8/12/105 o’clock meeting3 Access request Cavern and surface You should submit an ADI and a task procedure Two persons minimum Work breakdown structure – risk associated at each step ADI https://edh.cern.ch/Document/ADI Task procedure Template EDMS Attach task procedure

Transcript of ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here: The full shutdown planning.

Page 1: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 1

ALICE 5 o’clock meeting

Wk 49

Page 2: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 2

INDICO

• You’ll find this meeting here:– http://indico.cern.ch/categoryDisplay.py?categId=2957

• The full shutdown planning is here:– http://indico.cern.ch/conferenceDisplay.py?confId=116294

Page 3: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 3

Access requestCavern and surface

• You should submit an ADI and a task procedure

Two persons minimum

Work breakdown structure – risk associated at each step

ADIhttps://edh.cern.ch/Document/ADI

Task procedureTemplate EDMS 1103355

Attach task procedure

Page 4: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 4

ALICE Christmas break schedule

OpenOpenExperimentExperiment

TRDTRD EMCalEMCal CloseCloseExperimentExperiment

Open L3 doors

Close L3doors

Page 5: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 5

UX25 access

Rules for access restrictions:Removal/installation of shielding (restriction includes RB24 triplets)

• PX24 blocks: no access CR5 and UX25• PX24 beams (35t): no access CR1-5, Expo, and UX-25• All other blocks: no access to UX-25

LHC evacuation test (7/12 after 18:00 and 24/12 tbc) – no access UX25Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25DSO test (12-13/1) (Department Safety Officer) – no access UX25

No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)

Page 6: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 6

L3 (and MNF) access

NoVentilation

EMCal EMCal

EMCal

NoVentilation

+AUG

Wks 50 and 4: access (TPC) to be coordinated with TC (transport)Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day)

When moving from low-beta to yellow platform: no access to MNFWhen inserting the module: no access L3 and MNF

Watcher needed in wk 49 and from wk 4 onwardsWk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC)

24 31

Evac.

Page 7: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

Day-by-day schedule

UX25 and MNF - Wk 49

Page 8: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 8

• 18:00: end HI program– Ramp down both magnets. !!! Emergency dump !!!

• 18:00 – 22:00: access system test. No access UX25• 22:00: RPE survey (Jiri + 2nd person)

– Then go to restricted mode

Week 49 - 6/12 MondayProgram

Page 9: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 9

Activities in UX25 - Week 49 - 6/12 Monday

No access UX-25 - possibility of access from 22:00

ITECO

HAULOTTE

TRD team at CERN: 6 to 10/12

Page 10: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 10

• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)

• 8:30 - 9:30: RP liquid (and gas) sampling (Adeline, Pierre)– Collect RP samples (Fernando, Philippe)– Survey L3 and Dipole

• 18:00 - 21:00: evacuation test – No access UX25• From 21:00 - Cavern in General mode

• 14:00 - 15:00: Portuguese Press visit. 10 persons

Week 49 - 7/12 TuesdayProgram

Page 11: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 11

• ALTEAD: PX24 shielding blocks – top layer removed– 8:00 to 18:00: no access CR5

• Reinstall crane electronics - Problems (ongoing)• 14:00 to 15:00: put SM16 into the rotator - Ongoing• VAC: Neon injection preparation - Started

– Transport needed (EDH 4472100) – Rack moved by hand– Remove “green fence” (P2 technician) - Done

• Stop flammable gases i-C4H10 and CH4 (Ar/H2 on 10/12) - Done• 8:30: Lock L3+Dipole power converter + compensator magnet - Done• Test transmission of alarm lift to FB - Done• 8:30: inspection PHOS cooling plant (Arturo, Dominique, Philippe, Sasha) – Done

(will install temporary line)• 15:15: VIC SPD – Done + Gas VIC• DCS: 10:00 – 12:00, interruptions of the GPN link to/from P2 – Done. DCS got stuck.

Investigating why• MCR (Magnet Control Room): HW modifications (Pascal B.) – Started• TRD (after 21:00): Wiener PS back-plane modification and LV consolidation (L3)

Week 49 - 7/12 TuesdayActivities

Page 12: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 12

Activities in UX25 - Week 49 - 7/12 Tuesday

VAC

RP samples

PX24 shielding: blocks

TRD Wiener PS

TRD Wiener PS

Page 13: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 13

• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)

• From 18:00 - Cavern in General mode

• 18:00: Confined Space Training– Tour in L3 at the end of the course

Week 49 - 8/12 WednesdayProgram

Page 14: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 14

• ALTEAD: PX24 shielding beams (35t) - Done– 8:00 to 16:30: no access CR1-5 and Expo– Move ITECO C-side - Ongoing

• EN-HE: Reinstall crane electronics – Done. Crane operational• VAC: Neon injection – injection table prepared. Neon injected tomorrow afternoon

