN CONSTRUCTION

END CONSTRUCTION

LA

NE

CL

OS

UR

E S

IGN

ING

AL

ON

G U

S 9

0

US

90

AD

VA

NC

E S

IGN

ING

DE

TA

IL A

LO

NG

US

90

EAST AND W EST BOUND

INTERSECTION

AND FOY SHAW

PRIOR TO US 90

MIL

ES

21N

EX

T

RO

AD

WO

RK

HARE ST

OPPORTUNITY DR

SHOFFNER BLVD

PIN

EW

OO

DS

DR

FO

RR

ES

T A

VE

.

TO

TH

RU

T

RA

FF

IC

RO

AD

CL

OS

ED

R11-4

HARE ST

PIN

EW

OO

DS

DR

OPPORTUNITY DR

TO

TH

RU

TR

AF

FIC

RO

AD

CL

OS

ED

R11-4

SK

YL

INE

DR

JOHN GIVENS RD

HA

RE

ST

TE

MP

OR

AR

Y S

IGN

ING

01

01

MO

VE

D D

ET

AIL

TO

TH

IS S

HE

ET

8/2

2/1

9

8/2

2/2

019

8:1

8:4

6 A

MP

W:\

009308\0

00000000241443\1

3.0

0_C

AD

\13.0

2_D

esig

n_P

lans\r

oadw

ay\T

CG

NR

D01_R

ev01.d

gn

DE

SC

RIP

TIO

ND

AT

ED

ES

CR

IPT

ION

DA

TE

RE

VIS

IO

NS

NO

.

SH

EE

T

JB

UR

CH

FI

Jo

nath

on

D. B

urchfield,

P.E

.

P.E

. L

IC

EN

SE

NU

MB

ER

68451

HD

R E

ng

in

eerin

g, In

c.

25

West C

ed

ar S

treet,

Su

ite 2

00

Pen

saco

la,

FL

3

25

02

-5

94

5

CE

RT

IF

IC

AT

E O

F A

UT

HO

RIZ

AT

IO

N 4

21

3

FPID

: 425

617-

2-94

-01

OK

AL

OO

SA

CO

UN

TY

NOTICE: THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE SIGNED AND SEALED UNDER RULE 61G15-23.003, F.A.C.

Add

endu

m N

o. 1

Page 12: ALL BIDDERS BID TIME AND DATE: ITEM NO. 1 – SECTION … ADDENDUM NO 1.pdfThe Bid Schedule, pages 00410-3 through 00410-5 has been revised: Changes to Item Nos. 3, 5, 7 and 16. Replace

RE

GIS

TE

R L

N

CAVALIER DR

GODFREY ST

GE

OR

GE

ST

HARE ST

GO

DF

RE

Y S

T

US H

WY 90

TO

TH

RU

T

RA

FF

IC

RO

AD

CL

OS

ED

R11-4

1

CAV

ALIE

R DR

IVE

M4-9

RD

ET

OU

R

CAV

ALIE

R DR

IVE

M4-9

R

2

1

DE

TO

UR

2

1

2

DE

TO

UR

EN

DM

4-8

A

3

3

CAVALIER DR

2

NNTS

TR

AF

FIC

FL

OW

WO

RK

ZO

NE

SIG

N

ME

SS

AG

E S

IGN

PO

RT

AB

LE

CH

AN

GE

AB

LE

(W/

FL

AS

HIN

G L

IGH

T)

TY

PE

III

BA

RR

ICA

DE

LE

GE

ND

CH

AN

GE

AB

LE

ME

SS

AG

ES

CL

OS

ED

ME

SS

AG

E 1

ME

SS

AG

E 2

SIG

NS

FO

LL

OW

DE

TO

UR

DR

IVE

CA

VA

LIE

R

155

T

RA

FF

IC C

ON

TR

OL

PL

AN

CA

VA

LIE

R D

R D

ET

OU

R

DET

OU

RM

4-8

WI-6

US

E G

OD

FR

EY

ST

RE

ET

CA

VA

LIE

R D

RIV

E C

LO

SE

D

4

5

500'

500'

CAVA

LIER

DRI

VE

5

5

4

4

HARE ST

SHOFFNER BLVD

TO

TH

RU

T

RA

FF

IC

RO

AD

CL

OS

ED

R11-4

TO

TH

RU

TR

AF

FIC

RO

AD

CL

OS

ED

R11-4

SK

YL

INE

DR

JOHN GIVENS RD

AIR

PO

RT

RD

.

FAIRCHILD RD

US

90

2

2

14

1

4

500'

5

1

M4-9

RD

ET

OU

RM

4-9

R

2

DE

TO

UR

DE

TO

UR

EN

DM

4-8

A

3

DET

OU

RM

4-8

WI-6

5

4

US

E D

ET

OU

RIN

TE

RS

EC

TIO

N C

LO

SE

DS

KY

LIN

E/J

OH

N G

IVE

NS

500'

5

1

2

2

SK

YL

INE

/JO

HN

GIV

EN

S D

ET

OU

R

NO

TE

: D

ET

OU

RS

AR

E N

OT

TO

BE

UT

ILIZ

ED

AT

TH

E S

AM

E T

IME

01

01

8/2

2/1

90

1A

DD

ED

SK

YL

INE

/JO

HN

GIV

EN

S D

ET

OU

R

8/2

2/2

019

8:1

9:1

5 A

MP

W:\

009308\0

00000000241443\1

3.0

0_C

AD

\13.0

2_D

esig

n_P

lans\r

oadw

ay\T

CG

NR

D01_R

ev01.d

gn

DE

SC

RIP

TIO

ND

AT

ED

ES

CR

IPT

ION

DA

TE

RE

VIS

IO

NS

NO

.

SH

EE

T

JB

UR

CH

FI

Jo

nath

on

D. B

urchfield,

P.E

.

P.E

. L

IC

EN

SE

NU

MB

ER

68451

HD

R E

ng

in

eerin

g, In

c.

25

West C

ed

ar S

treet,

Su

ite 2

00

Pen

saco

la,

FL

3

25

02

-5

94

5

CE

RT

IF

IC

AT

E O

F A

UT

HO

RIZ

AT

IO

N 4

21

3

FPID

: 425

617-

2-94

-01

OK

AL

OO

SA

CO

UN

TY

NOTICE: THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE SIGNED AND SEALED UNDER RULE 61G15-23.003, F.A.C.

Add

endu

m N

o. 1