8/12/10 1
ALICE 5 o’clock meeting
Wk 49
8/12/10 2
INDICO
• You’ll find this meeting here:– http://indico.cern.ch/categoryDisplay.py?categId=2957
• The full shutdown planning is here:– http://indico.cern.ch/conferenceDisplay.py?confId=116294
8/12/10 5 o’clock meeting 3
Access requestCavern and surface
• You should submit an ADI and a task procedure
Two persons minimum
Work breakdown structure – risk associated at each step
ADIhttps://edh.cern.ch/Document/ADI
Task procedureTemplate EDMS 1103355
Attach task procedure
8/12/10 5 o’clock meeting 4
ALICE Christmas break schedule
OpenOpenExperimentExperiment
TRDTRD EMCalEMCal CloseCloseExperimentExperiment
Open L3 doors
Close L3doors
8/12/10 5 o’clock meeting 5
UX25 access
Rules for access restrictions:Removal/installation of shielding (restriction includes RB24 triplets)
• PX24 blocks: no access CR5 and UX25• PX24 beams (35t): no access CR1-5, Expo, and UX-25• All other blocks: no access to UX-25
LHC evacuation test (7/12 after 18:00 and 24/12 tbc) – no access UX25Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25DSO test (12-13/1) (Department Safety Officer) – no access UX25
No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)
8/12/10 5 o’clock meeting 6
L3 (and MNF) access
NoVentilation
EMCal EMCal
EMCal
NoVentilation
+AUG
Wks 50 and 4: access (TPC) to be coordinated with TC (transport)Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day)
When moving from low-beta to yellow platform: no access to MNFWhen inserting the module: no access L3 and MNF
Watcher needed in wk 49 and from wk 4 onwardsWk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC)
24 31
Evac.
Day-by-day schedule
UX25 and MNF - Wk 49
8/12/10 5 o’clock meeting 8
• 18:00: end HI program– Ramp down both magnets. !!! Emergency dump !!!
• 18:00 – 22:00: access system test. No access UX25• 22:00: RPE survey (Jiri + 2nd person)
– Then go to restricted mode
Week 49 - 6/12 MondayProgram
8/12/10 5 o’clock meeting 9
Activities in UX25 - Week 49 - 6/12 Monday
No access UX-25 - possibility of access from 22:00
ITECO
HAULOTTE
TRD team at CERN: 6 to 10/12
8/12/10 5 o’clock meeting 10
• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)
• 8:30 - 9:30: RP liquid (and gas) sampling (Adeline, Pierre)– Collect RP samples (Fernando, Philippe)– Survey L3 and Dipole
• 18:00 - 21:00: evacuation test – No access UX25• From 21:00 - Cavern in General mode
• 14:00 - 15:00: Portuguese Press visit. 10 persons
Week 49 - 7/12 TuesdayProgram
8/12/10 5 o’clock meeting 11
• ALTEAD: PX24 shielding blocks – top layer removed– 8:00 to 18:00: no access CR5
• Reinstall crane electronics - Problems (ongoing)• 14:00 to 15:00: put SM16 into the rotator - Ongoing• VAC: Neon injection preparation - Started
– Transport needed (EDH 4472100) – Rack moved by hand– Remove “green fence” (P2 technician) - Done
• Stop flammable gases i-C4H10 and CH4 (Ar/H2 on 10/12) - Done• 8:30: Lock L3+Dipole power converter + compensator magnet - Done• Test transmission of alarm lift to FB - Done• 8:30: inspection PHOS cooling plant (Arturo, Dominique, Philippe, Sasha) – Done
(will install temporary line)• 15:15: VIC SPD – Done + Gas VIC• DCS: 10:00 – 12:00, interruptions of the GPN link to/from P2 – Done. DCS got stuck.