Activities after 16:30:• EN-CV: empty TPC tank - Ongoing• TPC: replacement of damaged FECs (C-side) - Ongoing• TRD: pretrigger PS work done. Wiener PS back-plane modification (SXL2, almost

done). Start re-installing Wieners tonight.• SPD: cut inox pipes - Done• Muon TRK: CROCUS firmware upgrade• Muon TRG: Maintenance Local decision electronics and upgrade FE threshold

distributors – Will start at 17:00• T0: investigation broken amplifier (MNF and L4-rack) - Ongoing

Week 49 - 8/12 WednesdayActivities

Page 15: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 15

Activities in UX25 - Week 49 - 8/12 Wednesday

PX24 shielding:

beams (35t)

VAC

MoveTRD Wiener PS

TRD Wiener PS

Cut SPD pipes

Stabilizers

Muon TRG

TPC

FE

C a

nd

TRD

LV

TPC cooling

Muo

n TR

K:

CR

OC

US

firm

war

e up

grad

e

T0

Page 16: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 16

Activities in MNF - Week 49 - 8/12 Wednesday

T0

Page 17: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 17

• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC and TC)

• From 18:00 - Cavern in General mode

• Interruption on auto-transfert network (from 07:00 till 07:05). No access underground

– all wall outlets will be interrupted– including all non-UPS outlets in the ACR (so essentially all WRs)– including outlets SXL2, offices and barracks– non-UPS power for the detector cooling plants will be interrupted– power to all gas systems will be interrupted– the UPS powered systems will not be affected, but will run on batteries for the 2 min.

interruption– the electronics racks in the cavern and CRs will not be affected.

– See https://edms.cern.ch/file/1106913/1/ENNC_2010_196.pdf

Week 49 - 9/12 ThursdayProgram

Page 18: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 18

• ALTEAD: MNF shielding– 8:00 to 18:00: No access CR1-5 during lifting up of 5 big beams– Stabilizers (after 18:00)

• VAC: Neon injection• RAMSES: removal of Data Acquisition modules CR5• EMCal team at CERN: fit rollers on all SMs (SXL2). Start 13:30

Activities after 18:00:• TPC: replacement of damaged FECs (C-side)• TRD: Wiener PS back-plane modification and LV consolidation (L3)• Muon TRK: CROCUS firmware upgrade• T0: investigation broken amplifier (MNF and L4-rack)

Week 49 - 9/12 ThursdayActivities

Page 19: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 19

Activities in UX25 - Week 49 - 9/12 Thursday

VAC

MNF shielding

TRD Wiener PS

TRD Wiener PS

Stabilizers

No access CR1-5 during lifting up of 5 big beams

TPC

FE

C a

nd

TRD

LV

Muo

n TR

K:

CR

OC

US

firm

war

e up

grad

e

T0

Page 20: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 20

Activities in MNF - Week 49 - 9/12 Thursday

T0

Page 21: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 21

Activities in UX25 - Week 49 - 10/12 Friday

Move if needed

LV156

Gas functional test (2h no access UX25 and CR1-5)

Maintenance PX24 MAD (transparent)

MNF shielding

No access CR1-5 during lifting up of 5 big beams

18:00 to 8:00: access in general mode8:00 to 18:00: no access UX25 (except Transport)

TRD Wiener PS

TRD Wiener PS

TPC

FE

C a

nd

TRD

LV

EMCal team at CERN: fit rollers on all SMs

Muo

n TR

K:

CR

OC

US

firm

war

e up

grad

e

Page 22: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 22

Activities in MNF - Week 49 - 10/12 Friday

8:00 to 18:00: no access UX2518:00 to 8:00: access in general mode

Page 23: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 23

Activities in UX25 - Week 49 - 11/12 Saturday

LV156

MNF shielding

18:00 to 8:00: access in general mode8:00 to 18:00: no access UX25 (except Transport)

TRD Wiener PS

TRD Wiener PS

TRD

LV

Page 24: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 24

Activities in MNF - Week 49 - 11/12 Saturday

8:00 to 18:00: no access UX2518:00 to 8:00: access in general mode

Page 25: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 25

Activities in UX25 - Week 49 - 12/12 Sunday

Access in general mode

Page 26: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 26

Activities in MNF - Week 49 - 12/12 Sunday

Access in general mode

Page 27: ALICE 5 oclock meeting Wk 49. INDICO Youll find this meeting here:   The full shutdown planning.

8/12/10 5 o’clock meeting 27

DCS plans• Wk 49

– Tue 7/12 10:00 – 12:00: interruptions of the GPN link to/from P2• No connectivity on GPN (mail on laptops etc.); could have impact on running

systems (is the main reason for this test: try to spot dependencies)• Done – switch upgraded to 10x higher bandwidth; experienced blockage of

DCS; to be investigated more tests needed later.– Wed 8/12 – Fri 10/12 (daytime): SW upgrades and patches to central

systems, to detectors on request only (Operating system and PVSS)• Systems unavailable for short (~hrs) periods, frequent reboots

André / Peter