Investigating why• MCR (Magnet Control Room): HW modifications (Pascal B.) – Started• TRD (after 21:00): Wiener PS back-plane modification and LV consolidation (L3)
Week 49 - 7/12 TuesdayActivities
8/12/10 5 o’clock meeting 12
Activities in UX25 - Week 49 - 7/12 Tuesday
VAC
RP samples
PX24 shielding: blocks
TRD Wiener PS
TRD Wiener PS
8/12/10 5 o’clock meeting 13
• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)
• From 18:00 - Cavern in General mode
• 18:00: Confined Space Training– Tour in L3 at the end of the course
Week 49 - 8/12 WednesdayProgram
8/12/10 5 o’clock meeting 14
• ALTEAD: PX24 shielding beams (35t) - Done– 8:00 to 16:30: no access CR1-5 and Expo– Move ITECO C-side - Ongoing
• EN-HE: Reinstall crane electronics – Done. Crane operational• VAC: Neon injection – injection table prepared. Neon injected tomorrow afternoon
Activities after 16:30:• EN-CV: empty TPC tank - Ongoing• TPC: replacement of damaged FECs (C-side) - Ongoing• TRD: pretrigger PS work done. Wiener PS back-plane modification (SXL2, almost
done). Start re-installing Wieners tonight.• SPD: cut inox pipes - Done• Muon TRK: CROCUS firmware upgrade• Muon TRG: Maintenance Local decision electronics and upgrade FE threshold
distributors – Will start at 17:00• T0: investigation broken amplifier (MNF and L4-rack) - Ongoing
Week 49 - 8/12 WednesdayActivities
8/12/10 5 o’clock meeting 15
Activities in UX25 - Week 49 - 8/12 Wednesday
PX24 shielding:
beams (35t)
VAC
MoveTRD Wiener PS
TRD Wiener PS
Cut SPD pipes
Stabilizers
Muon TRG
TPC
FE
C a
nd
TRD
LV
TPC cooling
Muo
n TR
K:
CR
OC
US
firm
war
e up
grad
e
T0
8/12/10 5 o’clock meeting 16
Activities in MNF - Week 49 - 8/12 Wednesday
T0
8/12/10 5 o’clock meeting 17
• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC and TC)
• From 18:00 - Cavern in General mode
• Interruption on auto-transfert network (from 07:00 till 07:05). No access underground
– all wall outlets will be interrupted– including all non-UPS outlets in the ACR (so essentially all WRs)– including outlets SXL2, offices and barracks– non-UPS power for the detector cooling plants will be interrupted– power to all gas systems will be interrupted– the UPS powered systems will not be affected, but will run on batteries for the 2 min.
interruption– the electronics racks in the cavern and CRs will not be affected.
– See https://edms.cern.ch/file/1106913/1/ENNC_2010_196.pdf
Week 49 - 9/12 ThursdayProgram
8/12/10 5 o’clock meeting 18
• ALTEAD: MNF shielding– 8:00 to 18:00: No access CR1-5 during lifting up of 5 big beams– Stabilizers (after 18:00)
• VAC: Neon injection• RAMSES: removal of Data Acquisition modules CR5• EMCal team at CERN: fit rollers on all SMs (SXL2). Start 13:30
Activities after 18:00:• TPC: replacement of damaged FECs (C-side)• TRD: Wiener PS back-plane modification and LV consolidation (L3)• Muon TRK: CROCUS firmware upgrade• T0: investigation broken amplifier (MNF and L4-rack)
Week 49 - 9/12 ThursdayActivities
8/12/10 5 o’clock meeting 19
Activities in UX25 - Week 49 - 9/12 Thursday
VAC
MNF shielding
TRD Wiener PS
TRD Wiener PS
Stabilizers
No access CR1-5 during lifting up of 5 big beams
TPC
FE
C a
nd
TRD
LV
Muo
n TR
K:
CR
OC
US
firm
war
e up
grad
e
T0
8/12/10 5 o’clock meeting 20
Activities in MNF - Week 49 - 9/12 Thursday
T0
8/12/10 5 o’clock meeting 21
Activities in UX25 - Week 49 - 10/12 Friday
Move if needed
LV156
Gas functional test (2h no access UX25 and CR1-5)
Maintenance PX24 MAD (transparent)
MNF shielding
No access CR1-5 during lifting up of 5 big beams
18:00 to 8:00: access in general mode8:00 to 18:00: no access UX25 (except Transport)
TRD Wiener PS
TRD Wiener PS
TPC
FE
C a
nd
TRD
LV
EMCal team at CERN: fit rollers on all SMs
Muo
n TR
K:
CR
OC
US
firm
war
e up
grad
e
8/12/10 5 o’clock meeting 22
Activities in MNF - Week 49 - 10/12 Friday
8:00 to 18:00: no access UX2518:00 to 8:00: access in general mode
8/12/10 5 o’clock meeting 23
Activities in UX25 - Week 49 - 11/12 Saturday
LV156
MNF shielding
18:00 to 8:00: access in general mode8:00 to 18:00: no access UX25 (except Transport)
TRD Wiener PS
TRD Wiener PS
TRD
LV
8/12/10 5 o’clock meeting 24
Activities in MNF - Week 49 - 11/12 Saturday
8:00 to 18:00: no access UX2518:00 to 8:00: access in general mode
8/12/10 5 o’clock meeting 25
Activities in UX25 - Week 49 - 12/12 Sunday
Access in general mode
8/12/10 5 o’clock meeting 26
Activities in MNF - Week 49 - 12/12 Sunday
Access in general mode
8/12/10 5 o’clock meeting 27
DCS plans• Wk 49
– Tue 7/12 10:00 – 12:00: interruptions of the GPN link to/from P2• No connectivity on GPN (mail on laptops etc.); could have impact on running
systems (is the main reason for this test: try to spot dependencies)• Done – switch upgraded to 10x higher bandwidth; experienced blockage of
DCS; to be investigated more tests needed later.– Wed 8/12 – Fri 10/12 (daytime): SW upgrades and patches to central
systems, to detectors on request only (Operating system and PVSS)• Systems unavailable for short (~hrs) periods, frequent reboots
André / Peter
8/12/10 5 o’clock meeting 28
AOB
• -